Operation status display device and operation status display method
Through the operation status display device and method, the waiting time and replenishment operation time of the article replenishment in the substrate working machine are identified and displayed, which solves the problem of users having difficulty in grasping these times and improves the efficiency and early warning capability of the replenishment operation.
Patent Information
- Application Number
- CN201980101762.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-15
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2039-11-15
AI Technical Summary
In the prior art, it is difficult for users to grasp the waiting time from the occurrence of component shortage until the operator starts the replenishment operation and the operation time from the operator starting the replenishment operation until the components are replenished, and these times cannot be effectively identified and displayed.
An operating status display device and method are designed. Through the combination of the acquisition part and the display part, the waiting time (first time) from the occurrence of shortage of items in the substrate working machine to the operator's replenishment operation and the waiting time from the operator's replenishment operation can be identified and graphically displayed. The time from starting the replenishment operation to when the item is replenished (the second time) so that users can understand these critical time points.
It realizes the identifiable chart display of the first time and the second time, helping users to better grasp the operating status of the substrate working machine, improving the early warning and preparation capabilities for item replenishment, and reducing the delay of replenishment operations.
Smart Images

Figure CN114600135B_ABST
Abstract
Description
Technical Field
[0001] This specification discloses a technology related to an operating status display device and an operating status display method. Background Art
[0002] The data processing device described in Patent Document 1 is provided with a display control unit. The display control unit displays the component supply waiting time and the number of component supply times for multiple production lines in parallel. In the example of the display screen described in Patent Document 1, the number of component supply times of the first production line is greater than the number of component supply times of the second production line, and the component supply waiting time becomes longer. Patent Document 1 describes the following: At this time, the user can determine that the number of operators of the first production line is insufficient, and can discuss changes in the personnel allocation of the operators.
[0003] In addition, in the example of the display screen described in Patent Document 1, the difference in the number of component supply times of the third production line is smaller than that of the second production line, but the component supply waiting time is longer. Patent Document 1 describes the following: In this case, when the number of operators on the second production line is the same as the number of operators on the third production line, the operating efficiency of the operator in charge of the third production line may be lower than that of the operator in charge of the second production line.
[0004] Prior art literature
[0005] Patent Literature
[0006] Patent Document 1: International Publication No. 2018 / 138925 Summary of the invention
[0007] Problems to be solved by the invention
[0008] However, Patent Document 1 does not describe the details of the component supply waiting time of the production line. Therefore, in the data processing device described in Patent Document 1, it is difficult for the user to understand the waiting time from when the component is insufficient to when the operator starts the component replenishment operation and the operation time from when the operator starts the replenishment operation to when the component is replenished.
[0009] In view of such a situation, the present specification discloses an operating status display device and an operating status display method, which graphically display the waiting time from the occurrence of shortage of items in a substrate working machine to the time when an operator starts the replenishment operation of the items, i.e., a first time, and the operating time from the time when the operator starts the replenishment operation to the time when the items are replenished to the substrate working machine, i.e., a second time, in an identifiable manner.
[0010] Technical solutions to solve problems
[0011] The present specification discloses an operation status display device, which displays the operation status of a substrate operation machine that performs a predetermined substrate operation on a substrate, and the substrate operation machine produces the substrate product by replenishing the items used in the production of the substrate product using the substrate operation machine by an operator, and the operation status display device includes an acquisition unit and a display unit. The acquisition unit acquires a first time and a second time, the first time being a waiting time from when the item is insufficient in the substrate operation machine to when the operator starts the replenishment operation of the item, and the second time being an operation time from when the operator starts the replenishment operation to when the item is replenished to the substrate operation machine. The display unit graphically displays the first time and the second time in a recognizable manner for the stop time of the substrate operation machine from when the item is insufficient in the substrate operation machine to when the item is replenished.
[0012] In addition, the present specification discloses an operation status display method, which displays the operation status of a substrate operation machine that performs a predetermined substrate operation on a substrate, and the substrate operation machine produces the substrate product by replenishing the items used in the production of the substrate product using the substrate operation machine by an operator, and the operation status display method includes an acquisition step and a display step. In the acquisition step, a first time and a second time are acquired, the first time being a waiting time from when the item is insufficient in the substrate operation machine to when the operator starts the replenishment operation of the item, and the second time being an operation time from when the operator starts the replenishment operation to when the item is replenished to the substrate operation machine. In the display step, the first time and the second time are displayed in a graph in an identifiable manner with respect to the stop time of the substrate operation machine from when the item is insufficient in the substrate operation machine to when the item is replenished.
[0013] Effects of the Invention
[0014] The operating status display device includes an acquisition unit and a display unit. Thus, the operating status display device can display the first time and the second time in a identifiable graphical form. The above contents about the operating status display device are also the same for the operating status display method. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural diagram showing a structural example of substrate production equipment.
[0016] Figure 2 It is a top view showing a structural example of a component mounting machine.
[0017] Figure 3This is a schematic diagram showing an example of the relationship between the first time, the second time, and the stop time of the substrate working machine.
[0018] Figure 4 This is a flowchart showing an example of a control procedure of the operating status display device.
[0019] Figure 5 This is a schematic diagram showing an example of a graph display by the display unit.
[0020] Figure 6 This is a schematic diagram showing another example of a graph display by the display unit.
[0021] Figure 7 This is a schematic diagram showing another example of a graph display by the display unit.
