A floating bollard second-phase concrete rapid construction device and method
By using hydraulic cylinder components and a winch-driven formwork system in the second phase of concrete construction of the floating bollards of the ship lock, automatic reinforcement and demoulding were achieved, solving construction quality and safety issues, and improving construction efficiency and economy.
Patent Information
- Application Number
- CN202210060013.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-19
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-01-19
AI Technical Summary
The traditional second-stage concrete construction method for floating bollards in ship locks has problems such as difficulty in ensuring construction quality, large safety hazards, long construction period, high cost, and difficulty in formwork reinforcement.
A rapid construction device including a formwork system and a lifting mechanism is adopted, the hydraulic cylinder assembly is used to realize automatic reinforcement and demoulding of the formwork, and the winch and guide wheel are used to realize the bottom-up movement of the formwork, thereby improving construction efficiency and safety.
Fast, safe and economical construction is achieved, construction quality and personnel safety are ensured, construction costs are reduced, and construction efficiency is improved.
Smart Images

Figure CN114263180B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of concrete construction, in particular to a device and method for rapid second-phase concrete construction of a floating mooring post, which is suitable for the second-phase concrete construction of a floating mooring post for a ship lock. Background Art
[0002] During the second phase concrete construction of the floating bollard of the ship lock, the traditional construction method is to use bulk wooden formwork and use the method of inner pulling and outer supporting to reinforce the formwork. This method has a large workload, requires a lot of materials and labor, has a long construction period, is costly, and the second phase concrete space of the bollard is narrow, the inner pull bar construction is difficult, the formwork is not easy to reinforce, and it is easy to cause the formwork to move, and the high-altitude operation cannot guarantee the construction safety, quality, and progress. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a floating mooring column second-phase concrete rapid construction device and method, which solves the common problem that the construction quality of the floating mooring column second-phase concrete is difficult to ensure, ensures the safety of construction personnel, and the device is reusable, can speed up the construction progress, reduce construction costs, and has strong operability.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0005] A floating bollard second-stage concrete rapid construction device, comprising a template system and a lifting mechanism;
[0006] The template system includes a construction platform, a guide beam is fixed below the construction platform, a hydraulic cylinder assembly is installed on the guide beam, the hydraulic cylinder assembly is connected to the template assembly, and the template assembly matches the shape of the floating bollard slot; when the hydraulic cylinder assembly is extended or retracted, the template assembly completes the formwork or demoulding;
[0007] The lifting mechanism includes a bracket, which is installed on the concrete top surface of the completed lock chamber. A guide wheel is installed on the bracket. The steel wire rope of the winch passes around the guide wheel and is connected to the guide beam. When the winch is started, the template system is gradually lifted.
[0008] The formwork assembly includes a first panel, a second panel, a third panel and a horizontal formwork reinforcement, and the first panel, the second panel, the third panel and the horizontal formwork reinforcement are all connected to the hydraulic cylinder assembly through a supporting mechanism; the first panel is arranged in two groups on the left and right, the second panel is located above between the two groups of first panels, the third panel is located below the first panel and arranged on the left and right, and the horizontal formwork reinforcement is connected to the two third panels.
[0009] The third panel is hinged by the first supporting plate and the second supporting plate to form an L-shaped structure, and the hinge point is located at the arc corner.
[0010] The hydraulic cylinder assembly includes a first hydraulic cylinder for driving the left and right first panels to extend and retract, a second hydraulic cylinder for driving the second panel to extend and retract, a third hydraulic cylinder for driving the third panel to extend and retract, and a fourth hydraulic cylinder for driving the template horizontal reinforcement to extend and retract; wherein, the other ends of the first hydraulic cylinder, the second hydraulic cylinder, and the fourth hydraulic cylinder are installed on the guide beam, and both ends of the third hydraulic cylinder are respectively connected to the left and right third panels.
[0011] The guide beam comprises an inner support, and an outer support plate is fixed on the outer side of the inner support.
