Curtain wall engineering construction equipment with track-type hanger and construction method thereof

Through the design equipment of the curtain wall project of the rail frame, the problem of low efficiency and poor safety in the construction of traditional scaffolding in the construction of the curtain wall engineering has been solved, and efficient and safe construction effects are achieved.

CN114232974BActive Publication Date: 2025-01-24DECORATION CO LTD OF CHINA CONSTR 3RD ENG BUREAU
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202111475525.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-06
Publication Date
2025-01-24
Estimated Expiration
2041-12-06

AI Technical Summary

Technical Problem

Traditional scaffolding has problems such as frequent cross-operation, low utilization rate, unfavorable lifting, prefabricated construction, high cost, low safety and difficult to adapt to complex roof shapes.

Method used

Design a kind of rail-type hanger curtain wall engineering construction equipment. By connecting the upper and lower ends of the hanger to the construction components and track sliding components, and using hoisting methods to connect to the overall steel structure of the curtain wall, the prefabricated construction method is used to improve construction efficiency and hoisting. Operational efficiency.

Benefits of technology

Under the premise of ensuring construction safety, the construction method of the traditional curtain wall sector is broken, the construction efficiency and the efficiency of hanging operation have been improved, the cost is reduced, the use of scaffolding is reduced, and the construction needs of complex roof shapes have been adapted to the construction needs of complex roof shape.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114232974B_ABST
    Figure CN114232974B_ABST
Patent Text Reader

Abstract

The present invention discloses a curtain wall engineering construction equipment of a track-type hanger and a construction method thereof, which specifically relates to the technical field, including a support and protection component, a track running component and a construction component, wherein the support and protection component is arranged between the main hanger and the main steel structure of the curtain wall, including a cantilevered support arm and a lower end support member; the track running component is installed between the upper part of the main hanger and the main steel structure of the curtain wall through the bridging of the cantilevered support arm, including a channel steel track H-shaped walking wheel; the track-type hanger runs in the X-transverse direction of the main steel structure of the curtain wall through the track running component. The present invention solves the problem that traditional scaffolding is not conducive to prefabricated construction, firstly connects the upper and lower ends of the hanger with the construction component and the track sliding component, and adopts a hoisting method to connect with the overall steel structure of the curtain wall, and uses the prefabricated construction method to improve the efficiency during construction and improve the efficiency of hoisting operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and more specifically, to curtain wall engineering construction equipment of a track-type hanger and a construction method thereof. Background Art

[0002] In current construction projects, stricter requirements are imposed on the progress control, safety control, standardization management, quality management and other aspects of on-site construction. For large-scale perimeter construction of buildings, such as curtain walls, exterior wall coatings and other projects, traditional scaffolding construction can no longer meet these requirements.

[0003] Its main disadvantages are:

[0004] 1. Frequent cross-operation and low utilization rate. If scaffolding is used for construction, once municipal and underground pipeline workers enter the site, the scaffolding will face the risk of being forced to be dismantled, making it difficult to use the scaffolding for subsequent construction work.

[0005] 2. It is not conducive to hoisting operations. For projects with long cantilevered eaves, it is difficult to use a crane to hoist the materials into place at once after setting up the scaffolding, and the hoisting operation efficiency is low.

[0006] 3. It is not conducive to the development of prefabricated construction. Prefabricated construction usually adopts the method of ground assembly and overall hoisting. The erection of scaffolding greatly affects the hoisting operation, making prefabricated construction difficult to achieve.

[0007] 4. Increased costs. For projects with long construction spans and wide construction areas, the cost of setting up scaffolding for construction is extremely high.

[0008] 5. For projects with long construction spans, it is difficult to form an effective connection between the frame and the main structure when setting up scaffolding. In addition, the area is open and the wind is extremely strong. Once the scaffolding is used, the windward area of ​​the measure will be greatly increased, and the safety of the frame will be low.

[0009] 6. There are various architectural forms, and the roof shape and structure often have ups and downs. It is difficult for scaffolding to fully adapt to such height changes. The arrangement of measures is complex and the erection is difficult.

