A method and system for optimizing group charging

By acquiring the status information of electric vehicle charging equipment and distribution substations, and calculating and allocating the regulation power of the charging equipment, the problem of grid instability caused by the independent operation of electric vehicle charging equipment is solved, and the safe and stable operation of the power grid and the optimized allocation of resources are achieved.

CN114336709BActive Publication Date: 2026-11-10FUZHOU POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111673517.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-31
Publication Date
2026-11-10
Estimated Expiration
2041-12-31

AI Technical Summary

Technical Problem

In existing technologies, electric vehicle charging equipment operates independently and lacks information sharing, which makes it impossible to make comprehensive judgments and controls within the distribution area. This may lead to peak-on-peak and peak electricity consumption in the power grid, affecting the safety and economy of power grid operation.

Method used

By acquiring the status information of charging equipment and distribution substations, the adjustment power of each charging equipment is calculated, and the corresponding charging power is generated. A classification adjustment strategy is adopted to prioritize the allocation of power to high-power equipment, rationally allocate power resources, and avoid overload conditions.

Benefits of technology

It has enabled the safe and stable operation of the power grid, improved power utilization, prevented power grid overload, and optimized the business turnover rate of charging equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114336709B_ABST
    Figure CN114336709B_ABST
Patent Text Reader

Abstract

This invention discloses a group charging optimization method and system. The optimization method includes: acquiring charging equipment status information and distribution transformer area status information; calculating the adjustment power of each charging equipment in the charging state based on the acquired status information; and generating the corresponding charging power of the charging equipment based on the adjustment power. The charging equipment status information includes equipment operating status, rated charging power, AC input phase voltage, and AC input phase current. The distribution transformer area status information includes AC three-phase phase voltage, AC three-phase phase current, and rated load capacity of the distribution transformer. The optimization system includes a charging power acquisition module, a distribution load acquisition module, a calculation module, and a generation module. This novel group charging optimization method and system optimizes the orderly charging mode of electric vehicles and improves the safety of power grid operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of electric vehicle charging technology, and in particular to a method and system for optimizing group charging. Background Technology

[0002] With the rapid development of electric vehicles, the planning of electric vehicle infrastructure construction needs to focus on how to scientifically and orderly schedule the charging power of electric vehicles and flexibly and conveniently adjust the power grid operation status to reduce the impact and adverse effects caused by electric vehicles connecting to the grid, and improve the economic efficiency and safety of grid operation. By studying control methods for the dynamic and orderly charging power of electric vehicles, it is possible to effectively avoid disorderly charging of electric vehicles and the "peak-on-peak" or even new peak electricity demand caused by users' random charging behavior in scenarios of concentrated high-power charging and peak charging. Therefore, researching orderly charging strategies at the edge device level and realizing intelligent control of charging piles to improve the operational stability and energy utilization rate of the power system has significant theoretical and practical implications for the safe and economical operation of the power grid. Summary of the Invention

[0003] To overcome the above-mentioned shortcomings, the present invention aims to provide a group-optimized charging method and system that optimizes the orderly charging mode of electric vehicles and improves the safety of power grid operation.

[0004] To achieve the above objectives, one of the technical solutions adopted by the present invention is: a group charging optimization method, comprising: acquiring charging equipment status information and distribution transformer area status information; calculating the adjustment power of each charging equipment in the charging state based on the acquired status information; generating the corresponding charging power of the charging equipment based on the adjustment power; wherein, the charging equipment status information includes equipment operating status, equipment rated charging power, equipment AC input side phase voltage, and equipment AC input side phase current; the distribution transformer area status information includes AC three-phase phase voltage, AC three-phase phase current, and distribution transformer rated load capacity.

[0005] Furthermore, calculating the adjustable power of each charging device in a charging state includes: calculating the total allocatable charging capacity P of the system. ENCHG ; Calculate the total rated charging capacity RP of the charging devices currently in a charging state. CH Calculate the charge-to-discharge ratio (DCR); calculate the adjustable power (P) of each charging device. adj Among them, when the charging ratio DCR ≥ 1, the adjustment power P of each charging device is... adj Its rated output power; when the charging ratio DCR < 1, the regulating power P of each charging device is allocated according to the regulation and distribution method. adj The formula for calculating the fill ratio (DCR) is as follows: ; In the formula, P ENCHG RP represents the total allocatable charging capacity of the system. CH The total rated charging capacity for all charging devices that are in a charging state.

