Cooperative expansion joint structure system of material storage structure
By designing a collaborative expansion joint structure system in the material library structure, and using different forms of expansion joints and connecting structures, the problem of large differences in deformation of each single body in the existing technology is solved, and the coordinated deformation and overall performance improvement of the material library structure are achieved.
Patent Information
- Application Number
- CN202111410965.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-25
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2041-11-25
AI Technical Summary
When the expansion joints of existing structural structures face temperature changes, the deformation of each monomer varies greatly, resulting in poor overall performance, which especially has an adverse impact on the smooth operation of the equipment.
Design a coordinated expansion joint structure system for the material library structure. By setting different expansion joint forms in different parts of the material library, including the first to fifth expansion joint structures, the connecting structure of steel bars and steel pipes, as well as the serrated and tenon structures, the coordinated deformation and overall coordination of the structure are achieved.
Effectively reduce the impact of deformation of the expansion joint of the material warehouse, improve the overall working effect of the structure, ensure smooth operation of the equipment, and reduce the adverse effects of the temperature effect.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of temperature stress of industrial material yards and building structures, and in particular to a cooperative working expansion joint structural system of a material storage structure. Background Art
[0002] In order to prevent temperature changes caused by climate and other factors from causing cracks or structural damage, most of the existing structural expansion joints are directly cut at appropriate locations to set horizontal or vertical through seams. The structure is divided into several independent monomers, each of which is subjected to force, thereby reducing the adverse effects of temperature forces. The disadvantages of this are that the deformation of each monomer is greatly different and the overall performance is poor, which has an adverse effect on the smooth operation of the equipment.
[0003] Therefore, the inventor, relying on his many years of experience and practice in related industries, proposes a cooperative expansion joint structure system of a material storage structure to overcome the defects of the prior art. Summary of the invention
[0004] The object of the present invention is to provide a cooperative working expansion joint structural system of a material storage structure. The present invention arranges different expansion joint forms according to the actual conditions of each component, which can effectively reduce the influence of deformation of the expansion joint of the material storage, improve the overall working effect of the structure, and make the equipment run more smoothly.
[0005] The object of the present invention is achieved by providing a cooperative expansion joint structure system of a material storage structure, comprising:
[0006] A plurality of first expansion joint structures are arranged at intervals on the low retaining wall of the material storage, including first slits vertically penetrating the low retaining wall, the vertical positions of the first slits are arranged in the same manner; and the cross-section of the first slits is arranged in a rectangular shape;
[0007] A plurality of second expansion joint structures are arranged at intervals on the middle retaining wall of the material storage, including second slits penetrating the middle retaining wall, the vertical positions of the second slits are arranged in the same manner, and the cross-sections of the second slits are arranged in a single sawtooth shape;
[0008] A plurality of third expansion joint structures are arranged at intervals between the middle platform columns of the material storage, including a third slit penetrating the middle platform column, the vertical positions of the third slits are arranged in the same manner, the third slits are arranged above the second slits and penetrating the second slits, and the cross section of each third slit is arranged in a single sawtooth shape;
[0009] A plurality of fourth expansion joint structures are arranged at intervals between the middle platform beams of the material warehouse, including fourth gaps between the middle platform beams, and the vertical positions of the fourth gaps are arranged in the same manner;
[0010] A plurality of fifth expansion joint structures are arranged at intervals between the middle platform plates of the material storage, including fifth gaps arranged between the middle platform plates, the vertical positions of the fifth gaps are arranged in the same manner, and the cross-sections of the fifth gaps are arranged in a continuously arranged serrated shape.
[0011] In a preferred embodiment of the present invention, a first basic raft is arranged at the bottom of the first gap, and two ends of the first basic raft are respectively located at the bottom of the low retaining walls on both sides of the first gap.
[0012] In a preferred embodiment of the present invention, each of the first expansion joint structures also includes a first connecting structure, which includes a plurality of first steel bars and a plurality of first steel pipes, each of the first steel bars is arranged in a low retaining wall on one side of the first gap, extending from one side of the first gap to the other side, and each of the first steel pipes is arranged in the low retaining wall on the other side of the first gap, and the first steel bars can be slidably passed through the first steel pipes.
[0013] In a preferred embodiment of the present invention, the diameter of each of the first steel bars is greater than or equal to 25 mm; the buried depth of each of the first steel bars in the low retaining wall on one side of the first gap is greater than or equal to 35 times the diameter of the first steel bar; the depth of each of the first steel pipes is greater than the length of each of the first steel bars exposed from the low retaining wall on one side of the first gap.
[0014] In a preferred embodiment of the present invention, each of the first gaps is filled with a first leak-proof portion that can be horizontally retracted.
[0015] In a preferred embodiment of the present invention, a first protrusion extending in a horizontal direction is provided on the middle retaining wall on one side of the second gap, and a first groove is provided on the middle retaining wall on the other side of the second gap, and the first protrusion can be slidably inserted into the first groove; a second basic raft is provided at the bottom of the second gap, and two ends of the second basic raft are respectively located at the bottom of the middle retaining wall on both sides of the second gap.