[0022] Figure 8 This is a schematic diagram showing another example of a graph display by the display unit. DETAILED DESCRIPTION
[0023] 1. Implementation Method
[0024] 1-1. Example of the structure of substrate production equipment PF0
[0025] The substrate production equipment PF0 uses a substrate operation machine WM0 that performs a predetermined substrate operation on the substrate 90 to produce the substrate product 900. The type and number of the substrate operation machine WM0 are not limited. Figure 1 As shown, the substrate production equipment PF0 of this embodiment includes multiple (5) substrate operation machines WM0 including a printer WM1, a print inspection machine WM2, a component assembly machine WM3, a reflow oven WM4 and a visual inspection machine WM5, and the substrate 90 is transported sequentially by a substrate transport device.
[0026] The printer WM1 prints solder at the respective mounting positions of the plurality of components 91 on the substrate 90. The print inspection machine WM2 inspects the printing state of the solder printed by the printer WM1. The component assembly machine WM3 assembles the plurality of components 91 on the substrate 90 printed with solder. The component assembly machine WM3 may be one or more. In the case where a plurality of component assembly machines WM3 are provided, the plurality of component assembly machines WM3 can assemble the plurality of components 91 in a shared manner.
[0027] The reflow oven WM4 heats the substrate 90 on which the plurality of components 91 are assembled by the component assembly machine WM3, so that the solder melts and performs soldering. The appearance inspection machine WM5 inspects the assembly state of the plurality of components 91 assembled by the component assembly machine WM3, etc. In this way, the substrate production equipment PF0 can use a plurality (5) of substrate operation machines WM0 to sequentially transport the substrate 90, perform production processing including inspection processing, and thus produce substrate products 900. In addition, the substrate production equipment PF0 can also be equipped with a function inspection machine, a buffer device, a substrate supply device, a substrate turning device, a shielding assembly device, an adhesive coating device, an ultraviolet irradiation device, and other substrate operation machines WM0 as needed.
[0028] The multiple (5) substrate work machines WM0 and the management device WC0 constituting the substrate production equipment PF0 are connected to be able to communicate via a wired or wireless communication unit LC0. In addition, various methods can be used as the communication method. In the present embodiment, a local area network (LAN: Local Area Network) is formed by multiple (5) substrate work machines WM0 and the management device WC0. Thus, the multiple (5) substrate work machines WM0 can communicate with each other via the communication unit LC0. In addition, the multiple (5) substrate work machines WM0 can communicate with the management device WC0 via the communication unit LC0.
[0029] The management device WC0 controls the multiple (5) substrate operation machines WM0 constituting the substrate production equipment PF0 and monitors the operation status of the substrate production equipment PF0. Various control data for controlling the multiple (5) substrate operation machines WM0 are stored in the management device WC0. The management device WC0 sends control data to the multiple (5) substrate operation machines WM0 respectively. In addition, the multiple (5) substrate operation machines WM0 send the operation status and production status to the management device WC0 respectively.
[0030] For example, a data server 80 can be provided in the management device WC0. The data server 80 can store, for example, acquired data acquired by the substrate operation machine WM0 during the substrate operation. Various image data captured by the substrate operation machine WM0 are included in the acquired data. Records (log data) of the operating status acquired by the substrate operation machine WM0 are included in the acquired data.
[0031] In addition, the data server 80 can also store various production information related to the production of the substrate product 900. For example, shape-related information such as information related to the shape of the component 91, information related to image processing of image data obtained by photographing the component 91, information related to processing of the component 91, information related to photographing conditions when photographing the component 91, and information related to electrical characteristics of the component 91 are included in the production information. Information related to the supply method of the component 91, that is, packaging information is included in the production information. Furthermore, inspection reference information used by inspection machines such as the printing inspection machine WM2 and the appearance inspection machine WM5 when inspecting the inspection object and inspection results based on the inspection machine are included in the production information.
[0032] 1-2. Configuration example of component mounting machine WM3
[0033] The component mounting machine WM3 mounts a plurality of components 91 on the substrate 90. Figure 2 As shown, the component mounting machine WM3 includes a substrate conveying device 11, a component supply device 12, a component transfer device 13, a component camera 14, a substrate camera 15, and a control device 16. In this specification, the conveying direction of the substrate 90 is represented by the X-axis direction. The direction orthogonal to the X-axis direction in the horizontal plane is represented by the Y-axis direction. The direction orthogonal to the X-axis direction and the Y-axis direction is represented by the Z-axis direction.
[0034] The substrate transport device 11 is composed of, for example, a belt conveyor, and transports the substrate 90 along the transport direction (X-axis direction). The substrate 90 is a circuit substrate, and at least one of an electronic circuit and an electrical circuit is formed thereon. The substrate transport device 11 transports the substrate 90 into the component assembly machine WM3 and positions the substrate 90 at a predetermined position in the machine. After the assembly process of the plurality of components 91 by the component assembly machine WM3 is completed, the substrate transport device 11 transports the substrate 90 out of the component assembly machine WM3.
[0035] The component supply device 12 supplies a plurality of components 91 to be mounted on the substrate 90. The component supply device 12 includes a plurality of feeders 121 arranged along the conveying direction (X-axis direction) of the substrate 90. The plurality of feeders 121 respectively convey the carrier tape containing the plurality of components 91 at intervals, and supply the components 91 in a manner that can be picked up at the supply position located at the front end side of the feeder 121. In addition, the component supply device 12 can also supply electronic components (for example, lead components, etc.) that are relatively large compared to chip components, etc., in a state arranged on a tray.
