Scaffold and construction method thereof

Through the combination of brackets and connectors and the use of oblique rods, the problems of low efficiency and insufficient safety of existing scaffolding are solved, rapid installation and stable construction are achieved, and safety and efficiency are improved.

CN114232958BActive Publication Date: 2025-05-02邓伟
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111579652.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-22
Publication Date
2025-05-02
Estimated Expiration
2041-12-22

AI Technical Summary

Technical Problem

The existing scaffolding is inefficient during the construction and disassembly process, and the connecting parts that have been used for a long time are prone to slip wires, which affects the safety of use, is complex in structure, is cumbersome in installation, is seriously wasted in materials, and is labor and workload.

Method used

The bracket is used to cooperate with the first connecting member and the second connecting member, and the vertical rod is connected to the first cross beam and the second cross beam. The first cross beam and the second cross beam are dislocation, and stability is increased through the first inclined rod and the second inclined rod. Each component is processed in the factory and is assembled on site.

Benefits of technology

The rapid installation and disassembly of scaffolding is realized, the construction speed and stability are improved, construction safety is ensured, and material waste and labor demand are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114232958B_ABST
    Figure CN114232958B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of scaffolding, and discloses a scaffolding and a construction method thereof, comprising upright poles, cross beams, and connectors and brackets for connecting the upright poles and the cross beams. The upright poles are welded to the brackets, the cross beams are welded to the connectors, the connectors are snap-connected to the brackets, the cross beams include a first cross beam and a second cross beam, the length of the first cross beam is twice the length of the second cross beam, the connectors include a first connector and a second connector, the first connector is provided with a first stopper, a first groove, and a first slot, the second connector is provided with a second stopper, a second groove, a second slot, and a protrusion, the second stopper is connected to the protrusion, the protrusion is provided with a first connecting ring, the first connecting ring is connected to the cross beam, the bracket is provided with a third groove and a first inserting block, and the upright poles are arranged in the third grooves and connected to the brackets. The scaffolding designed by the present invention uses the brackets to cooperate with the first connector and the second connector to connect the upright poles to the first cross beam and the second cross beam, and the construction speed is faster and more stable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of scaffolds, and in particular to a scaffold and a construction method thereof. Background Art

[0002] With the development of construction equipment, the research and application of scaffolding has made rapid progress, and various scaffolding erection forms have emerged in large numbers. The scaffolding is formed by connecting a number of steel pipes. The existing scaffolding is generally connected by bolts and buckles. Therefore, it takes a lot of time to tighten and remove the bolts when building or dismantling the scaffolding, which makes the efficiency of scaffolding construction low, and the scaffolding bolts and buckles that have been used for a long time will slip, affecting the safety of use. The scaffolding currently used is not only complex in structure and cumbersome to install, but also wastes materials, causes serious loss, and requires a lot of labor and workload. The invention patent with application number CN201410601071.7 discloses a scaffolding, including columns, long transverse tubes, first connecting fasteners, second connecting fasteners and bearing plates. The columns and long transverse tubes are seamless square tubes, and through holes are provided at both ends of the long transverse tubes. The first connecting fastener is a coaxial double hinge structure, and the second connecting fastener is a hinge structure with double bolts. A base is fixed on the side of the hinge structure, and a protrusion extends axially from the base along the hinge structure, and the protrusion matches the size of the through hole. The bearing plate is a flat plate structure, and the upper part of both sides of the plate extends downward to form a hook. The above patent uses the first connecting fastener to connect the two columns, and then uses the second connecting fastener to fix the long transverse tube on the column, and then uses the bearing plate to hang on the long transverse tube. Although this scaffolding connects the columns and the transverse tubes through the connecting fasteners, although the traditional connecting parts have been improved, there are still installation problems, low construction efficiency, and affect the construction progress. Summary of the invention

[0003] The present invention aims at solving the shortcomings of the prior art and provides a scaffold and a construction method thereof.

