Hardware-in-the-loop test platform, pitch-in-the-loop test system and test system

Through the real-time parallel multi-processor platform and RedHawk operating system combined with the multi-body dynamics analysis software package Simpack, a nonlinear virtual model is established, which solves the problem of insufficient real-time and scalability in the hardware-in-the-loop test of wind turbines and achieves high accuracy. and flexibility testing effects.

CN114647200BActive Publication Date: 2024-10-18GOLDWIND SCI & TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202011492106.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-17
Publication Date
2024-10-18
Estimated Expiration
2040-12-17

AI Technical Summary

Technical Problem

The existing hardware-in-the-loop test platform for wind turbines has insufficient real-time performance and scalability, making it difficult to achieve stable real-time closed-loop simulation, and it is difficult to consider the nonlinearity of large wind turbine blades and drive train flexibility, resulting in insufficient test accuracy and flexibility. .

Method used

A real-time parallel multi-processor platform is used with the RedHawk real-time Linux operating system, combined with the multi-body dynamics analysis software package Simpack, to establish a nonlinear virtual model based on first-order and multi-order modes, and communicate with the physical system through a real-time communication module to achieve High-precision and flexible hardware-in-the-loop testing.

Benefits of technology

It significantly improves the accuracy and real-time performance of hardware-in-the-loop testing, improves the scalability and flexibility of testing, can more accurately simulate the complex working conditions of wind turbines, and meets the needs of multi-channel testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114647200B_ABST
    Figure CN114647200B_ABST
Patent Text Reader

Abstract

The present disclosure provides a hardware-in-the-loop test platform, a pitch-in-the-loop test system and a test system. The hardware-in-the-loop test platform includes: a real-time parallel multi-processor platform, which is configured to run a multi-threaded real-time operating system on the real-time parallel multi-processor platform to simulate a virtual model of a wind turbine generator set in real time, and test the performance of a physical system of the wind turbine generator set based on the virtual model; a communication module, which is connected between the real-time parallel multi-processor platform and the physical system, and the physical system and the real-time parallel multi-processor platform communicate with each other through the communication module.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of wind power generation, and in particular to a hardware-in-the-loop test platform, a pitch-in-the-loop test system and a test system for a wind generator set. Background Art

[0002] As human beings’ demand for energy increases, the wind power industry has developed rapidly by virtue of wind energy’s attributes as a clean energy source, but there are also many problems, such as poor stability and low availability of wind turbines, downtime and power generation loss due to human operating errors, insufficient verification of new equipment due to the large number of configurations of wind turbines, and increased failure rates, etc. The occurrence of the above-mentioned failures has led to higher and higher operating and maintenance costs for wind turbines, causing significant economic losses to wind power equipment manufacturers and wind power developers.

[0003] Each component of a wind turbine (for example, the nacelle, generator, hydraulic system, etc.) is designed and tested independently. After the software control and communication development of the above components are completed, the wind turbine will be transported to the wind farm for debugging to ensure its normal operation. However, due to the vast area and changeable environment of the wind farm, some extreme working conditions cannot be simulated. In addition, it is difficult to ensure the safety of the staff when conducting on-site debugging of the wind turbine.

[0004] In order to solve the problems in the testing or debugging process of wind turbines, simulation technology can be used to test the performance of wind turbines. For example, hardware-in-the-loop simulation technology is a typical semi-physical simulation method developed based on physical simulation and digital simulation technology. In the hardware-in-the-loop simulation test, the actual equipment or environment is replaced by a simulation model, and then the simulation model is connected to the real controller through an interface module to form a closed-loop test system, and the software environment and hardware of the test system are required to run according to the natural time scale. Hardware-in-the-loop simulation technology can not only make full use of the convenience and simplicity of computer modeling, greatly reducing economic costs; but also facilitates the quick and flexible modification of the input of the test system, and the precise and rapid optimization of system parameters and control strategies, so as to facilitate the verification of the performance indicators and reliability of the actual system.

[0005] Usually, a hardware-in-the-loop test platform for the control system of a wind turbine generator set is established using a computing device based on a Windows system and installed with GH Bladed software. For simulations under Windows systems, since Windows systems are non-real-time operating systems, there are often problems with unresponsive applications, or hardware resources are occupied by other tasks, and tasks cannot be executed immediately, which leads to delays in some signal acquisition or control signals, making it difficult to achieve stable real-time closed-loop simulation. The simulation model of a wind turbine generator set established using Bladed software is difficult to consider the nonlinearity of blades of large wind turbine generator sets and the flexibility of the transmission system, and for direct-drive wind turbine generator sets, it is impossible to consider the influence of many factors such as generator flexibility, main bearing nonlinearity, and magnetic tension on the stability and load of the whole machine. Usually, the hardware-in-the-loop test module configured by Bladed software itself is used to call the Ethernet port of a computer with a Windows system to realize communication between the computing module and the communication PLC, but the hardware-in-the-loop test module configured by Bladed itself is a packaged module, and the channel scalability and flexibility are poor, which cannot meet the needs of multi-channel testing. In addition, for simulation models with increased degrees of freedom or modes, the solution process of Bladed software is prone to divergence and the solution accuracy is low. It can be seen that there are many shortcomings in hardware-in-the-loop testing using GH Bladed software based on Windows system. Summary of the invention

[0006] The purpose of the embodiments of the present disclosure is to provide a hardware-in-the-loop test platform, a variable pitch-in-the-loop test system and a test system for a wind turbine generator set, so as to overcome the deficiencies in the prior art and achieve at least one of the following technical effects: improve the accuracy of hardware-in-the-loop testing, improve the real-time performance of hardware-in-the-loop testing, and improve the scalability and flexibility of testing.