[0036] The component transfer device 13 includes a head drive device 131 and a moving table 132. The head drive device 131 is configured to move the moving table 132 in the X-axis direction and the Y-axis direction through a direct-acting mechanism. On the moving table 132, an assembly head 20 is provided in a manner that can be loaded and unloaded (replaced) by a clamping component. The assembly head 20 uses at least one holding component 21 to pick up and hold the component 91 supplied by the component supply device 12, and assembles the component 91 on the substrate 90 positioned by the substrate conveying device 11. The holding component 21 can use, for example, a suction nozzle, a chuck, etc.
[0037] The component camera 14 and the substrate camera 15 can use a known imaging device. The component camera 14 is fixed to the base of the component assembly machine WM3 in such a manner that the optical axis becomes the upper direction (vertical upper direction) of the Z-axis direction. The component camera 14 can photograph the component 91 held by the holding member 21 from below. The substrate camera 15 is provided on the movable table 132 of the component transfer device 13 in such a manner that the optical axis becomes the lower direction (vertical lower direction) of the Z-axis direction. The substrate camera 15 can photograph the substrate 90 from above. The component camera 14 and the substrate camera 15 perform imaging based on the control signal sent from the control device 16. The image data captured by the component camera 14 and the substrate camera 15 are sent to the control device 16.
[0038] The control device 16 includes a known computing device and a storage device, and constitutes a control circuit. Information output from various sensors provided in the component mounting machine WM3, image data, etc. are input to the control device 16. The control device 16 sends a control signal to each device based on a control program and pre-set predetermined mounting conditions, etc.
[0039] For example, the control device 16 causes the substrate camera 15 to photograph the substrate 90 positioned by the substrate transport device 11. The control device 16 performs image processing on the image photographed by the substrate camera 15 to recognize the positioning state of the substrate 90. In addition, the control device 16 causes the holding member 21 to pick up and hold the component 91 supplied by the component supply device 12, and causes the component camera 14 to photograph the component 91 held by the holding member 21. The control device 16 performs image processing on the image photographed by the component camera 14 to recognize whether the component 91 is appropriate or not and the holding posture of the component 91.
[0040] The control device 16 moves the holding member 21 toward the upper side of the scheduled assembly position that is preset by the control program, etc. In addition, the control device 16 corrects the scheduled assembly position based on the positioning state of the substrate 90, the holding posture of the component 91, etc., and sets the assembly position of the actual assembly component 91. The scheduled assembly position and the assembly position include the rotation angle in addition to the position (X coordinate and Y coordinate).
[0041] The control device 16 corrects the target position (X coordinate and Y coordinate) and the rotation angle of the holding member 21 according to the assembly position. The control device 16 lowers the holding member 21 at the corrected rotation angle at the corrected target position to assemble the component 91 on the substrate 90. The control device 16 performs the assembly process of assembling a plurality of components 91 on the substrate 90 by repeatedly performing the above-mentioned pick-and-place cycle.
[0042] 1-3. Supply of the article 30 and the stop time TN0 of the substrate working machine WM0
[0043] The substrate work machine WM0 of the present embodiment is supplied by an operator with articles 30 used in the production of the substrate product 900 using the substrate work machine WM0, thereby producing the substrate product 900. For example, when the substrate work machine WM0 is the above-mentioned component mounting machine WM3, the feeder 121 is included in the article 30. When the components 91 of the carrier tape accommodated in the feeder 121 in the component mounting machine WM3 are insufficient, the component mounting machine WM3 instructs the operator to replenish the components 91 (replenishment of the feeder 121).
[0044] When the operator is instructed to replenish the component 91 (replenish the feeder 121), the operator removes the feeder 121 that is short of the component 91 from the slot of the component supply device 12, and equips the feeder 121 that contains the component 91 for replenishment in the designated slot. In this way, the shortage of the article 30 includes the shortage of the supply (in this case, the component 91) supplied from the article 30. In addition, the article 30 is not limited to the feeder 121. For example, a reel that contains a carrier tape is included in the article 30. In this case, the operator removes the feeder 121 that is short of the component 91, and takes out the reel from the feeder 121. Then, the operator installs the reel that contains the component 91 for replenishment in the feeder 121, and equips the feeder 121 in the designated slot.
[0045] Similarly, a component tray that accommodates a plurality of components 91 is included in the article 30. In addition, the substrate 90 (substrate 90 on which solder is not printed and components 91 are not mounted) supplied to the printer WM1 is included in the article 30. Furthermore, when the substrate operation machine WM0 is the printer WM1, for example, a solder storage container is included in the article 30. In either case, the operator can replenish the article 30 that is insufficient in the substrate operation machine WM0. In addition, the operator can also recover the article 30 that is not needed in the substrate operation machine WM0.
[0046] In this way, since the substrate working machine WM0 of the present embodiment produces the substrate product 900 while replenishing the articles 30 , the substrate working machine WM0 stops the production of the substrate product 900 in order to receive the replenishment of the articles 30 . Figure 3An example of the relationship between the first time TM1, the second time TM2, and the stop time TN0 of the substrate work machine WM0 is schematically shown. The horizontal axis of the figure represents the time, and the vertical axis represents the operating state or the stop state of the substrate work machine WM0. The operating state refers to the state in which the substrate work machine WM0 produces the substrate product 900. The stop state refers to the state in which the substrate work machine WM0 stops producing the substrate product 900 due to the shortage of the article 30.