[0010] To this end, we proposed a curtain wall engineering construction equipment with a track-type hanger and a construction method thereof to solve the above problems. It is especially suitable for the exterior enclosure construction of large-span buildings such as exhibition halls and first-floor lobbies, and provides a construction platform that can move left and right using tracks and can be raised and lowered. Summary of the invention

[0011] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a curtain wall engineering construction equipment and a construction method of a track-type hanger, wherein the upper and lower ends of the hanger are first connected to the construction assembly and the track sliding assembly, and then connected to the overall steel structure of the curtain wall by hoisting. The assembled construction method is used to improve the efficiency during construction and the hoisting operation efficiency, so as to solve the problems raised in the above-mentioned background technology.

[0012] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a curtain wall construction equipment with a track-type hanger, comprising a channel steel track, the channel steel track is connected to the main steel structure of the curtain wall, a hanger is arranged on one side of the channel steel track, a construction component is installed on the surface of the hanger, a support and protection component is arranged between the hanger and the main steel structure of the curtain wall, a cantilever arm is installed at the top of the side wall of the hanger close to the channel steel track, a lower end support is installed at the bottom of the side wall of the hanger close to the channel steel track, a track running component is installed between the channel steel track and the hanger, and the hanger slides above the channel steel track through the track running component;

[0013] The track running assembly includes an H-shaped running wheel installed above the channel steel track, the H-shaped running wheel is slidably connected to the channel steel track, the outer wall groove of the H-shaped running wheel is engaged with the side wall of the channel steel track, one side of the cantilever arm is connected to a connecting piece by bolts, and the H-shaped running wheel and the connecting piece are connected by bolts.

[0014] In a preferred embodiment, an anti-derailment bearing is provided on one side of the H-type traveling wheel, and an anti-overturning T-type wheel is provided at a position of the channel steel track away from one side of the H-type traveling wheel.

[0015] In a preferred embodiment, the end of the anti-overturning T-shaped wheel is inserted into the inner groove of the channel steel track, and the anti-overturning T-shaped wheel and the adapter are connected by bolts.

[0016] In a preferred embodiment, the vertical section of the anti-derail bearing is arranged in an inverted T shape, the upper end of the anti-derail bearing is connected with the H-type traveling wheel by bolts, and the lower end of the anti-derail bearing contacts with the outer sidewall of the channel rail.

[0017] In a preferred embodiment, the construction assembly includes several operating platforms installed inside the hanger, an upper and lower passage is provided on the other side of the hanger, a plurality of one-way doors are provided on the surface of the upper and lower passage, and a large safety rope is provided through one end of the operating platform close to the curtain wall.

[0018] In a preferred embodiment, a plurality of the operating platforms are equidistantly distributed inside the hanger, a plurality of the one-way doors are also distributed inside the upper and lower passages, and the operating platforms, the upper and lower passages and the one-way doors are interconnected.

[0019] In a preferred embodiment, the operating platform, upper and lower passages, and one-way doors are all components made of steel, the safety rope is a steel cable, and a plurality of safety belts are fixedly provided on the surface of the steel cable.

[0020] In a preferred embodiment, the support and protection assembly includes a steel wire rope and a differential fall arrester, the steel wire rope is located above the hanger and connected to the main structure of the curtain wall, the differential fall arrester is located between the steel wire rope and the hanger, and the hanger and the steel wire rope are connected via the differential fall arrester.

[0021] In a preferred embodiment, a construction method of a curtain wall construction equipment of a track-type hanger is also included, and the specific operation steps are as follows:

[0022] Step 1: Install the channel steel track and fix the channel steel track on the top of the main steel structure of the curtain wall by welding or bolting;

[0023] Step 2: Assemble the track running assembly. First, use bolts to fix the adapter to the bottom side wall of the cantilever arm. Then, use bolts to connect one end of the H-shaped running wheel to the middle position of the adapter. The H-shaped running wheel can rotate on the surface of the adapter. Then, install the anti-derailment bearing on the other end of the anti-overturning T-shaped wheel by bolts. Finally, fix the anti-overturning T-shaped wheel to the bottom end of the adapter by bolts.

[0024] Step 3: Assemble the construction components, weld the construction components to the hanger by welding, further weld the cantilever arm to the top of the hanger by welding, and install the lower end support member at the position of the operating platform close to the bottom of the curtain wall side;

[0025] Step 4: Overall hoisting: Use a crane to hoist the hanger obtained in step 3 as a whole, and make the H-shaped walking wheels, anti-overturning T-shaped wheels and anti-derailment bearings all engage on the surface of the channel steel track, so that the hanger can move on the working surface of the overall structure of the curtain wall.

