An online review system and method for oil and gas pipeline construction engineering design drawings
Through the design of the drawing online review system, the problems of inefficiency and information leakage in traditional methods are solved, and efficient and safe drawing review is achieved, ensuring construction quality and cost savings.
Patent Information
- Application Number
- CN202210105670.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-28
- Publication Date
- 2025-08-26
- Estimated Expiration
- 2042-01-28
AI Technical Summary
The traditional oil and gas pipeline construction engineering drawing review method is inefficient, has serious waste of resources, and is prone to leakage of information, which affects construction quality and cost.
An online review system for design drawings of oil and gas pipeline construction engineering is designed, including process configuration module, audit process management module, information feedback and problem-selling module, to realize process management, progress management and problem-selling items of drawings, support online Q&A and question-selling items, and improve audit efficiency through weight settings of different review links.
It improves the efficiency of drawing review, ensures construction quality, saves construction costs, establishes an efficient and safe drawing review method, and shortens the construction period.
Smart Images

Figure CN114511288B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of oil and gas pipeline construction projects, and in particular to an online review system and method for oil and gas pipeline construction project design drawings. Background Art
[0002] In oil and gas pipeline construction projects, due to the importance and authority of engineering drawings in design and construction, they typically undergo rigorous review processes after completion, including process and standardization reviews. This review process may also involve revisions and re-reviews. Construction personnel and designers must communicate and exchange ideas repeatedly before the drawings are approved for storage and release for construction. Traditional engineering drawing review methods are inefficient, wasteful, and prone to information leakage. Therefore, a new, efficient and secure drawing review method is urgently needed to ensure project quality, shorten construction schedules, and reduce costs. Summary of the Invention
[0003] The present invention aims to address at least one of the aforementioned deficiencies in the prior art. For example, one object of the present invention is to provide an online review system for oil and gas pipeline construction project design drawings that can manage the drawing review process, progress, issue resolution, and document management. Another object of the present invention is to provide an online review method for oil and gas pipeline construction project design drawings that is efficient, resource-efficient, and highly secure.
[0004] To achieve the above-mentioned objectives, the present invention provides, on one hand, an online review system for design drawings of oil and gas pipeline construction projects. The online review system includes a process configuration module, a review process management module, and an information feedback and problem resolution module. The process configuration module is configured with process nodes for each review link in the drawing review process and allows the design unit to upload drawings corresponding to each review link process node. The review process management module is connected to the process configuration module and the information feedback and problem resolution module respectively. The review process management module allows the drawing review unit to review the drawings uploaded by the design unit, and the review process management module can display the progress of each review link process node, the overall progress, question resolution statistics, and alarm message statistics. The information feedback and problem resolution module allows reviewers to ask questions and provide information feedback on issues encountered during the review, and the information feedback and problem resolution module also allows the design unit to answer questions and resolve issues online.
[0005] In an exemplary embodiment of an aspect of the present invention, the review process may include process review and standardization review.
[0006] In an exemplary embodiment of an aspect of the present invention, the process nodes may include review and approval, approval for warehousing, and issuance for construction.
[0007] In an exemplary embodiment of one aspect of the present invention, the process configuration module includes first-level sub-modules of project preparation, project definition, project implementation, project settlement and final acceptance, wherein each first-level sub-module includes second-level sub-modules of overall deployment, project department establishment, preliminary design, preliminary design approval and project job selection, and each second-level sub-module includes third-level sub-modules of survey and design, version A design, version A review, version B design, version B review, version 0 design and version 0 review, and each third-level sub-module can be used for the design unit to upload corresponding drawings.
[0008] In an exemplary embodiment of one aspect of the present invention, the drawing review process management module may include first-level sub-modules of overall deployment, project department establishment and project job selection, each first-level sub-module includes second-level sub-modules of overview, planned time management and structured documents, each second-level sub-module includes third-level sub-modules of overall progress, problem sales statistics, alarm message statistics and progress of each process, and each third-level sub-module of process progress includes survey and design progress, version A design progress, version A review progress, version B design progress, version B review progress, version 0 design progress, version 0 review progress and preliminary design approval progress.
