Method, system and terminal for voltage sag transformation considering grid side and user side
By combining the Monte Carlo method and voltage sag analysis, the weak links on the power grid and the user side are identified, and the improved adaptive genetic algorithm is used to determine the optimal transformation plan, which solves the problem of economic loss assessment of industrial processes caused by voltage sag and power grid transformation. The problem of high investment and low return has achieved economic transformation of voltage sag and improvement of power quality.
Patent Information
- Application Number
- CN202111399799.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-19
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-11-19
AI Technical Summary
Existing technologies are difficult to effectively assess and solve the economic losses caused by voltage sag to industrial processes, and traditional power grid transformation solutions have the problem of high investment and low returns, making it impossible to economically take into account the risks of both the power grid and users.
The Monte Carlo method is combined with voltage sag analysis and calculation to identify weak links in the power grid and the user side, and the optimal transformation plan is determined through an improved adaptive genetic algorithm, including replacing the overhead lines of the power grid with cables and installing DVR on the user side. Voltage sag compensation, optimizing the grid structure and user-side equipment configuration.
It realizes the economic evaluation of voltage sag and optimizes the transformation plan, reduces the economic losses caused by voltage sag to industrial sensitive users, improves the power quality, and at the same time overcomes the high investment and low return problem of traditional power grid transformation, and provides a cost-effective Higher solution.
Smart Images

Figure CN114154408B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of auxiliary decision-making for power grid engineering transformation, and more specifically, to a method, system and terminal for transformation taking into account voltage sag on the power grid side and the user side. Background Art
[0002] With the development of digital economy in the 21st century, various digital devices are becoming more and more important in social and economic development. The economic losses caused by power quality problems will have a huge impact on the development of the national economy. There are two ways to ensure that power supply and user loads are 100% compatible: one is to design and build a perfect power supply network; the other is to ensure that all end-user equipment can resist general power quality problems, but both methods are not economical. Therefore, it is of great significance to fully grasp the economic impact of power quality, comprehensively consider the factors of both the power grid and the user, and carry out power quality management work economically and effectively.
[0003] At present, voltage sag is the most complained power quality problem by users in foreign countries, which brings huge economic losses to users. The economic losses caused by power quality need to be solved by the joint efforts of power supply enterprises and users. From the perspective of users, the premise of avoiding voltage sag is to evaluate the actual economic losses caused by voltage sag. From the perspective of the power grid, how to provide users with high-quality power supply services and improve user satisfaction is the responsibility and obligation of power grid operation and management personnel. Otherwise, there will be risks such as compensation disputes or loss of potential users caused by power supply quality problems. When any sensitive user is connected to the system, in order to avoid the above situation, the power grid must change the traditional way of thinking and should consider the risks that may exist on both the power grid and the user. First, analyze the power consumption status and economic loss risks of such sensitive users. If it does not meet the power consumption requirements of users, measures should be taken to prevent such incidents from happening: first, consider the selection of access points; second, plan and transform the power grid; third, consider whether it can be solved by installing corresponding control equipment. By transforming the power grid or controlling equipment, the frequency of voltage sag can be reduced or avoided, which can effectively reduce the economic losses of important industrial sensitive users under the entire distribution network.
[0004] When voltage sag cannot be avoided, the economic losses caused by voltage sag can be avoided by configuring voltage sag mitigation equipment or modifying the grid structure, but expensive investment costs must be considered. To determine the optimal investment plan, it is necessary to reasonably evaluate the economic losses caused by voltage sag before and after equipment configuration. Therefore, accurately evaluating the economic losses caused by voltage sag to industrial processes is an important basis for selecting voltage sag mitigation plans, which has important practical significance and theoretical value and has become an important issue that needs to be solved urgently. Summary of the invention
[0005] In order to solve the deficiencies in the prior art, the purpose of the present invention is to provide a method, system and terminal for voltage sag transformation considering both the grid side and the user side. The present invention comprehensively considers factors such as the bidirectional fault characteristics on the grid side and the user side, the transformation cost, etc., and conducts a voltage sag transformation evaluation, which can provide technical support for improving the power quality and reducing the transformation cost.
[0006] The above technical objectives of the present invention are achieved through the following technical solutions:
[0007] In a first aspect, a method for voltage sag transformation considering the grid side and the user side is provided, comprising the following steps:
[0008] Replace the grid overhead lines with cables and install DVR on the user side to compensate for voltage sag;
[0009] Based on the historical fault data of the line, the Monte Carlo method and the voltage sag analysis and calculation method are combined to identify the weak links on the power grid side;
[0010] The sensitive loads on the user side are classified by comprehensively considering the voltage sag sensitivity of the load and the loss level of a single voltage sag of the load;
[0011] After identifying the weak links on the grid side and the user side, a decision model is established with the maximum net present value as the objective function, and the improved adaptive genetic algorithm or adaptive genetic algorithm is used to select the optimal solution.