[0047] In addition, the broken line L11 represents an example of the time-dependent change in the operating status of the substrate work machine WM0. The broken line L11 represents that the substrate work machine WM0 changes from the operating state to the stopped state, and after continuing the stopped state for the stop time TN0, it changes to the operating state. The stop time TN0 of the substrate work machine WM0 refers to the time from the occurrence of a shortage of the item 30 in the substrate work machine WM0 to the replenishment of the item 30. As shown in the figure, the stop time TN0 is the time obtained by adding the first time TM1 and the second time TM2. The first time TM1 refers to the waiting time from the occurrence of a shortage of the item 30 in the substrate work machine WM0 to the operator starting the replenishment operation of the item 30. The second time TM2 refers to the operation time from the operator starting the replenishment operation to the replenishment of the item 30 to the substrate work machine WM0.
[0048] In the prior art, the first time TM1 and the second time TM2 are not considered, and it is difficult for the user to grasp the first time TM1 and the second time TM2. Therefore, in the present embodiment, an operation status display device 40 is provided to display the operation status of the substrate work machine WM0. The operation status display device 40 displays the first time TM1 and the second time TM2 in a graph in a recognizable manner.
[0049] 1-4. Configuration Example of Operation Status Display Device 40
[0050] The operating status display device 40 can be provided in various electronic computers, control devices, etc. Figure 1 As shown, the operation status display device 40 of this embodiment is provided in an electronic computer 70. The electronic computer 70 has a known computing device, a storage device, an input device, and an output device (including a display device DP0). The operation status display device 40 can also be formed, for example, on a substrate operation machine WM0, a management device WC0, a host computer that manages multiple substrate production equipment PF0, or on the cloud.
[0051] In addition, the operating status display device 40, if understood as a control block, includes an acquisition unit 41 and a display unit 42. Furthermore, the operating status display device 40 is configured in accordance with Figure 4The control is performed according to the flowchart shown in FIG. 4. The acquisition unit 41 performs the process shown in step S11. The display unit 42 performs the process shown in step S12.
[0052] 1-4-1. Acquisition section 41
[0053] The acquisition unit 41 acquires the first time TM1 and the second time TM2 ( Figure 4 The acquisition unit 41 can acquire the first time TM1 and the second time TM2 from the operation status record (log data) acquired by the substrate operation machine WM0. For example, assuming that the object 30 is Figure 2 In this case, when installing the feeder 121 in the slot, the operator uses a reader to read the identification code attached to the feeder 121 and installs the feeder 121 in the predetermined slot of the component supply device 12.
[0054] When the feeder 121 is equipped in the slot, power is supplied to it from the component assembly machine WM3 via the connector, and it becomes a state capable of communicating with the component assembly machine WM3. Thus, the slot of the component supply device 12 and the identification information of the feeder 121 equipped in the slot are associated, and installation information indicating that the feeder 121 is equipped is recorded. On the contrary, when the feeder 121 is removed from the slot, the component assembly machine WM3 cannot communicate with the feeder 121. Thus, the disassembly information indicating that the feeder 121 is removed is recorded. In addition, the component assembly machine WM3 counts the number of components 91 supplied from the component supply device 12, and if the number of components 91 supplied reaches a predetermined number, it is determined that the components 91 accommodated in the feeder 121 are insufficient. Thus, insufficient information indicating that the components 91 are insufficient is recorded.
[0055] As mentioned above, the operation status records (log data) are stored in Figure 1 The data server 80 shown. Thus, the acquisition unit 41 of the present embodiment can acquire the record (log data) of the operation status from the data server 80, and acquire the first time TM1 and the second time TM2. Specifically, the acquisition unit 41 acquires the shortage information of the component 91 accommodated in the feeder 121 and the disassembly information of the feeder 121. The acquisition unit 41 acquires the time between the time when the shortage of the component 91 included in the shortage information occurs (the time when the component mounting machine WM3 stops) and the time when the feeder 121 included in the disassembly information is disassembled (the time when the operator starts the replenishment operation) as the first time TM1.
[0056] In addition, the acquisition unit 41 acquires the disassembly information of the feeder 121 in which the component 91 is insufficient and the installation information of the feeder 121 that accommodates the component 91 for replenishment. The acquisition unit 41 acquires the time between the moment when the feeder 121 included in the disassembly information is disassembled (the moment when the operator starts the replenishment operation) and the moment when the feeder 121 included in the assembly information is equipped (the moment when the component 91 is replenished) as the second time TM2. In addition, the above content about the feeder 121 is also the same for the other articles 30 mentioned above. In addition, the loading and unloading of the article 30 can also be known using the detection signal of the detector that detects the loading and unloading, for example. Furthermore, when the operator starts the replenishment operation, for example, there is a case where the reset button of the substrate operation machine WM0 or the article 30 is operated. In this case, the acquisition unit 41 can also judge the moment when the operator performs the operation as the moment when the operator starts the replenishment operation.
[0057] 1-4-2. Display unit 42
[0058] The display unit 42 displays the first time TM1 and the second time TM2 in a graphical manner for the stop time TN0 of the substrate working machine WM0 from when the shortage of the article 30 occurs in the substrate working machine WM0 to when the article 30 is replenished ( Figure 4 The display unit 42 can be, for example, Figure 1 The display device DP0 shown in the figure performs a graph display. For example, a well-known display device such as a liquid crystal display device can be used as the display device DP0. In this case, the display device DP0 performs a graph display of the first time TM1 and the second time TM2 in a identifiable manner.
