An integrated device of an articulated triangular bracket and a hanging basket for a reference section of a cantilevered beam
Through the design of the integrated device of articulated triangular bracket and hanging basket, the pin connection and embedded parts are used to solve the welding quality and safety problems in the construction of the reference section of the traditional suspended beam, and the efficient and safe construction progress is achieved. Material turnover improves construction efficiency and structural stiffness.
Patent Information
- Application Number
- CN202111449093.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-01
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-12-01
AI Technical Summary
During the construction of the reference section of the traditional suspended beam, the welding quality of the triangle bracket is difficult to ensure, the high altitude operation time is long and the safety risks are high, and the structural deformation is large, resulting in long construction cycles, low craftsmanship and poor material turnover.
Adopt an integrated device of articulated triangular bracket and hanging basket. Through pin connection and embedded parts design, the overall lifting and rapid assembly can be achieved, reducing high-altitude welding, and combining self-locking unloading blocks and adjustable height-adjustable pad beams to adapt to the beam The bottom longitudinal slope improves construction accuracy and safety.
It greatly improves construction progress and safety, reduces the risk of high-altitude operations, shortens construction period, improves material turnover and structural stiffness, and reduces the investment and processing costs of temporary structural materials.
Smart Images

Figure CN114108499B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge construction, and in particular to an integrated device of an articulated triangular bracket combined with a hanging basket for a reference section of a cantilevered cast-beam, and a construction method of the device. Background Art
[0002] At present, cantilever beam design is mostly used in continuous beams (rigid frames), tied arches and cable-stayed bridges. Block 0 is the reference section for the subsequent cantilever segment construction. Sometimes the length of block 0 does not meet the minimum space requirement for the hanging basket assembly. In this case, block 1 is also used as part of the reference section, and all are cast in place using brackets or brackets. The construction of the reference section controls the progress and safety quality of the entire bridge. It is made of large-volume concrete cast in place. Generally, the bridge piers are high, and the triangular brackets beside the piers are used as the support system. Due to the existence of the longitudinal slope at the bottom of the beam, it is necessary to set a wedge-shaped bottom formwork between the triangular bracket and the bottom of the beam to meet the construction needs.
[0003] The traditional construction method is to use a fixed triangular bracket, process each rod on site, and use high-altitude welding to fix the triangular bracket to the embedded parts beside the pier. The quality of the weld is difficult to guarantee, the high-altitude operation time is long, and the safety risk is high. In addition, it is a common method to install a steel rack made of steel or set up a full-height bracket as a wedge-shaped bottom formwork frame on the triangular bracket beside the pier. These two forms of structure deformation are large, the structure is processed on site, and the quality and precision are relatively poor. After the construction of the benchmark section is completed, the wedge-shaped bottom formwork frame and the bottom formwork need to be removed, and then the hanging basket bottom formwork system is installed. The construction period is long, the construction efficiency is low, and the material turnover is poor. Therefore, there is an urgent need for a structure and a construction method that can solve the above problems. Summary of the invention
[0004] The present invention aims to solve the above-mentioned deficiencies in the prior art and proposes an integrated device of an articulated triangular bracket combined with a hanging basket for a cantilevered beam reference section, which can significantly improve the production progress while ensuring processing quality and installation accuracy. A construction method of the integrated device is also disclosed.
[0005] The above technical objectives of the present invention are achieved through the following technical solutions: an articulated triangular bracket combined with a hanging basket integrated device for a cantilever beam reference section, comprising a pier 1, characterized in that: a cantilever beam 15 is arranged on the top surface of the pier 1, a plurality of triangular main brackets 2 are symmetrically installed on the side of the pier 1 along the bridge direction, a plurality of triangular side brackets 11 are symmetrically installed on the side of the pier 1 in the transverse direction of the bridge, and a first height-adjusting cushion beam is arranged in sequence from low to high at the fulcrum position of the top surface of the triangular main bracket 2 according to the longitudinal slope of the bridge 3. The second height-adjusting cushion beam 4, the third height-adjusting cushion beam 5 and the fourth height-adjusting cushion beam 6 are provided with an oblique-stayed limiter 7 on the inner side surface direction of the first height-adjusting cushion beam 3 and the fourth height-adjusting cushion beam 6 close to the pier column 1. The oblique-stayed limiter 7 is connected between the height-adjusting cushion beam and the triangular main bracket 2. Self-locking unloading blocks 8 are provided on the top surfaces of all height-adjusting cushion beams. All self-locking unloading blocks 8 located on the same side of the pier column 1 jointly support the bottom formwork frame 9 of the hanging basket. The top surface of the bottom formwork frame 9 is also provided with a bottom formwork 10 of the hanging basket.
[0006] A side mold cushion beam 12 is arranged on the triangular side bracket 11, a side mold steel unloading block 13 is arranged on the top surface of the side mold cushion beam 12, and a hanging basket outer mold 14 is arranged on the side mold steel unloading block 13.
[0007] The triangular main bracket 2 includes a main bracket lower embedded part 21, a main bracket upper embedded part 22, a main bracket diagonal support rod 23, a main bracket vertical rod 24 and a main bracket horizontal rod 25, and the components are connected by pins. At the same time, the triangular main bracket 2 is also connected to a main bracket cross-link 26, and the main bracket cross-link 26 connects all triangular main brackets 2 on the same side of the pier 1 in the direction of the bridge into an integral structure.