[0012] Furthermore, the identification process of the weak links on the power grid side is specifically as follows:
[0013] Use the Monte Carlo method to perform N sets of simulations on the location and type of faults;
[0014] The voltage sag analysis and calculation are performed on the simulated fault location and fault type to obtain N voltage conditions connected to the PCC point when different types of faults occur at different nodes. The PCC point is a sensitive load node.
[0015] The voltage sag of each node in each set of data is compared with the voltage sag severity that the three assumed PCC points can withstand. If the former is higher than the latter, it is regarded as a loss and accumulated. After the N sets of simulations are completed, the expected value of the loss caused by a single fault is calculated.
[0016] The expected values of losses caused by single faults corresponding to different lines in N simulations are arranged in descending order, and the first K lines are taken as the weak links of the power grid.
[0017] Furthermore, the calculation formula for the expected value of the loss caused by a single failure is specifically:
[0018]
[0019] Among them, C expect represents the expected value of the loss caused by a single failure; C ij represents the loss caused by the jth line failure in the ith simulation; N represents the number of simulated groups; E fault It indicates the expected number of failures per 100 km of the line.
[0020] Furthermore, the classification process of the sensitive load is specifically as follows:
[0021] Evaluate and calculate the economic losses caused by a single voltage sag;
[0022] Calculate the user's annual voltage sag loss based on the voltage amplitude, duration, and number of sags;
[0023] The corresponding load category is obtained by matching the voltage sag sensitivity and the distribution range of the user's annual sag loss.
[0024] Furthermore, the calculation formula for the economic loss caused by a single voltage sag is specifically:
[0025]
[0026] Among them, C sag Indicates the economic loss caused by a single voltage sag; represents the interruption probability of the jth subprocess; represents the interruption loss of the jth subprocess; P p represents the probability of process interruption; C p represents the process interruption loss; T represents the duration; Indicates the sub-process immunity time, which is the shortest duration that can cause the sub-process to be interrupted; PIT p Represents the global process immunity time, which is the shortest drop duration that can cause the entire process to terminate.
[0027] Furthermore, the calculation formula for the user's annual temporary drop loss is specifically as follows:
[0028]
[0029] Among them, C sag (V i ,T i ) represents the economic loss of the ith temporary drop; V i , T i They represent the voltage amplitude and duration of the i-th sag respectively; Num represents the number of sags per year for the user.
[0030] Furthermore, the improved adaptive genetic algorithm is obtained by adopting an elite retention strategy and introducing a chain competition strategy based on the traditional adaptive genetic algorithm.
[0031] Furthermore, the calculation formula of the decision model is specifically:
[0032]
[0033] Among them, f(x) NPV Represents the net present value of the benefits that the comprehensive transformation plan can bring; C t represents the cash flow in the tth year, that is, the voltage sag loss value and other benefits reduced by installing DVR on the user side and transforming the weak links on the grid side; C operating represents the annual maintenance cost of DVR and cables; C o represents the initial investment value, i.e. the initial investment for purchasing and installing DVR and the reconstruction of overhead lines. The initial investment for DVR is the investment cost for 30 years. r represents the predetermined discount rate.
[0034] Secondly, a voltage sag transformation system considering the grid side and the user side is provided, including:
[0035] Compensation module, used to replace the overhead lines of the power grid with cables and install DVR on the user side to compensate for voltage sag;
[0036] The power grid identification module is used to identify weak links on the power grid side based on historical fault data of the line by combining the Monte Carlo method with the voltage sag analysis and calculation method;
[0037] The user identification module is used to classify sensitive loads on the user side by comprehensively considering the voltage sag sensitivity of the load and the loss level of a single voltage sag of the load;
[0038] The scheme selection module is used to establish a decision model with the maximum net present value as the objective function after identifying the weak links on the grid side and the user side, and adopt an improved adaptive genetic algorithm or an adaptive genetic algorithm to select the optimal scheme.
[0039] In a third aspect, a computer terminal is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a method for voltage sag transformation taking into account both the grid side and the user side as described in any one of the first aspects is implemented.