[0012] A method for rapid construction of second-phase concrete of a floating bollard comprises the following steps:
[0013] Step 1), first, use steel to seal the second phase concrete part of the mooring bollard on the concrete top surface of the lock chamber and construct an operating platform;
[0014] Step 2) Install the lifting mechanism on the top surface of the lock chamber and pass the wire rope of the winch through the guide wheel;
[0015] Step 3) Weld the template support mechanism and the guide beam through the hydraulic cylinder assembly. The segment height of the floating bollard template is 1.5~2m. Weld the panel in the template assembly to the template support mechanism;
[0016] Step 4) Arrange the hydraulic oil pump on the construction platform and connect the hydraulic oil pump to the corresponding hydraulic cylinder assembly;
[0017] Step 5) Connect the wire rope of the lifting mechanism to the guide beam, lift the formwork system, remove the blocking steel, and lower the lifting formwork system to the bottom of the bollard under the traction of the winch to start pouring concrete;
[0018] Step 6), before pouring the second phase concrete of the floating bollard, the formwork assembly is extended by the first hydraulic cylinder, the second hydraulic cylinder, and the third hydraulic cylinder, and the fourth hydraulic cylinder is contracted and the support hinge at the third panel is rotated to adjust the formwork support mechanism for formwork reinforcement;
[0019] Step 7), after the second phase concrete pouring of the floating bollard is completed, the floating bollard template is demoulded by adjusting the template support mechanism through the contraction of the first hydraulic cylinder, the second hydraulic cylinder, and the third hydraulic cylinder, the extension of the fourth hydraulic cylinder, and the rotation of the support hinge at the third panel;
[0020] Step 8) Use a winch to lift the formwork system and cast it from bottom to top;
[0021] Step 9) After the second phase of concrete construction of a floating bollard is completed, the work can be continued by moving to the next construction site.
[0022] There are two groups of hydraulic oil pumps in step 4), and the corresponding first hydraulic cylinder, second hydraulic cylinder, and third hydraulic cylinder are connected to one group of hydraulic oil pumps; and the corresponding fourth hydraulic cylinder is connected to the other group of hydraulic oil pumps.
[0023] The present invention provides a floating bollard second-phase concrete rapid construction device and method, which has the following technical effects:
[0024] 1) Due to the narrow concrete space of the second phase of the bollard, the lifting mechanism installed on the top of the lock chamber is used to move the template system from bottom to top, and the lower template system is used to automatically reinforce and remove the template. In this way, the template system can be continuously supported and demolded without repeated transfer, which improves efficiency. The construction personnel are located on the construction platform and work safely and reliably. The template is controlled by the hydraulic system installed on the construction platform to reinforce and remove the template, and it is not easy to move.
[0025] 2) After the second phase of concrete for a floating bollard is completed, when the concrete strength reaches the condition for demoulding, the hydraulic cylinder will slightly move the template panel under the action of hydraulic pressure to complete the demoulding work. After the second phase of concrete construction of a floating bollard is completed, the template system and lifting mechanism will be transferred to the next bollard to continue construction. The use of this device can ensure the safety of construction workers and the quality of the second phase of concrete construction of the bollard, with fast construction speed and significant economic benefits.
[0026] 3) The formwork system in the present application adopts a combined structure of a first panel, a second panel, a third panel and a horizontal reinforcement of the formwork, which can form a cross-section that matches the shape of the floating mooring post slot, and a hinged third panel is used at the corner that matches the shape of the floating mooring post slot. By using two sets of hydraulic cylinders to perform telescopic actions, the formwork and demoulding actions can be completed quickly and effectively. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:
[0028] Figure 1 It is a schematic diagram of the planar structure of the present invention.
[0029] Figure 2 It is a schematic diagram of the elevation structure of the present invention.
[0030] Figure 3 It is a side structural schematic diagram of the present invention.
[0031] Figure 4 for Figure 1 A partial enlarged schematic diagram of .
[0032] Figure 5 for Figure 2 A partial enlarged schematic diagram of .
[0033] Figure 6 for Figure 3 A partial enlarged schematic diagram of .
[0034] In the figure: lock chamber concrete 1, formwork assembly 2, formwork support mechanism 3, first panel 2.1, second panel 2.2, third panel 2.3, formwork horizontal reinforcement 2.4, guide beam 4, hydraulic cylinder assembly 5, first hydraulic cylinder 5.1, second hydraulic cylinder 5.2, third hydraulic cylinder 5.3, fourth hydraulic cylinder 5.4, construction platform 7, wire rope 8, bracket 9, guide wheel 10, winch 11, track 12, hydraulic oil pump 13. DETAILED DESCRIPTION
[0035] A floating bollard second-stage concrete rapid construction device comprises a template system and a lifting mechanism.