[0026] Technical effects and advantages of the present invention:

[0027] The overall structure designed by the present invention, compared with the prior art, makes the overall structure can be, under the premise of ensuring construction safety, break through the existing curtain wall panel installation construction method, solve the problem that traditional scaffolding is not conducive to prefabricated construction, first connect the upper and lower ends of the hanger with the construction assembly and the track sliding assembly, and use the hoisting method to connect with the overall steel structure of the curtain wall, use the prefabricated construction method to improve the efficiency during construction, and improve the efficiency of hoisting operations.

[0028] By setting up a high-rail sliding assembly, compared with the prior art, the hanger can be moved on the surface of the overall structure of the curtain wall, so that the position of the hanger can be changed according to the actual construction situation, thereby adapting to the construction at different positions on the curtain wall surface, thereby avoiding the use of scaffolding, reducing costs during the construction process, reducing the time waste caused by repeated erection and disassembly of scaffolding during construction, and greatly improving construction efficiency.

[0029] Therefore, the present invention has good promotion and practical value, and will produce good economic benefits after being widely promoted and applied. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a structural schematic diagram of the track-type hanger and the curtain wall integral steel structure during installation proposed by the present invention.

[0031] Figure 2 For the present invention Figure 1 A magnified view of the structure in the middle.

[0032] Figure 3 This is a schematic diagram of the elevation structure of the track-type hanger and construction components proposed in the present invention during installation.

[0033] Figure 4 This is a schematic diagram of the mechanism of the protection component proposed in the present invention.

[0034] The accompanying drawings are marked as follows: 1. channel steel track; 2. H-shaped walking wheel; 3. anti-overturning T-shaped wheel; 4. anti-derailment bearing; 5. operating platform; 6. upper and lower passages; 7. one-way door; 8. safety rope; 9. cantilever arm; 10. lower end support; 11. wire rope; 12. differential fall arrester; 13. adapter. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Figure 1 This is a structural schematic diagram of the main hanger and the curtain wall main steel structure during installation, which can be applied to the track-type hanger proposed by the present invention; Figure 2 For the present invention Figure 1 An enlarged view of the structure at the connection point A between the middle main hanger and the upper part of the main steel structure of the curtain wall, with a focus on the structural details of the channel steel track 1.

[0037] like Figure 1 and Figure 2 As shown, the curtain wall engineering construction equipment of the track-type hanger proposed by the present invention includes a supporting and protecting component, a track running component and a construction component.

[0038] like Figure 1 As shown, away from the curtain wall ( Figure 1 The left side of the main hanger ( Figure 1 On the right side), construction components are installed on the surface of the main hanger. Construction workers use the construction components to construct the entire curtain wall. The construction components also improve the safety of construction workers during construction.

[0039] like Figure 3 As shown, Figure 3 This is a schematic diagram of the elevation structure of the track-type hanger and construction components proposed in the present invention during installation.

[0040] The construction assembly includes several operating platforms 5 installed inside the main hanger, on which construction workers can perform construction. An upper and lower passage 6 is provided on the side of the main hanger close to the curtain wall, and a plurality of one-way doors 7 are provided on the surface of the upper and lower passage 6. A large safety rope 8 is provided through one end of the operating platform 5 close to the curtain wall, so that construction workers can enter the construction assembly for construction.

[0041] Furthermore, several operating platforms 5 are equidistantly distributed inside the hanger, and several one-way doors 7 are also distributed inside the upper and lower passages 6. The operating platforms 5, the upper and lower passages 6 and the one-way doors 7 are interconnected. There are large safety ropes 8 and cantilever arms 9 in the upper and lower passages 6. Construction workers enter the upper and lower passages 6 through the one-way doors 7 and enter the designated operating platforms 5 through the upper and lower passages 6, thereby facilitating construction work for the construction workers.

[0042] The operating platform 5, upper and lower passages 6, and one-way door 7 are all steel components. The safety rope 8 is a steel cable. Several safety belts (not shown in the figure) are fixed on the surface of the steel cable. The safety belts are hung high and used low. They are fixed on the safety rope 8 to ensure safety. Construction is carried out on the operating platform 5 of the hanger.

[0043] The support protection component is set between the main hanger and the main steel structure of the curtain wall to further improve the safety of construction workers on the track hanger. Figure 1 Upper, main hanger ( Figure 1 A cantilever arm 9 is installed at the top of the side wall of the main hanger (right side part) close to the channel steel track 1, and a lower end support 10 is installed at the bottom of the side wall of the main hanger close to the channel steel track 1. The lower end support 10 can be located at the bottom of the operating platform 5 close to the curtain wall side and supported on the main structure of the building to ensure the stability of the overall system.