[0006] Furthermore, the total rated charging capacity RP of the charging devices currently in a charging state... CH When doing so, the charging equipment needs to be classified: all charging equipment should be classified in descending order of rated power into K1, K2, and so on. n , total K chp The classes, whose corresponding rated power is P chp (K1), P chp (K2) to P chp (K n The number of devices in the charging state are M1, M2 to M... K Total M chp tower.

[0007] Furthermore, the control allocation method includes: setting a total power limit COERP for K1 type charging devices. CH (K1); Calculate the adjustable power of charging devices of type K1; correct the total allocable charging capacity of the system; and calculate the charging state of devices K2 to K1 in sequence according to the above steps. n Power adjustment for different types of charging equipment. Based on the different rated power of the charging equipment, priority is given to adjusting the power of charging equipment with higher rated power, so as to make the power distribution in the distribution area more reasonable and optimize the overall charging turnover rate of charging equipment in the distribution area.

[0008] Furthermore, the total power limit COERP CH The formula for calculating (K1) is: COERP CH (K1) = COE × RP ch (K1), where RP ch (K1) represents the total rated power of the K1 type of device in the charging state; the value of COE ranges from 0 to 1.

[0009] Furthermore, when calculating the regulating power of K1 class charging devices, when COERP CH (K1)≤P ENCHG When the device is charging, the regulating power P of the K1 type device will be adjusted. adj (K1) represents COE×P CHP (K1), otherwise return to the previous step and reset the value of COE.

[0010] Furthermore, the total allocatable charging capacity P of the system ENCHG The calculation formula is: ; In the formula, P STC For allocable charging static capacity, P DYM For allocable dynamic charging capacity, R ATIO To allow for charging capacity redundancy.

[0011] Furthermore, the allowable charging capacity redundancy rate ranges from 0.5 to 1.0.

[0012] Furthermore, the formula for calculating the allocatable dynamic charging capacity is: P DYM =P DN -P NCH , where P NCH For non-charging total AC three-phase load; P NCH The calculation formula is: P NCH =P DS -P CH , where P CH The total AC three-phase load is for charging.

[0013] The second technical solution adopted in this invention is a group charging optimization system, including a charging power acquisition module, a power distribution load acquisition module, a calculation module, and a generation module. The charging power acquisition module is built into the charging equipment to collect the status information of the charging equipment; the power distribution load acquisition module is used to collect the status information of the power distribution area; the calculation module is used to calculate the charging regulation power of each charging equipment; and the generation module is used to generate charging control commands based on the charging regulation power and send the charging control commands to the corresponding charging equipment.

[0014] The beneficial effects of this invention are as follows: by calculating the adjustment power of each charging device and generating the corresponding charging power of the charging device, the charging power of each charging device can be reasonably allocated according to the state of the distribution substation, avoiding overload of the distribution substation, so that the charging power of the charging device is always affected by the load of the distribution substation, and the charging power is always under the charging power of safe operation of the distribution network, thus playing a role in protecting the distribution substation. Attached Figure Description

[0015] Figure 1 This is a flowchart illustrating the optimization method according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the framework of the optimization system according to an embodiment of the present invention. Detailed Implementation

[0016] The preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby providing a clearer and more explicit definition of the scope of protection of the present invention.

[0017] Example With the rapid development of electric vehicles (EVs), the planning of EV infrastructure construction needs to focus on how to scientifically and orderly schedule EV charging power and flexibly and conveniently adjust the power grid's operating status to reduce the impact and adverse effects of EVs connecting to the grid and improve the economic efficiency and safety of grid operation. Currently, the common practice in EV infrastructure planning is to equip a distribution substation with multiple types of charging equipment, which then connect to EVs for charging. However, currently, most charging equipment operates independently, and there is no information exchange between them, making it impossible to comprehensively judge, analyze, and control each charging device within the distribution substation. When high-power charging occurs simultaneously within the same distribution substation, or during peak charging scenarios, users' random charging behavior may cause "peak-on-peak" conditions on the power grid or even create new peak electricity demand. Therefore, it is necessary to study orderly charging strategies at the edge device level to achieve intelligent control of charging equipment.

