Super-primary frequency modulation synchronous AGC method and system based on power difference between generator and user

By adopting the super-primary frequency modulation synchronization AGC method based on the generated power difference in the power grid, the entire network coordinated frequency control with a 10 millisecond period is realized, which solves the problems of lag in response of the traditional power grid dispatching center and frequency instability of the new energy grid, and enables rapid recovery. grid frequency and reduce energy demand.

CN114400717BActive Publication Date: 2024-10-01BEIJING SIFANG JIBAO ENG TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111617502.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-27
Publication Date
2024-10-01
Estimated Expiration
2041-12-27

AI Technical Summary

Technical Problem

The automatic power generation control system of the traditional power grid dispatch center has a response lag problem in frequency control, especially in high-proportion new energy power grids, resulting in frequency instability, and the primary frequency regulation response is slow and cannot quickly track frequency changes, resulting in the time required to restore the frequency. The energy is larger, and the hot backup energy storage of conventional thermal power units is limited and cannot support frequency recovery.

Method used

Adopting the super-primary frequency modulation synchronous AGC method based on the power generation difference, through centralized and rapid control of the entire network with a period of 10 milliseconds, the whole network collaborative frequency control for large disturbances in the power grid is realized, frequency changes are predicted and advanced control is performed, and power generation and consumption are hindered. The difference translates into frequency changes.

Benefits of technology

It realizes frequency control before the frequency actually changes, quickly restores the grid frequency, enhances the grid's response ability to frequency instability, reduces the energy required for recovery, and avoids frequency oscillation and machine and load shedding actions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114400717B_ABST
    Figure CN114400717B_ABST
Patent Text Reader

Abstract

The present invention relates to a super-primary frequency modulation synchronous AGC method and system based on the power difference between power generation and use. It includes: using the synchronous phasor measurement data of the set 10ms level period, based on the same time section data of each unit, synchronously and real-time calculation of the power generation power and load power difference of the whole network is performed, and the frequency change is predicted accordingly, and the frequency of the power grid is advanced controlled according to the prediction, and the advanced control can be performed quickly and continuously through the continuous closed-loop control of the 10ms level period, thereby preventing the power generation and use power difference from being converted into frequency change. In addition, thermal measurement or filtering methods are used to obtain the mechanical power of the generator that cannot be directly measured. Therefore, it is possible to realize frequency control before the actual change of the power grid frequency at the level of centralized control of the whole network, that is, to realize super-primary frequency modulation control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power grid dispatching and power grid safety and stability control, and more specifically, relates to a super-primary frequency modulation synchronous AGC method and system based on power difference between generation and use. Background Art

[0002] The automatic generation control system of the traditional power grid dispatching center controls the frequency based on the deviation between the measured frequency and 50Hz to calculate the adjustment amount of the generators in the entire network, and performs second-level cycle control based on the RTU data refreshed in seconds, for example, the control cycle is 4 seconds. If there is a tie line with the external network, the difference between the actual tie line power and the planned tie power will also be taken into account; but in fact, the frequency regulation power is still calculated by the deviation between the frequency and the rated frequency. This means that the automatic generation control (AGC) of the power grid dispatching center can only be reflected when the power deviation is clearly reflected in the frequency, which will inevitably lead to a lag in frequency control; and because the control cycle is in seconds, it is impossible to quickly track the change of frequency, and the frequency may have crossed the safe and stable frequency limit within 1 second, thereby triggering the action of the stabilization control device to cut the machine and cut the load. Therefore, the emergency control of frequency by the power grid can actually only rely on the primary frequency regulation of each unit. However, primary frequency regulation has the following problems: it only responds to the frequency caused by power imbalance, so in theory there is a problem of delayed response to power changes; each unit can only respond to frequency fluctuations caused by remote faults when they are transmitted to the local area, and cannot respond quickly to remote faults in the power grid; the units lack coordination, and there is a lack of quantitative and unified control over over-regulation and under-regulation, which can easily cause oscillations.

[0003] The above shortcomings of the existing automatic generation control AGC and primary frequency regulation will not cause frequency stability problems in the power grid when the power grid has sufficient rapid frequency regulation capabilities. The proportion of new energy sources such as wind power and photovoltaics in the power grid is rapidly increasing. Since new energy sources such as wind power and photovoltaics lack rapid frequency regulation capabilities, in a high-proportion new energy grid, when the primary and secondary frequency regulation respond slowly, there is an acceleration or deceleration time extension of frequency instability, which means that the deceleration and acceleration energy required to restore the frequency to the rated value is greater. However, since wind power and photovoltaics have almost no hot standby energy storage; conventional thermal power units have a small proportion, so the hot standby energy storage stored in their steam turbine systems is limited, which may not be able to support frequency recovery, resulting in frequency instability and triggering the action of the machine or load shedding stabilization control device.