[0059] In addition, the display format of the graph display is not limited, and the display unit 42 can display the first time TM1 and the second time TM2 in a graph in a identifiable manner in various display formats. Figure 5 An example of a graph display on the display unit 42 is shown. In this figure, the first time TM1 and the second time TM2 for each substrate-working machine WM0 are shown in a bar graph. The horizontal axis of this figure represents the identification number N of the substrate-working machine WM0, and the vertical axis represents time.
[0060] Figure 6 Another example of a graph display based on the display unit 42 is shown. In this figure, the ratio of the first time TM1 to the second time TM2 for each substrate work machine WM0 is shown in a bar graph. The horizontal axis of this figure represents the identification number N of the substrate work machine WM0, and the vertical axis represents the ratio of the first time TM1 to the second time TM2 (0% to 100%). In addition, Figure 5 as well as Figure 6In order to facilitate the illustration, some bar graphs are marked with symbol numbers, and the symbol numbers are omitted for other bar graphs. The bar graph marked with slashes represents the first time TM1, and the bar graph without slashes represents the second time TM2. Figure 7 as well as Figure 8 The same is true in .
[0061] exist Figure 5 as well as Figure 6 In any of the modes shown, the display unit 42 can display the first time TM1 and the second time TM2 in a graph in a manner that can be identified for a plurality of substrate work machines WM0 of the same type. The display unit 42 can display the graph for a plurality of component assembly machines WM3, for example. In addition, the display unit 42 can also display the first time TM1 and the second time TM2 in a graph in a manner that can be identified for a plurality of substrate work machines WM0 of a plurality of types. The display unit 42 can also display the graph for a printer WM1 and a plurality of component assembly machines WM3, for example.
[0062] Furthermore, the display unit 42 can also display the first time TM1 and the second time TM2 in a graph in a manner that can be identified for a plurality of substrate work machines WM0 of the same type in different substrate production equipment PF0. Furthermore, the display unit 42 can also display the first time TM1 and the second time TM2 in a graph in a manner that can be identified for a plurality of substrate work machines WM0 of a plurality of types in different substrate production equipment PF0.
[0063] exist Figure 5 as well as Figure 6 In the example, the first time TM1 and the second time TM2 are displayed in a graph in a recognizable manner with respect to the stop time TN0 of the substrate work machine WM0. Thus, the user of the operation status display device 40 can easily grasp the first time TM1 and the second time TM2 with respect to the stop time TN0 of the substrate work machine WM0. Figure 5 The first time TM1 of the substrate working machine WM0 with identification number N10 is shorter than the second time TM2. On the other hand, the first time TM1 of the substrate working machine WM0 with identification number N11 is longer than the second time TM2. Figure 6 The substrate working machine WM0 with identification number N10 shown has a smaller ratio of first time TM1 than second time TM2. On the other hand, for substrate working machine WM0 with identification number N11, the ratio of first time TM1 than second time TM2 is larger.
[0064] Before the item 30 runs out of the substrate operation machine WM0, the operator is notified of the notice information that the item 30 is running out. When the operator is notified of the notice information, he can prepare the replenishment operation of the item 30. Specifically, the operator prepares the item 30 for replenishment for the substrate operation machine WM0 before the item 30 runs out. When the item 30 is a feeder 121, the operator prepares the feeder 121 for replenishment, for example, for the component mounting machine WM3. In addition, the operator can also prepare a reel containing the component 91 for replenishment, for example, for the component mounting machine WM3.
[0065] Since the operator can immediately perform the replenishment operation of the article 30 after the preparation for the replenishment operation is performed, the second time TM2 is likely to be shortened. On the contrary, if the preparation for the replenishment operation is not performed, the operator first needs to prepare the article 30 for replenishment, and the second time TM2 is likely to be longer. The operator of the substrate operation machine WM0 with identification number N10, whose second time TM2 is longer than the first time TM1, may not have performed the preparation for the replenishment operation of the article 30. In addition, the shortage of the article 30 can be guided to the operator by, for example, a display light or a warning sound provided in the substrate operation machine WM0. The operator of the substrate operation machine WM0 with identification number N11, whose first time TM1 is longer than the second time TM2, may delay noticing the shortage of the article 30.
[0066] Furthermore, the operator of the substrate work machine WM0 with identification number N11 noticed that there was a shortage of the article 30, but because he was doing other work, he might delay starting the replenishment work of the article 30. In addition, the operator of the substrate work machine WM0 with identification number N11 noticed that there was a shortage of the article 30, but he might delay starting the replenishment work of the article 30 without a proper reason. The above contents about the first time TM1 and the second time TM2 are also the same as the ratio of the first time TM1 to the second time TM2.
[0067] 1-4-3. Optimal selection method
[0068] exist Figure 5 as well as Figure 6In the manner shown, it is difficult for the user of the operation status display device 40 to obtain the time series information. For this reason, the acquisition unit 41 can divide the production time period for the substrate work machine WM0 to produce the substrate product 900 into predetermined unit times TU0, and summarize the first time TM1 and the second time TM2 for each unit time TU0. In addition, the display unit 42 can display the first time TM1 and the second time TM2 for each unit time TU0 summarized by the acquisition unit 41 in time series. Furthermore, it is also possible that the acquisition unit 41 summarizes the insufficient quantity of the item 30 for each unit time TU0, and the display unit 42 displays the insufficient quantity of the item 30 for each unit time TU0 summarized by the acquisition unit 41 in time series.
