A method for sealing water leakage in the later stage of anchor rod and cable eye
Through casing drilling and pressure grouting, the problem of water leakage in anchor rods and anchor cables is solved, the anchoring effect is improved and the equipment is protected, providing an efficient plugging solution.
Patent Information
- Application Number
- CN202210178368.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-25
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-02-25
AI Technical Summary
Anchor rods and anchor cables often leak water in the later stages of anchoring, which affects the anchoring effect and corrodes equipment. The existing plugging methods are inefficient and have problems such as failure of drilling and communication.
Drill and install the orifice pipe through casing holes, and perform grouting under pressure to seal the leakage channels of the anchor rods and anchor cable eyes. Use cement-water glass slurry as the grouting material to ensure that the grouting pressure is lower than the anchor rods and anchor cable holes. The pull-out resistance of the cable is increased, and clean water is injected at the end of grouting to stabilize the slurry.
It effectively blocks the leakage channels of anchor rods and anchor cable eyes, increases the anchoring length and capacity, and is easy to operate and has remarkable effects.
Smart Images

Figure CN114635728B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of underground coal mine safety, and in particular to a method for sealing late water leakage of an anchor rod and anchor cable eye. Background Art
[0002] At present, anchor rods and anchor cables are the most commonly used methods for supporting mines and underground projects, especially for deep projects. Anchor rods and anchor cables mainly achieve the overall anchoring effect on the surrounding rock through the anchoring agent at the tail, the tray and nut at the leakage section.
[0003] In actual application, water leakage in the anchored anchor holes and anchor cable holes is quite common. The main reason is that the original constructed anchor holes and anchor cable holes communicate with the water-bearing rock layer, that is, the anchor holes and anchor cable holes themselves have water leakage. In the later stage, ultra-fast solidifying anchoring agents are generally used to anchor the tail section of the anchor rod and anchor cable. After the anchoring is completed, the water continues to flow out along the anchor hole. The water leakage of the anchor hole itself will affect the anchoring effect of the anchor rod and anchor cable. In the later stage, long-term water leakage will corrode the anchor rod and anchor cable and deteriorate the environment of the tunnel. Chinese patent application CN113153396A discloses a sealing and grouting water blocking reinforcement method for the anchor cable hole in the water sprinkling area of the tunnel. It is achieved by drilling oblique holes on the periphery to connect the anchor holes, and then grouting to block the water leakage. This method has the disadvantages of low success rate of drilling holes to connect the anchor holes and grouting slurry leakage. Summary of the invention
[0004] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a method for sealing the late water leakage of anchor rod and anchor cable eyes, which completely seals the leakage of anchor rod eyes and anchor cable eyes by drilling holes into the original anchor rod and anchor cable holes, installing orifice pipes, and then grouting under pressure. The method has a simple principle, is convenient to operate, and has a good treatment effect.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] The present invention provides a method for plugging water leakage in the later stage of an anchor rod and an anchor cable eye, comprising the following steps:
[0007] S1. Remove the nuts and trays on the anchor rods and anchor cables that need to be treated for water leakage;
[0008] S2. Drill holes for the anchor bolt holes and anchor cable holes that need to be processed, and the drilling tool covers the anchor bolts and anchor cables during drilling;
[0009] S3. Select an orifice pipe with appropriate outer diameter and length for installation according to the diameter of the hole drilled in the casing section;
[0010] S4. After the orifice pipe is installed, grouting is performed to seal the leakage channels of the anchor rod eye and the anchor cable eye;
[0011] S5. After the slurry solidifies, remove the orifice pipe of the leakage section;
[0012] S6. Resume the installation of nuts and trays on anchor rods and anchor cables, and the anchor rods and anchor cables continue to play the anchoring role.
[0013] Preferably, in step S2, a coring drill is used to drill a hole, an anchor rod, or an anchor cable. The inner diameter of the core tube used in the hole drilling is 10 mm larger than the diameter of the anchor rod or the anchor cable. The drilling depth is not less than 600 mm. After the hole drilling is completed, the hole section is punched.
[0014] Preferably, in step S3, the orifice pipe is provided with a tooth buckle and hemp or cotton yarn is wrapped around the tooth buckle to increase the contact between the orifice pipe and the surrounding rock; the orifice pipe is divided into two sections, an external leakage section and an internal section, the external leakage section is 10-20 mm longer than the external leakage section of the anchor rod and anchor cable, and the length of the internal section is 10-20 mm shorter than the casing depth.
[0015] Preferably, in step S4, after the orifice pipe is installed, the original leaking parts of the anchor rod and anchor cable are also in the orifice pipe, a valve is installed in the orifice pipe, a grouting pipeline is connected, and grouting operation is performed on the anchor rod eye;
[0016] The grouting pressure must be lower than the pull-out resistance of the anchor rods and cables; when the grouting is nearing the end, clean water is injected into the orifice pipe, and the amount of clean water injected is consistent with the internal space of the leakage section of the orifice pipe.
[0017] Preferably, in step S4, cement-water glass slurry is used for grouting.
