A grab control method for irregular inclined materials in bulk material yard
Through three-dimensional laser scanning and image processing technology, combined with linear regression model and segmented control algorithm, the problem of wire rope falling into grooves and poor grasping amount when the grab crane is grabbing irregular slanted materials is solved, and the efficiency of slanted materials is achieved. Crawl and run efficiency improvements.
Patent Information
- Application Number
- CN202210060119.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-19
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-01-19
AI Technical Summary
The existing grab driving technology cannot effectively grasp irregular inclined materials in bulk material processing plants, causing the wire rope to easily fall into the groove, and the grasping capacity is poor, making it impossible to capture a full bucket in every bucket.
Using three-dimensional laser scanning technology and related image processing technology, through three-dimensional real-time imaging of the material pile and model calculation, the position of the cart is adjusted so that the wire rope is always perpendicular to the ground and enters the deep excavation mode. The linear regression model and segmented control algorithm are combined to optimize During the grabbing process, the wire rope can be avoided and the grabbing efficiency can be improved.
It achieves efficient grabbing of irregular slanted materials, avoids wire rope slipping out of the groove, improves the grabbing capacity and operating efficiency, and can effectively handle the accumulation of slanted materials in real-time production.
Smart Images

Figure CN114380200B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of grab bucket driving, in particular to a grab bucket control method for irregular inclined materials in a bulk cargo yard. Background Art
[0002] At present, most bulk material yards in my country use grab cranes for loading, loading, unloading and other processes. With the development of Industry 4.0, unmanned intelligent grab cranes have gradually become the mainstream, but the bulk materials in the crane yards are unevenly piled and easily piled into inclined materials. Due to the various designs of the discharge ports, it is also common that the grab crane can only grab inclined materials.
[0003] At present, in the bulk material plant with grab crane, with the development of intelligence, the material field model can also display the material field stacking situation in real time and display its three-dimensional material field image with the development of ultrasonic, microwave, laser and other equipment. The stacking situation of bulk materials also makes relevant requirements for the control of grab. According to the relevant operating procedures of grab, in the process of grabbing bulk materials, the tilt direction of grab can only be tilted relative to the front and rear direction of grab, but not relative to the left and right direction of grab. If the grab tilts in the left and right direction, it will cause the opening and closing of the crane or the steel wire rope of the hoisting mechanism drum to fall out of the groove. For the grab control, it is not possible to grab any material pile. It is necessary to rely on the three-dimensional model to calculate the grab point of the material pile and then grab it. In actual applications, the accumulation of bulk material in the material field cannot be very flat. Although the position of the grab point can be calculated by using the three-dimensional model to make the grab point avoid the situation of the grab tilting left and right as much as possible, some special material piles are tilted left and right, such as the discharge port parallel to the direction of the crane movement. Due to the special material discharge conditions of this type of material discharge port, the material can only be piled up at an inclined angle parallel to the direction of the vehicle movement. Therefore, for this special material pile situation, the existing technology generally uses a fixed-point material grabbing method. This method avoids the occurrence of wire rope falling out of the groove, but the effect on the grabbing amount is not very good, and it is impossible to grab a full bucket in every bucket. In view of the above situation, new solutions need to be studied. Summary of the invention
