A method for predicting and optimizing carbon emissions

Through the carbon emission prediction and optimization method from the perspective of the park energy Internet, we analyze the park energy data, establish a carbon emission model and optimize energy equipment, solve the problem of carbon dioxide emission calculation of the park's cooling, heating, electricity and gas integrated energy, and realize carbon trading and Support for energy conservation and carbon reduction.

CN114330826BActive Publication Date: 2024-10-01STATE GRID JIANGSU ECONOMIC RES INST +1

Patent Information

Application Number
CN202111423690.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2021-11-04
Filing Date
2021-11-26
Publication Date
2024-10-01
Estimated Expiration
2041-11-26

AI Technical Summary

Technical Problem

Existing technology cannot effectively measure carbon dioxide emissions from comprehensive energy sources such as cooling, heating, electricity, and gas from the perspective of the park. With the increase in park participation in comprehensive energy transactions, carbon emission measurement has become more important, but there is a lack of corresponding research support.

Method used

Propose a carbon emission prediction and optimization method based on the perspective of the park energy Internet. By obtaining historical data of multiple types of energy in the park, distinguishing energy production and consumption data, analyzing the change patterns, establishing a carbon emission prediction model, and optimizing through mathematical optimization models Configure energy conversion equipment, calculate total carbon emissions and optimize solutions.

Benefits of technology

It realizes the carbon dioxide emission prediction and optimization analysis of the park, supports carbon trading and energy conservation and carbon reduction work, makes up for the park’s research deficiencies in carbon emission measurement and optimization of energy Internet projects, and provides accurate carbon emission prediction and optimization solutions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114330826B_ABST
    Figure CN114330826B_ABST
Patent Text Reader

Abstract

The present invention relates to a carbon emission prediction and optimization method, including S1, obtaining comprehensive energy consumption data of various types of designated energy in a park within a preset historical time period and judging whether there is an energy conversion enterprise in the park, if so, analyzing and processing the data of the energy conversion enterprise; if not, proceeding to the next step; S2, distinguishing energy production data, primary energy consumption data and secondary energy consumption data in the comprehensive energy consumption data and analyzing the changing rules within the preset time period; S3, judging whether it is necessary to carry out carbon emission prediction analysis for the park, if so, establishing a park carbon emission prediction model according to the changing rules to predict the carbon emissions of the park, and carrying out carbon emission optimization analysis for the park; if not, directly carrying out carbon emission optimization analysis for the park. It is conducive to carrying out carbon accounting and energy conservation and carbon reduction for the park, and making up for the lack of research on carbon emission measurement in the park in the energy Internet project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of carbon dioxide emission, and in particular to a carbon emission prediction and optimization method. Background Art

[0002] China has proposed to strive to peak carbon dioxide emissions before 2030 and achieve carbon neutrality before 2060. As the importance of addressing climate change in the global governance system continues to increase, carbon emission measurement, carbon asset management, carbon trading and other tasks have also received more attention from all parties, and carbon emission measurement systems at all levels are gradually being established.

[0003] Most of the existing studies on carbon emissions consider carbon emissions from the perspective of the industry, such as the current status of carbon emissions in the professional fields of transportation, port transportation, and construction. Carbon emissions from comprehensive energy such as cooling, heating, electricity, and gas are not considered from the perspective of the park. With the continuous promotion and implementation of concepts such as comprehensive energy services, the park has gradually become a new trading entity, focusing on comprehensive energy trading and carbon emissions trading, which makes the carbon emission measurement work of the park more important. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a carbon emission prediction and optimization method. Based on the perspective of the park energy Internet, it proposes a method for predicting the comprehensive energy carbon dioxide emissions of the park energy system and optimizing the carbon dioxide emissions analysis. It is conducive to carrying out carbon accounting and energy conservation and carbon reduction for the park, and makes up for the lack of research on carbon emission measurement in the park's energy Internet projects.

