A method for temporary plugging deep in the seam and then turning to acid fracturing to find holes along the seam
By temporarily blocking deep parts of the fractures and turning to the acid fracturing method of finding holes along fractures, the reaction between acid liquid and carbonate rock is used to form and expand fractures, which solves the problem that existing technology cannot communicate with caves in non-maximum principal stress directions in far-well areas, and significantly Increased production of oil and gas wells.
Patent Information
- Application Number
- CN202011127694.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-20
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2040-10-20
AI Technical Summary
Existing technology cannot effectively communicate with caves in non-maximum principal stress directions in far-well zones, resulting in insufficient oil and gas well production.
The method of temporarily blocking deep parts of the fractures and turning to follow the fractures to find holes and acid fracturing is used to open the cracks in the direction of the maximum principal stress by injecting pre-hydraulic pressure, pumping temporary plugging agent to increase the pressure in the fractures, and injecting acid to dissolve the cracks and form secondary cracks. The horizontal stress difference is used to turn the secondary fractures to the direction of the maximum principal stress. Temporary plugging and acid fracturing are repeated until the secondary fractures are close to the target cave. Finally, the target cave is communicated with low-volume acid fluid loss and dissolution.
Effectively communicate with caves in non-maximum principal stress directions in far-well areas to increase oil and gas well production, especially when the target cave is located at a vertical distance of more than 15m in the direction of the maximum horizontal principal stress in the wellbore.
Smart Images

Figure CN114439442B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of acid fracturing of tight oil and gas reservoirs, and in particular to an acid fracturing method for temporary plugging deep in a fracture and then diverting to find a hole by following the fracture. Background Art
[0002] Fracture-cavity carbonate reservoirs are a type of reservoir that uses irregular fracture-cavity bodies as the main storage space and development unit for crude oil. Its reservoir is composed of matrix, fractures and caves. The matrix is very dense and has almost no ability to store oil and gas. Therefore, the storage space of this type of oil and gas reservoir is mainly various caves. In order to increase the production of this type of oil and gas wells, hydraulic fracturing and acidizing and other transformation measures are carried out during the production process to connect the caves.
[0003] Chinese invention patent application publication number CN106194145A discloses a multi-stage temporary plugging depth network acid fracturing method, and provides a multi-stage temporary plugging depth network acid fracturing method, which uses temporary plugging materials in the seam and temporary plugging materials at the seam mouth to form bridge plugging, so as to achieve interlayer diversion. This method can form a complex fracture network in multi-layer, thick layers or long well sections of horizontal wells with different permeability in carbonate rocks through the principle of combining hydraulic self-seeking with artificial regulation, increase the probability of connecting oil and gas zones, reduce oil and gas seepage resistance, increase single well production, and enable carbonate reservoirs to be developed efficiently and economically.
[0004] China Invention Patent Application Publication No. CN110259429A discloses a multi-stage dynamic temporary plugging volume acid fracturing method, which takes "multi-stage physical temporary plugging + multi-stage chemical temporary plugging" as the main idea, and combines multi-stage hydraulic sand fracturing with multi-stage injection acid fracturing. This method improves the pertinence and conductivity of the reservoir, reduces acid loss, increases the length of fracture acid erosion, and expands the reservoir transformation volume by fracture diversion, achieving the goal of effectively transforming the single well production of dolomitic carbonate reservoirs.
[0005] Chinese invention patent application publication number CN105041288A discloses a carbonate oil and gas reservoir fracture diversion acid fracturing method, providing a carbonate oil and gas reservoir fracture diversion acid fracturing method. After repeated temporary plugging and fracture creation, multiple diversion acid fracturing fractures can be formed. After the acid fracturing construction is completed, the temporary plugging material degrades, and the pollution to the reservoir is small. This is a method that can improve the efficiency of acid fracturing.
