Titanium metal production equipment and titanium metal production method
By designing a titanium metal production equipment that includes a heating furnace, a gas phase reaction zone, a condensation zone and a discharge zone, the problems of low continuous production efficiency and high cost in the gas phase metal thermal reduction method are solved, and high purity and good sphericity are achieved. Continuous production and cost reduction of high-purity titanium powder.
Patent Information
- Application Number
- CN202111675329.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-12-31
AI Technical Summary
In the existing technology, the gas-phase metal thermal reduction method lacks devices for continuous feeding and continuous discharging when preparing high-purity titanium metal, resulting in low production efficiency and high cost, and it is difficult to obtain high-purity and good sphericity titanium powder.
A titanium metal production equipment is designed, including a heating furnace, a gas phase reaction zone, a condensation zone and an unloading zone. The metal material is continuously added to react with the titanium tetrachloride gas through the feeding device, and the product is condensed and settled by the condensing device, and passed through The spiral discharger continuously discharges high-purity titanium powder.
The continuous production of high-purity titanium powder with good sphericity is achieved, reducing production costs and improving production efficiency.
Smart Images

Figure CN114178544B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of metallurgy and chemical engineering, and in particular to a titanium metal production device and a titanium metal production method. Background Art
[0002] Titanium metal is widely used in aerospace, marine engineering, transportation and other fields because of its low density, high melting point, ultra-high specific strength and excellent corrosion resistance. The preparation methods of titanium metal can be divided into two categories: physical method and chemical method. Physical methods include atomization method, plasma spheroidization method, mechanical crushing method, granulation sintering method, etc.
[0003] Among them, the atomization method for preparing titanium powder uses sponge titanium as the basic raw material for subsequent processing. New impurities are easily introduced during the processing, making it difficult to obtain high-purity titanium; although the thermal decomposition method of titanium iodide can effectively remove oxygen, the current output is small, the process is unstable, and the key technology and equipment have not yet been fully mastered; the molten salt electrolysis method can effectively remove heavy metal elements such as Fe, Cu, Cr and oxygen, but it is not effective in removing impurity elements such as Mn and V that are close to the potential of titanium; the electron beam melting method can significantly reduce the content of C, N, H and other low-melting point metal impurity elements, but the oxygen and heavy metal elements in the product must be removed in advance, and it is generally not used as an independent method for purifying titanium; the traditional Kroll method for preparing titanium powder requires hydrogenation, crushing, dehydrogenation and other processes of the sponge titanium raw material, and cannot reduce the impurities brought in by metallic magnesium. At the same time, the powder obtained is irregular in shape and produced intermittently.
[0004] The gas phase metallothermic reduction method is an effective and low-cost method for obtaining high-purity, spherical, and fluid titanium powder. However, in the related art, relatively few studies have been conducted on the gas phase metallothermic reduction method. Therefore, there is an urgent need for a production device for preparing high-purity titanium metal by the gas phase metallothermic reduction method that can continuously add and discharge materials. Summary of the invention
[0005] The embodiments of the present disclosure provide a titanium metal production device and a titanium metal production method, which can continuously add materials and continuously produce high-purity titanium powder with high purity, good sphericity and good fluidity, thereby reducing production costs.
[0006] The technical solutions provided by the embodiments of the present disclosure are as follows:
[0007] A titanium metal production device, comprising:
[0008] A heating furnace, wherein a first air inlet pipe for supplying titanium tetrachloride gas and a second air inlet pipe for supplying argon gas are provided at a first end of the heating furnace, an exhaust pipe is provided at a second end of the heating furnace, and an inner cavity of the heating furnace is sequentially a gas phase reaction zone, a condensation zone and a discharge zone from the first end to the second end, and a condensation device is provided in the condensation zone;
[0009] A feeding device for feeding metal materials into the gas phase reaction zone, wherein the feeding device is arranged outside the heating furnace, and a discharge port of the feeding device is communicated with the gas phase reaction zone;
[0010] A gasification chamber is used for gasifying the metal material so that the gasified metal material reacts with titanium tetrachloride gas. The gasification chamber is located in the gas phase reaction zone and directly below the discharge port to contain the metal material.
[0011] Exemplarily, the feeding device includes a storage bin and a transition bin arranged in sequence from top to bottom, wherein the storage bin and the transition bin are separated by a partition, and the partition is provided with a feed port with an adjustable angle.