[0016] In a preferred embodiment of the present invention, each of the second expansion joint structures also includes a second connecting structure, the second connecting structure includes a plurality of second steel bars and a plurality of second steel pipes, each of the second steel bars extends from the first protrusion to the first groove, the second steel pipe is arranged in the middle retaining wall on one side of the first groove, and the second steel bar can be slidably passed through the second steel pipe.
[0017] In a preferred embodiment of the present invention, the diameter of each of the second steel bars is greater than or equal to 25 mm; the depth of each of the second steel pipes is greater than the length of each of the second steel bars exposed from the first protrusion.
[0018] In a preferred embodiment of the present invention, each of the second gaps is filled with a second leak-proof portion that can be expanded and contracted horizontally.
[0019] In a preferred embodiment of the present invention, a second protrusion extending in the horizontal direction is provided on the middle platform column on one side of the third gap, and a second groove is provided on the middle platform column on the other side of the third gap, and the second protrusion can be slidably inserted into the second groove.
[0020] In a preferred embodiment of the present invention, each of the third gaps is filled with a third leak-proof portion that can be expanded and contracted horizontally.
[0021] In a preferred embodiment of the present invention, a plurality of mortise and tenon structures are distributed at equal intervals between the intermediate platform beams on both sides of the fourth gap.
[0022] In a preferred embodiment of the present invention, each of the mortise and tenon structures includes a first mortise and tenon portion and a second mortise and tenon portion, respectively, and a plurality of first embedded parts and a plurality of second embedded parts are respectively preset in the middle layer platform beam on both sides of the fourth gap, each of the first embedded parts is connected to the first mortise and tenon portion, and each of the second embedded parts is connected to the second mortise and tenon portion.
[0023] In a preferred embodiment of the present invention, the first mortise and tenon portion includes two first mortise and tenon units spaced apart from each other, and the second mortise and tenon portion includes a second mortise and tenon unit, and the second mortise and tenon unit can be slidably inserted between the two first mortise and tenon units.
[0024] In a preferred embodiment of the present invention, each of the first mortise and tenon units includes three first steel plates arranged in parallel and at intervals, the two ends of each of the first steel plates are respectively connected to the second steel plates, and the two second steel plates are arranged in parallel; each of the second mortise and tenon units includes three first steel plates arranged in parallel and at intervals, the two ends of each of the first steel plates are respectively connected to the second steel plates, and the two second steel plates are arranged in parallel.
[0025] In a preferred embodiment of the present invention, the first embedded part includes an embedded steel plate, on which a plurality of embedded anchor bars and a plurality of embedded anchor-shaped steels are arranged; the second embedded part includes an embedded steel plate, on which a plurality of embedded anchor bars and a plurality of embedded anchor-shaped steels are arranged.
[0026] In a preferred embodiment of the present invention, a first continuous serration portion and a second continuous serration portion are respectively arranged on the middle layer platform plate on both sides of the fifth gap, the teeth of the first continuous serration portion and the teeth of the second continuous serration portion are staggered, and the first continuous serration portion and the second continuous serration portion are inserted into each other.
[0027] In a preferred embodiment of the present invention, the middle platform plate is provided with a lower cantilever platform below the first serration portion.
[0028] In a preferred embodiment of the present invention, each of the fifth gaps is filled with a fifth leak-proof portion that can be horizontally retracted and contracted.
[0029] As described above, the cooperative expansion joint structure system of the material storage structure of the present invention has the following beneficial effects:
[0030] In the cooperative expansion joint structure system of the material storage structure provided by the present invention, different expansion joint forms are set according to the actual conditions of each component, so that the material storage structure can not only meet the free deformation of the structure along the length direction, but also realize the coordinated deformation of the material storage structure in the vertical direction and the vertical direction; the first expansion joint structure and the second expansion joint structure can ensure the cooperative work of the structure under the pressure of stacking materials while meeting the effect of temperature expansion and contraction; the third expansion joint structure, the fourth expansion joint structure and the fifth expansion joint structure can effectively adjust the deformation of the platform in the vertical and horizontal directions while meeting the effect of temperature expansion and contraction; the expansion joints of each expansion joint structure are respectively in the same vertical position, ensuring the functionality of each expansion joint structure in the present invention and the overall coordination of the structure, the structural integrity is better, the adverse effects of deformation are eliminated, the good operation of stacking materials and platform rail vehicles is met, the smooth operation of the material storage structure is ensured, and the adverse effects of temperature effects are reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The following drawings are intended only to illustrate and explain the present invention, and are not intended to limit the scope of the present invention.
[0032] Figure 1 : is a schematic diagram of the first expansion joint structure of the present invention.
[0033] Figure 2 : is a schematic diagram of the exploded state of the first expansion joint structure of the present invention.
[0034] Figure 3 :for Figure 1 Middle AA section view.
[0035] Figure 4 : is a schematic diagram of the second expansion joint structure of the present invention.
