Ship intelligent navigation control system and operation control method thereof
By introducing communication link switching devices and multi-link communication methods into the ship's intelligent navigation system, the problems of link switching and resource waste in intelligent navigation are solved, and the stability and security of information transmission are achieved.
Patent Information
- Application Number
- CN202210337024.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-01
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-04-01
AI Technical Summary
Existing ship communication systems cannot meet the needs of intelligent navigation, especially the waste of resources and safety risks caused by automatic link switching and the different dependence of different types of information on communication performance indicators.
A ship intelligent navigation control system is designed, including ship-side system, communication link and shore-side system. Automatic or manual mode link switching is realized through communication link switching device, combined with multi-link communication method and adaptive data adjustment. , optimize the utilization of communication resources, and enhance shore-side information acquisition capabilities through intelligent monitoring devices.
It achieves stable and reliable information transmission, improves communication quality and efficiency, avoids waste of resources, and enhances the safety of ship navigation and shore control capabilities.
Smart Images

Figure CN114675651B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of ship communication and control, and in particular to a ship intelligent navigation control system and an operation control method thereof. Background Art
[0002] With the rapid development of navigation technology, smart ships integrate modern information technology and new technologies such as artificial intelligence. They are safe, reliable, energy-saving, environmentally friendly, economical and efficient, and are the key direction of future ship development. Compared with traditional ships, the intelligence of smart ships is mainly reflected in the intelligent navigation function based on autonomous situation perception, risk identification and intelligent decision-making. To achieve intelligent navigation, it is inseparable from the support of shore-based support, and it also requires the collaboration between ships and shores. Therefore, the key to intelligent navigation lies in the information interaction and collaborative control between ships and shores, and efficient, reliable and stable ship-shore intelligent communication is the foundation.
[0003] At present, ship communications mainly focus on distress communications to ensure safe navigation of ships and transmission of some commercial operations. Existing satellite communications and ground communications equipment have their own characteristics, such as high transmission rate and wide coverage. However, each communication system operates independently and requires manual link switching as needed. This communication mode cannot meet the needs of ships to automatically equip themselves with corresponding communication equipment according to different navigation areas, and has become a bottleneck problem restricting ship-shore intelligent communications.
[0004] In the process of ship development towards intelligence, more and more data needs to be transmitted between ship and shore. The data types are more complex than traditional services, and the requirements of various types of data on communication links are different. Therefore, traditional ship communication technology cannot meet the needs of ship-to-shore communication for intelligent navigation. At present, the main research trend in this field is to unify the management of various communication equipment and allocate links according to the location of the ship and the signal strength to achieve uninterrupted communication and reduce communication costs. The patent "A multi-communication network intelligent networking method for ship intelligent navigation" (CN202010463594.5) divides the information needs into levels, manages them in four levels: control, decision-making, perception, and dynamic, and uses four parameters: priority, maximum acceptable transmission delay, message size, and whether confirmation is required to quantify communication tasks, and adjusts the communication links according to communication needs. However, this method does not take into account the different dependence of different types of information on communication performance indicators, which is easy to cause waste of communication resources.
[0005] When a ship is sailing at sea, it will inevitably deviate from the planned route due to the influence of wind, waves, currents and the hull itself. The driver needs to constantly adjust the ship's position and heading to keep the ship on the planned route as much as possible. When there are obstacles on the track, the ship needs to plan an obstacle avoidance path to ensure the safety of the ship's navigation. In order to save the driver from complicated labor, a track control system is used to achieve automatic and precise control of the ship's track and autonomous obstacle avoidance. Track control mainly includes track deviation control and steering control. The design of traditional PID rudders and adaptive rudders is only based on tracking and maintaining the heading, and cannot achieve track control functions. The patent "A method for comprehensive control of the heading and speed of an intelligent ship" (ZL202010322872.5) collects external navigation data and internal data of the ship, and controls the heading and speed of the ship based on shore-based instructions and whether the data analysis results meet the navigation conditions, and combines the ship's kinematic model and fuzzy PID. This method does not consider the impact of the ship's navigation deviation on the response time, accuracy and stability of the heading and speed adjustment; the patent "A method for automatic track planning of unmanned ships" (ZL202010376077.4) establishes a collision risk judgment model based on the distance, heading and other information of the oncoming ship, and obtains the expected heading and expected speed of the unmanned ship through a mixed integer linear planner to avoid oncoming ship collisions. However, the calculation model of this method is complex, and does not consider the impact of the size changes of fixed obstacles (such as reefs) in the track under different sea conditions on the ship's navigation path planning.
