Online translation project comprehensive risk calculation method, device, equipment and storage medium

Through the machine learning prediction model, combined with language, time and scale risk indicators, the comprehensive risk level of the online translation project is calculated, which solves the problem of the inability to control the progress of the translation project and assess the risk in real time in the existing technology, and achieves accurate evaluation of the translation project. , objective risk management.

CN114528862BActive Publication Date: 2024-10-29IOL WUHAN INFORMATION TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210216577.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-07
Publication Date
2024-10-29
Estimated Expiration
2042-03-07

AI Technical Summary

Technical Problem

It is difficult to control the progress and objectively assess risks of existing online translation projects in real time, especially when considering multiple factors such as translator capacity, language and manuscript size. Existing methods are limited to text content analysis and cannot fully predict risks.

Method used

Adopt a comprehensive risk calculation method for online translation projects based on machine learning, use a prediction model to predict the project time, determine quantitative indicators of language risk, time risk and scale risk, and combine these indicators to calculate the comprehensive risk level to achieve multi-dimensional risk assessment of translation projects and management.

Benefits of technology

Real-time progress control and risk management of online translation projects are realized. The results are accurate, objective and reliable, and can more comprehensively assess the risk level of translation projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114528862B_ABST
    Figure CN114528862B_ABST
Patent Text Reader

Abstract

The present invention provides a method, device, equipment and storage medium for calculating the comprehensive risk of an online translation project, including: inputting online data into a prediction model to obtain the time consumption of the prediction project; determining multiple dimensional risk quantification indicators according to the online data, the limit duration and the time consumption of the prediction project; the multiple dimensional risk quantification indicators include at least one of the following: language risk quantification indicator; time risk quantification indicator; scale risk quantification indicator; according to the multiple dimensional risk quantification indicators, determining the comprehensive risk quantification indicator and risk level quantification indicator of the online translation project. The present invention can control the progress and quality of the translation project in real time, and realize the reliable prediction of multiple dimensional risk values ​​and comprehensive risk values.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of online translation, and in particular to a method, device, equipment and storage medium for calculating the comprehensive risk of an online translation project. Background Art

[0002] With the advancement of society and computer technology, the translation industry is also undergoing a series of changes. Most translation work is carried out and completed online. Online translation projects, especially Distributed Online Translation (DOT), unpack large translation tasks into many small translation tasks through certain algorithmic logic, and then go through the tagging, post-editing (PE), PE review, and quality control processes.

[0003] In the existing technology, translation projects carried out online always have certain risks, such as delays, quality issues, etc. In order to manage translation projects and evaluate and control risks, there are mainly two ways in the traditional translation industry.

[0004] One is to use statistical analysis methods, such as analytic hierarchy process, network analytic hierarchy process, fuzzy mathematics comprehensive evaluation method, etc., to conduct various factor analyses on translation projects to analyze various factors that generate risks, so as to facilitate relatively macro-control and management in subsequent translation projects, and to actually control and manage the actual progress and risk level of translation projects;

[0005] The other is to calculate the difficulty of the translation manuscript, such as by counting the number of words with different translation difficulty levels, and then calculate the risk level of the translation project. This type of method is relatively limited to the sentences and text content of the translation manuscript, but in reality, factors such as the actual translator's translation capacity, language, and manuscript size must also be considered, and it is impossible to calculate the risk level of the translation project more objectively. Summary of the invention

[0006] The present invention provides a method, device, equipment and storage medium for calculating the comprehensive risk of an online translation project, which are used to solve the defect that the real-time progress of the translation project cannot be controlled in the prior art, and realize the reliable prediction of risk values ​​of multiple dimensions and comprehensive risk values.

[0007] The present invention provides a method for calculating the comprehensive risk of an online translation project, which is used for predicting the risk level of an online translation project, and comprises:

[0008] Input online data into the prediction model to obtain the time consumption of the prediction project;

[0009] Determine multiple dimensional risk quantification indicators based on online data, time limit and the time consumption of the forecast project; the multiple dimensional risk quantification indicators include at least one of the following: language risk quantification indicator; time risk quantification indicator; scale risk quantification indicator;

[0010] Based on risk quantification indicators in multiple dimensions, the comprehensive risk quantification indicators and risk level quantification indicators of online translation projects are determined.

