Power system, server, charge and discharge control device, and power supply and demand adjustment method
By designing the power system and management device, it can simultaneously respond to the power supply and demand adjustment of the grid and the power adjustment request of the power adjustment resource, solving the problem of difficulty in responding simultaneously in the existing technology, and achieving efficient management of power resources and environmentally friendly power dispatch.
Patent Information
- Application Number
- CN202110971406.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-09-17
- Filing Date
- 2021-08-24
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-08-24
AI Technical Summary
It is difficult for existing servers to simultaneously respond to supply and demand adjustment requests of the power grid and power adjustment requests of power adjustment resources. Especially in a microgrid environment, it is difficult to effectively manage multiple power adjustment resources to achieve scheduled period adjustment of power amount.
A power system is designed, including multiple power adjustment resources connected to the power grid, and a management device that can obtain the supply and demand adjustment request signal of the power grid and the power adjustment request signal of the power adjustment resource, and generate a power command signal, In response to the two requests, the predetermined power adjustment resources are instructed to perform grid supply and demand adjustment and power amount adjustment. The system also includes computers to manage enterprises and electric vehicles, and realize power adjustment of electric vehicles by generating and sending power command signals to reduce power costs and carbon dioxide emissions.
It achieves the ability to simultaneously respond to grid supply and demand adjustments and power adjustment resource power adjustment in a microgrid environment, optimizing power management, reducing power costs and carbon dioxide emissions, and improving the flexibility and efficiency of the power grid.
Smart Images

Figure CN114204543B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to a power system, a server, a charge and discharge control device, and a power supply and demand adjustment method. Background Art
[0002] For example, International Publication No. 2018 / 084151 discloses a server that controls the charging and discharging of a storage battery according to either a switching request for short-term charging and discharging from the storage battery to the power grid (a request for frequency adjustment) or a continuous discharge request from the storage battery to the power grid (a request for spinning reserve). The server is configured to select either a request for frequency adjustment or a request for spinning reserve based on the SOC (State Of Charge) of the storage battery. Summary of the invention
[0003] The server described in the above-mentioned International Publication No. 2018 / 084151 can only respond to any one of the requests for frequency adjustment and the request for spinning reserve. When responding to the request for frequency adjustment, the server focuses on frequency adjustment.
[0004] However, in recent years, a microgrid formed by a network of multiple power adjustment resources (e.g., distributed power sources, power storage devices, and electrical equipment) has attracted attention. The server that manages the microgrid sometimes requests the power adjustment resources to adjust the amount of power for a predetermined period, for example, from an economic point of view and / or from the point of view of reducing carbon dioxide emissions (minimizing CO2). Hereinafter, the adjustment of the amount of power for a predetermined period will also be referred to as "power adjustment". By adjusting the amount of power using the power adjustment resources, the amount of power supplied from the power grid to the microgrid within a predetermined period can be adjusted.
[0005] When requesting supply and demand adjustment of the power grid (for example, frequency adjustment) and power adjustment for power adjustment resources, it is difficult to use the server described in the above-mentioned International Publication No. 2018 / 084151 to respond to these two requests at the same time.
[0006] The present disclosure provides a power system, a server, a charge and discharge control device, and a power supply and demand adjustment method that can simultaneously respond to both a request for supply and demand adjustment of a power grid and a request for power amount adjustment of a power adjustment resource.
[0007] The power system of the first scheme of the present disclosure includes: a plurality of power adjustment resources configured to be electrically connected to a power grid; and a management device configured to manage the plurality of power adjustment resources. The management device is configured to obtain a first request signal requesting supply and demand adjustment of the power grid and a second request signal requesting the power adjustment resource to adjust the amount of power for a predetermined period, the management device is configured to send a power command signal to a predetermined power adjustment resource included in the plurality of power adjustment resources, the power command signal indicating a command power value for each predetermined interval of the predetermined period, and the management device is configured to generate the power command signal in response to both the first request signal and the second request signal.
[0008] In the above-mentioned power system, the power command signal generated as described above can be used to instruct the predetermined power adjustment resource to adjust the supply and demand of the power grid and the power quantity adjustment for a predetermined period. The predetermined power adjustment resource can respond to both the request for the supply and demand adjustment of the power grid and the request for the power quantity adjustment for a predetermined period by operating according to the command power value represented by the power command signal (i.e., the command power value for each predetermined interval for a predetermined period).
[0009] In the above aspect, the management device may be configured to generate the power command signal by superimposing the first request signal and the second request signal.
[0010] In the above-mentioned method, the predetermined power adjustment resource may also include an electric vehicle configured to be electrically connected to the power grid. The management device may include: a first computer configured to manage an enterprise; and a second computer configured to manage the electric vehicle. The first computer may also be configured to generate the second request signal using the power load of the enterprise, and to send the generated second request signal to the second computer, and the second computer may be configured to receive the first request signal, and to generate the power command signal for the electric vehicle in response to both the first request signal and the second request signal.
[0011] In the above power system, a second request signal is generated based on the power load of the enterprise. And the power of the electric vehicle is adjusted according to the power command signal in response to the request of the second request signal generated in this way. Therefore, the power cost or carbon dioxide emission can be reduced in the enterprise.
[0012] It should be noted that an electric vehicle is a vehicle that is configured to use the electricity stored in a power storage device to travel. Electric vehicles include FC vehicles (fuel cell vehicles), range extender EVs, etc. in addition to EVs (electric vehicles) and PHVs (plug-in hybrid vehicles). The power storage device can be configured to store electricity, and the storage method is arbitrary. The power storage device can directly store electricity (electric energy) or convert it into other energy (for example, liquid fuel or gas fuel as an energy source) for storage. Examples of power storage devices include secondary batteries and PtG (Power to Gas) equipment.
[0013] An enterprise may also construct a microgrid. An enterprise may also be a factory. The first computer may be a FEMS (Factory Energy Management System) server or a BEMS (Building Energy Management System) server.
[0014] In the above-mentioned method, the enterprise may also include a naturally variable power source. The first computer may also be configured to generate the second request signal using the power generation of the naturally variable power source of the enterprise and the power load of the enterprise so that the amount of power supplied from the power grid to the enterprise during the predetermined period does not exceed a predetermined value.
[0015] The amount of power generated by a naturally variable power source varies according to meteorological conditions. Examples of naturally variable power sources include solar power generation equipment and wind power generation equipment. In a naturally variable power source, power is generated using renewable energy, so that at least a portion of the power used in the enterprise is ensured using a naturally variable power source, thereby reducing the carbon dioxide emissions of the enterprise. Furthermore, in the above-mentioned power system, the second request signal is generated using the power generated by the naturally variable power source, so that the second request signal can be generated to match the power generated by the variable naturally variable power source. In addition, the second request signal is generated in such a way that the amount of power supplied from the power grid to the enterprise during a predetermined period does not exceed a predetermined value. Therefore, the amount of power supplied from the power grid to the enterprise is prevented from becoming excessive.
[0016] In the above aspect, the first request signal may be a signal requesting frequency adjustment of the power grid, and the second computer may be configured to receive the first request signal from a third computer configured to manage supply and demand of the power grid.
[0017] According to the above-described electric power system, it is possible to simultaneously respond to both a request for frequency regulation of the electric power grid and a request for electric power regulation of the electric power regulation resource.
[0018] The first request signal may also be a LFC (Load Frequency Control) signal. In addition, the first request signal may also be a signal requesting non-speed regulation operation. The third computer may be a server of a power transmission and distribution operator, a server of a supply and demand adjustment market, or a server of an integrator.
[0019] The predetermined period of the second request signal (hereinafter, also referred to as the "target period") may also be set to a length suitable for adjusting the amount of electric power (kWh). The predetermined interval of the power command signal (hereinafter, also referred to as the "command interval") may also be set to an interval suitable for adjusting the amount of electric power (kW). These target periods and command intervals may also be set to the following ranges.
[0020] In the above-mentioned method, the length of the predetermined period may be more than 3 minutes, and the predetermined interval may be less than 15 seconds. The length of the object period may be more than 3 minutes and less than 3 hours, or more than 30 minutes and less than 1 hour. The instruction interval may be more than 0.1 milliseconds and less than 15 seconds, or more than 0.1 seconds and less than 5 seconds.