[0004] In order to solve the above technical problems, the present invention is solved by the following technical solutions:

[0005] A scaffolding comprises a vertical pole, a horizontal beam, a connecting piece for connecting the vertical pole and the horizontal beam, and a bracket, wherein the vertical pole is welded to the bracket, the horizontal beam is welded to the connecting piece, the connecting piece is snap-connected to the bracket, the horizontal beam comprises a first horizontal beam and a second horizontal beam, the length of the first horizontal beam is twice the length of the second horizontal beam, the connecting piece comprises a first connecting piece and a second connecting piece, the first connecting piece is provided with a first stopper, a first groove and two first slots, the two first slots are arranged on both sides of the first stopper, the second connecting piece is provided with a second stopper, a second groove, a second slot and a protrusion, the first Two grooves are arranged on one side of the second stopper, the second stopper is connected to the protrusion, a first connecting ring is arranged on the protrusion, the first connecting ring is connected to the crossbeam, a third groove and two first plug-in blocks are arranged on the bracket, the vertical rod is arranged in the third groove and connected to the bracket, the two first plug-in blocks are respectively engaged with the two first slots of the first connecting member, the two first plug-in blocks are respectively engaged with the second slots of the two second connecting members, the center of the first crossbeam is arranged in the first groove and connected to the first connecting member, and both ends of the first crossbeam and the second crossbeam are arranged in the second groove and connected to the first connecting ring.

[0006] Preferably, the first oblique rod and the first plug-in component are further included, the two ends of the first oblique rod are provided with connectors, the connectors are provided with through holes, the first connector and the second connector are provided with third slots and limiting tracks, the first plug-in component is arranged in the third slot and engaged with the third slot, the first plug-in component is provided with studs and limiting grooves, the studs pass through the through holes, the first oblique rod is fixed to the first plug-in component with nuts through the connectors, the limiting track is connected with the third slot, a latch is provided in the limiting track, and the latch is inserted into the limiting groove. The latch has a limiting effect on the first plug-in component.

[0007] Preferably, the second oblique rod, the second plug-in component and the third plug-in component are further included, one end of the second oblique rod is connected to the second plug-in component, the other end of the second oblique rod is connected to a connecting pipe, the connecting pipe is connected to the third plug-in component, the second plug-in component and the third plug-in component are both arranged in the third slot and engaged with the third slot. One end of the second oblique rod is welded to the second plug-in component, the other end of the second oblique rod is welded to the connecting pipe, and the connecting pipe is welded to the third plug-in component.

[0008] Preferably, the bracket further comprises a third crossbeam, the third crossbeam is arranged between the two vertical poles, a fourth slot is arranged on the lower side of the two first plug-in blocks on the bracket, a fourth plug-in piece is inserted in the fourth slot, a connecting block is arranged on the fourth plug-in piece, a second connecting ring is arranged on the connecting block, the second connecting ring is connected to the end of the third crossbeam, and the second connecting ring is welded to the end of the third crossbeam.

[0009] Preferably, the mounting seat is further included, a fourth groove is provided at the bottom of the mounting seat, the mounting seat is arranged on the third cross beam through the fourth groove, two second plug blocks are also provided on the mounting seat, a second connecting piece is inserted on the mounting seat, the second plug blocks are engaged with the second slots, and the second connecting piece is connected to the second cross beam. The third cross beam is welded in the fourth groove at the bottom of the mounting seat.

[0010] Preferably, the height of the second crossbeam on the third crossbeam is lower than the height of the first crossbeam and the second crossbeam on the two vertical poles connected to the third crossbeam, and a bearing plate is laid on the second crossbeam on the third crossbeam. Since the height of the second crossbeam on the third crossbeam is low, the edge of the laid bearing plate will be blocked and will not shake, which is more stable and ensures the safety of construction workers.

[0011] A scaffolding construction method includes a scaffolding and the following steps:

[0012] Step A: One scaffolding unit includes 8 vertical poles, 2-4 first diagonal poles, 2 second diagonal poles, 6-8 first beams, 12-20 second beams and 8-12 third beams. The 8 vertical poles are connected with 6-8 first beams and 6-8 second beams by brackets, first connecting pieces and second connecting pieces. One first beam at the bottom of the scaffolding is connected with one second beam. From the bottom of the scaffolding upward, the positions of the first beam and the second beam are staggered.