[0011] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the risk quantitative indicators of multiple dimensions are determined according to the online data, the limit time and the predicted project time consumption, including:

[0012] In a case where the multiple dimensional risk quantification indicators include the language risk quantification indicator, the language risk quantification indicator is determined according to the language pair field of the online data.

[0013] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the risk quantitative indicators of multiple dimensions are determined according to the online data, the limit time and the predicted project time consumption, including:

[0014] In the case where the multiple dimensional risk quantification indicators include the time risk quantification indicator, the time risk quantification indicator is determined according to the predicted project time consumption and the limited time length.

[0015] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the time risk quantitative index includes a first part of time risk quantitative index and a second part of time risk quantitative index, and the upper limit values ​​are the same, and the second part of time risk indicators include a limited time length;

[0016] Determining the time risk quantification index according to the predicted project time and the limited time includes:

[0017] Obtain the predicted project time x of the online translation project through the prediction model;

[0018] Calculate the first part of time risk based on the predicted project duration x, quantitative indicator time_risk t1 :

[0019] If the word count of the online translation project is less than or equal to the word count threshold, the time risk first part condition value time_risk is calculated according to formula (1) t11 ,

[0020]

[0021] If the number of words in the online translation project is greater than the word count threshold, the time risk is calculated according to formula (2):t12 ,

[0022]

[0023] and time_risk t11 =time_risk t1 or time_risk t12 =time_risk t1 ;

[0024] If the first part of the time risk quantitative indicator time_risk t1 If time_risk is greater than the upper limit, t1 = upper limit value;

[0025] According to the predicted project duration x and the limited duration X, the second part of the quantitative indicator of time risk, time_risk, is calculated according to formula (3). t2 ,

[0026]

[0027] If the second part of the time risk quantitative indicators time_risk t2 If time_risk is greater than the upper limit, t2 = upper limit value;

[0028] Time risk quantitative indicator time_risk=(time_risk t1 +time_risk t2 ) / 2.

[0029] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the risk quantitative indicators of multiple dimensions are determined according to the online data, the limit time and the predicted project time consumption, including:

[0030] In the case that the multiple dimensional risk quantification indicators include the scale risk quantification indicator, the scale risk quantification indicator is determined according to the prediction project time consumption and the number of remaining packages of the online data.

[0031] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the method of determining a quantitative index of scale risk according to the predicted project time consumption and the number of remaining packages of the online data includes:

[0032] According to the predicted project duration and the number of remaining packages, the scale risk quantitative indicator scale_risk is calculated according to formula (4):

[0033]

[0034] If the scale risk quantitative indicator scale_risk is greater than the upper limit value, then scale_risk = upper limit value.

[0035] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the range of the risk level quantitative index is [0, a];

[0036] Determining the comprehensive risk quantitative indicators and risk level quantitative indicators of online translation projects based on the risk quantitative indicators of multiple dimensions includes:

[0037] If the language risk quantitative index lan_risk is greater than the language threshold, the risk level quantitative index risk_level = a-1;

[0038] If the language risk quantification index lan_risk is less than or equal to the language threshold, and the risk quantification indexes of the multiple dimensions are all less than or equal to the upper limit value and belong to the same dimension, then the comprehensive risk quantification index total_risk and the risk level quantification index risk_level are calculated according to formula (5) and formula (6) respectively:

[0039] total_risk=lan_risk+time_risk+scale_risk (5);

[0040] risk_level=total_risk / (a+1) (6);

[0041] Among them, a is the upper limit of the risk level quantitative indicator range.

[0042] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the prediction model is based on a machine learning algorithm, historical sample data of online translation projects are used to establish a training data set, and the training data set is used to train the prediction model.

[0043] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the training data set includes one or more of language pairs, word counts, line counts, marking prices, PE prices, PE review prices, PE order periods, deadline timestamps, total number of packages, and number of remaining packages.

[0044] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the training method of the prediction model comprises:

[0045] Converting the language pair fields in the training data set into discrete features through a feature encoder;

[0046] Performing maximum and minimum normalization processing on the discrete features;

[0047] The discrete feature data that has undergone maximum and minimum standardization is optimized using the parameter optimization algorithm of the sklearn package to optimize the parameters of the prediction model and obtain a trained prediction model.