[0004] Therefore, a super-primary frequency regulation synchronous AGC method based on the actual difference between the power generation power and the load power of the whole network is proposed. When a large power imbalance disturbance occurs, advance control based on the power difference is realized before the actual frequency change, and the whole network coordinated frequency control of large disturbances in the power grid is realized through centralized rapid control of the whole network with a period of 10 milliseconds, thereby accelerating the recovery of the frequency and helping to solve the problem of insufficient rapid frequency regulation capability of power grids with a high proportion of new energy. Summary of the invention

[0005] In order to solve the deficiencies in the prior art, the purpose of the present invention is to provide a super-primary frequency regulation synchronous AGC method and system based on the power difference between generation and use, to realize advanced control based on the power difference, and to realize the whole network coordinated frequency control of large disturbances in the power grid through 10 millisecond-level centralized rapid control of the whole network, thereby accelerating the frequency recovery, aiming to solve the problem of insufficient rapid frequency regulation capability of a power grid with a high proportion of new energy.

[0006] The present invention adopts the following technical solution. On one hand, the present invention provides a super-primary frequency modulation synchronous AGC method based on the power difference between the generator and the user, comprising the following steps:

[0007] Step 1, continuously collecting time-stamped data at a 10 ms level period based on a synchronized phasor measurement device;

[0008] Step 2: The data collected in step 1 are aggregated and aligned at the control center according to the source time stamp of the data to form the simultaneous data section data required for subsequent calculation and analysis;

[0009] Step 3, taking into account the power difference between generation and use, calculate the current expected total active power regulation of the entire network;

[0010] Step 4: Based on the result obtained in step 3, the regulating power undertaken by the units participating in the regulation is allocated according to their current regulating margins;

[0011] Step 5, calculating the power target setting value of each unit according to the result obtained in step 4;

[0012] Step 6, the active power target value of each unit obtained in step 5 is combined into a control instruction, and the control master station synchronously sends the control instruction to each generator set at a set 10ms level cycle.

[0013] Preferably, in step 1, a PMU is used to synchronously collect electrical measurement information with a 10ms period at the outlet of the power generation source of the entire network or the high-voltage side of the step-up transformer of the new energy station and the voltage and current phasors of the external interconnection lines, and the collected data is time-stamped with microsecond precision to obtain the power and frequency with a time stamp at the power outlet.

[0014] For thermal power units, additional thermal information of the units is further selected for collection, including regulating stage pressure, regulating valve opening, main steam pressure, temperature, and is time-stamped with microsecond accuracy.

[0015] Preferably, the currently desired total active power regulation amount of the entire network in step 3 is calculated using the following formula:

[0016] p a =Δp em +Δp f +Δp tie

[0017] p a =k em (p e -p m )-k·Δf+(p tie -p tie_ref )

[0018]

[0019]

[0020]

[0021] Where:

[0022] p a Indicates the current expected adjustment amount of active power of the whole network units.

[0023] Δp em It indicates the difference between the electromagnetic power frequency at the machine end of all the running units in the whole network and the mechanical power of the units.

[0024] Δp f Indicates the power adjustment required for the current frequency deviation.

[0025] Δp tie Indicates the deviation between the power of the grid's external interconnection line and the target power.

[0026] k em It represents the power generation and consumption deviation adjustment coefficient, which is taken as the ratio of the sum of the rated active power of all operating units in the whole network to the sum of the rated active power of all frequency regulating units in the whole network.

[0027] p e It represents the sum of active power measured by PMU at each frequency modulation unit.

[0028] N represents the number of frequency-regulated units.

[0029] p e_i represents the real-time active power of the i-th frequency-regulated unit measured by the PMU,

[0030] p m It represents the sum of the mechanical power of each frequency-regulated unit.

[0031] k represents the frequency response coefficient, unit MW / Hz,

[0032] Δf represents the deviation between the current frequency and the rated frequency.

[0033] p tie Indicates the current measured active power of the tie line.

[0034] p tie_ref represents the target active power of the tie line control,

[0035] p m_i represents the real-time mechanical power of the i-th frequency regulating unit obtained by the estimation algorithm,

[0036] m represents the speed change rate of the generator set,

[0037] p e_i_n Represents the rated electromagnetic power of the i-th unit.