[0013] Step B: insert the fourth connector on the brackets at the bottom and top of the scaffold, connect the third beam between the two fourth connectors, weld the mounting seat on the third beam, insert the second connector on the mounting seat, and then connect the two ends of the second beam to the two second connectors. Six second beams are installed on the third beams at the bottom and top of the scaffold, and finally lay the bearing plate at the bottom and top of the scaffold;

[0014] Step C: Connect the two ends of 2-4 first diagonal bars to the bottom and top of the scaffold respectively, the bottom of one first diagonal bar is connected to the first crossbeam at the bottom of the scaffold, and the top is connected to the second crossbeam at the top of the scaffold; the bottom of another first diagonal bar is connected to the second crossbeam at the bottom of the scaffold, and the top is connected to the first crossbeam at the top of the scaffold, and the two first diagonal bars form an "eight" shape;

[0015] Step D: Install two second diagonal bars on both sides of the scaffolding in an offset manner, with the two ends of the second diagonal bars respectively connected to the second cross beams at the bottom and top of the scaffolding.

[0016] The present invention has significant technical effects due to the adoption of the above technical scheme: the bracket is used in conjunction with the first connecting member and the second connecting member to connect the vertical pole with the first beam and the second beam. This method is quick to install, the first beam and the second beam are staggered, and the first diagonal rod and the second diagonal rod are used to make the scaffolding more stable. According to the construction requirements of the building site, each component is processed in the factory and assembled on site. The scaffolding of the present invention is faster than the traditional one, and is more stable and safer. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of the present invention.

[0018] Figure 2 It is a schematic diagram of the connection structure of the vertical pole, the first crossbeam and the third crossbeam.

[0019] Figure 3 It is a schematic diagram of the connection structure of the vertical pole, the first crossbeam and the second crossbeam.

[0020] Figure 4 It is a schematic diagram of the connection structure between the second connector and the first connector.

[0021] Figure 5 It is a schematic diagram of the structure of the first connector.

[0022] Figure 6 Schematic diagram of the structure of the first connecting member.

[0023] Figure 7 It is a schematic diagram of the structure of the bracket.

[0024] Figure 8 It is a schematic diagram of the connection structure between the bracket and the fourth connector.

[0025] Fig. 9 It is a schematic diagram of the connection structure of the bracket, the first connector and the fourth connector.

[0026] Fig.10 It is a schematic diagram of the connection structure between the bracket and the second connecting member.

[0027] Fig.11 yes Figure 1 Schematic diagram of the structure of A.

[0028] Fig.12 yes Figure 1 Schematic diagram of the structure of B.

[0029] Fig.13 yes Figure 1 Schematic diagram of the structure of C.

[0030] Fig.14 yes Figure 1 Schematic diagram of the structure of D.

[0031] Fig.15 It is a structural diagram of the scaffolding and the load-bearing plate.

[0032] The names of the parts indicated by the numerical labels in the above drawings are as follows: 1—vertical pole, 2—crossbeam, 201—first crossbeam, 202—second crossbeam, 3—connecting member, 301—first connecting member, 3011—first stopper, 3012—first groove, 3013—first slot, 302—second connecting member, 3021—second stopper, 3022—second groove, 3023—second slot, 3024—bump, 30241—first connecting ring, 4—bracket, 401—third groove, 402—first plug , 403—fourth slot, 5—first oblique rod, 501—connecting head, 5011—through hole, 6—first connector, 601—stud, 602—limiting groove, 7—third slot, 8—limiting track, 9—latch pin, 10—second oblique rod, 11—second connector, 12—third connector, 13—connecting pipe, 14—third beam, 15—fourth connector, 1501—connecting block, 15011—second connecting ring, 16—mounting seat, 1601—fourth groove, 1602—second connector, 17—bearing plate. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0034] Example 1

[0035] A scaffold, such as Figure 1-15As shown, it includes a vertical pole 1, a crossbeam 2, a connecting piece 3 for connecting the vertical pole 1 and the crossbeam 2, and a bracket 4. The vertical pole 1 is welded to the bracket 4, the crossbeam 2 is welded to the connecting piece 3, and the connecting piece 3 is snap-fitted to the bracket 4. The crossbeam 2 includes a first crossbeam 201 and a second crossbeam 202. The length of the first crossbeam 201 is twice the length of the second crossbeam 202. The connecting piece 3 includes a first connecting piece 301 and a second connecting piece 302. The first connecting piece 301 is provided with a first stopper 3011, a first groove 3012 and two first slots 3013. The two first slots 3013 are arranged on both sides of the first stopper 3011. The second connecting piece 302 is provided with a second stopper 3021, a second groove 3022, a second slot 3023 and a protrusion 3024. The second groove 3022 is arranged at On one side of the second stopper 3021, the second stopper 3021 is connected to the protrusion 3024, the protrusion 3024 is provided with a first connecting ring 30241, the first connecting ring 30241 is connected to the beam 2, the bracket 4 is provided with a third groove 401 and two first plug-in blocks 402, the vertical rod 1 is arranged in the third groove 401 and connected to the bracket 4, the two first plug-in blocks 402 are respectively engaged with the two first slots 3013 of the first connecting member 301, and the two first plug-in blocks 402 are respectively engaged with the second slots 3023 of the two second connecting members 302, the center of the first beam 201 is arranged in the first groove 3012 and connected to the first connecting member 301, and both ends of the first beam 201 and the second beam 202 are arranged in the second groove 3022 and connected to the first connecting ring 30241.