[0007] According to an embodiment of the present disclosure, a hardware-in-the-loop test platform for a wind turbine is provided, the hardware-in-the-loop test platform comprising: a real-time parallel multi-processor platform, configured to run a multi-threaded real-time operating system on the real-time parallel multi-processor platform to simulate a virtual model of the wind turbine in real time, and test the performance of a physical system of the wind turbine based on the virtual model; a communication module, connected between the real-time parallel multi-processor platform and the physical system, and the physical system and the real-time parallel multi-processor platform communicate with each other through the communication module.

[0008] Optionally, the real-time parallel multi-processor platform is an iHawk real-time parallel multi-processor platform, and / or the real-time operating system is a RedHawk real-time Linux operating system.

[0009] Optionally, a multi-body dynamics analysis software package Simpack is installed in the real-time operating system, and the multi-body dynamics analysis software package Simpack is configured to perform real-time simulation on the virtual model.

[0010] Optionally, the physical system includes: one or more of a variety of control systems and a variety of execution systems of the wind turbine generator set.

[0011] Optionally, the virtual model is a nonlinear model based on first-order and / or multi-order modes.

[0012] Optionally, the virtual model is a dynamic model of a wind turbine generator set, and includes one or more of a plurality of environmental models and a plurality of execution system models associated with the physical system.

[0013] Optionally, the multiple execution system models include a pitch execution system model, which includes a nonlinear model of a single blade based on first-order and / or multi-order modes, and the mode includes one or more of a flapping mode, a swing mode, and a torsional mode of the blade.

[0014] Optionally, the virtual model includes multiple virtual models, and the multiple virtual models are independently run on corresponding processors among multiple processors of the real-time parallel multi-processor platform.

[0015] Optionally, one of the multiple processors is isolated and protected to prevent the virtual model run by the one processor from being interfered by anything outside the one processor.

[0016] Optionally, the execution cycle of the virtual model is set to adjust the solution accuracy of the virtual model and converge the simulation result of the virtual model.

[0017] Optionally, the communication parameters corresponding to the virtual model have corresponding priorities and / or scheduling modes, so that the virtual model executes operations corresponding to the communication parameters in the order of priorities and / or scheduling modes.

[0018] Optionally, through the communication module, the physical system and the real-time parallel multi-processor platform communicate with each other based on one or more of the Ethernet control automation technology protocol, the user datagram protocol, and the process field bus protocol.

[0019] According to an embodiment of the present disclosure, a test system for a wind turbine generator set is provided, the test system comprising: a hardware-in-the-loop test platform as described above; and a physical system of the wind turbine generator set, configured to perform physical operations under the control of the hardware-in-the-loop test platform and to feed back parameters of the physical operations to the hardware-in-the-loop test platform.

[0020] According to an embodiment of the present disclosure, a pitch-in-the-loop test system for a wind turbine is provided, the pitch-in-the-loop test system comprising: a physical system of the wind turbine, including a pitch component of the wind turbine; a real-time parallel multi-processor platform, communicating with the physical system and configured to run a multi-threaded real-time operating system on the real-time parallel multi-processor platform to perform real-time simulation on a virtual model of the wind turbine, simulate the pitch condition of the wind turbine by performing real-time simulation on the virtual model, and generate control parameters and / or control instructions for testing the performance of the physical system according to the simulated pitch condition, wherein the physical system is configured to perform physical operations associated with pitch change in response to the control parameters and / or the control instructions, and feed back the parameters of the physical operations to the real-time parallel multi-processor platform.

[0021] Optionally, the real-time parallel multi-processor platform is an iHawk real-time parallel multi-processor platform, and / or the real-time operating system is a RedHawk real-time Linux operating system.

[0022] Optionally, a multi-body dynamics analysis software package Simpack is installed in the real-time operating system, and the multi-body dynamics analysis software package Simpack is configured to perform real-time simulation on the virtual model.

[0023] Optionally, the pitch assembly includes at least one of a pitch drive controller, a pitch load controller, a pitch drive actuator and a pitch load actuator.

[0024] Optionally, the pitch load controller communicates with the real-time parallel multi-processor platform and the pitch drive controller respectively, and / or the physical system also includes a main controller of the wind turbine generator set, and the main controller communicates with the real-time parallel multi-processor platform and the pitch drive controller respectively.

[0025] Optionally, the real-time parallel multi-processor platform is configured to determine the aerodynamic load and / or pitch load of the wind turbine under different wind conditions based on the simulated pitch operating conditions, and generate main control parameters and / or main control instructions for sending to the main controller based on the aerodynamic load and / or pitch load, and the main controller is configured to control the pitch drive controller in response to the main control parameters and / or main control instructions and receive drive feedback information from the pitch drive controller, wherein the drive feedback information includes at least one of status information, parameter requirements and request instructions of the pitch drive actuator.

[0026] Optionally, the real-time parallel multi-processor platform is configured to determine the aerodynamic load and / or pitch load of the wind turbine under different wind conditions based on the simulated pitch operating conditions, and generate load control parameters and / or load control instructions for sending to the pitch load controller based on the aerodynamic load and / or pitch load, and the pitch load controller is configured to control the pitch load actuator in response to the load control parameters and / or load control instructions and send load feedback information to the real-time parallel multi-processor platform, wherein the load feedback information includes at least one of status information, parameter requirements and request instructions of the pitch load actuator.

[0027] Optionally, the virtual model is a nonlinear model based on first-order and / or multi-order modes.