[0038] Preferably, there are two methods for calculating the mechanical power in step 3, wherein method 1 is as follows:

[0039] For thermal power units that send up thermal quantities such as regulating stage pressure, the mechanical power p measured based on the regulating stage pressure m-i The estimation method is expressed as follows:

[0040]

[0041] Where:

[0042] p m_i (t) is the mechanical power at the current moment t,

[0043] b i (t) represents the regulating stage pressure at the current moment t,

[0044] p m_i (t0) represents 20 seconds before the current time m_i The average value of (t) is in the first 20 seconds after the program starts, when there is no p m_i (t), using p e_i (t) replace,

[0045] b i (t0) is the average regulating stage pressure 20 seconds before the current moment.

[0046] Method 2 is as follows:

[0047] For thermal power units without thermal power collection or virtual power generation units composed of new energy units, the following mechanical power p based on electromagnetic power filtering is used: m_i Calculation method: A low-pass filter is used to separate the mechanical power less than 0.1Hz from the electromagnetic power. According to the time constant characteristics of the generator set, the parameters of the low-pass filter are as follows: the passband cutoff frequency is 0.12Hz, the stopband cutoff frequency is 0.15Hz, the passband ripple coefficient is 1, the stopband attenuation coefficient is 20, and the sampling frequency is 100Hz; a bidirectional IIR filter is used, that is, the data first passes through the IIR filter in the forward direction, and then passes through the same IIR filter in the reverse direction.

[0048] Preferably, in step 4, p is allocated according to the adjustment margin ratio of each unit. a The formula is as follows:

[0049]

[0050] Where:

[0051] Δp i (t) represents the active power regulation amount shared by unit i;

[0052] Among them, for thermal power units with thermal measurements, m i (t) is expressed as follows,

[0053]

[0054] Where:

[0055] m i (t) represents the regulation margin of each unit at the current time t,

[0056] p e_i (t) represents the current electromagnetic power,

[0057] d i (t) represents the valve opening,

[0058] b m_i (t) represents the main steam pressure,

[0059] c i (t) represents the main steam temperature,

[0060] p e_i_n Represents the rated electromagnetic power of the i-th unit.

[0061] For thermal power units without thermal measurement or virtual power generation units equivalent to new energy units, the regulation margin m of each unit at the current time t i (t) is expressed as follows,

[0062]

[0063] Preferably, the active power target setting value p of each participating regulating unit in step 5 is T_i The calculation formula of (t) is as follows,

[0064] p T_i (t) = p m_i (t)+Δp i (t).

[0065] Preferably, in step 6, the target power instructions of all units are included in one instruction, and the power instructions are sent to each unit in a broadcasting manner.

[0066] The second aspect of the present invention provides a super-primary frequency modulation synchronous AGC system based on the power difference between power generation and use, and the super-primary frequency modulation synchronous AGC method based on the power difference between power generation and use is provided, comprising: a synchronous data acquisition module, a section data summary and alignment module, an active power regulation amount calculation module, a distribution module, a power target setting value calculation module for each unit, and an instruction synchronization sending module, wherein:

[0067] The synchronous data acquisition module collects data with a time stamp at a 10ms period based on the synchronous phasor measurement device and sends it to the cross-sectional data summary and alignment module;

[0068] The section data aggregation and alignment module is used to aggregate and align the collected time-stamped data based on the high-precision source time stamp in the control center, form the simultaneous data section data required for subsequent calculation and analysis, and send it to the active regulation calculation module;

[0069] The active power regulation calculation module is used to calculate the current expected total active power regulation of the entire network by considering the power difference between generation and use, and send it to the distribution module;

[0070] The allocation module is used to allocate the regulating power undertaken by the units involved in the regulation according to the thermal regulation margin of each unit, and send it to the module for calculating the power target setting value of each unit;

[0071] The power target setting value calculation module for each unit is used to calculate the power target setting value of each unit and send it to the instruction synchronization sending module;

[0072] The instruction synchronization sending module is used to control the master station to synchronously send control instructions to each generator set at a set period of 10ms, where the control instructions consist of the active power target value of each unit.