[0040] Compared with the prior art, the present invention has the following beneficial effects:
[0041] The present invention firstly adopts the voltage sag analysis and calculation method, and combines the Monte Carlo method to simulate and calculate the location and type of fault, and obtains the voltage conditions of N nodes (PCC points) connected to sensitive loads when different types of faults occur at different nodes; for sensitive loads, the present invention proposes a load model that classifies the load according to the voltage sag sensitivity and the loss level of a single voltage sag of the load, and then determines the weak links of the power grid according to the loss value caused by the fault; finally, the improved adaptive genetic algorithm is used to determine the optimal solution with the maximum net present value as the objective function. The invention considers the comprehensive optimization scheme of user-side compensation and power grid-side transformation, which not only overcomes the high investment and low return problem of traditional large-scale power grid transformation, but also highlights the cost-effectiveness, thereby maximizing the benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0043] Figure 1 is an overall flow chart of an embodiment of the present invention;
[0044] Figure 2 is a system block diagram in an embodiment of the present invention;
[0045] Figure 3 It is a wiring diagram of an IEEE 30 node system in an embodiment of the present invention;
[0046] Figure 4 is an objective function-algebraic diagram considering only the grid-side transformation in the embodiment of the present invention;
[0047] Figure 5 It is a line number-algebraic diagram considering only the grid side transformation in the embodiment of the present invention;
[0048] Figure 6 is an algebraic graph of the objective function value considering only the user-side transformation in the embodiment of the present invention;
[0049] Figure 7 It is a DVR compensation voltage-algebraic diagram considering only the user side modification in the embodiment of the present invention;
[0050] Figure 8 14 is a schematic diagram comparing the network loss before and after the transformation of the user node in the embodiment of the present invention;
[0051] Fig. 9 1 is a schematic diagram comparing the network loss before and after the transformation of 10 node users in an embodiment of the present invention;
[0052] Fig.10 1 is a schematic diagram comparing the network loss before and after the transformation of 30 node users in an embodiment of the present invention;
[0053] Fig.11 is the objective function value-algebraic graph of the comprehensive scheme in the embodiment of the present invention;
[0054] Fig.12 is a compensation voltage-algebraic diagram of a comprehensive solution in an embodiment of the present invention;
[0055] Fig.13 is a line number-algebraic diagram of the comprehensive scheme in an embodiment of the present invention;
[0056] Fig.14 This is a comparison diagram of the entire network loss before and after the transformation of the 14-node user in the comprehensive solution in the embodiment of the present invention;
[0057] Fig.15 This is a comparison diagram of the entire network loss before and after the transformation of the 10-node user in the comprehensive solution in the embodiment of the present invention;
[0058] Fig.16 It is a comparison diagram of the entire network loss before and after the transformation of the 30-node user in the comprehensive solution in the embodiment of the present invention. DETAILED DESCRIPTION
[0059] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0060] Embodiment 1: Considering the voltage sag transformation method on the grid side and the user side, such as Figure 1 As shown, the following steps are included:
[0061] Step 1: Replace the grid overhead lines with cables and install DVR on the user side to compensate for voltage sag;
[0062] Step 2: Based on the historical fault data of the line, the Monte Carlo method and the voltage sag analysis and calculation method are combined to identify the weak links on the grid side;
[0063] Step 3: Classify the sensitive loads on the user side by comprehensively considering the voltage sag sensitivity of the load and the loss level of a single voltage sag of the load;
[0064] Step 4: After identifying the weak links on the grid side and the user side, a decision model is established with the maximum net present value as the objective function, and the improved adaptive genetic algorithm or adaptive genetic algorithm is used to select the optimal solution.
[0065] In order to improve the effectiveness and economy of voltage sag transformation, the present invention takes into account the voltage sag conditions existing on both the grid side and the user side.
[0066] The specific process of identifying weak links on the power grid side is as follows:
[0067] 1. Use the Monte Carlo method to perform N sets of simulations on the location and type of faults.
[0068] (1) Probabilistic model of fault types
[0069] The fault type has a great influence on the amplitude of voltage sag. The present invention considers 4 different fault types, represented by FT. FT from 1 to 4 represents different fault types, namely single-phase ground short circuit, two-phase ground short circuit, phase-to-phase short circuit, and three-phase short circuit.
[0070] Assuming that the random number u1~(0,1) is uniformly distributed, the probability distribution model of different fault types occurring in the system is:
[0071]
[0072] Among them, P(FT i ) is the probability of each failure type occurring.
[0073] According to the accident statistics of distribution network over the years, the probability of occurrence of various fault types is shown in the following table, where i ranges from 1 to 4, corresponding to 4 types of short-circuit faults.
[0074] Occurrence probability statistics of distribution network fault types
[0075]
[0076]
[0077] (2) Probability model of faulty lines
[0078] In the absence of historical data, it is assumed that the failure of each line is random, and the probability of line failure is equal to the ratio of the line length to the total line length, that is:
[0079]
[0080] Where: P(l i ) is the probability of failure of the i-th line, l i is the length of the i-th line.
[0081] Assume that the random number u2~(0,1) is uniformly distributed, FL represents the fault line, then the probability model of the fault line is:
[0082]
[0083] (3) Probabilistic model of fault location
[0084] Assuming that the probability of a fault occurring at each point in the fault line is the same, for the convenience of simulation, the fault points can be evenly set according to the length of the fault line. If three fault points are evenly set on each line, and the random number u3~(0,1) is evenly distributed, F represents the fault point location, then the probability distribution model of the fault point location is as follows:
[0085]
[0086] 2. Perform voltage sag analysis and calculation on the simulated fault location and fault type to obtain N voltage conditions connected to the PCC point when different types of faults occur at different nodes. The PCC point is a sensitive load node.