[0021] A server according to a second aspect of the present disclosure is configured to manage a plurality of power regulation resources that are electrically connected to a power grid.
[0022] The server is configured to receive a first request signal requesting supply and demand adjustment of the power grid and a second request signal requesting the power adjustment resource to adjust the amount of power during a predetermined period. The server is configured to generate a power command signal in response to both the first request signal and the second request signal, the power command signal indicating a command power value for each predetermined interval during the predetermined period. The server is configured to send the generated power command signal to a predetermined power adjustment resource included in the plurality of power adjustment resources.
[0023] In the server, the power command signal generated as described above can be used to instruct the predetermined power adjustment resource to adjust the supply and demand of the power grid and adjust the power quantity for a predetermined period. Thus, it is possible to respond to both the request for adjusting the supply and demand of the power grid and the request for adjusting the power quantity for the power adjustment resource at the same time.
[0024] The charge and discharge control device of the third scheme of the present disclosure is configured to perform charge and discharge control of a power storage device that is electrically connected to a power grid, the charge and discharge control device being configured to obtain a first request signal requesting supply and demand adjustment of the power grid and a second request signal requesting the power storage device to adjust the amount of electricity for a predetermined period, and the charge and discharge control device being configured to control the charge and discharge of the power storage device in a manner that simultaneously responds to both the first request signal and the second request signal.
[0025] According to the above-described charge and discharge control device, it is possible to perform charge and discharge control of the power storage device in a manner that simultaneously responds to both a request for supply and demand adjustment of the power grid and a request for electric energy adjustment of the power storage device.
[0026] The fourth scheme of the electric power supply and demand adjustment method of the present disclosure includes: generating an electric power command signal in response to both a request for supply and demand adjustment of a power grid and a request for electric power adjustment during a predetermined period for an electric power adjustment resource that can be electrically connected to the power grid, the electric power command signal indicating an instruction power value for each predetermined interval during the predetermined period; and controlling the electric power adjustment resource in accordance with the electric power command signal.
[0027] According to the above-mentioned power supply and demand adjustment method, it is possible to generate power command signals that respond to both the request for supply and demand adjustment of the power grid and the request for power quantity adjustment of the power adjustment resource, and control the power adjustment resource according to the generated power command signals. Thus, it is possible to simultaneously respond to both the request for supply and demand adjustment of the power grid and the request for power quantity adjustment of the power adjustment resource.
[0028] According to the present disclosure, a power system, a server, a charge and discharge control device, and a power supply and demand adjustment method are capable of simultaneously responding to both a request for supply and demand adjustment of a power grid and a request for power amount adjustment of a power adjustment resource. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Features, advantages, and technical and industrial significance of exemplary embodiments of the present invention will be described below with reference to the accompanying drawings, in which like reference numerals represent like elements, and in which:
[0030] Figure 1 It is a diagram showing a schematic configuration of a power system according to an embodiment of the present disclosure.
[0031] Figure 2 Yes means Figure 1 A diagram showing the internal structure of each server and each vehicle included in the power system shown.
[0032] Figure 3 Detailed description of the invention The invention is a flowchart showing a method for adjusting power supply and demand according to an embodiment of the present disclosure.
[0033] Figure 4 It is expressed by function Figure 1 The functional block diagram of the components of the FEMS server and the integrator server included in the power system shown.
[0034] Figure 5 It is used to illustrate Figure 4 A diagram showing the method by which the integrator server calculates the optimal plant load.
[0035] Figure 6 This is a diagram showing a first power signal generated by a first request signal (supply-demand adjustment request) according to the embodiment.
[0036] Figure 7 This is a diagram showing a kWh target value requested by the second request signal in the first embodiment and a second power signal generated from the kWh target value.
[0037] Figure 8 This is a diagram showing the power command signal according to the first embodiment.
[0038] Fig. 9 This is a diagram showing a kWh target value requested by a second request signal according to the second embodiment and a second power signal generated from the kWh target value.
[0039] Fig.10 This is a diagram showing a power command signal according to the second embodiment.
[0040] Fig.11 It is a diagram showing a power system to which a sub-integrator server is applied in a modification of the embodiment of the present disclosure.
[0041] Fig.12 Yes means Figure 4 A diagram of a modified example of the FEMS server shown.
[0042] Fig.13 Yes means Fig.12 A diagram of a modified example of the FEMS server shown. DETAILED DESCRIPTION
[0043] The embodiments of the present disclosure will be described in detail with reference to the accompanying drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals, and their description will not be repeated.
[0044] Figure 1 1 is a diagram showing a schematic configuration of an electric power system according to an embodiment of the present disclosure. Figure 1The power system 1 includes a power system PG, multiple vehicles 10, a FEMS server 100 (hereinafter, simply referred to as "server 100"), an integrator server 200 (hereinafter, simply referred to as "server 200"), a power transmission and distribution operator server 300 (hereinafter, simply referred to as "server 300"), a factory 500, and a transformer and distribution equipment 501. FEMS refers to a factory energy management system (Factory Energy Management System). An integrator is an electrical operator that brings together multiple power adjustment resources to provide energy management services. The factory 500 is equivalent to an example of an "enterprise" in the present disclosure.
[0045] The power system PG is a power grid constructed by power plants and power transmission and distribution equipment not shown in the figure. In this embodiment, the power company serves as both a power generation operator and a power transmission and distribution operator. The power company is equivalent to a general power transmission and distribution operator, and maintains and manages the power system PG. The power company is equivalent to the manager of the power system PG. Server 300 is a computer that manages the supply and demand of the power system PG (power grid) and belongs to the power company. The power system PG and server 300 are respectively equivalent to an example of the "power grid" and the "third computer" of the present disclosure.
[0046] The integrator manages a plurality of vehicles 10. The server 200 is a computer that manages a plurality of vehicles 10 and belongs to the integrator. The server 200 is equivalent to an example of the "second computer" of the present disclosure. The plurality of vehicles 10 are, for example, EVs (electric vehicles) each, and are equipped with a power storage device 11. Each vehicle 10 is configured to be able to perform external charging and external power supply. External charging is to charge the power storage device 11 of the vehicle 10 by receiving power supply from the outside of the vehicle 10. External power supply is to use power discharged from the power storage device 11 of the vehicle 10 to supply power to the outside of the vehicle 10. The plurality of vehicles 10 are equivalent to an example of the "power adjustment resource" of the present disclosure. In this embodiment, each vehicle 10 included in the power system 1 has the same structure. However, the power system 1 may also include a plurality of vehicles with different structures. The power system 1 may also include at least one of a personally owned vehicle (POV) and a vehicle (MaaS vehicle) managed by a MaaS (Mobility as a Service) operator.
[0047] The factory 500 constructs a microgrid MG using a plurality of power adjustment resources described later. The power line used to network a plurality of power adjustment resources in the microgrid MG may also be a self-operated power line. The power transformer 501 is provided at the connection point (power receiving point) of the microgrid MG, and is configured to be able to switch the parallel (connection) / de-coupling (disconnection) of the power system PG and the microgrid MG. When the microgrid MG is connected to the power system PG, the power transformer 501 receives, for example, ultra-high voltage (voltage exceeding 7000V) AC power from the power system PG, and steps down the received power and supplies it to the microgrid MG. The power transformer 501 is configured to include a switchgear (for example, a section switch, a circuit breaker, a blocker, and a load switch) on the high-voltage side (primary side), a transformer, a protective relay, a measuring device, and a control device. It should be noted that the power received by the power transformer 501 from the power system PG is not limited to ultra-high voltage power, and may also be, for example, high voltage power (voltage exceeding 600V and below 7000V).
[0048] The factory 500 may be, for example, an automobile manufacturing factory or other factories. The multiple elements included in the factory 500 are electrically connected to each other to form a microgrid MG. Specifically, the factory 500 includes multiple EVSEs 20, a stationary power storage device 30, a building 510, an industrial device 520, a natural variable power source 530, and a generator 540.
