A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues

By using a water-cooled gas-solid separator and multiple air flow design in the circulating fluidized bed boiler, the problems of high energy consumption and high failure rate of the cyclone separator are solved, efficient gas-solid separation and heat transfer are achieved, and the amount of material used is reduced. and maintenance costs, improving the market competitiveness of the boiler.

CN114413255BActive Publication Date: 2024-10-22王森
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202210081387.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2021-01-26
Filing Date
2022-01-24
Publication Date
2024-10-22
Estimated Expiration
2042-01-24

AI Technical Summary

Technical Problem

Circulating fluidized bed boilers are at a disadvantage in market competition, mainly due to the high energy consumption of raw materials, high manufacturing and installation costs, high failure rates, high maintenance and repair costs of cyclone separators, and the easy wear and tear of the convection heating surface, and the existing technology is in There are deficiencies in high temperature and gravity separation.

Method used

The fluidized bed boiler design adopts a water-cooled gas-solid separator and four- and seven-pass water-cooled flues, including a tapered section in the upper part of the furnace, a second-pass high-temperature accelerated downward tapered flue, an auxiliary combustion chamber, and a burnout chamber, which naturally expands the combustion chamber. The exhaust chamber and multiple air flow designs realize gas-solid high-temperature inertial gravity separation, reducing the height of the furnace body and the amount of material used.

Benefits of technology

It significantly reduces the use of wear-resistant heat insulation materials and steel frames of the boiler, improves the heat transfer effect and separation efficiency, extends the service life of the boiler, reduces maintenance and repair costs, and improves market competitiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114413255B_ABST
    Figure CN114413255B_ABST
Patent Text Reader

Abstract

The invention discloses a fluidized bed boiler with a water-cooled gas-solid separator and four-pass and seven-pass water-cooled flues, including a steam boiler, a forced circulation tube rack hot water boiler, a power station boiler, and a super-large power station boiler. The fluidized bed boiler includes a furnace main combustion chamber, an auxiliary combustion chamber, a burnout chamber, a four-pass water-cooled flue, a seven-pass water-cooled flue, and a water-cooled ceiling. The separator of the invention does not require any special device and separation element, which can save the refractory and heat-insulating materials and steel frame support of all cyclone separators. The integrated structure of the invention can save the refractory and heat-insulating materials of two cross walls. The CFB boiler with a flue gas four-pass>75T and the CFB boiler with a flue gas seven-pass>600MW of the invention can reduce the furnace body height by 30% and 40% respectively, and save the refractory and heat-insulating materials and steel frames of the whole machine by 40% and 30% and 50% and 40% respectively. The ultra-low initial smoke emission of the invention and the wet structure of the furnace wall flue of all heating surfaces of the furnace body can eliminate the wear of the convection heating surface, greatly save the maintenance and repair costs, and extend the service life of the boiler.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention discloses a fluidized bed boiler with a water-cooled gas-solid separator and four and seven return water-cooled flues, and relates to circulating fluidized bed hot water boilers, circulating fluidized bed steam boilers, circulating fluidized bed cogeneration boilers and circulating fluidized bed power station boilers; in particular, to an ultra-large circulating fluidized bed power station boiler and an ultra-large circulating fluidized bed centralized heating boiler; to energy-saving and emission-reduction transformation of various circulating fluidized bed boilers, pulverized coal boilers and layer-fired chain boilers in use; to upgrading and replacing various circulating fluidized bed boilers in use; and to using low-rank coal to replace pulverized coal boilers, layer-fired chain boilers and natural gas boilers in a low-cost, clean and efficient manner. Background Art

[0002] Circulating fluidized bed boilers, with their staged air supply, easily adjust the air-fuel mixture ratio and low-temperature circulating combustion, can burn all types of coal, especially low-rank coal. They not only achieve high combustion efficiency but also achieve highly efficient sulfur dioxide removal and ultra-low nitrogen oxide formation within the boiler at low cost, making pollutant emissions comparable to those of natural gas boilers. When generating electricity and providing heat, pollutant emissions from circulating fluidized bed boilers are even lower than those from natural gas boilers. Circulating fluidized bed boilers have become a proven technology for the clean and efficient use of coal.

[0003] However, the current reality is that circulating fluidized bed boilers only have an absolute competitive advantage in the market when using low-quality coal and meeting special environmental requirements. When the market is not restricted by coal type and there are no special environmental requirements, circulating fluidized bed boilers are at a significant competitive disadvantage. This is due to the excessively high furnace structure of circulating fluidized bed boilers, the high raw material and energy consumption of the core component "cyclone separator", high manufacturing and installation costs, high failure rate, high maintenance and repair costs, and easy wear of the convection heating surface. If a major breakthrough in this technology can be achieved and widely promoted in the market, it will undoubtedly have important strategic significance for energy conservation, consumption reduction, emission reduction, and climate change response in my country and the world.

[0004] Currently, the most popular and mature fluidized bed boiler in the Chinese market is a high-temperature adiabatic cyclone separator fluidized bed boiler made of wear-resistant insulation materials. Currently, the most popular and mature fluidized bed boiler in the European and American markets is a circular steam (water)-cooled cyclone separator fluidized bed boiler. Both of these boiler types share a common disadvantage: the boiler's main frame, furnace wall, and steam-water system are composed of three interconnected independent bodies: the furnace, cyclone separator, and vertical shaft flue. The large number of independent walls and the high height of the furnace body result in high consumption of refractory insulation materials and steel frames. Furthermore, the boiler structure is the same, differing only in size. This results in high costs for medium and small boilers, especially for small boilers.

[0005] Let's first consider high-temperature adiabatic cyclone separators. Because these separators use wear-resistant, thermally insulating materials >300mm thick, not only do they consume a lot of raw materials and increase manufacturing and installation costs, they also suffer from thermal inertia and high heat loss. These disadvantages include high-temperature coking, slow boiler startup and shutdown, high failure rates, high maintenance costs, and wear on the convection heating surfaces. This type of separator structure consists of a multi-layer structure consisting of a steel shell, insulation blocks, insulating refractory bricks, anti-wear linings, and fastening bricks, placing stringent demands on construction techniques and refractory material selection.

[0006] Let's look at the circular steam (water) cooled cyclone separator. Although this type of separator reduces the wear-resistant insulation material, solves the disadvantages of thermal inertia and large heat loss, and prevents the boiler from coking and has fast start and stop, it also has the disadvantages of high wind speed, large resistance, serious fly ash entrainment resulting in high power consumption of the induced draft fan, high initial emission concentration of smoke, and easy wear of the convection heating surface. In particular, the structure of the separator membrane wall and the circular ring header is complex, the process requirements and manufacturing costs are extremely high, and the selling price is high. Moreover, once the anti-wear castable on the surface of the cyclone tube falls off, the steam-water pipeline will quickly wear out and cause leakage.

[0007] In addition, there is a square water (steam) cooled cyclone separator fluidized bed boiler, in which the separator membrane water-cooled wall and the combustion chamber membrane water-cooled wall are integrated. Although the boiler structure is very compact, the refractory and wear-resistant lining is thin, the boiler starts and stops quickly, and the heat dissipation loss is small, its separation efficiency and stability are significantly lower than those of the circular water (steam) cooled cyclone separator. Since the centrifugal force separation characteristics of the cyclone separator are not very compatible with the square structure, it is normal that the square water (steam) cooled cyclone separator fluidized bed boiler has low separation efficiency. The efficiency and stability of gas-solid separation are directly related to the performance of the fluidized bed boiler. Obviously, this type of furnace does not have a market competitive advantage. Therefore, although there are literature reports that the square water (steam) cooled cyclone separator fluidized bed boiler is a third-generation fluidized bed boiler, even though this publicity has been going on for many years, the square water (steam) cooled cyclone separator fluidized bed boiler still cannot be said to have a market share.

[0008] Although the inertial gravity separator for a circulating fluidized bed boiler disclosed in the invention patent No. ZL201480002881.9 has many outstanding advantages over the above two cyclone separators, such as low flow resistance that saves power consumption of the induced draft fan, a water-cooled separator structure that saves wear-resistant high-temperature materials, and low original smoke dust emissions, there are still obvious defects in the key technologies of high-temperature and gravity separation. For example, the first key technology of the patent, the "first-stage 'high-temperature' inertial gravity water-cooled separator" described in the claims, is difficult to guarantee whether it can achieve "high temperature"; the second key technology of the patent, according to the sixth scheme of the attached drawings of the specification, the vertical structure of the water-cooled wall of the guiding gas-solid two-phase direct impact silo, makes the low flow resistance of the descending flue not optimal; the third key technology of the patent, according to the seventh scheme of the attached drawings of the specification, the structural form of the water-cooled wall of the guiding gas-solid two-phase direct impact silo, seriously affects the smoke gravity sedimentation efficiency and ultra-low original smoke dust emissions; many design schemes make the manufacturing and installation processes complicated and costly. Summary of the Invention

[0009] Based on this, the present invention proposes a fluidized bed boiler with a water-cooled gas-solid separator and four and seven return water-cooled flues. It not only solves the market competition shortcomings of the traditional "cyclone separator" and the shortcomings of the ultra-high boiler body, and solves the defects of the invention patent ZL201480002881.9, but also solves the comprehensive innovation of the new structure of the boiler body, new process, and new high-temperature water-cooled gas-solid separator, making the advantages of the present invention more prominent, perfect and irreplaceable.

[0010] First, the tapered cross-section of the upper part of the furnace of the present invention can ensure the wear protection of the heating surface under high temperature and increased smoke velocity conditions; the second-pass high-temperature accelerated downward tapered flue can accelerate the high-temperature flue gas to enter the auxiliary combustion chamber with a large expansion space and a turning channel for full combustion.

[0011] Secondly, the tapered cross-section of the upper part of the furnace of the present invention and the forward-moving rear wall of the second-pass high-temperature accelerated downward tapered flue can realize the optimal design of different flow directions, different processes and different flow rates of dust-laden flue gas, making the performance advantages of gas-solid high-temperature inertial gravity separation more stable and reliable.

[0012] Third, the furnace walls and flues of all radiation convection heating surfaces of the boiler body of the present invention all realize a water vapor cooling wet structure, which can greatly reduce the failure rate and maintenance costs and extend the service life of the boiler.

[0013] Fourth, the naturally expanding burnout chamber (three-pass ascending flue) has a low flow rate of 3-﹤5 meters throughout the entire process, which can not only improve the burnout degree of combustible materials, especially achieve ultra-low emissions of initial smoke, but also eliminate the wear of convection heating surfaces, and truly solve the problems that cyclone separators cannot solve.

[0014] Fifth, the CFB boiler with a four-pass water-cooled flue of more than 75T can reduce the furnace height by 30% compared with the traditional cyclone separator CFB boiler. This alone can save 30% of the raw materials of the boiler body.

[0015] Sixth, the ultra-large CFB boiler with seven return water-cooled flues and a capacity of more than 600MW can reduce the furnace height by 40% compared with the traditional cyclone separator CFB boiler. This alone can save 40% of the raw materials of the boiler body.

[0016] The present invention is implemented as follows: the fluidized bed boiler with a water-cooled gas-solid separator and four- and seven-pass water-cooled flues proposed in the present invention includes: a furnace, a main combustion chamber of the furnace, a tapered cross-section at the upper part of the furnace, a two-pass high-temperature accelerated downward tapered flue, an auxiliary combustion chamber (a large expansion space and a turning channel), a burnout chamber (a three-pass ascending flue), a four-pass water-cooled flue, a seven-pass water-cooled flue, a seven-pass all-water vapor cooling heating surface, a water-cooled ceiling, a superheater ceiling, a superheater, and an economizer.

[0017] The four-pass water-cooled flue includes: ① a first-pass flue from the main combustion chamber of the furnace to the flue gas outlet of the furnace, ② a second-pass high-temperature accelerated downward convergent flue, ③ a third-pass ascending flue, the third-pass ascending flue is a burnout chamber, and ④ a boiler tail convection flue, the boiler tail convection flue is a vertical shaft flue.

[0018] The seven-pass water-cooled flue includes: ① a one-pass from the main combustion chamber of the furnace to the flue gas outlet of the furnace, ② two-pass high-temperature accelerated downward convergent flues in front of the furnace, ③ two-pass high-temperature accelerated downward convergent flues in the back of the furnace, ④ three-pass ascending flues in front of the furnace (upper burnout chamber), ⑤ three-pass ascending flues in the back of the furnace (upper burnout chamber), ⑥ longitudinal wet water vapor cooling flue on the upper part of the furnace, ⑦ convection flue at the rear of the boiler, and the convection flue at the rear of the boiler is a vertical shaft flue.

[0019] The seven-pass all-water vapor cooling heating surface includes the seven transverse membrane water-cooled walls and two laterally symmetrical membrane water-cooled walls of the six upper and lower return flues, all of which are water-cooled heating surfaces; the upper end of the longitudinal wet water vapor cooling flue on the upper part of the furnace is a water-cooled heating surface, the lower end of the longitudinal wet water vapor cooling flue on the upper part of the furnace is a high-temperature superheater, i.e., a steam-cooled heating surface, and the front, rear, and left and right ends of the longitudinal wet water vapor cooling flue on the upper part of the furnace are water-cooled heating surfaces.

[0020] The significant beneficial effects of the new structure of the present invention are:

[0021] The four-pass water-cooled flue structure of the present invention allows CFB boilers (≥75 tonnes) to maintain a significantly longer flue gas flow path than cyclone separators, while reducing furnace height by 30%. This alone can save 30% of the boiler's wear-resistant insulation material and 30% of the steel frame. The integrated structure of the present invention can save approximately 10% of the total insulation material used in the two transverse walls and 5% of the steel frame. Furthermore, all three transverse membrane water walls are heated from both sides, significantly improving heat transfer. In contrast, the heating surfaces of cyclone separator fluidized bed boilers are all heated from one side.

[0022] The water-cooled gas-solid separation system of this invention does not require any specialized equipment or separation components. The heated surface naturally forms a water-cooled, high-temperature inertial gravity separator. Compared with conventional fluidized bed boilers equipped with cyclone separators, this system can save approximately 10% of wear-resistant and thermal insulation materials and 5% of steel frame. This also saves approximately 50% of refractory insulation materials and 40% of steel frame per boiler for CFBs larger than 75 tons.

[0023] The seven-pass water-cooled flue structure of the present invention enables a flue gas flow path significantly longer than that of a fluidized bed boiler with a cyclone separator for supercritical CFB boilers exceeding 600MW, while reducing the furnace height by 40%. This alone can save 40% of the boiler's wear-resistant, thermal insulation materials and 40% of its steel frame. Based on the structural principles of the four-pass water-cooled flue, each supercritical CFB boiler exceeding 600MW can save approximately 60% of its refractory, thermal insulation materials and 50% of its steel frame. The five transverse membrane water walls are all heated on both sides, significantly improving heat transfer efficiency.

