A planning method for electric vehicle charging stations considering photovoltaic coupling

By establishing an electric vehicle endurance and traffic behavior model, combining photovoltaic power generation system, optimizing the location and capacity of electric vehicle charging stations, the complexity and uncertainty of electric vehicle charging network planning is solved, and the effective absorption of charging load is achieved and cost reduction.

CN114169609BActive Publication Date: 2024-11-01STATE GRID NINGXIA ELECTRIC POWER CO LTD ECO TECH RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111491949.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-08
Publication Date
2024-11-01
Estimated Expiration
2041-12-08

AI Technical Summary

Technical Problem

During the planning process of electric vehicle charging station, there are problems such as charging load prediction, traffic behavior simulation, charging station site selection and capacity adjustment, distribution network access system transformation and photovoltaic power generation system, resulting in complexity and uncertainty in the planning of electric vehicle charging network. Higher.

Method used

A method of electric vehicle charging station planning considering photovoltaic coupling is adopted. By establishing an electric vehicle endurance model and traffic behavior model, the electric vehicle capacity and its temporal distribution sample set are extracted, cluster optimization is used to determine the site selection of the charging station, and queue up. The algorithm determines the capacity and quantity of charging facilities, and finally conducts joint optimization planning of the photovoltaic-electric vehicle charging network.

Benefits of technology

The global optimization of the electric vehicle charging network has been achieved, the charging load has been promoted to absorb distributed photovoltaic power generation on-site, the charging network construction and operation costs have been reduced, and the planning has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114169609B_ABST
    Figure CN114169609B_ABST
Patent Text Reader

Abstract

The present invention proposes a method for charging network planning considering photovoltaic coupling, comprising the following steps: step 1: establishing an electric vehicle endurance model; step 2: establishing an electric vehicle traffic behavior model; step 3: based on step 1 and step 2, extracting a sample set of electric vehicle capacity and its spatiotemporal distribution; step 4: determining the location of charging stations through clustering optimization; step 5: determining the capacity and number of charging facilities using a queuing algorithm; step 6: conducting a joint optimization planning of photovoltaic-electric vehicle charging networks. The method aims to minimize the investment and construction cost of electric vehicle charging networks, takes into account transportation network constraints such as charging load supply and demand balance, electric vehicle charging station location and capacity determination, and electric power network operation constraints such as electric vehicle charging station access to the distribution network electrical system and supporting photovoltaic power generation systems, and is used for the joint planning and layout of electric vehicle charging stations and their supporting photovoltaic power generation systems in a given area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of power system planning and design, and in particular relates to an electric vehicle charging station method considering photovoltaic coupling. Background Art

[0002] As people pay more and more attention to energy and environmental issues, electric vehicles have become an important carrier for promoting clean alternatives and electric energy alternatives. According to statistics, by the end of 2020, China's electric vehicle ownership has reached 4.92 million; it is expected that by 2025, China's electric vehicle ownership will reach 130 million. At the same time, the large-scale promotion and application of electric vehicles is closely related to the construction and improvement of supporting service systems such as electric vehicle charging facilities.

[0003] The differences in urban transportation networks, power grids, and urban socio-economic development levels increase the complexity and uncertainty of electric vehicle charging network planning. Therefore, the planning of electric vehicle charging networks should fully consider the local socio-economic development level and the development plans of power grids and transportation networks. Through scientific planning and reasonable layout, a complete electric vehicle charging network can be built to promote the sustainable development of the electric vehicle industry. Summary of the invention

[0004] The present invention proposes a planning method for electric vehicle charging stations considering photovoltaic coupling, aiming to solve the problems of charging load prediction, traffic behavior simulation, charging station site selection and capacity determination, distribution network access system transformation and joint optimization with the supporting photovoltaic power generation system in the planning process of electric vehicle charging stations.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] A method for planning an electric vehicle charging station considering photovoltaic coupling includes the following steps:

[0007] Step 1: Based on the random distribution characteristics of the battery capacity state of electric vehicles, an electric vehicle endurance model is established;

[0008] Step 2: Based on the random characteristics of the spatiotemporal distribution of electric vehicles, establish an electric vehicle traffic behavior model;

[0009] Step 3: Based on the electric vehicle endurance and traffic behavior model, extract the electric vehicle capacity and its spatiotemporal distribution sample set;

[0010] Step 4: Based on the sample set of electric vehicle capacity and its spatiotemporal distribution, considering the endurance constraint, the location of charging stations is determined through cluster optimization;

[0011] Step 5: Based on the location of charging stations, use the queuing algorithm to determine the capacity and number of charging facilities;

[0012] Step 6: Based on the charging station site selection and capacity determination plan, conduct joint optimization planning of the photovoltaic-electric vehicle charging network.