[0009] In an exemplary embodiment of one aspect of the present invention, the information feedback and problem solution management module may include first-level sub-modules of feasibility study, special evaluation and approval, each first-level sub-module includes second-level sub-modules of overview, planned time management and structured document, and each second-level sub-module corresponds to third-level sub-modules of information feedback and problem solution. If the reviewer encounters problems or doubts during the review process, he or she may provide information feedback and ask questions at the corresponding position of the information feedback and problem solution management module according to the nature of the problem.
[0010] Another aspect of the present invention provides an online review method for oil and gas pipeline construction project design drawings, which is implemented by the online review system for oil and gas pipeline construction project design drawings as described above, and includes the following steps:
[0011] The design drawing review is sorted according to different review links, and the proportion is set according to the different weights of the review links. Combined with process management, the review business process is set; the design unit uploads the design documents at the corresponding position in the process configuration module according to the process node, and the review unit reviews and archives them in the review process management module, and approves them for storage and releases them for construction; if the review unit encounters problems or doubts during the review process, they can raise them in the information feedback and problem resolution management module, and the design unit will answer the questions and resolve the problems.
[0012] In an exemplary embodiment of another aspect of the present invention, the proportion of the project pre-stage in the drawing review is 10% to 20%, the proportion of the project definition in the drawing review is 15% to 25%, the proportion of the project implementation in the drawing review is 20% to 30%, the proportion of the project settlement in the drawing review is 15% to 25%, and the proportion of the final acceptance in the drawing review is 15% to 25%.
[0013] In an exemplary embodiment of another aspect of the present invention, the method may further include the steps of modifying, re-uploading, re-examining, approving, and archiving the drawings when they fail the review.
[0014] Compared with the prior art, the beneficial effects of the present invention may include at least one of the following:
[0015] (1) Provides an online review system for oil and gas pipeline construction engineering design drawings, which can realize process management, progress management, problem resolution, and document management of design drawing review;
[0016] (2) If the construction unit raises questions or doubts during the construction process, the design unit can provide online answers or problem resolution functions;
[0017] (3) It solves the problems of low efficiency, waste of resources and easy information leakage of traditional engineering drawing review methods, and establishes a set of efficient and safe engineering drawing review methods, which ultimately ensures the quality of project construction, shortens the construction period and saves construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 The figure shows a process configuration module interface of an online review system for oil and gas pipeline construction engineering design drawings according to an exemplary embodiment of the present invention;
[0019] Figure 2 The interface of the review process management module of the online review system for oil and gas pipeline construction engineering design drawings according to an exemplary embodiment of the present invention is shown;
[0020] Figure 3 The interface of the information feedback and problem elimination module of the online review system for oil and gas pipeline construction engineering design drawings according to an exemplary embodiment of the present invention is shown. DETAILED DESCRIPTION
[0021] Hereinafter, an online review system and method for oil and gas pipeline construction engineering design drawings of the present invention will be described in detail with reference to the accompanying drawings and exemplary embodiments.
[0022] In a first exemplary embodiment of the present invention, an online review system for oil and gas pipeline construction engineering design drawings includes a process configuration module, a review process management module, and an information feedback and problem resolution module.
[0023] Among them, the process configuration module can configure each review link and the process node corresponding to each review link during the drawing review process, and can allow the design unit to upload drawings according to the review link and corresponding process node of the current drawing for review by the review unit.
[0024] In this embodiment, the review process management module is connected to the process configuration module and the information feedback and problem resolution module, respectively, and is capable of reading data from these modules. The review process management module enables the drawing review unit to review drawings uploaded by the design unit and displays the progress of each review process node, overall progress, question resolution statistics, and alarm message statistics.
[0025] In this embodiment, the information feedback and problem resolution module enables auditors to ask questions and provide information feedback on issues arising during the audit, and the information feedback and problem resolution module also enables the design unit to answer questions and resolve issues online for issues arising during the audit process of the audit unit and / or the construction unit during the construction process.
[0026] In this exemplary embodiment, the review process mainly includes process review and standardization review.