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the present invention provides a grab control method for irregular inclined materials in bulk material yards, which solves the problem that in the current bulk material plants with grab cranes, with the development of intelligence, the material yard model can also display the material stacking situation of the material yard in real time with the development of ultrasonic, microwave, laser and other equipment, and display its three-dimensional material yard image. The bulk material stacking situation also makes relevant requirements for the control of the grab. According to the relevant operating procedures of the grab, in the process of grabbing bulk materials, the tilt direction of the grab can only be tilted relative to the front and rear direction of the grab, and cannot be tilted relative to the left and right direction of the grab. If the grab is tilted in the left and right directions, it will cause the opening and closing of the crane or the wire rope of the hoisting mechanism drum to fall out of the groove. For the grab control, it is impossible to grab any material pile, and it is necessary to rely on the three-dimensional model to calculate the grab point of the material pile and then grab it. In actual applications, the bulk material yard cannot be piled up very flat. Although the position of the grabbing point can be calculated using a three-dimensional model to avoid the grab bucket tilting left or right, some special material piles are tilted left or right, such as the material discharge port parallel to the direction of vehicle movement. Due to the special material discharge situation of this type of material discharge port, the material can only be piled up at an angle parallel to the direction of vehicle movement. Therefore, for this special material pile situation, the existing technology generally uses a fixed-point grabbing method. This method avoids the occurrence of the wire rope falling out of the groove, but the effect on the grabbing amount is not very good, and it cannot achieve the problem of grabbing a full bucket in every bucket.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: a method for controlling an irregular inclined material grab bucket in a bulk material field, the specific operations are as follows:
[0008] Prepare relevant equipment, including laser scanning equipment, positioning equipment, data communication equipment and control unit. The control system uses Siemens PLC1500 series equipment. The laser scanning equipment obtains the three-dimensional position information of each point on the surface of the pile based on the relevant principles of laser ranging, and sends the scanned data to the server through TCP communication. The server sends the pile model data required by the control system to the PLC through OPC communication. When grabbing the inclined pile, the slope of the pile is fed back to the PLC through the laser scanning equipment. The control system adjusts the position of the trolley in combination with the positioning system so that the wire rope is always perpendicular to the ground during the grabbing process, enters the deep digging mode, optimizes the grabbing amount, and solves the problem of wire rope running in the groove;
[0009] As a prerequisite for the control model, the warehouse area laser scanning equipment has high requirements for model accuracy and stability. The control system calculates the control algorithm based on the slope of the three-dimensional scanning material pile, which requires the establishment of a three-dimensional model of the material yard and the establishment of the material yard's coordinate system through laser scanning. Establishing the coordinate system requires relying on the system positioning equipment to determine the three-dimensional coordinate position, calibrating the positions of the X-axis and Y-axis according to the size of the vehicle, and calibrating the position of the Z-axis according to the height of the grab;
[0010] The rectangular coordinate system established is as follows Figure 1 As shown in the figure, the control model of the grab bucket needs to know the angle of the inclined material pile to be grabbed. To obtain this angle, the known conditions should be: the length of the grab bucket opening, the height of the material pile on the leftmost grab bucket side when the grab bucket is opened, and the height of the material pile on the rightmost grab bucket side when the grab bucket is opened;
[0011] Assume the coordinates of point O to be (a, b, c), and the coordinates of point Q to be (d, e, f), then we can calculate the left side of point W to be (d, e, c). Given the length of the grab bucket, set it as L, and project the grab bucket to the material surface, the slope angle of the material surface is θ. As shown in the figure below, the slope height of the inclined material corresponding to the slope angle of the grab bucket grabbing the material surface is H, then H = (fc). After obtaining the slope height of the inclined material and the length of the grab bucket, the value of the inclination angle θ is obtained according to the inverse trigonometric function: θ = arctan (H / L) = arctan [(fc) / L];
[0012] The grabbing model of the moving range of the trolley was analyzed. It was found that the displacement of the trolley and the angle of the inclined material had a linear regression relationship. The linear regression model was used to determine the displacement of the trolley.
[0013] The above data are linearized to remove interference data and abnormal data in local areas, and digital linear regression data analysis is performed on this basis, that is, large vehicle displacement algorithm data processing is performed.