[0036] like Figure 1-3 As shown, the template system includes a construction platform 7, which is a patterned steel plate. A hydraulic oil pump 13 is installed above the construction platform 7. The hydraulic oil pump 13 is divided into two groups. The two groups of hydraulic oil pumps 13 are connected to the hydraulic cylinder assembly 5. When supporting or demolding, the two groups of hydraulic oil pumps 13 drive the two sets of hydraulic cylinders to move respectively, one set of hydraulic cylinders contracts, and the other set of hydraulic cylinders extends. A guide beam 4 is welded at the lower end of the construction platform 7. The guide beam 4 includes an inner support 4-1, and an outer support plate 4-2 is fixed to the outer side of the inner support 4-1. Among them, the inner support 4-1 is an I-beam, and the outer support plate 4-2 is a steel plate. The inner support 4-1 is welded to the outer support plate 4-2. A hydraulic cylinder assembly 5 is installed at a suitable position on the guide beam 4 in front, back, left and right directions, and the other end of the hydraulic cylinder assembly 5 is connected to the template assembly 2 through a template support mechanism 3. The template support mechanism 3 here is a channel steel, and the template assembly 2 is a steel plate.
[0037] Before and after the second phase concrete pouring of the floating bollard, the formwork assembly 2 is actuated by the hydraulic cylinder assembly 5 to reinforce or demould the formwork.
[0038] like Figure 4 As shown, the formwork assembly 2 includes a first panel 2.1, a second panel 2.2, a third panel 2.3 and a formwork horizontal reinforcement 2.4, and the first panel 2.1, the second panel 2.2, the third panel 2.3 and the formwork horizontal reinforcement 2.4 are all connected to the hydraulic cylinder assembly 5 through a supporting mechanism 3; the first panel 2.1 is U-shaped, and is arranged in two groups of left and right mirror images, the second panel 2.2 is arc-shaped, and the second panel 2.2 is located above between the two groups of first panels 2.1, the third panel 2.3 is L-shaped, and the third panel 2.3 is located below the first panel 2.1 and is arranged left and right, and the formwork horizontal reinforcement 2.4 is connected to the two third panels 2.3.
[0039] like Figure 1As shown, the track 12 is a permanent embedded part for the floating bollard to move up and down, and has been pre-embedded before the second phase concrete pouring. The contact part between the track 12 and the formwork assembly 2 is affixed with double-sided tape. When the formwork is reinforced, the track 12 and the formwork assembly 2 are tightly attached through the double-sided tape to prevent concrete leakage. When demolding, under the drive of the hydraulic cylinder, there is a gap between the track 12 and the formwork assembly 2, so as to quickly complete the formwork assembly and removal.
[0040] The template horizontal reinforcement 2.4 is square steel or channel steel (equivalent to the transverse enclosure of the third panel 2.3.1), and is welded and fixed to the third panel 2.3.1.
[0041] like Figure 4 As shown, the third panel 2.3 is hinged by the first support plate 2.3.1 and the second support plate 2.3.2 to form an L-shaped structure, and the hinge point 2.3.3 is located at the arc corner. The template at the arc corner of the third panel 2.3 is reinforced or removed by rotating the support hinge.
[0042] like Figure 4-6 As shown, the hydraulic cylinder assembly 5 includes a first hydraulic cylinder 5.1 for driving the left and right first panels 2.1 to extend and retract. The first hydraulic cylinder 5.1 is arranged horizontally in two groups on the left and right. One end of the first hydraulic cylinder 5.1 is installed on the guide beam 4, and the other end of the first hydraulic cylinder 5.1 is connected to the supporting mechanism 3 at the first panel 2.1.
[0043] The hydraulic cylinder assembly 5 also includes a second hydraulic cylinder 5.2 for driving the second panel 2.2 to extend and retract. The second hydraulic cylinder 5.2 is arranged vertically, one end of the second hydraulic cylinder 5.2 is mounted on the guide beam 4, and the other end of the second hydraulic cylinder 5.2 is connected to the supporting mechanism 3 at the second panel 2.2.
[0044] The hydraulic cylinder assembly 5 further comprises a third hydraulic cylinder 5.3 for driving the third panel 2.3 to extend and retract. The third hydraulic cylinder 5.3 is arranged horizontally and has two ends extending out to be connected to the supporting mechanism 3 at the third panel 2.3.
[0045] The hydraulic cylinder assembly 5 also includes a fourth hydraulic cylinder 5.4 for driving the template horizontal reinforcement 2.4 to extend and retract. The fourth hydraulic cylinder 5.4 is arranged vertically, one end of the fourth hydraulic cylinder 5.4 is installed on the guide beam 4, and the other end of the fourth hydraulic cylinder 5.4 is connected to the supporting mechanism 3 at the template horizontal reinforcement 2.4.