[0008] The self-locking unloading block 8 comprises a symmetrically arranged unloading block horizontal support 81 and an unloading block vertical support 82. A through hole is provided in the middle of the unloading block horizontal support 81. A finely rolled threaded steel bar 83 is inserted into the through hole. The finely rolled threaded steel bar 83 is fixedly connected to the unloading block horizontal support 81.
[0009] The bottom mold frame 9 of the hanging basket includes a bottom mold front crossbeam 91 and a bottom mold rear crossbeam 92. The tops of the bottom mold front crossbeam 91 and the bottom mold rear crossbeam 92 are fixedly connected with a pin seat 93. The pin seat 93 is connected with a bottom mold longitudinal beam 94. The pin seat 93 includes a pin seat bottom plate 931 and a pin seat ear plate 932 connected to each other. The bottom mold longitudinal beam 94 includes a longitudinal beam 941. An L-shaped notch 942 is arranged at one end of the longitudinal beam 941. At the same time, a pin seat pin hole 933 and a bottom mold longitudinal beam pin hole 944 matching the pin seat ear plate 932 are also opened on the longitudinal beam 941. A stiffening plate 943 is also arranged on the longitudinal beam 941 at the L-shaped notch 942.
[0010] The triangular side bracket 11 includes a side bracket lower embedded part 111 and a side bracket upper embedded part 112 arranged in the pier 1, and the side bracket lower embedded part 111 and the side bracket upper embedded part 112 are commonly connected to the side bracket main frame 113.
[0011] The first height adjustment pad beam 3 and the fourth height adjustment pad beam 6 are symmetrically arranged at the hinge point of the main bracket horizontal rod 25 and the main bracket diagonal support rod 23, and the second height adjustment pad beam 4 and the third height adjustment pad beam 5 are symmetrically arranged at the hinge point of the main bracket horizontal rod 25 and the embedded part 22 on the main bracket.
[0012] The length direction of the fine-rolled threaded steel bar 83 is parallel to the transverse bridge direction.
[0013] The top surface of the pin seat bottom plate 931 is provided with two symmetrically distributed pin seat ear plates 932, and the net distance between the two pin seat ear plates 932 is greater than the maximum width of the bottom mold longitudinal beam 94 at this location.
[0014] The long side of the L-shaped notch 942 is parallel to the length direction of the longitudinal beam 941, and the angle formed by the short side and the long side is an obtuse angle.
[0015] A construction method for the above-mentioned cantilever beam reference section articulated triangular bracket combined with a hanging basket integrated device, characterized in that the method comprises the following steps:
[0016] Step 1: Construction preparation:
[0017] The processing and production of the triangular bracket and other related components will be inspected and accepted after entering the site.
[0018] Step 2: Construction of bracket embedded parts:
[0019] When constructing the pier 1, the main bracket lower embedded parts 21, the main bracket upper embedded parts 22, the side bracket lower embedded parts 111 and the side bracket upper embedded parts 112 are embedded according to the predetermined requirements.
[0020] Step 3: Installation of the triangular main bracket:
[0021] The main components of the manufactured triangular main bracket 2 are connected by pins under the bridge, and each triangular main bracket 2 is assembled into a whole. Then, a tower crane is used to hoist the whole. Multiple sets of triangular main brackets 2 are symmetrically installed on the two sides of the pier 1 along the bridge direction. Pins are used to connect the main bracket horizontal rod 25 and the main bracket upper embedded part 22, and the main bracket diagonal support rod 23 and the main bracket lower embedded part 21. The main bracket cross link 26 is used to connect all the triangular main brackets 2 on each side of the pier 1 along the bridge direction into a whole.
[0022] Step 4: Install the fulcrum heightening beam:
[0023] According to the longitudinal slope of the bridge, the hinge point of the small mileage main bracket horizontal rod 25 and the main bracket diagonal support rod 23 is used as the first fulcrum, where the first height adjustment cushion beam 3 is set on the top surface of the triangular main bracket 2, the hinge point of the small mileage main bracket horizontal rod 25 and the main bracket upper embedded part 22 is used as the second fulcrum, where the second height adjustment cushion beam 4 is set on the top surface of the triangular main bracket 2, and the hinge point of the large mileage main bracket horizontal rod 25 and the main bracket upper embedded part 22 is used as the third fulcrum, where the triangular main The top surface of the bracket 2 is provided with a third height adjustment cushion beam 5, and the hinge point of the large mileage main bracket horizontal rod 25 and the main bracket diagonal support rod 23 is the fourth fulcrum, at which the fourth height adjustment cushion beam 6 is provided on the top surface of the triangular main bracket 2, and the first height adjustment cushion beam 3 and the fourth height adjustment cushion beam 6 of each fulcrum of the triangular main bracket 2 are provided with an oblique stay limiter 7 close to the inner side of the pier 1, and the bottom of the oblique stay limiter 7 is fixed to the top surface of the main bracket horizontal rod 25, and the top thereof is fixed to the inner top of the height adjustment cushion beam.