[0048] According to a method for calculating the comprehensive risk of an online translation project provided by the present invention, the step of inputting online data into a prediction model and obtaining the predicted project time consumption comprises:

[0049] Using a specified request to transfer online data to the prediction model through an interface;

[0050] The online data is processed by feature encoding and unified dimension standardization, and converted into data with the same dimension as the training data set as the input data of the prediction model to obtain the time consumption of the prediction project.

[0051] The present invention also provides an online translation project comprehensive risk calculation device, comprising:

[0052] The first acquisition module is used to generate and train the prediction model, and after inputting the online data into the prediction model, obtain the prediction project time consumption;

[0053] A determination module is used to determine multiple dimensional risk quantification indicators according to online data, the limit time and the time consumption of the predicted project; the multiple dimensional risk quantification indicators include at least one of the following: language risk quantification indicator; time risk quantification indicator; scale risk quantification indicator;

[0054] The second acquisition module is used to obtain the comprehensive risk quantitative index and risk level quantitative index of the online translation project according to the multiple dimensional risk quantitative indexes obtained by the determination module.

[0055] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, any one of the above-mentioned methods for calculating the comprehensive risk of online translation projects is implemented.

[0056] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for calculating the comprehensive risk of an online translation project as described in any one of the above is implemented.

[0057] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the computer program implements any of the above-mentioned methods for calculating the comprehensive risk of online translation projects.

[0058] The method, device, equipment and storage medium for calculating the comprehensive risk of online translation projects provided by the present invention input online data into a prediction model based on a machine learning method to achieve a time prediction for a DOT project, and control the progress and translation quality of the DOT project in real time from the DOT project itself; at the same time, by predicting the time consumption of the project, the risk values ​​of each dimension are calculated in real time, and the comprehensive risk value and risk level are calculated, so as to control the risk level of the online translation project in real time as a whole, and the result is accurate, objective and reliable. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0060] Figure 1 It is a flow chart of the comprehensive risk calculation method for online translation projects provided by the present invention;

[0061] Figure 2 It is a schematic diagram of the architecture of the comprehensive risk provided by the present invention;

[0062] Figure 3 It is a schematic diagram of field categories of the training data set provided by the present invention;

[0063] Figure 4 It is a schematic diagram of the calculation process of time risk of the online translation project comprehensive risk calculation method provided by the present invention;

[0064] Figure 5 It is a schematic diagram of the calculation process of the scale risk of the online translation project comprehensive risk calculation method provided by the present invention;

[0065] Figure 6 It is a structural schematic diagram of the device for calculating the comprehensive risk of online translation projects provided by the present invention;

[0066] Figure 7 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0067] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] Combine the following Figure 1-Figure 5 The comprehensive risk calculation method of an online translation project of the present invention is described.

[0069] Figure 1 A flow chart of a method for calculating the comprehensive risk of an online translation project provided by the present invention is shown in FIG. Figure 1 As shown in Figure 1, a comprehensive risk calculation method for online translation projects is

[0070] The present invention provides a method for calculating the comprehensive risk of an online translation project, which is used for predicting the risk level of an online translation project, and comprises:

[0071] Step 110, input the online data into the prediction model to obtain the time consumption of the prediction project.

[0072] Optionally, the prediction model is based on a machine learning algorithm, and a training data set is established using historical sample data of online translation projects, and the training data set is used to train the prediction model.

[0073] Optionally, Figure 3 This is a schematic diagram of the field categories of the training data set provided by the present invention. Figure 3 As shown, the training data set includes language pairs, for example, en->zh-CN represents English to Simplified Chinese, the number of words, the number of lines, the marking price, the unit is yuan / thousand words, the PE (Post-editing, referred to as PE) price, the unit is yuan / thousand words, the PE review price, the unit is yuan / thousand words, the PE review is the review of the PE content, the PE order period, for example, a total of 24 periods, 0-1 is one or more of time period 0, the deadline timestamp, the total number of packages and the remaining number of packages.

[0074] Optionally, the training method of the prediction model includes:

[0075] The language pair fields in the training dataset are converted into discrete features through the feature encoder (LabelEncoder);

[0076] Perform maximum and minimum standardization on discrete features, convert them into unified dimensions, achieve data standardization, and improve the accuracy and reliability of the prediction model;

[0077] The discrete feature data that has undergone maximum and minimum standardization is optimized through the parameter optimization algorithm of the sklearn package to optimize the parameters of the prediction model and obtain the trained prediction model.