[0006] The literature (Luo Zhifeng, Wu Lin, Zhao Liqiang, Zhang Nanlin, Cheng Long, Ren Dengfeng. Design method and application of fiber temporary plugging and acid fracturing process [J]. Oil and Gas Reservoir Evaluation and Development, 2019, 9(06): 65-71.) introduced the difficulty in quantitative design of fiber dosage for fiber temporary plugging and acid fracturing. A total stress field model considering the initial artificial fractures, artificial fractures in adjacent wells, pore pressure changes, temperature changes and in situ stress was established. Multivariate nonlinear regression was performed to establish a prediction model for the diversion radius. The displacement discontinuity method (DDM) was used to solve the problem. Combined with the fiber plugging mechanism, a fiber dosage design model was established. The model was applied to Xinjiang M Well. The design results were basically close to the on-site construction results, and the new fractures were successfully diverted.
[0007] The literature (Chen Can, Wang Dong, Hu Dianqi, Wei Meitao, Shi Hengyi, Cui Mengxuan. Temporary plugging and diversion acid fracturing technology for carbonate reservoirs in Puguang Gas Field [J]. Petroleum Drilling and Production Technology, 2019, 41(02): 230-235.) introduced the application of a true triaxial simulation experimental device, using outcrop cores with similar physical properties to the reservoir, loading triaxial stresses corresponding to the actual reservoir, and using independently developed degradable acid fracturing temporary plugging agents and high-temperature clean diversion acid systems to conduct acid fracturing temporary plugging and diversion experiments. The temporary plugging and acid fracturing field test results were similar to those of the previous outcrop core temporary plugging and acid fracturing experiments, verifying the reliability of the temporary plugging and diversion acid fracturing technology.
[0008] In summary, it can be seen that deep acid fracturing, hydraulic fracturing, and cross-linked acid plus sand fracturing are commonly used to exploit such oil and gas reservoirs. However, the main purpose of such technologies is to penetrate deeply to form a network of connections, expand the seepage area, and connect the caves in the near-well zone or the direction of the maximum horizontal principal stress. It is not possible to purposefully connect the caves in the far-well zone that are not in the direction of the maximum principal stress. Therefore, providing a method that can specifically connect the caves in the far-well zone that are not in the direction of the maximum principal stress has become an urgent problem to be solved in this field. Summary of the invention
[0009] In order to solve the problem that the existing technology cannot purposefully communicate with caves in the direction of non-maximum principal stress in the far-well area, the present invention provides a method for acid fracturing by temporarily plugging deep in the fracture and then turning to fracture-following cave finding, which fully utilizes the property that acid can react with carbonate rock to communicate with natural fractures, so that it can "follow the fractures to find caves" and can purposefully communicate with caves in the direction of non-maximum principal stress in the far-well area.
[0010] The technical solution of the present invention is as follows:
[0011] A method for temporarily plugging deep in a seam and then turning to acid fracturing by following the seam to find a hole is characterized by comprising the following steps:
[0012] S1. Injecting pre-fluid to open the crack in the direction of maximum principal stress and extend it to a certain distance to form a main crack;
[0013] S2. Pumping a temporary plugging agent so that the temporary plugging agent reaches the front end of the main crack for temporary plugging, thereby increasing the pressure in the crack;
[0014] S3. injecting acid at a displacement higher than the fracturing pressure for acid fracturing, so that the acid dissolves the main fracture and the natural fractures in contact with the main fracture, increases the conductivity of the natural fracture, and extends the natural fracture along the non-principal stress direction to form secondary fractures;
[0015] S4. Under the action of horizontal stress difference, the secondary fractures extending from the natural fractures gradually turn to expand in the direction of maximum principal stress. If the distance between the secondary fractures and the target cave exceeds the threshold, repeat steps S2 and S3, and perform temporary plugging, extension, and acid fracturing again until the secondary fractures are close to the target cave;
[0016] S5. Continue to inject acid at a rate lower than the fracturing pressure, so that the acid flows and reacts in the main fractures, natural fractures and secondary fractures. The filtered acid flows and dissolves along the high permeability zone around the target cave, connecting with the nearby target cave.