[0018] Based on this, see Appendix Figure 1 As shown, a group charging optimization method in this embodiment includes: S1, acquiring charging device status information and distribution station status information; S2, calculating the adjustment power of each charging device in the charging state based on the acquired status information; S3, generating the corresponding charging power of the charging device based on the adjustment power.

[0019] In step S1, the charging equipment status information includes the equipment operating status, the equipment rated charging power, the equipment AC input phase voltage, and the equipment AC input phase current. The distribution transformer area status information includes the AC three-phase phase voltage, the AC three-phase phase current, and the distribution transformer rated load capacity.

[0020] By calculating the adjustment power of each charging device and generating the corresponding charging power, the charging power of each charging device can be reasonably allocated according to the status of the distribution substation, avoiding overload of the distribution substation, ensuring that the charging power of the charging device is always affected by the load of the distribution substation, and ensuring that the charging power is always under the charging power of safe operation of the distribution network, thus protecting the distribution substation.

[0021] Step S2 includes: S21, calculating the total allocatable charging capacity P of the system. ENCHG S22. Calculate the total rated charging capacity RP of the charging devices currently in the charging state. CH S23. Calculate the charge-to-discharge ratio (DCR); S24. Calculate the adjustment power (P) of each charging device. adj .

[0022] Among them, S21, the total allocatable charging capacity P of the computing system ENCHG Specifically: S211, Calculate the total AC three-phase load P for charging. CH This refers to the total AC output power of all charging devices within the distribution area, calculated using the following formula:

[0023] In the formula, N chp P is the total number of charging devices within the distribution area. chp (n) is the AC output power of the nth charging device.

[0024] P chp The formula for calculating (n) is as follows: P chp (n)=U A ·I A +U B ·I B +U C ·I C In the formula, U A U B U C These are the phase voltages of the three-phase AC circuits A, B, and C of the nth charging device, I. A I B I C U represents the phase currents A, B, and C of the three-phase AC circuit for the nth charging device. A U B U C I A I B I C All are obtained directly from step S1.

[0025] S212. Calculate the total non-charging AC three-phase load P. NCH This refers to the total AC output power of all non-charging devices within the distribution area, calculated using the following formula: P NCH =P DS -P CH S213, The allocatable dynamic charging capacity P of the computing system DYM The calculation formula is as follows: P DYM =PDN-P NCH S214, Calculate the total allocatable charging capacity P of the system ENCHG The calculation formula is as follows: ; In the formula, P STC For allocable charging static capacity, P DYM For allocable dynamic charging capacity, RATIO To allow for charging capacity redundancy.

[0026] Within the distribution area, besides charging equipment, some non-charging equipment also requires power allocation. Therefore, before adjusting the power of the charging equipment, the power required by the non-charging equipment must be deducted. In step S21, the allocatable dynamic charging capacity within the system after deducting non-charging equipment is first calculated, and the final allocatable total charging capacity of the system is obtained by comparing the allocatable dynamic charging capacity with the allocatable static charging capacity. Step S214 can adjust the total allocatable charging capacity P of the system. ENCHG Proper configuration is required to maximize the total allocatable charging capacity of the system. PENCHG Maximize the power output without affecting the total load of the distribution area, which facilitates power regulation of subsequent charging equipment.

[0027] S22. Calculate the total rated charging capacity RP of the charging devices currently in the charging state. CH Specifically: S221. Classify all charging equipment within the distribution transformer area. The classification method is as follows: classify all charging equipment in descending order of rated power into K1, K2 to K... n There are n categories in total, and the rated power of each type of charging device is P. chp (K1), P chp (K2) to P chp (K n Among various types of charging equipment, the number of devices currently in a charging state are M1, M2 to M... x A total of k units.

[0028] For example, if there are three types of charging devices with rated power of 20kW, 15kW and 7kW in the distribution area, the charging device with rated power of 20kW is a K1 type charging device, the charging device with rated power of 15kW is a K2 type charging device and the charging device with rated power of 7kW is a K3 type charging device.

[0029] S222. Calculate the total rated charging capacity RP of each of the Kth type of devices currently in the charging state. CH (K), the calculation formula is as follows:

[0030] In the formula, RP chp (m,k) represents the rated power of the m-th unit in class K, where m takes values ​​from 1, 2 to x; M x This indicates the number of devices in the Kth category that are in a charging state.

