Multi-objective dynamic dispatching method for wind, water and thermal power system based on double-level optimization

Through the double-layer optimization model and beetle search algorithm, combined with the regulation capabilities of hydropower and thermal power, the problem of neglected hydropower regulation capabilities and difficulty in parameter setting of intelligent optimization algorithms in the existing technology has been solved, and the output stability of thermal power units and the system have been achieved. The goal of lowest operating cost fully utilizes the hydropower regulation capabilities and reduces the impact of wind power uncertainty.

CN114362242BActive Publication Date: 2024-10-18XIAN UNIV OF TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111499995.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-09
Publication Date
2024-10-18
Estimated Expiration
2041-12-09

AI Technical Summary

Technical Problem

The existing power system dispatching ignores the regulating capabilities of hydropower and the operating efficiency of traditional thermal power units, making it difficult for hydropower to fully exert its regulating role, and the intelligent optimization algorithm has local optimal problems and difficulty in parameter setting.

Method used

A multi-objective dynamic dispatching method for wind, water, thermal power systems based on double-layer optimization is used, combined with the beetle search algorithm, to establish a hierarchical optimization model, taking into account the different adjustment capabilities of hydropower, optimizing the output stability of thermal power units and system operating costs, and processing it through a penalty function Constraints are used to solve the model using the beetle search algorithm.

Benefits of technology

It achieves the goal of stable output of thermal power units and lowest system operating costs, fully stimulates the adjustment ability of hydropower, reduces the impact of wind power uncertainty on system dispatch, avoids wind abandonment, and improves the accuracy and reliability of dispatch results. sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114362242B_ABST
    Figure CN114362242B_ABST
Patent Text Reader

Abstract

The invention discloses a multi-objective dynamic dispatch method for a wind, water, fire and power system based on double-layer optimization, comprising the following steps: step 1, establishing a double-layer optimization model for the multi-objective dynamic economic dispatch of a wind, water, fire and power system; step 2, designing a processing strategy for equality constraints and inequality constraints; step 3, using a beetle whisker search algorithm to solve the double-layer optimization dispatch model. The method of the invention adopts a beetle whisker search algorithm, which is suitable for solving a dynamic optimization dispatch model containing large-scale nonlinear coupling constraints and objective functions. The algorithm has few parameter settings and is easy to implement, thereby improving the accuracy and reliability of the dispatch result.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of power system optimization and dispatching, and in particular relates to a multi-objective dynamic dispatching method for a wind, water, and fire power system based on double-layer optimization. Background Art

[0002] In order to alleviate the serious pollution problem caused by traditional thermal power generation to the environment, new energy represented by wind power has developed rapidly, and its proportion in the power system is increasing. It has become an inevitable trend to incorporate wind power into the power system dispatch. However, the unpredictability and volatility of wind power have brought huge challenges to the stable operation of the power system. Hydropower is a clean, flexible and adjustable power source. It is an effective means to use the regulation capacity of hydropower to alleviate the impact of the randomness of wind power. The existing dispatching strategy gives little consideration to the regulation capacity of hydropower, and ignores the operating efficiency of traditional thermal power units. It only pursues the consumption of wind power, which is not conducive to the full play of the regulation capacity of hydropower. The power generation and regulation capacity of hydropower are related to many factors such as the amount of water that can be dispatched. The different amount of water that can be dispatched has different regulation effects. How to integrate hydropower into a large system containing wind power and thermal power is of great significance to give full play to the regulation role of hydropower.

[0003] In the process of establishing the operation mathematical model for various types of power plants, the valve point effect and climbing ability of thermal power units are taken into consideration, making the dispatch model a non-convex, nonlinear, multi-objective optimization problem, which increases the difficulty of solving the model. Solving this complex model is also the focus of research by scholars at home and abroad. At present, most of the algorithms adopted are intelligent optimization algorithms, including genetic algorithms, particle swarm algorithms, simulated annealing algorithms, etc. However, many intelligent algorithms have the problem of falling into local optimality, or have complex principles and difficult parameter settings. Summary of the invention

[0004] The purpose of the present invention is to provide a multi-objective dynamic scheduling method for wind, water and fire power systems based on double-layer optimization, based on the longicorn search algorithm, taking into account the different regulation capabilities of hydropower, and achieving the economy and stability of the operation of the wind, water and fire combined power system.

[0005] The technical solution adopted by the present invention is a multi-objective dynamic dispatching method of wind, water, fire and power system based on double-layer optimization, comprising the following steps:

[0006] Step 1: Establish a two-level optimization model for multi-objective dynamic economic dispatch of wind, water, and thermal power systems;

[0007] Step 2: Design strategies for handling equality constraints and inequality constraints;

[0008] Step 3: Use the beetle whisker search algorithm to solve the two-layer optimization scheduling model.

[0009] The present invention is also characterized in that

[0010] Step 1 is as follows:

[0011] Step 1.1, establish the first-level optimization target with the goal of making the total output curve of thermal power the most stable, and provide boundary conditions for the second-level optimization;

[0012] Step 1.2: Establish the second optimization target with the goal of minimizing the system operation cost. The operation cost includes the fuel cost, start-up and shutdown cost, ramp cost of the thermal power plant, and the wind farm’s wind abandonment cost.