[0069] Figure 7 Another example of a graph display based on the display unit 42 is shown. In this figure, the first time TM1 and the second time TM2 per unit time TU0 are shown by the bar graph on the right. In addition, in this figure, the insufficient number of items 30 per unit time TU0 is shown by the bar graph on the left. The numbers on the upper part of the bar graph on the left represent the insufficient number of items 30 per unit time TU0. In addition, the horizontal axis of this figure represents the production time period, and the vertical axis represents the insufficient number or time of the item 30.
[0070] The unit time TU0 can be set arbitrarily within a range in which the tendency of the first time TM1 and the second time TM2 can be grasped. The unit time TU0 can be set, for example, based on the time required for a replenishment operation required for an operator to replenish an item 30. For example, when the above required time is 1 minute, the unit time TU0 can be set to, for example, 10 minutes to 15 minutes. For example, when the above required time is 10 minutes, the unit time TU0 can be set to, for example, 1 hour to 2 hours. In addition, in this figure, for the convenience of illustration, symbol numbers are marked on some unit times TU0, and symbol numbers are omitted for other unit times TU0. The above content about the unit time TU0 is described in detail in the following. Figure 8 The same is true in .
[0071] For example, in Figure 7In the first unit time TU1, one of the multiple unit times TU0 shown, the insufficient number of items 30 is 28. Therefore, the acquisition unit 41 summarizes the first time TM1 of the 28 replenishment operations and summarizes the second time TM2 of the 28 replenishment operations. For other unit times TU0, the acquisition unit 41 also summarizes the first time TM1 and the second time TM2. In addition, in the second unit time TU2, which is another unit time TU0 among the multiple unit times TU0, the insufficient number of items 30 is 30. The insufficient number of items 30 in the first unit time TU1 and the second unit time TU2 is roughly the same, but the size relationship between the first time TM1 and the second time TM2 is very different. Specifically, in the first unit time TU1, the first time TM1 is shorter than the second time TM2. Since there is no shortage of items 30 in the unit time TU0 immediately before the first unit time TU1, it is considered that the operator can prepare for the replenishment operation of the items 30 in the first unit time TU1. Therefore, the operator can immediately perform the replenishment operation of the article 30 in the first unit time TU1 , but since the shortage number of the article 30 increases (gap between replenishment operations), it is considered that the second time TM2 increases.
[0072] In contrast, in the second unit time TU2, the first time TM1 is longer than the second time TM2. The second unit time TU2 is the unit time TU0 immediately following the first unit time TU1. Therefore, it is considered that the operator is delayed in noticing the shortage of the item 30 in the second unit time TU2 due to the gap in the replenishment operation in the first unit time TU1, or that the replenishment operation in the second unit time TU2 is delayed due to the replenishment operation in the first unit time TU1. In addition, it is considered that the preparation for the replenishment operation of the item 30 in the second unit time TU2 is not performed due to the gap in the replenishment operation in the first unit time TU1. As described above, if the preparation for the replenishment operation is not performed, the operator first needs to prepare the items 30 for replenishment, and the second time TM2 is likely to be longer. However, for example, it is considered that the second time TM2 can be significantly shortened compared to the first unit time TU1 by replenishment operations based on support from operators, replenishment operations of multiple items 30 at once, etc.
[0073] The acquisition unit 41 can also divide the production time period for the substrate work machine WM0 to produce the substrate product 900 into predetermined unit time TU0, and summarize the ratio of the first time TM1 to the second time TM2 for each unit time TU0. In this case, the display unit 42 can display the ratio of the first time TM1 to the second time TM2 for each unit time TU0 summarized by the acquisition unit 41 in chronological order.
[0074] Figure 8Another example of a graph display based on the display unit 42 is shown. In this figure, a bar graph is used to represent the ratio of the first time TM1 to the second time TM2 of each unit time TU0. In addition, in this figure, the insufficient number of items 30 for each unit time TU0 is represented by the numbers in the upper part of the bar graph. Furthermore, the horizontal axis of the figure represents the production time period, and the vertical axis represents the insufficient number of items 30 or the above-mentioned ratio. For example, in the first unit time TU1, which is one unit time TU0 among multiple unit times TU0, the insufficient number of items 30 is 28. Therefore, the acquisition unit 41 summarizes the first time TM1 of 28 replenishment operations, summarizes the second time TM2 of 28 replenishment operations, and summarizes the ratio of the first time TM1 to the second time TM2. For other unit times TU0, the acquisition unit 41 also summarizes the ratio of the first time TM1 to the second time TM2. Figure 8 In the method shown, about Figure 7 The same is true for the contents already described in the manner shown.
[0075] For example, if the time required for a replenishment operation required for one operator to replenish one item 30 is 1 minute, the unit time TU0 is set to 15 minutes. In this case, the maximum number of items 30 that can be replenished by one operator in the unit time TU0 is 15. That is, it is difficult for one operator to replenish more than 15 items 30 in the unit time TU0. Furthermore, the time required for the replenishment operation of the item 30 may differ depending on the type of the item 30.
[0076] To this end, the display unit 42 may display an upper limit line UL0 indicating the maximum number of items 30 that the operator can replenish per unit time TU0. The upper limit line UL0 may be set based on at least one of the type of item 30 and the operator's operating ability. Thus, the user of the operating status display device 40 can easily understand the gap in replenishment operations. Figure 7 as well as Figure 8 As shown, for example, in the first unit time TU1 and the second unit time TU2, the insufficient number of articles 30 per unit time TU0 exceeds the upper limit line UL0. Thus, the user of the operation status display device 40 can easily understand that a gap in the replenishment operation occurs in the first unit time TU1 and the second unit time TU2.
