Construction method of indoor exhaust duct structure with integrated waterproofing, unloading and smoke prevention
By using flame-retardant soft PVC material connecting pipe clamps and fixed steel bars in the exhaust duct installation, combined with the pouring of non-shrinkable anti-seepage concrete, the problems of unloading, waterproofing and smoke protection in the prior art are solved. Achieve high-quality and safe exhaust duct installation.
Patent Information
- Application Number
- CN202111494895.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-08
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-12-08
AI Technical Summary
In the installation of exhaust ducts in residential kitchens and bathrooms, it is difficult to solve the problems of unloading, waterproofing and smoke protection at the same time, resulting in poor construction quality, high safety risks, and frequent re-repairs.
The connecting pipe clamp made of flame-retardant soft PVC material is welded with fixed steel bars through the design of sockets and sockets to form a socket-bearing connection structure of the upper and lower flues, and poured with shrinkage-resistant concrete after each layer is installed. To achieve waterproof sealing.
It effectively avoids smoke intersecting, avoids damage to the flue due to weight transmission, and realizes the integrated functions of waterproofing, unloading and smoke anti-screw intersecting, which is convenient to construct, high efficiency, economical cost and excellent quality.
Smart Images

Figure CN114319784B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an installation method for an exhaust duct, and in particular to an installation method for a prefabricated exhaust duct in an indoor kitchen or bathroom. Background Art
[0002] The vertical finished pipe products used in residential kitchens and bathrooms to remove smoke or waste gas are also called exhaust ducts, ventilation ducts, and flues. At present, in building construction, the construction requirements for the reserved openings of structural plates such as the flue openings on the floors are very strict. The commonly used construction method is to construct the flue openings reserved between floors. Due to the difference in construction level, the reserved openings are not equipped with flue support devices in the building structure layer, which makes the flue stacked layer by layer during the construction process. Since the flue materials are mostly thin-walled cement products, they are easily damaged during the construction process. The weight of the upper flue is directly transferred to the lower part, resulting in poor construction quality. After installation, it is easy to form quality defects such as broken interfaces, cracked pipes, water seepage in bathroom pipes, and smoke from pipes. The repair construction is a great waste of labor, and at the same time affects the use function and causes quality and safety hazards.
[0003] In order to solve the above problems, the commonly used technologies in the existing technology are: 1. Unloading: steel bars are set at the floor position between layers to unload the smoke duct, angle steel frames are set at the floor position between layers to unload the smoke duct, and positioning plates are set at the top and bottom as well as the left and right sides of the reserved smoke duct openings in the floor, and a smoke duct fixing plate with a steel sheet is set between two adjacent positioning plates; 2. Waterproofing: waterproofing of the platform behind the smoke duct opening, and pouring of concrete at the opening and the floor concrete at one time to return the waterproof platform; 3. Anti-smoke cross-linking: the upper and lower smoke ducts are directly connected and sealed with concrete or mortar.
[0004] The above methods are limited by the process methods and materials, and cannot solve all the problems of unloading, waterproofing and smoke prevention at the same time. Summary of the invention
[0005] The purpose of the present invention is to overcome the deficiencies of the prior art and to provide a construction method for an indoor exhaust duct structure that is waterproof, unloadable and smoke-proof.