[0024] The super-large power station boiler structure of the present invention has a longitudinal wet steam cooling flue on the upper part of the furnace. The six surfaces of the upper, lower, front, rear and two sides of the longitudinal wet steam cooling flue on the upper part of the furnace are all wet structures, that is, the upper wall of the longitudinal wet steam cooling flue on the upper part of the furnace is a full membrane water-cooled wall plus heat insulation material, and the lower wall of the longitudinal wet steam cooling flue on the upper part of the furnace is a high-temperature superheater covering the six flues. The high-temperature superheater is closely adjacent to the top of the furnace and the top of the high-temperature accelerated downward tapered flue in the first two return passes of the furnace and the top of the high-temperature accelerated downward tapered flue in the second return pass of the furnace. The membrane wall high-temperature superheater or the light tube high-temperature superheater is cast with refractory material (sealing layer), and is sealed with the three return upward flues in the first three passes of the furnace. The flue outlet (the inlet of the longitudinal wet steam cooling flue at the top of the boiler) is adjacent to the flue outlet of the three-pass ascending flue at the rear of the furnace (the inlet of the longitudinal wet steam cooling flue at the top of the boiler). The distance between the high-temperature superheater and the top of the vertical shaft flue is the flue gas outlet of the boiler top flue, i.e., the vertical shaft flue inlet. The front wall of the boiler top flue is a membrane-type water-cooled wall with thermal insulation material, and the rear wall of the boiler top flue is a membrane-type water-cooled wall with thermal insulation material. This not only effectively protects the furnace wall and extends the flue service life by 5-7 years, but also increases the heating surface, thereby improving the thermal efficiency of the boiler. The top flue of a cyclone separator fluidized bed boiler, on the other hand, is cast with high-temperature refractory material, which not only shortens its service life but also causes significant heat loss.

[0025] The tapered cross-section of the upper furnace and the two-pass high-temperature accelerated downward tapered flue of the present invention bring three major beneficial effects: First, it is conducive to expanding the full cross-section of the burnout chamber (three-pass upward flue) and ensuring a low flow rate throughout the exhaust flue, which is conducive to improving the burnout degree of combustibles and reducing the entrainment of fly ash by the airflow. Second, it can increase the smoke temperature and smoke speed to enter the auxiliary combustion chamber with a large expansion space and a turning channel in time for full combustion and radiative heat transfer. Third, the tapered cross-section of the upper furnace can increase the heat load of the upper furnace, and the normal high temperature of the upper furnace can be met by using natural secondary air or a lower secondary hot air temperature, and the hot air is concentrated to meet the high temperature and low oxygen requirements of the primary air in the dense phase area (flue gas recirculation).

[0026] The full cross-sections of the auxiliary combustion chamber (large expansion space and turning channel) and the burnout chamber (three-pass ascending flue) of the present invention are larger than the furnace cross-section, which is conducive to the full combustion and radiation heat transfer of combustibles, can reduce the carbon content of fly ash and improve thermal efficiency.

[0027] The fluidized bed boiler with a water-cooled gas-solid separator and four and seven return water-cooled flues according to the present invention also includes a water outlet, a gas collecting tank, an automatic exhaust valve and a coal economizer. The four-in-one water-cooled ceiling is longitudinally arranged on the horizontal header on the front wall of the furnace, the horizontal header on the rear wall of the furnace, the horizontal header on the water-cooled wall of the flue gas directing the silo, the horizontal header on the front wall of the shaft and the upper end of the horizontal header on the rear wall of the shaft. The front end of the four-in-one water-cooled ceiling is connected to the front horizontal header of the four-in-one water-cooled ceiling, and the rear end of the four-in-one water-cooled ceiling is connected to the rear horizontal header of the four-in-one water-cooled ceiling. The superheater ceiling is longitudinally arranged on the upper horizontal header on the front wall of the furnace, the upper horizontal header on the rear wall of the furnace, the horizontal header on the water-cooled wall of the guide flue gas directly to the silo, and the upper end of the horizontal header on the front wall of the shaft and the horizontal header on the rear wall of the shaft. The front end of the superheater ceiling is connected to the steam outlet, the rear end of the superheater ceiling is connected to the reheater, and the air ducts pass through the superheater ceiling and are connected to the air main.

[0028] The full-membrane water-cooled wall separator, full-membrane water-cooled wall flue, and full-membrane water (steam) cooled ceiling of the present invention not only have excellent sealing properties that help protect the furnace wall, significantly extend the service life of the boiler, and save maintenance and repair costs; they also completely solve the problem of insufficient space for heating surfaces within the bed of large circulating fluidized bed boilers; and completely resolve the drawbacks of traditional fluidized bed external beds (external superheaters) with relatively complex combustion systems, equipment, and overall boiler layout. This completely breaks away from the stage where large circulating fluidized bed power station boilers relied on modular stacking or amplification. The larger the boiler, the greater the savings in refractory insulation materials and steel frames.

[0029] Ultra-high heat transfer performance: The seven-pass water-cooled flue CFB boiler of this invention features dual-sided heating of the five transverse membrane water-cooled walls: the furnace front and rear membrane water-cooled walls, the dust-laden flue gas impingement silo water-cooled walls, and the shaft front and rear membrane water-cooled walls. In contrast, all transverse membrane water-cooled walls of conventional CFB boilers are heated from a single side.

[0030] The water circulation flow resistance is small, easy to inspect and repair, and the equipment runs safely and stably: all the headers of the separator membrane water-cooled wall are straight headers with hand holes at both ends; while the membrane water-cooled wall headers of the water-steam cooling cyclone separator are circular ring headers, which not only have high water circulation flow resistance, but also cause serious fouling and are difficult to repair in the event of management errors; and once the anti-wear castable on the surface of the cyclone tube falls off, the steam-water pipeline will quickly wear out and cause leakage.

[0031] The high-end structural design ensures excellent furnace airtightness and long-term stable performance: the full-membrane water-cooled hearth, full-membrane water-wall separator, full-membrane water-wall shaft, and full-membrane water-wall ceiling are all integrated into the full-membrane water-wall structure, extending the service life of the entire boiler. In contrast, the furnace, separator, and shaft of a steam-cooled circular cyclone separator fluidized-bed boiler are all independent structures. The more cyclones there are, the more independent structures there are. Some areas are difficult to implement with a full-membrane water-wall, and refractory casting is required instead. This not only reduces service life and increases maintenance costs, but also increases heat loss.

[0032] The novel process and significant beneficial effects of the present invention: The present invention can adopt different boiler body design, manufacturing and installation processes according to the size of the boiler.

[0033] 1. The small boiler body of this invention is assembled into separate components in the factory, making it easy to use tooling to ensure manufacturing quality and improve manufacturing efficiency. The entire unit can be assembled on-site in separate parts. This can significantly reduce on-site processing and installation, helping to ensure installation quality and improve installation efficiency.

[0034] 2. The medium-sized boiler body of the present invention is manufactured in-house in individual components and connected and assembled on-site using connecting pipes. This can significantly reduce on-site processing and installation workload, significantly improving installation quality and efficiency.

[0035] 3. For larger, large, and super-large boiler bodies, the present invention manufactures individual components in-house. These components are then butt-welded and sealed with flat irons on-site. The components are then connected to the connecting pipe, air guide pipe, and downcomer, respectively. This significantly reduces on-site processing and installation, ensuring installation quality and improving efficiency.

[0036] 4. Simple Structure and Advanced Technology: 100% of companies with Class A qualifications can produce high-end full-mode wall products, and the vast majority of companies with Class B qualifications can also produce them, significantly reducing manufacturing and installation costs. However, 90% of Chinese companies with Class A qualifications are unable to produce water vapor-cooled circular cyclone separators. Currently, only a few companies in China can produce them, and the process is extremely complex, resulting in extremely high manufacturing and installation costs. While high-temperature water vapor-cooled circular cyclone separator fluidized bed boilers have many advantages over high-temperature adiabatic cyclone separator fluidized bed boilers, their high manufacturing costs and high price have resulted in a very low market share in China.

[0037] The novel high-temperature water-cooled gas-solid separator of the present invention has significant beneficial effects:

[0038] The key point of the novel high-temperature water-cooled gas-solid separator of the present invention is to bend the membrane-type water-cooled wall of the furnace rear wall forward and upward on the upper part of the furnace to form a tapered cross-sectional area that is larger at the bottom and smaller at the top. The purpose is: first, to reduce the cross-sectional area of ​​the upper furnace and increase the heat load of the upper furnace by adding the tapered cross-sectional area at the upper part of the furnace to reduce the water cooling degree, thereby increasing the temperature and smoke velocity entering the water-cooled separator to facilitate full combustion in the auxiliary combustion chamber with a large expansion space; second, to change the cross-sectional area of ​​the downward flue to a tapered cross-sectional area that is larger at the top (flue gas inlet) and smaller at the bottom (flue gas outlet), so as to reduce the flow resistance and expand the expansion multiples of entering the large expansion space, so that the dust-laden flue gas is accelerated from the high temperature of the second return to the downward tapered flue. The volume suddenly expands and slows down after the outlet to ensure the best effect of gas-solid gravity separation; the third is not only to increase the smoke speed of the upper convergent flue of the furnace and tilt its back wall forward, but also to increase the smoke speed of the second-pass high-temperature accelerated downward convergent flue, and move the back wall of the second-pass high-temperature accelerated downward convergent flue (guiding the dust-laden flue gas directly to the water-cooled wall of the silo) forward, so that the cross-section of the three-pass ascending flue, that is, the burnout chamber, is naturally expanded. The smoke speed is designed to be 3-<5 meters per second, which not only increases the residence time of combustibles in the three-pass ascending flue, which is conducive to the full combustion and burnout of combustibles, but also can greatly reduce the entrainment of fly ash by the airflow, and greatly reduce the initial emission concentration of smoke dust. The fourth is also a measure specifically designed for ultra-low emissions of pollutants. The cross-sectional area of ​​the upper furnace is reduced and the heat load of the upper furnace is increased by adding a tapered cross-section to the upper furnace to reduce water cooling. The temperature of the furnace outlet can be stabilized by using natural wind for secondary air. The hot air from the air preheater can be concentrated on the primary air to ensure that when the dense phase zone is lacking in oxygen, its temperature can reach 850-900 degrees; this ensures low oxygen and high temperature to achieve ultra-low NOx generation.

[0039] The present invention does not use any special devices and separation elements. The high-temperature water-cooled inertial gravity separator is naturally formed by the heating surface space of the two-pass downward tapered flue; the auxiliary combustion chamber (large expansion space and turning channel); and the burnout chamber (three-pass upward flue). The high-efficiency separation of gas and solid phases is achieved by adopting the design of different flow velocities of dust-laden flue gas in different sections and directions after the furnace flue gas outlet. That is, a guide for the gas-solid two-phase flow to the silo is set at the second-pass flue gas inlet (furnace flue gas outlet). The dust-laden flue gas is directed to the silo water-cooled wall at the second-pass flue gas inlet, forming a characteristic of using airflow to transport the solid particles and combustibles suspended in the upper part of the furnace directly to the silo, forcing the gas and solid two-phases to turn 180 degrees sharply from the furnace outlet and directly rush to the auxiliary combustion chamber with large expansion space and then flow to the silo, so that the solid particles with high concentration for the first time are subjected to the centrifugal force and drag force of the sharp turn, and then the vertical direction of the gas and solid two-phases. The downward co-directional flow, combined with the force of the airflow, the weight of the solids, the ground's gravity, and the vertical downward force from high to low, causes the solids' falling velocity to exceed the airflow velocity, causing most solid particles to quickly fall directly to the bottom of the silo from the secondary return high-temperature accelerated downward and gradually contracting flue outlet. Some solid fine particles, after sudden expansion and deceleration, settle into the silo by gravity. Some fine particles carried by the airflow are fully burned in the auxiliary combustion chamber and burnout chamber, while the small amount of fine particles that fall into the auxiliary combustion chamber continue to burn fully. The airflow, at a low velocity of 3-<5 meters, carries very limited fly ash and enters the vertical shaft flue through the flue gas outlet of the burnout chamber. This allows efficient gas-solid separation to be achieved without any special devices or separation elements.

[0040] The new high-temperature water-cooled gas-solid separator has five beneficial effects and advantages:

[0041] 1. Ultra-low energy consumption. The separator does not require any special devices and separation components, which can save the refractory heat insulation materials and steel frame support of the entire cyclone separator.

[0042] 2. Ultra-low initial smoke emission, greatly reducing the dust on the convection heating surface, reducing thermal resistance and flow resistance, and stable operating efficiency: the initial smoke emission concentration of the present invention is 1800mg / m 3 ---3000mg / m 3 The initial emission concentration of smoke from a cyclone separator fluidized bed boiler is 15000 mg / m 3 ---50000mg / m 3 .

[0043] 3. Ultra-low resistance, saving power consumption of induced draft fans: The water-cooled inertial gravity separator of the present invention has a local maximum smoke velocity of 10 meters, while the optimal flow velocity of the adiabatic cyclone separator and the water vapor-cooled circular cyclone separator is 25-30 meters.

[0044] 4. Ultra-high separation efficiency, eradicating convection heating surface wear: From the initial smoke emission concentration of 1800mg / m 3 ---3000mg / m 3; It can be concluded that eliminating the wear of the convection heating surface is undoubtedly possible and the service life of the boiler can be extended.

[0045] 5. Ultra-high combustion efficiency and reduced carbon content in fly ash: The gas-solid phases stay in the separator for a long time. The flue gas of the present invention enters the auxiliary combustion chamber with a large expansion space, where the combustibles continue to burn fully and completely; while the flue gas of a traditional CFB boiler stops burning when it enters the central tube in the second return cyclone.

[0046] The inventive concept of the new water-cooled gas-solid separation technology described in the present invention is: based on the basic principle of gravity sedimentation, the present invention changes the flow direction of the dust-laden flue gas from the furnace outlet and scientifically designs the flow velocity changes of the dust-laden flue gas in different process sections, thereby not only achieving efficient gas-solid separation, but also achieving full combustion and burnout of solid combustibles in the auxiliary combustion chamber and the burnout chamber.

[0047] This invention utilizes a completely new gas-solid separation principle and a completely new water-cooled gas-solid separator structure. This eliminates the need for specialized devices and separation elements in the water-cooled gas-solid separator, the core component of the circulating fluidized bed boiler. Instead, the heated surface naturally forms a high-temperature inertial gravity separator. This technological breakthrough revolutionizes fluidized bed boilers in all aspects, significantly reducing furnace height and conserving boiler raw materials, simplifying the structure, and utilizing advanced technology. It also addresses the challenges of traditional fluidized bed boilers' core components, such as high raw material and energy consumption, high manufacturing and installation costs, high failure rates, high maintenance costs, and easily worn convection heating surfaces.

[0048] The technical solution adopted by the present invention to solve the technical problems existing in the known technology is: a fluidized bed boiler with a new high-temperature water-cooled gas-solid separator and a variety of new boiler body processes, the new high-temperature water-cooled gas-solid separator is composed of a two-pass high-temperature accelerated downward convergent flue, an auxiliary combustion chamber, a burnout chamber (three-pass upward flue) and a return device; the front wall of the two-pass high-temperature accelerated downward convergent flue is the forward bending point to the membrane water-cooled wall of the furnace rear wall to the forward upward bending inclined section of the membrane water-cooled wall of the furnace rear wall, and the rear wall of the two-pass high-temperature accelerated downward convergent flue is the front wall of the water-cooled wall that guides the dust-laden flue gas directly to the silo The walls on both sides of the two-pass high-temperature accelerated downward convergent flue are symmetrical membrane water-cooled walls on both sides of the furnace and three-in-one symmetrical membrane water-cooled walls on both sides. The upper end of the two-pass high-temperature accelerated downward convergent flue is a water-cooled ceiling or a superheater ceiling. The lower end of the two-pass high-temperature accelerated downward convergent flue is a horizontal collecting box under the water-cooled wall that guides the dust-laden flue gas directly to the silo; the front wall of the auxiliary combustion chamber is the membrane water-cooled wall of the rear wall of the furnace, the rear wall of the auxiliary combustion chamber is the front wall of the vertical shaft flue, and the walls on both sides of the auxiliary combustion chamber are three-in-one symmetrical membrane water-cooled walls; the upper end of the auxiliary combustion chamber is the lower end of the water-cooled wall that guides the dust-laden flue gas directly to the silo, and the lower end of the auxiliary combustion chamber is the upper end of the silo. The return material device is composed of a hopper, a hopper leg, a return material device, and a return material leg; the upper end of the hopper is sealed and connected to the lower end of the auxiliary combustion chamber, and the lower end of the hopper is sealed and connected to the upper end of the hopper leg; the lower end of the hopper leg is sealed and connected to the upper end of the return material valve; the lower end of the return material valve is sealed and connected to the upper end of the return material leg; the lower end of the return material leg is sealed and connected to the membrane water-cooled wall of the rear wall of the furnace.