[0024] Step 5: Installation of self-locking unloading block:
[0025] A self-locking unloading block 8 is installed on the top surface of each fulcrum height adjustment pad beam, and each self-locking unloading block 8 is composed of two horizontally installed unloading block horizontal supports 81 and two vertically installed unloading block vertical supports 82. A through hole is set in the middle of the unloading block horizontal support 81, and the fine-rolled threaded steel 83 passes through the through hole and is locked. The length direction of the fine-rolled threaded steel 83 is parallel to the horizontal bridge direction; when the hanging basket bottom mold 10 is dropped from the frame, the fine-rolled threaded steel nut can be loosened to make the unloading block horizontal support 81 move outward and the upper unloading block vertical support 82 move downward, so that the height of the entire unloading block is reduced.
[0026] Step 6: Install the triangular bracket:
[0027] Each triangular side bracket main frame 113 is hoisted by a tower crane, and multiple sets of triangular side brackets 11 are symmetrically installed on the two sides of the pier 1 in the transverse direction of the bridge, and are respectively fixed to the upper embedded parts 112 and the lower embedded parts 111 of the side bracket by the upper and lower ends of the pier 1.
[0028] Step 7: Installation of side formwork beams:
[0029] A side mold cushion beam 12 is installed on the top surface of the triangular side bracket 11. The side mold cushion beam 12 uses the first height adjustment cushion beam 3, the second height adjustment cushion beam 4, the third height adjustment cushion beam 5, the fourth height adjustment cushion beam 6 and the triangular side bracket as fulcrums.
[0030] Step 8: Installation of the hanging basket bottom mold system:
[0031] A front crossbeam 91 and a rear crossbeam 92 of the bottom mold are installed on the top surface of the self-locking unloading block 8, and a pin seat 93 is fixed on the top surface of the crossbeam. The bottom plate of each pin seat 93 is fixed with two ear plates to form a groove shape, and the bottom mold longitudinal beam 94 is inserted into the groove; through holes are arranged at the relative positions of the longitudinal beam 941 and the pin seat ear plate 932, namely the pin seat pin hole 933 and the bottom mold longitudinal beam pin hole 944, and pin shafts are inserted into the pin holes to connect the components; an L-shaped notch 942 is formed after cutting off the overlapping part of the longitudinal beam 941 and the front crossbeam 91, the rear crossbeam 92 and the pin seat 93 of the bottom mold, and the long side of the L-shaped notch 942 is parallel to the length direction of the longitudinal beam 941, and the angle formed by its short side and the long side is an obtuse angle, and a stiffening plate 943 is arranged at the two web positions of the longitudinal beam 941 above the notch for reinforcement, and then a hanging basket bottom mold 10 is laid above the longitudinal beam 941.
[0032] Step 9, side model steel unloading block installation:
[0033] The side mold steel unloading block 13 is installed on the side mold cushion beam 12. When the outer mold 14 of the hanging basket falls off the frame, the steel unloading block is directly cut off by flame.
[0034] Step 10: Installation of the outer mold of the hanging basket:
[0035] The outer side mold 14 of the hanging basket is installed on the side mold steel unloading block 13.
[0036] In steps two, three, four, five and eight, the center of the height-adjusting cushion beam along the bridge, the center of the self-locking unloading block 8, the center of the front crossbeam 91 of the bottom mold along the bridge, the center of the rear crossbeam 92 of the bottom mold along the bridge and the center of the top surface fulcrum of the triangular main bracket 2 are respectively located in the same cross section.
[0037] In the step eight, the bottom mold rear cross beam 92 is used as a base point, and the bottom mold front cross beam 91 and the longitudinal beam 94 can rotate around the base point to adapt to the longitudinal slope of the bottom of the cantilever beam 15.
[0038] Compared with the prior art, the present invention has the following beneficial effects:
[0039] 1. All the main components of the triangular main bracket are connected by pins. Compared with the welding connection method, it reduces the amount of high-altitude welding work and speeds up the construction progress. The main components are processed in the factory and assembled on site, which effectively ensures the processing quality and installation accuracy.
[0040] 2. The fulcrum height adjustment pad beam can be completely transferred to other brackets or tripod structures, and the material turnover rate is high.
[0041] 3. The formwork frame adopts self-locking unloading blocks, which are highly safe, convenient and fast, low cost and can be used in rotation.
[0042] 4. The bottom side formwork system of the triangular main bracket adopts an integrated design of the bottom side formwork system of the hanging basket. Compared with the wedge-shaped bottom formwork of the steel rack and the full-floor bracket, it has high structural rigidity, professional processing by the manufacturer, reliable welds, short high-altitude operation time, and high safety and controllability. It reduces the investment and processing of temporary structural materials, speeds up and improves the turnover of materials, and reduces the cost. Moreover, the installation of the bottom side formwork system of the hanging basket is completed during the construction stage of the triangular bracket, and there is no need for subsequent dismantling and secondary installation, which shortens the construction period.
[0043] 5. The front and rear cross beams of the hanging basket bottom formwork and the longitudinal beams of the hanging basket bottom formwork are connected by pins, and an L-shaped notch is set at the fulcrum. The rear cross beam of the bottom formwork is used as the base point, and the front cross beam and longitudinal beam of the bottom formwork can rotate around the base point, which is suitable for more longitudinal slopes of the bottom of the beam. The cross beam of the bottom formwork is always in a horizontal state, and there is no need to set a leveling wedge.