[0036] The first oblique rod 5 and the first plug-in connector 6 are also included. The first oblique rod 5 is provided with connectors 501 at both ends. The connectors 501 are provided with through holes 5011. The first connector 301 and the second connector 302 are provided with third slots 7 and limiting rails 8. The first plug-in connector 6 is provided in the third slots 7 and engages with the third slots 7. The first plug-in connector 6 is provided with studs 601 and limiting grooves 602. The studs 601 pass through the through holes 5011. The first oblique rod 5 is fixed to the first plug-in connector 6 with nuts through the connectors 501. The limiting rails 8 are connected with the third slots 7. The limiting rails 8 are provided with latches 9, which are inserted into the limiting grooves 602. The latches 9 limit the first plug-in connector 6.

[0037] The second oblique rod 10, the second plug-in connector 11 and the third plug-in connector 12 are also included. One end of the second oblique rod 10 is connected to the second plug-in connector 11, and the other end of the second oblique rod 10 is connected to a connecting pipe 13, and the connecting pipe 13 is connected to the third plug-in connector 12. The second plug-in connector 11 and the third plug-in connector 12 are both arranged in the third slot 7 and engaged with the third slot 7. One end of the second oblique rod 10 is welded to the second plug-in connector 11, and the other end of the second oblique rod 10 is welded to the connecting pipe 13, and the connecting pipe 13 is welded to the third plug-in connector 12.

[0038] The bracket 4 further comprises a third cross beam 14, which is arranged between the two upright poles 1. A fourth slot 403 is arranged on the lower side of the two first plug blocks 402 on the bracket 4. A fourth plug connector 15 is inserted in the fourth slot 403. A connecting block 1501 is arranged on the fourth plug connector 15. A second connecting ring 15011 is arranged on the connecting block 1501. The second connecting ring 15011 is connected to the end of the third cross beam 14. The second connecting ring 15011 is welded to the end of the third cross beam 14.

[0039] The mounting seat 16 is also provided with a fourth groove 1601 at the bottom of the mounting seat 16. The mounting seat 16 is provided on the third beam 14 through the fourth groove 1601. The mounting seat 16 is also provided with two second plug blocks 1602. The mounting seat 16 is plugged with a second connector 302. The second plug blocks 1602 are engaged with the second slots 3023. The second connector 302 is connected to the second beam 202. The third beam 14 is welded in the fourth groove 1601 at the bottom of the mounting seat 16.

[0040] The height of the second beam 202 on the third beam 14 is lower than the height of the first beam 201 and the second beam 202 on the two uprights 1 connected to the third beam 14, and a bearing plate 17 is laid on the second beam 202 on the third beam 14. Since the height of the second beam 202 on the third beam 14 is low, the edge of the laid bearing plate 17 will be blocked and will not shake, which is more stable and ensures the safety of construction workers.

[0041] A scaffolding construction method includes a scaffolding and the following steps:

[0042] Step A: One scaffolding unit includes 8 vertical poles 1, 2 first diagonal poles 5, 2 second diagonal poles 10, 8 first beams 201, 20 second beams 202 and 12 third beams 14. The 8 vertical poles 1 are connected with the 8 first beams 201 and the 8 second beams 202 by using brackets 4, first connecting members 301 and second connecting members 302. One first beam 201 at the bottom of the scaffolding is connected with one second beam 202. From the bottom of the scaffolding upward, the positions of the first beam 201 and the second beam 202 are staggered with each other.