[0036] Figure 5 : is a schematic diagram of the exploded state of the second expansion joint structure of the present invention.
[0037] Figure 6 : is a schematic diagram of the third expansion joint structure of the present invention.
[0038] Figure 7 : is a schematic diagram of the exploded state of the third expansion joint structure of the present invention.
[0039] Figure 8 : is a schematic diagram of the fourth expansion joint structure of the present invention.
[0040] Fig. 9 :for Figure 8 Middle BB section view.
[0041] Fig.10 :for Figure 8 Middle CC section view.
[0042] Fig.11 : is a schematic diagram of the first mortise and tenon unit of the present invention.
[0043] Fig.12 : is a schematic diagram of the first embedded part of the present invention.
[0044] Fig.13 :for Fig.12 Center F view.
[0045] Fig.14 : It is a schematic diagram of the connection between the embedded anchor bar and the embedded steel plate of the present invention.
[0046] Fig.15 : is a schematic diagram of the fifth expansion joint structure of the present invention.
[0047] Fig.16 : is a schematic diagram of the exploded state of the fifth expansion joint structure of the present invention.
[0048] Fig.17 :for Fig.15 Center G view.
[0049] Fig.18 : A top view of the material storage structure.
[0050] Fig.19 :for Fig.18 Middle DD section view.
[0051] Fig. 20 :for Fig.18 EE section view.
[0052] In the figure:
[0053] 1. The first expansion joint structure;
[0054] 11. first gap; 12. first steel bar; 13. first steel pipe;
[0055] 2. Second expansion joint structure;
[0056] 21. second gap; 22. first protrusion; 23. first groove; 24. second steel bar; 25. second steel pipe; 26. first edge protection angle steel;
[0057] 3. The third expansion joint structure;
[0058] 31. third gap; 32. second protrusion; 33. second groove;
[0059] 4. The fourth expansion joint structure;
[0060] 41. fourth gap; 42. mortise and tenon structure; 421. first mortise and tenon part; 422. second mortise and tenon part; 431. first embedded part; 432. second embedded part; 441. first steel plate; 442. second steel plate; 451. embedded steel plate; 452. embedded anchor bar; 453. embedded anchor steel;
[0061] 5. Fifth expansion joint structure;
[0062] 51. fifth gap; 52. first continuous serration portion; 53. second continuous serration portion; 54. second edge protection angle steel; 55. lower cantilever platform;
[0063] 6. Polystyrene foam board;
[0064] 7. Lubricating oil;
[0065] 81. Low retaining wall; 82. Middle retaining wall; 83. Middle platform column; 84. Middle platform beam; 85. Middle platform slab; 86. Horizontal partition wall. DETAILED DESCRIPTION
[0066] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described with reference to the accompanying drawings.
[0067] The specific embodiments of the present invention described herein are only used to explain the purpose of the present invention and cannot be understood as limiting the present invention in any way. Under the guidance of the present invention, technicians can conceive of any possible variations based on the present invention, which should be considered to belong to the scope of the present invention. It should be noted that when an element is referred to as "arranged on" another element, it can be directly on the other element or there can also be a central element. When an element is considered to be "connected" to another element, it can be directly connected to the other element or there may be a central element at the same time. The terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a mechanical connection or an electrical connection, or it can be the internal communication of two elements, it can be directly connected, or it can be indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to the specific circumstances. The terms "vertical", "horizontal", "up", "down", "left", "right" and similar expressions used herein are only for illustrative purposes and do not represent the only implementation method.
[0068] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0069] like Figures 1 to 17 As shown, the present invention provides a cooperative expansion joint structure system of a material storage structure, which is arranged in a material storage structure (such as Fig.18 , Fig.19 , Fig. 20 shown), including,
[0070] A plurality of first expansion joint structures 1 are arranged at intervals on the low retaining wall 81 of the material storage, and include first slits 11 vertically penetrating the low retaining wall, and the vertical positions of the first slits 11 are arranged in the same manner; and the cross-section of each first slit 11 is arranged in a rectangular shape;
[0071] A plurality of second expansion joint structures 2 are arranged at intervals on the middle retaining wall 82 of the material storage, including second slits 21 penetrating the middle retaining wall, the vertical positions of the second slits 21 are arranged in the same manner, and the cross-sections of the second slits 21 are arranged in a single sawtooth shape;
[0072] A plurality of third expansion joint structures 3 are arranged at intervals between the middle platform columns 83 of the material storage, including third slits 31 penetrating the middle platform columns, the vertical positions of the third slits 31 are arranged in the same manner, the third slits 31 are arranged above the second slits 21 and are arranged penetrating with the second slits 21, and the cross section of each third slit 31 is arranged in a single sawtooth shape;
[0073] A plurality of fourth expansion joint structures 4 are arranged at intervals between the middle platform beams 84 of the material warehouse, including fourth gaps 41 between the middle platform beams, and the vertical positions of the fourth gaps 41 are arranged in the same manner;
[0074] A plurality of fifth expansion joint structures 5 are spaced apart between the middle platform plates 85 of the material storage (in the prior art, the middle platform plates support tracks, and the tracks support running vehicles), including fifth gaps 51 arranged between the middle platform plates. The vertical positions of the fifth gaps 51 are arranged in the same manner, and the cross-sections of the fifth gaps 51 are arranged in a continuously arranged serrated shape.
