A method for the structure and construction management of slope engineering in alpine canyon areas based on BIM

By adopting BIM technology in the slope project of the alpine canyon area, combined with the framework mechanism, protective net and irrigation system, the problem of insufficient slope design is solved, the safety and stability of the slope and water resource utilization are achieved, and the risk of safety accidents is reduced.

CN114658009BActive Publication Date: 2024-11-08CHINA RAILWAY CHENGDU PLANNING & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210227010.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-08
Publication Date
2024-11-08
Estimated Expiration
2042-03-08

AI Technical Summary

Technical Problem

In slope projects in alpine canyon areas, the existing technology leads to poor slope design, prone to stone drops or landslides, affecting vehicle passage and possibly causing safety accidents.

Method used

Adopt BIM-based slope engineering structure and construction management methods in the alpine canyon area, including slope main body, frame mechanism, protective mechanism and installation components, divide the slope main body through the frame mechanism, set up protective nets and irrigation systems, collect and store rainwater , ensure water supply and prevent stones from rolling off by installing components.

Benefits of technology

It improves the effect of slope management, prevents stones from rolling down and landslides, reduces the probability of safety accidents, and ensures safety of vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114658009B_ABST
    Figure CN114658009B_ABST
Patent Text Reader

Abstract

The present invention discloses a high mountain canyon area slope engineering structure based on BIM, including: a slope main body, a frame mechanism, a protective mechanism and an additional assembly; a groove is excavated on the slope main body, a collection frame is arranged in the slope main body, and a connecting pipe is connected to the collection frame; the frame mechanism is arranged in the groove, the frame mechanism includes a main frame, a support frame is installed on the main frame, and a plurality of partition plates are arranged on the main frame and the support frame; the protective mechanism is arranged on the main frame, the protective mechanism includes a left support column and a right support column, and an additional assembly is arranged between the left support column and the right support column, and the additional assembly is used to block stones and prevent stones from rolling down. The present invention improves the management effect of the slope through the arrangement of the corresponding mechanism, so that the stones will not roll down, thereby not affecting the passage of vehicles, and there will be no landslide, thereby reducing the probability of safety accidents and avoiding casualties.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of slope engineering, and in particular relates to a BIM-based slope engineering structure and construction management method in a high mountain canyon area. Background Art

[0002] BIM building information model is a technical level promoted by the International Union of Architects. As a complete information carrier of a construction project, BIM is an innovative method of building design, construction and management. Its main feature is that it can continuously and instantly provide high-quality, consistent and reliable project design scale, process and cost information. BIM is often used in some slope projects in high mountain canyon areas to improve the management effect of the slope. However, the slope engineering design in the existing technology is poor, so that the slope still has the phenomenon of falling stones or landslides, which affects the passage of vehicles and even causes serious safety accidents, leading to casualties.

[0003] Therefore, in response to the above technical problems, it is necessary to provide a BIM-based method for slope engineering structure and construction management in high mountain canyon areas. Summary of the invention

[0004] The purpose of the present invention is to provide a BIM-based high mountain canyon slope engineering structure and construction management method to solve the problem of poor existing slope management effect.

[0005] In order to achieve the above purpose, the technical solution provided by an embodiment of the present invention is as follows:

[0006] A BIM-based high mountain canyon slope engineering structure, including: a slope body, a frame mechanism, a protection mechanism and additional components;

[0007] A groove is chiseled on the main body of the slope;

[0008] The frame mechanism is arranged in the groove, and the frame mechanism comprises a main frame body, a supporting frame is installed on the main frame body, and a plurality of partition vertical plates are arranged on the main frame body and the supporting frame;

[0009] The protective mechanism is arranged on the main frame, and the protective mechanism comprises a left supporting column and a right supporting column. An additional component is arranged between the left supporting column and the right supporting column, and the additional component is used to block stones and prevent the stones from rolling down.

[0010] Furthermore, a collection frame is provided in the main body of the slope to collect excess water flow, thereby facilitating storage and facilitating resource utilization. A connecting pipe is connected to the collection frame to connect the collection frame and the storage tank, thereby facilitating water flow;

[0011] A filter is provided in the connecting pipe for filtering out impurities so that weeds or stones do not enter the storage tank, thereby preventing the delivery pipe from being blocked.

[0012] Furthermore, a storage groove is excavated in the slope body for storing water flow, so that when the slope body is dry, it can provide water for convenient irrigation of the slope body, and the end of the connecting pipe away from the collecting frame is inserted into the storage groove.