[0005] To solve the above technical problems, the present invention provides a carbon emission prediction and optimization method, comprising the following steps: S1. Obtain comprehensive energy consumption data of various types of designated energy in a park within a preset historical time period and determine whether there is an energy conversion enterprise in the park. If so, analyze and process the data of the energy conversion enterprise; if not, proceed directly to the next step; S2. Distinguish the energy production data, primary energy consumption data and secondary energy consumption data in the comprehensive energy consumption data and analyze the change patterns of the energy production data, primary energy consumption data and secondary energy consumption data within a preset time period; S3. Determine whether it is necessary to carry out carbon emission prediction and analysis on the park. If so, establish a park carbon emission prediction model based on the change pattern to predict the park's carbon emissions, and carry out carbon emission optimization analysis on the park; if not, directly carry out carbon emission optimization analysis on the park.

[0006] Preferably, the data of the energy conversion enterprise include: installed capacity, secondary energy utilization efficiency and enterprise production capacity.

[0007] Preferably, S3 also includes: park carbon emission measurement and analysis; the total carbon emission of the park is calculated as follows: ∑E ci =∑F ci +∑E wci +∑H ci -∑G ci ; Among them, ∑E ci Represents the total carbon emissions of the park; ∑F ci Represents the total carbon emissions generated by the consumption of primary energy in the park; ∑E wci Represents the total carbon emissions generated by the consumption of external electricity in the park; ∑H ci Represents the total carbon emissions generated by the consumption of external heat in the park; ∑G ci It represents the total carbon emissions of secondary energy obtained by consuming primary energy and converting it into energy and then delivering it to the park; based on the carbon emission measurement and analysis of the park and the carbon emission prediction model of the park, the carbon emission prediction data of the park within a preset time period is obtained.

[0008] Preferably, the establishment of a park carbon emission prediction model to predict the park's carbon emissions specifically includes:

[0009] Obtaining forecast data on gas consumption in the industrial park, and using the forecast data on gas consumption as total carbon emissions data generated by primary energy consumption in the industrial park;

[0010] Obtain secondary energy consumption data within a preset time period and analyze its changing pattern, and obtain consumption forecast data of external secondary energy in the park based on the changing pattern;

[0011] Obtain the carbon emissions of secondary energy produced, converted and delivered by the park through the consumption of primary energy within a preset time period and analyze its changing pattern, and obtain the carbon emissions forecast data of secondary energy obtained and delivered after the park consumes primary energy according to the changing pattern;

[0012] The predicted carbon emissions of the park = A1 + A2 - A3, where A1 represents the total carbon emissions generated by the park's consumption of primary energy, A2 represents the predicted consumption of external secondary energy in the park, and A3 represents the predicted carbon emissions of secondary energy obtained and delivered after the park consumes primary energy.

[0013] Preferably, the calculation formula for the park gas consumption forecast data is: Among them, N represents the predicted data of gas consumption, n1 represents the heat-to-electricity ratio of the gas-fired thermal power enterprises in the park; Q represents the heat production of the gas-fired thermal power enterprises in the park; and n2 represents the thermal efficiency of the gas-fired thermal power enterprises in the park.

[0014] Preferably, the calculation formula for the heat-to-electricity ratio of the gas-fired thermal power enterprise in the park is: Among them, E represents the power generation of gas-fired thermal power enterprises in the park.

[0015] Preferably, the calculation formula for the thermal efficiency of the gas-fired thermal power enterprise in the park is: Among them, B=b*N, where b is the conversion coefficient of gas to standard coal.

[0016] Preferably, a carbon emission optimization analysis is carried out on the park, specifically including: obtaining energy conversion equipment in the park, and constructing a mathematical optimization model for the carbon emissions of the energy conversion equipment; solving the mathematical optimization model to obtain an initial energy conversion equipment configuration plan; judging whether the initial energy conversion equipment configuration plan can meet the actual demand indicators of the project, if it deviates from the actual demand indicators of the project, solving the mathematical optimization model again to search for new energy conversion equipment configuration plans, and saving the energy conversion equipment configuration plan that meets the actual demand indicators of the project as the optimal energy conversion equipment configuration plan.

[0017] As a preferred method, “constructing the mathematical optimization model” specifically comprises the following steps: establishing the objective function of the mathematical optimization model: In the formula, e ele Indicates the amount of CO2 emitted when producing one unit of electricity; e gas Indicates the amount of CO2 emitted by one unit of gas; P t grid Indicates active power; f t total is the injection gas flow rate; Represents other carbon emissions; establishes the constraint function of the mathematical optimization model:

[0018] in, represents the power generated by the energy conversion device at time t, represents the cooling power of the energy conversion equipment at time t, represents the heating power of the energy conversion equipment at time t; Respectively represent the amount of electricity, cooling and heating resources purchased; and Respectively represent the electricity, cooling and heating load requirements; dch k,t is the discharge power of device k at time t, ch k,t is the charging power of device k at time t; the objective function and constraint function are combined to obtain the mathematical optimization model.