[0078] The sklearn package is an open source Python-based machine learning toolkit that covers most mainstream machine learning algorithms. Optionally, the commonly used modules in the sklearn package include classification modules, including but not limited to support vector machine classification algorithms, nearest neighbor algorithms, and random forest classification algorithms; regression modules, including but not limited to support vector machine regression algorithms, ridge regression algorithms, and Lasso algorithms; clustering modules, such as K-Means algorithms and mean-shift algorithms; dimensionality reduction modules, including but not limited to PCA principal component analysis algorithms, feature selection algorithms, and non-negative matrix decomposition algorithms; model selection modules, including but not limited to grid search algorithms and cross-validation algorithms; preprocessing modules, including but not limited to feature extraction and normalization. Parameter optimization algorithms include but are not limited to grid search algorithms.

[0079] Optionally, the online data is fed into the prediction model to obtain the prediction project time including:

[0080] This application provides computing services by providing an interface. The caller uses the specified request URL to pass online data to the prediction model through the interface. The fields included in the online data are the same as those included in the training data set;

[0081] The online data is processed by feature coding and unified dimension normalization, and converted into data with the same dimension as the training data set as the input data of the prediction model to obtain the time consumption of the prediction project. Among them, the normalization processing includes but is not limited to the maximum and minimum normalization processing.

[0082] like Figure 1 As shown, step 120, based on online data, time limit and predicted project time, multiple dimensional risk quantitative indicators are determined; Figure 2 As shown, the multiple dimensional risk quantification indicators include at least one of the following: a language risk quantification indicator lan_risk; a time risk quantification indicator time_risk; and a scale risk quantification indicator scale_risk.

[0083] Based on online data, time limit and predicted project duration, we determine risk quantitative indicators in multiple dimensions, including:

[0084] In the case where the multiple dimensional risk quantification indicators include a language risk quantification indicator lan_risk, the language risk quantification indicator lan_risk is determined according to the language pair field of the online data.

[0085] Optionally, the historical training data is statistically analyzed by language, and the number of orders is used as the basis to establish a language risk model. The language pair field of the online data is input into the language risk model to obtain the language risk quantitative index lan_risk, and the number of orders is negatively correlated with the language risk quantitative index, that is, the fewer orders of the corresponding language, the higher the language risk quantitative index lan_risk, and the upper limit of the language risk quantitative index lan_risk is 10. For example, the risk value of Chinese is 0, the risk value of English is 5, the risk value of Japanese is 5, the risk value of German is 6, the risk value of French is 6, the risk value of Spanish is 7, the risk value of Italian is 7, the risk value of Russian is 8, the risk value of Korean is 8, and the risk value of the remaining other languages ​​is 10.

[0086] Based on online data, time limit and predicted project duration, we determine risk quantitative indicators in multiple dimensions, including:

[0087] When the multiple dimensional risk quantification indicators include the time risk quantification indicator time_risk, the time risk quantification indicator time_risk is determined according to the predicted project duration and the limited duration.

[0088] Optionally, Figure 4 FIG. 1 is a schematic diagram of the calculation process of the time risk of the online translation project comprehensive risk calculation method provided by the present invention. Figure 4 As shown in the figure, the calculation method of the time risk quantitative indicator time_risk includes:

[0089] Obtain the predicted project time x for the online translation project through the prediction model;

[0090] Calculate the first part of time risk based on the predicted project duration x, quantitative indicator time_risk t1 .

[0091] If the word count of the online translation project is less than or equal to the word count threshold, the time risk first part condition value time_risk is calculated according to formula (1) t11 ,

[0092]

[0093] If the number of words in the online translation project is greater than the word count threshold, the time risk is calculated according to formula (2): t12 ,

[0094]

[0095] and time_risk t11 =time_risk t1 or time_risk t12=time_risk t1 ;

[0096] If the first part of the time risk quantitative indicator time_risk t1 If it is greater than the upper limit, time_risk t1 =Upper limit value.

[0097] According to the predicted project duration x and the limited duration X, the second part of the quantitative indicator of time risk, time_risk, is calculated according to formula (3). t2 ,

[0098]

[0099] If the second part of the time risk quantitative indicators time_risk t2 If time_risk is greater than the upper limit, t2 =Upper limit value.

[0100] Time risk quantitative indicator time_risk=(time_risk t1 +time_risk t2 ) / 2. Time risk part 1 Quantitative indicators time_risk t1 , Time risk part 2 quantitative indicators time_risk t2 The upper limit value of the time risk quantitative indicator time_risk is 10.