[0073] The beneficial effect of the present invention is that, compared with the prior art, the high-precision synchronous phasor measurement data with a period of 10 milliseconds is used to synchronously calculate the difference between the power generation and load power of the entire network in real time based on the same time section data of each unit, and the frequency change is predicted accordingly. The frequency of the power grid is controlled in advance according to the prediction, and the continuous closed-loop control with a period of 10 milliseconds allows the advance control to be performed quickly and continuously, thereby preventing the power generation and consumption difference from being converted into frequency changes. In addition, thermal measurement or filtering methods are used to obtain the mechanical power of the generator that cannot be directly measured. Therefore, frequency control can be implemented at the level of centralized control of the entire network before the actual change of the power grid frequency occurs, that is, super-one frequency modulation control can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] Figure 1 The figure is a comparison diagram of the algorithm flow of conventional AGC and super-single frequency modulation synchronous AGC based on the power difference between generator and user. DETAILED DESCRIPTION

[0075] Various exemplary embodiments, features and aspects of the present disclosure will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.

[0076] The word “exemplary” is used exclusively herein to mean “serving as an example, example, or illustration.” Any embodiment described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments.

[0077] In addition, in order to better illustrate the present disclosure, numerous specific details are given in the following specific embodiments. It should be understood by those skilled in the art that the present disclosure can also be implemented without certain specific details. In some examples, methods, means, components and circuits well known to those skilled in the art are not described in detail in order to highlight the subject matter of the present disclosure.

[0078] The 10 ms level referred to in the present invention specifically means that the allowed instruction cycles are 10 ms, 20 ms, 30 ms, 40 ms, and 50 ms.

[0079] The invention patent discloses a method of using high-precision synchronous phasor measurement data with a 10-millisecond period, and based on the same time section data of each unit, synchronously and real-time calculation of the power generation and power consumption difference of the entire power grid is performed, and frequency changes are predicted accordingly, and advance frequency control is performed according to the prediction, and the advance control can be performed quickly and continuously through continuous closed-loop control with a 10-millisecond period, thereby preventing the power generation and power consumption difference from being converted into frequency changes; in addition, thermal measurement or filtering methods are used to obtain the mechanical power of the generator that cannot be directly measured. Therefore, frequency control can be started before the actual change of the power grid frequency occurs at the level of centralized control of the entire network, that is, super-one frequency modulation control can be achieved.

[0080] The patent of the present invention can have two application scenarios in the actual power grid. One is to completely replace the existing second-level cycle AGC, and this patent is used in the whole process of power grid operation; the other is to retain the existing second-level cycle in daily operation, and only switch to the execution of the super-one frequency regulation synchronous automatic generation control AGC proposed by this patent when the power grid is disturbed. The former requires the acquisition system, execution system and communication network of all generator sets to be modified to meet the needs of 10ms-level cycle fast communication and fast synchronous execution of instructions, and the operation mechanism and hardware modification of the existing power grid are relatively large. Therefore, it is currently mainly suitable for small-scale power grids such as enterprise power grids or park power grids, or power grids with little resistance to the transformation of the active control system of the entire network; while in the latter application scheme, the original second-level cycle automatic generation control system in the power grid can be retained, and most generators retain the original acquisition system based on remote RTU and the command execution system of the dispatching center; only a small number of units with good frequency regulation performance are modified, including information collection and transmission based on PMU, thermal information collection and transmission, and receiving and executing control center commands with a 10ms cycle.

[0081] In the latter system, which retains both the conventional AGC with a second-level cycle and the AGC with a super-primary frequency regulation based on the power difference between power generation and use with a 10-millisecond cycle, the units with good frequency regulation performance and participating in the frequency regulation control of the entire network can receive instructions from two AGC master stations at the same time; in daily stable operation, they will only receive control instructions from the conventional AGC. When the power grid is disturbed or there are signs of disturbance, both AGC master stations will send instructions to the frequency regulation units. At this time, the AGC substation of the frequency regulation unit will receive instructions from both AGC master station systems at the same time, and the instructions from the super-primary frequency regulation synchronous AGC master station with a millisecond cycle are the highest priority, that is, the instructions of the super-primary frequency regulation synchronous AGC are executed first. When the super-primary frequency regulation synchronous AGC master station detects that the disturbance has completely subsided, the power grid has resumed safe and stable operation and has lasted for a sufficient period of time, it will stop sending fast control instructions to the frequency regulation unit. The frequency regulation unit resumes receiving only control instructions from the conventional AGC with a second-level cycle.

[0082] No matter what form the patented method is used in practice, it has the following features: Figure 1 As shown in the flowchart, Embodiment 1 of the present invention provides a super-primary frequency modulation synchronous AGC method based on the power difference between the generator and the user, comprising the following steps:

[0083] Step 1: Continuously collect time-stamped data at a period of 10 ms based on a synchronized phasor measurement device.