[0044] Therefore, compared with the traditional construction method of the triangular bracket beside the pier of the reference section of the cantilevered beam, the present invention has multiple advantages and has important promotion and application value. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a schematic diagram of the longitudinal cross section of the present invention.
[0046] Figure 2 It is a schematic diagram of the cross-section of the present invention.
[0047] Figure 3 It is a schematic diagram of the triangular main bracket of the present invention.
[0048] Figure 4 It is a schematic diagram of the triangular side bracket of the present invention.
[0049] Figure 5 It is a schematic diagram of the self-locking unloading block of the present invention.
[0050] Figure 6 It is a schematic diagram of the bottom formwork of the hanging basket of the present invention.
[0051] Figure 7 It is a schematic diagram of the longitudinal section of the pin seat of the present invention.
[0052] Figure 8 It is a schematic cross-sectional view of the pin seat of the present invention.
[0053] Fig. 9 It is a schematic diagram of the longitudinal section of the bottom mold longitudinal beam of the present invention.
[0054] Fig.10 It is a cross-sectional schematic diagram of the fulcrum of the bottom mold longitudinal beam of the present invention.
[0055] Fig.11 It is a process flow chart of the construction method of the present invention.
[0056] In the figure: 1- pier column; 2- triangular main bracket; 21- embedded parts under the main bracket; 22- embedded parts on the main bracket; 23- main bracket diagonal support rod; 24- main bracket vertical rod; 25- main bracket horizontal rod; 26- main bracket cross link; 3- first height adjustment cushion beam; 4- second height adjustment cushion beam; 5- third height adjustment cushion beam; 6- fourth height adjustment cushion beam; 7- inclined limiter; 8- self-locking unloading block; 81- horizontal support of unloading block; 82- vertical support of unloading block; 83- finely rolled threaded steel; 9- bottom formwork frame of hanging basket; 91- front of bottom formwork Crossbeam; 92-rear crossbeam of bottom mold; 93-pin seat; 931-pin seat bottom plate; 932-pin seat ear plate; 933-pin seat pin hole; 94-bottom mold longitudinal beam; 941-longitudinal beam; 942-L-shaped notch; 943-stiffening plate; 944-bottom mold longitudinal beam pin hole; 10-hanging basket bottom mold; 11-triangular side bracket; 111-side bracket lower embedded parts; 112-side bracket upper embedded parts; 113-side bracket main frame; 12-side mold cushion beam; 13-side model steel unloading block; 14-hanging basket outer mold; 15-cantilevered beam. DETAILED DESCRIPTION
[0057] The specific implementation modes of the present invention will be further described in detail below with reference to the accompanying drawings.
[0058] This specific embodiment is only an explanation of the present invention, not a limitation of the present invention. After reading the present invention, those skilled in the art can make non-creative modifications to the present implementation as needed, but they are protected by patent law as long as they are within the scope of the claims of the present invention.
[0059] like Figure 1-10 As shown: the present invention is an articulated triangular bracket combined with a hanging basket integrated device for a reference section of a cantilever beam, comprising a pier 1, characterized in that: a cantilever beam 15 is arranged on the top surface of the pier 1, a plurality of triangular main brackets 2 are symmetrically installed on the side of the pier 1 along the bridge direction, a plurality of triangular side brackets 11 are symmetrically installed on the side of the pier 1 in the transverse direction of the bridge, a first height adjustment cushion beam 3, a second height adjustment cushion beam 4, a third height adjustment cushion beam 5 and a fourth height adjustment cushion beam 6 are arranged in sequence from low to high at the fulcrum position of the top surface of the triangular main bracket 2 according to the longitudinal slope of the bridge, an oblique-stayed limiter 7 is arranged on the inner side surface direction of the first height adjustment cushion beam 3 and the fourth height adjustment cushion beam 6 close to the pier 1, the oblique-stayed limiter 7 is connected between the height adjustment cushion beam and the triangular main bracket 2, a self-locking unloading block 8 is arranged on the top surface of all the height adjustment cushion beams, and all the self-locking unloading blocks 8 located on the same side of the pier 1 jointly support the hanging basket bottom formwork frame 9, and a hanging basket bottom formwork 10 is also arranged on the top surface of the hanging basket bottom formwork frame 9,
[0060] A side mold cushion beam 12 is arranged on the triangular side bracket 11, a side mold steel unloading block 13 is arranged on the top surface of the side mold cushion beam 12, and a hanging basket outer mold 14 is arranged on the side mold steel unloading block 13.
[0061] The triangular main bracket 2 includes a main bracket lower embedded part 21, a main bracket upper embedded part 22, a main bracket diagonal support rod 23, a main bracket vertical rod 24 and a main bracket horizontal rod 25, which are connected to each other by pin shaft connection, and also includes a main bracket cross-link 26 that connects all the triangular main brackets 2 on each side of the pier 1 along the bridge into a whole.
[0062] The self-locking unloading block 8 comprises a symmetrically arranged unloading block horizontal support 81 and an unloading block vertical support 82. A through hole is provided in the middle of the unloading block horizontal support 81, and the fine-rolled threaded steel bar 83 passes through the through hole and is locked.