[0013] Furthermore, step 1 includes the following steps:

[0014] Step 1.1: Quantify the maximum battery capacity C of various types of electric vehicles through probability distribution functions rate The random nature of

[0015] Step 1.2: Use a probability distribution function to quantify the percentage SOC of the battery storage capacity at the entrance of the highway i And the percentage of battery power when the electric vehicle needs to be charged SOC c The random nature of

[0016] Step 1.3: Fitting the maximum driving distance of the electric vehicle Tan mc With the maximum battery capacity C rate relationship;

[0017] Step 1.4: Based on the maximum driving distance of electric vehicles Tan mc With the maximum battery capacity C rate , and build an electric vehicle endurance model.

[0018] Further preferably, the probability distribution function in step 1.1 selects a normal distribution or a gamma distribution with upper and lower bounds, and the probability distribution function in step 1.2 also selects a normal distribution or a gamma distribution with upper and lower bounds.

[0019] Preferred: Maximum driving distance of the car Tan mc With the maximum battery capacity C rate It is a linear relationship, and the electric vehicle endurance model is:

[0020] Tan ac =η·(SOC i -SOC c )·Tan mc (1)

[0021] Tan sc =η·SOC c ·Tan mc (2)

[0022] Among them, Tan ac It represents the distance an electric vehicle can travel from the time it enters the highway until it needs to be charged;

[0023] η is an efficiency parameter used to represent the energy consumption of electric vehicles during acceleration and deceleration;

[0024] SOC iIndicates the percentage of battery storage capacity at the entrance of the highway;

[0025] SOC c Indicates the percentage of battery power when the electric vehicle needs to be charged;

[0026] Tan sc Indicates that electric vehicles are in SOC c The distance traveled.

[0027] Furthermore, step 2 specifically includes:

[0028] There are g entrances and exits on the highway. The OD matrix A represents the number matrix of electric vehicles at the user's starting point and end point. The element a in the OD matrix A is uv represents the number of electric vehicles from entrance u to exit v. The probability OD matrix P represents the proportion of electric vehicles at the user's starting point and end point. Each element p in the probability OD matrix P uv It represents the proportion of electric vehicles from entrance u to exit v to the total number, satisfying

[0029]

[0030] Driving start time t s The random characteristics of are quantitatively described by the probability distribution function obtained from actual survey data.

[0031] Furthermore, step 3 includes the following steps:

[0032] Step 3.1: Draw electric vehicle samples and record the maximum battery capacity C corresponding to the sample rate , the percentage of battery storage capacity SOC at the entrance of the highway i And the percentage of battery power when charging is required SOC c ;

[0033] Step 3.2: Known maximum battery capacity C rate , based on the maximum driving range of electric vehicles Tan mc With the maximum battery capacity C rate The maximum driving distance of electric vehicles is calculated by fitting the relationship mc , and then calculate the SOC of electric vehicles c The distance that can be traveled is Tan ac ;

[0034] Step 3.3: Monte Carlo sampling is performed on the traffic behavior of electric vehicle users based on the OD matrix to establish a sample set of spatial distribution of electric vehicle traffic behavior; that is, the departure point, destination location and corresponding driving distance of the electric vehicle under each sample are obtained;

[0035] Step 3.4: Based on the electric vehicle driving start time t s The probability distribution function is used to perform Monte Carlo sampling to determine the driving start time t of each electric vehicle. s .

[0036] Further, step 4 includes the following steps:

[0037] Step 4.1: Determine the candidate station site set according to the mileage constraints of electric vehicles. The constraints include: ① the electric vehicle must be charged at least once on any road section whose length exceeds its mileage; ② the charging demand of the electric vehicle occurs at the transportation network node where the charging station is built;

[0038] Step 4.2: Based on Tan calculated in Monte Carlo simulation sc Distribution, determine the service radius SR of the charging station, and use the SNN clustering algorithm to determine the location of the charging station in the candidate site set.

[0039] Furthermore, step 5 is judged by the charging power demand in the charging station, specifically:

[0040] The charging power requirement in the charging station is:

[0041]

[0042]

[0043] in, is the average charging power of electric vehicles in candidate site i;

[0044] is the charging power of a single charging pile;

[0045] T k Charging service time for the kth electric vehicle;

[0046] λ r,k is the k-th EV traffic flow in OD pair r;

[0047] γ r,i,k A 0-1 variable indicating whether the k-th electric vehicle belonging to r is charging at charging station i, γ r,i,k =1 means charging, γ r,i,k =0 means no charging;

[0048] When all electric vehicle charging needs are met, On the contrary, when the system is overloaded, the charging needs of some electric vehicles cannot be met.