[0019] Preferably, the simplex method is used to solve the mathematical optimization model.

[0020] The above technical solution of the present invention has the following advantages compared with the prior art:

[0021] 1. The present invention builds a carbon emission prediction model for the park and proposes a method for predicting carbon dioxide emissions in the park. The design is ingenious and the carbon emission prediction effect is good, which is conducive to the subsequent carbon trading, carbon accounting and energy conservation and carbon reduction work in the park.

[0022] 2. The present invention adds a step of conducting carbon emission optimization analysis on the park, which can further optimize carbon emissions and make up for the lack of research on carbon emission optimization, and is conducive to helping energy projects to better save energy and reduce emissions. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to make the content of the present invention more clearly understood, the present invention is further described in detail below according to specific embodiments of the present invention in conjunction with the accompanying drawings, wherein:

[0024] Figure 1 It is a schematic diagram of the process of the present invention;

[0025] Figure 2 The total comprehensive energy consumption of a certain region from 2020 to 2030 is predicted in Example 1;

[0026] Figure 3 This is a prediction graph of the carbon emission development curve for a certain region from 2021 to 2060 in Example 1. DETAILED DESCRIPTION

[0027] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.

[0028] Reference Figure 1 As shown, the present invention discloses a carbon emission prediction and optimization method, comprising the following steps:

[0029] Obtain comprehensive energy consumption data of various types of specified energy in the park within a preset historical time period.

[0030] Specifically, through government statistical yearbooks, economic bulletins, field surveys and other means, collect the production and consumption of comprehensive energy such as coal, oil, gas, electricity, and heat in the designated park in the past 5-10 years. For parks with secondary energy production such as electricity or heat, it is necessary to sort out the energy production and consumption of electricity or heat production enterprises in detail. According to the coefficient of converting each energy into standard coal, all energy production and consumption data in the park are converted into standard coal.

[0031] Determine whether there are energy conversion enterprises in the above-mentioned parks. If there are energy conversion enterprises, analyze and process the data of energy conversion enterprises. The data of energy conversion enterprises include key information such as installed capacity, utilization efficiency of secondary energy and enterprise production capacity. For example, for thermal power production enterprises, the annual gas consumption, annual heating amount and annual power generation of the enterprises should be collected, and the thermal efficiency and electrical efficiency of gas units should also be collected; if there are no energy conversion enterprises in the park, proceed to the next step.

[0032] Distinguish the energy production data, primary energy consumption data and secondary energy consumption data in the above comprehensive energy consumption data. Analyze the energy flow relationship in the park, clarify the production capacity of power and heat sources, clarify the amount of energy used for secondary energy production such as electricity and heat, and sort out the energy usage in the industrial, construction and transportation fields based on the statistical yearbooks and other data of previous years.

[0033] Analyze the changing patterns of the park's energy production data, primary energy consumption data, and secondary energy consumption data within a preset time period (preferably the past 5-10 years) to provide a basic data reference for energy production and consumption forecasts and carbon emissions forecasts for the next five years.

[0034] Determine whether it is necessary to conduct carbon emission forecasting analysis for the park. If not, directly conduct carbon emission optimization analysis for the park. If necessary, establish a carbon emission forecasting model for the park based on the change patterns obtained in the above steps and the economic and population data of the park in the past five years to predict the carbon emissions of the park, and conduct carbon emission optimization analysis for the park.

[0035] Preferably, it also includes measuring and analyzing the carbon emissions of the park. The calculation formula for the total carbon emissions of the park is: ∑E ci =∑F ci +∑E wci +∑H ci -∑G ci , where ∑E ci Represents the total carbon emissions of the park; ∑F ci Represents the total carbon emissions generated by the consumption of primary energy in the park; ∑E wci Represents the total carbon emissions generated by the consumption of external electricity in the park; ∑H ci Represents the total carbon emissions generated by the consumption of external heat in the park; ∑G ci It indicates the total carbon emissions of secondary energy produced and delivered by the park through the consumption of primary energy. Based on the park's carbon emission measurement and analysis and the park's carbon emission prediction model, the park's carbon emission forecast data within the preset time period is obtained.