[0087] The voltage at the PCC after a fault occurs is given by:
[0088]
[0089] Among them, Z F is the impedance amplitude between PCC and the fault point; Z S is the source impedance magnitude at PCC. Let Z F =zl is the line impedance per unit length, and l is the distance between the PCC and the fault point.
[0090]
[0091]
[0092] For a three-phase system, when a three-phase short circuit occurs, Z S is the positive sequence impedance; for single-phase grounding, Z S is the sum of positive sequence, negative sequence and zero sequence impedance; for phase-to-phase fault, Z S It is the sum of positive-sequence and negative-sequence impedances.
[0093] 3. Compare the voltage sag situation of each node in each set of data with the voltage sag severity that the three assumed PCC points can withstand. If the former is higher than the latter, it is regarded as a loss and accumulated. After the completion of N groups of simulations, the expected value of the loss caused by a single fault is calculated.
[0094] The calculation formula for the expected value of the loss caused by a single failure is as follows:
[0095]
[0096] Among them, C expect represents the expected value of the loss caused by a single failure; C ij represents the loss caused by the jth line failure in the ith simulation; N represents the number of simulated groups; E faultIt indicates the expected number of failures per 100 km of the line.
[0097] 4. Arrange the expected values of losses caused by single faults corresponding to different lines in N simulations in descending order, and take the first K lines as the weak links of the power grid.
[0098] The classification process of sensitive loads is specifically as follows: evaluate and calculate the economic losses caused by a single voltage sag; calculate the user's annual voltage sag losses based on the voltage amplitude, duration, and number of voltage sags; and obtain the corresponding load category based on the distribution range of voltage sag sensitivity and the user's annual voltage sag losses.
[0099] The calculation formula for the economic loss caused by a single voltage sag is as follows:
[0100]
[0101] Among them, C sag Indicates the economic loss caused by a single voltage sag; represents the interruption probability of the jth subprocess; represents the interruption loss of the jth subprocess; P p represents the probability of process interruption; C p represents the process interruption loss; T represents the duration; Indicates the sub-process immunity time, which is the shortest duration that can cause the sub-process to be interrupted; PIT p Represents the global process immunity time, which is the shortest drop duration that can cause the entire process to terminate.
[0102] The specific calculation formula for the user's annual temporary drop loss is:
[0103]
[0104] Among them, C sag (V i ,T i ) represents the economic loss of the ith temporary drop; V i 、T i Respectively represent the voltage amplitude and duration of the ith sag; Num represents the number of sags per year for the user. The load classification is shown in the following table:
[0105] Load classification
[0106]
[0107] Since the D-type load is not only less sensitive, that is, the possibility of loss caused by voltage sag is small, and even if the loss occurs, the magnitude of the loss is negligible, therefore, this embodiment focuses on the loss status of the three types of loads A, B, and C.
[0108] The improved adaptive genetic algorithm is obtained by adopting an elite retention strategy and introducing a chain competition strategy based on the traditional adaptive genetic algorithm. It should be noted that the improved adaptive genetic algorithm can also directly adopt the traditional adaptive genetic algorithm.
[0109] The calculation formula of the decision model is as follows:
[0110]
[0111] Among them, f(x) NPV Represents the net present value of the benefits that the comprehensive transformation plan can bring; C t represents the cash flow in the tth year, that is, the voltage sag loss value and other benefits reduced by installing DVR on the user side and transforming the weak links on the grid side; C operating represents the annual maintenance cost of DVR and cables; C o represents the initial investment value, i.e. the initial investment for purchasing and installing DVR and the reconstruction of overhead lines. The initial investment for DVR is the investment cost for 30 years. r represents the predetermined discount rate.
[0112] The improved adaptive genetic algorithm mainly includes the following steps:
[0113] A. Determine the actual problem parameter set based on the identification results on the grid side and the user side;
[0114] B. Encode the parameter set;
[0115] C. Initialize the population P(t) using a quasi-random Halton sequence;
[0116] D. Based on the parameters of bit string decoding, the objective function value is calculated, the function value is mapped to the fitness value, and the fitness value is adjusted to complete the evaluation group P(t);
[0117] E. Determine whether the stopping criteria are met; if so, output the ideal solution; if not, perform selection, crossover, and mutation operations in sequence to generate a new group and re-evaluate.
[0118] The agent at position (1, i) is represented by L 1,i , i = 1, 2…popsize. popsize is the number of agents in the initial population. L 1,i The neighborhood of 1,i . NbS 1,i ={L 1,i1 L 1,i2}.in
[0119]
[0120] Each intelligent agent has a certain amount of energy, namely, fitness value. In the present invention, an intelligent agent represents an individual L 1,i , all agents are placed in a circular chain of size 1×popsize, each individual occupies a grid point and cannot move. Since the agent has only local perception ability, it can only interact with the surrounding agents, which forms a circular chain structure.