[0013] Step 1.3: Determine the constraints of the optimization model.

[0014] In step 1.1, the first-level optimization target F1 is established with the goal of achieving the most stable total output curve of thermal power units:

[0015]

[0016] Where: T is the total number of dispatching time periods, t represents time t, t∈T; G is the number of wind turbines, k represents wind turbine k, k∈G; M is the total number of hydropower units, j represents hydropower unit j, j∈M; P Lt is the load value during period t; P Hjt is the output power of hydropower unit j at time t; P Wkt is the actual output of wind turbine k at time t.

[0017] In step 1.2, the second-level optimization goal F2 is established with the goal of minimizing the system operation cost, specifically:

[0018] minF2=C1+C2+C3+C4 (2)

[0019] Where C1, C2, C3, and C4 represent the fuel cost, start-up and shutdown cost, ramp cost, and wind farm abandonment cost of thermal power plants, respectively. The specific calculation formula is as follows:

[0020] 1) Fuel cost of thermal power plant considering penalty effect C1

[0021]

[0022] Where: N represents the total number of thermal power units, i represents unit i, i∈N; P Tit is the active power of thermal power unit i at time t; is the minimum active power of thermal power unit i at time t; a i ,b i ,c i ,d i ,e i is the fuel cost coefficient of thermal power unit i;

[0023] 2) Start-up and shutdown costs of thermal power plants C2

[0024]

[0025] Where: S Tit is the startup cost of thermal power unit i at time t; u it Represents the state of thermal power unit i at time t. When u it =1When the unit is in the power-on state, when u it =0 when the unit is in shutdown state;

[0026] 3) Ramp-up cost of thermal power plant C3

[0027]

[0028] Where: γ is the climbing cost factor;

[0029] 4) Wind curtailment cost C4

[0030]

[0031] Where: is the upper limit of the deviation between the actual output and the predicted output of the kth wind turbine at time t, G is the number of wind turbines, and λ is the penalty coefficient for wind abandonment cost.

[0032] In step 1.3, the constraints of the optimization model include system power balance constraints, thermal power unit operation constraints, hydropower unit operation constraints, wind farm operation constraints, and system reserve constraints;

[0033] in,

[0034] 1) System power balance constraints

[0035]

[0036] Where: P Lt is the load value in period t;

[0037] 2) Output constraints of thermal power units

[0038]

[0039] Where: is the minimum output of the thermal power unit; is the maximum output of the thermal power unit, and this parameter is the known rated value of the unit;

[0040] 3) Minimum startup and shutdown time constraints for thermal power units

[0041]

[0042] Where: The cumulative startup time of the unit; The cumulative downtime of the unit; The minimum continuous start time of the unit; The minimum continuous downtime of the unit;

[0043] 4) Climbing constraints of thermal power units

[0044] V down,i ≤P Tit -P Ti(t-1) ≤V up,i (10)

[0045] Where: V down,i is the downward climbing rate of thermal power unit i; V up,i is the upward climbing rate of thermal power unit i;

[0046] 5) Output constraints of hydropower units

[0047]

[0048] Where: is the minimum output of hydropower unit j; is the maximum output of hydropower unit j;

[0049] 6) Reservoir water storage capacity constraints

[0050]

[0051] Where: are the minimum and maximum water storage capacities of the reservoir corresponding to hydropower unit j at time t; X jt is the actual water storage capacity of hydropower plant j at time t;

[0052] 7) Reservoir discharge constraints

[0053]

[0054] Where: are the minimum and maximum discharge of the reservoir corresponding to hydropower unit j at time t; Q jt is the actual water discharge of the reservoir corresponding to hydropower unit j at time t;

[0055] 8) Daily scheduling of available water constraints

[0056]

[0057] Where: W min,j , W max,jis the minimum and maximum available water volume for power generation allocated to the reservoir corresponding to hydropower unit j after the reservoir dispatching department considers the comprehensive application of the reservoir; the index representing the hydropower regulation capacity is

[0058] 9) Wind farm output constraints

[0059]

[0060] Where: P Wkt is the actual output of wind turbine k at time t; is the predicted output of wind turbine k at time t; It is the deviation between the actual wind power output and the predicted output; and They are the upper and lower limits of the deviation between the actual output and the predicted output respectively;

[0061] The wind power output range is

[0062] 10) System backup constraints

[0063]

[0064] Where: k d and k w The fluctuation coefficients of load and wind power respectively.