[0049] The novel high-temperature water-cooled gas-solid separator described in the present invention improves the method for efficient gas-solid separation: significantly improves the smoke velocity at the outlet end of the second-pass high-temperature accelerated downward tapered flue, increases the sudden expansion deceleration rate entering the auxiliary combustion chamber, strengthens the gravity sedimentation of solid combustibles in the silo, which is conducive to full combustion in the auxiliary combustion chamber, and significantly reduces the smoke velocity in the burnout chamber. It can not only increase the residence time of the combustibles and improve the degree of burnout entering the burnout chamber, but also significantly reduce the Yang Xi entrainment of fly ash by the airflow, and significantly reduce the initial emission concentration of smoke dust. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] The accompanying drawings, which constitute part of this application, are intended to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are intended to explain the present invention and do not constitute an undue limitation of the present invention. In the accompanying drawings:

[0051] Figure 1 This is the first plan front view of the steam boiler body with four-pass water-cooled flue and water-cooled and superheater ceiling;

[0052] Figure 2 This is the front view of the second scheme of the steam boiler body with four-pass water-cooled flue and water-cooled and superheater ceiling;

[0053] Figure 3This is the front view of the third scheme of the four-pass water-cooled flue and water-cooled ceiling steam boiler body;

[0054] Figure 4 This is the front view of the fourth scheme of the four-pass water-cooled flue and water-cooled ceiling steam boiler body;

[0055] Figure 5 This is the main view of the fifth scheme of the four-pass water-cooled flue and water-cooled ceiling forced circulation tube rack hot water boiler body;

[0056] Figure 6 This is the front view of the 6th scheme of the steam boiler body with four-pass water-cooled flue and superheater ceiling;

[0057] Figure 7 This is the main view of the 7th scheme of the four-pass water-cooled flue and superheated steam ceiling steam boiler body;

[0058] Figure 8 This is the first plan front view of the super-large power station boiler body with double combustion chambers, seven return water-cooled flues and superheater ceiling;

[0059] Figure 9 This is a sectional view taken along line A-A of the front view of the first embodiment of the super-large power station boiler body of the present invention;

[0060] Figure 10 This is the second plan front view of the super-large power station boiler body with seven-pass water-cooled flue and superheater ceiling;

[0061] Figure 11 This is the front view of the third scheme of the super-large power station boiler body with seven-pass water-cooled flue and superheater ceiling;

[0062] Figure 12 This is the first plan front view of the main body of the super-large power station once-through boiler with seven-pass water-cooled flue and superheater ceiling;

[0063] Figure 13 This is the second plan front view of the super-large power station once-through boiler body with seven-pass water-cooled flue and superheater ceiling;

[0064] Figure 14 This is the main view of the first scheme of the once-through boiler body with four-pass water-cooled flue and superheater ceiling;

[0065] Figure 15 This is the front view of the second scheme of the once-through boiler body with four-pass water-cooled flue and superheater ceiling;

[0066] Figure 16 This is the main view of the water flow of the four-pass water-cooled flue and superheater ceiling of the once-through boiler body;

[0067] Figure 17 This is the main view of the water flow of the seven-pass water-cooled flue and superheater ceiling of a super-large power station once-through boiler.

[0068] Figure 18 This is a schematic diagram of the working process of the new structure, new process and new high-temperature water-cooled gas-solid separator of the present invention;

[0069] Figure 19 This is a schematic diagram of the connection between the downcomers and the gas guide pipes of large, medium and small boilers of the present invention;

[0070] Figure 20 It is a schematic diagram of the connection between the downcomer and the air guide pipe of the super-large boiler of the present invention.

[0071] Among them, 1- furnace front wall lower horizontal header, 2- furnace bilaterally symmetrical lower vertical header, 3- furnace rear wall lower horizontal header, 4- furnace front wall membrane water-cooled wall, 5- furnace rear wall membrane water-cooled wall, 6- return leg, 7- return valve, 8- leg, 9- furnace bilaterally symmetrical membrane water-cooled wall, 10- furnace main combustion chamber, 11- silo, 12- three-in-one bilaterally symmetrical lower vertical header (lower, upward flue, vertical shaft flue), 13- turning channel, 14- furnace rear wall membrane water-cooled wall forward bending point, 15- two-return high temperature accelerated downward tapered flue outlet, 16- guide dust-laden flue gas directly to the silo lower horizontal header, 17- furnace rear wall membrane water-cooled wall forward upward bending inclined section, 18- guide dust-laden flue gas directly to the silo water-cooled wall, 19- two-return high temperature accelerated downward tapered flue outlet, 10- furnace front wall membrane water-cooled wall forward upward bending inclined section, 11- furnace rear wall membrane water-cooled wall forward upward bending inclined section, 12- guide dust-laden flue gas directly to the silo water-cooled wall, 13- two-return high temperature accelerated downward tapered flue outlet ... Downward convergent flue, 20-burnout chamber (three-pass ascending flue), 21-furnace rear wall upper horizontal header, 22-connecting pipe, 23-furnace flue gas outlet, 24-furnace water-cooled ceiling (one-pass water-cooled ceiling), 25-downward main pipe, 26-boiler drum, 27-symmetrical upper vertical headers on both sides of the furnace, 28-upper horizontal header on the furnace water-cooled ceiling, 29-downward flue water-cooled ceiling (two-pass water-cooled ceiling), 30-superheater ceiling horizontal header, 31-superheater connecting pipe, 32-superheater ceiling, 33-gas guide main, 34-symmetrical upper vertical header gas guide pipe on both sides, 35-three-in-one bilaterally symmetrical upper vertical header (three-in-one is the abbreviation of: two-pass high-temperature accelerated downward convergent flue 19, burnout chamber 20, and shaft flue 41), 36-horizontal header guide Gas pipe, 37-horizontal header on the front wall of the shaft, 38-economizer connecting pipe, 40-combustion chamber flue gas outlet, 41-shaft flue, 42-shaft flue rear wall and symmetrical front wall of the double furnace, 43-superheater, 44-auxiliary combustion chamber (large expansion space and turning channel), 45-shaft flue front wall, 46-three-in-one bilaterally symmetrical membrane water-cooled wall (three-in-one is: two-pass high-temperature accelerated downward tapered flue bilaterally symmetrical membrane water-cooled wall, burnout chamber bilaterally symmetrical membrane water-cooled wall, shaft flue bilaterally symmetrical membrane water-cooled wall), 47-steam outlet, 48-economizer, 49-water inlet, 50-horizontal header under the shaft rear wall, 51-horizontal header under the shaft front wall, 54-burnout chamber water-cooled ceiling (three-pass water-cooled ceiling), 55-burnout chamber flue gas outlet vent, 56-two-in-one water-cooled ceiling upper horizontal header (two-in-one: burnout chamber 20 and shaft flue 41), 58-furnace front wall upper horizontal header, 60-furnace water-cooled ceiling lower horizontal header, 61-directed flue gas directing silo water-cooled wall horizontal header, 62-two-pass high-temperature accelerated downward tapered flue water-cooled ceiling lower horizontal header, 63-burnout chamber water-cooled ceiling lower horizontal header, 67-shaft water-cooled ceiling (four-pass water-cooled ceiling), 68-shaft water-cooled ceiling lower horizontal header, 69-shaft rear wall horizontal header, 72-four-in-one water-cooled ceiling front horizontal header, 73-partition, 74-furnace flue gas outlet upper horizontal header, 75-water outlet, 76-gas collecting tank, 79-superheater horizontal header, 80-superheater horizontal header, 81-boiler front longitudinal gas guide main pipe,82- Boiler rear longitudinal air guide main, 85- Downcomer, 87- Horizontal header on silo rear wall, 89- Horizontal header on silo front wall, 90- silo rear wall membrane water-cooled wall, 91- silo front wall membrane water-cooled wall, 92- silo rear wall lower horizontal header, 93- silo front wall lower horizontal header, 94- Furnace front three-return ascending flue outlet (boiler front top longitudinal wet steam cooling flue inlet), 95- High-temperature superheater, 96- Furnace upper longitudinal wet steam cooling flue, 97- Front two-in-one bilaterally symmetrical upper longitudinal header, 98- Membrane wall high-temperature superheater Or cast refractory seal (sealing layer) for light tube high temperature superheater, 99-two middle side symmetrical upper longitudinal headers, 100-boiler top flue water cooling ceiling, 101-furnace rear three-return upward flue outlet (boiler rear top longitudinal wet steam cooling flue inlet), 103-shaft flue inlet, 104-front two-in-one two-sided symmetrical lower longitudinal headers, 105-furnace front wall circulation pipe, 106-furnace rear wall circulation pipe, 108-membrane water cooling wall, 109-air distribution plate, 110-air chamber, 111-water cooling air chamber bottom and primary air inlet, 112-two middle Laterally symmetrical lower vertical header, 113-bilaterally symmetrical membrane water-cooled wall, 114-silo side wall water-cooled wall lower horizontal header, 115-silo side wall water-cooled wall, 116-silo side wall water-cooled wall upper horizontal header, 117-four-in-one water-cooled ceiling rear horizontal header, 118-four-in-one water-cooled ceiling (four-in-one refers to: furnace main combustion chamber 10, two-pass high-temperature accelerated downward convergent flue 19, burnout chamber (three-pass ascending flue) 20, shaft flue 41), 119-three-in-one superheater ceiling (furnace, two-pass flue in front of furnace, two-pass flue in back of furnace), 122 - Six-in-one superheater ceiling (furnace, two-pass flue in front of the furnace, three-pass flue in front of the furnace, two-pass flue in the back of the furnace, three-pass flue in the back of the furnace, tail shaft flue), 123-horizontal header, 124-tapered section of the upper furnace, 125-tapered section of the upper furnace for the seven-pass water-cooled flue, 126-exhaust pipe, 127-automatic exhaust valve, 128-burnout chamber inlet, 129-exhaust port, 130-lower symmetrical longitudinal header, 131-lower front and rear symmetrical horizontal header, 132-water-cooled ceiling of the shaft, 133-front and rear symmetrical combustion chamber. DETAILED DESCRIPTION

[0072] The following will clearly and completely describe the technical solutions of the present invention in conjunction with the accompanying drawings. Obviously, the embodiments described are only some of the embodiments of the present invention, not all of them. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.

[0073] Example 1: Please refer to Figure 1The boiler body of the present invention is composed of two parts, namely the "boiler" and the "furnace" as referred to in conventional standards. The "boiler" refers to the pressure-bearing component that contains boiler water and steam, including the boiler drum, water-cooled wall tubes, membrane water-cooled wall, convection tube bundle, header, superheater, economizer and pipelines, which are composed of a closed steam-water system. Its task is to absorb the heat energy released by the combustion of fuel and heat the water into hot water or steam at a specified temperature and pressure. The "furnace" refers to the combustion equipment, including the wind chamber 110 (see Figure 10 ), combustion chamber (furnace), separator, air preheater, flue and steel frame, etc., whose function is to provide a place and good conditions for fuel combustion. The "boiler" in this embodiment only refers to the boiler drum, membrane water-cooled wall, convection tube bundle, header, superheater, economizer and pipeline. The "furnace" only refers to the furnace, separator, flue, etc. The other structures of the boiler can adopt conventional boiler structures that meet national standards, and other parts of the boiler such as furnace wall, steel frame, etc. are not described in detail.

[0074] The fluidized bed boiler provided by the present invention has a water-cooled gas-solid separator and four or seven return water-cooled flues, including any one of a steam boiler, a forced circulation hot water boiler, a power station boiler, and a super-large power station boiler. The fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues includes a furnace, a furnace main combustion chamber 10, a furnace upper tapered section 124, a two-return high-temperature accelerated downward tapered flue 19, an auxiliary combustion chamber (large expansion space and turning channel) 44, a burnout chamber (three-return upward flue) 20, a one-return water-cooled ceiling (furnace water-cooled ceiling 24), a two-return water-cooled ceiling (downward flue water-cooled ceiling) ) 29 and superheater ceiling 32, one return water-cooled ceiling (furnace water-cooled ceiling) 24, two return water-cooled ceiling (downward flue water-cooled ceiling) 29, three return water-cooled ceiling (burnout chamber water-cooled ceiling) 54 and four return water-cooled ceiling (vertical shaft water-cooled ceiling 67, four-in-one water-cooled ceiling 118 and superheater ceiling 32, the upper longitudinal wet steam cooling flue 96 of the furnace, four return water-cooled flue, seven return water-cooled flue, the upper longitudinal header air duct 34, the horizontal header air duct 36 and the exhaust pipe 126 symmetrical on both sides constitute a fluidized bed boiler with a new structure, new process and new high-temperature water-cooled gas-solid separator of multiple boiler bodies of the present invention.

[0075] Please see the attached Figure 1 In this embodiment, the fluidized bed boiler with a water-cooled gas-solid separator and four- and seven-return water-cooled flues also includes a water-cooled gas-solid separator. The water-cooled gas-solid separator of this embodiment includes a two-return high-temperature accelerated downward tapered flue 19, a burnout chamber (three-return upward flue) 20, an auxiliary combustion chamber 44, and a silo 11; the return device of this embodiment includes a return leg 6, a return valve 7, and a return leg 8.

[0076] The fluidized bed boiler with a water-cooled gas-solid separator and four and seven return water-cooled flues also includes a return device and a vertical flue 41. This embodiment is a circulating fluidized bed boiler with a full-membrane water-cooled hearth, a full-membrane water-cooled wall ceiling, a full-membrane water-cooled wall separator, and a full-membrane water-cooled wall vertical shaft.

[0077] In this embodiment, an air distribution plate 109 is provided at the bottom of the furnace, and a main combustion chamber 10 of the furnace is formed from the air distribution plate 109 at the bottom of the furnace to the lower end of the forward bending point 14 of the membrane water-cooled wall of the furnace rear wall in the upper and middle part of the furnace. The four walls of the main combustion chamber 10 of the furnace are composed of the membrane water-cooled wall 4 of the furnace front wall, the membrane water-cooled wall 5 of the furnace rear wall, and the membrane water-cooled walls 9 symmetrical on both sides of the furnace. The front wall of the main combustion chamber 10 of the furnace is the membrane water-cooled wall 4 of the furnace front wall, the rear wall of the main combustion chamber 10 is the membrane water-cooled wall 5 of the furnace rear wall, and the two side walls of the main combustion chamber 10 of the furnace are the membrane water-cooled walls 9 symmetrical on both sides of the furnace.