[0077] In addition, when a clamp is used when performing the replenishment operation of the item 30, it may take time to prepare the clamp. Therefore, in addition to the type of the item 30 itself, the type of clamp used when performing the replenishment operation of the item 30 may also be included in the types of items 30 considered when setting the upper limit line UL0. In addition, there are deviations in the operating capabilities of the operators. Therefore, the upper limit line UL0 can also be set according to the operating capabilities of the operators who actually performed the operation. The operating capabilities of the operators can be obtained or estimated based on past operating performance. Furthermore, when multiple operators perform the operation, the operating capabilities of the operators include the operating capabilities of the amount corresponding to the number of people.
[0078] The substrate production equipment PF0 of this embodiment includes a plurality of substrate work machines WM0. In this case, the acquisition unit 41 can acquire the first time TM1 and the second time TM2 for the plurality of substrate work machines WM0. In addition, the acquisition unit 41 can also acquire the first time TM1 and the second time TM2 for a specified substrate work machine WM0 among the plurality of substrate work machines WM0.
[0079] The acquisition unit 41 can acquire the first time TM1 and the second time TM2 for a plurality of substrate working machines WM0 of the same type. Figure 7 as well as Figure 8 As shown, the user of the operating status display device 40 can select "all" in the work machine selection column. In this case, the acquisition unit 41 can, for example, acquire the first time TM1 and the second time TM2 for multiple component assembly machines WM3. As a result, the user of the operating status display device 40 can grasp the tendency of the first time TM1 and the second time TM2 for the entirety of the multiple component assembly machines WM3. In addition, the user of the operating status display device 40 can also select a desired component assembly machine WM3 (for example, the work machine M1 or the work machine M2) in the work machine selection column. In this case, the acquisition unit 41 can acquire the first time TM1 and the second time TM2 for a specified component assembly machine WM3 among the multiple component assembly machines WM3. As a result, the user of the operating status display device 40 can grasp the tendency of the first time TM1 and the second time TM2 for the specified component assembly machine WM3 (for example, the bottleneck component assembly machine WM3).
[0080] In addition, the acquisition unit 41 can also acquire the first time TM1 and the second time TM2 for multiple types of multiple substrate work machines WM0. The acquisition unit 41 can also acquire the first time TM1 and the second time TM2 for, for example, the printer WM1 and multiple component assembly machines WM3. Furthermore, the acquisition unit 41 can also acquire the first time TM1 and the second time TM2 for multiple substrate work machines WM0 of the same type in different substrate production equipment PF0. In addition, the acquisition unit 41 can also acquire the first time TM1 and the second time TM2 for multiple types of multiple substrate work machines WM0 in different substrate production equipment PF0.
[0081] In either case, the acquisition unit 41 summarizes the first time TM1 and the second time TM2 for each unit time TU0. Then, the display unit 42 can display the first time TM1 and the second time TM2 for each unit time TU0 summarized by the acquisition unit 41 in chronological order. Similarly, the acquisition unit 41 can also acquire the insufficient number of items 30 for a plurality of substrate work machines WM0 or a designated substrate work machine WM0 among a plurality of substrate work machines WM0, and summarize the insufficient number of items 30 for each unit time TU0. Then, the display unit 42 can also display the insufficient number of items 30 for each unit time TU0 summarized by the acquisition unit 41 in chronological order.
[0082] In addition, depending on the working time period of the operator, there are cases where the operating efficiency of the operation of the substrate operation machine WM0 and the replenishment operation of the article 30 are different. For this reason, the acquisition unit 41 can also acquire the first time TM1 and the second time TM2 based on the working time period of the operator. Specifically, it is assumed that the operator belongs to the first group GP1 that performs operations in a predetermined first time period or the second group GP2 that performs operations in a time period different from the first time period. For example, the first time period is the working time period of the day shift, and the time period different from the first time period is the working time period of the night shift. In this case, the acquisition unit 41 can acquire the first time TM1 and the second time TM2 for the replenishment operation of the operator belonging to the first group GP1 or the second group GP2.
[0083] For example, Figure 7 as well as Figure 8As shown, the user of the operation status display device 40 can select "first group GP1" or "second group GP2" in the displacement selection column. The acquisition unit 41 can acquire the first time TM1 and the second time TM2 for the replenishment operation of the operator belonging to the selected group. The acquisition unit 41 summarizes the first time TM1 and the second time TM2 for each unit time TU0 for the acquired first time TM1 and second time TM2. Then, the display unit 42 can display the first time TM1 and the second time TM2 for each unit time TU0 summarized by the acquisition unit 41 in time sequence.
[0084] Similarly, the acquisition unit 41 can also acquire the insufficient quantity of the item 30 for the replenishment operation of the operator belonging to the first group GP1 or the second group GP2, and summarize the insufficient quantity of the item 30 for each unit time TU0. Then, the display unit 42 can also display the insufficient quantity of the item 30 for each unit time TU0 summarized by the acquisition unit 41 in time series.
[0085] 2. Operation status display method
[0086] The contents described above about the operating status display device 40 are also the same as those about the operating status display method. Specifically, the operating status display method includes an acquisition step and a display step. The acquisition step corresponds to the control performed by the acquisition unit 41. The display step corresponds to the control performed by the display unit 42.
[0087] 3. An example of the effect of the embodiment
[0088] The operating status display device 40 includes an acquisition unit 41 and a display unit 42. Thus, the operating status display device 40 can display the first time TM1 and the second time TM2 in a identifiable graphical form. The above contents about the operating status display device 40 are also the same for the operating status display method.