[0017] Preferably, before step S1, the method further includes obtaining reservoir properties and rock mechanics parameter data of the reservoir to be transformed, and simulating the opening of the end of the fracture after the injection of the pre-fluid in step S1 and the opening of the entrance section of the fracture when the temporary plugging agent is injected in step S2 through FracPT acid fracturing optimization design software according to the obtained rock mechanics parameter data, and selecting the temporary plugging agent based on the simulated information; judging the distance and orientation between the target cave and the wellbore according to the well logging and geological data, and predicting the required amount of fracturing fluid, acid and temporary plugging agent.
[0018] Preferably, the pre-fluid in step S1 is a guar fracturing fluid, and the raw material composition of the guar fracturing fluid includes 0.5% carboxymethyl guar + 0.2% viscosity stabilizer + 0.5% drainage aid + 0.2% cross-linking accelerator + 0.05% bactericide, and the balance is water;
[0019] Alternatively, the prefluid is an acid-resistant fracturing fluid, and the acid-resistant fracturing fluid is one or more of an acidic carboxymethyl fracturing fluid, an autogenous acid fracturing fluid, and an acidic cross-linked cellulose fracturing fluid.
[0020] Preferably, the temporary plugging agent in step S2 is determined by physical modeling experiments, a temporary plugging experiment is carried out in the laboratory using a diversion channel temporary plugging displacement device, and different temporary plugging agents are selected according to the fracture width obtained by software simulation.
[0021] Preferably, the acid solution in step S3 is a cross-linked acid system, and the raw material composition of the cross-linked acid system includes: 20% hydrochloric acid + 1% thickener + 2.5% corrosion inhibitor + 0.5% synergist + 1% iron ion stabilizer for acid fracturing + 1% demulsifier for acid fracturing + a total of 1% cross-linking agent and delayed cross-linking agent.
[0022] Preferably, when the prefluid is an acid-resistant fracturing fluid, the acidic carboxymethyl fracturing fluid, the autogenous acid fracturing fluid and the acidic cross-linked cellulose fracturing fluid select additive formulas according to the actual reservoir temperature and fluid loss conditions to adapt to the reservoir.
[0023] Preferably, the raw material composition and ratio of the cross-linking acid system are adjusted according to the actual situation of the reservoir to be transformed, and the configuration ratio of the cross-linking agent to the delayed cross-linking agent is 2:12.
[0024] Preferably, when injecting the temporary plugging agent into the fracture in step S2, the selected temporary plugging agent is first added to the guar gum fracturing fluid or the acid-resistant fracturing fluid, and then injected into the formation.
[0025] Preferably, when the temporary plugging agent is added to the guar fracturing fluid or the acid-resistant fracturing fluid, the mass percentage of the temporary plugging agent is 2% to 3%.
[0026] Preferably, the temporary plugging agent is composed of fibers, bulky particles, and rigid particles.