[0084] A high-precision synchronous phasor measurement device is used to synchronously collect electrical measurement information with a 10-millisecond period at the outlet of the power generation source of the entire network or the high-voltage side of the step-up transformer of the new energy station and the external interconnection line. The collected data is time-stamped with microsecond accuracy to obtain the time-stamped power and frequency of the power outlet.

[0085] For thermal power units, you can further choose to collect additional thermal information of the unit, including regulating stage pressure, regulating valve opening, main steam pressure, temperature, and mark it with microsecond accuracy time stamp.

[0086] Step 2: Data aggregation and alignment based on high-precision source time stamps are performed at the control center.

[0087] The 10ms periodic data collected at the measurement point source and marked with a high-precision time stamp (error less than 1μs) will have different delays when it reaches the centralized analysis, decision-making and control server at the dispatching center through the data network. The centralized analysis, decision-making and control server or its front-end processor must align the data according to the time stamp before using this data to form the simultaneous data section data required for subsequent calculation and analysis.

[0088] Step 3: Calculate the current expected total active power regulation of the entire network by considering the power difference between generation and use

[0089] Calculate the current expected adjustment amount p of the active power of the whole network units a , which consists of the following three parts: ① The difference between the electromagnetic power frequency of all operating units in the whole network and the mechanical power of the units; ② The power adjustment required for the current existing frequency offset; ③ The deviation between the power of the external interconnection line of the power grid and the target power. The formula is as follows,

[0090] p a =Δp em +Δp f +Δp tie

[0091] Where:

[0092] p a Indicates the current expected adjustment amount of the active power of the whole network units.

[0093] Δp emIt indicates the difference between the electromagnetic power frequency at the machine end of all the running units in the whole network and the mechanical power of the units.

[0094] Δp f Indicates the power adjustment required for the current frequency deviation.

[0095] Δp tie Indicates the deviation between the power of the grid's external interconnection line and the target power.

[0096] Further, the formula is expressed as follows,

[0097] p a =k em (p e -p m )-k·Δf+(p tie -p tie_ref )

[0098]

[0099] Where:

[0100] k em The power deviation adjustment coefficient is usually taken as the ratio of the sum of the rated active power of all operating units in the whole network to the sum of the rated active power of all frequency regulating units in the whole network.

[0101] p e It represents the sum of active power measured by PMU at each frequency modulation unit.

[0102] N represents the number of frequency-regulated units.

[0103] p e_i represents the real-time active power of the i-th frequency-regulated unit measured by the PMU,

[0104] p m is the sum of the mechanical powers of each frequency-regulated unit,

[0105] k represents the frequency response coefficient, unit is MW / Hz,

[0106] Δf represents the deviation between the current frequency and the rated frequency.

[0107] p tie Indicates the current measured active power of the tie line.

[0108] p tie_ref Indicates the target active power of tie line control.

[0109] Furthermore, p m is the sum of the mechanical powers of each frequency-regulated unit,

[0110] The following formula represents:

[0111]

[0112] Where:

[0113] N represents the number of frequency-regulated units.

[0114] p m_i Represents the real-time mechanical power of the i-th frequency-regulated unit obtained by the estimation algorithm.

[0115] Furthermore, there are two ways to calculate mechanical power:

[0116] For thermal power units that send up thermal quantities such as regulating stage pressure, the mechanical power p measured based on the regulating stage pressure m-i The estimation method is expressed as follows:

[0117]

[0118] Where:

[0119] p m_i (t) is the mechanical power at the current moment t,

[0120] b i (t) represents the regulating stage pressure at the current moment t,

[0121] p m_i (t0) represents 20 seconds before the current time m_i The average value of (t) is 20s after the program starts, when there is no p m_i (t), using p e_i (t) replace,

[0122] b i (t0) is the average regulating stage pressure 20 seconds before the current moment.

[0123] For thermal power units without thermal power collection or virtual power generation units composed of new energy units, the mechanical power calculation method based on electromagnetic power filtering is adopted:

[0124] Preferably, based on the filtered mechanical power p m-i The estimation method is as follows: a low-pass filter is used to separate the mechanical power less than 0.1Hz from the electromagnetic power. According to the time constant characteristics of the generator set, the parameters of the low-pass filter are a passband cutoff frequency of 0.12Hz, a stopband cutoff frequency of 0.15Hz, a passband ripple coefficient of 1, a stopband attenuation coefficient of 20, and a sampling frequency of 100Hz. In order to ensure computational efficiency and avoid large phase shifts, a bidirectional IIR filter is used, that is, the data first passes through an IIR filter in the forward direction, and then passes through the same IIR filter in the reverse direction.