[0121] The principle of neighborhood competition selection is described as follows:
[0122] Assume that the competition selection is carried out from left to right on the loop chain, and the current agent is L1′ ,i , whose neighborhood is NbS 1,i , NbS 1,i ={L t 1,i1 L t 1,i2}, i = 1, 2…popsize. L1′ ,i The update method is as follows:
[0123]
[0124] Among them, Represents the competition operation between agents.
[0125] Assume that agent L t 1,i and L t 1,i1 Competition, then:
[0126] L t 1,i =(c t i,1 c t i,2 …c t i,1 …c t i,length )
[0127] L t 1,i1 =(c t i1,1 c t i1,2 …c t i1,1 …c t i1,length )
[0128] Among them, c t i,j represents the j-th gene of the agent at position (1, i); c ti1,j Represents the j-th gene of the agent at position (1, i1); length is the number of genes of a single agent, that is, the number of features.
[0129] For example, the competition operation It can be expressed as follows:
[0130]
[0131] U(0,1) represents a random number generated under uniform distribution in the (0,1) interval.
[0132] Steps of chain neighborhood competition strategy:
[0133] Step 1: Define a register temp with a space of (1×3), temp←(L t 1,i1 ,L t 1,i ,L t 1,i2 )
[0134] Step 2: Update L according to formula (5) t 1,i
[0135] Step 3: Determine whether i=popsize holds. If so, enter the crossover phase. Otherwise, i←i+1 and go to step 1.
[0136] Adaptive Crossover:
[0137] In the crossover process, the crossover probability p c is adaptive. The corresponding formula is as follows:
[0138]
[0139] Among them, GH(i,i′) is L t 1,i and Max 1,i Hamming distance of Max 1,i NbS 1,i Individuals with larger fitness values; f i ′ is the current individual L t 1,i The fitness value of L t 1,i and Max 1,i The larger fitness value among the fitness values; f t max is the maximum fitness value of individuals in this generation; f t ave is the average fitness value of individuals in this generation.
[0140] The specific operation of the crossover is: generate a random number U(0,1) between 0 and 1 and p c Compare and determine L t 1,i and Max 1,i Whether to perform crossover, the process is as follows:
[0141]
[0142] A pair of parents performing a crossover randomly exchange genes at the same gene position to generate offspring individuals.
[0143] Example 2: Considering the voltage sag transformation system on the grid side and the user side, such as Figure 2 As shown, it includes a compensation module, a power grid identification module, a user identification module and a user identification module.
[0144] Among them, the compensation module is used to replace the overhead lines of the power grid with cables and install DVR on the user side to compensate for voltage sag. The power grid identification module is used to identify the weak links on the power grid side by combining the Monte Carlo method with the voltage sag analysis and calculation method based on the historical fault data of the line. The user identification module is used to classify the sensitive loads on the user side by comprehensively considering the voltage sag sensitivity of the load and the loss level of a single voltage sag of the load. The solution selection module is used to establish a decision model with the maximum net present value as the objective function after identifying the weak links on the power grid side and the user side, and use the improved adaptive genetic algorithm or the adaptive genetic algorithm to select the optimal solution.
[0145] Example 3: Grid-side transformation solution Select three nodes in the IEEE 30-node system, such as Figure 3 As shown, nodes 14, 10, and 30 are connected to users of categories A, B, and C respectively. Based on the identification results of weak links in the power grid, this project uses an improved adaptive genetic algorithm to analyze 10 lines in the weak links of the power grid, and selects the optimal transformation line with the maximum net present value as the objective function.
[0146] The line reconstruction considers putting the weak lines in the system underground, that is, transforming the overhead lines into cables, in order to reduce the probability of failure. The corresponding fault rate of the transformed lines becomes 1 / 10 of the original, that is:
[0147]
[0148] Where: E′ fault represents the failure probability of the line after transformation; E fault Represents the line failure probability before transformation.
[0149] The objective function of optimization is:
[0150]
[0151] Where: C t represents the cash flow in the tth year, i.e., the reduction of voltage sag loss on the user side and other benefits after the weak grid transformation; C operating is the operation and maintenance cost; r is the predetermined discount rate; C0 represents the initial investment in line reconstruction.
[0152] As can be seen from the table below, the average cost of 35kV line reconstruction is 1.124 million yuan / km, and the average cost of 110kV line reconstruction is 3.8742 million yuan / km. When calculating the line reconstruction cost, this project uses the average market price. The cost of line reconstruction C can be obtained according to the following formula: line :
[0153] C0=C line =C kunit × k
[0154] Where: C kunit is the cost per kilometer of line k; l k is the length of line k.