[0028] Optionally, the virtual model is a dynamic model of a wind turbine generator set, and includes one or more of a plurality of environmental models and a plurality of execution system models associated with the physical system.

[0029] Optionally, the multiple execution system models include a pitch execution system model, which includes a nonlinear model of a single blade based on first-order and / or multi-order modes, and the mode includes one or more of a flapping mode, a swing mode, and a torsional mode of the blade.

[0030] Optionally, the virtual model includes multiple virtual models, and the multiple virtual models are independently run on corresponding processors among multiple processors of the real-time parallel multi-processor platform.

[0031] Optionally, one of the multiple processors is isolated and protected to prevent the virtual model run by the one processor from being interfered by anything outside the one processor.

[0032] Optionally, the execution cycle of the virtual model is set to adjust the solution accuracy of the virtual model and converge the simulation result of the virtual model.

[0033] Optionally, the communication parameters corresponding to the virtual model have corresponding priorities and / or scheduling modes, so that the virtual model executes operations corresponding to the communication parameters in the order of priorities and / or scheduling modes.

[0034] The use of the hardware-in-the-loop test platform, pitch-in-the-loop test system and test system of the wind turbine generator set according to the embodiments of the present disclosure can at least significantly improve the accuracy of the hardware-in-the-loop test, improve the real-time performance of the hardware-in-the-loop test, and improve the scalability and flexibility of the test. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The above and other objects and features of the present disclosure will become more apparent from the following description in conjunction with the accompanying drawings.

[0036] Figure 1 is a block diagram of a test system for a wind turbine generator set according to an embodiment of the present disclosure;

[0037] Figure 2 is a block diagram of a real-time parallel multi-processor platform for a wind turbine generator system according to an embodiment of the present disclosure;

[0038] Figure 3 It is a block diagram of a pitch-in-the-loop test system for a wind turbine generator set according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0039] Wind turbines contain complex and diverse components (e.g., nacelles, generators, hydraulic systems, etc.), and the connection or communication methods between different components may also be different. Moreover, the testing or debugging of wind turbines involves a complex and changeable external environment. Therefore, there are many problems in the testing or debugging process of wind turbines.

[0040] The present invention proposes a novel hardware-in-the-loop test platform and test system and a variable pitch-in-the-loop test system for wind turbines, which can perform real-time hardware-in-the-loop simulation on the hardware system or physical system of the wind turbine, have high test accuracy and good scalability and flexibility.

[0041] Figure 1 is a block diagram of a test system 1000 for a wind turbine generator system according to an embodiment of the present disclosure.

[0042] The test system 1000 may include a software part and a hardware part, and utilizes the combination of software and hardware to perform an in-loop test on the performance of a wind turbine generator set. Figure 1 As shown, the test system 1000 may include: a hardware-in-the-loop test platform 1 and a physical system 2 of a wind turbine generator set, wherein the physical system 2 is configured to perform physical operations under the control of the hardware-in-the-loop test platform 1 and feed back parameters of the physical operations to the hardware-in-the-loop test platform 1.

[0043] The hardware-in-the-loop test platform 1 may include: a real-time parallel multi-processor platform 11 and a communication module 12. The real-time parallel multi-processor platform 11 is electrically connected to the communication module 12, or the real-time parallel multi-processor platform 11 may be integrated with the communication module 12. The real-time parallel multi-processor platform 11 is configured to run a multi-threaded real-time operating system on the real-time parallel multi-processor platform to perform real-time simulation of the virtual model of the wind turbine generator set. The hardware-in-the-loop test platform 1 can test the performance of the physical system 2 of the wind turbine generator set based on the virtual model.

[0044] The communication module 12 is connected between the real-time parallel multi-processor platform 11 and the physical system 2 , and the physical system 2 and the real-time parallel multi-processor platform 11 communicate with each other through the communication module 12 .

[0045] The hardware-in-the-loop test platform 1 is implemented based on multi-threading technology and can provide true symmetric multi-processing, load balancing, processor isolation protection support, etc., thereby maximizing the determinism and real-time performance of mission-critical solutions.

[0046] According to an embodiment, the real-time parallel multi-processor platform 11 is an iHawk real-time parallel multi-processor platform, and / or the multi-threaded real-time operating system running on the real-time parallel multi-processor platform 11 is a RedHawk real-time Linux operating system. A multi-body dynamics analysis software package Simpack is installed in the real-time operating system, and the multi-body dynamics analysis software package Simpack is configured to perform real-time simulation on the virtual model of the wind turbine generator set. An open-loop test can be performed on the communication between the multi-body dynamics analysis software package Simpack and the real-time parallel multi-processor platform 11 to ensure the normal operation of the multi-body dynamics analysis software package Simpack on the real-time parallel multi-processor platform 11, so that the real-time parallel multi-processor platform 11 can perform a closed-loop test on the physical system 2.

[0047] The hardware-in-the-loop test platform 1 is a refined hardware-in-the-loop test platform for wind turbines. It is based on the iHawk real-time parallel multi-processor platform and real-time Linux operating system developed by Concurrent. It uses the general multi-body dynamics analysis software package Simpack to establish a refined virtual model, establish a semi-physical real-time simulation connection with the physical system 2 of the wind turbine (for example, the main controller and programmable logic controller (PLC) of the wind turbine), perform closed-loop testing on the functions and performance of the physical system 2, and ensure the safety of on-site control of the wind turbine.