[0125] Further preferably, the frequency response coefficient k can be calculated from the speed change rate m of the generator set, because the calculation formula of m is as follows:

[0126]

[0127] where p n It is the sum of the rated powers of all running units.

[0128] Therefore, the total power regulation caused by the frequency deviation Δp f The calculation formula is as follows:

[0129] Δp f =-kΔf

[0130]

[0131] Where:

[0132] p e_i_n represents the rated electromagnetic power of the i-th unit,

[0133] m represents the speed change rate of the generator set.

[0134] Therefore, the calculation formula between the frequency response coefficient k and the unit speed change rate m can be obtained as follows:

[0135] Step 4: Allocate the regulating power to each unit according to its regulating margin.

[0136] For units with thermal measurements, their regulation margin is calculated based on their thermal measurements, and the total active power regulation amount is allocated to each adjustable unit according to the active power regulation margin ratio of each operating unit.

[0137] Note: The total power control amount p a >0, the unit output should increase, p a <0, the unit output should be reduced. In addition, only the units involved in the regulation need to calculate the regulation amount. Allocate p according to the regulation margin ratio of each unit a The method is as follows:

[0138] For thermal power units with thermal measurements, the current regulation margin m of each unit is i (t) is expressed as follows,

[0139]

[0140] Where:

[0141] m i (t) represents the regulation margin of each unit at the current time t,

[0142] p e_i(t) represents the current electromagnetic power,

[0143] d i (t) represents the valve opening,

[0144] b m_i (t) represents the main steam pressure,

[0145] c i (t) represents the main steam temperature,

[0146] The subscript n indicates that the corresponding quantity is a rated value.

[0147] For thermal power units without thermal measurement or virtual power generation units equivalent to new energy units, the regulation margin m of each unit at the current time t i (t) is expressed as follows,

[0148]

[0149] Therefore, the active power regulation amount shared by unit i is Δp i (t) is expressed as follows,

[0150]

[0151] Step 5: Calculate the power target setting value of each unit.

[0152] Active power target setting value p of each participating regulating unit T_i The calculation formula of (t) is as follows,

[0153] p T_i (t) = p m_i (t)+Δp i (t)

[0154] Step 6: The control master station sends control instructions to each generator set periodically at a period of 10ms.

[0155] The 10ms cycle of the control master station sending instructions can be set between 10ms and 50ms according to demand, for example, a 30ms control cycle is used. The active power target value of each unit obtained in step 5 is sent to the machine network coordination substation at the same time. In order to achieve synchronization, the target power instructions of all units are included in one instruction, and the power instructions are sent to each unit in a broadcast manner.

[0156] In the above two application scenarios of the present invention, for the first scenario in which the method of the present invention completely replaces the conventional AGC, the exit of the super-primary frequency regulation synchronous AGC mainly occurs after the power grid is black, and the automatic power generation control is manually exited; and for the second scenario in which the present invention only participates when a power grid disturbance occurs, the super-primary frequency regulation synchronous AGC master station monitors the stage of occurrence and development of the power grid disturbance. When it is confirmed that the disturbance has subsided, the control center master station will stop issuing power control instructions to the units participating in the centralized coordinated frequency regulation, and send a signal to exit the super-primary frequency regulation synchronous AGC control mode to the units participating in the frequency regulation.

[0157] Embodiment 2 of the present invention provides a super-primary frequency modulation synchronous AGC system based on the power difference between power generation and use, and runs the super-primary frequency modulation synchronous AGC method based on the power difference between power generation and use, including: a synchronous data acquisition module, a section data summary and alignment module, an active power regulation amount calculation module, a distribution module, a power target setting value calculation module for each unit, and an instruction synchronization sending module, wherein:

[0158] The synchronous data acquisition module collects data with time stamp based on the synchronous phasor measurement device PMU at a period of 10ms and sends it to the cross-sectional data summary and alignment module; the typical acquisition period of PMU is 10ms, 20ms, and 40ms. It is recommended to give priority to the short acquisition period.