[0006] In addition, in terms of ship-shore information interaction, there are problems such as the single way of obtaining information on the shore side, the few types of information obtained, the delay in sending and receiving ship-shore information, and the large amount of redundant information. The means for the shore side to obtain ship information is mainly through the communication equipment on the ship, and the collected information is transmitted back to the shore side. If the ship fails or the communication equipment is not installed, the shore side cannot effectively obtain all the ship information in the channel, which makes it difficult for the shore platform to supervise and control the ship; when the ship is sailing in the open sea, due to the limited bandwidth resources of the communication link, it is necessary to set a time for sending and receiving ship-shore information. If a dangerous situation occurs suddenly, the frequency and synchronization of sending and receiving ship-shore information cannot be adjusted in time, so that the message sent by the shore side cannot be received in time, which is easy to cause serious losses. Summary of the invention
[0007] A technical problem to be solved by the present invention is to provide a ship intelligent navigation control system with stable and reliable information transmission.
[0008] In order to solve the above technical problems, the technical solution adopted by the present invention is: a ship intelligent navigation control system, including a ship-side system, a communication link, a shore-side system and an intelligent monitoring device. The ship-side system and the shore-side system are wirelessly connected through the communication link to transmit and receive data and share data, so as to provide basic data and decision support for realizing ship intelligent navigation, energy consumption management, fault diagnosis and remote control functions;
[0009] The invention is characterized in that: the communication link comprises a ship-end communication terminal arranged in the ship-end system and a shore-end communication terminal arranged in the shore-end system, and a communication link switching device is provided between the ship-end system and the ship-end communication terminal and between the shore-end system and the shore-end communication terminal, and the communication link switching device is used to evaluate the quality of the communication link and can switch the communication link to the best communication link in manual or automatic mode;
[0010] The communication link switching device includes a main control module, a data processing module, a communication interface, a monitoring module, a switching module and a communication terminal interface; the main control module is connected to the ship-end system or the shore-end system through the communication interface to realize data transmission and reception between the communication link switching device and the ship-end system or the shore-end system; the communication terminal interface is connected to the ship-end or shore-end communication terminal to realize data transmission and reception between the communication link switching device and the ship-end communication terminal or the shore-end communication terminal; multiple communication terminal interfaces are respectively connected to multiple communication terminals externally and connected to the data processing module internally to form multiple communication links;
[0011] The data processing module processes the data received from the communication terminal interface and sends it to the main control module, or processes the data received from the main control module and sends it to the communication terminal through the communication terminal interface; the communication interface and the communication terminal interface are standard interfaces, including Ethernet, standard serial port, and USB;
[0012] A monitoring module and a link switching switch are provided on the connection line between the communication terminal interface and the data processing module. The monitoring module monitors and calculates the information and status of each communication link and sends the link information to the switching module. The communication link information includes communication link delay, packet loss rate, signal-to-noise ratio, energy consumption, and cost parameters; the link switching switch is controlled by the switching module. The switching module can realize opening or closing of the communication link from the hardware through the link switching switch, and can also realize switching of the communication link by selecting to receive information of different links from the software through the control program;
