Optimal dispatching method for regional integrated energy system based on V2G response of electric buses
By modeling electric buses and establishing an optimized dispatch model, the problem of the burden of large-scale disorderly charging of electric buses on the power grid has been solved, the orderly charging and discharging of electric bus clusters and V2G response strategies have been realized, and the power grid operation has been reduced. cost and electrical load fluctuation rate, improving the reliability and economy of the system.
Patent Information
- Application Number
- CN202111517247.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-13
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-12-13
AI Technical Summary
Large-scale disorderly charging of electric buses places a burden on the power grid and increases the power supply risk of the system. Moreover, the power load peaks during peak load periods of the grid, affecting the safety, stability and economy of the system.
Propose a regional comprehensive energy system optimization dispatching method for electric buses V2G response. By modeling electric buses, an optimization model of charging and discharging, energy coupling equipment output, renewable energy output, and system purchasing and selling energy collaborative dispatching is established. The goal is The function is to minimize the total operating cost, and on this basis, optimize the electric load fluctuation rate, and finally realize the orderly charging and discharging and V2G response strategy of the electric bus cluster.
It effectively reduces the operating costs and electric load fluctuation rate of the regional comprehensive energy system caused by the charging and discharging of electric bus clusters, improves the operational reliability and economy of the system, optimizes the charging and V2G response strategies of electric buses, and reduces system costs. electricity purchase costs and improve the consumption capacity of renewable energy.
Smart Images

Figure CN114186742B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to an energy management technology, and in particular to an optimization scheduling method for a regional integrated energy system of an electric bus V2G response. Background Art
[0002] With the rapid development of the economy and society, electric buses have been vigorously developed in recent years, using electricity instead of oil as their main power source, with the characteristics of zero carbon emissions and environmental friendliness. As a new type of power load, electric buses will inevitably bring a huge impact on the safety, stability and economy of the power distribution system if they are charged disorderly on a large scale. In particular, charging during the peak load period of the power grid will cause peaks on peak loads, increasing the power supply burden and operation risks of the system.
[0003] Compared with fuel buses, electric buses are affected by the range, charging rate and operation plan, and their driving plan and charging and discharging strategy are much more complicated. Therefore, it is necessary to analyze and study electric buses. Through the analysis of the charging and discharging behavior characteristics of electric buses, a model is established to centrally plan and manage electric buses, so that their charging load is controllable. At the same time, with the development and research of power interaction technology between electric buses and power grids, electric buses are connected to the distribution network as a mobile energy storage. Through certain power interaction response strategies, they can be used as a backup power source to transmit electricity to the grid during the peak load period of the grid. With the large-scale access of electric buses to the grid, the structure and operation mode of the grid have become more complex. Summary of the invention
[0004] Aiming at the power interaction between electric buses and power grids and the problem of comprehensive energy management, an optimal scheduling method for regional comprehensive energy system with V2G response for electric buses was proposed.
[0005] The technical solution of the present invention is: a regional integrated energy system optimization scheduling method for electric bus V2G response, based on the operation characteristics of electric buses in the regional integrated energy system, and modeling the electric buses; setting constraints according to the operation characteristics of the regional integrated energy system, and taking the total operation cost of the regional integrated energy system as the objective function, establishing a regional integrated energy system optimization scheduling model for coordinated scheduling of bus cluster charging and discharging, energy coupling equipment output, renewable energy output, and system purchase and sale energy; on the basis of the regional integrated energy system optimization scheduling model, taking the minimum electric load fluctuation rate as the objective function, the charging and discharging plan of the electric bus cluster within the secondary optimization cycle and the output scheduling of energy coupling equipment in the regional integrated energy system are optimized.
[0006] Furthermore, the electric bus is modeled as follows:
[0007] The energy expression of an electric bus is as follows:
[0008] E t+1 =E t +E c,t -E d,t -E t,t +E s,t
[0009]
[0010]
[0011]
[0012]
[0013] Among them, E t+1 and E t are the energy of the battery of the electric bus at time t+1 and t respectively; E c,t 、E d,t 、E t,t and E s,t are the energy changes of charging, discharging, driving and parking of the electric bus during period t; and are the state variables of the electric bus in the period t, namely, charging, discharging, driving and parking. When they are 1, it means the electric bus is in the state of charging, discharging, driving and parking, and other states are 0; and They are respectively the power consumed by the electric bus for charging, discharging and driving during period t; and The charging and discharging efficiency of electric buses;
[0014] Electric bus constraints:
[0015]
[0016]
[0017] SOC t =E t / E max
[0018] SOC min ≤SOC t ≤SOC max
[0019] E 0 =E T
[0020]
[0021]
[0022] in: and E is the maximum value of the allowed charging and discharging power of the electric bus; max E is the upper limit of the battery capacity of electric buses; 0 and E T are the proportion of electric energy at the beginning and end of the electric bus dispatch, respectively, indicating that the battery energy of the electric bus is consistent before and after the dispatch; the last two equations indicate the uniqueness of the charging, discharging, driving and parking states of the electric bus.