[0049] Each EVSE 20 is an EVSE installed in the factory 500. EVSE refers to Electric Vehicle Supply Equipment. In order to exchange power between each EVSE 20 and the microgrid MG, each EVSE 20 is electrically connected to the microgrid MG. The vehicle 10 is configured to be electrically connected to the EVSE 20. For example, a charging cable connected to the EVSE 20 is connected to the inlet of the vehicle 10, and power can be sent / received between the EVSE 20 and the vehicle 10. The number of EVSE 20 possessed by the factory 500 is arbitrary, and can be about 5, more than 10, or more than 100.
[0050] The stationary power storage device 30 is a power storage device installed in the factory 500. In order to be able to exchange power between the stationary power storage device 30 and the microgrid MG, the stationary power storage device 30 is electrically connected to the microgrid MG. In this embodiment, a lithium-ion battery is used as the stationary power storage device 30. The lithium-ion battery can also be a battery used in a vehicle (a recycled product). The stationary power storage device 30 is not limited to a lithium-ion battery, and can be other secondary batteries or a PtG (Power to Gas) device. In this embodiment, the number of stationary power storage devices 30 is 1, but the number of stationary power storage devices 30 possessed by the factory 500 is arbitrary, and can be about 5, more than 10, or more than 100.
[0051] For example, an operator of the factory 500 enters and exits the building 510. The building 510 includes various electrical devices (e.g., lighting fixtures and air conditioning equipment) that operate using the power supplied from the microgrid MG. In this embodiment, only generators (natural variable power supply 530 and generator 540) are provided outside the building 510, but a generator may also be provided inside the building 510.
[0052] The industrial equipment 520 is an industrial equipment used outdoors and operates using the power supplied from the microgrid MG. The industrial equipment 520 of this embodiment includes an electric melting furnace and a holding furnace for aluminum. The industrial equipment 520 may also include at least one of a drainage device for treating drainage and a recycling device for recycling waste.
[0053] The natural variable power source 530 is a power source whose power generation output varies according to meteorological conditions, and outputs the generated power to the microgrid MG. The power generated by the natural variable power source 530 is equivalent to variable renewable energy (VRE). The surplus power generated by the natural variable power source 530 can be stored in the fixed power storage device 30. In this embodiment, a PV power generation device (for example, a solar panel installed on the roof) is used as the natural variable power source 530. PV power generation refers to photovoltaic power generation. However, it is not limited to this. The natural variable power source 530 can also replace the PV power generation device or include a wind power generation device on the basis of the PV power generation device.
[0054] The generator 540 is a generator that is not equivalent to a naturally variable power source, and outputs the generated power to the microgrid MG. In this embodiment, a steam turbine generator is used as the generator 540. However, it is not limited to this. The generator 540 may also replace the steam turbine generator or include at least one of a gas turbine generator, a diesel engine generator, a gas engine generator, and a biomass generator on the basis of the steam turbine generator. The factory 500 may also include a cogeneration system that utilizes the heat generated during power generation.
[0055] The server 100 is configured to manage the factory 500. The stationary power storage device 30, the building 510, the industrial equipment 520, the natural variable power source 530, and the generator 540 included in the factory 500 are each equivalent to an example of the "power regulation resource" of the present disclosure. The server 100 is configured to manage these power regulation resources. The server 100 is equivalent to an example of the "first computer" of the present disclosure.
[0056] Figure 2 1 is a diagram showing the internal structure of each of the servers 100, 200, 300 and the vehicle 10. Figure 2 The servers 100, 200, and 300 are configured to include control devices 101, 201, and 301, storage devices 102, 202, and 302, and communication devices 103, 203, and 303, respectively. The control devices 101, 201, and 301 are configured to include processors, respectively, to perform predetermined information processing. The storage devices 102, 202, and 302 are configured to be able to store various information, respectively. In addition to storing programs executed by the control devices 101, 201, and 301, respectively, the storage devices 102, 202, and 302 also store information used in the programs (such as mappings, mathematical formulas, and various parameters). The communication devices 103, 203, and 303 include various communication I / Fs, respectively. The control devices 101, 201, and 301 are configured to communicate with the outside via the communication devices 103, 203, and 303, respectively.
[0057] The vehicle 10 includes, in addition to the aforementioned power storage device 11, a charger 12 for adjusting the charge and discharge power of the power storage device 11 and an ECU (Electronic Control Unit) 13 for controlling the charger 12. The ECU 13 is configured to include a processor (e.g., a CPU (Central Processing Unit)), a RAM (Random Access Memory), a storage device, and a timer (all not shown). The ECU 13 may also be a microcomputer.
[0058] The power storage device 11 is configured to include a secondary battery for storing electric power for driving. In this embodiment, a battery pack including a plurality of lithium-ion batteries is used as the secondary battery. The battery pack is configured by electrically connecting a plurality of single cells (also commonly referred to as "units") to each other. It should be noted that other power storage devices such as double-layer capacitors may also be used instead of secondary batteries.
[0059] In this embodiment, a DC EVSE is used as EVSE20. Therefore, DC power is supplied from the vehicle 10 to the EVSE20, and DC / AC conversion is performed using an inverter built into the EVSE20. The charger and discharger 12 is configured to adjust the charge and discharge power, for example, using a DC / DC converter. The specifications of the DC EVSE may also be any one of CHAdeMO, CCS (Combined Charging System), GB / T, and Tesla. However, EVSE20 does not necessarily have to be a DC method, but may also be an AC method. In the method in which the vehicle 10 externally supplies power to the AC EVSE, the charger and discharger 12 may also include a rectifier circuit, a PFC (Power Factor Correction) circuit, an insulation circuit (for example, an insulation transformer), an inverter, and a filter circuit. The charger and discharger 12 may also perform DC / AC conversion on the power discharged from the power storage device 11, and supply the converted AC power from the vehicle 10 to the EVSE.
[0060] The user of each vehicle 10 carries a portable terminal 14. In this embodiment, a smartphone with a touch panel display is used as each portable terminal 14. However, it is not limited to this. As each portable terminal 14, any portable terminal can be used, and a tablet terminal, a wearable device (for example, a smart watch), or an electronic key can also be used. The portable terminal 14 is installed with a predetermined application software (hereinafter referred to as "application"), and the portable terminal 14 is configured to exchange information with the server 200 via the application. The user can send the action schedule of the vehicle 10 belonging to the user to the server 200 by operating the portable terminal 14. As an example of the action schedule of the vehicle 10, a POV driving plan (for example, the time of departure from home, the destination, and the arrival time) or an operation plan of a MaaS vehicle can be listed.
[0061] The server 100 manages the status (e.g., power consumption, generated power, and stored power) of each power adjustment resource used in the factory 500. The status of each power adjustment resource in the factory 500 is stored in the storage device 102. Each power adjustment resource is given identification information (hereinafter also referred to as "resource ID") for identifying the power adjustment resource, and the server 100 uses the resource ID to distinguish and manage the information of each power adjustment resource. The control device 101 is configured to detect the status of each power adjustment resource in the factory 500 using various sensors (not shown) and update the data in the storage device 102.
[0062] The server 200 is configured to manage information of each registered user (hereinafter, also referred to as "user information"), information of each registered vehicle 10 (hereinafter, also referred to as "vehicle information"), information of each registered EVSE 20 (hereinafter, also referred to as "EVSE information"), and information of the registered stationary power storage device 30 (hereinafter, also referred to as "PS information"). The user information, vehicle information, EVSE information, and PS information are distinguished by identification information (ID) and stored in the storage device 202.
[0063] The user ID is identification information for identifying the user, and also functions as information (terminal ID) for identifying the portable terminal 14 carried by the user. The server 200 is configured to distinguish and store information received from the portable terminal 14 for each user ID. The user information includes the communication address of the portable terminal 14 carried by the user and the vehicle ID of the vehicle 10 belonging to the user.
[0064] The vehicle ID is identification information for identifying the vehicle 10. The vehicle ID may also be a VIN (Vehicle Identification Number). The vehicle information includes the action schedule of each vehicle 10. The EVSE-ID is identification information for identifying the EVSE 20. The EVSE information includes the communication address of each EVSE 20 and the status of the vehicle 10 connected to each EVSE 20. In addition, the EVSE information also includes information indicating the combination of the mutually connected vehicle 10 and EVSE 20 (for example, a combination of the EVSE-ID and the vehicle ID). In this embodiment, the server 200 is configured to communicate with the EVSE 20, and communicate with the vehicle 10 connected to the EVSE 20 via the EVSE 20. The server 200 is configured to obtain the status of each vehicle 10 connected to the EVSE 20 (for example, the SOC (State Of Charge) of the power storage device 11). It should be noted that the vehicle 10 can also be configured to directly communicate wirelessly with the server 200. The vehicle 10 can include a DCM (Data Communication Module) or a communication I / F corresponding to a 5G (fifth generation mobile communication system).