[0065] The specific process of step 2 is:

[0066] In the first level optimization: for the equality constraint (7), the penalty function is used to add the penalty term that violates the equality constraint to the objective function, increase the penalty factor, and continuously judge the error accuracy of the equality constraint until the accuracy requirement is met. When the optimal solution that minimizes the objective function is obtained, since the penalty factor is selected to be large enough, the optimal solution must satisfy the equality constraint. The penalty term is expressed as:

[0067]

[0068] Where: f penalty represents the penalty function; σ represents the penalty factor, which is a positive number;

[0069] For the processing of inequality constraints, we choose to iterate continuously to make the independent variable take values ​​within the specified interval, and then compare the function values ​​of the left and right whiskers in the beetle whisker search algorithm until the optimal solution is obtained;

[0070] In the second-level optimization, the load curve of thermal power is obtained from the first-level optimization as the boundary condition of this level of optimization. This ensures that the output of the thermal power unit with the lowest cost is obtained under the premise of the minimum fluctuation of the total output of the thermal power unit. The equality constraint of this level is that the sum of the output of all thermal power units is balanced with the load curve obtained in the first level. The penalty function method is still used for the processing method. For the inequality constraint, the output of each thermal power unit must satisfy the power limit and the ramp constraint at the next moment at the same time. According to the output and ramp rate at the current moment, the intersection of the two intervals is taken to obtain the upper and lower limits of the output of each unit at each moment, as shown below:

[0071]

[0072] Where: P Ti(t-1) is the dispatch output of thermal power units in the period before period t; are the minimum and maximum output of thermal power units respectively; V down,i 、V up,i are the downward and upward climbing rates of thermal power unit i respectively; Δt is the duration of a scheduling period.

[0073] The specific implementation process of step 3 is:

[0074] Step 3.1, input the system parameters of the wind, water, and thermal power system; for the first-level optimization objective, the optimization variables are the output of the hydropower unit and the wind power unit, that is, [P H1t ,…P Hjt ,P HMt ,P W1t ,…P Wjt ,P WGt ], t∈T; For the second-level optimization objective, the optimization variable is the output of the thermal power unit, that is, [P T1t ,…P Tit ,P TNt ], t∈T;

[0075] Step 3.2, initialize the parameters of the beetle whisker search algorithm: the specific parameters include: ①step0: step resolution, the default is eps (usually the smallest positive number); ②step1: step initial value, the default is 1; ③eta_step is the compensation attenuation coefficient, the range is 0-1, and the default value is 0.95; ④d0 is the resolution of the beetle whisker perception length, the default is equal to eps; ⑤d1 represents the initial value of the beetle whisker perception length, which is continuously updated as the iteration proceeds; ⑥eta_d is similar to eta_step, and the default value is 0.95; ⑦n is the number of iterations, the default is 100, the first iteration n is set to 0, and it is continuously accumulated; ⑧stepol is equal to eps by default, and the optimization is terminated when the step size is less than stepol; ⑨the penalty factor σ is 100000;

[0076] Step 3.3: Randomly generate an initial solution vector x that satisfies the constraints and treat it as the optimal solution x best , substitute the expressions of the objective function F1 (first-level optimization objective) and F2 (second-level optimization objective) and calculate the function value F of the optimal solution at this time best ; The objective function value is calculated according to the following principle: determine whether the optimal solution is within the upper and lower limits of the constraints. If so, return the objective function value; otherwise, return the sum of the objective function value of the current solution and the penalty term generated by exceeding the constraints;

[0077] Step 3.4: Generate a random vector dir = rands (G + M, 1) to represent the vector from the right beard to the left beard, and normalize it. norm represents the normalization function. According to the location of the optimal solution at this time, the distances xl and xr of the left and right whiskers of each longicorn are calculated respectively:

[0078]

[0079] Step 3.5: Determine whether the element values ​​of the left and right whisker vectors exceed the upper and lower limits of the corresponding unit output. If they exceed the upper limit, take them as the upper limit; if they are lower than the lower limit, take them as the lower limit; and calculate their objective function value F left and F right ;

[0080] Step 3.6: According to F left and F right The value of the solution vector x is updated by the value of new :

[0081]

[0082] Step 3.7: Determine the updated x new The value must meet the upper and lower limit constraints. If it exceeds the upper and lower limits, the processing method is the same as the processing method for the left and right whisker positions in step 3.5;

[0083] Step 3.8: Calculate the updated solution vector x new The objective function value F x , if F x <F best , then update the current optimal solution, that is, x best =x new ;

[0084] Step 3.9, update step size: step1 = step1 × eta_step + step0;

[0085] Update the sensing length of the beetle whiskers: d1 = d1 × eta_d + d0;

[0086] Step 3.10: Determine the magnitude of step1. If step1 < steptol, this iteration ends.

[0087] Step 3.11: Let n = n + 1, and determine whether n reaches the maximum number of iterations. If not, return to Step 3.4; if it reaches the maximum number of iterations, the optimization process ends, and the current optimal solution x best and the corresponding objective function value F best .

[0088] The beneficial effects of the present invention are as follows:

[0089] (1) The hierarchical optimization multi-objective dynamic scheduling model established by the method of the present invention includes optimization objectives and constraint conditions, with the objectives of ensuring stable output of thermal power units, minimizing the overall economic cost of system operation, and fully consuming wind power. The objective functions are interrelated and mutually restrictive, and the constraint conditions comprehensively consider multi-dimensional and strongly coupled constraint conditions such as system constraints, thermal power unit operation constraints, hydropower unit operation constraints, and wind power operation constraints.