[0063] The bottom mold frame 9 of the hanging basket includes a front crossbeam 91 of the bottom mold and a rear crossbeam 92 of the bottom mold, a pin seat 93 is fixed on the top surface of the crossbeam, and a bottom mold longitudinal beam 94 is inserted into the pin seat 93; the pin seat 93 includes a pin seat bottom plate 931 and a pin seat ear plate 932, and the two are fixed; the bottom mold longitudinal beam 94 includes a longitudinal beam 941 and an L-shaped notch 942, and through holes are arranged at the relative positions of the longitudinal beam 941 and the pin seat ear plate 932, namely, the pin seat pin hole 933 and the bottom mold longitudinal beam pin hole 944, and pin shafts are inserted into the pin holes to connect the various components; the L-shaped notch 942 is formed by cutting off the overlapping parts of the longitudinal beam 941 and the front crossbeam 91 of the bottom mold, the rear crossbeam 92 of the bottom mold and the pin seat 93, and a stiffening plate 943 is arranged at the two web positions of the longitudinal beam 941 above this position for reinforcement.
[0064] The triangular side bracket 11 includes a side bracket lower embedded part 111 , a side bracket upper embedded part 112 and a side bracket main frame 113 .
[0065] According to the present invention, the first height adjustment pad beam 3 and the fourth height adjustment pad beam 6 are symmetrically arranged at the hinge point of the main bracket horizontal rod 25 and the main bracket diagonal support rod 23, and the second height adjustment pad beam 4 and the third height adjustment pad beam 5 are symmetrically arranged at the hinge point of the main bracket horizontal rod 25 and the main bracket upper embedded part 22; the length direction of the fine-rolled threaded steel bar 83 is parallel to the transverse bridge direction; two pin seat ear plates 932 are fixed on the top surface of each pin seat bottom plate 931 to form a groove shape, and the net distance between the two pin seat ear plates 932 is greater than the maximum width of the bottom mold longitudinal beam 94 at this point; the long side of the L-shaped notch 942 is parallel to the length direction of the longitudinal beam 941, and the angle formed by its short side and the long side is an obtuse angle.
[0066] The invention discloses a construction method for a cantilevered beam reference section articulated triangular bracket combined with a hanging basket integrated device, which is characterized by comprising the following steps:
[0067] Step 1: Construction preparation:
[0068] Double-joined C36b channel steels are used to make 8 sets of main bracket diagonal braces 23 and 8 sets of main bracket vertical bars 24, double-joined C40b channel steels are used to make 8 sets of main bracket horizontal bars 25, and C20b channel steels are used to make 10 main bracket cross links 26;
[0069] Three groups of three-piece I56b I-beams and three groups of three-piece I36b I-beams are used as fulcrum height adjustment pads; C20b channel steel is used to make 8 inclined stay limiters 7; the vertical and horizontal supports of the self-locking unloading block are welded by a combination of 12mm, 16mm and 20mm thick q235b steel plates, and the specification of the fine-rolled threaded steel 83 is PSB830-JL32;
[0070] Two sets of bottom mold front beams 91 and two sets of bottom mold rear beams 92 are made of double-joined I40b I-beams, the pin seat 93 is welded by 14mm and 16mm thick q235b steel plates, and 12 bottom mold longitudinal beams 94 are made of I40b I-beams; the hanging basket bottom mold 10 is made of ordinary steel flat mold;
[0071] I25b I-beams are used to make four horizontal bars of the triangular side brackets 11 and four diagonal braces of the triangular side brackets 11, and I12 I-beams are used to make four vertical bars of the triangular side brackets 11. Double-piece C28b channel steels are used to make four groups of side formwork beams 12, I10 I-beams are used to make 40 side model steel unloading blocks 13, and a truss structure steel formwork is used to make the outer side formwork 14 of the hanging basket. The truss spacing is 1.1m, the panel thickness is 6mm, and the back ribs are made of C14 channel steel.
[0072] Step 2: Construction of bracket embedded parts:
[0073] When constructing pier 1, the embedded parts are installed according to the designed position. The structure of the ear plate exposed concrete surface is formed by welding 16mm and 20mm thick q235b steel plates as the main bracket lower embedded part 21 and the main bracket upper embedded part 22. The "door-shaped" anchor bar structure is formed by welding 20mm thick q235b steel plates and HRB400φ20 anchor bars as the side bracket lower embedded part 111 and the side bracket upper embedded part 112.
[0074] Step 3: Installation of the triangular main bracket:
[0075] The main components of the 8 groups of triangular main brackets 2 are connected under the bridge with 40Cr-φ80mm pins. Each triangular main bracket 2 is assembled into a whole, and then hoisted as a whole by a tower crane. With manual cooperation for precise positioning, the 8 groups of triangular main brackets 2 are symmetrically installed on the two sides of the pier 1 along the bridge direction. The main bracket horizontal rods 25 and the embedded parts 22 on the main bracket, as well as the main bracket diagonal braces 23 and the embedded parts 21 on the main bracket are connected with 40Cr-φ80mm pins. The main bracket cross links 26 are used to connect all the triangular main brackets 2 on each side of the pier 1 along the bridge direction into a whole.