[0049] Furthermore, the specific operations of step 6 are:

[0050] Step 6.1: Input the load characteristic data of electric vehicle charging stations, typical scenario data of photovoltaic power generation, construction and transformation costs of photovoltaic power stations, time-of-use electricity prices, and penalty factors;

[0051] Step 6.2: mathematically solving an optimization planning model with the goal of minimizing the construction and operation costs of a photovoltaic-coupled electric vehicle charging network;

[0052] Step 6.3: Based on the constraints of the PV-EV charging network joint optimization planning model, obtain the EV charging network planning scheme considering PV coupling.

[0053] Preferably, the construction and operation costs of the photovoltaic-electric vehicle charging network include the investment cost of the charging station, the investment cost of the supporting photovoltaic power generation system, the electricity cost of the whole system operation, and the penalty cost of the electric vehicle charging station losing load;

[0054] The constraints of the joint optimization planning model for the PV-EV charging network include: ① the power balance between the charging station and the grid, ② the PV output constraint, ③ the PV power generation system constraint, ④ the charging station transformer expansion capacity constraint, and ⑤ the node voltage constraint.

[0055] Beneficial effects of the present invention:

[0056] The present invention proposes a method for electric vehicle charging stations that takes photovoltaic coupling into consideration. By rationally optimizing the site selection and capacity of electric vehicle charging facilities and supporting photovoltaic power generation systems, the global optimization of the planning and layout of electric vehicle charging networks is achieved while meeting the charging needs of electric vehicles, and the local consumption of distributed photovoltaic power generation by electric vehicle charging loads is promoted.

[0057] 1. By modeling the probability distribution of electric vehicle endurance and its fitting relationship, the random characteristics of the maximum battery capacity and driving distance distribution of electric vehicles are quantitatively described.

[0058] 2. By modeling the traffic behavior of electric vehicles based on the OD probability matrix, the random characteristics of the spatiotemporal distribution of electric vehicles are quantitatively described.

[0059] 3. Considering factors such as electric vehicle range constraints and charging service radius, SNN clustering analysis is used to achieve clustering optimization of charging pile site selection.

[0060] 4. Considering the charging service time of electric vehicles, the queuing algorithm is used to optimize the capacity of electric vehicle charging facilities.

[0061] 5. Considering the coupling relationship and constraints between power grid nodes and electric vehicle charging station sites, the joint optimization planning of photovoltaic-electric vehicle charging network is realized with the goal of minimizing the total construction and operation costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] Figure 1 Steps for planning an EV charging station considering PV coupling. DETAILED DESCRIPTION

[0063] The following is a further detailed description of an electric vehicle charging station planning method considering photovoltaic coupling according to the present invention in conjunction with the accompanying drawings and specific implementation methods.

[0064] The present invention proposes a method for charging network planning considering photovoltaic coupling. The method aims to minimize the investment and construction cost of electric vehicle charging network, taking into account the transportation network constraints such as charging load supply and demand balance, electric vehicle charging station site selection and capacity determination; electric vehicle charging station access to the distribution network electrical system, supporting photovoltaic power generation system and other power network operation constraints, and establishes an optimization model for the joint planning of photovoltaic power generation and electric vehicle charging network. This method can be used for the joint planning and layout of electric vehicle charging stations and their supporting photovoltaic power generation systems in a given area. The specific model and steps are as follows:

[0065] Step 1: Consider the random distribution characteristics of the electric vehicle battery capacity state and establish an electric vehicle endurance model

[0066] Step 1.1: Use probability distribution functions (normal or gamma distribution with upper and lower bounds) to quantitatively describe the maximum battery capacity C of various types of electric vehicles rate random characteristics.

[0067] Step 1.2: Use a probability distribution function (normal distribution or gamma distribution with upper and lower bounds) to quantify the percentage SOC of the battery storage capacity at the highway entrance i And the percentage of battery power when the electric vehicle needs to be charged SOC c random characteristics.

[0068] Step 1.3: Fitting the maximum driving distance of the electric vehicle Tan mc With the maximum battery capacity C rate relationship (roughly proportional);

[0069] Step 1.4: Assuming that the battery storage capacity is linearly related to the driving distance, establish an electric vehicle endurance model:

[0070] Tan ac =η·(SOC i -SOC c )·Tan mc (1)

[0071] Tan sc =η·SOC c ·Tan mc (2)

[0072] Among them, Tan ac It represents the distance that an electric vehicle can travel from the time it enters the highway to the time it needs to be charged, km;

[0073] η is an efficiency parameter that considers the energy consumption of electric vehicles during acceleration and deceleration;

[0074] SOC i Indicates the percentage of battery storage capacity at the entrance of the highway;

[0075] SOC c Indicates the percentage of battery power when the electric vehicle needs to be charged;

[0076] Tan mc Indicates the maximum driving distance of electric vehicles, km;

[0077] Tan sc Indicates that electric vehicles are in SOC c The distance that can be traveled is km.