[0078] The lower end of the furnace front wall membrane water-cooled wall 4 is connected to the furnace front wall lower horizontal header 1, and the upper end of the furnace front wall membrane water-cooled wall 4 is bent backward and inclined upward to extend radially to the furnace water-cooled ceiling upper horizontal header 28 to form the furnace water-cooled ceiling 24. The front end of the furnace water-cooled ceiling 24 is bent vertically downward and extended to be connected to the furnace front wall lower horizontal header 1; the lower end of the furnace rear wall membrane water-cooled wall 5 is connected to the furnace rear wall lower horizontal header 3, and the upper end of the furnace rear wall membrane water-cooled wall 5 is bent forward and upward at a certain point to extend and be connected to the furnace rear wall upper horizontal header 21; the rear end of the furnace upper tapered section 124 is provided There is a furnace flue gas outlet 23; the connecting pipe 22 at the lower end of the furnace flue gas outlet 23 is connected to the horizontal header 21 on the furnace rear wall, and the connecting pipe 22 at the upper end of the furnace flue gas outlet 23 is connected to the horizontal header 28 on the furnace water-cooled ceiling. The inner side of the two connecting pipes 22 is the furnace flue gas outlet 23; the lower ends of the symmetrical membrane water-cooled walls 9 on both sides of the furnace are connected to the lower vertical headers 2 on both sides of the furnace, and the upper ends of the symmetrical membrane water-cooled walls 9 on both sides of the furnace are connected to the upper vertical headers 27 on both sides of the furnace. The outside of the two side walls and the front wall of the furnace are constructed with a thermal insulation layer, and the rear wall of the furnace is constructed with a thermal insulation layer except for the common wall. Specifically, in this embodiment, the furnace water-cooled ceiling upper horizontal header 28 is a two-in-one water-cooled ceiling upper horizontal header, including the furnace water-cooled ceiling upper horizontal header 28 and the second return flue upper horizontal header.

[0079] The front wall of the second-pass high-temperature accelerated downward tapered flue 19 of the water-cooled gas-solid separator is the forward-bent, upward-bent, inclined section 17 of the furnace rear wall membrane water-cooled wall. The rear wall of the second-pass high-temperature accelerated downward tapered flue 19 is the water-cooled wall 18 that guides dust-laden flue gas directly into the silo. The two side walls of the second-pass high-temperature accelerated downward tapered flue 19 are respectively the bilaterally symmetrical membrane water-cooled walls 9 of the furnace and the three-in-one bilaterally symmetrical membrane water-cooled walls 46. In this embodiment, the lower end of the water-cooled wall 18 that guides dust-laden flue gas directly into the silo is connected to the lower horizontal header 16 that guides dust-laden flue gas directly into the silo. The upper end of the water-cooled wall 18 that guides dust-laden flue gas directly into the silo is bent forward, inclined, and extends upward, radially connecting to the upper horizontal header 28 of the furnace water-cooled ceiling, forming the water-cooled ceiling 29 of the second-pass high-temperature accelerated downward tapered flue 19. The rear end of the water-cooled ceiling 29 bends vertically downward and extends to connect to the lower horizontal header 16 that guides dust-laden flue gas directly into the silo.

[0080] The front wall of the burnout chamber 20 of the water-cooled gas-solid separator is a water-cooled wall 18 that guides the dust-laden flue gas directly into the silo, the rear wall of the burnout chamber 20 is the front wall 45 of the vertical shaft flue, the two side walls of the burnout chamber 20 are three-in-one bilaterally symmetrical membrane water-cooled walls 46, the upper end of the burnout chamber 20 is the superheater ceiling 32 or the water-cooled ceiling, and the lower end of the burnout chamber 20 is provided with a burnout chamber flue gas outlet 40. The front wall of the auxiliary combustion chamber 44 of the water-cooled gas-solid separator is the membrane water-cooled wall 5 of the rear wall of the furnace, and the rear wall of the auxiliary combustion chamber 44 is the front wall 45 of the vertical shaft flue. The upper end of the auxiliary combustion chamber 44 is provided with a two-pass high-temperature accelerated downward convergent flue outlet 15 and a three-pass upward flue inlet (burnout chamber flue gas inlet 128). The two-pass high-temperature accelerated downward convergent flue outlet 15 is connected to the three-pass upward flue inlet (burnout chamber flue gas inlet 128). The lower end of the auxiliary combustion chamber 44 is the upper end of the silo 11, and the two side walls of the auxiliary combustion chamber 44 are three-in-one bilaterally symmetrical membrane water-cooled walls 46.

[0081] The silo 11 of the water-cooled gas-solid separator is composed of one or more trapezoidal bodies with rectangular or square cross-sections, which are larger at the top and smaller at the bottom and eccentrically positioned forward. The upper end of the front wall of the silo 11 is tightly sealed with the membrane water-cooled wall 5 on the rear wall of the furnace, the upper end of the rear wall of the silo 11 is tightly sealed with the lower end of the front wall 45 of the vertical shaft flue, and the upper ends of the two outer walls of the silo 11 are tightly sealed with the three-in-one bilaterally symmetrical lower longitudinal headers 12. The lower ends of the front and rear walls of the silo 11 are inclined inward and separated by the partitions of the silo 11 to form one or more trapezoidal silos with rectangular or square cross-sections, which are larger at the top and smaller at the bottom, concentric or eccentrically positioned forward. The lower end of the silo 11 is sealedly connected to the upper ends of one or more feed legs 8. The lower end of the feed leg 8 is sealedly connected to the upper end of the return valve 7, the upper end of the return leg 6 is sealedly connected to the lower end of the return valve 7, and the lower end of the return leg 6 is sealedly connected to the membrane water-cooled wall 5 on the rear wall of the furnace.

[0082] The membrane water-cooled wall 5 on the furnace rear wall at the upper part of the furnace bends forward and upward and extends to the lower end of the furnace flue gas outlet 23 and is connected to the upper horizontal header 21 on the furnace rear wall. The connecting pipe 22 at the upper end of the furnace flue gas outlet 23 is connected to the upper horizontal header 74 on the furnace flue gas outlet, and the connecting pipe 22 at the lower end of the furnace flue gas outlet 23 is connected to the upper horizontal header 21 on the furnace rear wall; the upper end of the furnace upper tapered section 124 is the four-in-one water-cooled ceiling 118 or the superheater ceiling 32, the front wall of the furnace upper tapered section 124 is the furnace front wall membrane water-cooled wall 4, the upper part of the rear wall of the furnace upper tapered section 124 is the furnace flue gas outlet 23, the middle and lower part of the rear wall of the furnace upper tapered section 124 is the furnace rear wall membrane water-cooled wall forward and upward bent inclined section 17, and the two side walls of the furnace upper tapered section 124 are the membrane water-cooled walls 9 symmetrical on both sides of the furnace.

[0083] The rear upper end of a return water-cooled ceiling 24 is radially connected to the upper horizontal header 28 of the furnace water-cooled ceiling, and the front end of the return water-cooled ceiling 24 is bent vertically downward and extended to be connected to the lower horizontal header 1 of the furnace front wall.

[0084] The front end of the second return water-cooled ceiling 29 is radially connected to the upper horizontal header 28 of the furnace water-cooled ceiling, and the rear end of the second return water-cooled ceiling 29 is bent vertically downward and extends to connect with the lower horizontal header 16 guiding the dust-laden flue gas to directly impact the silo.

[0085] The fluidized bed boiler with a water-cooled gas-solid separator and four and seven return water-cooled flues also includes a vertical flue 41, in which a superheater or a reheater is provided. A superheater ceiling 32 is provided at the top of the burnout chamber 20 and the top of the vertical flue 41; one end of the superheater ceiling 32 is connected to the steam outlet 47, and the other end of the superheater ceiling 32 is connected to the superheater or reheater in the vertical flue 41.

[0086] The vertical flue 41 of this embodiment is composed of a vertical flue front wall 45 , a vertical flue rear wall 42 , a three-in-one bilaterally symmetrical membrane water-cooled wall 46 and a superheater ceiling 32 .

[0087] The lower end of the shaft flue front wall 45 is connected to the lower horizontal header 51 of the shaft front wall, and the upper end of the shaft flue front wall 45 is connected to the upper horizontal header 37 of the shaft front wall;

[0088] The lower end of the shaft flue rear wall 42 is connected to the lower horizontal header 50 of the shaft rear wall, and the upper end of the shaft flue rear wall 42 is connected to the horizontal header 69 on the shaft rear wall;

[0089] The lower ends of the three-in-one bilaterally symmetrical membrane water-cooled walls 46 on both side walls of the vertical shaft flue 41 are connected to the three-in-one bilaterally symmetrical lower vertical header 12 , and the upper ends of the three-in-one bilaterally symmetrical membrane water-cooled walls 46 are connected to the three-in-one bilaterally symmetrical upper vertical header 35 .

[0090] A superheater 32 or a reheater is provided in the vertical flue 41 of the fluidized bed boiler, and a superheater ceiling 32 is provided at the top of the burnout chamber 20 and the top of the vertical flue 41. One end of the superheater ceiling 32 is connected to the steam outlet 47, and the other end of the superheater ceiling 32 is connected to the superheater 43 or the reheater in the vertical flue 41.

[0091] The working process of the novel high-temperature water-cooled gas-solid separation in this embodiment: Fluidized bed combustion is a type of combustion in which the bed material is in a fluidized state. The fuel can be fossil fuels, industrial and agricultural waste, municipal solid waste and various inferior fuels, biomass combustion or biomass and coal mixed combustion. Generally, coarse particles burn in the lower part of the main combustion chamber 10 of the furnace, and fine particles burn in the upper part of the main combustion chamber 10 of the furnace. The solid particles blown out of the flue gas outlet 23 of the furnace are forced to make a sharp turn of 180 degrees and flow in the same direction through the two-pass high-temperature accelerated downward tapered flue 19 directly into the silo 11 under the action of the water-cooled wall 18 that guides the dust-laden flue gas directly. The solid particles are subjected to the centrifugal force and drag force of the sharp turn for the first time, especially the blowing force of the air flow plus the gravity of the solid plus the gravity of the ground and the straight falling force of the solid from high to low, which can make the solid particles fall downward at a faster speed than the gas. The flow velocity falls directly and quickly into the bottom of the silo 11. The fine particles that have not fallen into the bottom of the silo 11 continue to burn and radiate convection heat in the auxiliary combustion chamber 44. The fly ash entrained by the air flow is fully burned and burned out in the burnout chamber 20. The smoke is in the water-cooled gas-solid separator and is inertially separated by two 180-degree downward and upward bends and inertially separated by flushing and collision with the cross-row pipe bundle at the smoke outlet 40 of the burnout chamber, and then falls directly into the auxiliary combustion chamber 44 to the silo 11, and returns to the main combustion chamber 10 of the furnace through the material leg 8, the return valve 7 and the return leg 6 for multiple cycles. The solid particles are fully burned and heat transferred during the circulation process.

[0092] The flue gas in this embodiment passes through the flue gas outlet 23 of the furnace, turns 180 degrees and enters the second-pass high-temperature accelerated downward tapered flue 19, passes through the second-pass high-temperature accelerated downward tapered flue outlet 15, enters the auxiliary combustion chamber 44, passes through the turning channel 13, and enters the burnout chamber 20. The flue gas burned in the burnout chamber 20 passes through the burnout chamber flue gas outlet 40, that is, the cross-row gap of the water-cooled wall tube bundle at the upper end of the vertical shaft flue front wall 45, and enters the vertical shaft flue 41. Through convection heat transfer with the superheater 43 and the economizer 48, it enters the dust collector through the exhaust port 129. After the flue gas is static, it is discharged to the chimney by the induced draft fan and enters the atmosphere.

[0093] In this embodiment, the steam-water circuit: the inlet water enters the economizer 48 from the water inlet 49 and enters the boiler drum 26 through the economizer connecting pipe 38. The low-temperature water passes through the downcomer 25 and then respectively enters the lower horizontal header 1 of the front wall of the furnace, the lower vertical header 2 symmetrical on both sides of the furnace, the lower horizontal header 3 of the rear wall of the furnace, the three-in-one lower vertical header 12 symmetrical on both sides, the lower horizontal header 16 of the guide dust-laden flue gas directly into the silo, the lower horizontal header 51 of the front wall of the shaft, the lower horizontal header 50 of the rear wall of the shaft, and then respectively enters the membrane water-cooled wall 9 symmetrical on both sides of the furnace, the three-in-one membrane water-cooled wall 46 symmetrical on both sides, the membrane water-cooled wall 5 of the rear wall of the furnace, the water-cooled wall 18 of the guide dust-laden flue gas directly into the silo, and the vertical shaft flue. The hot water rises through the front wall 45 and the rear wall 42 of the vertical shaft flue through radiation convection heat transfer, and enters the upper vertical headers 27 symmetrical on both sides of the furnace, the three-in-one upper vertical headers 35 symmetrical on both sides, the horizontal headers 28 on the water-cooled ceiling of the furnace, the horizontal headers 37 on the front wall of the vertical shaft, and the horizontal headers 69 on the rear wall of the vertical shaft, and then enters the boiler drum 26 through the gas guide pipes 34 and the horizontal headers 36 through the gas guide main pipe 33. The low-temperature water continues to descend and circulate, and the saturated steam enters the superheater ceiling 32 through the superheater connecting pipe 31, near the rear wall 42 of the vertical shaft flue, and enters from the upper end of the superheater 43 downward, and is delivered to the user through the steam outlet 47 at the lower end of the superheater 43.

[0094] Example 2: Please refer to Figure 2 The difference between this embodiment and Example 1 is that the rear upper end of the furnace water-cooled ceiling 24 is radially connected to the front lower part of the boiler drum 26, and the front upper end of the second return water-cooled ceiling 29 is radially connected to the rear lower part of the boiler drum 26.

[0095] Example 3: Please read Figure 3 The difference between this embodiment and embodiment 1 is the burnout chamber flue gas outlet 55 and the burnout chamber water-cooled ceiling 54. The flue gas burned in the burnout chamber 20 enters the vertical shaft flue 41 through the burnout chamber flue gas outlet (the cross-row gap between the water-cooled wall tube bundle at the vertical upper end of the burnout chamber 20) 55, and enters the dust collector through the smoke outlet 129 through convection heat transfer with the economizer 48. After the flue gas is stabilized, it is discharged to the chimney by the induced draft fan and enters the atmosphere.

[0096] Another difference between this embodiment and embodiment 1 is the burnout chamber water-cooled ceiling 54. A two-in-one water-cooled ceiling upper horizontal header 56 is provided at the center of the upper ends of the burnout chamber (three-return flue) 20 and the vertical shaft flue 41. The front of the two-in-one water-cooled ceiling upper horizontal header 56 connects to the burnout chamber water-cooled ceiling 54, extends forward to abut against the rear end of the down flue water-cooled ceiling 29, bends downward 90 degrees for a distance, then bends backward across a gap to extend to the vertical shaft flue front wall 45, then bends vertically downward to connect to the vertical shaft front wall lower horizontal header 51. The rear of the two-in-one water-cooled ceiling upper horizontal header 56 connects to the vertical shaft water-cooled ceiling 67, extends backward to the vertical shaft flue rear wall 42, then bends vertically downward to connect to the vertical shaft rear wall lower horizontal header 50.