[0043] Step B: insert the fourth connector 15 on the bracket 4 at the bottom and top of the scaffold, connect the third beam 14 between two fourth connectors 15, weld the mounting seat 16 on the third beam 14, insert the second connector 302 on the mounting seat 16, and then connect the two ends of the second beam 202 to the two second connectors 302. Six second beams 202 are installed on the third beam 14 at the bottom and top of the scaffold, and finally lay the bearing plate 17 at the bottom and top of the scaffold;

[0044] Step C: Connect the two ends of the two first diagonal bars 5 to the bottom and top of the scaffold respectively, the bottom of one first diagonal bar 5 is connected to the first crossbeam 201 at the bottom of the scaffold, and the top is connected to the second crossbeam 202 at the top of the scaffold, the bottom of another first diagonal bar 5 is connected to the second crossbeam 202 at the bottom of the scaffold, and the top is connected to the first crossbeam 201 at the top of the scaffold, and the two first diagonal bars 5 form an "eight" shape;

[0045] Step D: Install two second diagonal rods 10 on both sides of the scaffolding in a staggered manner, with the two ends of the second diagonal rods 10 connected to the second cross beams 202 at the bottom and top of the scaffolding respectively.

[0046] Working principle: the bracket 4 is used in conjunction with the first connecting member 301 and the second connecting member 302 to connect the vertical pole 1 with the first beam 201 and the second beam 202. This method is quick to install. The first beam 201 and the second beam 202 are staggered, and the first diagonal rod 5 and the second diagonal rod 10 are used to make the scaffolding more stable. According to the construction requirements of the building site, each component is processed in the factory and assembled on site. The scaffolding of the present invention is faster than the traditional one, and is more stable and safer.

[0047] Example 2

[0048] A scaffold, such as Figure 1-10 As shown, it includes a vertical pole 1, a crossbeam 2, a connecting piece 3 for connecting the vertical pole 1 and the crossbeam 2, and a bracket 4. The vertical pole 1 is welded to the bracket 4, the crossbeam 2 is welded to the connecting piece 3, and the connecting piece 3 is snap-fitted to the bracket 4. The crossbeam 2 includes a first crossbeam 201 and a second crossbeam 202. The length of the first crossbeam 201 is twice the length of the second crossbeam 202. The connecting piece 3 includes a first connecting piece 301 and a second connecting piece 302. The first connecting piece 301 is provided with a first stopper 3011, a first groove 3012 and two first slots 3013. The two first slots 3013 are arranged on both sides of the first stopper 3011. The second connecting piece 302 is provided with a second stopper 3021, a second groove 3022, a second slot 3023 and a protrusion 3024. The second groove 3022 is arranged at On one side of the second stopper 3021, the second stopper 3021 is connected to the protrusion 3024, the protrusion 3024 is provided with a first connecting ring 30241, the first connecting ring 30241 is connected to the beam 2, the bracket 4 is provided with a third groove 401 and two first plug-in blocks 402, the vertical rod 1 is arranged in the third groove 401 and connected to the bracket 4, the two first plug-in blocks 402 are respectively engaged with the two first slots 3013 of the first connecting member 301, and the two first plug-in blocks 402 are respectively engaged with the second slots 3023 of the two second connecting members 302, the center of the first beam 201 is arranged in the first groove 3012 and connected to the first connecting member 301, and both ends of the first beam 201 and the second beam 202 are arranged in the second groove 3022 and connected to the first connecting ring 30241.

[0049] Example 3

[0050] A scaffold, such as Figure 1-13 As shown, it includes a vertical pole 1, a crossbeam 2, a connecting piece 3 for connecting the vertical pole 1 and the crossbeam 2, and a bracket 4. The vertical pole 1 is welded to the bracket 4, the crossbeam 2 is welded to the connecting piece 3, and the connecting piece 3 is snap-fitted to the bracket 4. The crossbeam 2 includes a first crossbeam 201 and a second crossbeam 202. The length of the first crossbeam 201 is twice the length of the second crossbeam 202. The connecting piece 3 includes a first connecting piece 301 and a second connecting piece 302. The first connecting piece 301 is provided with a first stopper 3011, a first groove 3012 and two first slots 3013. The two first slots 3013 are arranged on both sides of the first stopper 3011. The second connecting piece 302 is provided with a second stopper 3021, a second groove 3022, a second slot 3023 and a protrusion 3024. The second groove 3022 is arranged at On one side of the second stopper 3021, the second stopper 3021 is connected to the protrusion 3024, the protrusion 3024 is provided with a first connecting ring 30241, the first connecting ring 30241 is connected to the beam 2, the bracket 4 is provided with a third groove 401 and two first plug-in blocks 402, the vertical rod 1 is arranged in the third groove 401 and connected to the bracket 4, the two first plug-in blocks 402 are respectively engaged with the two first slots 3013 of the first connecting member 301, and the two first plug-in blocks 402 are respectively engaged with the second slots 3023 of the two second connecting members 302, the center of the first beam 201 is arranged in the first groove 3012 and connected to the first connecting member 301, and both ends of the first beam 201 and the second beam 202 are arranged in the second groove 3022 and connected to the first connecting ring 30241.