[0078] Step 2: Consider the random characteristics of the spatiotemporal distribution of electric vehicles and establish an electric vehicle traffic behavior model

[0079] The OD matrix is ​​used to describe the user's starting point and end point. Assume that there are g entrances and exits on the highway, and the element a in the OD matrix A (g-order square matrix) is uv represents the number of electric vehicles from entrance u to exit v. From A, we can get the probability OD matrix P (g-order square matrix), where each element p uv It represents the proportion of electric vehicles from entrance u to exit v to the total number, satisfying

[0080]

[0081] Driving start time t s The random characteristics of are quantitatively described by the probability distribution function obtained from actual survey data.

[0082] Step 3: Based on the electric vehicle endurance and traffic behavior model, extract the electric vehicle capacity and its temporal and spatial distribution sample set

[0083] Step 3.1: Draw electric vehicle samples according to the known probability distribution function and record the maximum battery capacity C corresponding to the sample rate , the percentage of battery storage capacity SOC at the entrance of the highway i And the percentage of battery power when charging is required SOC c ,

[0084] Step 3.2: Known maximum battery capacity C rate, based on the maximum driving range of electric vehicles Tan mc With the maximum battery capacity C rate The maximum driving distance of electric vehicles is calculated by fitting the relationship mc , and then calculate the SOC of electric vehicles c The distance that can be traveled is Tan ac .

[0085] Step 3.3: Based on the OD matrix, Monte Carlo sampling is performed on the traffic behavior of electric vehicle users to establish a sample set of spatial distribution of electric vehicle traffic behavior; that is, the departure point, destination location and corresponding driving distance of the electric vehicle under each sample are obtained.

[0086] Step 3.4: Based on the electric vehicle driving start time t s The probability distribution function is used to perform Monte Carlo sampling to determine the driving start time t of each electric vehicle. s .

[0087] Step 4: Based on the electric vehicle sample set, consider the range constraint and determine the location of the charging station through cluster optimization

[0088] Step 4.1: Determine the candidate station site set according to the mileage constraint of the electric vehicle, that is, the electric vehicle must be charged at least once on any road section whose length exceeds its mileage:

[0089]

[0090] Among them, γ r,i,k A 0-1 variable indicating whether the k-th electric vehicle belonging to r is charging at charging station i, γ r,i,k =1 means charging, γ r,i,k =0 means no charging;

[0091] o is the number of the sub-section of the highway whose distance is equal to the driving range of the electric vehicle;

[0092] O r,k is the set of sub-segments belonging to OD pair r, whose distance is the mileage of the k-th electric vehicle;

[0093] r is the serial number of the sub-section in the OD pair that does not exceed the mileage of the electric vehicle;

[0094] R is the set of all r;

[0095] is the set of all candidate sites located on sub-segment o;

[0096] k is the serial number of the electric vehicle type;

[0097] K is a set of electric vehicle types, and here it represents 4 typical electric vehicles.

[0098] The site selection process for electric vehicle charging stations also requires consideration of the scale constraints determined by the geographic space of the site:

[0099]

[0100] in, is the number of charging piles in candidate site i, and are its lower and upper limits respectively.

[0101] The charging needs of electric vehicles must occur at the nodes of the transportation network where charging stations are built:

[0102]

[0103] in, is a 0-1 decision variable for whether to build a charging station at candidate site i, A charging station is built at candidate site i; otherwise, no charging station is built.

[0104] Step 4.2: Based on Tan calculated in Monte Carlo simulation sc The distribution of charging stations can determine the service radius SR of the charging station. The SNN clustering algorithm is used to determine the location of the charging station in the candidate site set.

[0105] Let CS(k) denote the kth candidate station, and define NN(k) as the set of charging points whose distance to candidate station k is less than SR, 1≤k≤n CS . S(n CS Order square matrix) satisfies:

[0106] s kk =0

[0107] s kl =|NN(k)∩NN(l)|

[0108] 1≤k,l≤n CS

[0109] k≠l (7)

[0110] Where |NN(k)∩NN(l)| represents the number of elements in the set NN(k)∩NN(l).

[0111] L(n CS Order vector) satisfies:

[0112]

[0113] Among them, the larger l kThe value suggests that candidate site k should become a charging station.

[0114] The matrix S and vector L are calculated using the spatial coordinates of the charging point and the location of the candidate site. Then the clustering process begins: sort L from large to small to obtain the arrangement L′ of the candidate sites, take the first candidate site of L′ and put it into the charging station set SS, and the charging points with a distance less than SR from this point are placed in the cluster set C(1). Then process the second-ranked candidate site. If its similarity with any existing point in SS is 0, it is placed in SS, and a cluster set C(2) is also generated; if its similarity with a point in SS is greater than 0, no operation is performed. According to this method, all points are processed in order to obtain SS and |SS| cluster sets. Finally, a pre-specified lower bound d is used to check the size of each cluster set. The cluster points corresponding to the cluster sets that are too small will be deleted from SS. Finally, SS is the charging station set.