[0097] Example 4: Please read Figure 4 ,The differences between this embodiment and embodiment 3 are as follows:

[0098] (1) The upper end of the membrane water-cooled wall 4 on the front wall of the furnace is connected to the horizontal header 58 on the front wall of the furnace; the upper end of the membrane water-cooled wall 18 that guides the dust-laden flue gas directly to the silo is connected to the horizontal header 61 on the water-cooled wall that guides the flue gas directly to the silo; the upper end of the front wall 45 of the vertical shaft is connected to the horizontal header 37 on the front wall of the vertical shaft; and the upper end of the rear wall 42 of the vertical shaft is connected to the horizontal header 69 on the rear wall of the vertical shaft.

[0099] (2) The upper rear end of the furnace water-cooled ceiling 24 is radially connected to the upper horizontal header 28 of the furnace water-cooled ceiling, and the lower front end of the furnace water-cooled ceiling 24 is connected to the lower horizontal header 60 of the furnace water-cooled ceiling; the front end of the second-pass water-cooled ceiling 29 is radially connected to the upper horizontal header 28 of the furnace water-cooled ceiling, and the rear end of the second-pass water-cooled ceiling 29 is vertically bent downward and extended to connect to the lower horizontal header 62 of the second-pass high-temperature accelerated downward tapered flue water-cooled ceiling; the upper rear end of the three-pass water-cooled ceiling 54 is radially connected to the upper horizontal header 56 of the two-in-one water-cooled ceiling The front lower end of the three-return water-cooled ceiling 54 is connected with the lower horizontal header 63 of the burnout chamber water-cooled ceiling; the vertical shaft water-cooled ceiling 67 is longitudinally arranged on the upper horizontal header 58 on the front wall of the furnace, the upper horizontal header 21 on the rear wall of the furnace, the horizontal header 61 on the water-cooled wall of the guide flue gas directly into the silo, the horizontal header 37 on the front wall of the vertical shaft and the upper end of the horizontal header 69 on the rear wall of the vertical shaft. The front upper end of the vertical shaft water-cooled ceiling 67 is radially connected with the upper horizontal header 28 of the furnace water-cooled ceiling, and the rear lower end of the vertical shaft water-cooled ceiling 67 is connected with the lower horizontal header 68 of the vertical shaft water-cooled ceiling.

[0100] (3) There are multiple connecting pipes 22. The horizontal header 60 under the water-cooled ceiling of the furnace is connected to the horizontal header 58 on the front wall of the furnace through the connecting pipe 22. The horizontal header 62 under the water-cooled ceiling of the second-pass high-temperature accelerated downward tapered flue is connected to the horizontal header 61 on the water-cooled wall of the guide flue gas silo through the connecting pipe 22. The horizontal header 68 under the water-cooled ceiling of the vertical shaft is connected to the horizontal header 69 on the rear wall of the vertical shaft through the connecting pipe 22. The horizontal header 63 under the water-cooled ceiling of the burnout chamber is connected to the horizontal header 37 on the front wall of the vertical shaft through the connecting pipe 22.

[0101] (4) A superheater 43 is installed at the upper inlet of the vertical shaft flue 41.

[0102] Example 5: Please read Figure 5This embodiment is a forced circulation tube rack hot water boiler. The difference from the fourth embodiment is that the upper horizontal header 28 of the furnace water-cooled ceiling and the horizontal header air guide 36 are removed. The furnace water-cooled ceiling 24, the down flue water-cooled ceiling 29, the lower horizontal header 68 of the vertical shaft water-cooled ceiling and the vertical shaft water-cooled ceiling 67 are removed. The lower horizontal header 60 of the furnace water-cooled ceiling is removed. The horizontal header 61 on the water-cooled wall of the silo is guided directly by the flue gas. The lower horizontal header 63 of the burnout chamber water-cooled ceiling and the lower horizontal header 68 of the vertical shaft water-cooled ceiling are removed. The superheater 43 is removed. Box 58, horizontal header 69 on the rear wall of the shaft, at the lower end of the upper vertical header, the upper horizontal header 28 of the furnace water-cooled ceiling is replaced with the upper horizontal header 74 of the furnace flue gas outlet, the flue gas is directed directly to the horizontal header 61 on the water-cooled wall of the silo, and the four-in-one water-cooled ceiling front horizontal header 72; at the upper end of the upper vertical header, the water-cooled ceiling is replaced with a four-in-one water-cooled ceiling 118; secondly, a partition 73 is added; thirdly, the circulation water direction of the economizer 48 is different; fourthly, the boiler drum 26 is replaced with the four-in-one water-cooled ceiling rear horizontal header 117, and the position of the four-in-one water-cooled ceiling rear horizontal header 117 is at the upper rear end of the boiler body. An air collecting tank 76 is added, wherein the four-in-one water-cooled ceiling 118 is longitudinally arranged on the horizontal header 58 on the front wall of the furnace, the horizontal header 21 on the rear wall of the furnace, the horizontal header 61 on the water-cooled wall of the guide flue gas directly into the silo, the horizontal header 37 on the front wall of the shaft and the upper end of the horizontal header 69 on the rear wall of the shaft. The front end of the four-in-one water-cooled ceiling 118 is connected to the four-in-one water-cooled ceiling front horizontal header 72, the rear end of the four-in-one water-cooled ceiling 118 is connected to the four-in-one water-cooled ceiling rear horizontal header 117, and the water outlet 75 is connected to the upper end of the four-in-one water-cooled ceiling rear horizontal header 117. The center of the superheater is connected, and the exhaust pipes 126 pass through the four-in-one water-cooled ceiling 118 and are connected to the automatic exhaust valve 127. The superheater ceiling 32 is longitudinally arranged on the horizontal header 58 on the front wall of the furnace, the horizontal header 21 on the rear wall of the furnace, the horizontal header 61 on the water-cooled wall of the flue gas directing silo, the horizontal header 37 on the front wall of the shaft and the upper end of the horizontal header 69 on the rear wall of the shaft. The front end of the superheater ceiling 32 is connected to the steam outlet 47, and the rear end of the superheater ceiling 32 is connected to the reheater. The air ducts pass through the superheater ceiling 32 and are connected to the air main 33.

[0103] In the forced circulation tube rack hot water boiler of this embodiment, the front end of the four-in-one water-cooled ceiling 118 is connected to the four-in-one water-cooled ceiling front horizontal header 72, the rear end of the four-in-one water-cooled ceiling 118 is connected to the four-in-one water-cooled ceiling rear horizontal header 117, the water outlet 75 is connected to the upper center of the four-in-one water-cooled ceiling rear horizontal header 117, and the exhaust pipe 126 passes through the four-in-one water-cooled ceiling 118 and is connected to the automatic exhaust valve 127.

[0104] The water circuit of the forced circulation tube rack hot water boiler of this embodiment is as follows: the inlet water enters the economizer 48 from the water inlet 49, passes through the connecting pipe 77, enters the horizontal header 69 on the rear wall of the shaft, is distributed to the rear wall 42 of the shaft flue, goes down to the lower horizontal header 50 on the rear wall of the shaft, then passes through the connecting pipe 22 to enter the three-in-one bilaterally symmetrical lower vertical header 12, passes through the rear part of the partition 73, passes through the connecting pipe to enter the three-in-one bilaterally symmetrical membrane water-cooled wall 46, goes up to the rear section of the three-in-one bilaterally symmetrical upper vertical header 35, and is then forced to enter the shaft flue from the rear part of the partition 73. The front wall 45 goes down into the lower horizontal header 51 of the front wall of the shaft and then enters the three-in-one bilaterally symmetrical lower vertical header 12 through the connecting pipe 22. It is forced to pass through the three-in-one bilaterally symmetrical membrane water-cooled wall 46 through the partition 73 and go up into the middle section of the three-in-one bilaterally symmetrical upper vertical header 35. It is forced to enter the horizontal header 61 on the water-cooled wall of the guide flue gas direct-rushing silo through the partition 73. It passes through the connecting pipe 22 and then is forced to be distributed to the water-cooled wall 18 of the guide dust-laden flue gas direct-rushing silo through the partition 73. It goes down into the lower horizontal header 16 of the guide dust-laden flue gas direct-rushing silo and then passes The connecting pipes 22 at both ends enter the front section of the three-in-one bilaterally symmetrical lower vertical header 12, and are forced to be distributed to the three-in-one bilaterally symmetrical membrane water-cooled wall 46 through the partition 73. The front section of the three-in-one bilaterally symmetrical upper vertical header 35 goes up through the connecting pipe 22 and enters the bilaterally symmetrical upper vertical header 27 of the furnace. The connecting pipes 22 on both sides are forced to enter the partition 73 and then enter the upper horizontal header 21 of the furnace rear wall to be distributed to the forward upward bending inclined section 17 of the furnace rear wall membrane water-cooled wall and the furnace rear wall membrane water-cooled wall 5. The connecting pipes 22 on both ends enter the front section of the three-in-one bilaterally symmetrical membrane water-cooled wall 46, and the front section of the three-in-one bilaterally symmetrical upper vertical header 35 goes up through the connecting pipe 22 and enters the upper vertical header 27 of the furnace rear wall. The connecting pipes 22 on both sides enter the upper horizontal header 21 of the furnace rear wall to be distributed to the forward upward bending inclined section 17 of the furnace rear wall membrane water-cooled wall and the furnace rear wall membrane water-cooled wall 5. The connecting pipes 22 on both ends enter the upper horizontal header 3 of the furnace rear wall. It enters the symmetrical lower vertical headers 2 on both sides of the furnace and the lower horizontal header 1 on the front wall of the furnace through the connecting pipe 22, and is forced to pass through the symmetrical membrane water-cooled walls 9 on both sides of the furnace and the membrane water-cooled walls 4 on the front wall of the furnace, and then goes up to the upper end through the symmetrical upper vertical headers 27 on both sides of the furnace and the connecting pipe 22, and then enters the upper horizontal header 58 on the front wall of the furnace, and then enters the four-in-one water-cooled ceiling front horizontal header 72, and is distributed to the four-in-one water-cooled ceiling 118, and then enters the four-in-one water-cooled ceiling rear horizontal header 117, and is sequentially sent to the heating system through the gas collecting tank 76 and the water outlet 75.

[0105] Example 6: Please read Figure 6 This embodiment differs from Example 1 in that the upper horizontal header 28 of the furnace water-cooled ceiling is removed, as are the furnace water-cooled ceiling 24 and the secondary flue water-cooled ceiling 29. A three-in-one (furnace, secondary flue, and tertiary flue) superheated steam ceiling 32 is used. A superheater 119 is added to the upper portion of the tertiary flue, and the vertical shaft flue ceiling is a water-cooled ceiling 132.

[0106] Example 7: Please read Figure 7The differences between this embodiment and embodiment 1 are as follows: first, the furnace water-cooled ceiling 24 and the second return water-cooled ceiling 29 are changed into the superheater ceiling 32; second, the position of the boiler drum 26 is changed into a eccentric position; third, a longitudinal gas guide main pipe 81 at the front of the boiler and a longitudinal gas guide main pipe 82 at the rear of the boiler are added, the lower part of the boiler drum 26 is connected to the horizontal header 123 through the connecting pipe 22, and the lower parts of the two side ends of the horizontal header 123 are connected to the downcomer 85.

[0107] Example 8: Please read Figure 8 , this embodiment is a super-large power station boiler, which is different from embodiment 7 in that: first, the lower part of the furnace is connected to the lower horizontal header 1 of the front wall of the furnace and the lower horizontal header 3 of the rear wall of the furnace through the lower ends of the membrane wall tube bundles 108 symmetrical at the front and rear of the furnace, and the upper ends thereof are connected to the horizontal headers 107, so as to respectively form an air chamber 110, a water-cooled air chamber bottom and a primary air inlet 111, an air distribution plate 109 and a front and rear symmetrical combustion chamber 133, and the circulation pipes 105 and 106 are respectively connected to the upper horizontal header 74 of the furnace flue gas outlet; second, a set of symmetrical new high-temperature water-cooled gas-solid separators is added between the membrane water-cooled wall 4 of the front wall of the furnace and the membrane water-cooled wall 5 of the rear wall of the furnace; the new high-temperature water-cooled gas-solid separator includes a two-pass high-temperature accelerated downward convergent flue 19, an auxiliary combustion chamber (large expansion space and turning channel) 44, a burnout chamber (three-pass ascending flue) 20, a front two-in-one symmetrical upper longitudinal header 97 on both sides, a front two-in-one One is a lower vertical header 104 symmetrical on both sides; the third is to add a longitudinal wet steam cooling flue 96 on the upper part of the furnace leading to the vertical shaft flue 41 on the top of the boiler. Specifically, the four-pass water-cooled flue includes a return from the main combustion chamber 10 of the furnace to the furnace flue gas outlet 23, a second return high-temperature accelerated downward convergent flue 19, a third return upward flue 20 and a boiler tail convection flue. The three-pass upward flue 20 is a burnout chamber, and the boiler tail convection flue is The vertical shaft flue 41, the seven-pass water-cooled flue includes a return from the furnace main combustion chamber 10 to the furnace flue gas outlet 23, two return high-temperature accelerated downward convergent flues 19 in front of the furnace, two return high-temperature accelerated downward convergent flues 19 after the furnace, three return ascending flues 20 in front of the furnace, three return ascending flues 20 after the furnace, a longitudinal wet steam cooling flue 96 on the upper part of the furnace and a convection flue at the rear of the boiler, wherein the convection flue at the rear of the boiler is the vertical shaft flue 41;

[0108] Fourth, the lower wall of the longitudinal wet water vapor cooling flue 96 in the upper part of the furnace is the high-temperature superheater 95, the upper wall of the longitudinal wet water vapor cooling flue 96 in the upper part of the furnace is the boiler top flue water-cooling ceiling 100, the side walls of the longitudinal wet water vapor cooling flue 96 in the upper part of the furnace are the furnace bilaterally symmetrical membrane water-cooled wall 9, the bilaterally symmetrical membrane water-cooled wall 113, and the three-in-one bilaterally symmetrical membrane water-cooled wall 46, and the front and rear walls of the longitudinal wet water vapor cooling flue 96 in the upper part of the furnace are respectively the upper parts of the front and rear symmetrical vertical shaft flue rear wall 42; fifth, the symmetrical furnace front three-return upward flue outlet 94 and the furnace rear three-return upward flue outlet 101. Flue gas simultaneously enters the upper longitudinal wet steam cooling flue 96 of the furnace from the three-return ascending flue outlet 94 and the three-return ascending flue outlet 101, and is then discharged through the vertical shaft flue 41. Sixth, the silo 11 is equipped with two silo sidewall water-cooled walls 115. The upper ends of the silo sidewall water-cooled walls 115 are connected to the upper horizontal header 116 of the silo sidewall water-cooled walls, and the lower ends of the silo sidewall water-cooled walls 115 are connected to the lower horizontal header 114 of the silo sidewall water-cooled walls. The three-in-one bilaterally symmetrical lower horizontal headers 12 are connected to the upper horizontal header 116 of the silo sidewall water-cooled walls via a connecting pipe 22. This embodiment is suitable for use in ultra-large boilers with very deep furnaces.