[0101] Optionally, Figure 5 FIG. 1 is a schematic diagram of the calculation process of the scale risk of the online translation project comprehensive risk calculation method provided by the present invention. Figure 5 As shown, the method for obtaining the scale risk quantitative indicator scale_risk includes:

[0102] According to the predicted project duration and the number of remaining packages, the scale risk quantitative indicator scale_risk is calculated according to formula (4):

[0103]

[0104] If the scale risk quantitative indicator scale_risk is greater than the upper limit value, then scale_risk = upper limit value. The upper limit value of the scale risk quantitative indicator scale_risk is 10.

[0105] Step 130, according to the risk quantification indicators of multiple dimensions, determine the online translation project comprehensive risk quantification indicator total_risk and the risk level quantification indicator risk_level. For example, according to the language risk quantification indicator lan_risk, the time risk quantification indicator time_risk, and the scale risk quantification indicator scale_risk, determine the online translation project comprehensive risk quantification indicator total_risk and the risk level quantification indicator risk_level.

[0106] For ease of use and understanding, the comprehensive risk quantification indicator is converted into a risk level quantification indicator risk_level. Optionally, the risk level quantification indicator risk_level is divided into six levels from 0 to 5, where 0 and 1 are low risk, 2 and 3 are medium risk, and 4 and 5 are high risk.

[0107] The calculation method of the comprehensive risk quantitative index total_risk and the risk level quantitative index risk_level includes the following steps:

[0108] S41. If the language risk quantitative indicator lan_risk is greater than the language threshold, the risk level quantitative indicator risk_level=a-1. For example, the language threshold is set to 5, the upper limit a of the risk level quantitative indicator risk_level is 5, if the language risk quantitative indicator lan_risk of the online translation project>5, that is, the language of the project is not Chinese, English or Japanese, the risk level quantitative indicator risk_level is forcibly set to 4.

[0109] S42. If the language risk quantification index lan_risk is less than or equal to the language threshold, and the three risk quantification indicators are all less than or equal to the upper limit and belong to the same dimension, the comprehensive risk quantification index total_risk is calculated according to formula (5):

[0110] total_risk=lan_risk+time_risk+scale_risk (5);

[0111] Since the comprehensive risk range is [0, 30], and the risk level quantitative index risk_level range is [0, 5], which has six levels in total, the risk level quantitative index risk_level is calculated according to formula (6):

[0112] risk_level=total_risk / (a+1) (6);

[0113] Among them, a is the upper limit of the range of the risk level quantitative indicator risk_level, that is, a=5.

[0114] The present invention is based on machine learning methods, trains and optimizes the prediction model, inputs online data into the prediction model, realizes the time-consuming prediction of the DOT project, analyzes various factors that generate risks from the DOT project itself, and controls the translation quality and actual progress of the DOT project in real time and in a relatively macroscopic manner. The prediction results are based on historical training data, and the results are accurate, objective and reliable. At the same time, the risk level of the translation project is calculated from at least one dimension of the language risk quantitative index lan_risk, the time risk quantitative index time_risk and the scale risk quantitative index scale_risk, and the comprehensive risk quantitative index total_risk and the risk level quantitative index risk_level of the entire translation project are counted, so as to control the progress of the translation project in real time as a whole.

[0115] The present invention provides a device for calculating the comprehensive risk of an online translation project. Figure 6 This is a schematic diagram of the structure of the online translation project comprehensive risk calculation device provided by the present invention. Figure 6 As shown, the online translation project comprehensive risk calculation device 200 includes: a first acquisition module 201, a determination module 202 and a second acquisition module 203, wherein:

[0116] The first acquisition module 201 is used to generate and train a prediction model, and after inputting online data into the prediction model, obtain the time consumption of the prediction project;

[0117] The determination module 202 is used to determine multiple dimensional risk quantification indicators based on online data, time limit and predicted project duration; the multiple dimensional risk quantification indicators include at least one of the following: language risk quantification indicator; time risk quantification indicator; scale risk quantification indicator;

[0118] The second acquisition module 203 is used to acquire a comprehensive risk quantification indicator total_risk and a risk level quantification indicator risk_level of the online translation project according to the multiple dimensional risk quantification indicators acquired by the determination module 202.

