A high-pressure air blocking method for processing the interruption of circulating fluidized bed boiler return material

By installing a high-pressure air duct in the inclined tube section of the circulating fluidized bed boiler return device and using high-pressure air for sealing, the problems of flue gas backchanneling and ash circulation interruption are solved, ensuring the stable operation and safety of the boiler.

CN114060802BActive Publication Date: 2024-10-08WUXI HUAGUANG BOILER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111383851.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-19
Publication Date
2024-10-08
Estimated Expiration
2041-11-19

AI Technical Summary

Technical Problem

When the load of the circulating fluidized bed boiler returner decreases or the furnace is started up, improper adjustment of the return air will cause the vertical pipe material column to fluidize, lose the material seal, cause flue gas to backchannel, destroy the ash circulation and may cause a furnace shutdown accident.

Method used

Install a high-pressure air duct on the inclined pipe section of the return device near the furnace. Use the high-pressure air duct to blow in positive pressure air to block it. When the flue gas back-channels, it is started. The pressure is greater than the return fan. Gradually adjust the wind force to restore balance, and After the differential pressure rises, close the high-pressure air duct.

Benefits of technology

Effectively solve the problem of flue gas reflection, ensure the normal and stable operation of the boiler, and prevent the occurrence of boiler shutdown accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114060802B_ABST
    Figure CN114060802B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of boiler control technology, and specifically to a high-pressure air blocking method for processing the interruption of return material in a circulating fluidized bed boiler. The method can effectively solve the problem of flue gas backflow and ensure the normal and stable operation of the boiler. A high-pressure air duct is installed on the inclined pipe section of a return material device near the furnace. When the boiler is operating normally, the high-pressure air duct does not work. When flue gas backflows and the return material self-balance cannot be established, the high-pressure air duct starts to work and blows in positive pressure air for blocking. The pressure of the positive pressure air used is greater than the pressure of the return material fan, and at the same time, the loose air blown out by the air hood of the air distribution plate is reduced. When the material level is formed in the vertical pipe of the return material device, the positive pressure air blown out by the high-pressure air duct is gradually reduced, and the loose air blown out by the air hood of the air distribution plate and the return material air are restored to the design value, so as to realize the self-balance of the return material system. When the furnace differential pressure of the suspended section rises significantly, the high-pressure air duct is completely closed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of boiler control, in particular to a high-pressure wind blocking method for processing material return interruption of a circulating fluidized bed boiler. Background Art

[0002] As a key equipment to ensure ash circulation, the return feeder of circulating fluidized bed boiler not only transports the circulating ash from the negative pressure area to the positive pressure area, but also seals the positive pressure flue gas in the furnace.

[0003] In a circulating fluidized bed boiler, the temperature of circulating materials is as high as over 800°C, so the flow of circulating materials is controlled by non-mechanical means. The high-temperature circulating ash collected from the high-temperature separator is used to form a material level in the return feeder riser, which overcomes the fluidity in the return feeder and also serves as an ash seal.

[0004] During operation, a return fan is used to distribute air at the bottom of the return device, and a large amount of high-temperature circulating ash collected from the separator is continuously delivered into the furnace by utilizing the loose air and return air blown out from the wind hood of the air distribution plate.

[0005] In actual operation, when the boiler load drops sharply or in the initial stage of startup, improper adjustment of the return air, or excessive loose air during normal operation, may cause the vertical pipe material column to fluidize and blow through, thereby losing the material seal, and causing the dense phase area flue gas to flow back to the entire separation and return system, destroying the normal ash circulation and even causing a shutdown accident. Summary of the invention

[0006] In order to solve the problem of backflow of flue gas in the existing return device, which destroys the normal ash circulation and even causes shutdown accidents, the present invention provides a high-pressure wind blocking method for dealing with the interruption of return material in a circulating fluidized bed boiler, which can effectively solve the problem of flue gas backflow and ensure the normal and stable operation of the boiler.