[0044] The track running assembly is installed between the upper part of the main hanger and the main steel structure of the curtain wall through the bridging of the cantilevered support arm 9.

[0045] like Figure 2 As shown, the track running components specifically include:

[0046] Channel steel track 1, channel steel track 1 and curtain wall main steel structure (such as Figure 1 The left half) is connected to the channel steel track 1 to form a trough structure of the slideway so that the track type hanger slides along the direction of the channel steel track 1 above the channel steel track 1.

[0047] A channel steel track 1, wherein the channel steel track 1 is connected to the main steel structure of the curtain wall, a main hanger is arranged on one side of the channel steel track 1, a construction component is installed on the surface of the main hanger, a supporting and protecting component is arranged between the main hanger and the main steel structure of the curtain wall, a cantilever arm 9 is installed at the top of the side wall of the main hanger close to the channel steel track 1, a lower end support 10 is installed at the bottom of the side wall of the hanger close to the channel steel track 1, a track running component is installed between the channel steel track 1 and the hanger, and the hanger slides above the channel steel track 1 through the track running component.

[0048] To ensure safety and firmness, the channel steel track 1 is U-shaped. The channel steel track 1 is extended in the X-transverse direction of the curtain wall main steel structure, that is, in the direction parallel to the ground.

[0049] The track running assembly also includes an H-shaped running wheel 2 installed above the channel steel track 1, and the H-shaped running wheel 2 is slidably engaged with the channel steel track 1. Figure 2 As shown, the outer wall groove of the H-shaped running wheel 2 is engaged with the side wall of the channel steel track 1, one side of the cantilever arm 9 is connected with an adapter 13 by bolts, and the H-shaped running wheel 2 and the adapter 13 are connected by bolts.

[0050] Specifically, an anti-derailment bearing 4 is provided on one side of the H-type traveling wheel 2, and an anti-overturning T-shaped wheel 3 is provided at a position of the channel rail 1 away from one side of the H-type traveling wheel 2, so as to facilitate the movement of the track-type hanger on the working surface.

[0051] It should be noted that the vertical section of the anti-derail bearing 4 is arranged in an inverted T shape, the upper end of the anti-derail bearing 4 is connected to the H-type traveling wheel 2 by a bolt, and the lower end of the anti-derail bearing 4 contacts the outer side wall of the channel steel track 1, so as to facilitate the H-type traveling wheel 2 to rotate, and the H-type traveling wheel 2 can be kept rolling above the channel steel track 1 by the anti-derail bearing 4, and the phenomenon of derailment will not occur.

[0052] Furthermore, the track operation component also includes an anti-overturning T-shaped wheel 3 installed in the channel steel track 1, the end of which is deeply embedded in the internal groove of the channel steel track 1, and the anti-overturning T-shaped wheel 3 and the adapter 13 are connected by bolts, so that the H-shaped walking wheel 2, the anti-overturning T-shaped wheel 3 and the anti-derailment bearing 4 are connected to the lower end of the cantilever arm 9, and cooperate with each other to form a track operation component of the track-type hanger operation.

[0053] also, Figure 4 The schematic diagram of the protection assembly proposed by the present invention is shown in FIG. The installation system shown in the present invention provides secondary protection.

[0054] In another embodiment, further, the support protection component may further include:

[0055] The steel wire rope 11 and the differential fall arrester 12, the steel wire rope 11 is located above the hanger and connected to the main structure of the curtain wall, the differential fall arrester 12 is located between the steel wire rope 11 and the hanger, and the hanger and the steel wire rope 11 are connected through the differential fall arrester 12 to form a secondary protection system.

[0056] The present invention arranges a channel steel track 1, which is fixedly connected to the main body of the steel structure; an anti-overturning T-shaped wheel 3 is connected to a square steel base through bolts and is clamped in the channel steel track 1; an H-shaped running wheel 2 is connected to the square steel base through bolts, and a middle groove is clamped on the channel steel track 1; a track-type hanger is connected to the main steel structure of the curtain wall through a square steel base, an H-shaped running wheel, an anti-overturning T-shaped wheel, and a channel steel track; a steel wire rope 11 is located on the entire track-type hanger and is horizontally connected to the main body of the building; a differential fall arrester 12 is connected to the steel wire rope 11 and the track-type hanger.