[0075] In the cooperative expansion joint structure system of the material storage structure provided by the present invention, different expansion joint forms are set according to the actual conditions of each component, so that the material storage structure can not only meet the free deformation of the structure along the length direction, but also realize the coordinated deformation of the material storage structure in the vertical direction and the vertical direction; the first expansion joint structure and the second expansion joint structure can ensure the cooperative work of the structure under the pressure of stacking materials while meeting the effect of temperature expansion and contraction; the third expansion joint structure, the fourth expansion joint structure and the fifth expansion joint structure can effectively adjust the deformation of the platform in the vertical and horizontal directions while meeting the effect of temperature expansion and contraction; the expansion joints of each expansion joint structure are respectively in the same vertical position, ensuring the functionality of each expansion joint structure in the present invention and the overall coordination of the structure, the structural integrity is better, the adverse effects of deformation are eliminated, the good operation of stacking materials and platform rail vehicles is met, the smooth operation of the material storage structure is ensured, and the adverse effects of temperature effects are reduced.
[0076] Further, if Figure 1 , Figure 2 , Figure 3 As shown, a first basic raft is arranged at the bottom of the first gap 11, and the two ends of the first basic raft are respectively located at the bottom of the low retaining wall on both sides of the first gap. The first gap 11 is vertically through-arranged to completely separate the low retaining wall into two left and right parts, but the left and right low retaining walls share a first basic raft, reducing the additional deformation stress caused by uneven settlement on the position of the first gap 11.
[0077] In a specific embodiment of the present invention, the width of the first gap 11 is 50 mm to 100 mm, which satisfies the expansion or contraction of the wall of the short retaining wall between the first gaps 11 under the action of temperature stress.
[0078] In a specific embodiment of the present invention, the first gap 11 is arranged in the middle of a single material grid of the material warehouse, that is, the position where the constraint effect of the horizontal partition wall 86 (existing technology) is minimal; the adjacent spacing of the first gaps 11 is not greater than 80m.
[0079] Further, if Figure 1 , Figure 2 , Figure 3 As shown, each first expansion joint structure also includes a first connecting structure, which includes a plurality of first steel bars 12 and a plurality of first steel pipes 13. Each first steel bar 12 is arranged (pre-buried) in the low retaining wall on one side of the first gap, extending from one side of the first gap to the other side. The plurality of first steel bars 12 are located at the center line position of the low retaining wall on one side of the first gap, and are arranged at equal intervals from the bottom of the wall to the top of the wall; each first steel pipe 13 is arranged (pre-buried) in the low retaining wall on the other side of the first gap, located at its center line position, and each first steel pipe 13 is arranged corresponding to each first steel bar 12, and the first steel bar 12 can be slidably passed through the first steel pipe 13.
[0080] In a specific embodiment of the present invention, the first reinforcement 12 includes vertical sections and horizontal sections, each of which is spaced 200 mm apart.
[0081] Furthermore, the diameter of each first steel bar 12 is greater than or equal to 25 mm. In a specific embodiment of the present invention, the diameter d of the first steel bar is 32 mm. The first steel pipe 13 is a stainless steel pipe with a diameter of 45 mm and a wall thickness of 3 to 5 mm.
[0082] Each first steel bar 12 is located on the short retaining wall ( Figure 4 The buried depth of the low retaining wall on the left side of the middle is greater than or equal to 35 times the diameter d of the first steel bar; the length of the low retaining wall on the side of each first steel bar 12 exposed from the first gap is greater than or equal to 15 times the diameter d of the first steel bar.
[0083] In order to facilitate the sliding of the first steel bar 12 in the first steel pipe 13, a layer of lubricating oil 7 is evenly applied to the inner wall of the first steel pipe 13. In order to prevent the lubricating oil from flowing back, the mouth of the first steel pipe 13 should be slightly higher than the bottom of the pipe by 5mm. The depth dimension of each first steel pipe 13 is greater than the length dimension of the low retaining wall on the side of each first steel bar 12 exposed from the first gap. Generally, the length of the first steel pipe 13 is not less than 15d+200mm, which is convenient for the storage of the rich lubricating oil and maintains the durability of the use of the first gap 11. Generally, the bottom of the first steel pipe 13 is pre-filled with 200mm deep lubricating oil 7.
[0084] Since the gap between the pre-buried first steel bar 12 and the first steel pipe 13 is small, the shear bearing capacity between the first steel bar 12 and the first steel pipe 13 can be used to constrain the vertical deformation difference and ensure the structural integrity of the first gap 11 of the low retaining wall of the material warehouse in resisting the stockpile pressure.