[0023] Furthermore, the operating constraints of the regional integrated energy system include electric bus constraints, electricity, gas and heat power balance constraints, renewable energy output constraints, energy interaction constraints and coupling equipment constraints.
[0024] Furthermore, the total operating cost of the regional integrated energy system is the objective function as shown below:
[0025] minF=F ene +F op +F c +F wpc +F V2G
[0026] Where: F is the total cost of system operation; F ene 、F op 、F c 、F wpc and F V2G They are energy purchase and sales costs, equipment operation and maintenance costs, carbon emission costs, penalty costs for abandoned wind power and photovoltaic power, and battery loss costs for participating in V2G.
[0027] Furthermore, the charging and discharging plan of the electric bus cluster within the secondary optimization cycle is optimized with the minimum electric load fluctuation rate as the objective function, that is, the secondary optimization is performed under the condition that the charging and discharging amount and output of the bus cluster and related equipment remain unchanged during the three electricity price periods of peak, flat and valley. The secondary optimization objective function is:
[0028]
[0029] in: is the system load fluctuation rate during the dispatching period; P sys,t is the total power load of the system in period t during the dispatch period; P avg It is the average power of the total electric load of the system during the dispatching period.
[0030] Further, the optimization is implemented in the following specific steps:
[0031] 1) Initialization, reading the departure schedule of the electric bus cluster, the predicted output of renewable energy in the regional integrated energy system, and the demand for electricity, heat, and gas loads;
[0032] 2) According to the departure schedule, determine the operation plan of each electric bus, calculate the entry and exit time of each electric bus and the SOC change of the on-board battery;
[0033] 3) Inputting the data of step 1) and step 2), solving the regional integrated energy system optimization scheduling model with the minimum system operation cost as the objective function;
[0034] 4) Using Cplex, we find the solution set that satisfies the objective function in step 3), including the bus cluster charging and discharging, energy coupling equipment output, renewable energy output, and system energy purchase and sales power for 96 time periods;
[0035] 5) Under the condition that the total amount of system energy purchase and sales and the output of related equipment remain unchanged, the charging and discharging strategy of the electric bus cluster is further optimized with the minimum fluctuation rate of system power load as the objective function;
[0036] 6) Using Cplex, a solution set that satisfies the objective function in step 5) is obtained, including the bus cluster charging and discharging strategy optimized again in 96 time periods;
[0037] 7) Finally, output the final optimization scheduling results of the regional integrated energy system.
[0038] The beneficial effects of the present invention are as follows: the regional integrated energy system optimization scheduling method of the electric bus V2G response of the present invention takes into account a variety of actual operating conditions (charging, discharging, parking, etc.), analyzes the influence of the coordinated scheduling of electric bus clusters and energy coupling equipment on the optimized operation of the regional integrated energy system (RIES), embeds the orderly charging of the electric bus cluster and the V2G response into the regional integrated energy system optimization scheduling, and compares and analyzes the results of the coordinated scheduling of the electric bus cluster and each device under three charging and discharging scenarios to form a first-stage scheduling strategy with the minimum operating cost of the entire system as the goal; the second-stage scheduling model, based on the optimization results of the first stage, takes the minimum fluctuation rate of the total electric load of the system as the goal, further optimizes the operation strategy of the electric bus cluster and each energy coupling equipment, effectively and intuitively reflects the influence of the orderly charging of electric buses and the participation in V2G response on the operating cost and operating reliability of the regional integrated energy system, and provides reference value for subsequent actual system operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 A flow chart of the regional integrated energy system optimization dispatching method for electric bus V2G response of the present invention;
[0040] Figure 2 This is a dispatching pattern diagram for a single electric bus;
[0041] Figure 3 This is the timing state diagram of the electric bus cluster;
[0042] Figure 4 This is the structural diagram of the regional integrated energy system;
[0043] Figure 5 For renewable energy forecasts and multi-energy load diagrams;
[0044] Figure 6 This is the SOC and driving status diagram of the electric bus under the conventional charging strategy;
[0045] Figure 7 This is the SOC and driving status diagram of the electric bus under the orderly charging strategy;
[0046] Figure 8 This is the SOC and driving status diagram of the electric bus under the orderly charging strategy;
[0047] Fig. 9 This is the system power balance diagram of scenario 1 of the present invention;
[0048] Fig.10 This is the system power balance diagram of scenario 2 of the present invention;
[0049] Fig.11a This is the power balance diagram of the system electric load of scenario 3 of the present invention;
[0050] Fig.11b This is the thermal load power balance diagram of the system in scenario 3 of the present invention;
[0051] Fig.11c This is the gas load power balance diagram of the system in scenario 3 of the present invention;
[0052] Fig.12 It is the total power load diagram of the system;
[0053] Fig.13 This is a two-stage optimization result diagram of the present invention. DETAILED DESCRIPTION
[0054] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.