[0065] PS-ID is identification information for identifying the stationary power storage device 30. The PS information includes the state and communication address of the stationary power storage device 30. The server 200 is configured to store the state (for example, SOC) of the stationary power storage device 30 received from the stationary power storage device 30 in association with the PS-ID.
[0066] In this embodiment, the charger / discharger 12 of each vehicle 10 and the charger / discharger of the stationary power storage device 30 are configured to be remotely operated by the server 200 and to perform charging and discharging according to the instructions of the server 200. Each vehicle 10 is configured to exchange power between the microgrid MG and the power storage device 11 through external charging and external power supply. By performing power transmission / reception between the power storage device 11 and the stationary power storage device 30 and the microgrid MG respectively through remote operation of the server 200, supply and demand adjustment of the microgrid MG is performed.
[0067] In this embodiment, the manager of the factory 500 signs an electricity contract with the power company. The power company supplies electricity to the factory 500 in accordance with the electricity contract and receives a reward. The factory 500 (microgrid MG) receives electricity supply from the power system PG. According to the above-mentioned electricity contract, the maximum power that the factory 500 receives from the power system PG (hereinafter also referred to as "contract maximum power") is determined. The server 100 is configured to coordinate with the server 200 to adjust the supply and demand of the microgrid MG so that the power supplied from the power system PG to the microgrid MG does not exceed the contract maximum power.
[0068] The contract maximum power may also be the power (kWh / h) obtained by dividing the amount of electricity (kWh) during a predetermined object period by the length (h) of the object period. In this embodiment, the length of the object period is set to 30 minutes (= 0.5 hours). The server 100 adjusts the supply and demand of the microgrid MG so that the value (kW) obtained by dividing the amount of electricity (kWh) during the object period by 0.5h does not exceed the contract maximum power. If the object period has passed, the next object period is set continuously. Therefore, the object period is set every 30 minutes. Whenever the object period passes, the amount of electricity during the object period is evaluated. The server 100 adjusts the supply and demand of the microgrid MG so that the value of twice the amount of electricity supplied from the power system PG to the microgrid MG during the object period does not exceed the contract maximum power.
[0069] In the power system 1 of this embodiment, the server 200 receives a first request signal from the server 300 requesting supply and demand adjustment of the power system PG. The first request signal is, for example, a signal requesting frequency adjustment of the power system PG. The first request signal may request frequency adjustment only in the forward flow or the reverse flow, or may request the forward flow and the reverse flow alternately. The first request signal may also be an LFC (Load Frequency Control) signal. However, it is not limited to this, and the first request signal may be an EDC (Economic load Dispatching Control) signal, or a signal obtained by superimposing an LFC signal and an EDC signal. The server 200 may also be configured to receive multiple first request signals.
[0070] The server 200 receives a second request signal from the server 100 requesting the vehicle 10 to adjust the amount of electric power during the target period. The second request signal may be a signal requesting the vehicle 10 to set the amount of electric power (kWh) during the target period to a predetermined target value (hereinafter referred to as "kWh target value"). The kWh target value for the target period may be determined at the start of the target period or immediately before the start of the target period.
[0071] The server 200 selects the vehicle 10 for requesting power adjustment. Hereinafter, the selected vehicle 10 will also be referred to as an "adjustment vehicle". The number of adjustment vehicles required to respond to both the first request signal and the second request signal is selected. Among them, when the vehicle 10 performs frequency adjustment by repeatedly charging and discharging the power storage device 11 during the object period, the SOC of the power storage device 11 hardly changes before and after the object period. Therefore, in the case of requesting frequency adjustment using the first request signal, if an adjustment vehicle is selected to respond to the request of the second request signal, it can also respond to the request of the first request signal in most cases. It should be noted that the above-mentioned adjustment vehicle is equivalent to an example of the "predetermined power adjustment resource" of the present disclosure. In the following, the case where the number of adjustment vehicles is more than 2 is described, but in the case where the degree of requested power adjustment is small, the number of adjustment vehicles may sometimes be 1.
[0072] The server 200 generates a power command signal for each adjustment vehicle in response to the requests of both the first request signal and the second request signal. The power command signal is a signal indicating the command power value for each predetermined command interval during the object period. The power command signal may be a common signal for each adjustment vehicle or may be different for each adjustment vehicle. In this embodiment, the command interval is set to 0.5 seconds. However, it is not limited to this, and the command interval can be set arbitrarily. The command interval may be a fixed value or a variable value according to the type of the first request signal. The command power value may also be any one of a discharge power value and a charge power value. For example, a positive command power value may be used to represent a discharge power value, and a negative command power value may be used to represent a charge power value.
[0073] The server 200 remotely controls the charger and discharger 12 of each adjustment vehicle by transmitting a power command signal to each adjustment vehicle during the target period. The charger and discharger 12 of each adjustment vehicle is remotely controlled so that the charge and discharge power of the power storage device 11 of each adjustment vehicle becomes the command power value indicated by the power command signal.
[0074] Figure 3 1 is a flowchart showing a method for adjusting power supply and demand executed by server 200. The process shown in this flowchart is executed, for example, when the target period starts or immediately before it starts. S11 to S15 described below may be executed every time the target period starts or every time the start time of the target period approaches.
[0075] Reference Figure 3 as well as Figure 1 and Figure 2In step (hereinafter, simply referred to as "S") 11, the control device 201 obtains a first request signal (power adjustment request) for the target period from the server 300. In S12, the control device 201 obtains a second request signal (kWh target value) for the target period from the server 100. Figure 3 In the example shown, steps S11 and S12 are executed in the order, but steps S11 and S12 may be reversed.
[0076] In S13, the control device 201 selects an adjustment vehicle for responding to both the first request signal and the second request signal from the plurality of vehicles 10 registered in the server 200. At this time, the control device 201 determines the degree of power adjustment to be requested for each adjustment vehicle based on the state of each adjustment vehicle (for example, the SOC of the power storage device 11).
[0077] In S14, the control device 201 generates a power command signal for each adjustment vehicle to respond to both the first request signal and the second request signal during the target period. In S14, the power command signal is generated in a manner that responds to both the request of the first request signal (i.e., the request for supply and demand adjustment of the power system PG) and the request of the second request signal (i.e., the request for power quantity adjustment during the target period). S14 is an example of a "signal generation step".
[0078] In S15, the control device 201 transmits a power command signal to each adjustment vehicle during the target period, thereby controlling the charge and discharge of the power storage device 11 of each adjustment vehicle. In S15, each adjustment vehicle is controlled according to the power command signal. S15 corresponds to an example of a "control step".
[0079] Figure 4 This is a functional block diagram showing the components of the control device 101 of the server 100 and the control device 201 of the server 200 according to their functions.
[0080] Reference Figure 4 as well as Figure 1 and Figure 2 The control device 101 of the server 100 includes a power load prediction unit 110, a localization unit 120, a natural power generation prediction unit 130, and an optimal load calculation unit 140. These units are embodied by, for example, a processor and a program executed by the processor. However, the present invention is not limited thereto, and these units may also be embodied by dedicated hardware (electronic circuit).
[0081] The power load prediction unit 110 is configured to predict the power load of the factory 500 during the target period using information (eg, measurement data and production plan described below) stored in the storage device 102. The larger the power load, the greater the power consumption.
[0082] The server 100 uses sensors (not shown) to measure the state of the factory 500 (for example, power load, temperature, and sunlight intensity) in sequence, and records each measured value in the storage device 102. The data recorded in the storage device 102 in this way is measurement data. The power load prediction unit 110 can also use the measurement data in the prediction of the power load. The power load of the factory 500 can change according to the temperature and the intensity of sunlight. For example, the further the temperature is from the comfortable range (for example, about 27°C in summer), the greater the power load of the air conditioning equipment in the building 510.