[0115] Step 5: Based on the charging station site selection plan, use the queuing algorithm to determine the capacity and number of charging facilities

[0116] The charging power requirement in the charging station is:

[0117]

[0118]

[0119] in, is the average charging power of electric vehicles in candidate site i, kW;

[0120] is the charging power of a single charging pile, kW;

[0121] T k is the charging service time of the k-th electric vehicle, min;

[0122] λ r,k is the k-th electric vehicle traffic flow in OD pair r, / min;

[0123] When the system capacity is large, all electric vehicle charging needs can be met. On the contrary, when the system is overloaded, the charging needs of some electric vehicles cannot be met.

[0124] Utilize queuing algorithms to optimize the capacity of electric vehicle charging facilities.

[0125] Step 6: Conduct joint optimization planning of PV-EV charging network based on charging station site selection and capacity determination plan

[0126] Step 6.1: Based on the site selection and capacity determination plan for electric vehicle charging stations, establish a joint optimization planning model for photovoltaic-electric vehicle charging networks. The details are as follows:

[0127] (1) Objective function

[0128] The optimization goal is to minimize the construction and operation costs of the photovoltaic-electric vehicle charging network, including the investment cost of the charging station, the investment cost of the supporting photovoltaic power generation system, the electricity cost of the entire system operation, and the penalty cost of the electric vehicle charging station load loss.

[0129]

[0130] Among them: ev is the investment capital recovery factor of the electric vehicle charging station;

[0131] i is the serial number of the candidate site of the charging station to be built;

[0132] ψ tn A collection of candidate sites for charging stations to be built;

[0133] c 1,i is the fixed investment cost of candidate site i, ¥;

[0134] c 2,i Unit variable cost of charging piles established for candidate site i, ¥ / set;

[0135] is the number of charging piles in candidate site i, set;

[0136] c 3,i is the unit cost of the distribution network line of candidate site i, ¥ / (km·kW);

[0137] l i The length of the distribution line required to connect to the power grid when building a charging station at location i, km;

[0138] p sp is the rated charging power of the charging pile, kW;

[0139] c 4,i is the transformer expansion cost of the substation at candidate site i, ¥ / kW;

[0140] P i sub is the transformer expansion capacity at candidate site i, kW;

[0141] ζ pv is the capital recovery factor of the photovoltaic power station investment;

[0142] m is the node number of the distribution network;

[0143] ψtn is a set of distribution network nodes;

[0144] c 5,m is the unit variable cost of establishing a photovoltaic power plant at the distribution network node m, ¥ / kVA;

[0145] is the photovoltaic installed capacity at the distribution network node m, kW;

[0146] ω is the number of the future typical load day;

[0147] t is the time period, h;

[0148] π ω is the probability of occurrence on a typical day in the future;

[0149] The price of electricity purchased by the system from the upper power grid, ¥ / kWh;

[0150] is the active power absorbed by the system from the upper distribution network in time t on a typical day, kW;

[0151] Δt is the time variation, here Δt=1,h;

[0152] The price of electricity sold by the system to the upper grid, ¥ / kWh;

[0153] is the active power injected by the system into the upper distribution network within time t on a typical day, kW;

[0154] c p is the penalty cost of charging demand, ¥ / kWh;

[0155] is the active power of the EV charging demand that is not met at candidate site i on a typical day, kW.

[0156] (2) Constraints

[0157] ① Power balance constraints

[0158] The power balance equation for charging between the charging station and the power grid is as follows:

[0159]

[0160] The power absorbed by the charging station from the grid, the power discharged to the grid, the photovoltaic power generation power, and the electric vehicle charging power need to maintain a balance.

[0161] Among them, p ev Charging power for electric vehicles.

[0162] ② Photovoltaic output constraints

[0163] Traditional photovoltaic generator sets are connected through ordinary photovoltaic inverters, and their output model is as follows:

[0164]

[0165] s pv =p pv +jq pv (14)

[0166] The output model of the photovoltaic generator set equipped with a reactive power regulation transformer is as follows:

[0167]

[0168]

[0169] s pv =p pv +jq pv (17)

[0170] Among them, p pv is the photovoltaic active power output, kW;

[0171] is the upper limit of PV active power, kW;

[0172] s pv is the photovoltaic apparent power, MVA.

[0173] q pv is the reactive power output of the photovoltaic power generation system, kVAR;

[0174] It is the upper limit of the photovoltaic apparent power, MVA.