[0013] Furthermore, a water pump is installed on the slope body to pump out the water in the storage tank, and a delivery pipe and a water pumping pipe are connected to the water pump, both of which are used to deliver water;

[0014] The water extraction pipe is inserted into the storage tank to facilitate extraction of the stored water in the storage tank, and the delivery pipe is connected to the main frame so that the extracted water flow can be delivered into the main frame.

[0015] Furthermore, a plurality of irrigation pipes are installed on the main frame and the supporting frame for guiding the water flow into the interior of the slope body, thereby improving the irrigation effect and reducing the probability of landslide of the slope body. A plurality of down-drain pipes are connected between the main frame and the collecting frame for guiding excess water flow into the collecting frame for easy collection.

[0016] Furthermore, the additional component includes a protective net for preventing stones from sliding and ensuring the safety of passing vehicles. A pair of supporting bent rods are installed on one side of the protective net for engaging in the lower fixing sleeve and the upper fixing sleeve to achieve the installation of the protective net. The pair of supporting bent rods are arranged in opposite directions.

[0017] Furthermore, a fixing block is provided on the side of the protective net away from the supporting bent rod, which is used to support and fix the lower fixing sleeve to prevent the lower fixing sleeve from shaking or falling off. The fixing block is connected to a lower fixing sleeve matching the supporting bent rod, which is used to clamp one of the supporting bent rods, thereby achieving the supporting and fixing function, and then fixing the protective net.

[0018] Furthermore, a slide groove is excavated on the protective net to provide space for the lifting and moving of the lifting support slider, and a lifting support slider is arranged in the slide groove to support and fix the upper fixing sleeve to prevent the upper fixing sleeve from falling off;

[0019] One end of the lifting support slider is connected to an upper fixing sleeve matching the supporting curved rod, which is used to clamp the other supporting curved rod, thereby cooperating with the lower fixing sleeve to fix the pair of supporting curved rods, thereby achieving the function of fixing the protective net;

[0020] A pull ring is installed on the upper fixing sleeve, which is used to pull the upper fixing sleeve to move, making it convenient for workers to operate.

[0021] Furthermore, a fixing rod is inserted into the lifting support slider, which serves to limit the lifting support slider so that the lifting support slider will not tilt. The fixing rod is fixed in the slide groove, and a compression spring is sleeved on the fixing rod to compress the lifting support slider, thereby preventing the upper fixing sleeve from shaking, improving the fixing effect, and increasing the stability of the device.

[0022] A construction management method for slope engineering structure in alpine canyon area based on BIM, comprising the following steps:

[0023] S1. When the frame mechanism is used, the main body of the slope is divided into multiple blocks through the support frame and the partition plate, thereby reducing the probability of soil landslides, and the main frame can also prevent stones from sliding, thereby ensuring the safety of vehicles passing by;

[0024] S2. When it rains outside, rainwater will flow down along the main frame, and then flow into the soil through the irrigation pipe, thereby increasing the moisture inside the soil, and the excess rainwater will flow into the collection frame through the lower leakage pipe, and then be filtered by the filter element and discharged into the storage tank for storage;

[0025] S3. When the outside is dry, the staff can start the water pump to pump out the stored water in the storage tank through the pumping pipe, then transport it to the main frame through the delivery pipe, and finally transport it to the soil through the irrigation pipe;

[0026] S4. And the staff can disassemble and install the additional components at will, which is convenient for cleaning. When the additional components need to be installed;

[0027] S5, the staff pulls the pull ring, so that the pull ring drives the upper fixed sleeve to rise, so that the lifting support slider moves upward, thereby increasing the distance between the lower fixed sleeve and the upper fixed sleeve;

[0028] S6. Then insert the supporting bent rod at the lower end of the protective net into the lower fixing sleeve first, and then loosen the pull ring so that the upper fixing sleeve will also clamp the supporting bent rod at the upper end, thereby achieving the function of fixing the protective net.