[0083] In addition, the storage device 102 stores a production plan for the factory 500. The user may also input the production plan into the server 100 via an input device (not shown). The power load prediction unit 110 predicts the operating rate of the factory 500 for executing the production plan. The higher the operating rate, the more equipment is in operation and the greater the power load. For example, in an automobile manufacturing plant, the more the number of automobiles produced in the production plan is predicted to increase, the higher the operating rate of the factory 500. When predicting the power load of the factory 500, the power load prediction unit 110 may also take into account the power load (measurement data) when the production plan was executed in the past.
[0084] The localization unit 120 is configured to use the current meteorological conditions (measurement data) and the meteorological forecast data to predict the meteorological conditions during the target period. The server 100 sequentially obtains the meteorological conditions (e.g., sunshine intensity) predicted by the meteorological bureau and records them in the storage device 102. The data recorded in the storage device 102 in this way is the meteorological forecast data. The localization unit 120 can use the meteorological forecast data to predict how the current meteorological conditions change over time. The localization unit 120 can also use a predetermined mathematical formula to calculate the transition of the meteorological conditions during the target period. The prediction accuracy of the localization unit 120 can also be improved through machine learning.
[0085] The natural power generation prediction unit 130 is configured to use the meteorological conditions of the target period predicted by the localization unit 120 to predict the power generation output of the natural variable power source 530 during the target period. The natural power generation prediction unit 130 may also use a predetermined power generation prediction map to obtain the transition of the power generation of the natural variable power source 530 during the target period according to the predicted meteorological conditions during the target period. The power generation prediction map is a map that represents the relationship between meteorological conditions (e.g., sunshine intensity) and the power generation of the natural variable power source 530. There is a tendency that the stronger the sunshine intensity, the greater the PV power generation. The power generation capacity of the natural variable power source 530 may change over time, so the power generation prediction map may also be updated by learning. For example, the server 100 may also measure the meteorological conditions and the power generation of the natural variable power source 530 in sequence, and update the power generation prediction map based on the measured data.
[0086] The optimal load calculation unit 140 calculates the optimal power load of the factory 500 using the optimization information stored in the storage device 102. Hereinafter, the optimal power load of the factory 500 calculated by the optimal load calculation unit 140 will also be referred to as the "optimal factory load". The optimization information includes the contract maximum power, information for calculating the power cost, information for calculating the CO2 emission intensity, and historical data of the EV chargeable and dischargeable amount. The EV chargeable and dischargeable amount represents the range of the amount of power that can be adjusted by the vehicle group (multiple vehicles 10) managed by the integrator during the target period. The calculation results of the EV chargeable and dischargeable amount fed back from the server 200 to the server 100 in sequence are stored in the storage device 102 as the historical data of the EV chargeable and dischargeable amount. At the moment when the optimal load calculation unit 140 calculates the optimal factory load, the optimal load calculation unit 140 has not yet received the calculation results of the EV chargeable and dischargeable amount from the server 200. Therefore, the optimal load calculation unit 140 predicts the EV chargeable and dischargeable amount based on the historical data of the EV chargeable and dischargeable amount.
[0087] The optimal load calculation unit 140 determines the optimal plant load so that the value of twice the amount of power supplied from the power system PG to the microgrid MG during the target period does not exceed the contract maximum power. In addition, the optimal load calculation unit 140 determines the optimal plant load so that the power cost and CO2 emission intensity are sufficiently small. Figure 5 1 is a diagram for explaining a method in which the optimum load calculation unit 140 calculates the optimum plant load.
[0088] Reference Figure 5 as well as Figure 1 to Figure 4 The amount of power generated by the natural variable power source 530 during the target period (hereinafter also referred to as "natural power generation E1") is basically determined by the meteorological conditions during the target period. The natural power generation E1 is determined not to exceed the storage capacity of the factory 500. The server 100 can limit the power generation output of the natural variable power source 530 by controlling the natural variable power source 530. When the amount of power generated by the natural variable power source 530 is excessive and exceeds the storage capacity of the factory 500, the server 100 sends a command to limit the power generation output (natural power generation limit command) to the natural variable power source 530.
[0089] The amount of power generated by the generator 540 during the target period (hereinafter also referred to as "self-generated power E2") is determined so that the CO2 emission intensity does not become too high. The server 100 can control the power output of the generator 540 according to the command to control the generator 540 (self-generated power command).
[0090] The amount of electric power supplied from the vehicle 10 to the microgrid MG during the target period (hereinafter also referred to as "EV electric power E3") is determined to be within the range of the EV chargeable and dischargeable amount. The server 100 can control the EV electric power E3 by sending a signal (EV charge and discharge request) requesting charging and discharging to the vehicle 10 to the server 200. The EV charge and discharge request is equivalent to the aforementioned second request signal. The EV electric power E3 is equivalent to the aforementioned kWh target value.
[0091] The amount of electricity supplied from the power system PG to the microgrid MG during the target period (hereinafter also referred to as "PG electricity amount E4") is adjusted so as not to exceed the contract maximum power when converted in kWh / h. The PG electricity amount E4 is basically determined by the power load of the factory 500, the natural power generation E1, the self-generated power E2, and the EV power E3. The PG electricity amount E4 supplements the shortage of the natural power generation E1, the self-generated power E2, and the EV power E3 with respect to the power consumed by the power load of the factory 500.
[0092] The power load (optimal factory load) of the factory 500 is determined in such a way that the power cost does not become too high. The server 100 can control the power load of the factory 500 using a load adjustment command. The load adjustment command is a control signal for each of the electrical equipment and the industrial equipment 520 in the building 510. For example, the server 100 can reduce the power load of the factory 500 by limiting the use of the air conditioning equipment in the building 510. In addition, the server 100 can reduce the power load of the factory 500 by temporarily stopping (or reducing the output) the industrial equipment 520 (for example, an electric melting furnace and a holding furnace).
[0093] The optimal load calculation unit 140 determines the natural power generation E1, the self-generated power E2, the EV power E3, the PG power E4, and the optimal factory load from the above-mentioned perspective, and uses the load adjustment command, the natural power generation limit command, the self-generated power command, and the second request signal (EV charge and discharge request) to adjust the supply and demand of the microgrid MG. The server 100 of this embodiment uses the power generation of the natural variable power source 530 in the factory 500 and the power load in the factory 500 to generate the second request signal in such a way that the power supplied from the power system PG to the factory 500 (microgrid MG) during the target period does not exceed the predetermined value. The generated second request signal is sent from the server 100 to the server 200.
[0094] Refer again Figure 4 as well as Figure 1 and Figure 2The control device 201 of the server 200 includes a supply and demand adjustment load distribution calculation unit 210, an EV chargeable and dischargeable amount calculation unit 220, an EV charge and discharge optimization calculation unit 230, and an EV charge and discharge instruction generation unit 240. These units are embodied, for example, by a processor and a program executed by the processor. However, it is not limited to this, and these units can also be embodied using dedicated hardware (electronic circuit).
[0095] The supply and demand adjustment load distribution calculation unit 210 obtains the first request signal (supply and demand adjustment request) for the target period from the server 300, and determines the supply and demand adjustment load allocated to each power adjustment resource for the supply and demand adjustment of the power system PG requested by the first request signal. The first request signal may also be a signal requesting an adjustment force for frequency adjustment of the power system PG within a predetermined response time (for example, 5 minutes). The interval of the requested frequency adjustment may be more than 0.5 seconds and less than 30 seconds. The supply and demand adjustment load is allocated to the vehicle group (multiple vehicles 10) and the fixed power storage device 30 managed by the server 200. The method of allocating the supply and demand adjustment load is arbitrary, and it may also be allocated to the vehicle group and the fixed power storage device 30 in a predetermined ratio. The predetermined ratio may also be variable. The supply and demand adjustment load distribution calculation unit 210 may allocate the requested supply and demand adjustment with a shorter response time to the fixed power storage device 30.