[0036] Furthermore, the calculation formula for the forecast data of gas consumption in the park is: Among them, N represents the predicted data of gas consumption, n1 represents the heat-to-electricity ratio of the gas-fired thermal power enterprises in the park; Q represents the heat production of the gas-fired thermal power enterprises in the park; and n2 represents the thermal efficiency of the gas-fired thermal power enterprises in the park.

[0037] Among them, combined with the definition of heat-to-electricity ratio, the calculation formula for the heat-to-electricity ratio of gas-fired thermal power enterprises in the park is: Among them, E represents the power generation of gas-fired thermal power enterprises in the park.

[0038] Combined with the definition of thermal efficiency, the calculation formula for the thermal efficiency of gas-fired thermal power enterprises in the park is: B=b*N, where b is the conversion coefficient of gas to standard coal, and b is preferably 12.

[0039] Establishing a park carbon emission prediction model and predicting the park's carbon emissions specifically includes the following steps: (1) Obtaining the park's gas consumption prediction data, and using the gas consumption prediction data as the total carbon emission data generated by the park's consumption of primary energy. (2) Obtaining secondary energy consumption data within a preset time period (preferably in the past 5-10 years) and analyzing its changing rules, and obtaining the park's external secondary energy consumption prediction data based on the above changing rules. (3) Obtaining the carbon emissions of secondary energy produced, converted and delivered by the park through the consumption of primary energy within a preset time period (preferably in the past 5-10 years) and analyzing its changing rules, and obtaining the park's carbon emission prediction data based on the above changing rules. (4) The park's carbon emission prediction = A1 + A2 - A3, where A1 represents the total carbon emission data generated by the park's consumption of primary energy, A2 represents the park's external secondary energy consumption prediction data, and A3 represents the park's carbon emission prediction data obtained and delivered after consuming primary energy.

[0040] Carbon emission optimization analysis was conducted on the above-mentioned parks. The relevant energy equipment in the parks include power supply equipment: photovoltaic power generation, wind power, gas turbines, etc., cooling equipment: chillers, absorption refrigerators, heat pumps, etc., heating equipment: gas boilers, electric boilers, heat pumps, etc. From the perspective of energy supply and use, the essence of the above-mentioned equipment is to convert a certain form of energy into another form of energy with a certain efficiency. This plan summarizes this type of equipment as energy conversion equipment. Taking the chiller as an example, its input energy is electrical energy, its output energy is cooling, and its conversion efficiency is the chiller COP. Other energy conversion equipment can also be analyzed and modeled according to the same logic.

[0041] Preferably, the steps of conducting carbon emission optimization analysis on the above-mentioned park are: obtaining energy conversion equipment in the park, and constructing a mathematical optimization model for the carbon emissions of the energy conversion equipment. Solving the above-mentioned mathematical optimization model to obtain an initial energy conversion equipment configuration plan. Determine whether the initial energy conversion equipment configuration plan can meet the actual demand indicators of the project. If it deviates from the actual demand indicators of the project, solve the mathematical optimization model again to search for a new energy conversion equipment configuration plan, and save the energy conversion equipment configuration plan that meets the actual demand indicators of the project as the optimal energy conversion equipment configuration plan.

[0042] Get the conversion efficiency between different energy forms: Among them, P, C, H represent electric energy, cold energy and heat energy respectively; in and out represent input and output respectively; η represents the conversion efficiency between various energy sources, such as Indicates the power conversion efficiency, Indicates the efficiency of electric cooling.

[0043] When constructing the above mathematical optimization model: first establish the objective function of the mathematical optimization model: In the formula, e ele Indicates the amount of CO2 emitted when producing one unit of electricity; e gas Indicates the amount of CO2 emitted by one unit of gas; P t grid Indicates active power; f t total is the injection gas flow rate; Represents other carbon emissions. Secondly, the constraint function of the mathematical optimization model is established:

[0044] in, represents the power generated by the energy conversion device at time t, represents the cooling power of the energy conversion equipment at time t, represents the heating power of the energy conversion equipment at time t; Respectively represent the amount of electricity, cooling and heating resources purchased; and Respectively represent the electricity, cooling and heating load requirements; dch k,t is the discharge power of device k at time t, ch k,t is the charging power of device k at time t. Finally, the objective function and constraint function are combined to obtain a mathematical optimization model.