[0055] like Figure 1 The flowchart of the regional integrated energy system optimization dispatching method for electric bus V2G response shown in the figure includes the following steps:
[0056] S1 models electric buses based on the operating characteristics of electric buses in the regional integrated energy system;
[0057] S2 proposes constraints based on the operating characteristics of the regional integrated energy system;
[0058] S3 establishes the optimization dispatch model of RIES based on the total operating cost of the regional integrated energy system;
[0059] Based on the optimized dispatching strategy of RIES, S4 further optimizes the charging and discharging plan of the electric bus cluster and the output strategy of the energy coupling equipment within the dispatching cycle with the goal of minimizing the fluctuation rate of the electric load;
[0060] S5 uses the RIES two-order optimization scheduling method to evaluate the typical daily operation conditions in a certain area in winter.
[0061] Step S1 models the electric bus based on the operating characteristics of the electric bus in the regional integrated energy system, and the specific steps are as follows:
[0062] Step S11: Analyze the driving characteristics of the electric bus. Figure 2 is the dispatching pattern diagram of a single electric bus. The driving arc indicates that the electric bus is performing the driving task, that is, T trip The stop arc indicates that the vehicle is parked at the station, that is, T stay During this period, the system executes the charging, discharging and parking (neither charging nor discharging) strategies of each electric bus through coordinated scheduling.
[0063] Step S12: The electric bus has a driving state when performing a task and a charging, discharging and parking state when not performing a task. Figure 3 is the time sequence state diagram of the electric bus cluster. Four energy change models of electric bus batteries are established, and the energy expression of one electric bus is shown in the following formula. t+1 =E t +E c,t -E d,t -E t,t +E s,t
[0064]
[0065]
[0066]
[0067]
[0068] Among them, E t+1 and Et are the energy of the battery of the electric bus at time t+1 and t respectively; E c,t 、E d,t 、E t,t and E s,t are the energy changes of charging, discharging, driving and parking of the electric bus during period t; and are the state variables of the electric bus in the period t, namely, charging, discharging, driving and parking. When they are 1, it means the electric bus is in the state of charging, discharging, driving and parking, and other states are 0; and They are respectively the power consumed by the electric bus for charging, discharging and driving during period t; and It is the charging and discharging efficiency of electric buses.
[0069] In step S2, constraints are proposed according to the operating characteristics of the regional integrated energy system. The specific steps are as follows:
[0070] Step S21: Electric bus constraints:
[0071]
[0072]
[0073] SOC t =E t / E max
[0074] SOC min ≤SOC t ≤SOC max
[0075] E 0 =E T
[0076]
[0077]
[0078] in: and E is the maximum value of the allowed charging and discharging power of the electric bus; max E is the upper limit of the battery capacity of electric buses; 0 and E T are the proportion of electric energy at the beginning and end of the electric bus dispatch, respectively, indicating that the battery energy of the electric bus is consistent before and after the dispatch; the last two equations indicate the uniqueness of the charging, discharging, driving and parking states of the electric bus.