[0027] In this exemplary embodiment, the process nodes may include review and approval, approval for warehousing, and release for construction. In this exemplary embodiment, the process configuration module includes first-level sub-modules for project pre-construction, project definition, project implementation, project settlement, and final acceptance. Each first-level sub-module includes second-level sub-modules for overall deployment, project department formation, preliminary design, preliminary design approval, and project position selection. Each second-level sub-module includes third-level sub-modules for survey and design, version A design, version A review, version B design, version B review, version 0 design, and version 0 review. Each third-level sub-module allows the design unit to upload corresponding drawings. Here, the project pre-construction refers to the owner unit initiating a "work commission." The design unit receives the commission and conducts on-site survey and design. Once the design is completed, the design unit uploads version A for review by the owner. If questions are raised and suggestions for correcting issues are uploaded to the system, the design unit responds based on the suggestions. The owner unit completes the review, and the design unit then proceeds to version A. The design will be reviewed again. If there are no issues, Version 0 will be published. If there are any issues, the system will continue to upload rectification suggestions and proceed to Version B. The design will be reviewed again until there are no issues. The owner will then approve the feasibility study based on the design unit's Version 0 design. Once the approval is complete, the project report will be prepared. Currently, the average share is calculated based on the process nodes: if there are four nodes, each node accounts for 25%; if there are five nodes, each node accounts for 20%.
[0028] The project definition, implementation, settlement, and final acceptance process are similar to those in the early stages of a project. Design documentation provided by the design firm needs to be reviewed, along with corrective actions and any issues resolved.
[0029] In this exemplary embodiment, the drawing review process management module may include first-level sub-modules of overall deployment, project department formation and project position selection; each first-level sub-module includes second-level sub-modules of overview, planned time management and structured documents; each second-level sub-module includes third-level sub-modules of overall progress, problem item statistics, alarm message statistics and process progress; each process progress third-level sub-module includes survey and design progress, version A design progress, version A review progress, version B design progress, version B review progress, version 0 design progress, version 0 review progress and preliminary design approval progress.
[0030] In this exemplary embodiment, the information feedback and problem solution management module may include first-level sub-modules of feasibility study, special evaluation and approval. Each first-level sub-module includes second-level sub-modules of overview, planned time management and structured document. Each second-level sub-module corresponds to third-level sub-modules of information feedback and problem solution. If the reviewer encounters problems or doubts during the review process, he or she may provide feedback and ask questions at the corresponding position of the information feedback and problem solution management module according to the nature of the problem.
[0031] Figure 1 The figure shows a process configuration module interface of an online review system for oil and gas pipeline construction engineering design drawings according to an exemplary embodiment of the present invention; Figure 2 The interface of the review process management module of the online review system for oil and gas pipeline construction engineering design drawings according to an exemplary embodiment of the present invention is shown; Figure 3 The interface of the information feedback and problem elimination module of the online review system for oil and gas pipeline construction engineering design drawings according to an exemplary embodiment of the present invention is shown.
[0032] In the second exemplary embodiment of the present invention, the online review system for oil and gas pipeline construction engineering design drawings includes a process configuration module, a review process management module, and an information feedback and problem elimination module, wherein the process configuration module can configure each review link and the process node corresponding to each review link in the drawing review process, and can allow the design unit to upload the drawing according to the review link and the corresponding process node of the current drawing for review by the review unit. For example, Figure 1As shown, the process configuration module may include first-level sub-modules for project pre-stage, project definition, and project implementation. Each first-level sub-module includes second-level sub-modules for overall deployment, project department formation, preliminary design, preliminary design approval, and project position selection. Each second-level sub-module includes three-level sub-modules for survey and design, version A design, version A review, version B design, version B review, version 0 design, and version 0 review. Each third-level sub-module can be used by the design unit to upload corresponding drawings. Here, multiple first-level sub-modules are arranged in parallel, and each first-level sub-module can be expanded into several second-level sub-modules, and each second-level sub-module includes several third-level sub-modules.