[0175] ③ Constraints of photovoltaic power generation system:

[0176]

[0177]

[0178]

[0179]

[0180] in, is the upper limit of active output of the m-node PV power plant on a typical day, kW;

[0181] is the standard curve of PV output at m nodes on a typical day, kW;

[0182] is the upper limit of the photovoltaic installed capacity of node m, kW;

[0183] The number of photovoltaic power plants built for m nodes in the system;

[0184] is the lower limit of the photovoltaic installed capacity of node m, kW;

[0185] X pv The upper limit for the number of photovoltaic power plants;

[0186] is the upper limit of total installed photovoltaic capacity, kW.

[0187] ④Charging station transformer expansion capacity constraints

[0188]

[0189] in, is the capacity of the existing distribution transformer available at the charging station, MWA.

[0190] ⑤Node voltage constraints

[0191] V min 2 ≤v m,ω,t ≤V max 2 (twenty three)

[0192] V min 、V max are the upper and lower limits of the voltage at node m respectively.

[0193] Step 6.2: Input the load characteristic data of the electric vehicle charging station, the typical scenario data of photovoltaic power generation, the construction and transformation cost of the photovoltaic power station, the time-of-use electricity price, the penalty factor and other data and parameters, and mathematically solve the optimization planning model with the goal of minimizing the construction cost of the photovoltaic-coupled electric vehicle charging network to obtain the final electric vehicle charging network planning scheme considering photovoltaic coupling.

[0194] Take a simplified four-node transportation network system as an example: Assume that the installed capacity of electric vehicle charging piles at each node has been determined according to the charging load demand and the site selection and capacity determination algorithm, which are: 120kW, 160kW, 120kW, 160kW. At this time, the expansion of the supporting photovoltaic system is considered. Consider two typical charging load scenarios, weekdays and holidays, with the corresponding probabilities: 0.75 for weekdays; 0.25 for holidays. Consider two typical photovoltaic power generation scenarios, sunny days and rainy days, with the corresponding probabilities: 0.75 for sunny days; 0.25 for rainy days. Consider time-sharing grid-connected electricity purchase and sales prices. The data for each time series scenario are shown in Table 1

[0195] Table 1 Time series data in typical day scenarios

[0196]

[0197] In the above scenario, the expansion line lengths of each node photovoltaic power station are: 1.0km, 1.2km, 1.0km, 1.2km; the fixed investment cost of a single electric vehicle charging station is calculated at 300,000 yuan; the unit capacity cost of the charging station is calculated at 1,000 yuan / kW; the unit cost of the grid-connected line transformation is calculated at 200 yuan / (kW·km); the unit cost of the grid-connected transformer transformation is calculated at 400 yuan / kVA; the unit capacity construction cost of the photovoltaic power station is calculated at 10,000 yuan / kW; the capital recovery coefficient of the electric vehicle charging station is calculated at 0.12; the capital recovery coefficient of photovoltaic power generation is calculated at 0.06. The construction scale of the photovoltaic power station is affected by the geographical environment and investment cost control, and it is required here not to exceed the charging capacity of the charging station.

[0198] Based on the above parameters, the installed capacity of the photovoltaic power station at each node is calculated to be 120kW, 160kW, 120kW, and 160kW, which all reach the upper limit of the photovoltaic power station installed capacity constraint. This shows that under the current technical and economic parameters and resource environment, it is economically feasible to build a photovoltaic power station inside the charging station.

[0199] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0200] Similarly, it should be understood that in order to streamline the present disclosure and aid in understanding one or more of the various inventive aspects, in the above description of exemplary embodiments of the present invention, various features of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof. However, this disclosed method should not be interpreted as reflecting the intention that the claimed invention requires more features than those expressly recited in each claim. Rather, as reflected in the claims, inventive aspects lie in less than all of the features of the individual embodiments previously disclosed. Therefore, the claims that follow the detailed description are hereby expressly incorporated into the detailed description, with each claim itself serving as a separate embodiment of the present invention.

[0201] Those skilled in the art will appreciate that the modules or units or groups of the devices in the examples disclosed herein may be arranged in the device as described in the embodiment, or alternatively may be located in one or more devices different from the devices in the example. The modules in the foregoing examples may be combined into one module or may be divided into multiple submodules.

[0202] Those skilled in the art will appreciate that the modules in the devices in the embodiments can be adaptively changed and set in one or more devices different from the embodiments. The modules or units or groups in the embodiments can be combined into one module or unit or group, and in addition they can be divided into multiple submodules or subunits or subgroups. Except that at least some of such features and / or processes or units are mutually exclusive, all features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all processes or units of any method or device disclosed in this manner can be combined in any combination. Unless otherwise explicitly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) can be replaced by an alternative feature that provides the same, equivalent or similar purpose. In addition, those skilled in the art will appreciate that although some embodiments described herein include certain features included in other embodiments instead of other features, the combination of features of different embodiments means being within the scope of the present invention and forming different embodiments. For example, in the claims, any one of the embodiments claimed for protection can be used in any combination.