[0079] Step S22: Power balance constraints (electricity, gas, and heat power):
[0080]
[0081]
[0082]
[0083] Among them, P t W and P t PV are the actual outputs of wind power generation and photovoltaic power generation during period t respectively; and They are respectively the charging and discharging power of the electric bus cluster during period t; is the electric load power in period t; and are the power consumption and heat generation of EB (electric boiler) in period t respectively; is the gas load power in period t; is the gas consumption power of CHP (combined heat and power unit) during period t; is the gas consumption power of GB (gas boiler) during period t; is the heat load power during period t; is the heat consumption of CHP (combined heat and power unit) during period t; is the heat consumption power of GB (gas boiler) during period t; is the electric power purchased by the regional integrated energy system from the external power grid during period t; is the electric power sold by the regional integrated energy system to the external power grid during period t; It is the gas power purchased by the regional integrated energy system from the external power grid during period t.
[0084] Step S23: Renewable energy output constraints:
[0085]
[0086]
[0087] and are the predicted maximum outputs of wind power generation and photovoltaic power generation during period t, respectively;
[0088] Step S24: Energy interaction constraints:
[0089]
[0090]
[0091]
[0092]
[0093]
[0094] in: The upper limit of the power that the system can purchase from the external power market; The upper limit of the power sold by the system to the external power market; and The signs of the system purchasing and selling electricity from the external power market are 1, which means the system is in the state of purchasing and selling electricity during period t, and 0 for other states; The upper limit of the power that the system can purchase from the natural gas market;
[0095] Step S25: Coupling device constraints:
[0096] CHP (Combined Heat and Power) Equipment:
[0097]
[0098]
[0099]
[0100]
[0101] in: and are the efficiency coefficients of CHP power generation and heat production, respectively; is the maximum power of CHP; and They are the upper and lower limits of the CHP ramp rate respectively.
[0102] GB (gas boiler) equipment:
[0103]
[0104]
[0105]
[0106] in: is the heat generation efficiency coefficient of GB; is the maximum power of GB; and They are the upper and lower limits of GB climbing rate respectively.
[0107] EB (Electric Boiler) Equipment:
[0108]
[0109]
[0110]
[0111] in: is the heat generation efficiency coefficient of EB; is the maximum power of EB; and They are the upper and lower limits of EB climbing rate respectively.
[0112] In step S3, the optimization dispatch model of RIES is established based on the total operating cost of the regional integrated energy system. The specific steps are as follows:
[0113] Step S31: Establish a RIES optimization dispatch model with the total operating cost of the regional integrated energy system as the target, so as to achieve low-carbon and economic operation of RIES. The objective function of the first stage is as follows:
[0114] minF=F ene +F op +F c +F wpc +F V2G
[0115] Where: F is the total cost of system operation; F ene 、F op 、F c 、F wpc and F V2G They are energy purchase and sales costs, equipment operation and maintenance costs, carbon emission costs, penalty costs for abandoned wind power and photovoltaic power, and battery loss costs for participating in V2G.
[0116] Step S32: Energy purchase and sale costs
[0117]
[0118] Step S33: Equipment operation and maintenance costs
[0119]
[0120] Step S34: Carbon emission cost
[0121]
[0122]
[0123] Step S35: Penalty cost for wind and solar power abandonment
[0124]
[0125] Step S36: V2G battery loss cost
[0126]
[0127] Where: T is the number of scheduling cycle time periods 96; and are the electricity purchase, electricity sales and gas purchase prices in period t respectively; and are the power of electricity purchase, electricity sales and gas purchase in period t respectively; S is the set of wind turbines, photovoltaic units, CHP, GB and EB; δ i is the maintenance unit price of equipment i; P t i is the power of device i in period t; p c is the carbon emission tax rate price; μ CHP , μ GB and μ g They are the carbon emission intensity of thermal power units in CHP, GB and power markets respectively; is the carbon emission power converted from CHP; is the heat generation power of GB during period t; is the electric power purchased from the power market during period t; β is the electricity-to-heat conversion coefficient of CHP carbon emissions; and are the power generation and heat generation of CHP during period t, respectively; is the penalty cost coefficient; and are the wind power and solar power curtailment in period t respectively; M is the total number of electric bus clusters; C V2G The unit price of battery loss for V2G response of electric buses; is the discharge power of the i-th electric bus in period t.
[0128] In step S4, secondary optimization is performed based on the condition that the charging and discharging amount and output of the bus cluster and related equipment remain unchanged during the three electricity price periods of peak, flat and valley. The specific steps are as follows:
[0129] Step S41: The objective function of the second stage:
[0130]
[0131] in: is the system load fluctuation rate during the dispatching period; P sys,t is the total power load of the system in period t during the dispatch period; P avg It is the average power of the total electric load of the system during the dispatching period.