[0051] The first oblique rod 5 and the first plug-in connector 6 are also included. The first oblique rod 5 is provided with connectors 501 at both ends. The connectors 501 are provided with through holes 5011. The first connector 301 and the second connector 302 are provided with third slots 7 and limiting rails 8. The first plug-in connector 6 is provided in the third slots 7 and engages with the third slots 7. The first plug-in connector 6 is provided with studs 601 and limiting grooves 602. The studs 601 pass through the through holes 5011. The first oblique rod 5 is fixed to the first plug-in connector 6 with nuts through the connectors 501. The limiting rails 8 are connected with the third slots 7. The limiting rails 8 are provided with latches 9, which are inserted into the limiting grooves 602. The latches 9 limit the first plug-in connector 6.

[0052] The second oblique rod 10, the second plug-in connector 11 and the third plug-in connector 12 are also included. One end of the second oblique rod 10 is connected to the second plug-in connector 11, and the other end of the second oblique rod 10 is connected to a connecting pipe 13, and the connecting pipe 13 is connected to the third plug-in connector 12. The second plug-in connector 11 and the third plug-in connector 12 are both arranged in the third slot 7 and engaged with the third slot 7. One end of the second oblique rod 10 is welded to the second plug-in connector 11, and the other end of the second oblique rod 10 is welded to the connecting pipe 13, and the connecting pipe 13 is welded to the third plug-in connector 12.

Claims

1. A scaffolding, comprising uprights (1), cross beams (2), connectors (3) for connecting the uprights (1) and the cross beams (2), and brackets (4), wherein the uprights (1) and the brackets (4) are welded, the cross beams (2) and the connectors (3) are welded, and the connectors (3) and the brackets (4) are snap-fitted and connected, characterized in that: The crossbeam (2) comprises a first crossbeam (201) and a second crossbeam (202), the length of the first crossbeam (201) being twice the length of the second crossbeam (202), the connecting member (3) comprising a first connecting member (301) and a second connecting member (302), the first connecting member (301) being provided with a first stopper (3011), a first groove (3012) and two first slots (3013), the two first slots (3013) being arranged on both sides of the first stopper (3011), the second connecting member (302) being provided with a second stopper (3021), a second groove (3022), a second slot (3023) and a protrusion (3024), the second groove (3022) being arranged on one side of the second stopper (3021), the second stopper (3021) being connected to the protrusion (3024), the protrusion (3024) being provided with a first connecting ring (30241) ), the first connecting ring (30241) is connected to the crossbeam (2), the bracket (4) is provided with a third groove (401) and two first plug blocks (402), the upright pole (1) is arranged in the third groove (401) and connected to the bracket (4), the two first plug blocks (402) are respectively engaged with the two first slots (3013) of the first connecting member (301), the two first plug blocks (402) are respectively engaged with the second slots (3023) of the two second connecting members (302), the center of the first crossbeam (201) is arranged in the first groove (3012) and connected to the first connecting member (301), the two ends of the first crossbeam (201) and the second crossbeam (202) are both arranged in the second groove (3022) and connected to the first connecting ring (30241); from the bottom of the scaffold upwards, the positions of the first crossbeam (201) and the second crossbeam (202) are staggered.