[0033] In this embodiment, the review process management module is connected to the process configuration module and the information feedback and problem elimination module respectively, and the review process management module can read the data of the process configuration module and the information feedback and problem elimination module. The review process management module can be used by the drawing review unit to review the drawings uploaded by the design unit, and the review process management module can display the progress of the process nodes corresponding to each review link, the overall progress, the question elimination statistics and the alarm message statistics. For example, Figure 2 As shown, the drawing review process management module may include first-level sub-modules of overall deployment, project department formation and project job selection. Each first-level sub-module includes second-level sub-modules of overview, planned time management and structured documents. Each second-level sub-module includes third-level sub-modules of overall progress, problem item statistics, alarm message statistics and each process progress. The third-level sub-modules of each process progress include survey and design progress, version A design progress, version A review progress, version B design progress, version B review progress, version 0 design progress, version 0 review progress and preliminary design approval progress. Here, the early stage of the project refers to the owner unit initiating the "work commission", the design unit receiving the commission, and conducting on-site survey and design. After the design is completed, the design unit uploads version A of the design, and the owner unit reviews it. If there are suggestions for problem rectification uploaded to the system, the design unit responds based on the rectification suggestions, the owner unit reviews the closed loop, and the design unit then carries out version A design. The design will be reviewed again. If there are no issues, Version 0 will be published. If there are any issues, the system will continue to upload rectification suggestions and proceed to Version B. The design will be reviewed again until there are no issues. The owner will then approve the feasibility study based on the design unit's Version 0 design. Once the approval is complete, the project report will be prepared. Currently, the average share is calculated based on the process nodes: if there are four nodes, each node accounts for 25%; if there are five nodes, each node accounts for 20%.
[0034] The project definition, implementation, settlement, and final acceptance process are similar to those in the early stages of a project. Design documentation provided by the design firm needs to be reviewed, along with corrective actions and any issues resolved.
[0035] In this embodiment, the information feedback and problem resolution module can allow auditors to ask questions and provide information feedback on issues that arise during the audit, and the information feedback and problem resolution module can also allow the design unit to answer questions and resolve issues online for issues that arise during the audit process of the audit unit and / or the construction unit during the construction process. Figure 3 As shown, the information feedback and problem elimination management module may include first-level sub-modules of feasibility study, special evaluation and approval. Each first-level sub-module includes second-level sub-modules of overview, planned time management and structured document. Each second-level sub-module corresponds to third-level sub-modules of information feedback and problem elimination. If the reviewer encounters problems or doubts during the review process, he or she may provide feedback and ask questions at the corresponding position of the information feedback and problem elimination management module according to the nature of the problem.
[0036] In this exemplary embodiment, the review process may include process review and standardization review.
[0037] In this exemplary embodiment, the process nodes may include review and approval, approval for storage, and release for construction. Another aspect of the present invention provides an online review method for oil and gas pipeline construction engineering design drawings.
[0038] In a third exemplary embodiment of the present invention, the method may be implemented by the online review system for oil and gas pipeline construction engineering design drawings described in the first or second exemplary embodiment, and the method includes the steps of:
[0039] The design drawing review is sorted according to different review links, and the proportion is set according to the different weights of the review links. Combined with process management, the review business process is set up.
[0040] The design unit uploads the design documents to the corresponding location in the process configuration module according to the process node. The review unit reviews and archives the design documents in the review process management module, approves them for storage, and issues them for construction. If the review unit encounters any questions or concerns during the review process, they can raise them in the information feedback and problem resolution management module, and the design unit will answer them and resolve the issues. In this exemplary embodiment, the project early stage accounts for 10% to 20% of the drawing review, the project definition accounts for 15% to 25% of the drawing review, the project implementation accounts for 20% to 30% of the drawing review, the project settlement accounts for 15% to 25% of the drawing review, and the completion acceptance accounts for 15% to 25% of the drawing review. Specifically, the project early stage mainly includes work commissioning, survey and design, feasibility study approval, and project establishment report, accounting for approximately 10% to 20% of the entire drawing review process. The project definition mainly includes re-survey and design and preliminary design, accounting for approximately 15% to 25% of the entire drawing review process. Project implementation primarily involves detailed survey and design and construction drawing design, accounting for approximately 20%-30% of the entire drawing review process. Project settlement primarily involves the pre-design process, accounting for 15%-25% of the entire drawing review process. Final acceptance primarily involves the inspection and acceptance process, accounting for approximately 15%-25% of the entire drawing review process.
[0041] In this exemplary embodiment, the method may further include the steps of modifying, re-uploading, re-examining, approving, and archiving the drawings if they fail review. Specifically, if the review unit fails review, the design unit re-uploads the drawings after re-revision based on the issues raised by the review unit, and the review unit conducts another review.