[0203] In addition, some of the embodiments are described herein as methods or combinations of method elements that can be implemented by a processor of a computer system or by other devices that perform the functions. Therefore, a processor with necessary instructions for implementing the method or method elements forms a device for implementing the method or method elements. In addition, the elements described herein of the device embodiments are examples of devices for implementing the functions performed by the elements for the purpose of implementing the invention.

[0204] The various techniques described herein may be implemented in combination with hardware or software, or a combination thereof. Thus, the method and apparatus of the present invention, or some aspects or portions of the method and apparatus of the present invention may be in the form of program codes (i.e., instructions) embedded in a tangible medium, such as a floppy disk, a CD-ROM, a hard disk drive, or any other machine-readable storage medium, wherein when the program is loaded into a machine such as a computer and executed by the machine, the machine becomes a device for practicing the present invention.

[0205] In the case where the program code is executed on a programmable computer, the computing device generally includes a processor, a storage medium readable by the processor (including volatile and non-volatile memory and / or storage elements), at least one input device and at least one output device. The memory is configured to store the program code; the processor is configured to execute the method of the present invention according to the instructions in the program code stored in the memory.

[0206] By way of example and not limitation, computer readable media include computer storage media and communication media. Computer readable media include computer storage media and communication media. Computer storage media stores information such as computer readable instructions, data structures, program modules or other data. Communication media generally embodies computer readable instructions, data structures, program modules or other data in a modulated data signal such as a carrier wave or other transmission mechanism, and includes any information delivery medium. Any combination of the above is also included within the scope of computer readable media.

[0207] As used herein, unless otherwise specified, the use of ordinal numbers "first," "second," "third," etc. to describe common objects merely indicates that different instances of similar objects are involved, and is not intended to imply that the objects so described must have a given order in time, space, order, or in any other manner.

[0208] Although the present invention has been described according to a limited number of embodiments, it will be apparent to those skilled in the art, with the benefit of the above description, that other embodiments may be envisioned within the scope of the invention thus described. In addition, it should be noted that the language used in this specification is selected primarily for readability and teaching purposes, rather than for explaining or defining the subject matter of the present invention. Therefore, many modifications and variations will be apparent to those skilled in the art without departing from the scope and spirit of the appended claims. The disclosure of the present invention is illustrative, not restrictive, with respect to the scope of the present invention, which is defined by the appended claims.