[0029] Compared with the prior art, the present invention has the following advantages:

[0030] The present invention improves the management effect of the slope by setting up corresponding mechanisms, so that stones will not roll down, thus will not affect the passage of vehicles, and will not cause landslides, thereby reducing the probability of safety accidents and avoiding casualties. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 A three-dimensional diagram of a slope engineering structure in a high mountain canyon area based on BIM in one embodiment of the present invention;

[0033] Figure 2 A cross-sectional view of a slope engineering structure in a high mountain canyon area based on BIM in one embodiment of the present invention;

[0034] Figure 3 for Figure 2 Schematic diagram of the structure at A in the middle;

[0035] Figure 4 for Figure 2 Schematic diagram of the structure at B in the middle;

[0036] Figure 5 It is a structural schematic diagram of a frame mechanism in one embodiment of the present invention;

[0037] Figure 6 for Figure 5 Schematic diagram of the structure at point C in the middle.

[0038] In the figure: 1. Slope body, 101. Collection frame, 102. Connecting pipe, 103. Filter, 104. Storage tank, 105. Water pump, 106. Delivery pipe, 2. Frame mechanism, 201. Main frame, 202. Support frame, 203. Partition plate, 204. Irrigation pipe, 205. Lower leakage pipe, 3. Protection mechanism, 301. Left support column, 302. Right support column, 303. Additional assembly, 304. Protection net, 305. Support bent rod, 306. Fixed block, 307. Lower fixed sleeve, 308. Lifting support slider, 309. Upper fixed sleeve, 310. Pull ring, 311. Fixed rod, 312. Compression spring. DETAILED DESCRIPTION

[0039] The present invention will be described in detail below in conjunction with the various embodiments shown in the accompanying drawings. However, these embodiments do not limit the present invention, and any structural, methodological or functional changes made by a person skilled in the art based on these embodiments are all within the scope of protection of the present invention.

[0040] The present invention discloses a BIM-based high mountain canyon slope engineering structure, referring to Figure 1-Figure 6 As shown, it includes: a slope body 1, a frame mechanism 2, a protection mechanism 3 and an additional component 303.

[0041] refer to Figure 1-Figure 2 As shown, grooves are dug on the slope body 1 to facilitate the installation of the main frame 201 and the support frame 202, so that the surface of the slope body 1 can be divided into multiple blocks to reduce the probability of landslides. A collection frame 101 is provided in the slope body 1 to collect excess water flow, thereby facilitating storage and facilitating resource utilization.

[0042] refer to Figure 1-Figure 2 As shown, the collecting frame 101 is connected with a connecting pipe 102 for connecting the collecting frame 101 and the storage tank 104 to facilitate the flow of water. A filter 103 is provided in the connecting pipe 102 for filtering out impurities so that weeds or stones will not enter the storage tank 104, thereby preventing the delivery pipe 106 from being blocked.

[0043] Preferably, the connecting pipe 102 is fixed by bolts, which is convenient for disassembly and installation, thereby facilitating the cleaning of the filter element 103 and reducing the probability of clogging of the device.

[0044] refer to Figure 2 As shown, a storage groove 104 is excavated in the slope body 1 for storing water flow, so that when the slope body 1 is dry, it can provide a water source to facilitate irrigation of the slope body 1, and the end of the connecting pipe 102 away from the collecting frame 101 is inserted into the storage groove 104.

[0045] refer to Figure 1-Figure 2 As shown, a water pump 105 is installed on the slope body 1 for pumping out the water in the storage tank 104 , and a delivery pipe 106 and a water pumping pipe are connected to the water pump 105 , both for conveying water.

[0046] The pumping pipe is inserted into the storage tank 104 to facilitate pumping out the stored water in the storage tank 104 , and the delivery pipe 106 is connected to the main frame 201 so that the pumped water can be transported into the main frame 201 .

[0047] refer to Figure 1-Figure 6 As shown, the frame mechanism 2 is arranged in the groove, and the frame mechanism 2 includes a main frame body 201, and a supporting frame 202 is installed on the main frame body 201, which is used to divide the surface of the slope body 1 into multiple blocks, thereby reducing the probability of landslide.

[0048] A plurality of partitioning plates 203 are provided on the main frame 201 and the supporting frame 202 to separate the soil in the slope body 1 and reduce the probability of falling off.

[0049] Specifically, a plurality of irrigation pipes 204 are installed on the main frame 201 and the support frame 202 for guiding the water flow into the interior of the slope body 1, thereby improving the irrigation effect and reducing the probability of landslides in the slope body 1. A plurality of down-drain pipes 205 are connected between the main frame 201 and the collection frame 101 for guiding excess water flow into the collection frame 101 for easy collection.