[0085] Further, if Figure 1 As shown, to prevent leakage of the internal material, each first gap 11 is filled with a first leak-proof part that can be horizontally extended. In this embodiment, the first leak-proof part is a polystyrene foam board 6, which provides a buffering effect for the extension and contraction deformation.
[0086] Further, if Figure 4 , Figure 5 As shown, a first protrusion 22 extending in the horizontal direction is provided on the intermediate retaining wall 82 on one side of the second gap 21, and a first groove 23 is provided on the intermediate retaining wall on the other side of the second gap. The first protrusion 22 can be slidably inserted into the first groove 23, and there is a gap between the side surface of the first protrusion 22 and the side surface of the first groove 23, so that the cross-section of the second gap 21 is a single sawtooth shape; a second basic raft is provided at the bottom of the second gap, and both ends of the second basic raft are respectively located at the bottom of the intermediate retaining wall on both sides of the second gap, so as to reduce the additional deformation stress brought by uneven settlement to the expansion joint position.
[0087] The second gap 21 has a gap width of 50 mm to 100 mm, which satisfies the maximum threshold of thermal expansion and contraction in the longitudinal direction (horizontal length direction) of the middle retaining wall 82 between the expansion joints under the maximum temperature difference.
[0088] Since the second gap 21 on the middle retaining wall 82 needs to bear a large material stacking thrust, the shear bearing capacity between the anchor steel bars and the embedded sleeves in the prior art is not enough to resist deformation and ensure overall coordinated deformation, and a reinforced concrete structure (first protrusion 22 and first groove 23) needs to be added to help the middle retaining wall 82 on both sides of the second gap 21 of the material warehouse work together. The first protrusion 22 is continuously arranged from the bottom of the wall to the top of the wall, and the first groove 23 is arranged corresponding to the first protrusion 22, and it is necessary to ensure that the two can be stuck together.
[0089] The second gap 21 is arranged in the middle of a single material grid of the material warehouse, that is, the position where the constraint effect of the horizontal partition wall is minimal. The spacing between adjacent second gaps 21 is not greater than 80m.
[0090] In a specific embodiment of the present invention, the dimension of the first protrusion 22 along the wall thickness direction of the middle retaining wall 82 is one third of the wall thickness, the dimension of the first protrusion 22 protruding from the middle retaining wall 82 is 300 mm, and the depth of the first groove 23 is 300+50-100 mm.
[0091] Further, if Figure 4 , Figure 5 As shown, each second expansion joint structure also includes a second connection structure, which includes a plurality of second steel bars 24 and a plurality of second steel pipes 25. Each second steel bar 24 (pre-buried) extends from the first protrusion to the first groove, and the second steel pipe 25 is arranged in the middle retaining wall on one side of the first groove, and the second steel bar 24 can be slidably penetrated in the second steel pipe 25. The plurality of second steel bars 24 are located at the center line position of the first protrusion 22, and are arranged at equal intervals from the bottom of the wall to the top of the wall; each second steel pipe 25 is arranged (pre-buried) in the middle retaining wall on one side of the first groove, located at its center line position, and each second steel pipe 25 is arranged corresponding to each second steel bar 24.
[0092] In this embodiment, the diameter of each second steel bar 24 is greater than or equal to 25 mm; the depth of each second steel tube 25 is greater than the length of each second steel bar exposed from the first protrusion. In a specific embodiment of the present invention, the depth of each second steel tube 25 is 200 mm or more greater than the length of each second steel bar exposed from the first protrusion, which is convenient for storing the rich lubricating oil. The second steel bar 24 and the first steel bar 12 can be made of the same specification steel bars, and the second steel tube 25 and the first steel tube 13 can be made of the same specification steel bars. The cooperation and function between the second steel bar 24 and the second steel tube 25 are the same as the cooperation and function between the first steel bar 12 and the first steel tube 13.
[0093] In order to protect the first protrusion 22 and the first groove 23 from being damaged when working together, a first edge protection angle steel 26 (L160×100×10mm) is buried in the relevant positive corners of the two, and lubricating oil is evenly applied on the surface to ensure free expansion and contraction under the action of temperature changes, and the shear force between the first protrusion 22 and the first groove 23 is used in the vertical direction to provide constraints to ensure the coordinated whole, so as to maintain the durability and reliability of the second gap 21 in the middle retaining wall of the material warehouse.
[0094] Furthermore, to prevent leakage of the internal material, each second gap is filled with a second leak-proof part that can be horizontally extended. In this embodiment, the second leak-proof part is a polystyrene foam board 6, which provides a buffering effect for the extension and deformation.
[0095] Further, if Figure 6 , Figure 7 As shown, a second protrusion 32 extending in the horizontal direction is provided on the middle platform column on one side of the third gap, and a second groove 33 is provided on the middle platform column on the other side of the third gap. The second protrusion 32 can be slidably inserted into the second groove 33. There are gaps between the top surface and the side surface of the second protrusion 32 and the bottom and side surface of the second groove 33 respectively, so that the cross section of the third gap 31 is a single sawtooth shape.