[0027] The beneficial effects of the present invention are:
[0028] The method for acid fracturing by temporarily plugging deep in fractures and diverting to fracture-following cave finding provided by the present invention is mainly to communicate with the karst caves in the non-maximum principal stress direction in the far well area, namely, the target karst caves (or karst cave reservoirs), especially when the target karst caves to be communicated are located at a vertical distance of more than 15m in the direction of the maximum horizontal principal stress of the wellbore, the effect is obvious, firstly, the pre-fluid is injected to play a fracturing role, the fractures in the maximum principal stress direction are pressed open and extended to a certain distance to form the main fractures, and then the temporary plugging agent is pumped to make the temporary plugging agent reach the front end of the main fracture for temporary plugging, so that the pressure in the fracture is increased, and then the acid is injected for acid fracturing, so that the acid The liquid dissolves the main fracture and the natural fractures in contact with the main fracture, increases the conductivity of the natural fracture, and makes the natural fracture extend in the non-principal stress direction to form secondary fractures; under the action of horizontal stress difference, the secondary fractures extending on the natural fracture will gradually turn to expand in the direction of maximum principal stress. A temporary plugging and diverting operation may not be able to guide the fracture (secondary fracture) to the vicinity of the target cave. At this time, the distance between the secondary fracture and the target cave is far, that is, it exceeds the threshold. It is necessary to temporarily plug, extend, divert and acidize again according to the distance between the target cave and the wellbore until the secondary fracture is close to the target cave. When the secondary fracture is close to the cave, continue the subsequent steps and continue to inject acid for acidization at a displacement lower than the initiation pressure, so that the acid reacts in the main fracture, natural fracture and secondary fracture, and the filtrate acid flows and dissolves along the high permeability zone around the target cave to communicate with the nearby target cave. That is to say, the present application sets five steps, namely, initial fracturing, temporary plugging in the fracture, extension of natural fractures, acid fracturing of secondary fractures and dissolution of filtrate acid, which work in coordination with each other, making full use of the characteristics that acid can react with carbonate rocks, and the characteristics that filtrate acid can flow and dissolve along the high permeability zone around the target cave to communicate with the nearby target cave, communicate with the characteristics of natural fractures, so that it can "follow the fracture to find the cave", and communicate well with the target cave in the far well area, so as to achieve the purpose of increasing the production of oil and gas wells. By obtaining the reservoir properties and rock mechanics parameter data of the reservoir to be transformed, judging the positional relationship of the target cave, and fully combining the advantages of temporary plugging and diversion with matrix acidification, the target cave in the non-principal stress direction of the far well area can be communicated in a targeted and more effective manner. The present invention is mainly applied to fracture-cave carbonate reservoirs. When the cave reservoir is located in the non-maximum principal stress direction, the acid fracturing method of the present invention, which is targeted to communicate with the cave in the non-maximum principal stress direction of the far well area, has obvious advantages and can effectively increase the production of such oil and gas wells.
[0029] The temporary plugging agent used in the above-mentioned deep-seated temporary plugging and diverting acid fracturing method for finding holes by following the fractures of the present invention is preferably composed of fibers, rigid particles, and bulk-expanded particles, including both flexible temporary plugging agents such as fibers and bulk-expanded particles and rigid particles, and has a stronger plugging effect, which can further improve the temporary plugging and diverting effect, and make full use of the characteristics that the acid can react with carbonate rocks to communicate with natural fractures, so that its "finding holes by following the fractures" can well communicate with the target caves in the far-well area, making up for the defect that the fracturing fluid as an inert liquid cannot react with carbonate rocks, and can specifically communicate with the target caves in the non-maximum principal stress direction in the far-well area, greatly improving the production of oil and gas wells. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 This is a schematic diagram of the principle of the acid fracturing method for temporarily plugging deep in a fracture and then tracing the fracture to find a hole according to the present invention.
[0031] The accompanying drawings of the present invention are listed as follows:
[0032] a-wellbore; b-temporary plugging agent; c-main fracture; d-natural fracture; e-secondary fracture; f1-f5-target cave. DETAILED DESCRIPTION
[0033] In order to more clearly understand the content of the invention, it will be described in detail with reference to the drawings and embodiments.
[0034] The present invention relates to a method for temporarily plugging deep in a seam and then turning to acid fracturing to find a hole in the seam. The principle is as follows: Figure 1 As shown, the method includes the following steps: S1. injecting pre-fluid to press open the crack in the direction of maximum principal stress and extend it to a certain distance to form a main crack c; S2. pumping temporary plugging agent b so that the temporary plugging agent b reaches the front end of the main crack for temporary plugging, thereby increasing the pressure in the crack; S3. injecting acid liquid at a displacement higher than the fracture initiation pressure for acid fracturing, so that the acid liquid dissolves the main crack c and the natural crack d in contact with the main crack c, increases the conductivity of the natural crack d, and extends the natural crack d along the non-principal stress direction to form a secondary crack e; S4. under the action of horizontal stress difference, the secondary crack e extending from the natural crack d gradually turns to expand in the direction of maximum principal stress. If the distance between the secondary crack e and the target cave f exceeds the threshold, repeating steps S2 and S3, and performing temporary plugging, extension and expansion, and acid fracturing again until the secondary crack e is close to the target cave f ( Figure 1 f1, f2, f3, f4, and f5 in the figure are all target caves, collectively referred to as target cave f); S5. Continue to inject acid at a rate lower than the fracturing pressure, so that the acid flows and reacts in the main fracture c, natural fracture d, and secondary fracture e. The filtered acid flows and dissolves along the high permeability zone around the target cave f, connecting with the nearby target cave f, so as to achieve the purpose of increasing the production of oil and gas wells.