[0109] The upper end of the three-pass ascending flue in front of the furnace (upper burnout chamber) in the burnout chamber 20 of the super-large power station boiler in this embodiment is the three-pass ascending flue outlet 94 in front of the furnace, and the three-pass ascending flue outlet 94 in front of the furnace is the longitudinal wet water vapor cooling flue inlet at the front top of the boiler. A high-temperature superheater 95 is provided at the three-pass ascending flue outlet 94 in front of the furnace, and the lower end of the three-pass ascending flue is the three-pass flue gas inlet 128 in front of the furnace, and the three-pass flue gas inlet 128 in front of the furnace is connected to the second-pass high-temperature accelerated downward convergent flue outlet 15. The front end of the three-pass ascending flue in front of the furnace is a symmetrical vertical shaft flue rear wall 42, and the rear end of the three-pass ascending flue in front of the furnace is to guide the dust-laden flue gas directly to the silo water-cooled wall 18. The two side ends of the three-pass ascending flue in front of the furnace are two Laterally symmetrical membrane water-cooled wall 113; the upper end of the three-pass ascending flue at the rear of the furnace (upper burnout chamber) is the three-pass ascending flue outlet 101 at the rear of the furnace, which is the inlet of the longitudinal wet water vapor cooling flue at the rear top of the boiler. A high-temperature superheater 95 is provided at the outlet 101 of the three-pass ascending flue at the rear of the furnace. The lower end of the three-pass ascending flue is the flue gas inlet at the rear of the furnace, which is connected to the second-pass high-temperature accelerated downward convergent flue outlet 15. The front end of the three-pass ascending flue at the rear of the furnace is the water-cooled wall 18 that guides the dust-laden flue gas directly to the silo, and the rear end of the three-pass ascending flue is the front wall 45 of the vertical shaft flue. The two side ends of the three-pass ascending flue at the rear of the furnace are bilaterally symmetrical membrane water-cooled walls 113.

[0110] Specifically, in this embodiment, the upper wall of the longitudinal wet water vapor cooling flue 96 at the upper part of the furnace is the boiler top flue water-cooled ceiling 100, and the high-temperature superheater 95 on the lower wall of the longitudinal wet water vapor cooling flue 96 at the upper part of the furnace is close to the three-return upward flue outlet 94 in front of the furnace, the three-return upward flue outlet 101 in the rear of the furnace and the vertical shaft flue inlet 103, which is a bare tube high-temperature superheater (the gap between the tubes is the flue gas channel), and the high-temperature superheater 95 is close to the top of the furnace and the upper ends of the two symmetrical two-return high-temperature accelerated downward tapered flues 19 at the front and rear, which is a membrane wall high-temperature superheater or a bare tube high-temperature superheater cast refractory material seal (sealing layer) 98, and the two side walls of the longitudinal wet water vapor cooling flue 96 at the upper part of the furnace are bilaterally symmetrical membrane water-cooled walls 113.

[0111] The flue gas of the super-large power station boiler of this embodiment is as follows: the flue gas passes through the two symmetrical furnace flue gas outlets 23 at the front and rear, turns 180 degrees and enters the two symmetrical two-pass high-temperature accelerated downward gradually contracting flue gas ducts 19 at the front and rear, and the flue gas is decelerated by the sudden large expansion and deceleration of the two symmetrical two-pass high-temperature accelerated downward gradually contracting flue gas outlets 15 at the front and rear, so that a large amount of solid particles naturally settle in the silo 11. The fine particles that have not settled in the silo 11 continue to burn in the two symmetrical auxiliary combustion chambers 44 at the front and rear of the furnace, and the fly ash entrained by the airflow enters the flue gas duct 19. The flue gas enters the two symmetrical burnout chambers 20 in front and rear of the furnace, continues to burn in the burnout chambers 20, and then passes through the three-return upward flue outlet 94 in front of the furnace and the three-return upward flue outlet 101 in the rear of the furnace, through the gap of the high-temperature superheater 95, enters the longitudinal wet water vapor cooling flue 96 in the upper part of the furnace, and then goes down to the tail to enter the vertical shaft flue 41. Through convection heat transfer with the superheater 43 and the economizer 48, it enters the dust collector through the smoke outlet 129. After the smoke is static, it is discharged to the chimney by the induced draft fan and enters the atmosphere.

[0112] The steam-water circuit of the super-large power station boiler in this embodiment is as follows: the inlet water enters the economizer 48 from the water inlet 49, the economizer 48 enters the boiler top flue water-cooled ceiling 100 through the connecting pipe, and then enters the boiler drum 26 through the connecting pipe. The low-temperature water enters the downcomer branch pipes respectively through the downcomer main pipe 85, and the low-temperature water enters the lower vertical and horizontal headers respectively through the downcomer branch pipes, and then enters the vertical and horizontal membrane water-cooled walls to transfer heat through radiation convection. The hot water rises and enters the upper vertical and horizontal headers respectively, and then enters the gas guide branch pipes through the gas guide pipes of the upper vertical and horizontal headers respectively, and then enters the boiler drum 26 through the gas guide branch pipes. The low-temperature water continues to descend and circulate, and the saturated steam enters the high-temperature superheater 95 and the superheater 43 through the connecting pipe and is delivered to the user through the steam outlet 47.

[0113] Figure 9 A-A sectional view; mainly for matching Figure 8 Clarify the relative positions of the boiler drum 26, the longitudinal gas guide pipe 82 at the rear of the boiler, the connecting pipe 22, the horizontal header 123, the downcomer 85, the symmetrical upper longitudinal header gas guide pipes 34, and the horizontal header gas guide pipes 36.

[0114] Example 9: Please read Figure 10 The difference between this embodiment and embodiment 8 is that the transverse header 123 is removed in this embodiment; the boiler drum 26 is lengthened, and the boiler drum 26 is larger than the width of the boiler.

[0115] Example 10: Please read Figure 11 The difference between this embodiment and embodiment 10 is that in this embodiment, superheaters 43 are respectively provided on the upper parts of the two front and rear symmetrical burnout chambers 20.

[0116] Example 11: Please read Figure 12 The difference between this embodiment and embodiment 11 is that this embodiment is a forced circulation once-through boiler without a drum, while embodiment 11 is a drum-type natural circulation boiler.

[0117] Example 12: Please read Figure 13 The difference between this embodiment and embodiment 12 is that in this embodiment, superheaters 43 are respectively provided on the upper parts of the two front and rear symmetrical burnout chambers 20.

[0118] Example 13: Please read Figure 14 The difference between this embodiment and embodiment 6 is that this embodiment is a forced circulation once-through boiler without a drum.

[0119] Example 14: Please read Figure 15 The difference between this embodiment and embodiment 14 is that this embodiment adds a three-in-one superheater ceiling 119 to the three-return flue behind the furnace.

[0120] Example 15: Please read Figure 16 The difference between this embodiment and embodiment 14 is that this embodiment is a flow chart of the water steam path of a forced circulation direct current boiler.

[0121] The water vapor path of the direct-flow boiler of the return water-cooled flue of the fourth embodiment: the inlet water enters the economizer 48 from the water inlet 49, enters the horizontal header 123 through the connecting pipe 31, and then enters the lower longitudinal headers 2 symmetrically on both sides of the furnace, the lower horizontal header 1 on the front wall of the furnace, and the lower horizontal header 3 on the rear wall of the furnace through the connecting pipe 22. The water in the symmetrical lower vertical headers 2 of the furnace is distributed to the symmetrical membrane water-cooled walls 9 of the furnace and rises to the symmetrical upper vertical headers 27 of the furnace. All the partitions 73 start to descend to the three-in-one symmetrical lower horizontal headers 12. The water starts to flow backward to the rear end and is connected with the lower horizontal header 50 of the shaft rear wall through the connecting pipe 22. Part of the superheated steam rises to the three-in-one symmetrical upper vertical header 35 through the three-in-one symmetrical membrane water-cooled walls 46 and then is connected with the superheater horizontal header 79 through the connecting pipe 31. Part of the superheated steam is distributed to the shaft rear wall 42 through the shaft rear wall lower horizontal header 50 and ascends to the shaft rear upper horizontal header 69 and then is connected with the superheater horizontal header 79 through the connecting pipe 31. It enters the superheater 43 through two connecting pipes and goes down through the steam outlet 47 to be sent to the required equipment.

[0122] The water in the lower horizontal header 1 of the front wall of the furnace and the lower horizontal header 3 of the rear wall of the furnace are respectively distributed to the membrane water-cooled wall 4 of the front wall of the furnace and the membrane water-cooled wall 5 of the rear wall of the furnace, and then rise to the upper horizontal header 58 of the front wall of the furnace and the upper horizontal header 21 of the rear wall of the furnace respectively; the upper horizontal header 58 of the front wall of the furnace is connected with the ceiling superheater horizontal header 79 through the connecting pipe 22; the upper horizontal header 21 of the rear wall of the furnace is connected with the ceiling superheater horizontal header 79 through the connecting pipe 22; the water in both the front and rear headers of the furnace enters the superheater ceiling 122 through the connecting pipe 22 and then enters the superheater horizontal header 79, the superheater horizontal header 79 is connected with the upper horizontal header 61 of the guide flue gas direct-rushing silo through the superheater connecting pipe 31, and the water is distributed to the guide flue gas direct-rushing silo. The flue gas goes straight into the silo tube bundle and goes down into the lower horizontal header 16. The lower horizontal header 16 is connected with the horizontal header 89 on the front wall of the silo through the connecting pipe 22 and is distributed to the membrane water-cooled wall 91 on the front wall of the silo. The gas goes down into the lower horizontal header 93 on the front wall of the silo. The gas is then connected with the lower horizontal header 92 on the rear wall of the silo through the connecting pipe 31 and is distributed to the membrane water-cooled wall 90 on the rear wall of the silo. The gas then goes up into the horizontal header 87 on the rear wall of the silo and is connected with the lower horizontal header 51 on the front wall of the shaft through the connecting pipe 22 and is distributed to the front wall of the shaft 45. The gas then goes up into the horizontal header 37 on the front wall of the shaft and is connected with the superheater horizontal header 79 through the connecting pipe 31 and is distributed to the superheater 43. The gas then goes down through the steam outlet 47 and is sent to the required equipment.

[0123] This embodiment is a rough steam flow process based on the rules of a forced circulation once-through boiler and is only a directional solution.

[0124] Example 16: Please read Figure 17 The difference between this embodiment and embodiment 16 is that this embodiment is a double-furnace forced circulation water vapor circuit flow chart.

[0125] The steam path of the super-large power station boiler in this embodiment is as follows: the inlet water enters the economizer 48 from the water inlet 49, enters the horizontal header 123 through the connecting pipe 31, and then enters the lower vertical headers 2 symmetrically on both sides of the furnace, the lower horizontal header 1 on the front wall of the furnace, and the lower horizontal header 3 on the rear wall of the furnace through the connecting pipe 22. The water from the bilaterally symmetrical lower vertical headers 2 of the furnace is distributed to the bilaterally symmetrical membrane water-cooled walls 9 of the furnace, rises to the two middle symmetrical upper vertical headers 99, goes forward to the partition 73, and is then distributed to the three-in-one bilaterally symmetrical membrane water-cooled walls 46, goes down into the front two-in-one bilaterally symmetrical lower vertical headers 104, goes forward and is distributed to the three-in-one bilaterally symmetrical membrane water-cooled walls 46, goes up into the front two-in-one bilaterally symmetrical upper vertical headers 97, and then connects with the three-in-one bilaterally symmetrical upper vertical headers 35 through the connecting pipes 31 and goes back to the partition 73 and is then distributed to the bilaterally symmetrical longitudinal header tube bundles 46, goes down into the three-in-one bilaterally symmetrical lower vertical headers 12, and then goes back to the rear end and is distributed to the three-in-one bilaterally symmetrical membrane water-cooled walls 46, goes up into the three-in-one bilaterally symmetrical upper vertical headers 35, and then connects with the superheater horizontal headers 79 through the connecting pipes 31 and is then distributed to the superheater 43 and goes down to the steam outlet 47.

[0126] The water in the lower horizontal header 1 of the furnace front wall and the lower horizontal header 3 of the furnace rear wall are respectively distributed to the membrane water-cooled wall 4 of the furnace front wall, the membrane water-cooled wall 5 of the furnace rear wall and the membrane water-cooled wall 108, and rise to the upper horizontal header 21 of the furnace front wall; it is connected with the ceiling rear superheater horizontal header 79 through the connecting pipe 31 and distributed to the three-in-one superheater ceiling 119, and moves forward into the ceiling front superheater horizontal header 79, and then connects with the upper horizontal header 61 of the guide flue gas directly into the silo through the connecting pipe 22 and distributes to the guide dust-laden flue gas directly into the silo water-cooled wall 18, and moves downward into the lower horizontal header 16 of the guide flue gas directly into the silo, and then connects with the horizontal header 87 on the silo rear wall through the connecting pipe 22; the horizontal header 87 on the silo rear wall is then connected with the lower horizontal header 50 on the shaft rear wall through the connecting pipe 31 and distributed to the shaft flue rear wall and the double furnace symmetrical front wall 42 to move upward The gas enters the horizontal header 69 on the rear wall of the shaft and then connects with the ceiling superheater horizontal header 79 through the connecting pipe 22 and is distributed to the three-in-one superheater ceiling 119, and then enters the ceiling rear superheater horizontal header 79, and then connects with the upper horizontal header 61 of the guide flue gas directly into the silo through the connecting pipe 31 and is distributed to the guide dust-laden flue gas directly into the silo water-cooled wall 18, and then goes down to the lower horizontal header 16 of the guide flue gas directly into the silo, and the lower horizontal header 16 of the silo is connected with the horizontal header 89 on the front wall of the silo through the connecting pipe 22, and then connects with the lower horizontal header 51 of the front wall of the shaft and the lower horizontal header 50 of the rear wall of the shaft through the connecting pipe 31, and is respectively distributed to the front wall 45 of the shaft flue and the rear wall 42 of the shaft flue, and then goes up to the horizontal header 37 on the front wall of the shaft and the horizontal header 69 on the rear wall of the shaft, and then connects with the superheater horizontal header 79 through the connecting pipe 31 and goes down to the steam outlet 47.

[0127] Figure 18This is a schematic diagram of the working process of the new structure, new process and new high-temperature water-cooled gas-solid separator in the present invention; this working process has been described in Example 1.

[0128] Figure 19 This is a schematic diagram of the connection between the downcomers and the gas ducts for large, medium, and small boilers according to the present invention. A is the main downcomer, B is the branch downcomer, C is the gas duct, and E is the branch downcomer. The lower ends of the branch downcomers B are connected to the lower vertical and horizontal headers, respectively, while the upper ends of the branch downcomers B are connected to the main downcomer A.

[0129] The lower ends of the air guide pipes C are connected to the vertical and horizontal headers respectively, and the upper ends of the air guide pipes C are connected to the air guide branch pipes E respectively.

[0130] Figure 20 This is a schematic diagram of the connection between the downcomer and the gas duct of a super-large boiler according to the present invention. A is the main downcomer, B is the branch downcomer, C is the gas duct from the upper horizontal header, D is the gas duct from the upper vertical header, and E is the branch downcomer. The lower ends of the branch downcomers B are connected to the lower vertical and horizontal headers, respectively, while the upper ends of the branch downcomers B are connected to the main downcomer A.

[0131] The lower end of the upper horizontal header air duct C is connected to the upper horizontal header, and the upper end of the upper horizontal header air duct C is connected to the air branch pipe E. The lower end of the upper vertical header air duct D is connected to the upper vertical header, and the upper end of the upper vertical header air duct D is connected to the air branch pipe E.