[0048] The virtual model established by using the multi-body dynamics analysis software package Simpack is closer to the actual wind turbine model. Compared with the existing virtual models (e.g., Bladed software model), the virtual model is more complex, the degree of freedom of the virtual model to be solved can be greatly increased, and the real-time Linux operating system on the iHawk real-time parallel multi-processor platform has more advantages in real-time applications compared with the traditional single-processor multi-core system. The real-time Linux operating system is based on a multi-processor and multi-core hardware platform, which allows different virtual models and communication ports (e.g., I / O interfaces) to monopolize different processors / cores, so that the virtual model is not subject to any external interference when running on the processor, for example, it is not subject to interference from high-priority processes or interrupts in the test system, thereby reducing the scheduling delay under full load operation (e.g., the scheduling delay is controlled within 5us), effectively improving the real-time performance of the test system, and providing a stable guarantee for real-time simulation and running of complex multi-model tasks.

[0049] The physical system 2 may include: one or more of the various control systems and various execution systems of the wind turbine. For example, the physical system 2 may include: one or more of the main controller, pitch controller, current controller, yaw controller, transmission controller, cabin controller, generator controller, and grid controller of the wind turbine. Optionally, the physical system 2 may include: one or more of the pitch execution system, current execution system, yaw execution system, transmission execution system, cabin execution system, generator execution system, and grid execution system of the wind turbine.

[0050] The virtual model of the wind turbine generator set is a dynamic model of the wind turbine generator set, and may include multiple environmental models and one or more of multiple execution system models associated with the physical system 2. For example, the virtual model may include: one or more of an environmental wind model, an aerodynamic model, a variable pitch execution system model, a variable flow execution system model, a yaw execution system model, a transmission execution system model, a nacelle execution system model, a tower system model, a generator execution system model, and a power grid execution system model.

[0051] For example, the aerodynamic model may include operating condition models including the rated wind speed and direction, turbulent wind speed and direction, and custom wind speed and direction of the wind turbine. The aerodynamic model can be used to simulate the normal operation of the wind turbine in rated wind, turbulent wind, or custom wind.

[0052] The virtual model of the wind turbine generator set can be a nonlinear model based on the first-order and / or multi-order modes. The simulation using the nonlinear model of the multi-order modes can significantly improve the accuracy of the hardware-in-the-loop test.

[0053] The execution cycle of the virtual model is set to adjust the solution accuracy of the virtual model and converge the simulation results of the virtual model. For example, the execution cycle of the virtual model can be set to solve the problem of differential equation solution accuracy kernel divergence.

[0054] The communication parameters corresponding to the virtual model have corresponding priorities and / or scheduling modes, so that the virtual model executes the operations corresponding to the communication parameters in the order of the priorities and / or scheduling modes. By setting the priorities and / or scheduling modes of the communication parameters, the processors / cores that execute critical tasks with high priorities or advanced scheduling modes can be isolated and protected to ensure that the processors / cores are not interfered with by other tasks or interrupts and run at full speed.

[0055] For example, during the real-time simulation process, the operator can manually set the priority and scheduling mode of a specific signal, and the operator can manually input the pitch angle value in the test system 1000, and can set the input pitch angle value to a high priority, so that the test system 1000 will give priority to testing according to the manually input pitch angle value. Conversely, if it is not desired that the external input parameters or other parameters within the system interfere with the execution of pitch angle related operations, the processor / core that performs pitch angle related operations can be isolated and protected, so as to ensure that the processor / core that performs pitch angle related operations is executed at full speed without being interfered by other inputs, other tasks or interrupts.

[0056] In an embodiment of the present disclosure, a variety of execution system models may include a pitch execution system model. The pitch execution system model may include a nonlinear model of a single blade based on first-order and / or multi-order modes, wherein the modes include one or more of the blade's flapping mode, swing mode, and torsion mode.

[0057] In the embodiments of the present disclosure, the degrees of freedom of the virtual model are almost unlimited. For example, the degrees of freedom of the virtual model of a single blade can be nine, the degrees of freedom of the virtual model of the tower can be eight, the degrees of freedom of the virtual model of the foundation (for example, the earth can be used as the foundation of the wind turbine) can be four, and the degrees of freedom of the virtual model of the generator rotor can be six. In this way, the degrees of freedom of the virtual model of the entire wind turbine can reach at least 45.

[0058] Moreover, the virtual model of a single blade can be a nonlinear model based on the first-order and / or multi-order modes, so multi-order modes can be considered to make the aerodynamic and structural coupling of the blade closer to the actual situation. Due to the high efficiency of the in-loop test of the real-time parallel multi-processor platform 11, even for complex multi-order modal nonlinear models, the model solution will not diverge, so high-precision simulation can be performed.

[0059] The first-order mode (e.g., first-order flapping, first-order swing, first-order torsion, etc.) and multi-order modes (e.g., second-order flapping, second-order swing, second-order torsion, etc.) of each blade are crucial to the solution result of the entire impeller system. If these modes of each blade are not fully considered in the real-time simulation test, the simulation results will not reflect the vibration state of the real blade, and the simulation results will be meaningless. However, according to the real-time parallel multi-processor platform 11 of the embodiment of the present disclosure, the first-order and / or multi-order blade modes of each blade can be considered in the real-time simulation of the virtual model, and there will be no solution divergence problem, and the simulation results are closer to the actual blade operation state.

[0060] In addition, the virtual model may include a transmission execution system model, so that the flexibility of the transmission system in the wind turbine generator set can be fully considered during the simulation process of the test system. For example, the transmission execution system model may include other models associated with the transmission execution system, such as a generator model, an electromagnetic force model, and a bearing model. Therefore, during the simulation process of the test system, the influence of the generator flexibility, the nonlinearity of the main bearing, and the magnetic pull on the stability and load of the whole machine can be fully considered for the wind turbine generator set (for example, a direct-drive wind turbine generator set).