Claims

1. A method for planning electric vehicle charging stations considering photovoltaic coupling, characterized in that: The steps include: Step 1: Based on the random distribution characteristics of the battery capacity state of electric vehicles, an electric vehicle endurance model is established; Step 2: Based on the random characteristics of the spatiotemporal distribution of electric vehicles, the OD probability matrix is ​​used to establish the electric vehicle traffic behavior model; Step 3: Based on the electric vehicle endurance and traffic behavior model, extract the electric vehicle capacity and its spatiotemporal distribution sample set; Step 4: Based on the sample set of electric vehicle capacity and its spatiotemporal distribution, considering the endurance constraint, the location of charging stations is determined through cluster optimization; Step 5: Charging station site selection is determined by the charging power demand in the charging station. When the system capacity is large, all electric vehicle charging needs can be met; when the system is overloaded, some electric vehicle charging needs cannot be met, and the queuing algorithm is used to determine the capacity and number of charging facilities; Step 6: Based on the charging station site selection and capacity determination plan, conduct joint optimization planning of the photovoltaic-electric vehicle charging network; Step 1 includes the following steps: Step 1.1: Quantify the maximum battery capacity C of various types of electric vehicles through probability distribution functions rate The random nature of Step 1.2: Use a probability distribution function to quantify the percentage SOC of the battery storage capacity at the entrance of the highway i And the percentage of battery power when the electric vehicle needs to be charged SOC c The random nature of Step 1.3: Fitting the maximum driving distance of the electric vehicle Tan mc With the maximum battery capacity C rate relationship; Step 1.4: Based on the maximum driving distance of electric vehicles Tan mc With the maximum battery capacity C rate , and build an electric vehicle endurance model; Maximum driving distance of the car mc With the maximum battery capacity C rate It is a linear relationship, and the electric vehicle endurance model is: Anymore ac =η·(SOC i -SOC c )·Anymore mc (1) Anymore sc =η·SOC c ·Anymore mc (2) Among them, Tan ac It represents the distance an electric vehicle can travel from the time it enters the highway until it needs to be charged; η is an efficiency parameter used to represent the energy consumption of electric vehicles during acceleration and deceleration; SOC i Indicates the percentage of battery storage capacity at the entrance of the highway; SOC c Indicates the percentage of battery power when the electric vehicle needs to be charged; Tan sc Indicates that electric vehicles are in SOC c The distance travelled; Step 3 includes the following steps: Step 3.1: Draw electric vehicle samples and record the maximum battery capacity C corresponding to the sample rate , the percentage of battery storage capacity SOC at the entrance of the highway i And the percentage of battery power when charging is required SOC c ; Step 3.2: Known maximum battery capacity C rate , based on the maximum driving range of electric vehicles Tan mc With the maximum battery capacity C rate The maximum driving distance of electric vehicles is calculated by fitting the relationship mc , and then calculate the SOC of electric vehicles c The distance that can be traveled is Tan ac ; Step 3.3: Monte Carlo sampling is performed on the traffic behavior of electric vehicle users based on the OD matrix to establish a sample set of spatial distribution of electric vehicle traffic behavior; that is, the departure point, destination location and corresponding driving distance of the electric vehicle under each sample are obtained; Step 3.4: Based on the electric vehicle driving start time t s The probability distribution function is used to perform Monte Carlo sampling to determine the driving start time t of each electric vehicle. s ; Step 4 includes the following steps: Step 4.1: Determine the candidate station site set according to the mileage constraints of electric vehicles. The constraints include: ① the electric vehicle must be charged at least once on any road section whose length exceeds its mileage; ② the charging demand of the electric vehicle occurs at the transportation network node where the charging station is built; Step 4.2: Based on Tan calculated in Monte Carlo simulation sc Distribution, determine the charging station service radius SR, and use the SNN clustering algorithm to determine the location of the charging station in the candidate site set; The specific operations of step 6 are: Step 6.1: Based on the site selection and capacity determination plan for electric vehicle charging stations, establish a joint optimization planning model for the photovoltaic-electric vehicle charging network, input the load characteristic data of electric vehicle charging stations, typical photovoltaic power generation scenario data, photovoltaic power station construction and transformation costs, time-of-use electricity prices, and penalty factors; Step 6.2: mathematically solving an optimization planning model with the goal of minimizing the construction and operation costs of a photovoltaic-coupled electric vehicle charging network; Step 6.3: Based on the constraints of the PV-EV charging network joint optimization planning model, obtain the EV charging network planning scheme considering PV coupling.

2. The electric vehicle charging station planning method considering photovoltaic coupling according to claim 1 is characterized in that: In step 1.1, the probability distribution function uses a normal distribution or a gamma distribution with upper and lower bounds, and in step 1.2, the probability distribution function also uses a normal distribution or a gamma distribution with upper and lower bounds.

3. The electric vehicle charging station planning method considering photovoltaic coupling according to claim 1 is characterized in that: Step 2 specifically includes: There are g entrances and exits on the highway. The OD matrix A represents the number matrix of electric vehicles at the user's starting point and end point. The element a in the OD matrix A is uv represents the number of electric vehicles from entrance u to exit v. The probability OD matrix P represents the proportion of electric vehicles at the user's starting point and end point. Each element p in the probability OD matrix P uv It represents the proportion of electric vehicles from entrance u to exit v to the total number, satisfying Driving start time t s The random characteristics of are quantitatively described by the probability distribution function obtained from actual survey data.

4. The electric vehicle charging station planning method considering photovoltaic coupling according to claim 1 is characterized in that: Step 5 is to judge based on the charging power demand in the charging station, specifically: The charging power requirement in the charging station is: in, is the average charging power of electric vehicles in candidate site i; p sp is the rated charging power of the charging pile; is the active power of the EV charging demand that is not met at candidate site i on a typical day; T k Charging service time for the kth electric vehicle; λ r,k is the k-th EV traffic flow in OD pair r; γ r,i,k A 0-1 variable indicating whether the k-th electric vehicle belonging to r is charging at charging station i, γ r,i,k =1 means charging, γ r,i,k =0 means no charging; When all electric vehicle charging needs are met, On the contrary, when the system is overloaded, the charging needs of some electric vehicles cannot be met.

5. The electric vehicle charging station planning method considering photovoltaic coupling according to claim 1, characterized in that: The construction and operation costs of the PV-EV charging network include the investment costs of the charging stations, the supporting PV power generation system, the electricity costs of the entire system operation, and the penalty costs for the loss of load at the EV charging station; The constraints of the joint optimization planning model for the PV-EV charging network include: ① the power balance between the charging station and the grid, ② the PV output constraint, ③ the PV power generation system constraint, ④ the charging station transformer expansion capacity constraint, and ⑤ the node voltage constraint.