[0155] Line reconstruction cost
[0156]
[0157]
[0158]
[0159] The simulation results of the grid-side transformation are as follows: Figure 4 and Figure 5 As shown in the figure, from the line numbering diagram considering only the grid-side transformation, it can be seen that the simulation result is the transformation line 14, that is, the line from node 12 to node 14. According to the data, node 14 is a 33kV node, and its total line length is 18.5km. Cost calculation shows that it costs 20.794 million yuan to transform line 14. From the objective function diagram considering only the grid-side transformation, it can be seen that the objective function value of the grid-side transformation plan is 44.09 million yuan, that is, this plan can reduce the loss of 44.09 million yuan for the grid and users. The average service life of the cable line is 30 years, so the average annual income of the transformed line is about 1.47 million yuan.
[0160] Considering only the transformation on the grid side can effectively reduce the failure rate of the transformed lines and reduce the losses caused by voltage drops due to faults. On the one hand, in terms of fault elimination, the transformation of weak links in the grid can effectively reduce the failure rate of key lines, thereby not only reducing the economic losses of target sensitive users, but also improving the power quality of the entire network, reducing the losses of other uncounted users in the entire network, and attracting more new users to access the grid; on the other hand, in terms of transformation costs, the cost of laying overhead lines underground is relatively high (especially high-voltage overhead lines). If economic efficiency is considered, simply considering the transformation of overhead lines to reduce the losses caused to users by power quality is not the best option.
[0161] Embodiment 4: This embodiment proposes a user-side DVR compensation transformation solution based on an improved adaptive genetic algorithm.
[0162] In this embodiment, the transformation plan on the user side considers installing a dynamic voltage restorer at the target sensitive user. Three nodes are selected in the IEEE 30-node system (circled in the node diagram of Example 1), and nodes 14, 10, and 30 are assumed to be users of types A, B, and C, respectively. By installing DVRs for the above three types of users at the same time, and using an improved adaptive genetic algorithm to optimize the compensation voltage values of the three DVRs, the best DVR compensation value is selected to minimize the user's loss.
[0163] Since this project uses a non-energy storage DVR device, the compensation voltage range of the selected DVR type is set to (0-0.5) pu. According to the net present value method, the objective function to be calculated is:
[0164]
[0165] Where: f(x) NPV Represents the net present value of the benefits that can be brought by user-side transformation; C t represents the cash flow in year t, i.e., the voltage sag loss value reduced by installing DVR on the user side; C operating is the annual operation and maintenance cost of DVR; C o represents the initial investment value, which refers to the initial investment for purchasing and installing the DVR; r is the predetermined discount rate.
[0166] At present, the average design life of DVR is 10 years. Since the weak line transformation cycle of the power grid is 30 years, in order to better compare the plans, this project examines the benefits brought by the user-side transformation plan within 30 years.
[0167] The initial investment C0 of DVR is:
[0168] C0=C dvr_total
[0169] The compensation capacity of DVR is not only related to the compensation voltage, but also to the capacity of the load. The specific relationship is shown in the following formula:
[0170] Where: S i DVR Indicates the compensation capacity of the DVR; U i DVR is the output compensation voltage of the DVR; U n is the rated voltage of the busbar; S L Load capacity.
[0171] Depend on The initial investment cost C of DVR can be calculated dvr_total .
[0172] C dvr_total =∑C i dvr =∑S i DVR ×C i dvr_unit
[0173] Where: C i dvr_unit is the market cost of the i-th DVR (unit: yuan / KV·A).
[0174] On the other hand, there are the operating and maintenance costs of DVR. operating (10% of total cost / year):
[0175] C operating =C dvr_total ×10%.
[0176] The current market prices of DVRs are shown in the following table:
[0177] Current DVR market price
[0178]
[0179] Assume that the loads connected to nodes 14, 10, and 30 are of three types, A, B, and C, respectively, as shown in the load classification table (such as the circled part of the node diagram in Example 1). Assume that the total loss of a single voltage sag for loads of types A, B, and C is 400,000 yuan, 400,000 yuan, and 200,000 yuan, respectively. The simulation results are shown in Figure 6 shown.
[0180] Depend on Figure 6 It can be seen that the objective function value converges at the 43rd generation, and the optimal function value is 1.177×10 4 Ten thousand yuan, that is, the benefit of considering only the user-side transformation is 1.177×10 4Ten thousand yuan, with an average of about 3.923 million yuan per year.
[0181] like Figure 7 As shown in the figure, the final compensation voltages of the DVRs installed at 14 nodes, 10 nodes, and 30 nodes are 0.26, 0.38, and 0.09 (pu) respectively. The transformation investment for users with 14 nodes is 6.1935 million yuan; the transformation investment for users with 10 nodes is 9.0216 million yuan; the transformation investment for users with 30 nodes is 1.0322 million yuan, and the total investment for DVR is 16.25 million yuan.