[0061] In a real-time simulation environment, the real-time parallel multi-processor platform 11 simulates various operating states such as starting, power generation and fault triggering during the operation of the wind turbine generator set in real time. During the operation of multiple virtual models running on the real-time parallel multi-processor platform 11, the real-time parallel multi-processor platform 11 can generate control parameters and / or control instructions for the physical system 2 based on the operating states and simulation results of the multiple virtual models, and send the control parameters and / or control instructions to the physical system 2 in real time through the communication module 12. For example, corresponding control parameters and / or control instructions can be sent to each component in the physical system 2 at the same time in real time.

[0062] In one embodiment of the present disclosure, the multiple virtual models may include an environmental wind model, an aerodynamic model, a pitch execution system model, a cabin execution system model, a generator execution system model, a variable flow execution system model, and a transmission execution system model. The real-time parallel multi-processor platform 11 may implement the operation of multiple virtual models in parallel, and may generate control parameters and / or control instructions based on the operation status and simulation results of the multiple virtual models. The control parameters may include parameters associated with the operation status of the virtual model, such as wind speed, the pitch position of each blade of the wind turbine generator set, the rotation speed and execution torque of the generator, and the vibration acceleration of the cabin. The control instructions may include control instructions for the physical system 2, such as grid connection instructions and main controller startup instructions. Then, the real-time parallel multi-processor platform 11 may send the control parameters and / or control instructions to the main controller and / or other components in the physical system 2 in real time through the communication module 12. The main controller may perform corresponding physical operations according to the received control parameters and / or control instructions, for example, sending grid connection instructions to the grid connection controller. Then, the main controller may feedback the parameters of the physical operation to the real-time parallel multi-processor platform 11. In addition, each component in the physical system 2 can provide real-time feedback of corresponding parameters according to the physical operation performed. For example, the pitch controller in the physical system 2 can provide real-time feedback of pitch parameters to the parallel multi-processor platform 11 according to the pitch operation performed, such as the pitch position requirement of each blade, the generator torque requirement, etc. In this way, the test system 1 can implement closed-loop testing.

[0063] According to an embodiment, through the communication module 12, the physical system 2 and the real-time parallel multi-processor platform 11 communicate with each other based on one or more of the Ethernet control automation technology (EtherCat) protocol, the user datagram protocol (UDP), and the process field bus (profibus) protocol (for example, the distributed peripheral (DP) protocol).

[0064] In addition, the virtual model may include multiple virtual models, and the multiple virtual models are independently run on corresponding processors of the multiple processors of the real-time parallel multi-processor platform. One of the multiple processors is isolated and protected to prevent the virtual model run by the processor from interference outside the processor. On the hardware-in-the-loop test platform 1, the virtual model can be automatically or manually assigned online / offline to run on a specified processor / core.

[0065] Figure 2 1 is a block diagram of a real-time parallel multi-processor platform 11 for a wind turbine generator system according to an embodiment of the present disclosure. Figure 2As shown, the real-time parallel multi-processor platform 11 may include multiple processors, for example, a first processor 101, a second processor 102, and a third processor 103. The multiple processors shown here are only examples, but the present invention is not limited thereto, and the real-time parallel multi-processor platform 11 may include more or fewer processors.

[0066] exist Figure 2 In the illustrated embodiment, the first virtual model runs independently on the first processor 101, the second virtual model runs independently on the second processor 102, and the third virtual model runs independently on the third processor 103. The first processor 101 can be isolated and protected so that the first virtual model running on the first processor 101 is protected from interference from the outside of the first processor 101 and can run at full speed. The second processor 102 can be isolated and protected so that the second virtual model running on the second processor 102 is protected from interference from the outside of the second processor 102. The third processor 103 can be isolated and protected so that the third virtual model running on the third processor 103 is protected from interference from the outside of the third processor 103 and can run at full speed.

[0067] In addition, each processor may be a single-core or multi-core processor. A virtual model may be assigned to run on a designated core, and the core running the virtual model is isolated and protected to prevent the virtual model from being interfered with outside the designated core.

[0068] Figure 3 is a block diagram of a pitch-in-the-loop test system 3000 for a wind turbine generator system according to an embodiment of the present disclosure.

[0069] The pitch-in-the-loop test system 3000 may include: a physical system 2 of a wind turbine generator set and a real-time parallel multi-processor platform 11. The physical system 2 may include a pitch component 22 of the wind turbine generator set. The real-time parallel multi-processor platform 11 communicates with the physical system 2. For example, the real-time parallel multi-processor platform 11 communicates with various components in the physical system 2 through the communication module 12.

[0070] The real-time parallel multi-processor platform 11 is configured to run a multi-threaded real-time operating system on the real-time parallel multi-processor platform 11 to perform real-time simulation on the virtual model of the wind turbine generator set, simulate the pitch condition of the wind turbine generator set by performing real-time simulation on the virtual model, and generate control parameters and / or control instructions for testing the performance of the physical system 2 according to the simulated pitch condition.

[0071] The physical system 2 is configured to execute physical operations associated with pitch change in response to control parameters and / or control instructions from the real-time parallel multi-processor platform 11 , and feed back parameters of the physical operations to the real-time parallel multi-processor platform 11 .