[0045] Further preferably, a simplex algorithm is used to solve the mathematical optimization model. The mathematical essence of the constructed operation optimization model is a linear programming problem. The solution of the model calls the simplex method solver embedded in the Tomlab platform for calculation. The algorithm is mature in technology for solving linear programming problems, has good solution stability, and high computational efficiency.

[0046] After solving the above mathematical optimization model, it is necessary to test whether the energy conversion equipment configuration plan can meet the actual engineering demand indicators.

[0047] The carbon emission calculation method for the park energy internet project proposed in this patent is conducive to the park's carbon trading, carbon accounting, energy conservation and carbon reduction work. It can make up for the lack of research on carbon emission calculation and carbon emission optimization of the park's energy internet project.

[0048] Embodiment 1

[0049] Carbon dioxide emission forecast analysis

[0050] Taking the carbon emission measurement and forecast analysis of an energy internet planning project in a certain park in Jiangsu Province as an example, the main energy consumption in this area is coal, refined oil, natural gas, liquefied petroleum gas, electricity, and heat. The local new energy is mainly solar rooftop photovoltaics. A gas-fired cogeneration power plant has been built in the area, which not only supplies the thermal load demand of the area, but also supplies electricity to outside the area.

[0051] The region's energy demand forecast for 2020-2030 is as follows: Figure 2 shown.

[0052] According to demand forecast analysis, the region's total social comprehensive energy consumption will be in the range of 945,000-1,041,000 tons of standard coal in 2025. In 2030, the region's total social comprehensive energy consumption will be in the range of 1,043,000-1,267,000 tons of standard coal.

[0053] Figure 2 Among them, scenario one: the total energy consumption increases by 2%; scenario two: the total energy consumption increases by 3%; scenario three: the total energy consumption increases by 4%; scenario four: from 2021 to 2025, the total energy consumption increases by 2.5%; from 2026 to 2030, the total energy consumption increases by 3.5%; scenario five: from 2021 to 2025, the total energy consumption increases by 4%.

[0054] Analysis of CO2 emissions from the whole society

[0055] Based on the above carbon dioxide emission forecast analysis, considering the continued promotion of various energy conservation and emission reduction work, the region's total social carbon dioxide emissions are simulated and predicted. Figure 3Shown is the forecast curve of carbon emissions development in a certain region from 2021 to 2060.

[0056] Depend on Figure 3 It can be seen that only under the development model of scenario 6 can the region achieve energy carbon peak in 2025. It can be seen that if we hope to achieve carbon peak in the energy field in 2025, we need to rationally plan the production and consumption of various types of energy and the layout of energy infrastructure.

[0057] The scenario is as follows: Basic scenario: The coal consumption in the region remains the same, and the coal consumption is slowly reduced year by year from 2030 to 2060; the oil consumption for transportation is considered to grow at a rate of 2%, and after 2040, the oil consumption for transportation will show a slow downward trend; the average annual growth rate of electricity consumption remains at about 3%. Scenario 1: Based on the basic scenario, the coal reduction efforts will be intensified after 2025, and the whole region will achieve coal-free development in 2030. Scenario 2: Based on Scenario 1, the coal reduction efforts will be further intensified, and the whole region will achieve coal-free development in 2025. Scenario 3: Based on Scenario 1, vigorously promote the green development of transportation and reduce oil consumption for transportation. Scenario 4: Based on Scenario 3, further reduce gas consumption in the commercial sector. Scenario 5: Based on Scenario 4, further promote residents to reduce gas consumption, promote the electrification of residents' kitchens and bathrooms, and promote the level of transportation electrification. Scenario 6: Based on Scenario 5, starting from 2031, further promote the transformation of local gas power plants into emergency power plants to fully absorb the power grid. At the same time, we will strive to ensure that industrial heat load no longer increases after 2030.