[0096] By determining the supply and demand adjustment load as described above, the supply and demand adjustment of the power system PG requested by the first request signal to the vehicle group (hereinafter also referred to as "the first PG supply and demand adjustment") and the supply and demand adjustment of the power system PG requested by the first request signal to the stationary power storage device 30 (hereinafter also referred to as "the second PG supply and demand adjustment") are determined. The server 200 sends a signal (fixed charge and discharge instruction) requesting charging and discharging corresponding to the second PG supply and demand adjustment to the stationary power storage device 30, thereby causing the stationary power storage device 30 to perform the second PG supply and demand adjustment. In addition, the first PG supply and demand adjustment is sent from the supply and demand adjustment load distribution calculation unit 210 to the EV charge and discharge instruction generation unit 240.
[0097] The EV chargeable and dischargeable amount calculation unit 220 is configured to calculate the EV chargeable and dischargeable amount using the action schedule of each vehicle 10 (e.g., the driving plan of the POV or the operation plan of the MaaS vehicle) and the state of each vehicle 10 connected to the EVSE 20 (e.g., the SOC of the power storage device 11). For example, the EV chargeable and dischargeable amount calculation unit 220 identifies a vehicle 10 that is currently connected to the EVSE 20 and is not scheduled to travel during the target period as a standby vehicle (i.e., a vehicle that can adjust power during the target period). Then, the EV chargeable and dischargeable amount calculation unit 220 calculates the range of the amount of power that can be adjusted by each standby vehicle during the target period based on the SOC of the power storage device 11 of each standby vehicle. Thus, the range of the amount of power that can be adjusted by the vehicle group (i.e., the EV chargeable and dischargeable amount) is obtained. The calculated EV chargeable and dischargeable amount is fed back to the server 100 from the server 200.
[0098] The EV charge and discharge optimization calculation unit 230 selects an adjustment vehicle for responding to both the first request signal and the second request signal from the standby vehicles. At this time, the EV charge and discharge optimization calculation unit 230 allocates the adjustment power (hereinafter also referred to as "kWh adjustment power") for the supply and demand adjustment (electricity adjustment) of the microgrid MG requested by the second request signal to each adjustment vehicle. The EV charge and discharge optimization calculation unit 230 may also determine the kWh adjustment power allocated to each adjustment vehicle based on the state of each adjustment vehicle (for example, the SOC of the power storage device 11).
[0099] The EV charge and discharge instruction generation unit 240 obtains the vehicle ID of each adjustment vehicle and the kWh adjustment force allocated to each adjustment vehicle from the EV charge and discharge optimization calculation unit 230. In addition, the EV charge and discharge instruction generation unit 240 obtains the first request signal for the first PG supply and demand adjustment (for example, frequency adjustment) requested by the vehicle group from the supply and demand adjustment load distribution calculation unit 210, and distributes the adjustment force for the first PG supply and demand adjustment (hereinafter also referred to as "ΔkW adjustment force") to each adjustment vehicle. The ΔkW adjustment force can also be equally distributed to each adjustment vehicle.
[0100] The EV charge and discharge instruction generation unit 240 generates a power instruction signal for each adjustment vehicle to respond to both the first request signal and the second request signal during the object period. More specifically, the EV charge and discharge instruction generation unit 240 generates a power instruction signal for each adjustment vehicle based on the kWh adjustment force and the ΔkW adjustment force assigned to each adjustment vehicle. The EV charge and discharge instruction generation unit 240 can also generate a power instruction signal for each adjustment vehicle by, for example, converting the kWh adjustment force and the ΔkW adjustment force assigned to each adjustment vehicle into power signals and superimposing them. In addition, the EV charge and discharge instruction generation unit 240 can also generate a power instruction signal for each adjustment vehicle by correcting the power instruction signal for the ΔkW adjustment force common to each adjustment vehicle based on the kWh adjustment force assigned to each adjustment vehicle (i.e., the amount of electricity adjusted by the adjustment vehicle during the object period) (for example, adding the amount of kWh adjustment force).
[0101] The following describes a method of generating a power command signal based on a specific example. In the first and second embodiments described below, the length of the target period is set to 180 seconds. However, the length of the target period can be changed as appropriate.
[0102] Figure 6 2 is a diagram showing an example of a first power signal generated by a first request signal (request for supply and demand adjustment). Figure 6 as well as Figure 4 The first power signal of the embodiment is a waveform signal represented by line L10, which represents a power value that varies periodically within the range of ±5kW. The first power signal requests frequency adjustment to match such a waveform (line L10). Such a first power signal is generated based on a first request signal that alternately requests charging and discharging. The EV charge and discharge instruction generation unit 240 generates a first power signal for each adjustment vehicle based on the first request signal so that the vehicle group performs the first PG supply and demand adjustment requested by the first request signal.
[0103] Figure 7 This is a diagram showing a kWh target value requested by the second request signal in the first embodiment and a second power signal generated from the kWh target value.
[0104] Reference Figure 7 as well as Figure 4, the kWh target value requested by the second request signal of the first embodiment (for example, the kWh target value assigned to one adjusted vehicle) is 1kWh. In order to convert the kWh target value into the second power signal, the EV charge and discharge instruction generation unit 240 obtains the change in power during the target period. The change in power during the target period can be sent from the server 100 to the server 200 together with the kWh target value, and can also be generated in the EV charge and discharge instruction generation unit 240. The EV charge and discharge instruction generation unit 240 generates a second power signal that meets the kWh target value (1kWh) according to the above-mentioned change in power. Figure 7 In the example shown, line L21 indicates the transition of the power amount during the target period. On the other hand, the second power signal is a signal indicating the transition of the power value during the target period. Figure 7 In the example shown, line L22 represents the second power signal. The transition of the power amount during the target period (line L21) increases at a constant rate, so the power value requested to meet the kWh target value (1 kWh) is evenly distributed during the target period. The second power signal shown by line L22 requests that the power value during the target period be set to a constant value (20 kW).
[0105] Figure 8 1 is a diagram showing a power command signal according to the first embodiment. Figure 8 as well as Figure 4 In the first embodiment, the EV charge and discharge instruction generation unit 240 Figure 6 The first power signal (line L10) and Figure 7 The second power signal (line L22) shown in FIG. 1 is superimposed to generate a power command signal for each vehicle. Figure 8 In the example shown, line L23 represents a power command signal. In the first embodiment, this power command signal corresponds to a power command that responds to requests from both the first power signal and the second power signal.
[0106] Fig. 9 This is a diagram showing a kWh target value requested by a second request signal according to the second embodiment and a second power signal generated from the kWh target value.
[0107] Reference Fig. 9 as well as Figure 4 The kWh target value requested by the second request signal of the second embodiment (for example, the kWh target value assigned to one adjustment vehicle) is also 1 kWh as in the first embodiment. The EV charge and discharge instruction generation unit 240 obtains the change in the amount of power during the target period, and generates a second power signal that satisfies the kWh target value (1 kWh) according to the change in the amount of power. Fig. 9In the example shown, line L31 indicates the transition of the power amount during the target period. On the other hand, the second power signal is a signal indicating the transition of the power value during the target period. Fig. 9 In the example shown, line L32 represents the second power signal. The transition of the power amount during the target period (line L31) initially rises at a low speed and then rises at a high speed halfway through. The power value requested to meet the kWh target value (1 kWh) during the target period is allocated according to the transition of the power amount. The second power signal shown by line L32 initially requests a lower power value (10 kW) and then requests a higher power value (30 kW) halfway through.
[0108] Fig.10 2 is a diagram showing a power command signal according to the second embodiment. Fig.10 as well as Figure 4 In the second embodiment, the EV charge and discharge instruction generation unit 240 Figure 6 The first power signal (line L10) and Fig. 9 The second power signal (line L32) shown in FIG. 1 is superimposed to generate a power command signal for each vehicle. Fig.10 In the example shown, line L33 represents a power command signal. In the second embodiment, this power command signal corresponds to a power command that responds to requests from both the first power signal and the second power signal.
[0109] Refer again Figure 4 as well as Figure 1 and Figure 2 The EV charge and discharge command generation unit 240 controls the charge and discharge of the power storage device 11 of each adjustment vehicle by sending the power command signal (EV charge and discharge command) generated as described above to each adjustment vehicle. Each adjustment vehicle operates according to the power command signal during the target period, thereby functioning as the allocated kWh adjustment force and ΔkW adjustment force. As a result, during the target period, the supply and demand adjustment of the power system PG requested by the first request signal and the supply and demand adjustment of the microgrid MG requested by the second request signal are simultaneously performed.