[0090] (2) The method of the present invention uses the beetle antennae search algorithm, which is suitable for solving dynamic optimization scheduling models with large-scale non-linear coupling constraints and objective functions. This algorithm has few parameter settings and is easy to implement, improving the accuracy and reliability of the scheduling results.

[0091] (3) Through hierarchical optimization and modeling, the method of the present invention can not only simplify the solution process of strongly coupled optimization problems but also optimize the operation characteristics of each type of power source to the best. This model fully stimulates the regulation ability of hydropower, ensures stable thermal power output, eliminates wind power curtailment, maximizes the role of hydropower itself, and reduces the impact of wind power uncertainty on system scheduling.

[0092] (4) The method of the present invention introduces the beetle antennae search algorithm to solve the established scheduling model. The beetle antennae search algorithm is a bio-inspired algorithm, which is a generalization based on the principle of beetle foraging. The optimized objective function is simulated as the smell emitted by food, and the place with the strongest food smell is the optimal solution of the function. The process of the beetle searching for food is the process of the objective function searching for the optimal solution. This algorithm requires few parameters, has a simple principle and is easy to implement, and has obvious advantages in solving the optimization problem with multiple types of power sources in the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0093] Figure 1 is a flowchart of the multi-objective dynamic scheduling method for a wind-hydro-thermal power system based on double-layer optimization of the present invention;

[0094] Figure 2 is a schematic diagram of the scheduled output of each power source after optimization during the wet season;

[0095] Figure 3 This is a schematic diagram comparing the output of thermal power units before and after optimization during the flood season;

[0096] Figure 4 It is a schematic diagram of the dispatching output of each power source after optimization during the dry season;

[0097] Figure 5 It is a schematic diagram comparing the output of thermal power units before and after optimization during the dry season. DETAILED DESCRIPTION

[0098] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0099] The present invention provides a multi-objective dynamic dispatching method for wind, water, fire and power systems based on double-layer optimization, such as Figure 1 As shown, the following steps are included:

[0100] Step 1: Establish a two-level optimization model for multi-objective dynamic economic dispatch of wind, water, and thermal power systems;

[0101] Step 1 is as follows:

[0102] Step 1.1, establish the first-level optimization target with the goal of making the total output curve of thermal power the most stable, and provide boundary conditions for the second-level optimization;

[0103] In step 1.1, the first-level optimization target F1 is established with the goal of achieving the most stable total output curve of thermal power units:

[0104]

[0105] Where: T is the total number of dispatching time periods, t represents time t, t∈T; G is the number of wind turbines, k represents wind turbine k, k∈G; M is the total number of hydropower units, j represents hydropower unit j, j∈M; P Lt is the load value during period t; P Hjt is the output power of hydropower unit j at time t; P Wkt is the actual output of wind turbine k at time t.

[0106] Step 1.2: Establish the second optimization target with the goal of minimizing the system operation cost. The operation cost includes the fuel cost, start-up and shutdown cost, ramp cost of the thermal power plant, and the wind farm’s wind abandonment cost.

[0107] In step 1.2, the second-level optimization goal F2 is established with the goal of minimizing the system operation cost, specifically:

[0108] minF2=C1+C2+C3+C4 (2)

[0109] Where C1, C2, C3, and C4 represent the fuel cost, start-up and shutdown cost, ramp cost, and wind farm abandonment cost of thermal power plants, respectively. The specific calculation formula is as follows:

[0110] 1) Fuel cost of thermal power plant considering penalty effect C1

[0111]

[0112] Where: N represents the total number of thermal power units, i represents unit i, i∈N; P Tit is the active power of thermal power unit i at time t; is the minimum active power of thermal power unit i at time t; a i ,b i ,c i ,d i ,e i is the fuel cost coefficient of thermal power unit i.

[0113] 2) Start-up and shutdown costs of thermal power plants C2

[0114]

[0115] Where: S Tit is the startup cost of thermal power unit i at time t; u it Represents the state of thermal power unit i at time t. When u it =1When the unit is in the power-on state, when u it =0: The unit is in shutdown state.

[0116] 3) Ramp-up cost of thermal power plant C3

[0117]

[0118] Where: γ is the climbing cost factor.

[0119] 4) Wind curtailment cost C4

[0120]

[0121] Where: is the upper limit of the deviation between the actual output and the predicted output of the kth wind turbine at time t, G is the number of wind turbines, and λ is the penalty coefficient for wind abandonment cost;

[0122] Step 1.3, determine the constraints of the optimization model;

[0123] In step 1.3, the constraints of the optimization model include system power balance constraints, thermal power unit operation constraints, hydropower unit operation constraints, wind farm operation constraints, and system reserve constraints;

[0124] in,

[0125] 1) System power balance constraints

[0126]

[0127] Where: P Lt is the load value in period t;

[0128] 2) Output constraints of thermal power units

[0129]

[0130] Where: is the minimum output of the thermal power unit; is the maximum output of the thermal power unit, and this parameter is the known rated value of the unit;

[0131] 3) Minimum startup and shutdown time constraints for thermal power units

[0132]

[0133] Where: The cumulative startup time of the unit; The cumulative downtime of the unit; The minimum continuous start time of the unit; The minimum continuous downtime of the unit;