[0132] To make the system operation cost after optimization in the second stage consistent with that in the first stage, the following constraints are added on the basis of the constraints in the first stage;
[0133] Step S42: Constraint on constant charging and discharging amount of bus cluster
[0134]
[0135] Where: k is the number of different time-of-use electricity prices, including peak, flat and valley; Ω k is the number of time periods included in the kth electricity price type; is the charge and discharge amount of EBC in the kth electricity price period after the first stage optimization;
[0136] Step S43: Constraints on the output of other devices remaining unchanged
[0137]
[0138] in: and are the outputs of wind turbines, PV, CHP, GB and EB in period t after the second stage optimization and the first stage optimization respectively;
[0139] Step S44: Constraint on unchanged power purchase and sales
[0140]
[0141] in: The amount of electricity purchased and sold by the system to the external power market during the kth electricity price period after the first stage optimization;
[0142] Step S45: Constraint on unchanged gas purchase volume
[0143]
[0144] in: It is the gas purchase volume of the system from the external natural gas market after the first phase of optimization.
[0145] Under the above constraints, the total energy purchase and sale volume of the system after two-stage optimization and the operating status of related equipment (except the charging and discharging strategy of the electric bus cluster) are guaranteed to be consistent, so the total operating cost of the system under two-stage optimization remains unchanged. The solution strategy of RIES two-stage optimization scheduling considering electric bus clusters.
[0146] Step S46: Initialization, reading the departure schedule of the electric bus cluster, the predicted output of renewable energy in the regional integrated energy system, and the demand for electricity, heat, and gas loads;
[0147] Step S47: According to the departure schedule, determine the operation plan of each electric bus, calculate the entry and exit time of each electric bus and the SOC (state of charge) change of the on-board battery;
[0148] Step S48: input the data of step 46 and step 47, and solve the regional integrated energy system optimization scheduling model with the minimum system operation cost as the objective function in the first stage;
[0149] Step S49: Cplex is used to solve a solution set that satisfies the objective function of step S48, including the power of bus cluster charging and discharging, energy coupling equipment output, renewable energy output, and system energy purchase and sales in 96 time periods;
[0150] Step S410: passing the optimized dispatching strategy of the first stage to the second stage, further optimizing the charging and discharging strategy of the electric bus cluster with the minimum system load fluctuation rate as the objective function under the condition of ensuring that the total amount of system energy purchase and sales and the output of related equipment remain unchanged;
[0151] Step S411: using Cplex to solve a solution set that satisfies the objective function of step S410, including the bus cluster charging and discharging strategies optimized again in 96 time periods;
[0152] Step 412: finally outputting the final optimization scheduling result of RIES;
[0153] In step S5, the impact of coordinated dispatch of electric bus clusters and energy coupling equipment on RIES optimization operation is analyzed, and three scenarios are set for comparative analysis. The specific steps are as follows:
[0154] Step S51: Figure 5 This is a diagram of the maximum output of multi-energy load (electricity, gas, heat) and renewable energy predicted for a typical day in winter in a certain region. It can be used to understand the multi-energy load and renewable energy load at different times of the day. It can be seen that the regional photovoltaic output is relatively small and concentrated in the daytime from 6:00 to 18:00, and the regional electricity consumption can fully absorb it; while wind power is more in the night from 21:00 to 24:00 and in the early morning from 0:00 to 6:00, when the regional electricity load is small, and there will be serious wind abandonment;
[0155] Step S52: Set scenario 1: EBC conventional charging, that is, after the vehicle completes the nth mission, if the power does not meet the next driving capacity, it will be charged immediately. The SOC and driving status of one electric bus are as follows: Figure 6 As shown;
[0156] Step S53: Set scenario 2: EBC orderly charging, that is, optimize the charging strategy of the electric bus under the premise of meeting the operation plan. The SOC and driving status of an electric bus are as follows: Figure 7 As shown;
[0157] Step S54: Setting scenario 3: EBC participates in V2G response, that is, optimizing the charging and discharging strategy of electric buses under the premise of meeting the operation plan. The SOC and driving status of an electric bus are as follows: Figure 8 As shown;