[0014] From the above table, we can see that in order to ensure that the data is not distorted and reduce the deviation of the calculation model, the present invention divides the function into segments. As shown in the above table, when the inclination angle is between 15 degrees and 65 degrees, there is a good linear regression trend. When it is less than 15 degrees, there is no need to move the truck. The stockpile in the warehouse area generally does not exceed 65 degrees. The linear regression equation for the optimal truck displacement is:
[0015]
[0016]
[0017] Let the linear regression equation be X = bθ + a;
[0018] but Then the above request as well as Substituting the value of into the above formula, the value of a can be obtained. Therefore, the calculation model for calculating the displacement of the trolley is:
[0019] When θ<15 degrees
[0020] X=0
[0021] When 15≤θ<65 degrees
[0022]
[0023] When θ≥65 degrees
[0024] X=1000
[0025] During the material spreading operation, in order to avoid placing too much lifting wire rope, the torque of the wire rope is used to automatically determine whether the grab has reached the material surface. According to the torque of the supporting wire rope feedback, the action of continuing to release the rope can be ended in time. During deep excavation, the control mode of the grab support is converted from speed control to torque control. During the opening and closing process, the method of segmented torque is adopted to ensure that the grab is in a taut state when it starts to rise. Under this condition, the inclined material is grabbed. As the material is grabbed, the grab will gradually straighten with the lifting and opening and closing torque. In order to better adapt to deep excavation, as the deep excavation progresses, the control trolley gradually returns to its original position, thereby optimizing the grab amount and ensuring operation efficiency.
[0026] (III) Beneficial effects
[0027] The present invention provides a method for controlling a grab bucket for irregularly inclined materials in a bulk material field. It has the following beneficial effects:
[0028] The control method of the grab bucket for irregular inclined materials in bulk material yards is based on three-dimensional laser scanning technology and related image processing technology. Through three-dimensional real-time imaging of the material pile and the slope of the material pile given by the three-dimensional model of the material yard, the relevant control model is calculated to improve the grabbing effect of irregular inclined materials. The laser scanners installed at both ends of the driving crane are used to scan the storage area after calibration by the positioning device to form real-time three-dimensional coordinate data of the storage area. After calculating the real-time three-dimensional coordinate data of the material pile, the relevant data required by the control algorithm is obtained. The control algorithm obtains the optimal solution through calculation, controls the displacement of the trolley to solve the problem of wire rope running out of the groove when grabbing the inclined material and realizes the optimization of the grab amount of the inclined material, so that the inclined material mouth can be grabbed, and the efficiency can also meet the real-time production. Through the real-time on-site material pile model given by three dimensions, through a special control algorithm, the problem of wire rope slipping out of the groove when grabbing the inclined material can be solved, and deep digging control can be achieved synchronously on the inclined material surface to achieve the optimal control of the grab amount and solve the problem of grab efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 A schematic diagram of a mathematical model for calculating the three-dimensional oblique material angle of a detected target according to the present invention;
[0030] Figure 2 It is a schematic diagram of the tilt angle of the present invention and the optimal vehicle displacement adapted to the control model;
[0031] Figure 3 The process of the present invention is shown in FIG. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-3 The present invention provides a technical solution: a method for controlling an irregular inclined material grab bucket in a bulk material field, and the specific operation is as follows:
[0034] Prepare relevant equipment, including laser scanning equipment, positioning equipment, data communication equipment and control unit. The control system uses Siemens PLC1500 series equipment. The laser scanning equipment obtains the three-dimensional position information of each point on the surface of the pile based on the relevant principles of laser ranging, and sends the scanned data to the server through TCP communication. The server sends the pile model data required by the control system to the PLC through OPC communication. When grabbing the inclined pile, the slope of the pile is fed back to the PLC through the laser scanning equipment. The control system adjusts the position of the trolley in combination with the positioning system so that the wire rope is always perpendicular to the ground during the grabbing process, enters the deep digging mode, optimizes the grabbing amount, and solves the problem of wire rope running in the groove;