[0076] Step 4: Install the fulcrum heightening beam:
[0077] According to the longitudinal slope of the bridge, the hinge point of the main bracket horizontal rod 25 of the small mileage and the main bracket diagonal support rod 23 is the first fulcrum, where the top surface of the triangular main bracket 2 is installed with a first height-adjusting cushion beam 3 formed by a group of three-piece I56b I-beams and a group of three-piece I36b I-beams stacked up and down; the hinge point of the main bracket horizontal rod 25 of the small mileage and the embedded part 22 on the main bracket is the second fulcrum, where the top surface of the triangular main bracket 2 is provided with a second height-adjusting cushion beam 4 formed by a group of three-piece I36b I-beams; the hinge point of the main bracket horizontal rod 25 of the large mileage and the embedded part 22 on the main bracket is the third fulcrum, where A third height adjustment pad beam 5 formed by a group of three-piece I36b I-beams is arranged on the top surface of the triangular main bracket 2; the hinge point of the long-mileage main bracket horizontal rod 25 and the main bracket diagonal support rod 23 is the fourth fulcrum, at which the fourth height adjustment pad beam 6 formed by two groups of three-piece I56b I-beams stacked up and down is arranged on the top surface of the triangular main bracket 2; the first height adjustment pad beam 3 and the fourth height adjustment pad beam 6 of each fulcrum of the triangular main bracket 2 are arranged near the inner side of the pier 1, and the bottom of the diagonal limiter 7 is welded and fixed to the top surface of the main bracket horizontal rod 25, and the top thereof is welded and fixed to the inner top of the height adjustment pad beam.
[0078] Step 5: Self-locking unloading block installation:
[0079] A self-locking unloading block 8 is installed on the top surface of each fulcrum height adjustment beam, and each self-locking unloading block 8 is composed of two horizontally installed unloading block horizontal supports 81 and two vertically installed unloading block vertical supports 82. A through hole is set in the middle of the unloading block horizontal support 81, and the fine-rolled threaded steel 83 passes through the through hole and is locked. The length direction of the fine-rolled threaded steel 83 is parallel to the horizontal bridge direction; when the hanging basket bottom mold 10 is dropped from the frame, by loosening the fine-rolled threaded steel nut, the unloading block horizontal support 81 can be displaced outward and the upper unloading block vertical support 82 can be displaced downward, and the height of the entire unloading block is reduced.
[0080] Step 6: Installation of the triangle bracket:
[0081] The horizontal bars, vertical bars and diagonal braces of the triangular side brackets are all connected by welding. After each triangular side bracket main frame 113 is assembled, it is hoisted by a tower crane and precisely positioned by manual cooperation. Four groups of triangular side brackets 11 are symmetrically installed on the two sides of the pier 1 in the transverse direction of the bridge, and are welded and fixed to the upper embedded parts 112 of the side bracket and the lower embedded parts 111 of the side bracket respectively at the upper and lower ends of the pier 1.
[0082] Step 7: Side formwork beam installation:
[0083] Two sets of side form pad beams 12 are respectively installed on the top surfaces of the triangular side brackets 11 on both sides of the cross bridge of the pier 1, and the side form pad beams 12 respectively use the first height adjustment pad beam 3, the second height adjustment pad beam 4, the third height adjustment pad beam 5, the fourth height adjustment pad beam 6 and the triangular side bracket as fulcrums.
[0084] Step 8: Installation of the hanging basket bottom mold system:
[0085] The front cross beam 91 and the rear cross beam 92 of the bottom mold are installed on the top surface of the self-locking unloading block 8, and the pin seat 93 is welded on the top surface of the cross beam. The bottom plate of each pin seat 93 is welded and fixed with two ear plates to form a groove shape, and the bottom mold longitudinal beam 94 is inserted into the groove; the longitudinal beam 941 and the pin seat ear plate 932 are both provided with through holes at the relative positions, namely the pin seat pin hole 933 and the bottom mold longitudinal beam pin hole 944, and 40Cr-φ50mm pin shafts are inserted into the pin holes to connect the components ; After cutting off the overlapping parts of the longitudinal beam 941 and the front cross beam 91, the rear cross beam 92 and the pin seat 93 of the bottom mold, an L-shaped notch 942 is formed. The long side of the L-shaped notch 942 is parallel to the length direction of the longitudinal beam 941, and the angle formed by its short side and long side is 131°. 14mm thick q235b stiffening steel plates 943 are set at the two web positions of the longitudinal beam 941 above the notch for reinforcement, and then the hanging basket bottom mold 10 is laid above the longitudinal beam 941.
[0086] Step 9: Installation of side model steel unloading block:
[0087] Ten side mold steel unloading blocks 13 are installed on each set of side mold cushion beams 12. When the outer mold 14 of the hanging basket is dropped, the steel unloading blocks are directly cut off by flame.
[0088] Step 10: Installation of the outer mold of the hanging basket:
[0089] The outer side mold 14 of the hanging basket is installed on the side mold steel unloading block 13.
[0090] In steps 2, 3, 4, 5 and 8 of the present invention, the center of the height-adjusting cushion beam along the bridge, the center of the self-locking unloading block 8, the center of the front crossbeam 91 of the bottom mold along the bridge, the center of the rear crossbeam 92 of the bottom mold along the bridge and the center of the top surface fulcrum of the triangular main bracket 2 are respectively located in the same cross section; in step 8, with the rear crossbeam 92 of the bottom mold as the base point, the front crossbeam 91 of the bottom mold and the longitudinal beam 94 can rotate around the base point to adapt to the longitudinal slope of the bottom of the cantilever beam 15.