[0182] like Figure 8-Figure 10 As shown in the figure, from the comparison of the network losses before and after the transformation of the three node users, it can be seen that before the transformation of 14 nodes, the failure caused a loss of 2.575 million yuan / year to the 14 nodes, and after the transformation, the failure caused a loss of 262,400 yuan / year to the 14 nodes; before the transformation of 10 nodes, the failure caused a loss of 4.80 million yuan / year to the 10 nodes, and after the transformation, the failure caused a loss of 322,700 yuan / year to the 10 nodes; before the transformation of 30 nodes, the failure caused a loss of 513,400 yuan / year to the 30 nodes, and after the transformation, the failure caused a loss of 181,300 yuan / year to the 30 nodes.
[0183] The use of dynamic voltage restorers can effectively protect sensitive loads from voltage sags, and can also suppress interference such as harmonic flicker in the power supply voltage. The above simulation shows that the use of dynamic voltage restorers for point-to-point centralized compensation of industrial sensitive users can effectively reduce the user's electricity risk. However, from a global perspective, the governance of voltage sags should be undertaken by the power grid and users. If the prevention and governance of voltage sags is simply based on the user's own transformation, it will not be able to fundamentally improve the power quality of the power grid, nor can it achieve the goal of economically, effectively and reasonably managing power quality problems. Therefore, it is of great significance to propose a governance strategy that can achieve two-way interaction between the power grid and users by integrating the transformation plans of both the power grid and users. In addition, with the development of information technology, control technology and power electronics technology, high-reliability and low-cost dynamic voltage restorers continue to emerge, which also provides effective support for the comprehensive plan led by the power grid, unified planning, scientific governance, and joint transformation.
[0184] Embodiment 5: This embodiment proposes a comprehensive transformation plan based on an improved adaptive genetic algorithm that takes into account grid-side transformation and user-side compensation.
[0185] Considering the limitations of the traditional single user-side transformation plan and the single grid-side transformation plan, the project team proposed a comprehensive optimization plan that takes into account user-side compensation and grid-side transformation. This plan not only overcomes the high investment and low return problem of traditional large-scale grid transformation, but also highlights the cost-effectiveness of DVR, thereby maximizing the benefits. At this time, the optimization variables increase to 4, each variable is independent, and ultimately the optimal combination of the 4 variables optimizes the target value.
[0186] According to the net present value method, the objective function to be calculated is:
[0187]
[0188] Where: f(x) NPV Represents the net present value of the benefits that the comprehensive transformation plan can bring; C t represents the cash flow in the tth year, i.e., the voltage sag loss and other benefits reduced by installing DVR on the user side and transforming the weak links on the grid side; C operating Refers to the annual maintenance cost of DVR and cables; C o represents the initial investment value, i.e., the initial investment for purchasing and installing DVR and the reconstruction of overhead lines (where the initial investment for DVR is the investment cost for 30 years); r is the predetermined discount rate.
[0189] The simulation results of the comprehensive solution are as follows Figure 11-13 shown.
[0190] From the objective function value diagram of the comprehensive scheme, we can see that the objective function value is 1.246×10 4 The total revenue of the comprehensive scheme is 82.46 million yuan, which is about 2.7487 million yuan more per year on average.
[0191] like Figure 14-16 As shown in the figure, the line that needs to be renovated is line 14, which is the line from node 12 to node 14, and the renovation cost is 20.794 million yuan. The comparison before and after the renovation is shown in the figure below. Before the renovation of node 14, the loss caused by the fault to node 14 was 2.5756 million yuan / year, and after the renovation, the loss caused by the fault to node 14 was 545,000 yuan / year; before the renovation of node 10, the loss caused by the fault to node 10 was 4.800 million yuan / year, and after the renovation, the loss caused by the fault to node 10 was 412,600 yuan / year; before the renovation of node 30, the loss caused by the fault to node 30 was 513,400 yuan / year, and after the renovation, the loss caused by the fault to node 30 was 181,100 yuan / year.
[0192] In summary, the superiority of the transformation plan is considered from the perspectives of economic benefits and transformation effects. The analysis is as follows:
[0193] User-side transformation is highly targeted. For typical high-loss or high-sensitivity users in the system, user-side transformation can greatly improve their power quality, thereby ensuring the continuity of production. However, user-side transformation is ineffective for other users in the power grid whose power quality needs to be improved.
[0194] The grid-side transformation has a wide coverage and improves the power quality from the system level. However, the grid-side transformation is relatively weak in targeting and may not fully meet the power quality requirements of some highly sensitive and high-loss users. At the same time, due to the high cost of underground overhead lines, the transformation of weak lines on the grid side will be limited due to economic considerations.
[0195] The comprehensive transformation plan overcomes the limitations of traditional single-sided transformation and coordinates the advantages of single-sided transformation. It not only considers the improvement of the voltage level of the entire network from the system level, but also transforms typical sensitive loads in a targeted manner, achieving the purpose of load classification and processing. It provides a new way of thinking for power suppliers and users, that is, the interactive coordination between users and the grid side can more effectively improve the power quality.