[0050] refer to Figure 1-Figure 2 As shown, the protection mechanism 3 is arranged on the main frame 201, and the protection mechanism 3 includes a left supporting column 301 and a right supporting column 302, which are used to fix the additional component 303, so as to play a protective role to prevent stones from rolling down, thereby ensuring the safety of passing vehicles. An additional component 303 is provided between the left supporting column 301 and the right supporting column 302, and the additional component 303 is used to block stones and prevent them from rolling down.

[0051] Specifically, a slide groove is also excavated on the side of the left supporting column 301 close to the protective net 304, and is also provided with a lifting support slider 308, an upper fixing sleeve 309, a pull ring 310, a fixing rod 311 and a compression spring 312. A pair of supporting bent rods 305 are also provided on the side of the right supporting column 302 close to the protective net 304, which are used to facilitate the installation of the protective net 304 and facilitate disassembly, so that the protective net 304 can be installed and fixed in sequence.

[0052] refer to Figure 1-Figure 4 As shown, the additional component 303 includes a protective net 304, which is used to prevent stones from sliding and ensure the safety of passing vehicles. A pair of supporting bent rods 305 are installed on one side of the protective net 304, which are used to engage in the lower fixing sleeve 307 and the upper fixing sleeve 309, so as to realize the installation of the protective net 304. The pair of supporting bent rods 305 are set in opposite directions.

[0053] refer to Figure 4 As shown, a fixing block 306 is provided on the side of the protective net 304 away from the supporting bent rod 305, which is used to support and fix the lower fixing sleeve 307 to prevent the lower fixing sleeve 307 from shaking or falling off. The fixing block 306 is connected to a lower fixing sleeve 307 matching the supporting bent rod 305, which is used to clamp one of the supporting bent rods 305, thereby achieving the function of supporting and fixing, and then fixing the protective net 304.

[0054] refer to Figure 1-Figure 3 As shown, a slide groove is opened on the protective net 304 to provide space for the lifting and moving of the lifting support slider 308. The lifting support slider 308 is arranged in the slide groove to support and fix the upper fixing sleeve 309 to prevent the upper fixing sleeve 309 from falling off.

[0055] refer to Figure 1-Figure 3As shown, one end of the lifting support slider 308 is connected to an upper fixing sleeve 309 matching the supporting bent rod 305, which is used to clamp another supporting bent rod 305, thereby cooperating with the lower fixing sleeve 307 to fix a pair of supporting bent rods 305, thereby achieving the function of fixing the protective net 304.

[0056] A pull ring 310 is installed on the upper fixing sleeve 309 for pulling the upper fixing sleeve 309 to move, so as to facilitate the operation of the staff.

[0057] refer to Figure 1-Figure 3 As shown, a fixing rod 311 is inserted into the lifting support slider 308 to limit the lifting support slider 308 so that the lifting support slider 308 will not tilt. The fixing rod 311 is fixed in the slide groove, and a clamping spring 312 is sleeved on the fixing rod 311 to clamp the lifting support slider 308, thereby preventing the upper fixing sleeve 309 from shaking, improving the fixing effect, and increasing the stability of the device.

[0058] A construction management method for slope engineering structure in alpine canyon area based on BIM, comprising the following steps:

[0059] S1. When the frame mechanism 2 is in use, the main body 1 of the slope is divided into multiple blocks by the support frame 202 and the partition plate 203, thereby reducing the probability of soil landslides, and the main frame 201 can also play a role in preventing stones from sliding down, thereby ensuring the safety of vehicles passing by;

[0060] S2. When it rains outside, rainwater will flow downward along the main frame 201, and then flow into the soil through the irrigation pipe 204, thereby increasing the moisture content of the soil. Excess rainwater will flow into the collection frame 101 through the lower drain pipe 205, and then be filtered by the filter element 103 and discharged into the storage tank 104 for storage;

[0061] S3. When the outside is dry, the staff can start the water pump 105 to pump out the stored water in the storage tank 104 through the pumping pipe, and then transport it to the main frame 201 through the delivery pipe 106, and finally transport it to the soil through the irrigation pipe 204;

[0062] S4, and the staff can disassemble and install the additional component 303 at will, which is convenient for cleaning. When the additional component 303 needs to be installed;

[0063] S5, the staff pulls the pull ring 310, so that the pull ring 310 drives the upper fixing sleeve 309 to rise, so that the lifting support slider 308 moves upward, and then the distance between the lower fixing sleeve 307 and the upper fixing sleeve 309 increases;

[0064] S6. Then, the support bent rod 305 at the lower end of the protective net 304 is first inserted into the lower fixing sleeve 307, and then the pull ring 310 is loosened, so that the upper fixing sleeve 309 also clamps the support bent rod 305 at the upper end, thereby achieving the function of fixing the protective net 304.