[0091] like Fig.11 Shown is a process flow chart of the construction method of the present invention.
Claims
1. An integrated device of an articulated triangular bracket and a hanging basket for a cantilevered beam reference section, comprising a pier (1), characterized in that: A cantilever beam (15) is arranged on the top surface of the pier column (1); a plurality of sets of triangular main brackets (2) are symmetrically installed on the side of the pier column (1) in the direction of the bridge; a plurality of sets of triangular side brackets (11) are symmetrically installed on the side of the pier column (1) in the direction of the bridge; and a first height-adjusting cushion beam (3), a second height-adjusting cushion beam (4), a third height-adjusting cushion beam (5) and a fourth height-adjusting cushion beam (6) are arranged in sequence from low to high at the supporting point position on the top surface of the triangular main bracket (2) according to the longitudinal slope of the bridge. The beam (3) and the fourth height-adjusting cushion beam (6) are provided with an obliquely-stayed stopper (7) on the inner side surface direction close to the pier column (1), and the obliquely-stayed stopper (7) is connected between the height-adjusting cushion beam and the triangular main bracket (2). Self-locking unloading blocks (8) are provided on the top surfaces of all height-adjusting cushion beams. All the self-locking unloading blocks (8) located on the same side of the pier column (1) jointly support the hanging basket bottom formwork frame (9), and the top surface of the hanging basket bottom formwork frame (9) is also provided with a hanging basket bottom formwork (10). A side mold cushion beam (12) is arranged on the triangular side bracket (11), a side mold steel unloading block (13) is arranged on the top surface of the side mold cushion beam (12), and a hanging basket outer mold (14) is arranged on the side mold steel unloading block (13). The triangular main bracket (2) comprises a main bracket lower embedded part (21), a main bracket upper embedded part (22), a main bracket diagonal brace (23), a main bracket vertical rod (24) and a main bracket horizontal rod (25), and the components are connected by pins. At the same time, the triangular main bracket (2) is also connected to a main bracket cross-link (26), and the main bracket cross-link (26) connects all the triangular main brackets (2) on the same side of the pier (1) in the direction of the bridge into an integral structure. The self-locking unloading block (8) comprises a symmetrically arranged unloading block horizontal support (81) and an unloading block vertical support (82), a through hole is provided in the middle of the unloading block horizontal support (81), a finely rolled threaded steel bar (83) is inserted into the through hole, and the finely rolled threaded steel bar (83) is fixedly connected to the unloading block horizontal support (81). The hanging basket bottom mold frame (9) comprises a bottom mold front cross beam (91) and a bottom mold rear cross beam (92), the tops of the bottom mold front cross beam (91) and the bottom mold rear cross beam (92) are fixedly connected with a pin seat (93), the pin seat (93) is connected to a bottom mold longitudinal beam (94), the pin seat (93) comprises a pin seat bottom plate (931) and a pin seat ear plate (932) connected to each other, the bottom mold longitudinal beam (94) comprises a longitudinal beam (941), an L-shaped notch (942) is provided at one end of the longitudinal beam (941), and a pin seat pin hole (933) matching the pin seat ear plate (932) and a bottom mold longitudinal beam pin hole (944) are also provided on the longitudinal beam (941), and a stiffening plate (943) is also provided on the longitudinal beam (941) at the L-shaped notch (942). The triangular side bracket (11) comprises a side bracket lower embedded part (111) and a side bracket upper embedded part (112) arranged in the pier (1), wherein the side bracket lower embedded part (111) and the side bracket upper embedded part (112) are connected to a side bracket main frame (113). A first height adjustment cushion beam (3) and a fourth height adjustment cushion beam (6) are symmetrically arranged at the hinge point of the main bracket horizontal rod (25) and the main bracket diagonal support rod (23); a second height adjustment cushion beam (4) and a third height adjustment cushion beam (5) are symmetrically arranged at the hinge point of the main bracket horizontal rod (25) and the main bracket upper embedded part (22); The length direction of the finished rolled threaded steel bar (83) is parallel to the transverse bridge direction. The top surface of the pin seat bottom plate (931) is provided with two symmetrically distributed pin seat ear plates (932), and the net distance between the two pin seat ear plates (932) is greater than the maximum width of the bottom mold longitudinal beam (94) at this location. The long side of the L-shaped notch (942) is parallel to the length direction of the longitudinal beam (941), and the angle formed by the short side and the long side is an obtuse angle.