[0096] The gap width of the third gap 31 is between 50 mm and 100 mm, which meets the maximum threshold of thermal expansion and contraction caused by the maximum temperature difference in the longitudinal direction of the middle platform column between the expansion joints.
[0097] The third gap 31 continues the second gap 21 of the middle retaining wall. The method is the same as the second gap 21 of the middle retaining wall. The middle platform column is provided with denser stirrups and longitudinal steel bars, so it is not suitable to pre-embed steel bars and steel pipes to ensure that the bearing capacity of the structural column is not weakened. The second groove 33 is provided corresponding to the second protrusion 32, and it is necessary to ensure that the two can be stuck together to ensure free deformation and synergy.
[0098] Furthermore, each third gap 31 is filled with a third leak-proof part that can be horizontally extended and retracted. In this embodiment, the third leak-proof part is a polystyrene foam board 6, which provides a buffering effect for the expansion and contraction deformation.
[0099] Further, if Figure 8 As shown, multiple mortise and tenon structures 42 are evenly spaced between the middle platform beams 84 on both sides of the fourth gap. It provides the structure with the ability to deform freely in the horizontal and vertical directions, constrains the vertical settlement difference of the middle platform beams 84 on both sides of the fourth gap, ensures the flatness of the platform structure, and enables the upper track (in the prior art, located on the middle platform beam 84) to run smoothly.
[0100] The gap width of the fourth gap 41 is between 50 mm and 100 mm, which meets the maximum threshold of thermal expansion and contraction of the middle layer platform beam 84 between the expansion joints under the maximum temperature difference in the longitudinal direction.
[0101] Further, if Fig. 9 , Fig.10 As shown, each mortise and tenon structure includes a first mortise and tenon portion 421 and a second mortise and tenon portion 422, respectively. A plurality of first embedded parts 431 and a plurality of second embedded parts 432 are respectively preset in the middle layer platform beams on both sides of the fourth gap, and each first embedded part 431 is connected to the first mortise and tenon portion 421, and each second embedded part 432 is connected to the second mortise and tenon portion 422.
[0102] During construction, the first embedded part 431 and the second embedded part 432 are embedded in the beam side of the middle platform beam 84, and then the first mortise and tenon portion 421 and the second mortise and tenon portion 422 are welded to the first embedded part 431 and the second embedded part 432 respectively.
[0103] In this embodiment, the first mortise and tenon portion 421 includes two first mortise and tenon units spaced apart from each other, and the second mortise and tenon portion 422 includes a second mortise and tenon unit, which is slidably inserted between the two first mortise and tenon units.
[0104] Two rows of first mortise and tenon units are arranged on the side of the middle platform beam 84 on one side of the fourth gap, and a row of second mortise and tenon units is arranged in the middle of the side of the middle platform beam 84 on the other side of the fourth gap, so as to ensure that the first mortise and tenon parts 421 and the second mortise and tenon parts 422 on both sides can fit each other and provide resistance to restrict the settlement difference. Lubricant is evenly applied to the surfaces of the first mortise and tenon units to ensure smooth left and right extension and extension, and the upper and lower constraints ensure uniform platform settlement.
[0105] Further, if Fig.11 As shown, each first mortise and tenon unit includes three first steel plates 441 arranged in parallel and at intervals, and the two ends of each first steel plate 441 are respectively connected to the second steel plate 442, and the two second steel plates 442 are arranged in parallel; each second mortise and tenon unit includes three first steel plates 441 arranged in parallel and at intervals, and the two ends of each first steel plate are respectively connected to the second steel plate 442, and the two second steel plates are arranged in parallel. In a specific embodiment of the present invention, the first steel plate 441 is a 10 mm thick steel plate, and the second steel plate 442 is a 12 mm thick steel plate.
[0106] Further, if Fig.12 , Fig.13 , Fig.14As shown, the first embedded part 431 includes an embedded steel plate 451, on which a plurality of embedded anchor bars 452 and a plurality of embedded anchor steels 453 are arranged; the second embedded part 432 includes an embedded steel plate 451, on which a plurality of embedded anchor bars 452 and a plurality of embedded anchor steels 453 are arranged. In a specific embodiment of the present invention, the embedded steel plate 451 is made of a 20 mm thick steel plate, the embedded anchor bars 452 are made of a steel bar with a diameter of 20 mm, and the embedded anchor steel 453 is made of an I-beam with a specification of 100*63*4.5 mm. The first embedded part 431 and the second embedded part 432 are formed by vertically punching and plug welding the embedded anchor bars 452 and the embedded anchor steel 453 through the embedded steel plate 451.
[0107] In a specific embodiment of the present invention, two layers of first embedded parts 431 are pre-embedded at intervals in the upper and lower sides of the beam side of the intermediate platform beam 84 on one side of the fourth gap, with four layers evenly arranged; a layer of second embedded parts 432 is embedded in the beam side of the intermediate platform beam 84 on the other side of the fourth gap, with a total of four evenly arranged. The first mortise and tenon portion 421 and the second mortise and tenon portion 422 are both 650 mm long and are welded to the first embedded part 431 and the second embedded part 432, respectively.