[0046] like Figure 2-3As shown, the lifting mechanism includes a bracket 9, which is welded by steel beam legs and transverse support steel beams, and the steel beam legs and transverse support steel beams are I-beams. The steel beam legs are installed on the top surface of the gate chamber concrete 211 that has been constructed, and a guide wheel 10 is set on the transverse support steel beam. The wire rope 8 of the winch 11 passes around the guide wheel 10 and is connected to the guide beam 4. When the winch 11 is started, the template system is gradually lifted.
[0047] Working process and principle:
[0048] 1) Firstly, the second phase concrete part of the mooring column on the top surface of the lock chamber concrete 1 is sealed with steel sections to construct an operating platform.
[0049] 2) Install the lifting mechanism on the top surface of the lock chamber and pass the wire rope 8 of the winch 11 through the guide wheel 10.
[0050] 3) Install the formwork system, weld the formwork support mechanism 3 and the guide beam 4 through the hydraulic cylinder assembly 5, the segmented height of the floating bollard formwork is 1.5~2m, and weld the panel in the formwork assembly 2 to the formwork support mechanism 3.
[0051] 4) Arrange a hydraulic oil pump 13 on the construction platform 7, and connect the hydraulic oil pump 13 to the corresponding hydraulic oil cylinder. There are two groups of hydraulic oil pumps 13 here, and the corresponding first hydraulic oil cylinder 5.1, second hydraulic oil cylinder 5.2, and third hydraulic oil cylinder 5.3 are connected to one group of hydraulic oil pumps 13; the corresponding fourth hydraulic oil cylinder 5.4 is connected to the other group of hydraulic oil pumps 13. The formwork assembly 2 is adjusted by contracting the first hydraulic oil cylinder 5.1, the second hydraulic oil cylinder 5.2, and the third hydraulic oil cylinder 5.3, extending the fourth hydraulic oil cylinder 5.4, and rotating the hinge at the third panel 2.3.
[0052] 5) Connect the wire rope 8 of the lifting mechanism to the guide beam 4, lift the formwork system, remove the blocking steel, and lower the lifting formwork system to the bottom of the bollard under the traction of the winch 11 to start pouring concrete.
[0053] 6) Before pouring the second phase concrete of the floating bollard, the formwork assembly 2 adjusts the formwork support mechanism 3 to reinforce the formwork through the extension of the first hydraulic cylinder 5.1, the second hydraulic cylinder 5.2, and the third hydraulic cylinder 5.3, the contraction of the fourth hydraulic cylinder 5.4 and the rotation of the support hinge at the third panel 2.3.
[0054] 7) After the second phase concrete pouring of the floating bollard is completed, the floating bollard template is demoulded by adjusting the template support mechanism 3 through the contraction of the first hydraulic cylinder 5.1, the second hydraulic cylinder 5.2, and the third hydraulic cylinder 5.3, the extension of the fourth hydraulic cylinder 5.4 and the rotation of the support hinge at the third panel 2.3.
[0055] 8) The formwork system is lifted by the winch 11 to cast and mold in sequence from bottom to top.
[0056] 9) After the second phase of concrete construction of a floating bollard is completed, the construction can be transferred to the next site in a continuous manner.
Claims
1. A floating bollard second-phase concrete rapid construction device, Features: Including formwork system and lifting mechanism; The formwork system comprises a construction platform (7), a guide beam (4) is fixed below the construction platform (7), a hydraulic cylinder assembly (5) is mounted on the guide beam (4), the hydraulic cylinder assembly (5) is connected to the formwork assembly (2), and the formwork assembly (2) matches the shape of the floating bollard slot; when the hydraulic cylinder assembly (5) is extended or retracted, the formwork assembly (2) completes formwork or demoulding; The lifting mechanism comprises a bracket (9), the bracket (9) being mounted on the top surface of the gate chamber concrete (1) which has been constructed, a guide wheel (10) being mounted on the bracket (9), a steel wire rope (8) of a winch (11) passing around the guide wheel (10) and connected to the guide beam (4), and when the winch (11) is started, the formwork system is gradually lifted; The formwork assembly (2) comprises a first panel (2.1), a second panel (2.2), a third panel (2.3) and a formwork horizontal reinforcement member (2.4); the first panel (2.1), the second panel (2.2), the third panel (2.3) and the formwork horizontal reinforcement member (2.4) are all connected to the hydraulic cylinder assembly (5) via a formwork support mechanism (3); the first panels (2.1) are arranged in two groups on the left and right, the second panels (2.2) are located above between the two groups of first panels (2.1), the third panels (2.3) are located below the first panels (2.1) and are arranged on the left and right, and the formwork horizontal reinforcement member (2.4) is connected to the two third panels (2.3); The third panel (2.3) is hingedly connected