[0132] In all embodiments 1 to 16, the walls of the upper furnace section where the flue gas velocity exceeds 5 m are treated with anti-wear treatment, extending from the walls of the second-pass high-temperature accelerated descending convergent flue 19. Insulation is applied to all four walls, from the upper furnace section 17 to the walls of the second-pass descending convergent flue, the auxiliary combustion chamber 44, and the burnout chamber's third-pass ascending flue 20.

[0133] The water-cooled wall 18 guiding the dust-laden flue gas directly into the silo in embodiments 1 to 16 can be any one of a full-membrane water-cooled wall structure, a semi-membrane water-cooled wall structure, a full-light tube cast refractory material structure and a dry refractory wall structure, and the inner and outer structures of the water-cooled gas-solid separator can be rectangular or square; the four walls of the main combustion chamber 10 of the furnace can be any one of a full-membrane water-cooled wall structure, a semi-membrane water-cooled wall structure, a full-light tube cast refractory material structure, and the inner and outer structures can be rectangular or square; the four walls of the vertical shaft flue 41 can be any one of a full-membrane water-cooled wall structure, a semi-membrane water-cooled wall structure, a full-light tube cast refractory material structure and a dry refractory wall structure.

[0134] The fuel inlet, desulfurizer inlet, slag discharge port, circulating material inlet, air distribution plate, primary air and secondary air inlet, furnace flue gas outlet, furnace door, explosion-proof door, observation hole, measuring hole, inspection hole, etc. of embodiments 1 to 16 are all designed according to existing technical standards.

[0135] The furnace water-cooled wall tube water circulation, separator water-cooled wall tube water circulation, shaft water-cooled wall tube water circulation, steel frame and thermal insulation, low-temperature superheater, high-temperature superheater, desuperheater, reheater, economizer, air preheater, etc. of embodiments 1 to 16 are all designed according to existing general technical standards.

[0136] The rear wall of the upper tapered section 124 of the furnace of the four-pass water-cooled flue is the membrane water-cooled wall of the furnace rear wall from the forward bending point 14 to the top end, the front wall of the upper tapered section 124 of the furnace of the four-pass water-cooled flue is the furnace front wall, and the two side walls of the membrane water-cooled wall of the furnace rear wall are the membrane water-cooled walls 9 symmetrical on both sides of the furnace; the front wall of the upper tapered section 125 of the furnace of the seven-pass water-cooled flue is the membrane water-cooled wall of the furnace rear wall from the forward bending point 14 to the top end, and the rear wall of the upper tapered section 125 of the furnace of the seven-pass water-cooled flue is the membrane water-cooled wall of the furnace rear wall from the forward bending point 14 to the top end.

[0137] The upper portion of the drum 26 of the steam boiler and power station boiler is connected to the air duct, and the lower portion is connected to the downcomer. All lower vertical and horizontal headers are connected to their corresponding downcomers, and all upper vertical and horizontal headers are connected to their corresponding air ducts. The fluidized bed boiler with a water-cooled gas-solid separator and four- and seven-pass water-cooled flues includes pre-reserved holes in each water-cooled ceiling and each superheater ceiling 32 for corresponding steam and exhaust pipes. The drum can be located at the front or rear end of the top of the boiler body, or anywhere in the longitudinal direction that facilitates the placement of the downcomer. The hot water boiler is designed according to existing general technology.

[0138] All the different structures and components in the embodiments 1 to 16 can be mutually adopted and optimized to form a new furnace type.

[0139] Although the basic principles and preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments. The above-mentioned specific embodiments are merely illustrative and not restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, which all fall within the scope of protection of the present invention.

Claims

1. A fluidized bed boiler with a water-cooled gas-solid separator and four-pass and seven-pass water-cooled flues, comprising a furnace, a main combustion chamber (10) of the furnace, a tapered section (124) at the upper part of the furnace, a second-pass high-temperature accelerated downward tapered flue (19), an auxiliary combustion chamber (44), a burnout chamber (20), a first-pass water-cooled ceiling (24), a second-pass water-cooled ceiling (29) and a superheater ceiling (32), a first-pass water-cooled ceiling (24), a second-pass water-cooled ceiling Shelf (29), three-pass water-cooled ceiling (54) and four-pass water-cooled ceiling (67), four-in-one water-cooled ceiling (118) and superheater ceiling (32), six-in-one superheater ceiling (122), longitudinal wet steam cooling flue (96) on the upper part of the furnace, four-pass water-cooled flue, seven-pass water-cooled flue, symmetrical upper longitudinal header air duct (34), horizontal header air duct (36) and exhaust pipe (126) on both sides; characterized in that, It also includes a water-cooled gas-solid separator, which includes a two-pass high-temperature accelerated downward convergent flue (19), an auxiliary combustion chamber (44), a burnout chamber (20) and a silo (11); An air distribution plate (109) is arranged at the bottom of the furnace, and the main combustion chamber (10) of the furnace is formed from the air distribution plate (109) at the bottom of the furnace to the lower end of the forward bending point (14) of the furnace rear wall membrane water-cooled wall in the upper middle part of the furnace; a furnace flue gas outlet (23) is arranged at the rear end of the furnace upper tapered section (124); the front wall of the main combustion chamber (10) of the furnace is the furnace front wall membrane water-cooled wall (4), the rear wall of the main combustion chamber (10) of the furnace is the furnace rear wall membrane water-cooled wall (5), and the two side walls of the main combustion chamber (10) of the furnace are membrane water-cooled walls (9) symmetrical on both sides of the furnace; The furnace rear wall membrane water-cooled wall (5) at the upper part of the furnace is bent forward and upward to extend to the lower end of the furnace smoke outlet (23) and communicate with the upper horizontal header box (21) on the furnace rear wall; the connecting pipe (22) at the upper end of the furnace smoke outlet (23) is communicated with the upper horizontal header box (74) at the furnace smoke outlet; the connecting pipe (22) at the lower end of the furnace smoke outlet (23) is communicated with the upper horizontal header box (21) on the furnace rear wall; the upper end of the tapered section (124) at the upper part of the furnace is a four-in-one water-cooled ceiling (1 18) or a superheater ceiling (32), the front wall of the furnace upper tapered section (124) is a furnace front wall membrane water-cooled wall (4), the upper part of the rear wall of the furnace upper tapered section (124) is provided with a furnace flue gas outlet (23), the middle and lower part of the rear wall of the furnace upper tapered section (124) is a furnace rear wall membrane water-cooled wall forwardly bent and inclined section (17), and the two side walls of the furnace upper tapered section (124) are membrane water-cooled walls (9) symmetrical on both sides of the furnace; The upper end of the auxiliary combustion chamber (44) is provided with a two-pass high-temperature accelerated downward tapered flue outlet (15) and a burnout chamber flue gas inlet (128), and the two-pass high-temperature accelerated downward tapered flue outlet (15) is connected to the burnout chamber flue gas inlet (128); the lower end of the auxiliary combustion chamber (44) is the upper end of the silo (11), the front wall of the auxiliary combustion chamber (44) is the furnace rear wall membrane water-cooled wall (5), the rear wall of the auxiliary combustion chamber (44) is the shaft flue front wall (45), and the two side walls of the auxiliary combustion chamber (44) are three-in-one bilaterally symmetrical membrane water-cooled walls (46); The upper end of the burnout chamber (20) is a water-cooled ceiling or a superheater ceiling (32), the lower end of the burnout chamber (20) is provided with a burnout chamber flue gas inlet (128), the front wall of the burnout chamber (20) is a water-cooled wall (18) for directing dust-containing flue gas to directly impact the silo, the rear wall of the burnout chamber (20) is a front wall (45) of the vertical shaft flue, and the two side walls of the burnout chamber (20) are three-in-one bilaterally symmetrical membrane water-cooled walls (46); The upper wall of the longitudinal wet water vapor cooling flue (96) at the upper part of the furnace is the boiler top flue water-cooling ceiling (100); the high temperature superheater (95) at the lower wall of the longitudinal wet water vapor cooling flue (96) at the upper part of the furnace is close to the outlet (94) of the three return ascending flue at the front of the furnace, the outlet (101) of the three return ascending flue at the rear of the furnace and the inlet (103) of the vertical shaft flue, and is a light tube high temperature superheater; the high temperature superheater (95) close to the top of the furnace, the upper end of the high temperature accelerated downward tapered flue (19) at the front of the furnace and the upper end of the high temperature accelerated downward tapered flue (19) at the rear of the furnace is a membrane wall high temperature superheater or a light tube high temperature superheater cast refractory material seal (98); the two side walls of the longitudinal wet water vapor cooling flue (96) at the upper part of the furnace are bilaterally symmetrical membrane water-cooling walls (113).

2. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 1, characterized in that: In the first return water-cooling ceiling (24), the second return water-cooling ceiling (29) and the superheater ceiling (32), The rear upper end of the return water-cooled ceiling (24) is radially connected to the upper horizontal header (28) of the furnace water-cooled ceiling, and the front end of the return water-cooled ceiling (24) is bent vertically downward and extends to be connected to the lower horizontal header (1) of the furnace front wall; The front end of the second-pass water-cooled ceiling (29) is radially connected to the upper horizontal header (28) of the furnace water-cooled ceiling, and the rear end of the second-pass water-cooled ceiling (29) is bent and extended vertically downward to connect with the lower horizontal header (16) guiding the dust-containing flue gas to directly impact the silo; The fluidized bed boiler further comprises a vertical shaft flue (41), a superheater (43) or a reheater is arranged in the vertical shaft flue (41), and a superheater ceiling (32) is arranged at the top of the burnout chamber (20) and the top of the vertical shaft flue (41); one end of the superheater ceiling (32) is connected to the steam outlet (47), and the other end of the superheater ceiling (32) is connected to the superheater or reheater in the vertical shaft flue (41).

3. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 1, characterized in that: In the one-pass water-cooling ceiling (24), the two-pass water-cooling ceiling (29), the three-pass water-cooling ceiling (54) and the four-pass water-cooling ceiling (67), The rear upper end of the return water-cooled ceiling (24) is radially connected to the upper horizontal header (28) of the furnace water-cooled ceiling, and the front end of the return water-cooled ceiling (24) is bent vertically downward and extends to communicate with the lower horizontal header (60) of the furnace water-cooled ceiling; The front end of the second-pass water-cooled ceiling (29) is radially connected to the upper horizontal header (28) of the furnace water-cooled ceiling, and the rear end of the second-pass water-cooled ceiling (29) is bent and extended vertically downward to be connected to the lower horizontal header (62) of the second-pass high-temperature accelerated downward gradually converging flue water-cooled ceiling; The rear upper end of the three-pass water-cooled ceiling (54) is radially connected to the two-in-one water-cooled ceiling upper horizontal header (56), and the front lower end of the three-pass water-cooled ceiling (54) is connected to the burnout chamber water-cooled ceiling lower horizontal header (63); The front upper end of the four-pass water-cooled ceiling (67) is connected to the upper horizontal header (28) of the furnace water-cooled ceiling, and the rear lower end of the four-pass water-cooled ceiling (67) is connected to the lower horizontal header (68) of the vertical shaft water-cooled ceiling.

4. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 1, characterized in that: The fluidized bed boiler further comprises a water outlet (75), a gas collecting tank (76), an automatic exhaust valve (127), a steam outlet (47) and an economizer (48). The four-in-one water-cooled ceiling (118) is longitudinally arranged on the upper ends of the horizontal header (58) on the front wall of the furnace, the horizontal header (21) on the rear wall of the furnace, the horizontal header (61) on the water-cooled wall of the flue gas directing silo, the horizontal header (37) on the front wall of the shaft, and the horizontal header (69) on the rear wall of the shaft. The front end of the four-in-one water-cooled ceiling (118) is connected to the front horizontal header (72) of the four-in-one water-cooled ceiling, the rear end of the four-in-one water-cooled ceiling (118) is connected to the rear horizontal header (117) of the four-in-one water-cooled ceiling, the gas collecting tank (76) is connected to the upper center of the rear horizontal header (117) of the four-in-one water-cooled ceiling, and the exhaust pipe (126) are connected to the automatic exhaust valve (127) through the four-in-one water-cooled ceiling (118), and the superheater ceiling (32) is longitudinally arranged on the horizontal header (58) on the front wall of the furnace, the horizontal header (21) on the rear wall of the furnace, the horizontal header (61) on the water-cooled wall of the flue gas silo, the horizontal header (37) on the front wall of the shaft, and the upper end of the horizontal header (69) on the rear wall of the shaft. The front end of the superheater ceiling (32) is connected to the steam outlet (47), and the rear end of the superheater ceiling (32) is connected to the reheater. The air guide pipes pass through the superheater ceiling (32) and are connected to the air guide main pipe (33).

5. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 1, characterized in that: The four-pass water-cooled flue comprises a first-pass furnace main combustion chamber (10) to a furnace flue gas outlet (23), a second-pass high-temperature accelerated downward tapered flue (19), a third-pass ascending flue and a boiler tail convection flue, wherein the third-pass ascending flue is a burnout chamber (20), and the boiler tail convection flue is a vertical shaft flue (41). The seven-pass water-cooled flue comprises a first-pass furnace main combustion chamber (10) to a furnace flue gas outlet (23), a second-pass high-temperature accelerated downward tapered flue (19) in front of the furnace, a second-pass high-temperature accelerated downward tapered flue (19) in the back of the furnace, a third-pass ascending flue in front of the furnace, a third-pass ascending flue in the back of the furnace, a longitudinal wet water vapor cooling flue (96) on the upper part of the furnace and a boiler tail convection flue, wherein the boiler tail convection flue is a vertical shaft flue (41).

6. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 1, characterized in that: The water path of the fluidized bed boiler is as follows: the inlet water enters the economizer (48) from the water inlet (49), enters the horizontal header (69) on the rear wall of the shaft through the connecting pipe (22), is distributed to the rear wall (42) of the shaft flue, goes down to the lower horizontal header (50) on the rear wall of the shaft, and then enters the three-in-one bilaterally symmetrical lower vertical header (12) through the connecting pipe (22), enters the three-in-one bilaterally symmetrical membrane water-cooled wall (46) through the rear part of the partition (73), goes up to the rear section of the three-in-one bilaterally symmetrical upper vertical header (35), and then is forced to enter the front wall ( 45) descends into the lower horizontal header (51) of the front wall of the shaft, then enters the three-in-one bilaterally symmetrical lower vertical header (12) through the connecting pipe (22), is forced to pass through the three-in-one bilaterally symmetrical membrane water-cooled wall (46) through the partition (73), ascends into the middle section of the three-in-one bilaterally symmetrical upper vertical header (35), is forced to enter the horizontal header (61) on the water-cooled wall of the guide flue gas direct-to-bin silo through the partition (73), passes through the connecting pipe (22), then is forced to be distributed to the water-cooled wall (18) of the guide dust-containing flue gas direct-to-bin silo through the partition (73), descends into the lower horizontal header (16) of the guide dust-containing flue gas direct-to-bin silo, then passes through the two ends The connecting pipe (22) enters the front section of the three-in-one bilaterally symmetrical lower longitudinal header (12), is forcibly distributed to the three-in-one bilaterally symmetrical membrane water-cooled wall (46) through the partition (73), and then goes up to enter the front section of the three-in-one bilaterally symmetrical upper longitudinal header (35), enters the bilaterally symmetrical upper longitudinal header (27) of the furnace through the connecting pipe (22), is forced to enter the connecting pipes (22) on both sides through the partition (73), and then enters the upper horizontal header (21) of the rear wall of the furnace, and is distributed to the forward upward bending inclined section (17) of the membrane water-cooled wall of the rear wall of the furnace and the membrane water-cooled wall (5) of the rear wall of the furnace, and then goes down to enter the lower horizontal header (3) of the rear wall of the furnace, and passes through The connecting pipe (22) enters the symmetrical lower vertical headers (2) on both sides of the furnace and the lower horizontal header (1) on the front wall of the furnace, and is forced to pass through the symmetrical membrane water-cooled walls (9) on both sides of the furnace and the membrane water-cooled walls (4) on the front wall of the furnace, and then goes up to the upper end, respectively, through the symmetrical upper vertical headers (27) on both sides of the furnace and the connecting pipe (22), and then enters the upper horizontal header (58) on the front wall of the furnace, and then enters the four-in-one water-cooled ceiling front horizontal header (72), and then is distributed to the four-in-one water-cooled ceiling (118), and then enters the four-in-one water-cooled ceiling rear horizontal header (117), and is sequentially sent to the heating system through the gas collecting tank (76) and the water outlet (75).

7. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 5, characterized in that: The upper end of the membrane water-cooled wall (4) of the furnace front wall of the main combustion chamber (10) of the furnace is bent and extended backward and upward to communicate with the upper horizontal header (58) of the furnace front wall, and the connecting pipe (22) at the lower end of the furnace smoke outlet (23) is connected to the upper horizontal header (58) of the furnace front wall, and the connecting pipe (22) at the upper end of the furnace smoke outlet (23) is connected to the upper horizontal header of the furnace smoke outlet; the upper end of the membrane water-cooled wall (5) of the furnace rear wall is bent and extended forward and upward to communicate with the upper horizontal header (21) of the furnace rear wall, and the connecting pipe (22) at the lower end of the furnace smoke outlet (23) is connected to the upper horizontal header (21) of the furnace rear wall, and the connecting pipe (22) at the upper end of the furnace smoke outlet (23) is connected to the upper horizontal header of the furnace smoke outlet, so as to form a tapered section (12) at the upper part of the furnace 4), the upper end of the three-pass ascending flue in the burnout chamber (20) is the three-pass ascending flue outlet (94) of the burnout chamber, the three-pass ascending flue in the burnout chamber (20) refers to the upper part of the burnout chamber (20), the three-pass ascending flue outlet (94) of the burnout chamber is the longitudinal wet steam cooling flue inlet at the front top of the boiler, a high-temperature superheater (95) is provided at the three-pass ascending flue outlet (94), the lower end of the three-pass ascending flue is the three-pass flue gas inlet of the burnout chamber, the front end of the three-pass ascending flue is the symmetrical shaft flue rear wall (42), the rear end of the three-pass ascending flue is the dust-containing flue water-cooling wall (18) that guides the dust-containing flue gas to directly hit the silo, and the two side ends of the three-pass ascending flue are two symmetrical membrane water-cooling walls (113); The upper end of the three-pass ascending flue after the furnace is provided with a three-pass ascending flue outlet (101), the three-pass ascending flue after the furnace refers to the lower part of the burnout chamber (20), the three-pass ascending flue outlet (101) after the furnace is the longitudinal wet water vapor cooling flue inlet at the rear top of the boiler, a high-temperature superheater (95) is provided at the three-pass ascending flue outlet (101), the lower end of the three-pass ascending flue after the furnace is the three-pass flue gas inlet after the furnace, the front end of the three-pass ascending flue after the furnace is the water-cooled wall (18) that guides the dust-containing flue gas to directly hit the silo, the rear end of the three-pass ascending flue after the furnace is the front wall (45) of the vertical shaft flue, and the two side ends of the three-pass ascending flue after the furnace are two symmetrical membrane water-cooled walls (113).

8. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 6, characterized in that: The flue gas path of the fluidized bed boiler: the flue gas passes through two symmetrical furnace flue gas outlets (23) at the front and rear, turns 180 degrees and enters two symmetrical two-pass high-temperature accelerated downward gradually contracting flues (19) at the front and rear, and the flue gas is decelerated by the large expansion and deceleration of the two symmetrical two-pass high-temperature accelerated downward gradually contracting flue gas outlets (15) at the front and rear of the furnace, so that the solid particles naturally settle in the silo (11), and the fine particles that have not settled in the silo (11) continue to burn in the two symmetrical auxiliary combustion chambers (44) at the front and rear of the furnace, and the fly ash entrained by the airflow enters Two burnout chambers (20) are symmetrical at the front and rear of the furnace. The burnout flue gas continues to burn in the burnout chamber (20) and then enters the longitudinal wet water vapor cooling flue (96) at the upper part of the furnace through the three-pass ascending flue outlet (94) and the three-pass ascending flue outlet (101) at the rear of the furnace, and then goes down to the rear part and enters the vertical shaft flue (41). After convective heat transfer with the superheater (43) and the economizer (48), the flue gas enters the dust collector through the flue gas outlet (129), and after the flue gas is stabilized, it is discharged to the chimney by the induced draft fan and enters the atmosphere. The steam-water circuit of the fluidized bed boiler is as follows: water enters the economizer (48) from the water inlet (49), the economizer (48) enters the boiler top flue water-cooled ceiling (100) through the connecting pipe (22), and then enters the boiler drum (26) through the connecting pipe (22), low-temperature water enters the downcomer pipes through the downcomer main pipe (85), the low-temperature water enters the lower longitudinal and transverse headers through the downcomer pipes, and then enters the longitudinal and transverse membrane water-cooled walls (108) to transfer heat through radiation convection, the hot water rises, enters the upper longitudinal and transverse headers, and then enters the gas guide branches through the gas guide pipes of the upper longitudinal and transverse headers, and then enters the boiler drum (26) through the gas guide branches, the low-temperature water continues to descend and circulate, the saturated steam enters the high-temperature superheater (95) and the superheater (43) through the connecting pipe (22), and is sent to users through the steam outlet (47).

9. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 1, characterized in that: The water vapor path of the direct-flow boiler of the four-pass water-cooled flue is as follows: the inlet water enters the economizer (48) from the water inlet (49), enters the horizontal header (123) through the superheater connecting pipe (31), and then enters the lower vertical header (2) symmetrical on both sides of the furnace, the lower horizontal header (1) on the front wall of the furnace, and the lower horizontal header (3) on the rear wall of the furnace through the connecting pipe (22); the water in the lower vertical header (2) symmetrical on both sides of the furnace is distributed to the membrane water-cooled walls (9) symmetrical on both sides of the furnace and rises to the upper vertical header (27) symmetrical on both sides of the furnace, and all the partitions (73) begin to descend to the three-in-one lower horizontal header (12) symmetrical on both sides, and the water begins to flow backward to the rear end through the connecting pipe (22). The pipe (22) is connected with the lower horizontal header (50) of the shaft rear wall, a part of the superheated steam rises to the three-in-one bilaterally symmetrical upper horizontal header (35) through the three-in-one bilaterally symmetrical membrane water-cooled wall (46), and then communicates with the superheater horizontal header (79) through the superheater connecting pipe (31), a part of the superheated steam is distributed to the shaft flue rear wall (42) through the lower horizontal header (50) of the shaft rear wall, ascends to the upper horizontal header (69) of the shaft rear, and then communicates with the superheater horizontal header (79) through the superheater connecting pipe (31), enters the superheater (43) through the two-way connecting pipe (22), and descends through the steam outlet (47) to be sent to the required equipment; Water in the furnace front wall lower horizontal header (1) and the furnace rear wall lower horizontal header (3) is respectively distributed to the furnace front wall membrane water cooling wall (4) and the furnace rear wall membrane water cooling wall (5), and then rises to the furnace front wall upper horizontal header (58) and the furnace rear wall upper horizontal header (21) respectively; the furnace front wall upper horizontal header (58) is connected to the ceiling superheater horizontal header (79) through a connecting pipe (22); the furnace rear wall upper horizontal header (21 ... front wall upper horizontal header (58) is connected to the ceiling superheater horizontal header (79) through a connecting pipe (22); the furnace rear wall upper horizontal header (21) is connected to the ceiling superheater horizontal header (79) through a connecting pipe (22); the furnace rear wall upper horizontal header (21) is connected to the ceiling superheater horizontal header (79) through a connecting pipe (22); the furnace front wall upper horizontal header (58) is connected to the ceiling superheater horizontal header (79) through a connecting pipe (22); the furnace The superheater horizontal header (79) is connected to the ceiling through a connecting pipe (22); the water in the front and rear headers of the furnace enters the superheater ceiling (122) through the connecting pipe (22) and then enters the superheater horizontal header (79); the superheater horizontal header (79) is connected to the upper horizontal header (61) of the directing flue gas to directly flush the silo through the superheater connecting pipe (31), and the water is distributed to the directing flue gas to directly flush the silo tube bundle downward and enters the lower horizontal header (16). The lower horizontal header (16) is connected to the horizontal header (89) on the front wall of the silo through the connecting pipe (22), and the horizontal header (89) on the front wall of the silo distributes the water to the membrane type water cooling wall (91) on the front wall of the silo downwardly into the lower horizontal header (93) on the front wall of the silo, and then connects to the lower horizontal header (92) on the rear wall of the silo through the superheater connecting pipe (31) and distributes the water to the membrane type water cooling wall (90) on the rear wall of the silo, and then goes upwardly into the horizontal header (8 7) It is then connected to the lower horizontal header (51) of the front wall of the shaft through the connecting pipe (22), and the lower horizontal header (51) of the front wall of the shaft is distributed to the front wall of the shaft flue (45), and then it goes up to the upper horizontal header (37) of the front wall of the shaft and then connects to the superheater horizontal header (79) through the superheater connecting pipe (31), and the superheater horizontal header (79) is distributed to the superheater (43), and then it goes down through the steam outlet (47) and is sent to the required equipment.

10. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 1, characterized in that: The water vapor path of the fluidized bed boiler is as follows: the inlet water enters the economizer (48) from the water inlet (49), enters the horizontal header (123) through the superheater connecting pipe (31), and then enters the lower vertical header (2) on both sides of the furnace, the lower horizontal header (1) on the front wall of the furnace, and the lower horizontal header (3) on the rear wall of the furnace through the connecting pipe (22); the water in the lower vertical header (2) on both sides of the furnace is distributed to the membrane water-cooled walls (9) on both sides of the furnace, rises to the two middle symmetrical upper vertical headers (99), moves forward to the partition (73), and then is distributed to the three-in-one membrane water-cooled walls (46) on both sides, descends to the front two-in-one lower vertical header (104) on both sides, and then moves forward to be distributed to the The three-in-one bilaterally symmetrical membrane water-cooled wall (46) then moves upward and enters the front two-in-one bilaterally symmetrical upper longitudinal header (97), then communicates with the three-in-one bilaterally symmetrical upper longitudinal header (35) through the superheater connecting pipe (31), moves backward to the partition (73), and is then distributed to the three-in-one bilaterally symmetrical membrane water-cooled wall (46), moves downward and enters the three-in-one bilaterally symmetrical lower longitudinal header (12), then moves backward to the rear end and is distributed to the three-in-one bilaterally symmetrical membrane water-cooled wall (46), moves upward and enters the three-in-one bilaterally symmetrical upper longitudinal header (35), then communicates with the superheater horizontal header (79) through the superheater connecting pipe (31), and is then distributed to the superheater (43), and moves downward to the steam outlet (47); The water in the lower horizontal header (1) of the furnace front wall and the lower horizontal header (3) of the furnace rear wall is respectively distributed to the membrane water-cooled wall (4) of the furnace front wall, the membrane water-cooled wall (5) of the furnace rear wall and the membrane water-cooled wall (108), and rises to the upper horizontal header (21) of the furnace front wall; it is connected with the superheater horizontal header (79) behind the ceiling through the superheater connecting pipe (31) and distributed to the three-in-one superheater ceiling (119), and then enters the superheater horizontal header (79) before passing through the superheater connecting pipe (31). The connecting pipe (22) is connected with the upper horizontal header (61) of the guide flue gas directly rushing into the silo, and is distributed to the guide dust-containing flue gas directly rushing into the silo water-cooled wall (18), and then goes down to the guide flue gas directly rushing into the lower horizontal header (16) of the silo, and then is connected with the horizontal header (87) on the rear wall of the silo through the connecting pipe (22); the horizontal header (87) on the rear wall of the silo is then connected with the symmetrical horizontal header (50) through the superheater connecting pipe (31) and is distributed to the rear wall of the vertical shaft flue and the symmetrical front wall (42) of the double furnace, and then goes up to the rear wall of the vertical shaft. The wall horizontal header (69) is then connected to the ceiling superheater horizontal header (79) through a connecting pipe (22) and distributed to the three-in-one superheater ceiling (119) and then enters the ceiling rear superheater horizontal header (79). It is then connected to the upper horizontal header (61) of the guide flue gas directly rushing into the silo through the superheater connecting pipe (31) and distributed to the guide dust-containing flue gas directly rushing into the silo water-cooled wall (18) and then goes down to the lower horizontal header (16) of the guide flue gas directly rushing into the silo. The lower horizontal header (16) of the silo is connected to the upper horizontal header (61) of the guide flue gas directly rushing into the silo through the connecting pipe ( 22) is connected with the horizontal header (89) on the front wall of the silo, and then is connected with the horizontal header (51) under the front wall of the shaft and the horizontal header (50) under the rear wall of the shaft through the superheater connecting pipe (31) and is respectively distributed to the front wall (45) and the rear wall (42) of the shaft flue, and then goes up to the horizontal header (37) on the front wall and the horizontal header (69) on the rear wall of the shaft, and then is respectively connected with the superheater horizontal header (79) through the superheater connecting pipe (31) and goes down to the steam outlet (47).

11. The water-cooled gas-solid separator and the tapered cross section of the upper furnace of a fluidized bed boiler with four or seven return water-cooled flues according to claim 1, characterized in that: The rear wall of the tapered section (124) at the upper part of the furnace of the four-pass water-cooled flue is the membrane water-cooled wall at the rear wall of the furnace from the forward bending point (14) to the top, the front wall of the tapered section (124) at the upper part of the furnace of the four-pass water-cooled flue is the front wall of the furnace, and the two side walls of the tapered section (124) at the rear wall of the furnace are symmetrical membrane water-cooled walls (9) at both sides of the furnace; the front wall of the tapered section (125) at the upper part of the furnace of the seven-pass water-cooled flue is the membrane water-cooled wall at the rear wall of the furnace from the forward bending point (14) to the top, and the rear wall of the tapered section (125) at the upper part of the furnace of the seven-pass water-cooled flue is the membrane water-cooled wall at the rear wall of the furnace from the forward bending point (14) to the top.

12. A fluidized bed boiler with a water-cooled gas-solid separator and four or seven return water-cooled flues according to claim 1, characterized in that: The fluidized bed boiler comprises each water-cooled ceiling and each superheater ceiling with reserved pipe holes corresponding to the steam guide pipe and the exhaust pipe. The boiler drum can be arranged at the front and rear ends of the top of the boiler body and at any longitudinal position that is convenient for arranging the downcomer.

Citation Information

Cited By

  • BFB / CFB boiler flow state and combustion reconstruction energy-saving synergistic low-emission large-scale structure and method

    CN121067320A