[0012] Exemplarily, a crucible for gasifying the metal material is provided in the gasification chamber.
[0013] Exemplarily, the condensing device includes a circulating condensing water pipe surrounding the outer side wall of the condensing area.
[0014] Exemplarily, a discharger is provided in the condensation zone for discharging the condensed and settled products to the discharge zone.
[0015] Exemplarily, the discharger is a spiral discharger.
[0016] Exemplarily, the unloading area is provided with a unloading bin, and the unloading bin is located at a lower side of the condensation area.
[0017] Exemplarily, the heating furnace is provided with a flip cover.
[0018] The present disclosure also provides a method for producing titanium metal, the method comprising the following steps:
[0019] supplying titanium tetrachloride gas into the heating furnace through the first gas inlet pipe, and supplying argon gas into the heating furnace through the second gas inlet pipe, so that the argon gas carries the titanium tetrachloride gas into the gas phase reaction zone;
[0020] Adding metal material into the gasification chamber through the feeding device to gasify the metal material;
[0021] The heating furnace is heated to a reaction temperature so that the gasified metal material reacts with the titanium tetrachloride gas in the gas phase reaction zone;
[0022] condensing and settling the product entering the condensation zone through the condenser;
[0023] The product after condensation and sedimentation enters the unloading area.
[0024] Exemplarily, in the method, the reaction temperature is 800-1200° C.; the product after condensation and sedimentation is transported to the unloading area through a discharger.
[0025] The beneficial effects brought by the embodiments of the present disclosure are as follows:
[0026] The metal titanium production equipment and metal titanium production method provided in the embodiments of the present disclosure are provided with an air inlet pipe for supplying titanium tetrachloride gas and argon gas on the heating furnace, and also include a feeding device that can continuously feed metal materials into the heating furnace. In the gas phase reaction zone of the heating furnace, the raw materials can react with each other to generate metal titanium gas, and the metal titanium gas then enters the condensation zone to be condensed and precipitated, and then enters the unloading zone for continuous discharge. It can be seen that the metal titanium production equipment provided in the embodiments of the present disclosure can realize the gas phase metal thermal reduction method to prepare high-purity metal titanium, so as to prepare high-purity, spherical and fluid high-purity titanium powder. In further embodiments of the present disclosure, the continuous generation of high-purity titanium can be achieved, the production efficiency can be improved, and the production cost can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 A schematic diagram showing the structure of a titanium metal production device provided in an embodiment of the present disclosure.
[0028] In the figure, the components are marked as follows:
[0029] Heating furnace 10; first air inlet pipe 11; second air inlet pipe 12; exhaust pipe 13; gas phase reaction zone A; condensation zone B; unloading zone C; condensation device 20; feeding device 30; storage bin 31; transition bin 32; gasification chamber 40; discharger 50. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution of the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings of the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the described embodiments of the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.
[0031] Unless otherwise defined, the technical terms or scientific terms used in the present disclosure should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in the present disclosure do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, similar words such as "one", "one" or "the" do not indicate quantity restrictions, but indicate that there is at least one. Similar words such as "include" or "comprise" mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Similar words such as "connect" or "connected" are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0032] Figure 1 Shown is a schematic structural diagram of a titanium metal production device provided in an embodiment of the present disclosure.
[0033] like Figure 1 As shown, the titanium metal production equipment provided by the embodiment of the present disclosure includes:
[0034] A heating furnace 10, wherein a first air inlet pipe 11 for supplying titanium tetrachloride gas and a second air inlet pipe 12 for supplying argon gas are provided at a first end of the heating furnace 10, an exhaust pipe 13 is provided at a second end of the heating furnace 10, and an inner cavity of the heating furnace 10 is a gas phase reaction zone A, a condensation zone B and a discharge zone C from the first end to the second end, and the condensation zone B is provided with a condensation device 20;
[0035] A feeding device 30 for feeding metal materials into the gas phase reaction zone A, wherein the feeding device 30 is disposed outside the heating furnace 10, and a discharge port of the feeding device 30 is communicated with the gas phase reaction zone A;
[0036] The gasification chamber 40 is used to gasify the metal material so that the gasified metal material reacts with titanium tetrachloride gas. The gasification chamber 40 is located in the gas phase reaction zone A and is located directly below the discharge port to contain the metal material.