[0035] As a prerequisite for the control model, the warehouse area laser scanning equipment has high requirements for model accuracy and stability. The control system calculates the control algorithm based on the slope of the three-dimensional scanning material pile, which requires the establishment of a three-dimensional model of the material yard and the establishment of the material yard's coordinate system through laser scanning. Establishing the coordinate system requires relying on the system positioning equipment to determine the three-dimensional coordinate position, calibrating the positions of the X-axis and Y-axis according to the size of the vehicle, and calibrating the position of the Z-axis according to the height of the grab;
[0036] The rectangular coordinate system established is as follows Figure 1As shown in the figure, the control model of the grab bucket needs to know the angle of the inclined material pile to be grabbed. To obtain this angle, the known conditions should be: the length of the grab bucket opening, the height of the material pile on the leftmost grab bucket side when the grab bucket is opened, and the height of the material pile on the rightmost grab bucket side when the grab bucket is opened;
[0037] Assume the coordinates of point O to be (a, b, c), and the coordinates of point Q to be (d, e, f), then we can calculate the left side of point W to be (d, e, c). Given the length of the grab bucket, set it as L, and project the grab bucket to the material surface, the slope angle of the material surface is θ. As shown in the figure below, the slope height of the inclined material corresponding to the slope angle of the grab bucket grabbing the material surface is H, then H = (fc). After obtaining the slope height of the inclined material and the length of the grab bucket, the value of the inclination angle θ is obtained according to the inverse trigonometric function: θ = arctan (H / L) = arctan [(fc) / L];
[0038] The grabbing model of the moving range of the trolley was analyzed. It was found that the displacement of the trolley and the angle of the inclined material had a linear regression relationship. The linear regression model was used to determine the displacement of the trolley.
[0039] The above data are linearized to remove interference data and abnormal data in local areas, and digital linear regression data analysis is performed on this basis, that is, large vehicle displacement algorithm data processing is performed.
[0040] From the above table, we can see that in order to ensure that the data is not distorted and reduce the deviation of the calculation model, the present invention divides the function into segments. As shown in the above table, when the inclination angle is between 15 degrees and 65 degrees, there is a good linear regression trend. When it is less than 15 degrees, there is no need to move the truck. The stockpile in the warehouse area generally does not exceed 65 degrees. The linear regression equation for the optimal truck displacement is:
[0041]
[0042]
[0043] Let the linear regression equation be X = bθ + a;
[0044] but Then the above request as well as Substituting the value of into the above formula, the value of a can be obtained. Therefore, the calculation model for calculating the displacement of the trolley is:
[0045] When θ<15 degrees
[0046] X=0
[0047] When 15≤θ<65 degrees
[0048]
[0049] When θ≥65 degrees
[0050] X=1000
[0051] During the material spreading operation, in order to avoid placing too much lifting wire rope, the torque of the wire rope is used to automatically determine whether the grab has reached the material surface. According to the torque of the supporting wire rope feedback, the action of continuing to release the rope can be ended in time. During deep excavation, the control mode of the grab support is converted from speed control to torque control. During the opening and closing process, the method of segmented torque is adopted to ensure that the grab is in a taut state when it starts to rise. Under this condition, the inclined material is grabbed. As the material is grabbed, the grab will gradually straighten with the lifting and opening and closing torque. In order to better adapt to deep excavation, as the deep excavation progresses, the control trolley gradually returns to its original position, thereby optimizing the grab amount and ensuring operation efficiency.
[0052] In summary, the control method of the grab bucket for irregular inclined materials in bulk material yards is based on three-dimensional laser scanning technology and related image processing technology. Through three-dimensional real-time imaging of the material pile and the slope of the material pile given by the three-dimensional model of the material yard, the relevant control model is calculated to improve the grabbing effect of irregular inclined materials. The laser scanners installed at both ends of the driving crane are used to scan the warehouse area after calibration using the positioning device to form real-time three-dimensional coordinate data of the warehouse area. After calculating the real-time three-dimensional coordinate data of the material pile, the relevant data required by the control algorithm is obtained. The control algorithm obtains the optimal solution through calculation, controls the displacement of the trolley to solve the problem of wire rope running out of the groove when grabbing the inclined material and realizes the optimization of the grab amount of the inclined material, so that the inclined material mouth can be grabbed, and the efficiency can also meet the real-time production. Through the real-time on-site material pile model given by three dimensions, through a special control algorithm, the problem of wire rope slipping out of the groove when grabbing the inclined material can be solved, and deep digging control can be achieved synchronously on the inclined material surface to achieve the optimal control of the grab amount and solve the problem of grab efficiency.