[0072] exist Figure 3In the illustrated embodiment, the real-time parallel multi-processor platform 11 may be an iHawk real-time parallel multi-processor platform, and / or the real-time operating system may be a RedHawk real-time Linux operating system. A multi-body dynamics analysis software package Simpack is installed in the real-time operating system, and the multi-body dynamics analysis software package Simpack is configured to perform real-time simulation of the virtual model. An open-loop test may be performed on the communication between the multi-body dynamics analysis software package Simpack and the real-time parallel multi-processor platform 11 to ensure the normal operation of the multi-body dynamics analysis software package Simpack on the real-time parallel multi-processor platform 11, so that the real-time parallel multi-processor platform 11 can perform a closed-loop test on the physical system 2. For a description of the virtual model, please refer to the above description of Figure 1 and Figure 2 The description will not be repeated here.

[0073] The pitch assembly 22 may include at least one of a pitch drive controller 221, a pitch load controller 222, a pitch drive actuator 223 and a pitch load actuator 224 (which may include a pitch load end). The pitch drive controller 221 and the pitch load controller 222 control the operation of the pitch drive actuator 223 and the pitch load actuator 224, respectively. The pitch drive controller 221 and the pitch load controller 222 may communicate with each other. For example, the pitch rate may be transmitted between the pitch drive controller 221 and the pitch load controller 222. The torque of the pitch drive actuator 223 and the torque of the pitch load actuator 224 are balanced with each other so that the pitch motion is performed at a uniform speed. The pitch drive actuator 223 and the pitch load actuator 224 may both include a hydraulic station, a hydraulic cylinder and a valve group device.

[0074] In an embodiment of the present disclosure, the pitch load controller 222 communicates with the real-time parallel multi-processor platform 11 and the pitch drive controller 221. Optionally, the physical system 2 may further include a main controller 21 of the wind turbine generator set, and the main controller 21 communicates with the real-time parallel multi-processor platform 11 and the pitch drive controller 221.

[0075] The pitch-in-the-loop test system 3000 can test the matching between the whole machine control and the pitch operation of the wind turbine generator set, and can also test the response of the pitch component 22 under different wind loads and pitch command requirements.

[0076] The real-time parallel multi-processor platform 11 is configured to determine the aerodynamic load and / or pitch load of the wind turbine generator set under different wind conditions according to the simulated pitch working condition, and generate the main control parameters and / or main control instructions for sending to the main controller 21 according to the aerodynamic load and / or pitch load. For example, the main control parameters may include the ambient wind speed, the generator speed, and information about the operating status of the wind turbine generator set. The main controller 21 may send the main control feedback information, such as torque demand, grid connection instruction, etc., to the real-time parallel multi-processor platform 11 in real time in response to the received main control parameters and / or main control instructions.

[0077] An example of information communicated between the real-time parallel multi-processor platform 11 and the main controller 21 may be referred to in Table 1 below, but the present invention is not limited thereto.

[0078] Table 1

[0079]

[0080]

[0081] The main controller 21 may control the pitch drive controller 221 in response to the main control parameters and / or the main control instructions. For example, the main controller 21 may send pitch drive control instructions or requirements to the pitch drive controller 221 in real time, such as pitch drive position / rate requirements, pitch drive instructions, pitch control words and other information. The pitch drive controller 221 may control the operation of the pitch drive actuator 223 according to the pitch drive control instructions. For example, the pitch drive controller 221 may send a proportional valve voltage control signal, a hydraulic pump control signal, etc. to the pitch drive actuator 223. The pitch drive actuator 223 may feedback pitch drive position information, hydraulic pump status information, accumulator pressure information, etc. to the pitch drive controller 221.

[0082] The main controller 21 may receive drive feedback information from the pitch drive controller 221 , wherein the drive feedback information may include state information of the pitch drive actuator 223 (eg, pitch position feedback information, pitch drive state machine information), parameter requirements, and at least one of request instructions.

[0083] An example of information communicated between the main controller 21 and the pitch drive controller 221 may refer to the following Table 2, but the present invention is not limited thereto.

[0084] Table 2

[0085]

[0086] The real-time parallel multi-processor platform 11 may be configured to determine the aerodynamic load and / or pitch load of the wind turbine generator set under different wind conditions according to the simulated pitch working condition, and generate load control parameters and / or load control instructions for sending to the pitch load controller 222 according to the aerodynamic load and / or pitch load. For example, the load control parameters may include parameters such as aerodynamic torque, blade root bearing friction torque, load control word, etc., and the load control instructions may include torque demand instructions, loading instructions, etc.

[0087] The pitch load controller 222 is configured to control the pitch load actuator 224 in response to load control parameters and / or load control instructions and send load feedback information to the real-time parallel multi-processor platform 11, wherein the load feedback information includes state information of the pitch load actuator 224 (e.g., torque feedback information (e.g., actual execution torque), pitch load state (load state machine information), etc.), parameter requirements and at least one of request instructions. The pitch load controller 222 can control the operation of the pitch load drive actuator 224 according to the pitch drive control instruction. For example, the pitch load controller 222 can send a proportional valve voltage control signal, a hydraulic pump control signal, etc. to the pitch load drive actuator 224. The pitch load controller 222 can feed back torque feedback information, hydraulic pump state information, accumulator pressure information, etc. to the pitch load drive actuator 224.

[0088] An example of information communicated between the real-time parallel multi-processor platform 11 and the pitch load controller 222 may be referred to in Table 3 below, but the present invention is not limited thereto.

[0089] Table 3

[0090]

[0091] In an embodiment, the communication between the real-time parallel multi-processor platform 11 and the main controller 21 can be based on the Ethernet control automation technology (EtherCat) protocol, the communication between the real-time parallel multi-processor platform 11 and the pitch load controller 222 can be based on the user datagram protocol (UDP), the communication between the main controller 21 and the pitch drive controller 221 can be based on the distributed peripheral (DP) protocol, and the communication between the pitch drive controller 221 and the pitch load controller 222 can be based on the process field bus profibus protocol.