2. A scaffold according to claim 1, characterized in that: The invention also comprises a first oblique rod (5) and a first plug-in connector (6). Connectors (501) are provided at both ends of the first oblique rod (5). A through hole (5011) is provided on the connector (501). A third slot (7) and a limiting track (8) are provided on both the first connector (301) and the second connector (302). The first plug-in connector (6) is arranged in the third slot (7) and engages with the third slot (7). A stud (601) and a limiting slot (602) are provided on the first plug-in connector (6). The stud (601) passes through the through hole (5011). The first oblique rod (5) is fixed to the first plug-in connector (6) by a nut through the connector (501). The limiting track (8) is connected to the third slot (7). A latch (9) is provided in the latch track (8). The latch (9) is inserted into the limiting slot (602).

3. A scaffold according to claim 2, characterized in that: The invention also comprises a second oblique rod (10), a second plug-in connector (11) and a third plug-in connector (12); one end of the second oblique rod (10) is connected to the second plug-in connector (11); the other end of the second oblique rod (10) is connected to a connecting pipe (13); the connecting pipe (13) is connected to the third plug-in connector (12); the second plug-in connector (11) and the third plug-in connector (12) are both arranged in the third slot (7) and engaged with the third slot (7).

4. A scaffold according to claim 1, characterized in that: The invention also comprises a third cross beam (14), the third cross beam (14) is arranged between the two vertical poles (1), a fourth slot (403) is arranged on the bracket (4) below the two first plug blocks (402), a fourth plug connector (15) is inserted in the fourth slot (403), a connecting block (1501) is arranged on the fourth plug connector (15), a second connecting ring (15011) is arranged on the connecting block (1501), and the second connecting ring (15011) is connected to the end of the third cross beam (14).

5. A scaffold according to claim 4, characterized in that: The mounting seat (16) further comprises a mounting seat (16), a fourth groove (1601) being provided at the bottom of the mounting seat (16), the mounting seat (16) being arranged on the third cross beam (14) via the fourth groove (1601), two second plug blocks (1602) being provided on the mounting seat (16), a second connecting member (302) being inserted into the mounting seat (16), the second plug block (1602) being engaged with the second slot (3023), and the second connecting member (302) being connected to the second cross beam (202).

6. A scaffold according to claim 4, characterized in that: The height of the second crossbeam (202) on the third crossbeam (14) is lower than the height of the first crossbeam (201) and the second crossbeam (202) on the two uprights (1) connected to the third crossbeam (14), and a bearing plate (17) is laid on the second crossbeam (202) on the third crossbeam (14).

7. A scaffolding construction method, characterized in that: A scaffold comprising any one of claims 1 to 6, further comprising the following steps: Step A: one scaffolding unit comprises 8 vertical poles (1), 2-4 first diagonal poles (5), 2 second diagonal poles (10), 6-8 first cross beams (201), 12-20 second cross beams (202) and 8-12 third cross beams (14); the 8 vertical poles (1), 6-8 first cross beams (201) and 6-8 second cross beams (202) are connected by a bracket (4), a first connecting piece (301) and a second connecting piece (302); one first cross beam (201) at the bottom of the scaffolding is connected to one second cross beam (202); and from the bottom of the scaffolding upward, the positions of the first cross beam (201) and the second cross beam (202) are staggered with each other; Step B: inserting fourth connectors (15) on the brackets (4) at the bottom and top of the scaffold, connecting the third cross beam (14) between two fourth connectors (15), welding a mounting seat (16) on the third cross beam (14), inserting a second connecting member (302) on the mounting seat (16), and then connecting the two ends of the second cross beam (202) to the two second connecting members (302), and installing six second cross beams (202) on the third cross beams (14) at the bottom and top of the scaffold, and finally laying a bearing plate (17) at the bottom and top of the scaffold; Step C: connecting the two ends of 2-4 first inclined rods (5) to the bottom and top of the scaffold respectively, the bottom of one first inclined rod (5) is connected to the first crossbeam (201) at the bottom of the scaffold, and the top is connected to the second crossbeam (202) at the top of the scaffold; the bottom of another first inclined rod (5) is connected to the second crossbeam (202) at the bottom of the scaffold, and the top is connected to the first crossbeam (201) at the top of the scaffold, and the two first inclined rods (5) form an "eight" shape; Step D: Install two second diagonal rods (10) at both sides of the scaffolding in a staggered manner, with the two ends of the second diagonal rods (10) respectively connected to the second cross beams (202) at the bottom and top of the scaffolding.

Citation Information

Patent Citations

  • Scaffold

    CN104372923A

  • Scaffold

    CN216921252U