[0089] Description of Reference Numerals
[0090] 30: Article 40: Operation status display device 41: Acquisition unit 42: Display unit
[0091] 90: substrate 900: substrate product TM1: first time TM2: second time
[0092] TN0: Stop time TU0: Unit time UL0: Upper limit
[0093] PF0: Substrate production equipment WM0: Substrate operation machine GP1: Group 1
[0094] GP2: Group 2
Claims
1. An operation status display device, which displays the operation status of a substrate operation machine that performs a predetermined substrate operation on a substrate, wherein the substrate operation machine produces the substrate product by replenishing the substrate product produced by the substrate operation machine with articles used in the production of the substrate product by an operator, wherein: The operating status display device comprises: an acquisition unit, which acquires a first time and a second time, wherein the first time is a waiting time from when the article is insufficient in the substrate operation machine to when the operator starts a replenishment operation of the article, and the second time is an operation time from when the operator starts the replenishment operation to when the article is replenished to the substrate operation machine; as well as The display unit displays the first time and the second time in a graphical manner in a manner that allows identification, with respect to the stop time of the substrate working machine from when the shortage of the article occurs in the substrate working machine to when the article is replenished, The acquisition unit divides the production time period for the substrate work machine to produce the substrate product into predetermined unit time periods, and summarizes the first time and the second time for each unit time. The display unit displays the first time and the second time for each unit time summarized by the acquisition unit in time series.
2. An operation status display device, which displays the operation status of a substrate operation machine that performs a predetermined substrate operation on a substrate, wherein the substrate operation machine produces the substrate product by replenishing the substrate product produced by the substrate operation machine with articles used in the production of the substrate product using the substrate operation machine by an operator, wherein: The operating status display device comprises: an acquisition unit, which acquires a first time and a second time, wherein the first time is a waiting time from when the article is insufficient in the substrate operation machine to when the operator starts a replenishment operation of the article, and the second time is an operation time from when the operator starts the replenishment operation to when the article is replenished to the substrate operation machine; as well as The display unit displays the first time and the second time in a graphical manner in a manner that allows identification, with respect to the stop time of the substrate working machine from when the shortage of the article occurs in the substrate working machine to when the article is replenished, The acquisition unit divides the production time period of the substrate work machine for producing the substrate product into predetermined unit time periods, and summarizes the ratio of the first time to the second time for each unit time. The display unit displays the ratio of the first time to the second time for each unit time summarized by the acquisition unit in time series.
3. The operating status display device according to claim 1 or 2, wherein: The acquisition unit summarizes the insufficient quantity of the items for each unit time. The display unit displays the insufficient quantity of the article for each unit time summarized by the acquisition unit in time series.
4. The operating status display device according to claim 1 or 2, wherein: The display unit displays an upper limit line indicating a maximum number of the articles for which the operator can perform the replenishment work within the unit time.
5. The operating status display device according to claim 4, wherein: The upper limit is set based on at least one of the type of the article and the work ability of the worker.
6. The operating status display device according to claim 1 or 2, wherein: The substrate production equipment comprises a plurality of the substrate operation machines. The acquisition unit acquires the first time and the second time for the plurality of substrate working machines or the specified substrate working machine among the plurality of substrate working machines.
7. The operating status display device according to claim 1 or 2, wherein: The operator belongs to a first group that performs operations in a predetermined first time period or a second group that performs operations in a time period different from the first time period, The acquisition unit acquires the first time and the second time for the replenishment work performed by the worker belonging to the first group or the second group.
8. A method for displaying an operation status of a substrate operation machine that performs a predetermined substrate operation on a substrate, wherein the substrate operation machine produces a substrate product by replenishing the substrate product produced by the substrate operation machine with articles used in the production of the substrate product using the substrate operation machine by an operator, wherein: The operating status display method comprises: An acquisition step of acquiring a first time and a second time, wherein the first time is a waiting time from when the article is insufficient in the substrate operation machine to when the operator starts a replenishment operation of the article, and the second time is an operation time from when the operator starts the replenishment operation to when the article is replenished to the substrate operation machine; as well as A display step of graphically displaying the first time and the second time in a recognizable manner with respect to the stop time of the substrate working machine from when the shortage of the article occurs in the substrate working machine to when the article is replenished, In the acquisition step, the production time period for the substrate product production by the substrate work machine is divided into predetermined unit times, and the first time and the second time are summarized for each unit time. In the display step, the first time and the second time for each unit time summarized in the acquisition step are displayed in time series.
9. A method for displaying an operation status of a substrate operation machine that performs a predetermined substrate operation on a substrate, wherein the substrate operation machine produces a substrate product by replenishing the substrate product produced by the substrate operation machine with articles used in the production of the substrate product using the substrate operation machine by an operator, wherein: The operating status display method comprises: An acquisition step of acquiring a first time and a second time, wherein the first time is a waiting time from when the article is insufficient in the substrate operation machine to when the operator starts a replenishment operation of the article, and the second time is an operation time from when the operator starts the replenishment operation to when the article is replenished to the substrate operation machine; as well as A display step of graphically displaying the first time and the second time in a recognizable manner with respect to the stop time of the substrate working machine from when the shortage of the article occurs in the substrate working machine to when the article is replenished, In the acquisition step, the production time period for the substrate work machine to produce the substrate product is divided into predetermined unit times, and the ratio of the first time to the second time is summarized for each unit time. In the display step, the ratio of the first time to the second time for each of the unit time summarized in the acquisition step is displayed in time series.