[0134] 4) Climbing constraints of thermal power units

[0135] V down,i ≤P Tit -P Ti(t-1) ≤V up,i (10)

[0136] Where: V down,i is the downward climbing rate of thermal power unit i; V up,i is the upward climbing rate of thermal power unit i;

[0137] 5) Output constraints of hydropower units

[0138]

[0139] Where: is the minimum output of hydropower unit j; is the maximum output of hydropower unit j;

[0140] 6) Reservoir water storage capacity constraints

[0141]

[0142] Where: are the minimum and maximum water storage capacities of the reservoir corresponding to hydropower unit j at time t; X jt is the actual water storage capacity of hydropower plant j at time t;

[0143] 7) Reservoir discharge constraints

[0144]

[0145] Where: are the minimum and maximum discharge of the reservoir corresponding to hydropower unit j at time t; Q jt is the actual water discharge of the reservoir corresponding to hydropower unit j at time t;

[0146] 8) Daily scheduling of available water constraints

[0147]

[0148] Where: W min,j , W max,j is the minimum and maximum available water volume for power generation allocated to the reservoir corresponding to hydropower unit j after the reservoir dispatching department considers the comprehensive application of the reservoir. Then the index representing the hydropower regulation capacity is The larger the value is, the more water the reservoir can dispatch, and the more it can guarantee the regulation capacity of hydropower.

[0149] 9) Output constraints of wind farms

[0150]

[0151] Where: P Wkt is the actual output of wind turbine k at time t; is the predicted output of wind turbine k at time t; It is the deviation between the actual wind power output and the predicted output; and They are the upper and lower limits of the deviation between the actual output and the predicted output respectively;

[0152] The wind power output range is

[0153] 10) System backup constraints

[0154]

[0155] Where: k d and k w The fluctuation coefficients of load and wind power respectively. d Take 10%, k w Take 20%.

[0156] Step 2: Design strategies for handling equality constraints and inequality constraints;

[0157] The specific process of step 2 is:

[0158] In the first level optimization: for the equality constraint (7), the penalty function is used to add the penalty term that violates the equality constraint to the objective function, increase the penalty factor, and continuously judge the error accuracy of the equality constraint until the accuracy requirement is met. When the optimal solution that minimizes the objective function is obtained, since the penalty factor is selected to be large enough, the optimal solution must satisfy the equality constraint. The penalty term is expressed as:

[0159]

[0160] Where: f penalty represents the penalty function; σ represents the penalty factor, which is a positive number;

[0161] For the processing of inequality constraints, we choose to iterate continuously to make the independent variable take values ​​within the specified interval, and then compare the function values ​​of the left and right whiskers in the beetle whisker search algorithm until the optimal solution is obtained;

[0162] In the second-level optimization, the load curve of thermal power is obtained from the first-level optimization as the boundary condition of this level of optimization. This ensures that the output of the thermal power unit with the lowest cost is obtained under the premise of the minimum fluctuation of the total output of the thermal power unit. The equality constraint of this level is that the sum of the output of all thermal power units is balanced with the load curve obtained in the first level. The penalty function method is still used for the processing method. For the inequality constraint, the output of each thermal power unit must satisfy the power limit and the ramp constraint at the next moment at the same time. According to the output and ramp rate at the current moment, the intersection of the two intervals is taken to obtain the upper and lower limits of the output of each unit at each moment, as shown below:

[0163]

[0164] Where: P Ti(t-1) is the dispatch output of thermal power units in the period before period t; are the minimum and maximum output of thermal power units respectively; V down,i 、V up,i are the downward and upward climbing rates of thermal power unit i respectively; Δt is the duration of a scheduling period.

[0165] Step 3: Use the beetle whisker search algorithm to solve the two-layer optimization scheduling model.

[0166] The specific implementation process of step 3 is:

[0167] Step 3.1, input the system parameters of the wind, water, and thermal power system; for the first-level optimization objective, the optimization variables are the output of the hydropower unit and the wind power unit, that is, [P H1t ,…P Hjt ,PHMt ,P W1t ,…P Wjt ,P WGt ], t∈T; For the second-level optimization objective, the optimization variable is the output of the thermal power unit, that is, [P T1t ,…P Tit ,P TNt ], t∈T;

[0168] Step 3.2, initialize the parameters of the beetle whisker search algorithm: the specific parameters include: ①step0: step resolution, the default is eps (usually the smallest positive number); ②step1: step initial value, the default is 1; ③eta_step is the compensation attenuation coefficient, the range is 0-1, and the default value is 0.95; ④d0 is the resolution of the beetle whisker perception length, the default is equal to eps; ⑤d1 represents the initial value of the beetle whisker perception length, which is continuously updated as the iteration proceeds; ⑥eta_d is similar to eta_step, and the default value is 0.95; ⑦n is the number of iterations, the default is 100, the first iteration n is set to 0, and it is continuously accumulated; ⑧stepol is equal to eps by default, and the optimization is terminated when the step size is less than stepol; ⑨the penalty factor σ is 100000;