[0035] The method of temporarily plugging deep in fractures and redirecting acid fracturing to find caves along the fractures provided by the present invention is mainly to communicate with caves in the non-maximum principal stress direction in the far-well area in a targeted manner, namely, target caves (or cave reservoirs), especially when the target caves to be communicated are located at a vertical distance of more than 15m in the direction of the maximum horizontal principal stress of the wellbore, the effect is obvious.
[0036] Before step S1, the reservoir properties and rock mechanics parameter data of the reservoir to be transformed can be obtained first, and the following two aspects of design can be carried out: ① Based on the obtained rock mechanics parameter data, the FracPT acid fracturing optimization design software is used to simulate the end opening of the fracture after the injection of the pre-fluid in step S1 and the opening of the entrance section of the fracture when the temporary plugging agent is injected in step S2, and based on the simulated information, a reasonable temporary plugging system (temporary plugging agent) in the fracture can be selected; ② According to the logging and geological data, the distance and orientation between the target cave (i.e., the cave reservoir) and the wellbore are determined, so as to predict the amount of fracturing fluid, acid and temporary plugging agent required.
[0037] Specifically, in step S1, a pre-fluid is injected into the wellbore a to press open the cracks in the direction of the maximum principal stress and extend them to a certain distance to form a main crack c. Preferably, the pre-fluid used is a guar gum fracturing fluid. Further preferably, the raw material composition of the guar gum fracturing fluid includes 0.5% carboxymethyl guar gum + 0.2% viscosity stabilizer + 0.5% drainage agent + 0.2% cross-linking promoter + 0.05% bactericide, and the balance is water; further preferably, the pre-fluid is an acid-resistant fracturing fluid, and the acid-resistant fracturing fluid is one or more of an acidic carboxymethyl fracturing fluid, an autogenous acid fracturing fluid and an acidic cross-linked cellulose fracturing fluid. The acidic carboxymethyl fracturing fluid, the autogenous acid fracturing fluid and the acidic cross-linked cellulose fracturing fluid can select the optimal additive formula according to the actual temperature and filtration loss of the reservoir to better adapt to the reservoir.
[0038] In step S2, a temporary plugging agent is first added to the pre-fluid (guar fracturing fluid or acid-resistant fracturing fluid) at a mass percentage of 2% to 3%, and then injected into the formation. Further preferably, when the temporary plugging agent is added to the guar fracturing fluid or acid-resistant fracturing fluid, the mass percentage of the temporary plugging agent is preferably 2% to 3%. Specifically, the temporary plugging agent b is pumped into the wellbore a so that the temporary plugging agent b reaches the front end of the main fracture c for temporary plugging, thereby increasing the pressure in the fracture. Preferably, the selection of the temporary plugging agent is determined by a physical modeling experiment, and a temporary plugging experiment is carried out in the laboratory using a diversion groove temporary plugging displacement device, and different temporary plugging systems composed of fibers, bulky particles, and rigid particles are selected according to the fracture width obtained by software simulation, which include both flexible temporary plugging agents such as fibers and bulky particles, and rigid particles, and have a stronger plugging effect, which can further improve the effect of temporary plugging and diversion.