2. A construction method for the cantilever beam reference section articulated triangular bracket combined with the hanging basket integrated device as claimed in claim 1, characterized in that: The method comprises the following steps: Step 1: Construction preparation: The processing and production of the triangular bracket and other related components will be inspected and accepted after entering the site. Step 2: Construction of bracket embedded parts: When constructing the pier column (1), the main bracket lower embedded parts (21), the main bracket upper embedded parts (22), the side bracket lower embedded parts (111) and the side bracket upper embedded parts (112) are embedded according to predetermined requirements. Step 3: Installation of the triangular main bracket: The main components of the manufactured triangular main bracket (2) are connected by pins under the bridge, and each triangular main bracket (2) is assembled into a whole. Then, a tower crane is used to hoist the whole. Multiple sets of triangular main brackets (2) are symmetrically installed on two sides of the pier (1) along the bridge direction. Pins are used to connect the main bracket horizontal rod (25) and the main bracket upper embedded part (22), and the main bracket diagonal support rod (23) and the main bracket lower embedded part (21). The main bracket cross link (26) is used to connect all the triangular main brackets (2) on each side of the pier (1) along the bridge direction into a whole. Step 4: Install the fulcrum heightening beam: According to the longitudinal slope of the bridge, the hinge point of the main bracket horizontal rod (25) of the short mileage and the main bracket diagonal support rod (23) is used as the first fulcrum, at which the first height adjustment cushion beam (3) is arranged on the top surface of the triangular main bracket (2); the hinge point of the main bracket horizontal rod (25) of the short mileage and the embedded part (22) on the main bracket is used as the second fulcrum, at which the second height adjustment cushion beam (4) is arranged on the top surface of the triangular main bracket (2); the hinge point of the main bracket horizontal rod (25) of the long mileage and the embedded part (22) on the main bracket is used as the third fulcrum, at which the triangular main bracket ( 2) A third height adjustment pad beam (5) is arranged on the top surface, and the hinge point of the long-mileage main bracket horizontal rod (25) and the main bracket diagonal support rod (23) is the fourth support point, at which the fourth height adjustment pad beam (6) is arranged on the top surface of the triangular main bracket (2), and a diagonal stay limiter (7) is arranged on the first height adjustment pad beam (3) and the fourth height adjustment pad beam (6) of each support point of the triangular main bracket (2) near the inner side of the pier column (1), and the bottom of the diagonal stay limiter (7) is fixed to the top surface of the main bracket horizontal rod (25), and the top of the diagonal stay limiter (7) is fixed to the inner top of the height adjustment pad beam, Step 5: Installation of self-locking unloading block: A self-locking unloading block (8) is installed on the top surface of each fulcrum height adjustment pad beam. Each self-locking unloading block (8) is composed of two horizontal unloading block horizontal supports (81) installed horizontally and two vertical unloading block vertical supports (82) installed vertically. A through hole is arranged in the middle of the unloading block horizontal support (81). The fine-rolled threaded steel (83) passes through the through hole and is locked. The length direction of the fine-rolled threaded steel (83) is parallel to the horizontal bridge direction. When the hanging basket bottom mold (10) is dropped, the fine-rolled threaded steel nut can be loosened to make the unloading block horizontal support (81) move outward and the upper unloading block vertical support (82) move downward, so that the height of the entire unloading block is reduced. Step 6: Install the triangular bracket: Each triangular side bracket main frame (113) is hoisted by a tower crane, and multiple sets of triangular side brackets (11) are symmetrically installed on two sides of the pier column (1) in the transverse direction of the bridge, and are respectively fixed to the upper embedded parts (112) of the side bracket and the lower embedded parts (111) of the side bracket at the upper and lower ends of the pier column (1). Step 7: Installation of side formwork beams: A side mold cushion beam (12) is installed on the top surface of the triangular side bracket (11), and the side mold cushion beam (12) uses the first height adjustment cushion beam (3), the second height adjustment cushion beam (4), the third height adjustment cushion beam (5), the fourth height adjustment cushion beam (6) and the triangular side bracket as fulcrums. Step 8: Installation of the hanging basket bottom mold system: A bottom mold front crossbeam (91) and a bottom mold rear crossbeam (92) are installed on the top surface of the self-locking unloading block (8), and a pin seat (93) is fixed on the top surface of the crossbeam. The bottom plate of each pin seat (93) is fixed with two ear plates to form a groove shape, and the bottom mold longitudinal beam (94) is inserted into the groove; through holes are provided at relative positions of the longitudinal beam (941) and the pin seat ear plate (932), namely, the pin seat pin hole (933) and the bottom mold longitudinal beam pin hole (944), and pin shafts are inserted into the pin holes to connect the components; An L-shaped notch (942) is formed by cutting off the overlapping portion of the longitudinal beam (941) and the front cross beam (91) of the bottom mold, the rear cross beam (92) of the bottom mold, and the pin seat (93). The long side of the L-shaped notch (942) is parallel to the length direction of the longitudinal beam (941), and the angle formed by the short side and the long side is an obtuse angle. Stiffening plates (943) are arranged at the two webs of the longitudinal beam (941) above the notch for reinforcement. Then, a hanging basket bottom mold (10) is laid above the longitudinal beam (941). Step 9, side model steel unloading block installation: A side mold steel unloading block (13) is installed on the side mold cushion beam (12). When the outer mold (14) of the hanging basket is dropped, the steel unloading block is directly cut off by flame. Step 10: Installation of the outer mold of the hanging basket: Install the outer side mold (14) of the hanging basket on the side mold steel unloading block (13). In the steps 2, 3, 4, 5 and 8, the center of the height-adjusting cushion beam along the bridge, the center of the self-locking unloading block (8), the center of the bottom mold front beam (91) along the bridge, the center of the bottom mold rear beam (92) along the bridge and the center of the top surface fulcrum of the triangular main bracket (2) are respectively located in the same cross section. In the step eight, the bottom mold rear cross beam (92) is used as a base point, and the bottom mold front cross beam (91) and the longitudinal beam (94) can rotate around the base point to adapt to the longitudinal slope of the bottom of the cantilever beam (15).