A tire curing bladder leakage detection method
Through multiple pressure-maintaining inspections and automated control systems, the problem of hard-to-find tire vulcanization bladder leaks has been solved, accurate detection and alarming of bladder leaks have been achieved, waste products and economic losses in production have been avoided, and detection accuracy and economic benefits have been improved.
Patent Information
- Application Number
- CN202111376196.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-19
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-11-19
AI Technical Summary
Tire vulcanization bladders are prone to leakage during use, making it difficult to detect internal media fluid leakage, resulting in production waste and economic losses.
Using multiple pressure-holding detection methods, an alarm will be issued by calculating the pressure difference if it exceeds the preset threshold. Combined with the air intake and exhaust branches, steam and nitrogen branches, pressure gauges and valves will be used to automatically detect and alarm to ensure that the capsule is The quality and pressure of the fluid medium are stable.
Effectively detects and alarms capsule leakage, avoids the generation of continuous waste products, improves detection accuracy, reduces economic losses, and avoids false alarms by optimizing the second pressure threshold.
Smart Images

Figure CN114088320B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tire production and processing, and in particular relates to a tire vulcanization bladder leakage detection method. Background Art
[0002] Tire curing bladder (referred to as bladder) is a hollow thin-walled rubber product. During the vulcanization and molding process of the tire, it is installed inside the tire vulcanizer and used as an inner mold for tire shaping. The bladder is filled with fluid media such as superheated water or compressed air to stretch and support the tire embryo. It fits the tire lining and uses the flow and heat transfer characteristics of the fluid medium inside the bladder to maintain a relatively balanced temperature during the tire vulcanization process, achieving a uniform tire vulcanization effect and improving the balance performance of the tire. However, the bladder is prone to damage during actual use. Once the bladder leaks, the internal medium fluid will leak between the bladder and the embryo, which is not easy to be discovered, resulting in continuous waste in subsequent production and causing serious economic losses. Summary of the invention
[0003] In view of the various deficiencies in the prior art and in order to solve the above problems, a tire curing bladder leakage detection method is now proposed.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] A tire curing bladder leakage detection method comprises the following steps:
[0006] Step S100, performing a first pressure-maintaining test on the capsule to obtain a pressure difference value. If the pressure difference value exceeds a preset first pressure threshold value, a pressure alarm is issued. Otherwise, step S200 is executed;
[0007] Step S200, after performing a tire vulcanization molding process with the help of the capsule, a second pressure-maintaining test is performed on the capsule to obtain a pressure difference. If the pressure difference exceeds a preset first pressure threshold, a pressure alarm is issued. Otherwise, step S300 is executed;
[0008] Step S300, after the secondary tire vulcanization molding process is performed with the help of the capsule, the capsule is subjected to a third pressure-maintaining test to obtain a pressure difference value. If the pressure difference value exceeds a preset first pressure threshold value, a pressure alarm is issued. Otherwise, step S400 is executed;
[0009] Step S400, comparing the pressure difference between the first and third pressure-maintaining tests to obtain a pressure-maintaining pressure difference value. If the pressure-maintaining pressure difference value exceeds a preset second pressure threshold, a pressure alarm is issued. Otherwise, the tire vulcanization molding process is performed with the aid of the bladder.
[0010] Furthermore, the capsule is connected with an intake branch and an exhaust branch. The intake branch is provided with an intake valve for overall control of the amount of fluid medium entering the capsule, and the exhaust branch is provided with an exhaust valve for overall control of the amount of fluid medium discharged from the capsule.
[0011] Furthermore, a pressure gauge is provided on the exhaust branch to detect the pressure of the fluid medium in the capsule.
[0012] Further, in step S100, the exhaust valve is closed, and a fluid medium of rated pressure is introduced into the capsule through the air inlet valve, wherein the rated pressure is the pressure before the first pressure maintenance. The air inlet valve and the exhaust valve are closed, and a pressure maintenance test is performed on the capsule. After the test, the exhaust valve is opened, and the pressure after the first pressure maintenance in the capsule is recorded. The pressure before the first pressure maintenance and the pressure after the first pressure maintenance are subtracted to obtain a pressure difference value.
[0013] Furthermore, the pressure holding test time is 30-40 seconds.