[0039] In step S3, acid is injected at a displacement higher than the fracturing pressure for acid fracturing, so that the acid dissolves the main fracture c and the natural fracture d in contact with the main fracture c, increases the conductivity of the natural fracture d, and extends the natural fracture d along the non-principal stress direction to form a secondary fracture e. Preferably, the acid is a cross-linked acid system, and the raw materials of the cross-linked acid system are composed of 20% hydrochloric acid + 1% thickener + 2.5% corrosion inhibitor + 0.5% synergist + 1% iron ion stabilizer for acid fracturing + 1% demulsifier for acid fracturing + a total of 1% cross-linking agent and delayed cross-linking agent. Further preferably, the configuration ratio of the delayed cross-linking agent is 2:12 and the raw material composition and ratio of the cross-linked acid system can be adjusted according to the actual situation of the reservoir to be transformed.
[0040] In step S4, due to the horizontal stress difference in the formation, the secondary fracture e extending from the natural fracture d will gradually turn to expand in the direction of the maximum horizontal principal stress under the effect of the horizontal stress difference. If the distance between the secondary fracture e and the target cave f is far, a temporary plugging and diverting operation may not be able to guide the secondary fracture to the vicinity of the target cave f, that is, the distance between the target cave f and the wellbore a exceeds the threshold, then steps S2 and S3 are repeated, and temporary plugging, extension, diversion and acid fracturing are performed again until the secondary fracture e is close to the target cave f. Figure 1 As shown, for the target caves f1 and f4, a temporary plugging and diverting operation can guide the secondary fracture e to the target cave f1 (or the target cave f4), that is, the distance between the two is relatively close, that is, within the threshold, and the subsequent step S5 can be directly executed. However, for the target caves f2, f3 and f5, a temporary plugging and diverting operation cannot guide the secondary fracture e to the vicinity of the target cave f2 (or the target caves f3, f5). At this time, the distance between the secondary fracture e and the target cave is relatively far, that is, it exceeds the threshold. According to the distance between the target cave and the wellbore, temporary plugging, extension, diversion and acid fracturing are required again until the secondary fracture e is close to the target cave f2 (or the target caves f3, f5).
[0041] In step S5, when the secondary fracture e is close to the target cave f, the acid is continuously injected at a displacement rate lower than the fracturing pressure, so that the acid reacts in the main fracture c, the natural fracture d and the secondary fracture e, and the filtered acid flows and dissolves along the high permeability zone around the target cave f, thereby connecting with the nearby target cave f and increasing the production of the oil and gas well.
[0042] It should be noted that the above-described specific implementations can enable those skilled in the art to more fully understand the invention, but do not limit the invention in any way. Therefore, although this specification has described the invention in detail with reference to the drawings and embodiments, those skilled in the art should understand that the invention can still be modified or replaced by equivalents. In short, all technical solutions and improvements that do not deviate from the spirit and scope of the invention should be included in the protection scope of the patent for the invention.
Claims
1. A method for temporary plugging deep in fractures and then diverting to fracture-fault-finding acid fracturing, applied to fracture-cavity carbonate reservoirs, characterized in that: The following steps are involved: S1. Injecting pre-fluid to open the crack in the direction of maximum principal stress and extend it to a certain distance to form a main crack; S2. Pumping a temporary plugging agent so that the temporary plugging agent reaches the front end of the main crack for temporary plugging, thereby increasing the pressure in the crack; S3. Injecting acid liquid at a displacement higher than the fracturing pressure for acid fracturing, wherein the acid liquid is a cross-linked acid system, and the raw material composition of the cross-linked acid system includes: 20% hydrochloric acid + 1% thickener + 2.5% corrosion inhibitor + 0.5% synergist + 1% iron ion stabilizer for acid fracturing + 1% demulsifier for acid fracturing + 1% cross-linking agent and delayed cross-linking agent in total; the acid liquid dissolves the main cracks and the natural cracks in contact with the main cracks, increases the conductivity of the natural cracks, and extends the natural cracks along the non-main stress direction to form secondary cracks; S4. Under the action of horizontal stress difference, the secondary fractures extending from the natural fractures gradually turn to expand in the direction of maximum principal stress, and the secondary fractures are guided to the vicinity of the target cave through secondary fracture diversion acid fracturing. If the distance between the secondary fractures and the target cave exceeds the threshold, steps S2 and S3 are repeated to perform temporary plugging, extension, diversion acid fracturing again until the secondary fractures are close to the target cave; S5. Continue to inject acid at a rate lower than the fracturing pressure, so that the acid reacts in the main fractures, natural fractures and secondary fractures. Utilize the characteristics of the reaction between acid and carbonate rock, and the characteristic that the filtered acid flows and dissolves along the high permeability zone around the target cave to communicate with the nearby target cave, so as to "find caves by following the fractures" and achieve targeted communication with the target cave in the non-principal stress direction in the far well area.