[0092] The above has been referred to Figures 1 to 3 The hardware-in-the-loop test platform and test system for wind turbine generators and the pitch-in-the-loop test system according to the embodiments of the present disclosure are described. However, it should be understood that: Figures 1 to 3The various components or modules shown may be respectively configured as software, hardware, firmware or any combination of the above items to perform specific functions, and are not limited to including the components or modules shown. Instead, some components or modules may be added or deleted as needed, and the above components or modules may be combined.

[0093] By using the hardware-in-the-loop test platform and test system and the pitch-in-the-loop test system for wind turbines according to the embodiments of the present disclosure, at least the following technical effects can be achieved: real-time and microsecond-level high-precision synchronous clock; synchronous scheduling of simulation steps and data transmission can be achieved; the interactive interface between the virtual model and the physical system in the real-time parallel multi-processor platform uses a memory-level real-time database to interact with the model data, which significantly improves the real-time performance; a refined virtual model of the wind turbine is established based on the multi-body dynamics analysis software package Simpack, which can fully consider the flexibility of each mechanical component, the flexibility of the generator, the nonlinearity of the main bearing, and the influence of magnetic tension on the stability and load of the whole machine; it is conducive to more refined simulation of the actual structural state and operating state of the wind turbine; the communication channel has good scalability and flexibility, and can meet the needs of multi-channel testing.

[0094] The control logic or function performed by each component or controller in the control system can be represented by a flow chart or similar diagram in one or more figures. These figures provide representative control strategies and / or logic, which can be implemented using one or more processing strategies (such as event-driven, interrupt-driven, multi-tasking, multi-threading, etc.). Therefore, the various steps or functions shown can be executed in the order shown, executed in parallel, or omitted in some cases. Although not always clearly shown, it will be appreciated by those of ordinary skill in the art that one or more steps or functions shown can be repeatedly executed according to the specific processing strategy used.

[0095] While the present disclosure has been shown and described with reference to preferred embodiments, it will be understood by those skilled in the art that various modifications and variations may be made to these embodiments without departing from the spirit and scope of the disclosure as defined by the appended claims.

Claims

1. A hardware-in-the-loop test platform for a wind turbine generator set, characterized in that: The hardware-in-the-loop test platform includes: A real-time parallel multi-processor platform is configured to run a multi-threaded real-time operating system on the real-time parallel multi-processor platform to perform real-time simulation on a virtual model of the wind turbine generator set and test the performance of a physical system of the wind turbine generator set based on the virtual model; a communication module connected between the real-time parallel multi-processor platform and the physical system, wherein the physical system and the real-time parallel multi-processor platform communicate with each other through the communication module, The physical system includes a main controller of the wind turbine generator set, a pitch drive controller, a pitch load controller, a pitch drive actuator and a pitch load actuator. The main controller communicates with the real-time parallel multi-processor platform and the pitch drive controller respectively. The main controller responds to the main control parameters and / or main control instructions from the real-time parallel multi-processor platform, sends the pitch drive control instructions to the pitch drive controller, and sends control feedback information to the real-time parallel multi-processor platform in real time. The pitch drive controller controls the operation of the pitch drive actuator according to the pitch drive control instruction from the main controller, and feeds back drive feedback information to the main controller. The pitch load controller controls the pitch load actuator in response to a load control parameter and / or a load control instruction from the real-time parallel multi-processor platform, and sends load feedback information to the real-time parallel multi-processor platform.

2. The hardware-in-the-loop test platform according to claim 1, characterized in that: The real-time parallel multi-processor platform is an iHawk real-time parallel multi-processor platform, and / or The real-time operating system is the RedHawk real-time Linux operating system.

3. The hardware-in-the-loop test platform according to claim 1 or 2, characterized in that: A multi-body dynamics analysis software package Simpack is installed in the real-time operating system, and the multi-body dynamics analysis software package Simpack is configured to perform real-time simulation on the virtual model.

4. The hardware-in-the-loop test platform according to claim 1, characterized in that: The physical system includes: one or more of various control systems and various execution systems of the wind turbine generator set.

5. The hardware-in-the-loop test platform according to claim 1, characterized in that: The virtual model is a nonlinear model based on first-order and / or multi-order modes.

6. The hardware-in-the-loop test platform according to claim 1, characterized in that: The virtual model is a dynamic model of the wind turbine generator set and includes one or more of a plurality of environmental models and a plurality of execution system models associated with the physical system.

7. The hardware-in-the-loop test platform according to claim 6, characterized in that: The multiple actuator system models include a pitch actuator system model, which includes a nonlinear model of a single blade based on first-order and / or multi-order modes, wherein the modes include one or more of a flapping mode, a swing mode, and a torsional mode of the blade.

8. The hardware-in-the-loop test platform according to claim 1, characterized in that: The virtual model includes a plurality of virtual models, and the plurality of virtual models are independently run on corresponding processors among a plurality of processors of a real-time parallel multi-processor platform.

9. The hardware-in-the-loop test platform according to claim 8, characterized in that: One of the plurality of processors is isolated and protected so that a virtual model executed by the one processor is not interfered by an external part of the one processor.

10. The hardware-in-the-loop test platform according to claim 1, characterized in that: The execution cycle of the virtual model is set to adjust the solution accuracy of the virtual model and converge the simulation result of the virtual model.