[0058] It can be seen from this case that the method proposed in this patent can reasonably and effectively solve the carbon emission analysis of industrial parks that contain energy production enterprises such as power plants and thermal power plants and supply energy to the outside of the industrial park.

[0059] Embodiment 2

[0060] Optimize energy conversion equipment configuration with the goal of optimizing carbon emissions

[0061] Taking a two-square-kilometer demonstration park as an example, the park plans to centrally supply cooling, heating and electricity loads within the park and provide integrated energy services. The main loads of the park are as follows: 150MW of electricity load, 462MW of building cooling, and 38MW of building air conditioning heat load. Because there is a data center in the park, the cooling load is much greater than the heat load. There are abundant water resources near the area, so water source heat pumps can be considered. At the same time, there is a thermal power plant near the area, so the use of waste heat resources from the power plant can also be considered. For this type of project, there are usually the following configuration options:

[0062] Option 1: Chiller + CHP + LiBr absorption heat pump + energy storage. System configuration: CHP 24MW, gas boiler 14MW, LiBr 38MW, chiller 413M, heat storage 6MW, cold storage 11MW.

[0063] Option 2 / 3: Chiller + electrode boiler / gas boiler + energy storage. Equipment configuration: Chiller 451M, electrode boiler 32MW, heat storage 6MW, cold storage 11MW.

[0064] Option 4: Lithium bromide absorption heat pump. Equipment configuration: 451MW lithium bromide, 6MW heat storage, 11MW cold storage.

[0065] Plan 5: Adopt the park carbon emission optimization method proposed in this patent to optimize the park's energy conversion equipment configuration plan: centralized + distributed water source heat pumps, energy conversion equipment configuration: water source heat pump 455MW, heat storage 6MW, cold storage 11MW.

[0066] The analysis results of the above cases are compared in Table 1:

[0067] Table 1 Comparison of analysis results of different schemes

[0068]

[0069]

[0070] It can be seen that in traditional energy conversion equipment configuration schemes, most are based on empirical schemes. However, empirical schemes have not been subjected to detailed data measurement and analysis in terms of system economy and carbon emissions, and are often not the best choice. The method proposed in this scheme can effectively make up for this deficiency and calculate the system configuration scheme under the optimal carbon emission target through mathematical optimization model.

[0071] Based on the perspective of the park's energy internet, this patent proposes a method for predicting the comprehensive energy carbon dioxide emissions of the park's energy system and optimizing the analysis of carbon dioxide emissions. It is conducive to the park's carbon accounting and energy conservation and carbon reduction work, and makes up for the lack of research on carbon emission measurement in the park's energy internet projects.

[0072] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0073] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0074] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0075] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0076] Obviously, the above embodiments are merely examples for clear explanation and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from these are still within the protection scope of the invention.