[0110] As described above, the power system 1 of this embodiment includes a plurality of power adjustment resources (for example, a vehicle group including a plurality of vehicles 10) that can be electrically connected to the power system PG (power grid) and a management device (servers 100 and 200) that manages the plurality of power adjustment resources. The server 200 obtains a first request signal requesting supply and demand adjustment of the power system PG from the server 300. In addition, the server 100 generates a second request signal requesting the power adjustment resource (vehicle group) to adjust the amount of power in a predetermined period (object period). The server 200 obtains the second request signal from the server 100. In response to both the first request signal and the second request signal, the server 200 generates a power command signal representing a command power value for each predetermined interval in the object period, and sends the generated power command signal to the predetermined power adjustment resource (adjustment vehicle) included in the plurality of power adjustment resources.
[0111] In the power system 1 having the above structure, the power command signal generated as described above can be used to instruct the predetermined power adjustment resource to adjust the supply and demand of the power system PG and the power quantity adjustment during the target period. The predetermined power adjustment resource can respond to both the request for supply and demand adjustment of the power grid and the request for power quantity adjustment during the target period by operating according to the command power value represented by the power command signal.
[0112] The first request signal may also be a signal requesting non-speed regulation operation (local control). For example, the EV charge and discharge command generation unit 240 determines the power frequency of the microgrid MG connected to the power system PG, and generates a control signal for the adjustment vehicle to perform power adjustment based on non-speed regulation operation (for example, power adjustment to maintain the power frequency within a predetermined range), and adds the kWh adjustment force allocated to the adjustment vehicle to the control signal. Thus, power command signals are generated in response to both the request of the first request signal (a request for supply and demand adjustment of the power system PG based on non-speed regulation operation) and the request of the second request signal (kWh adjustment force). By sending the power command signal generated in this way to the adjustment vehicle, the supply and demand adjustment of the power system PG and the supply and demand adjustment of the microgrid MG are simultaneously performed using the adjustment vehicle.
[0113] The computer (server 300) that sends the first request signal is not limited to the server of the power transmission and distribution operator (e.g., the power company), but may also be a server in the supply and demand adjustment market. In addition, the length of the object period of the second request signal is not limited to 3 minutes (180 seconds) or 30 minutes, and can be changed appropriately. In addition, the command interval of the power command signal is not limited to 0.5 seconds, and can be changed appropriately.
[0114] In the above embodiment, the server 200 generates a power command signal for the electric vehicle (vehicle 10) in response to both the first request signal and the second request signal, but the server 200 may also generate a power command signal for a power adjustment resource other than the electric vehicle in response to both the first request signal and the second request signal. In addition, the distribution of the kWh adjustment force and the ΔkW adjustment force in the generation of the power command signal may also be variable according to the type of power adjustment resource. For example, although the secondary battery can respond quickly to the charge and discharge request, the capacity is limited, so it is difficult to continue charging or discharging for a long time. On the other hand, the steam turbine generator responds slowly to the power generation request, but can continue to generate power for a long time. In the case where the server 200 generates the power command signal for each of the secondary battery and the steam turbine generator in response to both the first request signal and the second request signal, it may be that for the secondary battery, the distribution of the kWh adjustment force is reduced, and the distribution of the ΔkW adjustment force is increased, and for the steam turbine generator, the distribution of the ΔkW adjustment force is reduced, and the distribution of the kWh adjustment force is increased. It should be noted that the gas engine generator and the like also have the same characteristics as the steam turbine generator.
[0115] The integrator server (server 200) may also receive the second request signal from each of the plurality of FEMS servers (server 100) and execute the second request signal for each factory. Figure 3 The processing shown in the figure generates a power command signal for each factory in response to both the first request signal and the second request signal. In addition, the power command signal generated in this way can be sent from the integrator server to each adjustment vehicle, thereby controlling each adjustment vehicle to simultaneously adjust the supply and demand of the power system PG and the supply and demand of the microgrid of each factory.
[0116] A sub-integrator server may be provided between the integrator server (server 200) and the FEMS server (server 100). The sub-integrator server may also be configured by region. The sub-integrator server may also be configured to cooperate with the FEMS server in the jurisdiction area to adjust the supply and demand of the power grid requested from the integrator server. Fig.11 FIG. 1 is a diagram showing an example of a power system to which a sub-integrator server is applied. Fig.11, FEMS servers 100A~100D, sub-integrator servers 400A~400D and factories 500A~500D exist in areas A~D respectively. The integrator server 200A is configured to be able to communicate with all of the sub-integrator servers 400A~400D. The sub-integrator servers 400A~400D are configured to be able to communicate with the FEMS servers 100A~100D within the jurisdiction area respectively. Hereinafter, except for the case where they are explained separately, each of the sub-integrator servers 400A~400D is recorded as a "sub-integrator server 400".
[0117] The integrator server 200A belongs to the integrator, and the sub-integrator server 400 belongs to the sub-integrator. Alternatively, the integrator may be a car manufacturer, and the sub-integrator may be a sales store. The sales store may also use the sub-integrator server 400 to manage the sold vehicles. The sub-integrator server 400 has Figure 4 The functions of the server 200 shown. That is, the sub-integrator server 400 receives the first request signal from the integrator server 200A, receives the second request signal from the FEMS server within the jurisdiction, and generates a power command signal in response to both the first request signal and the second request signal. In addition, the sub-integrator server 400 performs power adjustment on a predetermined power adjustment resource (for example, an electric vehicle) by sending a power command signal to the predetermined power adjustment resource. The predetermined power adjustment resource operates according to the power command signal, thereby simultaneously performing supply and demand adjustment of the power system PG requested from the integrator and supply and demand adjustment of the microgrid of the factory under its jurisdiction. In this variant, the sub-integrator server 400 and the integrator server 200A are respectively equivalent to an example of the "second computer" and the "third computer" of the present disclosure.
[0118] In the above-mentioned embodiment, the power system 1 ( Figure 1 to Figure 5 ), the FEMS server (server 100) may also have Figure 4 The functions of the integrator server (server 200) are shown, and the integrator server is omitted. Fig.12 Yes means Figure 4 FIG. 1 is a diagram showing a modified example of a FEMS server. Fig.12 The FEMS server 100E of this modified example is Figure 4 In addition to the functions of the FEMS server (server 100) shown, Figure 4The functions of the integrator server (server 200) shown in FIG. 1 are shown in FIG. 1 . That is, the FEMS server 100E includes a power load prediction unit 110, a localization unit 120, a natural power generation prediction unit 130, an optimal load calculation unit 140, a supply and demand adjustment load distribution calculation unit 210, an EV chargeable and dischargeable amount calculation unit 220, an EV charge and discharge optimization calculation unit 230, and an EV charge and discharge instruction generation unit 240.
[0119] Fig.13 Yes means Fig.12 FIG. 1 is a diagram showing a modified example of a FEMS server. Fig.13 The FEMS server 100F of this modification is applied to a power system including a plurality of stationary power storage devices 30, and uses a plurality of stationary power storage devices 30 to adjust power instead of a plurality of vehicles 10. The FEMS server 100F includes a charge-discharge optimization calculation unit 230A and a charge-discharge instruction generation unit 240A.
[0120] The charge-discharge optimization calculation unit 230A obtains the second request signal (charge-discharge request) from the optimal load calculation unit 140, and selects a stationary power storage device 30 for responding to both the first request signal and the second request signal from the plurality of stationary power storage devices 30. Hereinafter, the selected stationary power storage device 30 is also referred to as an "adjustment device". The charge-discharge optimization calculation unit 230A distributes the adjustment power (kWh adjustment power) for supply-demand adjustment (electricity adjustment) of the microgrid MG requested by the second request signal to each adjustment device.