[0065] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0066] In addition, it should be understood that although the present specification is described according to embodiments, not every embodiment contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation methods that those skilled in the art can understand.

Claims

1. A BIM-based slope engineering structure in a high mountain canyon area, characterized in that: include: A slope body (1), wherein a groove is bored on the slope body (1); a collection frame (101) is provided inside the slope body (1), a connecting pipe (102) is connected to the collection frame (101), and a filter element (103) is provided inside the connecting pipe (102); a storage groove (104) is bored inside the slope body (1), and one end of the connecting pipe (102) away from the collection frame (101) is inserted into the storage groove (104); A frame mechanism (2) is arranged in the groove, the frame mechanism (2) comprising a main frame (201), a support frame (202) is installed on the main frame (201), and a plurality of partition vertical plates (203) are provided on both the main frame (201) and the support frame (202); a plurality of irrigation pipes (204) are installed on both the main frame (201) and the support frame (202), and a plurality of lower leakage pipes (205) are connected between the main frame (201) and the collection frame (101); A protection mechanism (3) is arranged on the main frame (201), the protection mechanism (3) comprises a left support column (301) and a right support column (302), an additional component (303) is arranged between the left support column (301) and the right support column (302), the additional component (303) is used to block stones and prevent the stones from rolling down; the additional component (303) comprises a protection net (304), a pair of support curved rods (305) are installed on one side of the protection net (304), and the pair of support curved rods (305) are arranged on the side of the protection net (304). The protective net (304) is arranged in opposite directions; a fixing block (306) is provided on the side away from the supporting bent rod (305), and a lower fixing sleeve (307) matching the supporting bent rod (305) is connected to the fixing block (306); a sliding groove is excavated on the protective net (304), and a lifting support slider (308) is provided in the sliding groove, and one end of the lifting support slider (308) is connected to an upper fixing sleeve (309) matching the supporting bent rod (305), and a pull ring (310) is installed on the upper fixing sleeve (309).

2. The BIM-based high mountain canyon slope engineering structure according to claim 1 is characterized in that: A water pump (105) is installed on the slope body (1), and a delivery pipe (106) and a water pumping pipe are connected to the water pump (105). The water pumping pipe is inserted into the storage tank (104), and the delivery pipe (106) is connected to the main frame (201).

3. The BIM-based high mountain canyon slope engineering structure according to claim 1 is characterized in that: A fixing rod (311) is inserted into the lifting support sliding block (308), the fixing rod (311) is fixed in the sliding groove, and a pressing spring (312) is sleeved on the fixing rod (311).

4. A construction management method for slope engineering structure in high mountain canyon area based on BIM as claimed in any one of claims 1 to 3, characterized in that: The following steps are involved: S1. When the frame mechanism (2) is in use, the main body of the slope (1) is divided into a plurality of blocks by the support frame (202) and the partitioning plate (203), thereby reducing the probability of soil landslides, and the main frame (201) can also play a role in preventing stones from sliding down, thereby ensuring the safety of vehicles passing by; S2. When it rains outside, rainwater will flow downward along the main frame (201) and then flow into the soil through the irrigation pipe (204), thereby increasing the moisture content of the soil. Excess rainwater will flow into the collection frame (101) through the lower drain pipe (205) and then be filtered by the filter element (103) and discharged into the storage tank (104) for storage. S3. When the outside is dry, the staff can start the water pump (105), pump out the stored water in the storage tank (104) through the pumping pipe, then transport it to the main frame (201) through the delivery pipe (106), and finally transport it to the soil through the irrigation pipe (204); S4, and the staff can disassemble and install the additional component (303) at will, which is convenient for cleaning. When the additional component (303) needs to be installed; S5, the staff pulls the pull ring (310), so that the pull ring (310) drives the upper fixing sleeve (309) to rise, thereby causing the lifting support slider (308) to move upward, thereby increasing the distance between the lower fixing sleeve (307) and the upper fixing sleeve (309); S6, then insert the support bent rod (305) at the lower end of the protection net (304) into the lower fixing sleeve (307), and then release the pull ring (310) so that the upper fixing sleeve (309) also clamps the support bent rod (305) at the upper end, thereby achieving the function of fixing the protection net (304).