[0057] This embodiment provides a construction method of a curtain wall construction equipment with a track-type hanger, and the specific operation steps are as follows:

[0058] Step 1: Install the channel steel track 1, and fix the channel steel track 1 on the upper part of the curtain wall main steel structure by welding or bolting, so as to connect the channel steel track 1 on the main steel structure of the curtain wall, so as to facilitate the subsequent sliding of the track-type hanger on the main steel structure of the curtain wall;

[0059] Step 2: Assemble the track running components;

[0060] First, the adapter 13 is fixed to the bottom side wall of the cantilever arm 9 by bolts, and then one end of the H-shaped running wheel 2 is connected to the middle position of the adapter 13 by bolts, and the H-shaped running wheel 2 can rotate on the surface of the adapter 13;

[0061] Then, the anti-derail bearing 4 is installed on the other end of the anti-overturning T-shaped wheel 3 by bolts, and finally the anti-overturning T-shaped wheel 3 is fixed to the bottom end of the adapter 13 by bolts, so that the cantilever arm 9 can slide on the channel steel track 1, so that the subsequent track-type hanger can slide on the channel steel track 1;

[0062] Insert the four anti-overturning T-shaped wheels 3 into the grooves of the channel steel track 1 and fix them to the square steel base with bolts. The overall installation is completed and construction can be carried out.

[0063] Step 3: Assemble construction components;

[0064] First, the operating platform 5 is connected to the main hanger as a whole;

[0065] Then, the upper and lower channels 6 are installed on one side of the main hanger by welding, and the upper and lower channels 6 and the safety rope 8 are installed on the same side of the main hanger by welding. Finally, the cantilever arm 9 is welded to the top of the main hanger by welding, and the lower end support 10 is installed at the position of the operating platform 5 close to the bottom of the curtain wall side, so that the main hanger is kept vertical as a whole, and the track-type hanger is convenient for better movement on the main working surface of the curtain wall.

[0066] Step 4: Overall hoisting: Use the construction components obtained in step 3 to hoist the track-type hanger as a whole, and make the H-shaped walking wheels 2, anti-overturning T-shaped wheels 3 and anti-derailment bearings 4 all engage on the surface of the channel steel track 1, so that the track-type hanger can move on the working surface of the overall structure of the curtain wall.

[0067] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0068] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;

[0069] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A curtain wall construction equipment with a track-type hanger, characterized in that: It includes support and protection components, track operation components and construction components, among which, The support and protection components are set between the main hanger and the main steel structure of the curtain wall, including: A cantilever support arm (9) is mounted on the top of a side wall of the construction component close to the track running component; A lower end support member (10) is installed at the bottom end of the side wall of the construction component close to the track running component; The track running assembly is installed between the upper part of the main hanger and the main steel structure of the curtain wall through the connection of the cantilever support arm (9), and includes: A channel steel track (1), wherein the channel steel track (1) is connected to the main steel structure of the curtain wall, and the channel steel track (1) forms a channel structure of the slideway; An H-shaped running wheel (2) is installed above the channel steel track (1), the H-shaped running wheel (2) is slidably connected to the channel steel track (1), and the outer wall groove of the H-shaped running wheel (2) is engaged with the side wall of the channel steel track (1); One side of the cantilever support arm (9) is connected to a connecting piece (13) via bolts, and the H-shaped running wheel (2) and the connecting piece (13) are connected via bolts; The track-type hanger runs in the X-transverse direction of the curtain wall main body steel structure through a track running component; an anti-derailment bearing (4) is provided on one side of the H-shaped running wheel (2); and an anti-overturning T-shaped wheel (3) is provided at a position of the channel steel track (1) away from the side of the H-shaped running wheel (2); The hanger is hoisted as a whole by using a crane, and the H-shaped walking wheels (2), the anti-overturning T-shaped wheels (3) and the anti-derailment bearings (4) are all engaged on the surface of the channel steel track (1), so that the hanger can be moved on the working surface of the overall curtain wall structure; The end of the anti-overturning T-shaped wheel (3) is inserted into the inner groove of the channel steel track (1), and the anti-overturning T-shaped wheel (3) and the adapter (13) are connected by bolts; The vertical section of the anti-derail bearing (4) is arranged in an inverted T shape, the upper end of the anti-derail bearing (4) is connected to the H-type running wheel (2) by bolts, and the lower end of the anti-derail bearing (4) is in contact with the outer side wall of the channel steel track (1); The track running assembly also includes an anti-overturning T-shaped wheel (3) installed in the channel steel track (1), the end of which is deeply inserted into the internal groove of the channel steel track (1), and the anti-overturning T-shaped wheel (3) and the adapter (13) are connected by bolts, so that the H-shaped running wheel (2), the anti-overturning T-shaped wheel (3) and the anti-derailment bearing (4) are connected to the lower end of the cantilever support arm (9) and cooperate with each other to form a track running assembly for track-type hanger operation; The supporting protection assembly comprises a steel wire rope (11) and a differential fall arrester (12), wherein the steel wire rope (11) is located above the hanger and connected to the curtain wall main structure, and the differential fall arrester (12) is located between the steel wire rope (11) and the hanger, and the hanger and the steel wire rope (11) are connected via the differential fall arrester (12) to form a secondary protection system; The anti-overturning T-shaped wheel (3) is connected to the square steel base through bolts and is clamped inside the channel steel track (1); the H-shaped running wheel (2) is connected to the square steel base through bolts, and the middle groove is clamped on the channel steel track (1); the track-type hanger is connected to the main steel structure of the curtain wall through the square steel base, the H-shaped running wheel, the anti-overturning T-shaped wheel, and the channel steel track; the steel wire rope (11) is located on the entire track-type hanger and is horizontally connected to the building main body; the differential fall arrester (12) is connected to the steel wire rope (11) and the track-type hanger.