[0018] The beneficial effects of the present invention are as follows: the method adopts the casing hole technology, so that the grouting is directly targeted at the seepage channels of the anchor rod eyes and the anchor cable eyes, and the water control effect is good; this grouting is pressure grouting, which can not only block the leakage channels of the anchor rod eyes and the anchor cable eyes, but also has an auxiliary reinforcement effect on the surrounding rock of the grouting section, and at the same time increases the anchoring length of the anchor rod and the anchor cable, and increases its anchoring capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 A schematic diagram of the original anchor rod structure provided by an embodiment of the present invention;
[0021] Figure 2 A schematic diagram of the structure of the anchor bolt eye after the casing is provided in an embodiment of the present invention;
[0022] Figure 3 A schematic structural diagram of an anchor eye after grouting provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] like Figures 1 to 3 As shown, a method for sealing water leakage in the later stage of an anchor rod and an anchor cable eye comprises the following steps:
[0025] S1. Remove nuts and trays on anchor rods and cables that need to be treated for water leakage: Identify the anchor rod eyes and anchor cable eyes that are in a state of water leakage and need to be treated, and remove the nuts, gaskets and trays installed on the anchor rods and cables.
[0026] S2. Use coring drill tools to drill holes, anchor rods and anchor cables: Use coring drill tools to drill holes for the anchor rod holes and anchor cable holes that need to be processed. When drilling, the drill tools cover the anchor rods and anchor cables.
[0027] The inner diameter of the core tube used in casing drilling is 10mm larger than the diameter of the anchor rod and anchor cable; the hole depth of casing drilling is not less than 600mm, and the casing section is punched after the casing drilling is completed.
[0028] S3. Select an orifice pipe with appropriate outer diameter and length according to the diameter of the hole drilled in the casing section. The orifice pipe adopts the form of the orifice pipe in the "Specifications for Grouting Construction of Coal Mine Shaft Walls" NB / T 10527-2021.
[0029] The contact between the borehole pipe and the surrounding rock is increased by using a horse tooth buckle and wrapping hemp silk or cotton yarn around the horse tooth buckle.
[0030] The orifice pipe is divided into two sections: the external leakage section and the internal section. The external leakage section is slightly longer than the external leakage section of the anchor rod and anchor cable by 10-20mm, and the internal section is slightly shorter than the casing depth by 10-20mm.
[0031] S4. Grouting to block the leakage channels of anchor rod eyes and anchor cable eyes: After the orifice pipe is installed, the original leaking parts of the anchor rod and anchor cable are also in the orifice pipe. A valve is installed on the orifice pipe, and the grouting pipeline is connected to carry out grouting operations on the anchor rod eyes.
[0032] Grouting uses non-corrosive grouting materials, generally cement-water glass slurry, and the grouting pressure needs to be lower than the pull-out resistance of the anchor rods and cables.
[0033] When the grouting is nearing completion, the grouting pump injects a small amount of clean water into the orifice pipe, and the amount of clean water injected is consistent with the internal space of the leakage section of the orifice pipe.
[0034] S5. After the slurry solidifies, remove the orifice pipe of the leakage section. Since a certain amount of clean water is injected at the end of grouting, there is no solidified slurry in the leakage orifice pipe, and the orifice pipe of the leakage section can be removed.
[0035] S6. Resume the installation of nuts and trays on anchor rods and anchor cables: After removing the leaking section of the orifice pipe, the leaking section of the anchor rod and anchor cable leaks out. Resume the installation of nuts and trays on the anchor rod and anchor cable to continue to play the anchoring role.
[0036] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for sealing water leakage in the later stage of anchor bolt and cable eye. It is characterized in that The following steps are involved: S1. Remove the nuts and trays on the anchor rods and anchor cables that need to be treated for water leakage; S2. Drill holes for the anchor bolt holes and anchor cable holes that need to be processed, and the drilling tool covers the anchor bolts and anchor cables during drilling; S3. Select an orifice pipe with appropriate outer diameter and length for installation according to the diameter of the hole drilled in the casing section; S4. After the orifice pipe is installed, grouting is performed to seal the leakage channels of the anchor rod eye and the anchor cable eye; S5. After the slurry solidifies, remove the orifice pipe of the leakage section; S6. Resume the installation of nuts and trays on anchor rods and anchor cables, and the anchor rods and anchor cables continue to play the anchoring role.
2. A method for sealing water leakage in the later stage of an anchor rod and an anchor cable eye according to claim 1, It is characterized in that In step S2, a coring drill is used to drill a hole, an anchor rod, and an anchor cable. The inner diameter of the core tube used in the hole drilling is 10 mm larger than the diameter of the anchor rod and the anchor cable. The drilling depth is not less than 600 mm. After the hole drilling is completed, the hole section is punched.
3. A method for sealing water leakage in the later stage of an anchor rod and an anchor cable eye according to claim 1, It is characterized in that In step S3, the orifice pipe is provided with a tooth buckle and hemp or cotton yarn is wound around the tooth buckle to increase the contact between the orifice pipe and the surrounding rock; the orifice pipe is divided into two sections, an external leakage section and an internal section, the external leakage section is 10-20 mm longer than the external leakage section of the anchor rod and anchor cable, and the length of the internal section is 10-20 mm shorter than the casing depth.
4. A method for sealing water leakage in the later stage of an anchor rod and an anchor cable eye according to claim 1, It is characterized in that In step S4, after the orifice pipe is installed, the original leaking parts of the anchor rod and anchor cable are also in the orifice pipe, a valve is installed in the orifice pipe, a grouting pipeline is connected, and grouting operation is performed on the anchor rod eye; The grouting pressure must be lower than the pull-out resistance of the anchor rods and cables; when the grouting is nearing the end, clean water is injected into the orifice pipe, and the amount of clean water injected is consistent with the internal space of the leakage section of the orifice pipe.
5. A method for sealing water leakage in the later stage of an anchor rod and an anchor cable eye according to claim 1, It is characterized in that In step S4, cement-water glass slurry is used for grouting.