[0108] Further, if Fig.15 , Fig.16 As shown, the first continuous sawtooth portion 52 and the second continuous sawtooth portion 53 are respectively arranged on the middle layer platform plate 85 on both sides of the fifth gap 51, and the saw teeth of the first continuous sawtooth portion 52 and the saw teeth of the second continuous sawtooth portion 53 are arranged in an interlaced manner, and the first continuous sawtooth portion 52 and the second continuous sawtooth portion 53 are inserted into each other. The first continuous sawtooth portion 52 and the second continuous sawtooth portion 53 are completely matched, ensuring free deformation in the length direction, working together in the vertical direction, preventing the pressure on the side of the stacking from causing vertical deformation differences on both sides of the expansion joint, and eliminating the problem of track jamming caused by track plane deformation.
[0109] The gap width of the fifth gap 51 is between 50 mm and 100 mm, which meets the maximum threshold of thermal expansion and contraction of the middle layer platform plate 85 in the longitudinal direction under the maximum temperature difference between the expansion and contraction gaps.
[0110] Further, if Fig.15 , Fig.16 As shown, in order to prevent the middle platform slab 85 from crushing the squeezed concrete when resisting vertical deformation, the first continuous serrations 52 and the second continuous serrations 53 are provided with second edge protection angle steels 54 (specifications L50×50×5mm) at the outer corners.
[0111] Further, if Fig.17 As shown, the middle platform plate is located below the first serrated portion and a lower cantilever platform 55 is provided to prevent the accident of debris falling due to the cooperative working extrusion process.
[0112] Furthermore, a fifth leak-proof part capable of horizontal expansion and contraction is filled in each fifth gap 51. In this embodiment, the fifth leak-proof part is a polystyrene foam plate 6, which provides a buffering effect for expansion and contraction deformation.
[0113] As described above, the cooperative expansion joint structure system of the material storage structure of the present invention has the following beneficial effects:
[0114] In the cooperative expansion joint structure system of the material storage structure provided by the present invention, different expansion joint forms are set according to the actual conditions of each component, so that the material storage structure can not only meet the free deformation of the structure along the length direction, but also realize the coordinated deformation of the material storage structure in the vertical direction and the vertical direction; the first expansion joint structure and the second expansion joint structure can ensure the cooperative work of the structure under the pressure of stacking materials while meeting the effect of temperature expansion and contraction; the third expansion joint structure, the fourth expansion joint structure and the fifth expansion joint structure can effectively adjust the deformation of the platform in the vertical and horizontal directions while meeting the effect of temperature expansion and contraction; the expansion joints of each expansion joint structure are respectively in the same vertical position, ensuring the functionality of each expansion joint structure in the present invention and the overall coordination of the structure, the structural integrity is better, the adverse effects of deformation are eliminated, the good operation of stacking materials and platform rail vehicles is met, the smooth operation of the material storage structure is ensured, and the adverse effects of temperature effects are reduced.
[0115] The above description is only an illustrative embodiment of the present invention and is not intended to limit the scope of the present invention. Any equivalent changes and modifications made by any person skilled in the art without departing from the concept and principle of the present invention shall fall within the scope of protection of the present invention.
Claims
1. A cooperative expansion joint structure system of a material storage structure, characterized in that: include, A plurality of first expansion joint structures are arranged at intervals on the low retaining wall of the material storage, including first slits vertically penetrating the low retaining wall, the vertical positions of the first slits are arranged in the same manner; and the cross-section of the first slits is arranged in a rectangular shape; A plurality of second expansion joint structures are arranged at intervals on the middle retaining wall of the material storage, including second slits penetrating the middle retaining wall, the vertical positions of the second slits are arranged in the same manner, and the cross-sections of the second slits are arranged in a single sawtooth shape; A plurality of third expansion joint structures are arranged at intervals between the middle platform columns of the material storage, including a third slit penetrating the middle platform column, the vertical positions of the third slits are arranged in the same manner, the third slits are arranged above the second slits and penetrating the second slits, and the cross section of each third slit is arranged in a single sawtooth shape; A plurality of fourth expansion joint structures are arranged at intervals between the middle platform beams of the material warehouse, including fourth gaps between the middle platform beams, and the vertical positions of the fourth gaps are arranged in the same manner; A plurality of fifth expansion joint structures are arranged at intervals between the intermediate platform plates of the material storage, including fifth gaps arranged between the intermediate platform plates, the vertical positions of the fifth gaps are arranged in the same manner, and the cross sections of the fifth gaps are arranged in a continuously arranged sawtooth shape; A plurality of mortise and tenon structures are evenly spaced between the intermediate platform beams on both sides of the fourth gap; Each of the mortise and tenon structures comprises a first mortise and tenon portion and a second mortise and tenon portion, respectively; a plurality of first embedded parts and a plurality of second embedded parts are respectively preset in the middle platform beam on both sides of the fourth gap; each of the first embedded parts is connected to the first mortise and tenon portion, and each of the second embedded parts is connected to the second mortise and tenon portion; The first mortise and tenon portion includes two first mortise and tenon units spaced apart from each other, and the second mortise and tenon portion includes a second mortise and tenon unit, and the second mortise and tenon unit is slidably inserted between the two first mortise and tenon units; Each of the first mortise and tenon units comprises three first steel plates arranged in parallel and at intervals, the two ends of each of the first steel plates are respectively connected to the second steel plates, and the two second steel plates are arranged in parallel; each of the second mortise and tenon units comprises three first steel plates arranged in parallel and at intervals, the two ends of each of the first steel plates are respectively connected to the second steel plates, and the two second steel plates are arranged in parallel; The first embedded part comprises an embedded steel plate, on which a plurality of embedded anchor bars and a plurality of embedded anchor-shaped steels are arranged; the second embedded part comprises an embedded steel plate, on which a plurality of embedded anchor bars and a plurality of embedded anchor-shaped steels are arranged.