[0196] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0197] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0198] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0199] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0200] The above specific implementation methods further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above are only specific implementation methods of the present invention and are not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. Consider the voltage sag transformation method on the grid side and the user side, which is characterized by: The following steps are involved: Replace the grid overhead lines with cables and install DVR on the user side to compensate for voltage sag; Based on the historical fault data of the line, the Monte Carlo method and the voltage sag analysis and calculation method are combined to identify the weak links on the power grid side; The sensitive loads on the user side are classified by comprehensively considering the voltage sag sensitivity of the load and the loss level of a single voltage sag of the load; After identifying the weak links on the grid side and the user side, a decision model is established with the maximum net present value as the objective function, and an improved adaptive genetic algorithm or an adaptive genetic algorithm is used to select the optimal solution; The identification process of the weak link on the power grid side is specifically as follows: Use the Monte Carlo method to perform N sets of simulations on the location and type of faults; The voltage sag analysis and calculation are performed on the simulated fault location and fault type to obtain N voltage conditions connected to the PCC point when different types of faults occur at different nodes. The PCC point is a sensitive load node. The voltage sag of each node in each set of data is compared with the voltage sag severity that the three assumed PCC points can withstand. If the former is higher than the latter, it is regarded as a loss and accumulated. After the N sets of simulations are completed, the expected value of the loss caused by a single fault is calculated. Arrange the expected values of losses caused by single faults corresponding to different lines in N simulations in descending order, and take the first K lines as the weak links of the power grid; The classification process of the sensitive load is specifically as follows: Evaluate and calculate the economic losses caused by a single voltage sag; Calculate the user's annual voltage sag loss based on the voltage sag amplitude and duration; The corresponding load category is obtained by matching the voltage sag sensitivity and the distribution range of the user's annual sag loss.
2. The method for voltage sag transformation considering the grid side and the user side according to claim 1 is characterized in that: The calculation formula of the expected value of the loss caused by a single failure is specifically: Among them, C expect represents the expected value of the loss caused by a single failure; C ij represents the loss caused by the jth line failure in the ith simulation; N represents the number of simulated groups; E fault It indicates the expected number of failures per 100 km of the line.
3. The method for transforming voltage sags considering the grid side and the user side according to claim 1 is characterized in that: The calculation formula for the economic loss caused by a single voltage sag is specifically: Among them, C sag Indicates the economic loss caused by a single voltage sag; represents the interruption probability of the jth subprocess; represents the interruption loss of the jth subprocess; P p represents the probability of process interruption; C p represents the process interruption loss; T represents the duration; Indicates the sub-process immunity time, which is the shortest duration that can cause the sub-process to be interrupted; PIT p Represents the global process immunity time, which is the shortest drop duration that can cause the entire process to terminate.
4. The method for transforming voltage sags considering the grid side and the user side according to claim 1 is characterized in that: The specific calculation formula for the user's annual temporary drop loss is: Among them, C sag (V i ,T i ) represents the economic loss of the ith temporary drop; V i 、T i They represent the voltage amplitude and duration of the i-th sag respectively; Num represents the number of sags per year for the user.
5. The method for voltage sag transformation considering the grid side and the user side according to any one of claims 1 to 4, characterized in that: The improved adaptive genetic algorithm is obtained by adopting an elite retention strategy and introducing a chain competition strategy based on the traditional adaptive genetic algorithm.
6. The method for voltage sag transformation considering the grid side and the user side according to any one of claims 1 to 4, characterized in that: The calculation formula of the decision model is specifically: Among them, f(x) NPV Represents the net present value of the benefits that the comprehensive transformation plan can bring; C t represents the cash flow in the tth year, i.e., the voltage sag loss value and other benefits reduced by installing DVR on the user side and transforming the weak links on the grid side; C operating represents the annual maintenance cost of DVR and cables; C o represents the initial investment value, i.e. the initial investment for purchasing and installing DVR and the reconstruction of overhead lines. The initial investment for DVR is the investment cost for 30 years. r represents the predetermined discount rate.
7. Consider the voltage sag transformation system on the grid side and the user side, which is characterized by: The system is used to implement the voltage sag transformation method considering the grid side and the user side as described in any one of claims 1 to 4, comprising: Compensation module, used to replace the overhead lines of the power grid with cables and install DVR on the user side to compensate for voltage sag; The power grid identification module is used to identify weak links on the power grid side based on historical fault data of the line by combining the Monte Carlo method with the voltage sag analysis and calculation method; The user identification module is used to classify sensitive loads on the user side by comprehensively considering the voltage sag sensitivity of the load and the loss level of a single voltage sag of the load; The scheme selection module is used to establish a decision model with the maximum net present value as the objective function after identifying the weak links on the grid side and the user side, and adopt an improved adaptive genetic algorithm or an adaptive genetic algorithm to select the optimal scheme.
8. A computer terminal comprising a memory, a processor and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the method for voltage sag transformation taking into account the grid side and the user side as described in any one of claims 1 to 6 is implemented.