[0119] Optionally, the first acquisition module 201 is specifically used to: create a training data set from historical sample data of online translation projects based on a machine learning algorithm, and use the training data set to train a prediction model.

[0120] Optionally, the first acquisition module 201 is specifically configured to:

[0121] The language pair fields in the training dataset are converted into labels through the label encoder;

[0122] Normalize the labels to the maximum and minimum values;

[0123] The label data that has undergone maximum and minimum standardization is optimized through the parameter optimization algorithm of the sklearn package to optimize the parameters of the prediction model and obtain the trained prediction model.

[0124] Optionally, the first acquisition module 201 is specifically configured to:

[0125] Use the specified request to pass the online data into the prediction model through the interface;

[0126] The online data is processed by feature encoding and unified dimension standardization, and converted into data with the same dimension as the training data set as the input data of the prediction model to obtain the time consumption of the prediction project.

[0127] Optionally, the determination module 202 is specifically configured to:

[0128] When the risk quantification indicators of multiple dimensions include a language risk quantification indicator, the language risk quantification indicator is determined according to the language field of the online data.

[0129] Optionally, the determination module 202 is specifically configured to:

[0130] When multiple dimensional risk quantification indicators include time risk quantification indicators, the time risk quantification indicators are determined based on the predicted project duration and the limited duration.

[0131] The time risk quantitative indicators include the first part of the time risk quantitative indicators and the second part of the time risk quantitative indicators, and the upper limit values ​​are the same. The second part of the time risk indicators include the limit time, specifically including:

[0132] Obtain the predicted project time x for the online translation project through the prediction model;

[0133] Calculate the first part of time risk based on the predicted project duration x, quantitative indicator time_risk t1 :

[0134] If the word count of the online translation project is less than or equal to the word count threshold, the time risk first part condition value time_risk is calculated according to formula (1) t11 ,

[0135]

[0136] If the number of words in the online translation project is greater than the word count threshold, the time risk is calculated according to formula (2): t12 ,

[0137]

[0138] and time_risk t11 =time_riskt1 or time_risk t12 =time_risk t1 ;

[0139] If the first part of the time risk quantitative indicator time_risk t1 If time_risk is greater than the upper limit, t1 = upper limit value;

[0140] According to the predicted project duration x and the limited duration X, the second part of the quantitative indicator of time risk, time_risk, is calculated according to formula (3). t2 ,

[0141]

[0142] If the second part of the time risk quantitative indicators time_risk t2 If time_risk is greater than the upper limit, t2 = upper limit value;

[0143] Time risk quantitative indicator time_risk=(time_risk t1 +time_risk t2 ) / 2.

[0144] Optionally, the determination module 202 is specifically configured to:

[0145] When the risk quantification indicators of multiple dimensions include the scale risk quantification indicator, the scale risk quantification indicator is determined according to the predicted project time consumption and the number of remaining packages of online data.

[0146] Specifically, according to the predicted project duration and the number of remaining packages, the scale risk quantitative indicator scale_risk is calculated according to formula (4):

[0147]

[0148] If the scale risk quantitative indicator scale_risk is greater than the upper limit value, then scale_risk = upper limit value.

[0149] Optionally, the second acquisition module 203 is specifically configured to:

[0150] The range of the risk level quantitative index is [0, a];

[0151] If the language risk quantitative index lan_risk is greater than the language threshold, the risk level quantitative index risk_level = a-1;

[0152] If the language risk quantification index lan_risk is less than or equal to the language threshold, and the risk quantification indexes of the multiple dimensions are all less than or equal to the upper limit and belong to the same dimension, then the comprehensive risk quantification index total_risk and the risk level quantification index risk_level are calculated according to formula (5) and formula (6) respectively,

[0153] total_risk=lan_risk+time_risk+scale_risk (5);

[0154] risk_level=total_risk / (a+1) (6);

[0155] Among them, a is the upper limit of the risk level quantitative indicator range.

[0156] The comprehensive risk calculation device for online translation projects provided by the present invention is based on a machine learning method, pre-trains a prediction model and establishes a multi-dimensional risk model, inputs online data into the prediction model, realizes the time consumption prediction of the DOT project, and controls the progress and translation quality of the DOT project in real time from the DOT project itself; at the same time, by predicting the project time consumption, limiting the duration and online data, and using a multi-dimensional risk model, the risk value of each dimension is calculated in real time, and the comprehensive risk value and risk level are calculated, so as to control the risk degree of the online translation project in real time as a whole, and the result is accurate, objective and reliable.