2. The cooperative expansion joint structural system of the material storage structure according to claim 1, characterized in that: A first basic raft is arranged at the bottom of the first gap, and two ends of the first basic raft are respectively located at the bottom of the low retaining walls on both sides of the first gap.
3. The cooperative expansion joint structural system of the material storage structure according to claim 2, characterized in that: Each of the first expansion joint structures also includes a first connecting structure, which includes a plurality of first steel bars and a plurality of first steel pipes. Each of the first steel bars is arranged in a low retaining wall on one side of the first gap, extending from one side of the first gap to the other side. Each of the first steel pipes is arranged in a low retaining wall on the other side of the first gap, and the first steel bar can be slidably passed through the first steel pipe.
4. The cooperative expansion joint structural system of the material storage structure according to claim 3, characterized in that: The diameter of each first steel bar is greater than or equal to 25 mm; the buried depth of each first steel bar in the low retaining wall on one side of the first gap is greater than or equal to 35 times the diameter of the first steel bar; the depth of each first steel pipe is greater than the length of each first steel bar exposed from the low retaining wall on one side of the first gap.
5. The cooperative expansion joint structural system of the material storage structure according to claim 2, characterized in that: Each of the first gaps is filled with a first leak-proof portion that can be expanded and contracted horizontally.
6. The cooperative expansion joint structural system of the material storage structure according to claim 1, characterized in that: A first protrusion extending in the horizontal direction is arranged on the middle retaining wall on one side of the second gap, and a first groove is arranged on the middle retaining wall on the other side of the second gap, and the first protrusion can be slidably inserted into the first groove; a second basic raft plate is arranged at the bottom of the second gap, and two ends of the second basic raft plate are respectively located at the bottom of the middle retaining wall on both sides of the second gap.
7. The cooperative expansion joint structural system of the material storage structure according to claim 6, characterized in that: Each of the second expansion joint structures also includes a second connecting structure, which includes a plurality of second steel bars and a plurality of second steel pipes. Each of the second steel bars extends from the first protrusion to the first groove. The second steel pipe is arranged in the middle retaining wall on one side of the first groove. The second steel bar can be slidably passed through the second steel pipe.
8. The cooperative expansion joint structural system of the material storage structure according to claim 7, characterized in that: The diameter of each of the second steel bars is greater than or equal to 25 mm; the depth of each of the second steel pipes is greater than the length of each of the second steel bars exposed from the first protrusion.
9. The cooperative expansion joint structural system of the material storage structure according to claim 6, characterized in that: Each of the second gaps is filled with a second leak-proof portion that can be expanded and contracted horizontally.
10. The cooperative expansion joint structural system of the material storage structure according to claim 6, characterized in that: A second protrusion extending in the horizontal direction is arranged on the middle platform column on one side of the third gap, and a second groove is arranged on the middle platform column on the other side of the third gap, and the second protrusion can be slidably inserted into the second groove.
11. The cooperative expansion joint structural system of the material storage structure according to claim 10, characterized in that: Each of the third gaps is filled with a third leak-proof portion that can be stretched and retracted horizontally.
12. The cooperative expansion joint structural system of the material storage structure according to claim 1, characterized in that: A first continuous sawtooth portion and a second continuous sawtooth portion are respectively arranged on the middle layer platform plate on both sides of the fifth gap, the saw teeth of the first continuous sawtooth portion and the saw teeth of the second continuous sawtooth portion are arranged alternately, and the first continuous sawtooth portion and the second continuous sawtooth portion are inserted into each other.
13. The cooperative expansion joint structural system of the material storage structure according to claim 12, characterized in that: The middle platform plate is provided with a lower cantilever platform below the first sawtooth portion.
14. The cooperative expansion joint structural system of the material storage structure according to claim 12, characterized in that: Each of the fifth gaps is filled with a fifth leak-proof portion that can be expanded and contracted horizontally.
Citation Information
Patent Citations
Cooperative work expansion joint structure system of material warehouse structure
CN216340175U