[0121] The charge and discharge instruction generation unit 240A obtains the resource ID of each adjustment device and the kWh adjustment power allocated to each adjustment device from the charge and discharge optimization calculation unit 230A. In addition, the charge and discharge instruction generation unit 240A obtains the first request signal (supply and demand adjustment request) from, for example, the server 300, and allocates the adjustment power (ΔkW adjustment power) for the supply and demand adjustment (for example, frequency adjustment) of the power system PG requested by the first request signal to each adjustment device. Then, the charge and discharge instruction generation unit 240A generates a power instruction signal for each adjustment device to respond to both the first request signal and the second request signal during the object period, and sends the generated power instruction signal to each adjustment device, thereby performing charge and discharge control of each adjustment device during the object period. As a result, during the object period, the supply and demand adjustment of the power system PG requested by the first request signal and the supply and demand adjustment of the microgrid MG requested by the second request signal are performed simultaneously.
[0122] The FEMS server 100F of the above-mentioned variation is equivalent to an example of the "charge and discharge control device" of the present disclosure. The FEMS server 100F is configured to perform charge and discharge control of a stationary power storage device 30 that can be electrically connected to the power system PG (grid). The FEMS server 100F is configured to obtain a first request signal requesting supply and demand adjustment of the power system PG and a second request signal requesting the stationary power storage device 30 to adjust the amount of electricity for a predetermined period, and to control the charge and discharge of the stationary power storage device 30 in a manner that responds to both the first request signal and the second request signal. According to such a structure, the charge and discharge control of the stationary power storage device 30 can be performed in a manner that responds to both the request for supply and demand adjustment of the power system PG and the request for adjustment of the amount of electricity for the stationary power storage device 30.
[0123] Alternatively, the stationary power storage device or electric vehicle may have a function of generating a power command signal, and the stationary power storage device or electric vehicle may generate the power command signal in response to the first request signal and the second request signal, and control the charge and discharge of the power storage device owned by the stationary power storage device or electric vehicle according to the generated power command signal. In addition, the stationary power storage device or electric vehicle may generate a power command signal for non-speed regulation operation (local control) while measuring the power frequency.
[0124] In the above embodiment, an example of applying the power system to a factory is shown, but the power system may also be applied to other enterprises (eg, schools, hospitals, hotels, banks, or shopping malls). The computer managing the enterprise is not limited to a FEMS server, but may also be a BEMS server.
[0125] The structure of the electric vehicle used as a power adjustment resource is not limited to the structure shown in the above embodiment. For example, the electric vehicle is not limited to EV (electric vehicle), but may also be a plug-in hybrid vehicle (PHV). The electric vehicle may also be configured to be capable of contactless charging. In addition, the vehicle group used as a power adjustment resource may also include electric vehicles that are not configured to correspond to external power supply but can only be externally charged. Electric vehicles are not limited to cars, but may also be buses or trucks. Electric vehicles may be configured to be capable of automatic driving or have a flight function. Electric vehicles may also be unmanned vehicles that can travel (for example, unmanned transport vehicles (AGVs) or agricultural machinery).
[0126] The embodiments disclosed this time should be considered as illustrative in all aspects and not restrictive. The scope of the present invention is indicated by the claims rather than the description of the embodiments above, and is intended to include all modifications within the meaning and scope equivalent to the claims.
Claims
1. A power system, characterized in that: include: a plurality of power regulation resources configured to be electrically connected to a power grid; as well as A management device is configured to manage the plurality of power adjustment resources, wherein: The power adjustment resource includes a first power adjustment resource and a second power adjustment resource, The management device is configured to obtain a first request signal for requesting supply and demand adjustment of the power grid and a second request signal for requesting the first power adjustment resource to adjust the amount of power in a predetermined period. The management device is configured to transmit a power command signal to the first power adjustment resource, the power command signal indicating a command power value for each predetermined interval of the predetermined period, The management device is configured to generate the power command signal in response to both the first request signal and the second request signal. The second power regulation resource is a part of a microgrid that receives power supply from a power grid according to a power contract. The second request signal is used to request supply and demand adjustment of the microgrid, The second request signal requests the first power adjustment resource to adjust the amount of power during the predetermined period based on the power generation of the microgrid and the power load of the microgrid so that the amount of power supplied from the grid to the microgrid during the predetermined period does not exceed the contracted maximum power.
2. The power system according to claim 1, characterized in that: The management device is configured to generate the power command signal by superimposing the first request signal and the second request signal.
3. The power system according to claim 1 or 2, characterized in that: The first power regulation resource includes an electric vehicle configured to be electrically connected to the power grid, The management device includes: a first computer configured to manage the enterprise; and a second computer configured to manage the electric vehicle. The first computer is configured to generate the second request signal using the power load of the company, and is configured to transmit the generated second request signal to the second computer. The second computer is configured to receive the first request signal, and to generate the power command signal for the electric vehicle in response to both the first request signal and the second request signal.
4. The power system according to claim 3, characterized in that: The enterprise includes naturally varying sources of electricity, The first computer is configured to generate the second request signal using the power generation amount of the naturally variable power source of the enterprise and the power load of the enterprise so that the amount of power supplied from the power grid to the enterprise during the predetermined period does not exceed a predetermined value.
5. The power system according to claim 3, characterized in that: The first request signal is a signal requesting frequency adjustment of the power grid, The second computer is configured to receive the first request signal from a third computer configured to manage supply and demand of the power grid.
6. The power system according to claim 4, characterized in that: The first request signal is a signal requesting frequency adjustment of the power grid, The second computer is configured to receive the first request signal from a third computer configured to manage supply and demand of the power grid.
7. The power system according to claim 1 or 2, characterized in that: The length of the predetermined period is 3 minutes or longer, and the predetermined interval is 15 seconds or shorter.
8. A server, wherein: The server is configured to manage a plurality of power adjustment resources configured to be electrically connected to a power grid, the plurality of power adjustment resources including a first power adjustment resource and a second power adjustment resource. The server is configured to receive a first request signal requesting supply and demand adjustment of the power grid and a second request signal requesting the first power adjustment resource to adjust the amount of power in a predetermined period. The server is configured to generate a power command signal in response to both the first request signal and the second request signal, the power command signal indicating a command power value for each predetermined interval of the predetermined period. The server is configured to transmit the generated power instruction signal to the first power adjustment resource, The second power regulation resource is a part of a microgrid that receives power supply from a power grid according to a power contract. The second request signal is used to request supply and demand adjustment in the microgrid, The second request signal requests the first power adjustment resource to adjust the amount of power during the predetermined period based on the power generation of the microgrid and the power load of the microgrid so that the amount of power supplied from the grid to the microgrid during the predetermined period does not exceed the contracted maximum power.
9. A charge and discharge control device, wherein: The charge and discharge control device is configured to manage a plurality of power regulation resources including a first power regulation resource and a second power regulation resource, wherein the second power regulation resource is a power storage device configured to be electrically connected to a power grid. The charge and discharge control device is configured to obtain a first request signal requesting supply and demand adjustment of the power grid and a second request signal requesting the power storage device to adjust the amount of electric power in a predetermined period. The charge and discharge control device is configured to control the charge and discharge of the power storage device in response to both the first request signal and the second request signal. The power storage device is part of a microgrid that receives power from a power grid according to a power contract. The second request signal is used to request supply and demand adjustment of the microgrid, The second request signal requests the first power adjustment resource to adjust the amount of power during the predetermined period based on the power generation of the microgrid and the power load of the microgrid so that the amount of power supplied from the grid to the microgrid during the predetermined period does not exceed the contracted maximum power.
10. A method for adjusting power supply and demand in a power system, characterized in that: The power system includes a plurality of power regulation resources configured to be electrically connected to a power grid, the plurality of power regulation resources including a first power regulation resource and a second power regulation resource, the second power regulation resource being a part of a microgrid that receives power supply from the power grid according to a power contract, The power supply and demand adjustment method comprises: receiving a first request signal requesting supply and demand adjustment of the power grid; receiving a second request signal for requesting the first power adjustment resource to adjust the amount of power during a predetermined period, wherein the second request signal is used to request supply and demand adjustment of the microgrid, and the second request signal requests the first power adjustment resource to adjust the amount of power during the predetermined period based on the power generation of the microgrid and the power load of the microgrid, so that the amount of power supplied from the grid to the microgrid during the predetermined period does not exceed the contracted maximum power; generating a power command signal indicating a command power value for each predetermined interval of the predetermined period in response to both the first request signal and the second request signal; and The power adjustment resource is controlled according to the power command signal.