[0037] The titanium metal production equipment provided in the embodiment of the present disclosure has an air inlet pipe for supplying titanium tetrachloride gas and argon gas on the heating furnace 10, and also includes a feeding device 30 for feeding metal materials into the heating furnace 10. In the gas phase reaction zone A of the heating furnace 10, the raw materials react with each other to generate titanium metal gas, which then enters the condensation zone B to be condensed and precipitated, and then enters the unloading zone C. It can be seen that the titanium metal production equipment provided in the embodiment of the present disclosure can realize the preparation of high-purity titanium metal by gas phase metal thermal reduction method, so as to prepare high-purity titanium powder with high purity, good sphericity and good fluidity.
[0038] The titanium metal production equipment provided in some exemplary embodiments of the present disclosure can achieve continuous feeding and continuous production. The titanium metal production equipment provided in the embodiments of the present disclosure is described in more detail below.
[0039] In some embodiments, Figure 1 As shown, the feeding device 30 includes a storage bin 31 and a transition bin 32 which are arranged in sequence from top to bottom, wherein the storage bin 31 and the transition bin 32 are separated by a partition 33, and a feed port with an adjustable angle is provided on the partition 33. With this solution, when producing titanium metal, metal materials (such as magnesium metal or calcium metal, etc.) can be pre-loaded into the storage bin 31, and then the metal materials in the storage bin 31 can be added to the transition bin 32 by adjusting the angle of the feed port on the partition 33, so as to achieve the purpose of continuous feeding and further realize continuous production.
[0040] In some embodiments, Figure 1 As shown, a crucible for gasifying the metal material is provided in the gasification chamber 40. The crucible can be a ceramic crucible. By heating the crucible, the metal material in the crucible can be gasified.
[0041] In some embodiments, Figure 1 As shown, the condensing device 20 includes a circulating condensing water pipe surrounding the outer side wall of the condensing area B. It can be understood that in other embodiments, the condensing device 20 is not limited thereto.
[0042] In some embodiments, Figure 1 As shown, a discharger 50 is provided in the condensation zone B for discharging the condensed and settled product to the discharge zone C. By setting the discharger 50, the condensed and settled product can be continuously discharged to the discharge zone C, thereby achieving production continuity.
[0043] In some embodiments, Figure 1 As shown, the discharge device 50 is a spiral discharge device 50. Of course, it can be understood that in practical applications, the discharge device 50 is not limited thereto.
[0044] In some embodiments, Figure 1 As shown, the unloading area C is provided with a unloading bin, which is located at the lower side of the condensation area B, and the exhaust pipe 13 is located at the upper side of the condensation area B.
[0045] Exemplarily, a flap is provided on the heating furnace 10. The heating furnace 10 can be opened through the flap for rapid cooling.
[0046] It should be noted that, in some embodiments, the first air inlet pipe 11, the second air inlet pipe 12, the exhaust pipe 13 and the furnace body of the heating furnace 10 can be made of stainless steel. The heating furnace 10 can be in the shape of a long horizontal tube. The exhaust pipe 13 is provided with an exhaust valve.
[0047] The present disclosure also provides a method for producing titanium metal, wherein the titanium metal production device provided in the present disclosure is used to produce titanium metal, and the method comprises the following steps:
[0048] supplying titanium tetrachloride gas into the heating furnace through the first gas inlet pipe, and supplying argon gas into the heating furnace through the second gas inlet pipe, so that the argon gas carries the titanium tetrachloride gas into the gas phase reaction zone;
[0049] Adding metal material into the gasification chamber through the feeding device to gasify the metal material;
[0050] The heating furnace is heated to a reaction temperature so that the gasified metal material reacts with the titanium tetrachloride gas in the gas phase reaction zone;
[0051] condensing and settling the product entering the condensation zone through the condenser;
[0052] The product after condensation and sedimentation enters the unloading area.
[0053] Exemplarily, in the method, the reaction temperature is 800-1200° C.; the product after condensation and sedimentation is transported to the unloading area through a discharger.