[0157] The present invention provides an electronic device, Figure 7 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 7 As shown, the electronic device may include: a processor 310, a communications interface 320, a memory 330 and a communications bus 340, wherein the processor 310, the communications interface 320 and the memory 330 communicate with each other via the communications bus 340. The processor 310 may call the logic instructions in the memory 330 to execute the online translation project comprehensive risk calculation method, which includes:

[0158] Input online data into the prediction model to obtain the time consumption of the prediction project;

[0159] According to the online data, the time limit and the predicted project time consumption, a multi-dimensional risk model is established to obtain multiple dimensional risk quantitative indicators, including a language risk quantitative indicator lan_risk, a time risk quantitative indicator time_risk, and a scale risk quantitative indicator scale_risk, wherein: the language risk quantitative indicator lan_risk is determined according to the language field of the online data, the time risk quantitative indicator time_risk is determined according to the predicted project time consumption and the time limit, and the scale risk quantitative indicator scale_risk is determined according to the predicted project time consumption and the number of remaining packages of the online data;

[0160] Based on the risk quantification indicators of multiple dimensions, determine the comprehensive risk quantification indicator total_risk and the risk level quantification indicator risk_level of the online translation project.

[0161] In addition, the logic instructions in the above-mentioned memory 310 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk.

[0162] On the other hand, the present invention further provides a computer program product, the computer program product comprising a computer program, the computer program can be stored in a non-transitory computer-readable storage medium, when the computer program is executed by a processor, the computer can execute the online translation project comprehensive risk calculation method provided by the above methods, the method comprising:

[0163] Input online data into the prediction model to obtain the time consumption of the prediction project;

[0164] According to the online data, the time limit and the predicted project time consumption, a multi-dimensional risk model is established to obtain multiple dimensional risk quantitative indicators, including a language risk quantitative indicator lan_risk, a time risk quantitative indicator time_risk, and a scale risk quantitative indicator scale_risk, wherein: the language risk quantitative indicator lan_risk is determined according to the language field of the online data, the time risk quantitative indicator time_risk is determined according to the predicted project time consumption and the time limit, and the scale risk quantitative indicator scale_risk is determined according to the predicted project time consumption and the number of remaining packages of the online data;

[0165] Based on the risk quantification indicators of multiple dimensions, determine the comprehensive risk quantification indicator total_risk and the risk level quantification indicator risk_level of the online translation project.

[0166] In another aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, which is implemented when the computer program is executed by a processor to perform the online translation project comprehensive risk calculation method provided by the above methods, the method comprising:

[0167] Input online data into the prediction model to obtain the time consumption of the prediction project;

[0168] According to the online data, the time limit and the predicted project time consumption, a multi-dimensional risk model is established to obtain multiple dimensional risk quantitative indicators, including a language risk quantitative indicator lan_risk, a time risk quantitative indicator time_risk, and a scale risk quantitative indicator scale_risk, wherein: the language risk quantitative indicator lan_risk is determined according to the language field of the online data, the time risk quantitative indicator time_risk is determined according to the predicted project time consumption and the time limit, and the scale risk quantitative indicator scale_risk is determined according to the predicted project time consumption and the number of remaining packages of the online data;

[0169] Based on the risk quantification indicators of multiple dimensions, determine the comprehensive risk quantification indicator total_risk and the risk level quantification indicator risk_level of the online translation project.