[0006] The construction method of the waterproof, unloading and smoke-proof indoor exhaust duct structure of the present invention comprises the following steps:
[0007] The first step is to prepare a connecting pipe hoop, wherein the connecting pipe hoop is made of flame-retardant soft PVC material;
[0008] The connecting pipe clamp includes a socket, a rectangular outer edge is arranged around the bottom wall of the socket in the horizontal direction, the top wall of the socket is fixed on the rectangular outer edge, the socket and the socket are arranged on the same central axis, the inner wall size of the socket is larger than the outer wall size of the flue, the outer wall size of the socket is smaller than the inner wall size of the flue, and a fixed steel bar hole parallel to the corresponding side edges of the rectangular outer edge is opened on the left and right sides and the front and rear sides of the rectangular outer edge, and a fixed steel bar arranged in the horizontal direction is inserted into each fixed steel bar hole, and both ends of each fixed steel bar are exposed from the rectangular outer edge;
[0009] The second step is to place the connecting pipe hoop into the reserved flue opening of the ground structural plate of the kitchen or bathroom on the first floor of the building, the upper end of the connecting pipe hoop is higher than the ground decorative surface layer of the kitchen or bathroom structural plate on the first floor, so that the lower end of the first-floor flue is in close contact with the top wall of the rectangular outer edge of the connecting pipe hoop at the kitchen or bathroom structural plate on the first floor; the lower end of the first-floor flue is vertically placed in the connecting pipe hoop of the kitchen or bathroom on the first floor of the building, the upper end of the first-floor flue is placed in the reserved flue opening in the top plate of the first floor, and the fixed steel bars are welded to the reserved stress-bearing steel bars in the kitchen or bathroom structural plate on the first floor by arc welding to form a fixed welded connection;
[0010] The third step is to put the connecting pipe hoop into the reserved flue opening in the top plate of the first layer, insert the socket of the connecting pipe hoop into the upper opening of the flue of the first layer, and make the top surface of the upper opening of the flue of the first layer tightly contact with the bottom wall of the rectangular outer edge of the connecting pipe hoop; the upper opening of the connecting pipe hoop is higher than the ground decoration surface layer of the top plate of the layer, and the lower opening extends out of the bottom surface of the top plate of the layer;
[0011] The fourth step is to align the flue of the first layer according to the designed longitudinal and transverse axes, then bend the ends of the fixed steel bars in the connecting pipe clamp 90 degrees to contact the reserved stress-bearing steel bars in the top plate of the first layer, and use arc welding to weld the fixed steel bars to the reserved stress-bearing steel bars in the top plate of the first layer to form a fixed welded connection;
[0012] The fifth step is to place the upper opening of the second-layer flue into the reserved flue opening of the second-layer top plate; the lower opening of the second-layer flue is sleeved on the outer wall of the socket of the connecting pipe clamp on the first-layer top plate, so that the lower opening of the second-layer flue is in close contact with the top wall of the rectangular outer edge of the connecting pipe clamp on the first-layer top plate;
[0013] Step 6, repeat the construction process of step 3 to step 5 from bottom to top to complete the installation of the connecting pipe clamps and the flue of each layer, and the connection of the connecting pipe clamps and the flue, until the lower opening of the flue on the top floor is sleeved on the outer wall of the socket of the connecting pipe clamp in the reserved flue opening of the top floor structure board, and the upper opening of the flue on the top floor is placed in the reserved flue opening of the roof structure board, wherein the upper opening of the connecting pipe clamp installed in the reserved flue opening of the top floor structure board protrudes out of the ground decorative surface layer of the top floor structure board;
[0014] The seventh step is to install the connecting pipe hoop on the roof in the reserved flue opening of the roof structure board according to the third step, and the upper opening of the connecting pipe hoop on the roof is extended out of the roof structure board to connect the connecting pipe hoop on the roof to the flue on the top floor; then according to the fourth step, the connecting pipe hoop on the roof is corrected and fixed in the reserved flue opening of the roof structure board, and finally a section of the flue on the roof is inserted into the outer wall of the socket of the connecting pipe hoop on the roof, and the flue on the roof passes through the roof to meet the design requirements of the roof height, and the flue installation of all layers is completed;
[0015] The eighth step is to install the formwork in the empty positions of the reserved flue openings outside the outer walls of each flue layer from bottom to top, and then pour the shrinkage-free anti-seepage concrete to combine each connecting pipe clamp with the concrete of the first kitchen or bathroom structural plate, top plate, top floor structural plate and roof structural plate of the corresponding installation layer into a whole; the entire flue is connected and fixed from bottom to top through the connecting pipe clamp and the shrinkage-free anti-seepage concrete in the reserved flue opening to form a waterproof and closed flue that is integrated from top to bottom.