by a first support plate (2.3.1) and a second support plate (2.3.2) into an L-shaped structure, and the hinge point (2.3.3) is located at the arc corner; The hydraulic cylinder assembly (5) comprises a first hydraulic cylinder (5.1) for driving the left and right first panels (2.1) to extend and retract, a second hydraulic cylinder (5.2) for driving the second panel (2.2) to extend and retract, a third hydraulic cylinder (5.3) for driving the third panel (2.3) to extend and retract, and a fourth hydraulic cylinder (5.4) for driving the template horizontal reinforcement (2.4) to extend and retract; wherein the other ends of the first hydraulic cylinder (5.1), the second hydraulic cylinder (5.2) and the fourth hydraulic cylinder (5.4) are mounted on the guide beam (4), and the two ends of the third hydraulic cylinder (5.3) are respectively connected to the left and right third panels (2.3); The first panel (2.1) is U-shaped and is arranged in two groups of left and right mirror images, and the second panel (2.2) is arc-shaped; The track (12) is a permanent embedded part for the floating bollard to move up and down, and is pre-embedded before the second phase concrete pouring. The contact portion between the track (12) and the formwork component (2) is affixed with double-sided tape. When the formwork is reinforced, the track (12) and the formwork component (2) are tightly attached by the double-sided tape. The other end of the hydraulic cylinder assembly (5) is connected to the formwork assembly (2) via a formwork support mechanism (3); the formwork support mechanism (3) is a channel steel.
2. A floating bollard second-stage concrete rapid construction device according to claim 1, Features: The guide beam (4) comprises an inner support (4-1), and an outer support plate (4-2) is fixed on the outer side of the inner support (4-1).
3. A method for rapid second-stage concrete construction of a floating bollard, the method comprising: using a device for rapid second-stage concrete construction of a floating bollard as claimed in any one of claims 1 to 2 for construction; The following steps are involved: Step 1), first, the second phase concrete part of the mooring column on the top surface of the lock chamber concrete (1) is sealed with steel sections to construct an operating platform; Step 2), installing a lifting mechanism on the top surface of the lock chamber, and passing the steel wire rope (8) of the winch (11) through the guide wheel (10); Step 3), welding the formwork support mechanism (3) and the guide beam (4) together through a hydraulic cylinder assembly (5), wherein the floating bollard formwork has a segmented height of 1.5 to 2 m, and welding the panel in the formwork assembly (2) to the formwork support mechanism (3); Step 4), arranging a hydraulic oil pump (13) on the construction platform (7), and connecting the hydraulic oil pump (13) to the corresponding hydraulic cylinder assembly (5); Step 5), connect the steel wire rope (8) of the lifting mechanism to the guide beam (4), lift the formwork system, remove the blocking steel, and lower the lifted formwork system to the bottom of the bollard under the traction of the winch (11) to start pouring concrete; Step 6), before pouring the second phase concrete of the floating bollard, the formwork assembly (2) is extended by the first hydraulic cylinder (5.1), the second hydraulic cylinder (5.2), and the third hydraulic cylinder (5.3), and the fourth hydraulic cylinder (5.4) is contracted and the support hinge at the third panel (2.3) is rotated to adjust the formwork support mechanism (3) to reinforce the formwork; Step 7), after the second phase concrete pouring of the floating bollard is completed, the floating bollard template is demoulded by adjusting the template support mechanism (3) through the contraction of the first hydraulic cylinder (5.1), the second hydraulic cylinder (5.2), and the third hydraulic cylinder (5.3), the extension of the fourth hydraulic cylinder (5.4) and the rotation of the support hinge at the third panel (2.3); Step 8), using a winch (11) to lift the formwork system to cast and mold from bottom to top; Step 9) After the second phase of concrete construction of a floating bollard is completed, the work can be continued by moving to the next construction site.
4. A method for rapid second-stage concrete construction of a floating bollard according to claim 3, Features: The hydraulic oil pumps (13) in step 4) are in two groups, and the corresponding first hydraulic oil cylinder (5.1), second hydraulic oil cylinder (5.2), and third hydraulic oil cylinder (5.3) are connected to one group of hydraulic oil pumps (13); and the corresponding fourth hydraulic oil cylinder (5.4) is connected to the other group of hydraulic oil pumps (13).
Citation Information
Patent Citations
Examine and repair gate slot second phase concrete construction device
CN205224045U
Hydraulic internal mold device of floating bollard
CN210482265U
Ship lock chamber wall floating type bollard track integral pouring formwork system
CN213204057U
Floating bollard second-stage concrete rapid construction device
CN216948285U