[0014] Furthermore, the first pressure threshold is 0.1-0.15 MPa.
[0015] Further, in step S200, the second pressure-maintaining test is the same as the first pressure-maintaining test.
[0016] Further, in step S300, the third pressure-maintaining test is the same as the first pressure-maintaining test.
[0017] Further, in step S400, the second pressure threshold is 0.02-0.025 MPa.
[0018] Furthermore, the air intake branch is connected to the steam branch and the nitrogen branch respectively. The steam branch is provided with a steam valve, and the nitrogen branch is provided with a nitrogen valve. Steam is first introduced into the capsule to heat the capsule, and then nitrogen is introduced into the capsule to perform pressure maintenance detection.
[0019] Furthermore, the pressure gauge, air inlet valve, exhaust valve, steam valve and nitrogen valve are all communicatively connected to the control terminal, and the control terminal is communicatively connected to the alarm.
[0020] The beneficial effects of the present invention are:
[0021] 1. The pressure difference is calculated for each pressure maintenance test. If the pressure difference exceeds the preset first pressure threshold, a pressure alarm is issued to detect capsule rupture and leakage, thereby avoiding the phenomenon of continuous waste caused by capsule rupture and reducing economic losses.
[0022] 2. Perform a second pressure-maintaining test at intervals, and calculate the pressure difference between the first and third pressure-maintaining tests. If the pressure difference exceeds the preset second pressure threshold, a pressure alarm is issued. When a small amount of leakage occurs in the capsule, the phenomenon of being unable to determine whether the capsule is leaking by the pressure difference of each pressure-maintaining test is avoided, thereby improving the detection accuracy.
[0023] 3. The second pressure threshold is preferably set to 0.02-0.025 MPa to avoid false alarms when the capsule does not leak and false alarms when the capsule leakage difference does not reach the pressure threshold. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a flowchart of the present invention;
[0025] Figure 2 It is a schematic diagram of the assembly of the capsule, the intake branch, and the exhaust branch;
[0026] Figure 3 It is a schematic diagram of the amount of waste.
[0027] In the attached drawings: 1-capsule, 2-mold, 3-intake branch, 4-exhaust branch, 5-intake valve 5, 6-exhaust valve, 7-pressure gauge, 8-steam branch, 9-nitrogen branch, 10-steam valve, 11-nitrogen valve. DETAILED DESCRIPTION
[0028] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is clearly and completely described below in conjunction with the accompanying drawings of the present invention. Based on the embodiments in this application, other similar embodiments obtained by ordinary technicians in this field without making creative work should all fall within the scope of protection of this application. In addition, the directional words mentioned in the following embodiments, such as "up", "down", "left", "right", etc., are only reference to the directions of the accompanying drawings. Therefore, the directional words used are used to illustrate rather than limit the invention.
[0029] Embodiment 1:
[0030] like Figure 1 As shown, a tire curing bladder leakage detection method comprises the following steps:
[0031] Step S100, perform the first pressure-maintaining test on the capsule to obtain a pressure difference. If the pressure difference exceeds a preset first pressure threshold, a pressure alarm is issued. Otherwise, step S200 is executed.
[0032] Step S200, after a tire vulcanization molding process is performed once with the help of the capsule, a second pressure-maintaining test is performed on the capsule to obtain a pressure difference. If the pressure difference exceeds a preset first pressure threshold, a pressure alarm is issued. Otherwise, step S300 is executed.
[0033] Step S300, after the secondary tire vulcanization molding process is performed with the help of the bladder, the bladder is subjected to a third pressure-maintaining test to obtain a pressure difference. If the pressure difference exceeds a preset first pressure threshold, a pressure alarm is issued. Otherwise, step S400 is executed.
[0034] Step S400, comparing the pressure difference between the first and third pressure-maintaining tests to obtain a pressure-maintaining pressure difference value. If the pressure-maintaining pressure difference value exceeds a preset second pressure threshold, a pressure alarm is issued. Otherwise, the tire vulcanization molding process is performed with the aid of the bladder.