[0053] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for controlling a grab bucket for irregularly inclined materials in a bulk material field, characterized by: The specific operations are as follows: Prepare relevant equipment, including laser scanning equipment, positioning equipment, data communication equipment and control system. The control system uses Siemens PLC1500. The laser scanning equipment obtains the three-dimensional position information of each point on the surface of the pile based on laser ranging, and sends the scanned data to the server through TCP communication. The server sends the pile model data required by the control system to the PLC through OPC communication. When grabbing the pile, the slope of the pile is fed back to the PLC through the laser scanning equipment. The control system adjusts the position of the trolley in combination with the positioning equipment so that the wire rope is always perpendicular to the ground during the grabbing process, enters the deep digging mode, optimizes the grabbing amount, and solves the problem of wire rope running in the groove; Laser scanning equipment is a prerequisite for the control model. The control system calculates the control algorithm based on the slope of the three-dimensional scanning material pile to establish a three-dimensional model of the material yard. The material yard needs to be scanned by laser to establish the material yard's coordinate system. To establish the coordinate system, the positioning equipment needs to determine the three-dimensional coordinate position, calibrate the X-axis and Y-axis positions according to the truck, and calibrate the Z-axis position according to the height of the grab. The established rectangular coordinate system requires the control model of the grab to know the angle of the slope of the material pile to be grabbed. To obtain this angle, the known conditions should be: the length of the grab opening, the height of the material pile on the leftmost side of the grab when the grab is opened, and the height of the material pile on the rightmost side of the grab when the grab is opened; Assume the coordinates of point O to be (a, b, c), and the coordinates of point Q to be (d, e, f), then we can calculate that the left side of point W of the truck is (d, e, c). The length of the grab is known, set as L, and the projection of the grab to the material surface is θ. The inclined angle of the material surface corresponding to the inclined angle of the grab grabbing the material surface is H, then H = (fc). After obtaining the inclined height of the material pile and the length of the grab, the value of the inclined angle θ is obtained according to the inverse trigonometric function: θ = arctan (H / L) = arctan [(fc) / L]; The grab model was analyzed for the moving range of the trolley. It was found that the displacement of the trolley and the slope angle of the pile were in a linear regression relationship. The linear regression model was used to determine the displacement of the trolley. Perform linearization processing to remove interference data and abnormal data in local areas, and then perform linear regression data analysis on this basis, that is, perform data processing for the vehicle displacement algorithm; The function is segmented. When the slope angle is between 15 and 65 degrees, there is a linear regression trend. When it is less than 15 degrees, there is no need to move the trolley. The material pile in the material yard will not be greater than 65 degrees. The linear regression equation for the optimal trolley displacement is obtained: Let the linear regression equation be X=b*θ+a (Formula A); but Then what you want as well as Substituting the value of into formula A, the value of a can be obtained. The calculation model calculates the displacement of the trolley as follows: When θ<15 degrees: X=0; When 15≤θ<65 degrees: When θ≥65 degrees: X=1000; During the material spreading operation, in order to avoid excessive placement of the lifting wire rope, the torque of the wire rope is used to automatically determine whether the grab has reached the material surface. According to the torque fed back by the wire rope, the action of continuing to release the rope can be ended in time. During deep excavation, the control mode of the grab is converted from speed control to torque control. During the opening and closing process, the method of segmented torque application is adopted to ensure that the grab is in a taut state when it starts to rise. Under this condition, the material pile is grabbed. As the grabbing progresses, the grab will gradually be straightened with the lifting and opening and closing torque, and the control trolley will gradually return to its original position, thereby optimizing the grabbing amount and ensuring operating efficiency.