[0169] Step 3.3: Randomly generate an initial solution vector x that satisfies the constraints and treat it as the optimal solution x best , substitute the expressions of the objective function F1 (first-level optimization objective) and F2 (second-level optimization objective) and calculate the function value F of the optimal solution at this time best ; The objective function value is calculated according to the following principle: determine whether the optimal solution is within the upper and lower limits of the constraints. If so, return the objective function value; otherwise, return the sum of the objective function value of the current solution and the penalty term generated by exceeding the constraints; (for the first-level optimization

[0170] x=[P H1t ,…P Hjt ,P HMt ,P W1t ,…P Wjt ,P WGt ], for the second layer optimization x = [P T1t ,…P Tit ,P TNt ];)

[0171] Step 3.4: Generate a random vector dir = rands (G + M, 1) to represent the vector from the right beard to the left beard, and normalize it. norm represents the normalization function. According to the location of the optimal solution at this time, the distances xl and xr of the left and right whiskers of each longicorn are calculated respectively:

[0172]

[0173] Step 3.5. Determine whether the element values of the left and right antenna vectors exceed the upper and lower limit values of the corresponding unit output. If it exceeds the upper limit, take it as the upper limit value; if it is lower than the lower limit, take it as the lower limit value; and calculate its objective function value F left and F right ;

[0174] Step 3.6. Update the value of the solution vector x according to the values of F left and F right . The updated solution vector is denoted as x new :

[0175]

[0176] Step 3.7. Determine whether the updated value of x new satisfies the upper and lower limit constraints. If it exceeds the upper and lower limits, the processing method is the same as that for the left and right antenna positions in Step 3.5;

[0177] Step 3.8. Calculate the objective function value F new of the updated solution vector x x . If F x < F best , then update the current optimal solution, that is, x best = x new ;

[0178] Step 3.9. Update the step size: step1 = step1 × eta_step + step0;

[0179] Update the antenna sensing length: d1 = d1 × eta_d + d0;

[0180] Step 3.10. Determine the magnitude of step1. If step1 < steptol, this iteration ends.

[0181] Step 3.11. Let n = n + 1, and determine whether n reaches the maximum number of iterations. If not, return to Step 3.4; if it reaches the maximum number of iterations, the optimization process ends, and output the current optimal solution x best and the corresponding objective function value F best .

[0182] The reservoir inflows are different in the wet season and the dry season. Therefore, the power generation capacity and regulation capacity of hydropower are different. Figure 2 and Figure 3 are the dispatching output results before and after optimization in the wet season. In the wet season, the water volume is abundant, which can ensure both power generation and regulation capacity. Compare Figure 3The two line graphs before and after optimization show that before optimization, the output of the thermal power unit fluctuated greatly, with a peak-to-valley difference of 897.7MW, which could easily cause damage to the thermal power unit. After optimization, the output of the thermal power unit was significantly more stable, with a peak-to-valley difference of 561.7MW, which is much smaller than the peak-to-valley difference of the thermal power unit before optimization, which fully demonstrates that the first-level optimization effect is obvious and has achieved the expected purpose. In addition, Figure 2 As shown in the figure, the optimized hydropower output characteristics are consistent with the load fluctuation characteristics, which shows that hydropower has played a good role in regulation and greatly reduced the peak load regulation pressure of thermal power and the pressure of bearing base load.

[0183] Figure 4 and Figure 5 This is the dispatch output result before and after the optimization in the dry season. The water volume in the dry season is less than that in the flood season, and the power generation of hydropower is limited, but it still has a certain regulation capacity. Figure 5 The two line graphs before and after optimization show that: before optimization, the output of thermal power units fluctuated greatly, with a peak-to-valley difference of 896.2MW, while after optimization, the output of thermal power units was much more stable, with a peak-to-valley difference of 736.7MW, which shows that the first-layer optimization effect is obvious, and also shows that hydropower has played a proper regulatory role, which has alleviated the task of thermal power units to regulate the peak-to-valley difference and bear the base load to a certain extent. Limited by the amount of water in the dry season, the regulatory capacity of hydropower is slightly inferior to that of the flood season, but under the stimulation of the double-layer optimization strategy of the method of the present invention, hydropower still maximizes its regulatory capacity.

[0184] Table 1 Operation costs during the flood season and dry season (unit: yuan)

[0185] Coal costs Start-Stop Cost Climbing cost Cost of curtailment Total Cost Flood season 539285 148517.8 59962 0 747764.8 Dry season 593568 178221.36 47234 0 819023.36

[0186] Table 1 shows the operating costs in the flood season and the dry season. It can be seen that the wind abandonment cost in both scenarios is 0, indicating that the method of the present invention can ensure the full absorption of wind power.

[0187] Through the above-mentioned method, the method of the present invention aims at the dynamic dispatch problem of the combined power system containing wind power, hydropower and thermal power, and establishes a two-layer optimization dispatch model, which encourages the play of the hydropower regulation role, ensures the stability and economy of thermal power operation, and ensures the consumption of wind power. The model is solved by using the beetle beard search algorithm, which is simple and easy to implement, and provides a new idea for the coordinated operation of power systems containing multiple types of power sources.