[0158] Step S55: The scheduling result of scenario 1 is as follows Fig. 9 As shown in the figure, the regional electricity load is provided by wind turbines, photovoltaics, CHP and external power market. Due to the battery capacity limitation of electric buses, the electric bus cluster will be charged successively from 15:00 to 17:45 and 20:15 to 22:15 to meet the subsequent travel tasks, which will increase the electricity demand during the afternoon and evening peak hours. During this period, the regional internal renewable energy and CHP power supply are insufficient, and electricity needs to be purchased from the external power market, further increasing the operating costs of RIES; at the same time, the night wind power is not fully absorbed by thermal power boilers and electricity sales, so the system is forced to abandon wind power, wasting renewable resources and increasing the system penalty cost;
[0159] Step S56: The scheduling result of scenario 2 is as follows: Fig.10 As shown in the figure, after EBC implements orderly charging, under the guidance of time-of-use electricity prices and wind abandonment penalty measures, the centralized charging load in the afternoon and evening peak periods in scenario 1 is transferred to 12:00-6:00 in the morning, and the excess wind power resources in the early morning period can be completely absorbed by EBC, EB and power sales; at the same time, due to the transfer of charging load, the original system power purchase during peak and normal electricity prices is greatly reduced, which reduces the system's power purchase costs and improves the economy of system operation;
[0160] Step S57: Scenario 3 scheduling result, such as Figures 11a to 11c As shown in the balance diagram of electric load, thermal load, and gas load, after EBC participates in the V2G response, during the peak electricity price periods of 10:30-13:00 and 18:15-21:45, EBC discharges to the system to alleviate the peak electric load and reduce the amount of electricity purchased during this period. At the same time, electric buses are restricted by driving tasks and need to be recharged during the normal electricity price period of 13:00-18:00 between the two discharge periods to meet the electricity demand of electric buses for subsequent travel. The sum of the system electricity purchase cost and the electric bus V2G loss cost in scenario 3 is lower than the electricity purchase cost in scenarios 1 and 2. Therefore, the economy of system operation in scenario 3 is better than the previous two.
[0161] Step S58: The various operating costs of RIES in the dispatching cycle are shown in Table 1. As can be seen from Table 1, compared with scenarios 1 and 2, although EBC's participation in V2G response in scenario 3 generates a battery loss cost of 424.3 yuan, the total system operating cost is reduced by 2285.6 yuan and 420.7 yuan respectively, achieving the optimal system operating cost while achieving full absorption of renewable energy and reducing carbon emissions, which has certain social and economic benefits;
[0162] Table 1
[0163]
[0164] Step S59: Fig.12 It can be seen that the conventional charging strategy of EBC significantly increases the power load of RIES during the afternoon and evening peak periods, further exacerbating the peak-to-valley difference in power consumption; the orderly charging strategy transfers the large-scale charging load of EBC to the early morning, optimizing the power consumption of the system while improving the absorption capacity of wind power; the V2G strategy of EBC further reduces the peak and fills the valley on the basis of scenario 2, reduces the power purchase cost of the system, effectively alleviates the power supply pressure during peak power consumption, and has good social benefits;
[0165] Step S510: Fig.13 A two-stage optimization scheduling method is adopted for scenario 3. The optimization results of the total power load of RIES are as follows: In the first stage, the output strategy of EBC and energy coupling equipment is optimized with the goal of minimizing the operating cost of RIES. Since only the operating cost is optimized, there are multiple feasible solutions for the scheduling strategy that meets the minimum cost in the same electricity price period (such as the normal electricity price: 13:00-18:00). It is only necessary to meet basic constraints such as supply and demand balance. Although this can optimize the system operating cost within the scheduling cycle, its total power load fluctuates greatly; in the second stage, on the basis of keeping the operating cost of RIES unchanged, the EBC charging and discharging and system power sales strategies are further optimized. Under the condition of meeting the regional energy consumption and electric bus operation needs, the system power load fluctuation rate of 3.62 after the first stage optimization is reduced to 2.56, and the effect is optimized by 29.3%. The power load of RIES is smoother and more stable.