[0159] The section data aggregation and alignment module is used to aggregate and align the collected data based on the high-precision source time stamp in the control center to form the simultaneous data section data required for subsequent calculation and analysis, and send it to the active regulation calculation module;

[0160] The active power regulation calculation module is used to calculate the current expected total active power regulation of the entire network by considering the power difference between generation and use, and send it to the distribution module;

[0161] The allocation module is used to allocate the regulating power undertaken by the units involved in the regulation according to the thermal regulation margin of each unit, and send it to the module for calculating the power target setting value of each unit;

[0162] The power target setting value calculation module for each unit is used to calculate the power target setting value of each unit and send it to the instruction synchronization sending module;

[0163] The instruction synchronization sending module is used to control the master station to synchronously send control instructions to each generator set at a period of 10ms, where the control instructions consist of the active power target value of each unit.

[0164] The beneficial effect of the present invention is that, compared with the prior art, the automatic generation control AGC system of the present invention can realize 10 millisecond-level super-primary frequency regulation synchronous automatic generation control for conventional units or new energy units participating in rapid frequency regulation or accident control within the entire network, thereby realizing coordinated utilization of units within the entire network, realizing real-time compensation for the difference between total power generation and total power consumption of the entire network, and preventing the grid frequency from deviating from the rated value; that is, before the actual deviation of the grid frequency occurs, control measures are taken to suppress the deviation of the grid frequency, thereby generating a response speed that exceeds the conventional primary frequency regulation based on local information, and at the same time avoiding the problem that the primary frequency regulation of each unit is only adjusted based on the local signal, and the coordination of the units in the entire network cannot be achieved, and therefore the limited rapid regulation capability of each unit cannot be maximized.

[0165] The applicant of the present invention has made a detailed explanation and description of the implementation examples of the present invention in conjunction with the drawings in the specification. However, those skilled in the art should understand that the above implementation examples are only preferred implementation schemes of the present invention, and the detailed description is only to help readers better understand the spirit of the present invention, but not to limit the scope of protection of the present invention. On the contrary, any improvements or modifications based on the inventive spirit of the present invention should fall within the scope of protection of the present invention.

Claims

1. A super-primary frequency modulation synchronous AGC method based on the difference in power generation and use, characterized in that: The following steps are involved: Step 1, continuously collecting time-stamped data at a 10 ms level period based on a synchronized phasor measurement device; Step 2: The data collected in step 1 are aggregated and aligned at the control center according to the source time stamp of the data to form the simultaneous data section data required for subsequent calculation and analysis; Step 3, taking into account the power difference between generation and use, calculate the current expected total active power regulation of the entire network; Step 4: Based on the result obtained in step 3, the regulating power undertaken by the units participating in the regulation is allocated according to their current regulating margins; Allocate p according to the regulation margin ratio of each unit a The formula is as follows: Where: Δp i (t) represents the active power regulation amount shared by unit i; Among them, for thermal power units with thermal measurements, m i (t) is expressed as follows, Where: m i (t) represents the regulation margin of each unit at the current time t, p e_i (t) represents the current electromagnetic power, d i (t) represents the valve opening, b m_i (t) represents the main steam pressure, c i (t) represents the main steam temperature, p e_i_n represents the rated electromagnetic power of the i-th unit; For thermal power units without thermal measurement or virtual power generation units equivalent to new energy units, the regulation margin m of each unit at the current time t i (t) is expressed as follows, Step 5, calculating the power target setting value of each unit according to the result obtained in step 4; Step 6, the active power target value of each unit obtained in step 5 is combined into a control instruction, and the control master station synchronously sends the control instruction to each generator set at a set 10ms level cycle.

2. The method for super-primary frequency modulation synchronous AGC based on power difference between generator and user according to claim 1, characterized in that: In step 1, PMU is used to synchronously collect electrical measurement information with a 10ms period at the outlet of the power generation source of the entire network or the high-voltage side of the step-up transformer of the new energy station and the voltage and current phasors of the external interconnection lines, and the collected data is time-stamped with microsecond accuracy to obtain the power and frequency with time stamp at the power outlet.

3. The method for super-primary frequency modulation synchronous AGC based on power difference between generator and user according to claim 2, characterized in that: In step 1, the thermal information of the thermal power unit is further selected and collected, including the regulating stage pressure, the regulating valve opening, the main steam pressure, and the temperature, and is marked with a microsecond precision time stamp.