[0031] S223. Calculate the total rated charging capacity RP of all charging devices currently in a charging state. CH The calculation formula is as follows:

[0032] S33. The fill ratio DCR is calculated as follows:

[0033] S24. Calculate the adjustment power P of each charging device. adj To calculate the adjustment power P of each charging device based on the DCR (Distribution Rate of Charge) judgment result. adj Specifically: When the charge-to-discharge ratio (DCR) ≥ 1, the adjustable power of each charging device in the charging state is its rated output power, i.e., P. adj (K n ) = P chp (K n ).

[0034] When the charging ratio DCR < 1, the regulating power of each charging device in the charging state is allocated according to the control allocation method. The control allocation method includes: S241, setting the total limit power COERP for K1 type charging devices. CH (K1); S242, calculate the adjustable power of charging devices of type K1; S243, correct the total allocable charging capacity of the system; S244, repeat steps S241, S242, and S243 to calculate the charging state of devices K2 to K1 in sequence. n Adjustable power of such devices.

[0035] In step S241, the total limit power COERP CH The formula for calculating (K1) is: COERP CH (K1) = COE × RP ch (K1) In the formula, RPch(K1) is the total rated power of the K1 type of device in the charging state; the value of COE ranges from 0 to 1.

[0036] In step S242, when COERP CH (K1)≤P ENCHG When the device is charging, the regulating power P of the K1 type device will be adjusted. adj The formula for calculating (K1) is: P adj (K1)=COE×P chp (K1), otherwise return to step S241 to reset the COE value.

[0037] It is important to note that before proceeding to step S241, multiple values ​​between 0 and 1 must first be selected and arranged in descending order. In step S241, COE prioritizes selecting the maximum value among these values. When COERP is in step S242... CH (K1) is greater than P ENCHG If the condition is met, return to step S241 and reselect the second largest value from these values ​​for COE, and so on, until COERP is reached. CH (K1) satisfies that it is less than or equal to P. ENCHG until.

[0038] For example, the values ​​of COE can be: 1.00, 0.90, 0.85, 0.75, 0.50, 0.25, 0.10, 0.00. Alternatively, the values ​​of COE can be: 1.00, 0.90, 0.80, 0.70, 0.60, 0.50, 0.40, 0.30, 0.20, 0.10, 0.00.

[0039] In step S243, after deducting the adjusted power already allocated to the M1 charging devices of type K1, the corrected total allocable charging capacity NEWP is obtained. ENCHG That is: NEWP ENCHG =P ENCHG -M1×P adj (K1); then NEWP ENCHG Replace P ENCHG .

[0040] In step S244, steps S241, S242, and S243 are repeated to calculate the K2 to K3 charging states sequentially. n Adjustable power of such devices.

[0041] In existing technologies, group charging often adopts a first-come, first-served or evenly distributed charging strategy, which does not take into account the effective utilization time of charging equipment with different output power types. This results in a low overall charging turnover rate in the distribution area. Therefore, this invention classifies the rated power of charging equipment and prioritizes the power adjustment of charging equipment with higher rated power when allocating power adjustment. This can improve the effective utilization time of high-power charging equipment and optimize the overall business turnover rate of charging equipment in the distribution area.

[0042] See appendix Figure 2As shown in the figure, this embodiment also provides a group charging optimization system, including a charging power acquisition module, a power distribution load acquisition module, a calculation module, and a generation module. The charging power acquisition module is built into the charging equipment to collect the status information of the charging equipment. The power distribution load acquisition module is used to collect the status information of the power distribution area. The power distribution load acquisition module can be configured inside the power distribution acquisition equipment in the power distribution area, or connected to the power distribution acquisition equipment in the power distribution area via wired or wireless communication. The calculation module is used to calculate the charging regulation power of each charging device. The generation module is used to generate charging control commands based on the charging regulation power and send the charging control commands to the corresponding charging devices.

[0043] The group charging optimization method and system of the present invention can calculate the adjustment power of the charging equipment according to the different power of the charging equipment and generate the corresponding charging power, thereby realizing the rational allocation of power in the distribution transformer area, avoiding overload of the distribution transformer area, ensuring that the charging power of the charging equipment is always affected by the load of the distribution transformer area, and ensuring that the charging power is always under the charging power of safe operation of the distribution network, thus protecting the distribution transformer area. In addition, it can also improve the effective utilization time of high-power charging equipment and improve the overall business turnover rate of charging equipment in the distribution transformer area.