[0054] The specific engineering process of the titanium metal production equipment provided by the embodiment of the present disclosure is described below:
[0055] First, titanium tetrachloride (TiCl4) gas in the first gas inlet pipe 11 is carried into the gas phase reaction zone A of the heating furnace 10 through argon (Ar) in the second gas inlet pipe 12;
[0056] Then, high-purity reducing metal materials (such as magnesium or calcium) are pre-loaded into the storage bin 31, and the partition 33 between the storage bin 31 and the transition bin 32 is adjusted so that the metal materials enter the transition bin 32;
[0057] Then, the heating furnace 10 is heated to 800-1200°C to heat the reactants to the reaction temperature. The formed product is condensed and settled in the condensation zone B through the condenser, and the product is discharged to the unloading zone C by the spiral discharger 50. The excess gas in the reaction process is discharged and collected through the exhaust pipe 13 for treatment.
[0058] After the reaction is finished, the heating furnace 10 can be opened by flipping the cover to perform rapid cooling.
[0059] There are a few points to note:
[0060] (1) The drawings of the embodiments of the present disclosure only relate to the structures related to the embodiments of the present disclosure, and other structures may refer to the general design.
[0061] (2) For the sake of clarity, in the drawings used to describe the embodiments of the present disclosure, the thickness of layers or regions is exaggerated or reduced, that is, these drawings are not drawn according to the actual scale. It is understood that when an element such as a layer, film, region or substrate is referred to as being "on" or "under" another element, the element may be "directly" "on" or "under" the other element or there may be intermediate elements.
[0062] (3) In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.
[0063] The above are only specific implementations of the present disclosure, but the protection scope of the present disclosure is not limited thereto, and the protection scope of the present disclosure shall be based on the protection scope of the claims.
Claims
1. A titanium metal production equipment, characterized in that: include: A heating furnace, wherein a first air inlet pipe for supplying titanium tetrachloride gas and a second air inlet pipe for supplying argon gas are provided at a first end of the heating furnace, an exhaust pipe is provided at a second end of the heating furnace, and an inner cavity of the heating furnace is sequentially a gas phase reaction zone, a condensation zone and a discharge zone from the first end to the second end, and a condensation device is provided in the condensation zone; A feeding device for feeding metal materials into the gas phase reaction zone, wherein the feeding device is arranged outside the heating furnace, and a discharge port of the feeding device is communicated with the gas phase reaction zone; A gasification chamber for gasifying the metal material so that the gasified metal material reacts with titanium tetrachloride gas, wherein the gasification chamber is located in the gas phase reaction zone and directly below the discharge port to contain the metal material; The feeding device comprises a storage bin and a transition bin arranged in sequence from top to bottom, wherein the storage bin and the transition bin are separated by a partition, and the partition is provided with a feed port with an adjustable angle; The gasification chamber is provided with a crucible for gasifying the metal material.
2. The titanium metal production equipment according to claim 1, characterized in that: The condensing device comprises a circulating condensing water pipe surrounding the outer side wall of the condensing area.
3. The titanium metal production equipment according to any one of claims 1 to 2, characterized in that: The condensation zone is provided with a discharger for discharging the condensed and settled reactants to the unloading zone.
4. The titanium metal production equipment according to claim 3, characterized in that: The discharger is a spiral discharger.
5. The titanium metal production equipment according to any one of claims 1 to 2, characterized in that: The unloading area is provided with a unloading bin, and the unloading bin is located at the lower side of the condensation area.
6. The titanium metal production equipment according to any one of claims 1 to 2, characterized in that: The heating furnace is provided with a flip cover.
7. A method for producing titanium metal, characterized in that: The titanium metal production device according to any one of claims 1 to 6 is used to produce titanium metal, and the method comprises the following steps: supplying titanium tetrachloride gas into the heating furnace through the first gas inlet pipe, and supplying argon gas into the heating furnace through the second gas inlet pipe, so that the argon gas carries the titanium tetrachloride gas into the gas phase reaction zone; Adding metal material into the gasification chamber through the feeding device to gasify the metal material; The heating furnace is heated to a reaction temperature so that the gasified metal material reacts with the titanium tetrachloride gas in the gas phase reaction zone; condensing and settling the product entering the condensation zone through the condenser; The product after condensation and sedimentation enters the unloading area.
8. The method according to claim 7, characterized in that In the method, the reaction temperature is 800-1200° C.; the product after condensation and sedimentation is transported to the unloading area through a discharger.