[0016] Compared with the prior art, the advantages of the present invention are:
[0017] In this structure, the upper and lower flues are connected by upper and lower socket connection structures, thereby avoiding the hidden danger of smoke cross-talk at the interface. At the same time, the deadweight load of the flue on each floor is directly transferred to the structural floor at the lower end of the flue through the connecting pipe clamp and the fixed steel bars in the connecting pipe clamp, avoiding the accumulation of loads in the flue and ensuring that the lower flue is not compressed and damaged due to the transfer of the weight of the upper flue. This connection structure adopts a waterproof and flame-retardant soft PVC material connecting pipe clamp. The upper end of the connecting pipe clamp is higher than the indoor ground surface layer, which can effectively play a waterproof and anti-leakage effect, and finally can achieve the integrated functions of waterproofing, unloading, and smoke cross-talk prevention. At the same time, this structure is convenient to construct, efficient, economical in cost, and has good functions and quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a plan view of the connecting pipe clamp with fixed steel bars installed;
[0019] Figure 2 It is a cross-sectional elevation view of the connecting pipe clamp;
[0020] Figure 3 Plan view for connecting pipe clamps to post-cast concrete of floor slabs;
[0021] Figure 4 Plan for installing the connecting pipe clamp in the reserved flue opening;
[0022] Figure 5 This is a cross-sectional elevation view of the flue after it is completed in the floor slab by connecting the pipe clamps;
[0023] Figure 6 This is a cross-sectional elevation view of the flue, which is spliced together through connecting pipe clamps and welded to the floor slab steel bars before concrete is poured. DETAILED DESCRIPTION
[0024] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0025] As shown in the accompanying drawings, the construction method of the waterproof, unloading and smoke-proof integrated indoor exhaust duct structure of the present invention comprises the following steps:
[0026] The first step is to prepare a connecting pipe clamp 2, wherein the connecting pipe clamp is made of a flame-retardant soft PVC material, which has waterproof and flame-retardant functions.
[0027] The connecting pipe clamp 2 includes a socket 2-1, and a rectangular outer edge is arranged in the horizontal direction around the bottom wall of the socket 2-1. The top wall of the socket 2-2 is fixed on the rectangular outer edge. The socket 2-1 and the socket 2-2 are arranged with the same central axis. The inner wall size of the socket 2-2 is larger than the outer wall size of the flue, and the outer wall size of the socket 2-1 is smaller than the inner wall size of the flue. Preferably, the inner wall size of the socket 2-2 is 2~5mm larger than the outer wall size of the flue, and the outer wall size of the socket 2-1 is 2~5mm smaller than the inner wall size of the flue. A fixed steel bar channel 3 parallel to the corresponding side edges of the rectangular outer edge is respectively opened on the left and right sides and the front and rear sides of the rectangular outer edge, and a fixed steel bar 4 arranged in the horizontal direction is inserted into each fixed steel bar channel 3, and the two ends of each fixed steel bar 4 are exposed from the rectangular outer edge.
[0028] The second step is to put the connecting pipe hoop into the reserved flue opening of the ground structure plate of the kitchen or bathroom on the first floor of the building, the upper end of the connecting pipe hoop is higher than the ground decorative surface layer of the kitchen or bathroom structure plate on the first floor, so that the lower end of the first-floor flue is in close contact with the top wall of the rectangular outer edge of the connecting pipe hoop at the kitchen or bathroom structure plate on the first floor; the lower end of the first-floor flue 1 is vertically placed in the connecting pipe hoop of the kitchen or bathroom on the first floor of the building, and the upper end of the first-floor flue 1 is placed in the reserved flue opening 9 in the top plate 7 of the first floor; the fixed steel bar 4 is welded to the reserved stress-bearing steel bar 5 in the kitchen or bathroom structure plate on the first floor by arc welding to form a fixed welded connection 6;