[0013] When the ship's intelligent navigation control system is in operation, after the shore system collects basic navigation information through the intelligent monitoring device, it uses the data transmission and reception adaptive adjustment method to simplify the data specification and determine the information type. The shore system sends the simplified data and data type to the communication link switching device through the communication interface; the communication link switching device adopts a multi-link communication method to monitor the communication quality of each communication link in real time, and evaluates the comprehensive quality of each communication link according to the type of data information to be sent. In automatic mode, the communication link with the best comprehensive quality is used as the data transmission and reception link. In manual mode, the communication link selected by the user is used as the data transmission and reception link; after determining the communication link, the communication link switching device uses the corresponding communication terminal to send the data to the ship-side system, and the ship-side system performs automatic track control and obstacle avoidance path planning based on the received basic navigation information data; the data transmission and reception adopts the adaptive adjustment method, including the implementation of the standard message sending data format in sequence, the shore system obtains the basic navigation information and ship information of the ship, the shore system calculates the influence weight of the basic navigation information of the ship on the navigation state of the ship, the ship-side and shore-side information is self-excited for regular transmission and reception, and the shore system simplifies the data information and sends it;
[0014] The specific contents of the standardized message sending data format are: standardized message content and the order of arrangement of each content, the message sending content is the receiving time and frequency, traffic conditions, hydrological and meteorological conditions, traffic management, obstacle information and additional information; the hydrological and meteorological conditions include wind speed, rainfall, visibility, and wave information; the additional information includes timestamp and communication link number information;
[0015] The specific content of simplified data information of the shore system is as follows: the content of the T-secondary data is compared with the content of the T-1-time data. If the receiving time and frequency change, it is modified, otherwise it is replaced by letter a; if the traffic conditions change, it is modified, otherwise it is replaced by letter b; compare and analyze the various contents in the hydrological and meteorological data. If the difference is within the set value, it is replaced by letter c, otherwise it is modified; if the traffic management content changes, it is modified, otherwise it is replaced by letter d; if the obstacle information changes, it is modified, otherwise it is replaced by letter e;
[0016] The shore-side system calculates the weight of the influence of the basic navigation information of the ship on the navigation status of the ship, which specifically includes the following steps:
[0017] Step 1: The shore system obtains basic navigation information and ship information, and determines the number of ships going out to sea w;
[0018] Step 2: The shore system calculates the influence of four basic navigation information of each ship, namely traffic conditions, hydrological and meteorological conditions, traffic management, and obstacle information on the navigation status of the ship, Aw1, Aw2, Aw3, and Aw4; and Aw1+Aw2+Aw3+Aw4=1;
[0019] Step 3: The shore-side system determines the weight of each basic information on the navigation of each ship according to the basic navigation information of each specific ship, as follows:
[0020] According to the set weight of the impact of traffic conditions on ship navigation, the weight of the impact of traffic conditions on the navigation of w ships is recorded as N = [N1, N2, ..., Nw-1, Nw];
[0021] The weight of the impact of hydrological and meteorological factors on the navigation of w ships is M = [M1, M2, ..., Mw-1, Mw], where the value Mw is calculated as follows:
[0022] Among them, s is the number of information types contained in the hydrological and meteorological content;
[0023] M s-ks The weight value of the impact of each specific hydrological and meteorological factor on ship navigation;
[0024] ks is the number of specific hydrological and meteorological grade divisions;
[0025] According to the set weight of the impact of traffic management on ship navigation, the weight of the impact of traffic management on the navigation of w ships is recorded as Q = [Q1, Q2, ..., Qw-1, Qw];
[0026] According to the set weights of the impact of obstacle information on ship navigation, the weights of the impact of obstacle information on the navigation of w ships are recorded as H = [H1, H2, ..., Hw-1, Hw].