Claims

1. A carbon emission prediction and optimization method, It is characterized in that The following steps are involved: S1. Obtain comprehensive energy consumption data of various types of designated energy in the park within a preset historical time period and determine whether there is an energy conversion enterprise in the park. If so, analyze and process the data of the energy conversion enterprise; if not, directly proceed to the next step; S2. Distinguishing energy production data, primary energy consumption data and secondary energy consumption data in the comprehensive energy consumption data and analyzing the changing patterns of the energy production data, primary energy consumption data and secondary energy consumption data within a preset time period; S3. Determine whether it is necessary to conduct carbon emission forecasting analysis on the park. If so, establish a park carbon emission forecasting model according to the change law to predict the carbon emission of the park, and conduct carbon emission optimization analysis on the park; if not, directly conduct carbon emission optimization analysis on the park; The establishment of a park carbon emission prediction model to predict the park's carbon emissions specifically includes: Obtaining forecast data on gas consumption in the industrial park, and using the forecast data on gas consumption as total carbon emissions data generated by primary energy consumption in the industrial park; Obtain secondary energy consumption data within a preset time period and analyze its changing pattern, and obtain consumption forecast data of external secondary energy in the park based on the changing pattern; Obtain the carbon emissions of secondary energy produced, converted and delivered by the park through the consumption of primary energy within a preset time period and analyze its changing pattern, and obtain the carbon emissions forecast data of secondary energy obtained and delivered after the park consumes primary energy according to the changing pattern; The predicted carbon emissions of the park = A1 + A2 - A3, where A1 represents the total carbon emissions generated by the park's consumption of primary energy, A2 represents the predicted consumption of external secondary energy in the park, and A3 represents the predicted carbon emissions of secondary energy obtained and delivered after the park consumes primary energy; The calculation formula for the forecast data of gas consumption in the park is: Where N represents the gas consumption forecast data, n 1 represents the heat-to-electricity ratio of the gas-fired thermal power enterprises in the park; Q represents the heat output of the gas-fired thermal power enterprises in the park; n 2 Indicates the thermal efficiency of gas-fired thermal power enterprises in the park; The calculation formula for the heat-to-electricity ratio of the gas-fired thermal power enterprises in the park is: Among them, E represents the power generation of gas-fired thermal power enterprises in the park; The calculation formula for the thermal efficiency of the gas-fired thermal power enterprises in the park is: Among them, B = b*N, b is the conversion coefficient of gas to standard coal; Carry out carbon emission optimization analysis for the park, including: Obtain energy conversion equipment in the park, and construct a mathematical optimization model for the carbon emissions of the energy conversion equipment; Solving the mathematical optimization model to obtain an initial energy conversion equipment configuration plan; Determine whether the initial energy conversion equipment configuration scheme can meet the actual demand indicators of the project. If it deviates from the actual demand indicators of the project, solve the mathematical optimization model again to search for a new energy conversion equipment configuration scheme, and save the energy conversion equipment configuration scheme that meets the actual demand indicators of the project as the optimal energy conversion equipment configuration scheme; "Constructing the mathematical optimization model" specifically includes the following steps: The objective function of the mathematical optimization model is established: In the formula, e ele Indicates the amount of carbon dioxide emitted when producing one unit of electricity; e gas Indicates the amount of carbon dioxide emitted by one unit of gas; P t grid Indicates active power; f t total is the injection gas flow rate; represents other carbon emissions; Establish the constraint function of the mathematical optimization model: in, represents the power generated by the energy conversion device at time t, represents the cooling power of the energy conversion equipment at time t, represents the heating power of the energy conversion equipment at time t; Respectively represent the amount of electricity, cooling and heating resources purchased; and Respectively represent the electricity, cooling and heating load requirements; dch k,t is the discharge power of device k at time t, ch k,t is the charging power of device k at time t; The objective function and constraint function are combined to obtain the mathematical optimization model.

2. The carbon emission prediction and optimization method according to claim 1, It is characterized in that The data of the energy conversion enterprises include: installed capacity, secondary energy utilization efficiency and enterprise production capacity.

3. The carbon emission prediction and optimization method according to claim 1, It is characterized in that The S3 also includes: park carbon emission measurement and analysis; The total carbon emissions of the park are calculated as follows: ∑E ci =∑F ci +∑E wci +∑H ci -∑G ci ; Among them, ∑E ci Represents the total carbon emissions of the park; ∑F ci Represents the total carbon emissions generated by the consumption of primary energy in the park; ∑E wci Represents the total carbon emissions generated by the consumption of external electricity in the park; ∑H ci Represents the total carbon emissions generated by the consumption of external heat in the park; ∑G ci It represents the total carbon emissions of secondary energy produced, converted and delivered by the park through the consumption of primary energy; According to the park carbon emission measurement and analysis and the park carbon emission prediction model, the park's carbon emission prediction data within a preset time period is obtained.

4. The carbon emission prediction and optimization method according to claim 1, It is characterized in that The mathematical optimization model is solved using the simplex method.

Citation Information

Patent Citations

  • Energy utilization efficiency evaluation method and system

    CN103455718A

  • Analysis method for carbon emission characteristics

    CN105046053A

  • Low-carbon energy planning method and system

    CN109840655A

  • Carbon accounting amount determination method, system and device, equipment and storage medium

    CN110634084A

  • Residential building gas carbon emission prediction method

    CN112329262A

Cited By

  • Carbon emission optimization method and system

    CN119919032A

  • A carbon emission optimization method and system

    CN119919032B

  • Park carbon emission power utilization optimization method, system and equipment based on multi-source data and medium

    CN120611820A

  • Park carbon emission power consumption optimization method, system, device and medium based on multi-source data

    CN120611820B