[0029] The third step is to put the connecting pipe hoop 2 into the reserved flue opening 9 in the top plate 7 of the first layer, and insert the socket 2-2 of the connecting pipe hoop 2 into the upper opening of the flue 1 of the first layer, so that the upper opening top surface of the flue 1 of the first layer is in close contact with the bottom wall of the rectangular outer edge of the connecting pipe hoop 2; the upper opening of the connecting pipe hoop is higher than the ground decoration surface layer of the top plate of this layer (can be higher by 5cm) and the lower opening protrudes from the bottom surface of the top plate of this layer; the lower opening can protrude from the bottom surface of the top plate of this layer by 2cm;
[0030] The fourth step is to align the flue of the first layer according to the designed longitudinal and transverse axes, and then bend the end of the fixed steel bar 4 in the connecting pipe clamp 2 by 90 degrees to contact the reserved stress steel bar 5 in the top plate 7 of the first layer, and use arc welding to weld the fixed steel bar 4 to the reserved stress steel bar 5 in the top plate 7 of the first layer to form a fixed welded connection 6;
[0031] The fifth step is to place the upper opening of the second-layer flue into the reserved flue opening 9 of the second-layer top plate; the lower opening of the second-layer flue 1 is sleeved on the outer wall of the socket of the connecting pipe hoop 2 on the first-layer top plate, so that the lower opening of the second-layer flue 1 is in close contact with the top wall of the rectangular outer edge of the connecting pipe hoop 2 on the first-layer top plate;
[0032] The sixth step is to repeat the construction process of the third step to the fifth step from bottom to top to complete the installation of the connecting pipe clamp 2 and the flue of each layer, and the connection between the connecting pipe clamp 2 and the flue (such as: putting the connecting pipe clamp 2 into the reserved flue opening 9 in the top plate 7 of the second layer, repeating the third step to connect the connecting pipe clamp 2 to the flue of the second layer; repeating the fourth step to complete the welding connection between the connecting pipe clamp 2 installed in the reserved flue opening 9 of the second layer top plate and the reserved stress-bearing steel bars 5 of the second layer top plate; repeating the fifth step to put the lower end of the flue 1 of the third layer on the outer wall of the socket 2-1 of the connecting pipe clamp 2 at the second layer top plate, and place the upper end of the flue 1 of the third layer in the reserved flue opening 9 of the third layer top plate...repeat the construction processes of the third, fourth and fifth steps in sequence), until the lower end of the flue 1 on the top layer is put on the outer wall of the socket 2-1 of the connecting pipe clamp 2 in the reserved flue opening 9 of the top floor ground structure plate, and the upper end of the flue 1 on the top layer is placed in the reserved flue opening 9 of the roof structure plate. The upper opening of the connecting pipe clamp installed in the reserved flue opening of the top floor structure board extends out of the floor decorative surface layer of the top floor structure board;
[0033] The seventh step is to install the connecting pipe clamp 2 on the roof in the reserved flue opening 9 of the roof structure board according to the third step, and the upper opening of the connecting pipe clamp on the roof extends out of the roof structure board to connect the connecting pipe clamp 2 on the roof to the flue on the top floor; then according to the fourth step, complete the correction and fixation of the connecting pipe clamp 2 on the roof in the reserved flue opening 9 of the roof structure board, and finally put a section of the flue 1 on the roof on the outer wall of the socket 2-1 of the connecting pipe clamp 2 on the roof, and the flue 1 on the roof passes through the roof to meet the design requirements of the roof height, and complete the installation of the flues on all floors.
[0034] The eighth step is to install the template in the vacant position of the reserved flue opening 9 outside the outer wall of the flue 1 from each floor slab (on the first floor, the second floor, etc.) to the roof structure plate in turn from bottom to top, and then pour the non-shrinkage waterproof concrete 8 to combine each connecting pipe clamp 2 with the concrete of the first kitchen or bathroom structure plate, the top plate, the top floor structure plate and the roof structure plate of the corresponding installation layer into a whole; the whole flue is connected and fixed from bottom to top through the connecting pipe clamp 2 and the non-shrinkage waterproof concrete 8 in the reserved flue opening 9 to form a waterproof and closed flue that is integrated from top to bottom, so as to achieve the effects of waterproofing, unloading and preventing smoke from flowing through.