[0007] The technical solution is as follows: a high-pressure air blocking method for handling the interruption of return material in a circulating fluidized bed boiler, characterized in that a high-pressure air duct is installed on the inclined pipe section of the return device near the furnace. When the boiler is operating normally, the high-pressure air duct does not work. When the flue gas backflows and the return material self-balance cannot be established, the high-pressure air duct starts to work and blows in positive pressure air for blocking, and the pressure of the positive pressure air used is greater than the pressure of the return material fan, and at the same time, the loose air blown out by the air distribution plate hood is reduced. When the material level is formed in the return device riser, the positive pressure wind blown out by the high-pressure air duct is gradually reduced, and the loose air blown out by the air distribution plate hood and the return material air are restored to the design value to achieve self-balance of the return material system, and the high-pressure air duct is completely closed when the furnace differential pressure of the suspended section rises significantly.

[0008] It is further characterized in that the high-pressure air duct includes a ring-shaped or rectangular air box with six air ducts evenly distributed, the angle between the air duct and the oblique pipe section of the return material device is 30-45 degrees, and the extension line of each air duct intersects the central axis of the oblique pipe section of the return material device;

[0009] The high-pressure air blown out of the high-pressure air duct is compressed air or steam drawn out from the steam pipeline.

[0010] After adopting the present invention, a high-pressure air duct for letting in high-pressure air is added to the return device. When smoke backflow occurs, the high-pressure air blown out of the high-pressure air duct can be used to block it, and it can be continuously adjusted according to actual conditions, which can quickly solve the problem of smoke backflow and ensure the normal and stable operation of the boiler. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the structure of the present invention;

[0012] Figure 2 for Figure 1 AA section view. DETAILED DESCRIPTION

[0013] See Figure 1 , Figure 2 As shown, a high-pressure air blocking method for handling the interruption of return material in a circulating fluidized bed boiler is provided. A high-pressure air duct is installed on the inclined pipe section 1 of the return material device near the furnace 2. The high-pressure air duct includes a ring-shaped or rectangular bellows 4 with six air ducts 3 evenly distributed. The angle between the air duct 3 and the inclined pipe section 1 of the return material device is 30°, so that the high-pressure air can be blown in evenly. An air valve 5 is installed on the air duct 3, which can be controlled individually. The extension line of each air duct 3 intersects with the central axis of the inclined pipe section 1 of the return material device and points to the furnace 2.

[0014] When the boiler is operating normally, the high-pressure air duct does not work, and the air valve 5 is closed to prevent the circulating ash from flowing back into the high-pressure air duct. When the flue gas backflows and the return material self-balance cannot be established, the high-pressure air duct starts to work and blows in positive pressure air for blocking. The pressure of the positive pressure air used is greater than the pressure of the return material fan. At the same time, the loose air blown out by the air hood of the air distribution plate is reduced. When the material level is formed in the return material vertical pipe, the positive pressure wind blown out by the high-pressure air duct is gradually reduced, and the loose air blown out by the air hood of the air distribution plate and the return material air are restored to the design value to achieve self-balance of the return material system. When the furnace differential pressure of the suspended section rises significantly, the high-pressure air duct is completely closed.

[0015] The high-pressure wind blown out of the high-pressure air duct is compressed air or steam drawn out from the steam pipe, both of which can be achieved using the built-in devices of the boiler itself.

Claims

1. A high-pressure air blocking method for processing the interruption of return material in a circulating fluidized bed boiler, characterized in that: A high-pressure air duct is installed on the inclined pipe section of the returner near the furnace. When the boiler is operating normally, the high-pressure air duct does not work. When the flue gas backflows and the return material self-balance cannot be established, the high-pressure air duct starts to work and blows in positive pressure air for blocking. The pressure of the positive pressure air used is greater than the pressure of the return material fan. At the same time, the loose air blown out by the air distribution plate hood is reduced. When the material level is formed in the returner riser, the positive pressure wind blown out by the high-pressure air duct is gradually reduced, and the loose air blown out by the air distribution plate hood and the return material air are restored to the design value to achieve self-balancing of the return material system. When the furnace differential pressure of the suspended section rises significantly, the high-pressure air duct is completely closed; the high-pressure air blown out by the high-pressure air duct is compressed air or steam drawn out from the steam pipeline.

2. A high-pressure air blocking method for processing the interruption of return material in a circulating fluidized bed boiler according to claim 1, characterized in that: The high-pressure air duct includes a ring or rectangular bellows with six evenly distributed air ducts. The angle between the air duct and the oblique pipe section of the return material device is 30-45 degrees, and the extension line of each air duct intersects the central axis of the oblique pipe section of the return material device.