[0042] In summary, the beneficial effects of the present invention may include at least one of the following:
[0043] (1) Provides an online review system for oil and gas pipeline construction engineering design drawings, which can realize process management, progress management, problem resolution, and document management of design drawing review;
[0044] (2) If the construction unit raises questions or doubts during the construction process, the design unit can provide online answers or problem resolution functions;
[0045] (3) It solves the problems of low efficiency, waste of resources and easy information leakage of traditional engineering drawing review methods, and establishes a set of efficient and safe engineering drawing review methods, which ultimately ensures the quality of project construction, shortens the construction period and saves construction costs.
[0046] Although the present invention has been described above with reference to the accompanying drawings and exemplary embodiments, it will be apparent to those skilled in the art that various modifications may be made to the above embodiments without departing from the spirit and scope of the claims.
Claims
1. An online review system for oil and gas pipeline construction engineering design drawings, characterized by: The online audit system includes a process configuration module, an audit process management module and an information feedback and problem resolution module, wherein: The process configuration module is configured with process nodes of each review link in the drawing review process, and can allow the design unit to upload drawings corresponding to each review link process node; the process configuration module includes the first-level sub-modules of project pre-stage, project definition, project implementation, project settlement and completion acceptance, among which, Each first-level sub-module includes second-level sub-modules: overall deployment, project department establishment, preliminary design, preliminary design approval, and project position selection. Each second-level sub-module includes third-level sub-modules: survey and design, version A design, version A review, version B design, version B review, version 0 design, and version 0 review. Each third-level sub-module allows the design unit to upload corresponding drawings. The review process management module is connected to the process configuration module and the information feedback and problem elimination module respectively. The review process management module can be used by the drawing review unit to review the drawings uploaded by the design unit, and the review process management module can display the progress of each review link process node, overall progress, question elimination statistics and alarm message statistics; the drawing review process management module includes first-level sub-modules of overall deployment, project department formation and project position selection, each first-level sub-module includes second-level sub-modules of overview, planned time management and structured documents, each second-level sub-module includes third-level sub-modules of overall progress, problem elimination statistics, alarm message statistics and each process progress, and each process progress third-level sub-module includes survey and design progress, version A design progress, version A review progress, version B design progress, version B review progress, version 0 design progress, version 0 review progress and preliminary design approval progress; The information feedback and problem resolution module enables auditors to ask questions and provide information feedback on issues arising during the audit, and the information feedback and problem resolution module can also enable design units to answer questions and resolve issues online; the information feedback and problem resolution management module includes first-level sub-modules of feasibility study, special evaluation and approval, and each first-level sub-module includes second-level sub-modules of overview, planned time management and structured document, and each second-level sub-module corresponds to third-level sub-modules of information feedback and problem resolution. If auditors encounter problems or doubts during the audit process, they can provide information feedback and ask questions at the corresponding position of the information feedback and problem resolution management module according to the nature of the problem.
2. The online review system for oil and gas pipeline construction engineering design drawings according to claim 1 is characterized in that: The review process includes process review and standardization review.
3. The online review system for oil and gas pipeline construction engineering design drawings according to claim 1 is characterized in that: The process nodes include review and approval, approval for warehousing and issuance for construction.
4. An online review method for oil and gas pipeline construction engineering design drawings, characterized in that: The method is implemented by the online review system for oil and gas pipeline construction engineering design drawings according to any one of claims 1 to 3, and the method comprises the steps of: Sequence the design drawing review according to different review stages, set the proportion according to the different weights of the review stages, and set up the review business process in combination with process management; The design unit uploads the design documents to the corresponding location in the process configuration module according to the process nodes. The review unit reviews and archives them in the review process management module, approves them for storage, and issues them for construction. If the audit unit encounters any questions or doubts during the audit process, they should raise them in the information feedback and problem resolution management module, and the design unit will answer the questions and resolve the problems.
5. The online review method for oil and gas pipeline construction engineering design drawings according to claim 4 is characterized in that: The proportion of the project early stage in the drawing review is 10% to 20%, the proportion of the project definition in the drawing review is 15% to 25%, the proportion of the project implementation in the drawing review is 20% to 30%, the proportion of the project settlement in the drawing review is 15% to 25%, and the proportion of the final acceptance in the drawing review is 15% to 25%.
6. The online review method for oil and gas pipeline construction engineering design drawings according to claim 4 is characterized in that: The method also includes the steps of modifying, re-uploading, re-examining, approving, and archiving when the drawing fails to pass the review.