[0027] As a preferred solution, the self-excitation of the timing transmission and reception of information between the ship end and the shore end specifically includes the following steps:
[0028] Step 1: The shore system calculates the importance F of the data sent to each ship receiving end:
[0029] F=[F1, F2,…,Fw-1,Fw]
[0030] Among them, F w =A w1 *N w +A w2 *M w +A w3 *Q w +A w4 *H w ;
[0031] Step 2: Based on the original set importance and the corresponding relationship between the ship-side receiving terminal opening time, time interval and simplified signal, the shore-side system generates a simplified signal group X of time and frequency according to the importance of the data sent to each ship-side receiving terminal: X = [X1, X2, ..., Xw-1, Xw]
[0032] Among them, X1, X2, ..., Xw-1, Xw are the corresponding codes of the importance of w ships, which are obtained by looking up the corresponding table of importance and the opening time and frequency of the ship-side receiving end;
[0033] Take the maximum value of the weight of each navigation basic information in the data, that is, Max{A w1 *N w , A w2 *M w , A w3 *Q w , A w4 *H w}The corresponding data type is the main influencing data type.
[0034] As a preferred solution, the ship-side system and the shore-side system both include a controller, a data acquisition and processing module, a data storage device, a communication interface and a display terminal; the data storage device includes a local storage device and a cloud storage device; the ship-side communication terminal and the shore-side communication terminal are both standard communication terminals, including a radio station, Beidou, 4G / 5G, and GPS;
[0035] The data sent and received by the ship-side system and the shore-side system include shore-side system data and ship-side system data; the shore-side system data is basic navigation information, including navigation water type, hydrometeorology, terrain, traffic conditions, traffic management, port terminals and obstacle information; the ship-side data is ship navigation status information, including ship heading angle, speed information, position information, and engine room information.
[0036] As a preferred solution, the intelligent monitoring device includes a control module, which is connected to the AIS module, RFID module, monitoring module, broadcast module, GPS module, WIFI module and communication antenna through a standard communication interface, and is connected to the shore system through a standard interface to realize data transmission;
[0037] The AIS module and RFID module are used to identify the ship information of passing ships; the monitoring module is used to obtain the ship's navigation images and video data and transmit them directly to the shore system. The shore system uses image analysis to determine whether the ship is overloaded, whether the crew is wearing life jackets, whether the ship has discarded garbage, and to capture unsafe or illegal behavior of the ship; the broadcast module is used to instantly play instructions and prompt information; the GPS module is used for the current intelligent monitoring device to self-position; the WIFI module and communication antenna can realize wireless communication with the wireless equipment on the ship; the intelligent monitoring device obtains real-time information on channel congestion and channel obstacles through the monitoring module.
[0038] As a preferred solution, the multi-link communication method comprises the following steps:
[0039] Step 1: Initialize the communication link
[0040] Establishing a communication link with the shore system through an initial communication link, and sending and receiving data through the communication link;
[0041] Step 2: Switch to running mode
[0042] In the initial state, the link switching mode is manual switching, that is, the operator manually switches the link on and off according to the quality of the communication link; when the operator selects the link switching mode to be automatic, the system automatically switches the communication link on and off according to the quality of the communication link; in the automatic switching mode, when the ship-side system or the shore-side system detects an emergency situation that requires the operator to manually switch the link, the operator will be prompted to switch the communication link;
[0043] The receiving end of each communication terminal is in the open state by default. The user sets one of the ship-side system or the shore-side system as the master device and the other as the slave device through the communication link switching device. The link selected by the master device shall prevail. After the master device selects the best communication link, the link number information is added to the transmitted data. After the slave device receives the information, it automatically switches to the corresponding communication link and continues to communicate with the master device through the link until it receives data containing different communication link number information;
[0044] Step 3: Communication link performance monitoring
[0045] The monitoring module monitors the link performance of each communication link. The performance parameters include communication link delay A, packet loss rate B, signal-to-noise ratio C, energy consumption D, and cost E, and sends the link performance parameter information to the switching module and the main control module; each performance parameter sets the evaluation interval range, for example, the delay evaluation interval is [2-10], the unit is s, and the interval value can be changed. The measured link delay value is normalized in proportion within this evaluation interval to obtain the communication link delay performance parameter index A, and the value range of A is [0, 1]; after the other performance parameters are normalized according to the set evaluation interval, the performance parameter of the communication link i is expressed as
[0046]
[0047] Wherein, A~E∈[0,1], i=1,2,…,k; k is the number of communication links;
[0048] A=1 indicates the lowest communication link delay, and A=0 indicates the highest communication link delay;
[0049] B = 1 means the communication link packet loss rate is the lowest, and A = 0 means the communication link packet loss rate is the highest;
[0050] C = 1 means the communication link has the lowest signal-to-noise ratio, and A = 0 means the communication link has the highest signal-to-noise ratio;
[0051] D = 1 means the communication link has the lowest energy consumption, and A = 0 means the communication link has the highest energy consumption;
[0052] E = 1 means the communication link cost is the lowest, and E = 0 means the communication link cost is the highest;
[0053] At the same time, the communication link switching device displays the communication link information with the highest single performance parameter, providing a basis for the operator to manually switch the communication link in an emergency situation in step 2;
[0054] Step 4: Communication data classification and rating
[0055] After receiving the data from the ship-side or shore-side system, the communication link switching device determines whether the data contains link number information. If the data contains link number information, step 6 is executed to switch to the corresponding link according to the link number information.