Claims
1. The construction method of the indoor exhaust duct structure with integrated waterproofing, unloading and smoke prevention is characterized in that The following steps are involved: The first step is to prepare a connecting pipe hoop, wherein the connecting pipe hoop is made of flame-retardant soft PVC material; The connecting pipe clamp includes a socket, a rectangular outer edge is arranged around the bottom wall of the socket in the horizontal direction, the top wall of the socket is fixed on the rectangular outer edge, the socket and the socket are arranged on the same central axis, the inner wall size of the socket is larger than the outer wall size of the flue, the outer wall size of the socket is smaller than the inner wall size of the flue, and a fixed steel bar hole parallel to the corresponding side edges of the rectangular outer edge is opened on the left and right sides and the front and rear sides of the rectangular outer edge, and a fixed steel bar arranged in the horizontal direction is inserted into each fixed steel bar hole, and both ends of each fixed steel bar are exposed from the rectangular outer edge; The second step is to place the connecting pipe hoop into the reserved flue opening of the ground structural plate of the kitchen or bathroom on the first floor of the building, the upper end of the connecting pipe hoop is higher than the ground decorative surface layer of the kitchen or bathroom structural plate on the first floor, so that the lower end of the first-floor flue is in close contact with the top wall of the rectangular outer edge of the connecting pipe hoop at the kitchen or bathroom structural plate on the first floor; the lower end of the first-floor flue is vertically placed in the connecting pipe hoop of the kitchen or bathroom on the first floor of the building, the upper end of the first-floor flue is placed in the reserved flue opening in the top plate of the first floor, and the fixed steel bars are welded to the reserved stress-bearing steel bars in the kitchen or bathroom structural plate on the first floor by arc welding to form a fixed welded connection; The third step is to put the connecting pipe hoop into the reserved flue opening in the top plate of the first layer, insert the socket of the connecting pipe hoop into the upper opening of the flue of the first layer, and make the top surface of the upper opening of the flue of the first layer tightly contact with the bottom wall of the rectangular outer edge of the connecting pipe hoop; the upper opening of the connecting pipe hoop is higher than the ground decoration surface layer of the top plate of the layer, and the lower opening extends out of the bottom surface of the top plate of the layer; The fourth step is to align the flue of the first layer according to the designed longitudinal and transverse axes, then bend the ends of the fixed steel bars in the connecting pipe clamp 90 degrees to contact the reserved stress-bearing steel bars in the top plate of the first layer, and use arc welding to weld the fixed steel bars to the reserved stress-bearing steel bars in the top plate of the first layer to form a fixed welded connection; The fifth step is to place the upper opening of the second-layer flue into the reserved flue opening of the second-layer top plate; the lower opening of the second-layer flue is sleeved on the outer wall of the socket of the connecting pipe clamp on the first-layer top plate, so that the lower opening of the second-layer flue is in close contact with the top wall of the rectangular outer edge of the connecting pipe clamp on the first-layer top plate; Step 6, repeat the construction process of step 3 to step 5 from bottom to top to complete the installation of the connecting pipe clamps and the flue of each layer, and the connection of the connecting pipe clamps and the flue, until the lower opening of the flue on the top floor is sleeved on the outer wall of the socket of the connecting pipe clamp in the reserved flue opening of the top floor structure board, and the upper opening of the flue on the top floor is placed in the reserved flue opening of the roof structure board, wherein the upper opening of the connecting pipe clamp installed in the reserved flue opening of the top floor structure board protrudes out of the ground decorative surface layer of the top floor structure board; The seventh step is to install the connecting pipe hoop on the roof in the reserved flue opening of the roof structure board according to the third step, and the upper opening of the connecting pipe hoop on the roof is extended out of the roof structure board to connect the connecting pipe hoop on the roof to the flue on the top floor; then according to the fourth step, the connecting pipe hoop on the roof is corrected and fixed in the reserved flue opening of the roof structure board, and finally a section of the flue on the roof is inserted into the outer wall of the socket of the connecting pipe hoop on the roof, and the flue on the roof passes through the roof to meet the design requirements of the roof height, and the flue installation of all layers is completed; The eighth step is to install the formwork in the empty positions of the reserved flue openings outside the outer walls of each flue layer from bottom to top, and then pour the shrinkage-free anti-seepage concrete to combine each connecting pipe clamp with the concrete of the first kitchen or bathroom structural plate, top plate, top floor structural plate and roof structural plate of the corresponding installation layer into a whole; the entire flue is connected and fixed from bottom to top through the connecting pipe clamp and the shrinkage-free anti-seepage concrete in the reserved flue opening to form a waterproof and closed flue that is integrated from top to bottom.
2. The construction method of the waterproof, unloading and smoke-proof indoor exhaust duct structure according to claim 1 is characterized in that: The inner wall size of the socket is 2-5 mm larger than the outer wall size of the flue, and the outer wall size of the plug is 2-5 mm smaller than the inner wall size of the flue.