2. The method for temporary plugging deep in a seam and then turning to seam-tracing and hole-finding acid fracturing according to claim 1 is characterized in that: Before step S1, the method also includes obtaining reservoir properties and rock mechanics parameter data of the reservoir to be transformed, and simulating the end opening of the fracture after the injection of the pre-fluid in step S1 and the opening of the entrance section of the fracture when the temporary plugging agent is injected in step S2 through FracPT acid fracturing optimization design software according to the obtained rock mechanics parameter data, and selecting the temporary plugging agent based on the simulated information; judging the distance and orientation between the target cave and the wellbore according to the well logging and geological data, and predicting the required amount of fracturing fluid, acid and temporary plugging agent.
3. The method for temporary plugging deep in a seam and then turning to acid fracturing by following the seam to find a hole according to claim 1, characterized in that: The pre-fluid in step S1 is guar fracturing fluid, and the raw material composition of the guar fracturing fluid includes 0.5% carboxymethyl guar gum + 0.2% viscosity stabilizer + 0.5% drainage aid + 0.2% cross-linking accelerator + 0.05% bactericide, and the balance is water; Alternatively, the prefluid is an acid-resistant fracturing fluid, and the acid-resistant fracturing fluid is one or more of an acidic carboxymethyl fracturing fluid, an autogenous acid fracturing fluid, and an acidic cross-linked cellulose fracturing fluid.
4. The method for temporary plugging deep in a seam and then turning to acid fracturing by following the seam to find a hole according to claim 1 is characterized in that: The temporary plugging agent in step S2 is determined through physical modeling experiments. A temporary plugging experiment is carried out in the laboratory using a diversion channel temporary plugging and displacement device, and different temporary plugging agents are selected according to the fracture width obtained by software simulation.
5. The method for temporary plugging deep in a seam and then turning to acid fracturing by following the seam to find a hole according to claim 3 is characterized in that: When the prefluid is an acid-resistant fracturing fluid, the acidic carboxymethyl fracturing fluid, the autogenous acid fracturing fluid and the acidic cross-linked cellulose fracturing fluid are selected with additive formulas according to the actual reservoir temperature and fluid loss conditions to adapt to the reservoir.
6. The method for temporary plugging deep in a seam and then turning to acid fracturing by following the seam to find a hole according to claim 1, characterized in that: The raw material composition and ratio of the cross-linking acid system are adjusted according to the actual situation of the reservoir to be transformed, and the configuration ratio of the cross-linking agent to the delayed cross-linking agent is 2:
12.
7. The method for temporary plugging deep in a seam and then turning to acid fracturing by following the seam to find a hole according to claim 3, characterized in that: When injecting the temporary plugging agent into the fracture in step S2, the selected temporary plugging agent is first added to the guar gum fracturing fluid or the acid-resistant fracturing fluid, and then injected into the formation.
8. The method for temporary plugging deep in a seam and then turning to seam-tracing and hole-finding acid fracturing according to claim 7 is characterized in that: When the temporary plugging agent is added to the guar gum fracturing fluid or the acid-resistant fracturing fluid, the mass percentage of the temporary plugging agent is 2% to 3%.