[0035] That is to say, the pressure difference is calculated for each pressure-maintaining test. If the pressure difference exceeds the preset first pressure threshold, a pressure alarm is issued to detect capsule rupture and leakage, thereby avoiding the phenomenon of continuous waste caused by capsule rupture and reducing economic losses. At the same time, the second pressure-maintaining test is performed at intervals, and the pressure difference between the first and third pressure-maintaining tests is taken to calculate the pressure difference value for pressure maintenance. If the pressure difference value for pressure maintenance exceeds the preset second pressure threshold, a pressure alarm is issued. When a small amount of leakage occurs in the capsule, the phenomenon of being unable to determine whether the capsule is leaking by the pressure difference value of each pressure-maintaining test is avoided, thereby improving the detection accuracy.
[0036] like Figure 2 As shown, the capsule 1 is connected with an air intake branch 3 and an air exhaust branch 4. The air intake branch 3 is provided with an air intake valve 5 for overall control of the amount of fluid medium entering the capsule 1. The air exhaust branch 4 is provided with an air exhaust valve 6 for overall control of the amount of fluid medium discharged from the capsule 1. The air exhaust branch 4 is provided with a pressure gauge 7 for detecting the pressure of the fluid medium in the capsule 1.
[0037] In step S100, the exhaust valve 6 is closed, and a fluid medium of rated pressure is introduced into the capsule 1 through the air inlet valve 5. The rated pressure is the pressure before the first pressure maintenance. The air inlet valve 5 and the exhaust valve 6 are closed, and the capsule 1 is subjected to a pressure maintenance test. After the test, the exhaust valve 5 is opened, and the pressure after the first pressure maintenance in the capsule 1 is recorded by the pressure gauge 7. The pressure before the first pressure maintenance and the pressure after the first pressure maintenance are subtracted to obtain a pressure difference. At the same time, in step S200, the second pressure maintenance test is the same as the first pressure maintenance test. In step S300, the third pressure maintenance test is the same as the first pressure maintenance test. If the pressure difference exceeds the preset first pressure threshold, a pressure alarm is issued, indicating that the capsule 1 is leaking.
[0038] Considering that when capsule 1 leaks, the pressure difference value of each pressure-maintaining test will gradually increase, while the data fluctuation of the pressure difference value of two adjacent pressure-maintaining tests will be very small, and it is impossible to determine whether capsule 1 is actually leaking. Therefore, the second pressure-maintaining test is performed at intervals, and the pressure difference value of the first and third pressure-maintaining tests is taken for data comparison. The data fluctuation will become larger, and it can be used to determine whether capsule 1 is leaking. At the same time, if the intervals between pressure-maintaining tests are large, if the capsule ruptures and leaks, it will lead to more waste. Therefore, the inventor chooses to compare the pressure difference values of the pressure-maintaining tests at intervals.
[0039] After long-term practice, the inventor found that: under the condition that there is no leakage in capsule 1, when the pressure-maintaining detection time is 30-40 seconds, when capsule 1 performs pressure-maintaining detection, the pressure difference is controlled at 0.1-0.15MPa. Therefore, 0.1-0.15MPa is used as the first pressure threshold. At the same time, the smaller the pressure-maintaining pressure difference data of the two pressure-maintaining tests, the more stable the pressure, indicating that there is no leakage in capsule 1. On the contrary, the larger the pressure-maintaining pressure difference data of the two pressure-maintaining tests, the greater the pressure fluctuation, indicating that there is a leakage in capsule 1. Therefore, the second pressure threshold is set to compare with the pressure-maintaining pressure difference value. When the pressure-maintaining pressure difference value exceeds the preset second pressure threshold, a pressure alarm is issued, indicating that there is a leakage in capsule 1, and the vulcanizer alarms and automatically shuts down.
[0040] During the optimization process of the second pressure threshold, the inventors set the second pressure threshold to 0.01MPa, 0.02MPa, and 0.03MPa, respectively, and conducted data experiments. The experimental results showed that when the second pressure threshold was set to 0.01MPa, a false alarm occurred when capsule 1 did not leak; when the second pressure threshold was set to 0.03MPa, when capsule 1 leaked, no alarm was issued because the holding pressure difference did not reach 0.03MPa, resulting in continuous waste in subsequent production and causing serious economic losses. Therefore, 0.02-0.025MPa was used as the second pressure threshold for comparison.