Claims

1. A multi-objective dynamic dispatching method for wind, water, and thermal power systems based on double-layer optimization, characterized in that: The following steps are involved: Step 1: Establish a two-level optimization model for multi-objective dynamic economic dispatch of wind, water, and thermal power systems; The step 1 is specifically as follows: Step 1.1, establish the first-level optimization target with the goal of making the total output curve of thermal power the most stable, and provide boundary conditions for the second-level optimization; Step 1.2: Establish the second optimization target with the goal of minimizing the system operation cost. The operation cost includes the fuel cost, start-up and shutdown cost, ramp cost of the thermal power plant, and the wind farm’s wind abandonment cost. Step 1.3, determine the constraints of the optimization model; In step 1.3, the constraints of the optimization model include system power balance constraints, thermal power unit operation constraints, hydropower unit operation constraints, wind farm operation constraints, and system reserve constraints; in, 1) System power balance constraints Where: P Lt is the load value in period t; 2) Output constraints of thermal power units Where: is the minimum output of the thermal power unit; is the maximum output of the thermal power unit, and this parameter is the known rated value of the unit; 3) Minimum startup and shutdown time constraints for thermal power units Where: The cumulative startup time of the unit; The cumulative downtime of the unit; The minimum continuous start time of the unit; The minimum continuous downtime of the unit; 4) Climbing constraints of thermal power units In down,i ≤P Tit -P Ti(t-1) ≤V up,i (10) Where: V down,i is the downward climbing rate of thermal power unit i; V up,i is the upward climbing rate of thermal power unit i; 5) Output constraints of hydropower units Where: is the minimum output of hydropower unit j; is the maximum output of hydropower unit j; 6) Reservoir water storage capacity constraints Where: are the minimum and maximum water storage capacities of the reservoir corresponding to hydropower unit j at time t; X jt is the actual water storage capacity of hydropower plant j at time t; 7) Reservoir discharge constraints Where: are the minimum and maximum discharge of the reservoir corresponding to hydropower unit j at time t; Q jt is the actual water discharge of the reservoir corresponding to hydropower unit j at time t; 8) Daily scheduling of available water constraints Where: W min,j , W max,j is the minimum and maximum available water volume for power generation allocated to the reservoir corresponding to hydropower unit j after the reservoir dispatching department considers the comprehensive application of the reservoir; the index representing the hydropower regulation capacity is 9) Output constraints of wind farms Where: P Wkt is the actual output of wind turbine k at time t; is the predicted output of wind turbine k at time t; It is the deviation between the actual wind power output and the predicted output; and They are the upper and lower limits of the deviation between the actual output and the predicted output respectively; The wind power output range is 10) System backup constraints Where: k d and k w The fluctuation coefficients of load and wind power respectively; Step 2: Design strategies for handling equality constraints and inequality constraints; Step 3: Use the beetle whisker search algorithm to solve the two-layer optimization scheduling model.

2. The multi-objective dynamic dispatching method for wind, water, fire and power systems based on double-layer optimization according to claim 1 is characterized in that: In step 1.1, the first-level optimization target F1 is established with the goal of achieving the most stable total output curve of thermal power units: Where: T is the total number of scheduling time periods, t represents time t, t∈T; G is the number of wind turbines, k represents wind turbine k, k∈G; M is the total number of hydropower units, j represents hydropower unit j, j∈M; P Lt is the load value during period t; P Hjt is the output power of hydropower unit j at time t; P Wkt is the actual output of wind turbine k at time t.

3. The multi-objective dynamic dispatching method for wind, water, fire and power systems based on double-layer optimization according to claim 1 is characterized in that: In step 1.2, the second-level optimization goal F2 is established with the goal of minimizing the system operation cost, specifically: min F2=C1+C2+C3+C4 (2) Where C1, C2, C3, and C4 represent the fuel cost, start-up and shutdown cost, ramp cost, and wind farm abandonment cost of thermal power plants, respectively. The specific calculation formula is as follows: 1) Fuel cost of thermal power plant considering penalty effect C1 Where: N represents the total number of thermal power units, i represents unit i, i∈N; P Tit is the active power of thermal power unit i at time t; is the minimum active power of thermal power unit i at time t; a i ,b i ,c i ,d i ,e i is the fuel cost coefficient of thermal power unit i; 2) Start-up and shutdown costs of thermal power plants C2 Where: S Tit is the startup cost of thermal power unit i at time t; u it Represents the state of thermal power unit i at time t. When u it =1When the unit is in the power-on state, when u it =0 when the unit is in shutdown state; 3) Ramp-up cost of thermal power plant C3 Where: γ is the climbing cost factor; 4) Wind curtailment cost C4 Where: is the upper limit of the deviation between the actual output and the predicted output of the kth wind turbine at time t, G is the number of wind turbines, and λ is the penalty coefficient for wind abandonment cost.