4. The method for super-primary frequency modulation synchronous AGC based on power difference between generator and user according to claim 3, characterized in that: The current expected total active power regulation of the entire network described in step 3 is calculated using the following formula: p a =Δp em +Δp f +Δp tie p a =k em (p e -p m )-k·Δf+(p tie -p tie_ref ) Where: p a Indicates the current expected adjustment amount of the active power of the whole network units. Δp em It indicates the difference between the electromagnetic power frequency at the machine end of all the running units in the whole network and the mechanical power of the units. Δp f Indicates the power adjustment required for the current frequency deviation. Δp tie Indicates the deviation between the power of the grid's external interconnection line and the target power. k em It represents the power generation and consumption deviation adjustment coefficient, which is taken as the ratio of the sum of the rated active power of all operating units in the whole network to the sum of the rated active power of all frequency regulating units in the whole network. p e It represents the sum of active power measured by PMU at each frequency modulation unit. N represents the number of frequency-regulated units. p e_i represents the real-time active power of the i-th frequency-regulated unit measured by the PMU, p m It represents the sum of the mechanical power of each frequency-regulated unit. k represents the frequency response coefficient, unit MW / Hz, Δf represents the deviation between the current frequency and the rated frequency. p tie Indicates the current measured active power of the tie line. p tie_ref represents the target active power of the tie line control, p m_i represents the real-time mechanical power of the i-th frequency regulating unit obtained by the estimation algorithm, m represents the speed change rate of the generator set, p e_i_n Represents the rated electromagnetic power of the i-th unit.

5. The method for super-primary frequency modulation synchronous AGC based on power difference between generator and user according to claim 4, characterized in that: There are two methods for calculating the mechanical power described in step 3, and method 1 is as follows: For thermal power units that send up thermal quantities such as regulating stage pressure, the mechanical power p measured based on the regulating stage pressure m-i The estimation method is expressed as follows: Where: p m_i (t) is the mechanical power at the current moment t, b i (t) represents the regulating stage pressure at the current moment t, p m_i (t0) represents 20 seconds before the current time m_i The average value of (t) is in the first 20 seconds after the program starts, when there is no p m_i (t), using p e_i (t) replace, b i (t0) is the average regulating stage pressure 20 seconds before the current moment.

6. The super-primary frequency modulation synchronous AGC method based on power difference between generator and user according to claim 4, characterized in that: There are two methods for calculating the mechanical power described in step 3, and method 2 is as follows: For thermal power units without thermal power collection or virtual power generation units composed of new energy units, the following mechanical power p based on electromagnetic power filtering is used: m_i Calculation method: A low-pass filter is used to separate the mechanical power less than 0.1Hz from the electromagnetic power. According to the time constant characteristics of the generator set, the parameters of the low-pass filter are as follows: the passband cutoff frequency is 0.12Hz, the stopband cutoff frequency is 0.15Hz, the passband ripple coefficient is 1, the stopband attenuation coefficient is 20, and the sampling frequency is 100Hz; a bidirectional IIR filter is used, that is, the data first passes through the IIR filter in the forward direction, and then passes through the same IIR filter in the reverse direction.

7. The method for super-primary frequency modulation synchronous AGC based on power difference between generator and user according to claim 6, characterized in that: The active power target setting value p of each participating regulating unit in step 5 T_i The calculation formula of (t) is as follows, p T_i (t)=p m_i (t)+Δp i (t)。 8. The method for super-primary frequency modulation synchronous AGC based on power difference between generator and user according to claim 7, characterized in that: In step 6, the target power instructions of all units are included in one instruction, and the power instructions are sent to each unit in a broadcast manner.

9. A super-primary frequency modulation synchronous AGC system based on power difference between generators and users, running a super-primary frequency modulation synchronous AGC method based on power difference between generators and users according to any one of claims 1 to 8, comprising: Synchronous data acquisition module, section data summary and alignment module, active power regulation calculation module, distribution module, power target setting value calculation module for each unit, and instruction synchronous issuance module, characterized by: The synchronous data acquisition module collects data with a time stamp at a 10ms period based on the synchronous phasor measurement device and sends it to the cross-sectional data summary and alignment module; The section data aggregation and alignment module is used to aggregate and align the collected time-stamped data based on the high-precision source time stamp in the control center, form the simultaneous data section data required for subsequent calculation and analysis, and send it to the active regulation calculation module; The active power regulation calculation module is used to calculate the current expected total active power regulation of the entire network by considering the power difference between generation and use, and send it to the distribution module; The allocation module is used to allocate the regulating power undertaken by the units involved in the regulation according to the thermal regulation margin of each unit, and send it to the module for calculating the power target setting value of each unit; The power target setting value calculation module for each unit is used to calculate the power target setting value of each unit and send it to the instruction synchronization sending module; The instruction synchronization sending module is used to control the master station to synchronously send control instructions to each generator set at a set period of 10ms, where the control instructions consist of the active power target value of each unit.