[0170] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0171] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0172] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A comprehensive risk calculation method for online translation projects, used for predicting the risk level of online translation projects, characterized in that: include: Input online data into the prediction model to obtain the time consumption of the prediction project; Determine risk quantitative indicators in multiple dimensions based on online data, time limit and the time taken to predict the project; The multiple dimensional risk quantification indicators include: language risk quantification indicator; time risk quantification indicator; scale risk quantification indicator; Determine the comprehensive risk quantitative indicators and risk level quantitative indicators of online translation projects based on risk quantitative indicators in multiple dimensions; The time risk quantitative indicators include the first part of time risk quantitative indicators and the second part of time risk quantitative indicators, and the upper limit values ​​are the same, and the second part of time risk indicators include the limit time; According to the online data, the limit time and the time consumption of the predicted project, multiple dimensional risk quantitative indicators are determined, including: Determining the language risk quantification indicator according to the language pair field of the online data; Obtain the predicted project time x of the online translation project through the prediction model; Calculate the first part of time risk based on the predicted project duration x, quantitative indicator time_risk t1 : If the word count of the online translation project is less than or equal to the word count threshold, the time risk first part condition value time_risk is calculated according to formula (1) t11 , (1); If the number of words in the online translation project is greater than the word count threshold, the time risk is calculated according to formula (2): the first part of the conditional binary value time_risk t12 , (2); and or ; If the first part of the time risk quantitative indicator time_risk t1 If it is greater than the upper limit, time_risk t1 =Upper limit value; According to the predicted project duration x and the limited duration X, the second part of the quantitative indicator of time risk, time_risk, is calculated according to formula (3). t2 , (3); If the second part of the time risk quantitative indicators time_risk t2 If time_risk is greater than the upper limit, t2 =Upper limit value; Time risk quantitative indicator time_risk=(time_risk t1 +time_risk t2 ) / 2; According to the predicted project duration and the number of remaining packages, the scale risk quantitative indicator scale_risk is calculated according to formula (4): (4); If the scale risk quantitative indicator scale_risk is greater than the upper limit value, then scale_risk=upper limit value; The range of the risk level quantitative index is [0, a]; Determining the comprehensive risk quantitative indicators and risk level quantitative indicators of online translation projects based on the risk quantitative indicators of multiple dimensions includes: If the language risk quantitative index lan_risk is greater than the language threshold, the risk level quantitative index risk_level=a-1; If the language risk quantification index lan_risk is less than or equal to the language threshold, and the risk quantification indexes of the multiple dimensions are all less than or equal to the upper limit and belong to the same dimension, then the comprehensive risk quantification index total_risk and the risk level quantification index risk_level are calculated according to formula (5) and formula (6) respectively: (5); (6); Among them, a is the upper limit of the risk level quantitative indicator range.

2. The method for calculating the comprehensive risk of an online translation project according to claim 1, characterized in that: The prediction model is based on a machine learning algorithm, and a training data set is established using historical sample data of online translation projects, and the training data set is used to train the prediction model.

3. The method for calculating the comprehensive risk of online translation projects according to claim 2, characterized in that: The training data set includes one or more of language pairs, word counts, line counts, marking prices, PE prices, PE review prices, PE order periods, deadline timestamps, total packages, and remaining packages.

4. The method for calculating the comprehensive risk of an online translation project according to claim 2 or 3, characterized in that: The training method of the prediction model includes: Converting the language pair fields in the training data set into discrete features through a feature encoder; Performing maximum and minimum normalization processing on the discrete features; The discrete feature data that has undergone maximum and minimum standardization processing is used to optimize the parameters of the prediction model through the parameter optimization algorithm of the sklearn package to obtain a trained prediction model.

5. The method for calculating the comprehensive risk of online translation projects according to claim 4, characterized in that: The time consumption of inputting online data into the prediction model and obtaining the prediction items includes: Using a specified request to transfer online data to the prediction model through an interface; The online data is processed by feature encoding and unified dimension standardization, and converted into data with the same dimension as the training data set as the input data of the prediction model to obtain the time consumption of the prediction project.

6. A device for implementing the method for calculating the comprehensive risk of an online translation project as claimed in any one of claims 1 to 5, characterized in that: include: The first acquisition module is used to obtain the time consumption of the prediction project after inputting the online data into the prediction model; A determination module is used to determine multiple dimensional risk quantification indicators according to online data, the limit time and the time consumption of the predicted project; the multiple dimensional risk quantification indicators include at least one of the following: language risk quantification indicator; time risk quantification indicator; scale risk quantification indicator; The second acquisition module is used to obtain the comprehensive risk quantitative index and risk level quantitative index of the online translation project according to the multiple dimensional risk quantitative indexes obtained by the determination module.

7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method for calculating the comprehensive risk of an online translation project according to any one of claims 1 to 5 is implemented.

8. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for calculating the comprehensive risk of an online translation project as claimed in any one of claims 1 to 5 is implemented.

9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method for calculating the comprehensive risk of an online translation project as claimed in any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Risk evaluation method and system for translation project

    CN106779455A

  • Dynamic self-adaptive evaluation method and system for translation project risks

    CN110033144A