4. The multi-objective dynamic dispatching method for wind, water, fire and power systems based on double-layer optimization according to claim 1 is characterized in that: The specific process of step 2 is: In the first level optimization: for the equality constraint (7), the penalty function is used to add the penalty term that violates the equality constraint to the objective function, increase the penalty factor, and continuously judge the error accuracy of the equality constraint until the accuracy requirement is met. When the optimal solution that minimizes the objective function is obtained, since the penalty factor is selected to be large enough, the optimal solution must satisfy the equality constraint. The penalty term is expressed as: Where: f penalty represents the penalty function; σ represents the penalty factor, which is a positive number; For the processing of inequality constraints, we choose to iterate continuously to make the independent variable take values ​​within the specified interval, and then compare the function values ​​of the left and right whiskers in the beetle whisker search algorithm until the optimal solution is obtained; In the second-layer optimization: Obtain the load curve borne by thermal power from the first-layer optimization as the boundary condition for this layer's optimization; this can ensure obtaining the minimum-cost thermal power unit output on the premise of the smallest fluctuation in the total output of thermal power units. The equality constraint of this layer is that the sum of the outputs of all thermal power units is balanced with the load curve obtained in the first layer, and the penalty function method is still used for the processing method. For the inequality constraint, the output of each thermal power unit must simultaneously meet the power limit and the ramping constraint at the next moment. By taking the intersection of the two intervals based on the current output and ramping rate, the upper and lower limits of the output of each unit at each moment can be obtained, as follows: Where: P Ti(t-1) is the dispatch output of thermal power units in the period before period t; are the minimum and maximum output of thermal power units respectively; V down,i 、V up,i are the downward and upward climbing rates of thermal power unit i respectively; Δt is the duration of a scheduling period.

5. The multi-objective dynamic dispatching method for wind, water, fire and power systems based on double-layer optimization according to claim 4 is characterized in that: The specific implementation process of step 3 is as follows: Step 3.1, input the system parameters of the wind, water, and thermal power system; for the first-level optimization objective, the optimization variables are the output of the hydropower unit and the wind power unit, that is, [P H1t ,…P Hjt ,P HMt ,P W1t ,…P Wjt ,P WGt ], t∈T; For the second-level optimization objective, the optimization variable is the output of the thermal power unit, that is, [P T1t ,…P Tit ,P TNt ], t∈T; Step 3.2: Initialize the parameters of the beetle antennae search algorithm. The specific parameters include: ① step0: step size resolution, defaulting to eps (usually taking the smallest positive number); ② step1: initial step size value, defaulting to 1; ③ eta_step is the compensation attenuation coefficient, with a range of 0 - 1, taking the default value of 0.95; ④ d0 is the resolution of the beetle antennae sensing length, defaulting to equal eps; ⑤ d1 represents the initial value of the beetle antennae sensing length, which is continuously updated as the iteration progresses; ⑥ eta_d is similar to eta_step, taking the default value of 0.95; ⑦ n is the number of iterations, defaulting to 100, with n set to 0 for the first iteration and continuously accumulated; ⑧ stepol defaults to equal eps, and when the step size is less than stepol, the optimization stops; ⑨ the penalty factor σ takes the value of 100000; Step 3.3: Randomly generate an initial solution vector x that satisfies the constraints and treat it as the optimal solution x best , substitute the expressions of the objective function F1 (first-level optimization objective) and F2 (second-level optimization objective) and calculate the function value F of the optimal solution at this time best ; The objective function value is calculated according to the following principle: determine whether the optimal solution is within the upper and lower limits of the constraints. If so, return the objective function value; otherwise, return the sum of the objective function value of the current solution and the penalty term generated by exceeding the constraints; Step 3.4: Generate a random vector dir = rands (G + M, 1) to represent the vector from the right beard to the left beard, and normalize it. norm represents the normalization function. According to the location of the optimal solution at this time, the distances xl and xr of the left and right whiskers of each longicorn are calculated respectively: Step 3.5: Determine whether the element values ​​of the left and right whisker vectors exceed the upper and lower limits of the corresponding unit output. If they exceed the upper limit, take them as the upper limit; if they are lower than the lower limit, take them as the lower limit; and calculate their objective function value F left and F right ; Step 3.6: According to F left and F right The value of the solution vector x is updated by the value of new : Step 3.7: Determine the updated x new The value must meet the upper and lower limit constraints. If it exceeds the upper and lower limits, the processing method is the same as the processing method for the left and right whisker positions in step 3.5; Step 3.8: Calculate the updated solution vector x new The objective function value F x , if F x <F best , then update the current optimal solution, that is, x best =x new ; Step 3.9: Update the step size: step1 = step1 × eta_step + step0; Update the beetle antennae sensing length: d1 = d1 × eta_d + d0; Step 3.10: Judge the magnitude of step1. If step1 < steptol, then this iteration ends; Step 3.11, let n = n + 1, determine whether n has reached the maximum number of iterations, if not, return to step 3.4; if it has reached the maximum number of iterations, the optimization process ends and the current optimal solution x is output best and the corresponding objective function value F best .

Citation Information

Patent Citations

  • Multi-target dynamic scheduling method for wind storage hydrothermal power system based on multi-source complementation

    CN106981888A

  • Automatic power generation control method for multi-source multi-region interconnected electric power system

    CN112636368A