[0041] The air inlet branch 3 is connected to the steam branch 8 and the nitrogen branch 9 respectively. The steam branch 8 is provided with a steam valve 10, and the nitrogen branch 9 is provided with a nitrogen valve 11. During the vulcanization process, the capsule 1 is located in the mold 2. First, steam is introduced into the capsule 1 to heat the capsule 1, and then nitrogen is introduced into the capsule 1. In order to detect whether the capsule 1 is leaking, a pressure maintenance test is performed after nitrogen is introduced into the capsule 1, that is, a pressure maintenance test is performed on the basis of the original vulcanization process. In order to improve the degree of automation, the pressure gauge 7, the air inlet valve 5, the exhaust valve 6, the steam valve 10 and the nitrogen valve 11 are all connected to the control terminal in communication. At the same time, the control terminal is connected to the alarm in communication to achieve automatic detection and automatic alarm.
[0042] After adding the bladder leakage detection method in the vulcanization process, the number of scraps caused by bladder leakage is compared. Figure 3 As shown. Figure 3 It can be seen that the number of scraps from April to May showed an upward trend. After the capsule leakage detection method was added from June to July, the number of scraps showed a downward trend. At the same time, in terms of the average number of scraps, the average from June to July was significantly lower than the average from April to May, which can improve economic benefits.
[0043] The present invention has been described in detail above. The above description is only a preferred embodiment of the present invention and should not limit the scope of implementation of the present invention. That is, all equivalent changes and modifications made within the scope of this application should still fall within the scope of the present invention.
Claims
1. A tire curing bladder leakage detection method, characterized in that: The following steps are involved: Step S100, performing a first pressure-maintaining test on the capsule to obtain a pressure difference value. If the pressure difference value exceeds a preset first pressure threshold value, a pressure alarm is issued. Otherwise, step S200 is executed; Wherein, in the step S100, the exhaust valve is closed, and a fluid medium of rated pressure is introduced into the capsule through the inlet valve, wherein the rated pressure is the pressure before the first pressure maintenance, the inlet valve and the exhaust valve are closed, and a pressure maintenance test is performed on the capsule. After the test, the exhaust valve is opened, and the pressure after the first pressure maintenance in the capsule is recorded, and the first pressure difference is obtained by subtracting the pressure before the first pressure maintenance and the pressure after the first pressure maintenance; Step S200, after the first tire vulcanization molding process is performed by means of the capsule, a second pressure-maintaining test is performed on the capsule to obtain a pressure difference value. If the pressure difference value exceeds a preset first pressure threshold value, a pressure alarm is issued. Otherwise, step S300 is executed; Step S300, after the secondary tire vulcanization molding process is performed with the help of the capsule, the capsule is subjected to a third pressure-maintaining test to obtain a pressure difference value. If the pressure difference value exceeds a preset first pressure threshold value, a pressure alarm is issued. Otherwise, step S400 is executed; Step S400, comparing the pressure difference between the first and third pressure-maintaining tests to obtain a pressure-maintaining pressure difference value, if the pressure-maintaining pressure difference value exceeds a preset second pressure threshold, a pressure alarm is issued, otherwise, the tire vulcanization molding process is performed with the aid of a capsule, wherein the second pressure-maintaining test and the third pressure-maintaining test are the same as the first pressure-maintaining test.
2. A tire curing bladder leakage detection method according to claim 1, characterized in that: The capsule is connected with an intake branch and an exhaust branch. The intake branch is provided with an intake valve for overall control of the amount of fluid medium entering the capsule, and the exhaust branch is provided with an exhaust valve for overall control of the amount of fluid medium discharged from the capsule.
3. A tire curing bladder leakage detection method according to claim 2, characterized in that: The exhaust branch is provided with a pressure gauge for detecting the pressure of the fluid medium in the capsule.
4. A tire curing bladder leakage detection method according to claim 1, characterized in that: The first pressure-maintaining detection time is 30-40 seconds.
5. A tire curing bladder leakage detection method according to claim 1, characterized in that: The first pressure threshold is 0.1-0.15 MPa.
6. A tire curing bladder leakage detection method according to claim 1, characterized in that: In the step S400, the second pressure threshold is 0.02-0.025 MPa.