[0166] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. A regional integrated energy system optimization scheduling method for electric bus V2G response, characterized in that: Based on the operation characteristics of electric buses in the regional integrated energy system, the electric buses are modeled; according to the operation characteristics of the regional integrated energy system, constraints are set, and the total operation cost of the regional integrated energy system is used as the objective function to establish a regional integrated energy system optimization scheduling model for coordinated scheduling of bus cluster charging and discharging, energy coupling equipment output, renewable energy output, and system purchase and sale of energy; Based on the optimization dispatching model of regional integrated energy system, the charging and discharging plan of electric bus cluster and the output dispatching of energy coupling equipment in regional integrated energy system are optimized in the second optimization cycle with the minimum fluctuation rate of electric load as the objective function. The electric bus modeling: The energy expression of an electric bus is as follows: AND t+1 =And t +E c,t -AND d,t -AND t,t +E s,t Among them, E t+1 and E t are the energy of the battery of the electric bus at time t+1 and t respectively; E c,t 、E d,t 、E t,t and E s,t are the energy changes of charging, discharging, driving and parking of the electric bus during period t; and are the state variables of the electric bus in the period t, namely, charging, discharging, driving and parking. When they are 1, it means the electric bus is in the state of charging, discharging, driving and parking, and other states are 0; and They are respectively the power consumed by the electric bus for charging, discharging and driving during period t; and The charging and discharging efficiency of electric buses; Electric bus constraints: SOC t =E t / IN max SOC min ≤SOC t ≤SOC max E0=E T in: and E is the maximum value of the allowed charging and discharging power of the electric bus; max The upper limit of the battery capacity of electric buses; E0 and E T are the proportion of electric energy at the beginning and end of the dispatch of electric buses, respectively, indicating that the battery energy of electric buses is consistent before and after the dispatch; the latter two equations indicate the uniqueness of the charging, discharging, driving and parking states of electric buses; The total operating cost of the regional integrated energy system is the objective function as shown below: minF=F ene +F op +F c +F wpc +F V2G Where: F is the total cost of system operation; F ene 、F op 、F c 、F wpc and F V2G They are energy purchase and sales costs, equipment operation and maintenance costs, carbon emission costs, penalty costs for abandoned wind power and photovoltaic power, and battery loss costs for participating in V2G.
2. The regional integrated energy system optimization scheduling method for electric bus V2G response according to claim 1 is characterized in that: The operating constraints of the regional integrated energy system include electric bus constraints, electricity, gas and heat power balance constraints, renewable energy output constraints, energy interaction constraints and coupling equipment constraints.
3. The regional integrated energy system optimization scheduling method for electric bus V2G response according to claim 1 is characterized in that: The objective function of the secondary optimization is to minimize the fluctuation rate of the electric load and optimize the charging and discharging plan of the electric bus cluster within the cycle. That is, the secondary optimization is performed under the condition that the charging and discharging amount and output of the bus cluster and related equipment remain unchanged during the three electricity price periods of peak, flat and valley. The secondary optimization objective function is: in: is the system load fluctuation rate during the dispatching period; P sys,t is the total power load of the system in period t during the dispatch period; P avg It is the average power of the total electric load of the system during the dispatching period.
4. The regional integrated energy system optimization scheduling method for electric bus V2G response according to claim 3 is characterized in that: The optimization is implemented in the following specific steps: 1) Initialization, reading the departure schedule of the electric bus cluster, the predicted output of renewable energy in the regional integrated energy system, and the demand for electricity, heat, and gas loads; 2) According to the departure schedule, determine the operation plan of each electric bus, calculate the entry and exit time of each electric bus and the SOC change of the on-board battery; 3) Inputting the data of step 1) and step 2), solving the regional integrated energy system optimization scheduling model with the minimum system operation cost as the objective function; 4) Using Cplex, we find the solution set that satisfies the objective function in step 3), including the bus cluster charging and discharging, energy coupling equipment output, renewable energy output, and system energy purchase and sales power for 96 time periods; 5) Under the condition that the total amount of system energy purchase and sales and the output of related equipment remain unchanged, the charging and discharging strategy of the electric bus cluster is further optimized with the minimum fluctuation rate of system power load as the objective function; 6) Using Cplex, a solution set that satisfies the objective function in step 5) is obtained, including the bus cluster charging and discharging strategy optimized again in 96 time periods; 7) Finally, output the final optimization scheduling results of the regional integrated energy system.
Citation Information
Patent Citations
Multi-energy complementary system two-stage optimization scheduling method and system considering source-storage-load cooperation
AU2020100983A4
Electric car charging-discharging behavior prediction method
CN104899667A
Electric vehicle grid-connected cooperative control method in comprehensive energy system environment
CN112467767A