[0044] The above embodiments are only for illustrating the technical concept and features of the present invention. Their purpose is to enable those skilled in the art to understand the content of the present invention and implement it. They should not be used to limit the scope of protection of the present invention. All equivalent changes or modifications made in accordance with the spirit and essence of the present invention should be covered within the scope of protection of the present invention.

Claims

1. A method for optimizing group charging, characterized in that, include: Acquire status information of charging equipment and distribution transformer area; calculate the adjustment power of each charging equipment in the charging state based on the acquired status information; generate the corresponding charging power of the charging equipment based on the adjustment power; wherein, the status information of charging equipment includes equipment operating status, equipment rated charging power, equipment AC input phase voltage, and equipment AC input phase current; the status information of distribution transformer area includes AC three-phase phase voltage, AC three-phase phase current, and distribution transformer rated load capacity; Calculating the adjustment power of each charging device in the charging state includes: obtaining the final total allocable charging capacity P of the system by comparing the allocable dynamic charging capacity with the allocable static charging capacity. ENCHG ; Calculate the total rated charging capacity RP of the charging devices currently in a charging state. CH Calculate the charge-to-discharge ratio (DCR); calculate the adjustable power (P) of each charging device. adj Among them, when the charging ratio DCR ≥ 1, the adjustment power P of each charging device is... adj Its rated output power; when the charging ratio DCR < 1, the regulating power P of each charging device is allocated according to the regulation and distribution method. adj The formula for calculating the fill ratio (DCR) is as follows: ; In the formula, P ENCHG RP represents the total allocatable charging capacity of the system. CH The total charging capacity is determined for all charging devices that are currently charging. The total rated charging capacity RP of the charging devices currently in a charging state CH When doing so, the charging equipment needs to be classified: all charging equipment should be classified in descending order of rated power into K1, K2, and so on. n There are n categories in total, and their corresponding rated powers are P. chp (K1), P chp (K2) to P chp (K n The number of devices in the charging state are M1, M2 to M... K A total of k units; The control and allocation sub-method includes: setting a total power limit (COERP) for K1 type charging devices. CH (K1); Calculate the adjustable power of charging devices of type K1; correct the total allocable charging capacity of the system; sequentially calculate the charging state of devices K2 to K... n Adjustable power of such equipment; The system's total allocatable charging capacity P ENCHG The calculation formula is: ; In the formula, P STC For allocable charging static capacity, P DYM For allocable dynamic charging capacity, R ATIO To allow for charging capacity redundancy; The allowable charging capacity redundancy rate is within the range of 0.

5. 1.0; The formula for calculating the allocatable dynamic charging capacity is: P DYM =P DN P NCH , where P NCH For non-charging total AC three-phase load; P NCH The calculation formula is: P NCH =P DS P CH , where P CH For the total AC three-phase load of the charging circuit, P DN For the total AC three-phase load of the power distribution network, P DS The total AC three-phase load of the distribution radio station area.

2. The group charging optimization method according to claim 1, characterized in that, Total power limit COERP CH The formula for calculating (K1) is: COERP CH (K1) = COE × RP ch (K1), where RP ch (K1) represents the total rated power of the K1 type of device in the charging state; the value of COE ranges from 0. Between 1 and 2.

3. The group charging optimization method according to claim 2, characterized in that, When calculating the regulating power of K1 type charging equipment, when COERP CH (K1)≤P ENCHG When the device is charging, the regulating power P of the K1 type device will be adjusted. adj (K1) represents COE×P CHP (K1), otherwise return to the previous step and reset the value of COE.

4. A group charging optimization system, characterized in that, The device includes a charging power acquisition module, a power distribution load acquisition module, a calculation module, and a generation module. The charging power acquisition module is built into the charging device and is used to acquire the status information of the charging device. The power distribution load acquisition module is used to acquire the status information of the power distribution area. The calculation module is used to execute the group charging optimization method according to any one of claims 1 to 3. The generation module is used to generate charging control commands based on the charging adjustment power and send the charging control commands to the corresponding charging devices.

Citation Information

Patent Citations

  • Electric automobile charging power regulating method and system

    CN109327035A

  • Method and system for managing and controlling ordered charging of charging piles by transformer area intelligent fusion terminal

    CN113725864A