11. The hardware-in-the-loop test platform according to claim 1, characterized in that: The communication parameters corresponding to the virtual model have corresponding priorities and / or scheduling modes, so that the virtual model executes operations corresponding to the communication parameters in the order of priorities and / or scheduling modes.

12. The hardware-in-the-loop test platform according to claim 1, characterized in that: Through the communication module, the physical system and the real-time parallel multi-processor platform communicate with each other based on one or more of the Ethernet control automation technology protocol, the user datagram protocol, and the process field bus protocol.

13. A test system for a wind turbine generator set, characterized in that: The test system comprises: The hardware-in-the-loop test platform according to any one of claims 1 to 12; and The physical system of the wind turbine generator set is configured to perform physical operations under the control of the hardware-in-the-loop test platform and feed back parameters of the physical operations to the hardware-in-the-loop test platform.

14. A variable pitch in-the-loop test system for a wind turbine generator set, characterized in that: The pitch-in-the-loop test system comprises: The physical system of the wind turbine generator set includes a main controller and a pitch component of the wind turbine generator set, wherein the pitch component includes a pitch drive controller, a pitch load controller, a pitch drive actuator and a pitch load actuator; A real-time parallel multi-processor platform communicates with the physical system and is configured to run a multi-threaded real-time operating system on the real-time parallel multi-processor platform to perform real-time simulation on a virtual model of the wind turbine generator set, simulate a pitch change condition of the wind turbine generator set by performing real-time simulation on the virtual model, and generate control parameters and / or control instructions for testing the performance of the physical system according to the simulated pitch change condition, The physical system is configured to perform a physical operation associated with pitch change in response to the control parameter and / or the control instruction, and feed back the parameter of the physical operation to the real-time parallel multi-processor platform. The main controller communicates with the real-time parallel multi-processor platform and the pitch drive controller respectively. The main controller responds to the main control parameters and / or main control instructions from the real-time parallel multi-processor platform, sends the pitch drive control instructions to the pitch drive controller, and sends control feedback information to the real-time parallel multi-processor platform in real time. The pitch drive controller controls the operation of the pitch drive actuator according to the pitch drive control instruction from the main controller, and feeds back drive feedback information to the main controller. The pitch load controller controls the pitch load actuator in response to a load control parameter and / or a load control instruction from the real-time parallel multi-processor platform, and sends load feedback information to the real-time parallel multi-processor platform.

15. The pitch-in-the-loop test system according to claim 14, characterized in that: The real-time parallel multi-processor platform is an iHawk real-time parallel multi-processor platform, and / or The real-time operating system is the RedHawk real-time Linux operating system.

16. The pitch-in-the-loop test system according to claim 14 or 15, characterized in that: A multi-body dynamics analysis software package Simpack is installed in the real-time operating system, and the multi-body dynamics analysis software package Simpack is configured to perform real-time simulation on the virtual model.

17. The pitch-in-the-loop test system according to claim 14, characterized in that: The pitch load controller communicates with the real-time parallel multi-processor platform and the pitch drive controller respectively.

18. The pitch-in-the-loop test system according to claim 17, characterized in that: The real-time parallel multi-processor platform is configured to determine the aerodynamic load and / or pitch load of the wind turbine generator set under different wind conditions according to the simulated pitch working condition, and generate the main control parameters and / or main control instructions according to the aerodynamic load and / or pitch load. The drive feedback information includes at least one of status information, parameter requirements and request instructions of the variable pitch drive actuator.

19. The pitch-in-the-loop test system according to claim 17, characterized in that: The real-time parallel multi-processor platform is configured to determine the aerodynamic load and / or pitch load of the wind turbine generator set under different wind conditions according to the simulated pitch working condition, and generate the load control parameters and / or load control instructions for sending to the load control parameters and / or load control instructions according to the aerodynamic load and / or pitch load. The load feedback information includes at least one of status information, parameter requirements and request instructions of the pitch load actuator.

20. The pitch-in-the-loop test system according to claim 14, characterized in that: The virtual model is a nonlinear model based on first-order and / or multi-order modes.

21. The pitch-in-the-loop test system according to claim 14, characterized in that: The virtual model is a dynamic model of the wind turbine generator set and includes one or more of a plurality of environmental models and a plurality of execution system models associated with the physical system.

22. The pitch-in-the-loop test system according to claim 21, characterized in that: The multiple actuator system models include a pitch actuator system model, which includes a nonlinear model of a single blade based on first-order and / or multi-order modes, wherein the modes include one or more of a flapping mode, a swing mode, and a torsional mode of the blade.

23. The pitch-in-the-loop test system according to claim 14, characterized in that: The virtual model includes a plurality of virtual models, and the plurality of virtual models are independently run on corresponding processors among a plurality of processors of a real-time parallel multi-processor platform.

24. The pitch-in-the-loop test system according to claim 23, characterized in that: One of the plurality of processors is isolated and protected so that a virtual model executed by the one processor is not interfered by an external part of the one processor.

25. The pitch-in-the-loop test system according to claim 14, characterized in that: The execution cycle of the virtual model is set to adjust the solution accuracy of the virtual model and converge the simulation result of the virtual model.

26. The pitch-in-the-loop test system according to claim 14, characterized in that: The communication parameters corresponding to the virtual model have corresponding priorities and / or scheduling modes, so that the virtual model executes operations corresponding to the communication parameters in the order of priorities and / or scheduling modes.

Citation Information

Patent Citations

  • Parallel computation management-based autonomous navigation simulation and scheduling management system

    CN101719078A

  • Wind power controller grid-connected testing system based on real-time simulation

    CN106054854A

  • Method and device for simulation of subsystem dynamic features of wind turbine

    CN108256704A