2. The curtain wall construction equipment of the track-type hanger according to claim 1 is characterized in that: The channel steel track (1) is U-shaped and is arranged to extend in the X-transverse direction of the curtain wall main body steel structure.

3. The curtain wall construction equipment of the track-type hanger according to claim 1 is characterized in that: The construction assembly comprises a plurality of operating platforms (5) installed inside the hanger, an upper and lower passage (6) is provided on the other side of the hanger, a plurality of one-way doors (7) are provided on the surface of the upper and lower passage (6), and a large safety rope (8) is provided through one end of the operating platform (5) close to the curtain wall.

4. The curtain wall construction equipment with a track-type hanger according to claim 3 is characterized in that: A plurality of the operating platforms (5) are equidistantly distributed inside the hanger, and a plurality of the one-way doors (7) are also distributed inside the upper and lower passages (6). The operating platforms (5), the upper and lower passages (6) and the one-way doors (7) are interconnected.

5. The curtain wall construction equipment with a track-type hanger according to claim 4, characterized in that: The operating platform (5), the upper and lower passages (6), and the one-way door (7) are all components made of steel. The large safety rope (8) is a steel cable, and a plurality of safety belts are fixedly arranged on the surface of the steel cable.

6. The construction method of the curtain wall construction equipment of the track-type hanger according to any one of claims 1 to 5, wherein the specific operation steps are as follows: Step 1: Install the channel steel track (1), and fix the channel steel track (1) on the upper side of the curtain wall main steel structure by welding or bolting; Step 2: Assemble the track running assembly, first fix the adapter (13) to the bottom side wall of the cantilever arm (9) by bolts, then connect one end of the H-type running wheel (2) to the middle position of the adapter (13) by bolts, and the H-type running wheel (2) can rotate on the surface of the adapter (13), then install the anti-derail bearing (4) on the other end of the anti-overturning T-type wheel (3) by bolts, and finally fix the anti-overturning T-type wheel (3) to the bottom end of the adapter (13) by bolts; Step 3: Assemble the construction components, weld the construction components to the hanger by welding, and further weld the cantilever arm (9) to the top of the hanger by welding, and install the lower end support member (10) on the operating platform (5) near the bottom of the curtain wall side; Step 4: Overall hoisting: Use a crane to hoist the hanger obtained in step 3 as a whole, and make the H-shaped walking wheels (2), anti-overturning T-shaped wheels (3) and anti-derailment bearings (4) all engage on the surface of the channel steel track (1), so that the hanger can move on the working surface of the overall structure of the curtain wall.

Citation Information

Patent Citations

  • Method for implementing operating platform in bottom wall construction of cantilever beam

    CN102877637A

  • Monorail type moving device used for greenhouse

    CN107555106A

  • Curtain wall engineering construction equipment of rail type hanging bracket

    CN216893415U