[0056] If the link number information is not included, the data to be sent is classified and rated according to the type of data to be sent, including traffic conditions, hydrological and meteorological conditions, traffic management, and obstacle information. The dependence of each type of data on one or more performance parameters of the communication link is determined, and the dependence level is set; the dependence of the main impact category data on the communication link performance is determined and expressed as: K j =[P A P B P C P D P E ];
[0057] Where j is the type number corresponding to the main impact category data transmitted by the ship-side communication; P A is the dependency value of data on the communication link delay, P B is the dependency value of the data on the packet loss rate of the communication link, P C is the dependency value of the data on the signal-to-noise ratio of the communication link, P D P is the dependency value of data on the energy consumption of the communication link; E is the dependency value of the data on the cost setting; and P A +P B +P C +P D +P E =1;
[0058] Step 5: Communication link quality assessment
[0059] The switching module comprehensively evaluates the quality of k links P according to the performance parameters of each link and the dependence of the current main influencing data type on the communication link performance. i , P i =I i ×K j(i=1, 2, 3, ..., k);
[0060] Take the maximum value from all the calculation results, that is, P n , indicating that the nth link is the best communication link for current data transmission;
[0061] P n =max(P 1 ,P 2 ,...,P k )
[0062] Step 6: Communication link switching
[0063] After waiting for the current data to be sent, the switching module controls the on and off of each link, connects the link corresponding to the link number information in step 4, or connects the communication link n with the best overall quality in step 5, and uses the communication link to send the data to be sent.
[0064] The beneficial effects of this system are:
[0065] The ship's intelligent navigation control system is built through the ship-side system, communication links, shore-side system and intelligent monitoring devices. The ship is equipped with Beidou terminals, GPS terminals, radio stations, public network (4G / 5G) terminals and other communication terminals to form multiple communication links. The communication quality is used as the basis for link selection, which not only ensures the communication reliability and stability in harsh environments, but also realizes the integration of communication network and ship-shore information.
[0066] Communication link switching devices are provided between the ship-side system and the ship-side communication terminal, as well as between the shore-side system and the shore-side communication terminal, which effectively improves the communication quality; the communication link switching device includes a main control module, a data processing module, a communication interface, a monitoring module, a switching module and a communication terminal interface. This modular design method and modular structure are conducive to the integrated development of shipborne equipment, reduce development costs, and improve communication efficiency and quality.
[0067] Adopt link communication quality detection and evaluation methods to detect communication link delay, packet loss rate, signal-to-noise ratio, signal level, energy consumption and other parameters, and make a weighted comprehensive evaluation of them. Then, they are sorted according to the link quality priority as the basis for selecting communication links, and links with high communication quality are given priority for communication to ensure the accuracy and reliability of data transmission;
[0068] Since the communication link quality evaluation standard considers that different information types have different degrees of dependence on communication link performance indicators, by setting the dependence of different types of signals on different indicators and comprehensively evaluating the communication link quality, it can avoid the waste of communication resources and save communication costs;
[0069] Two communication link operation modes, manual and automatic, are set, and the manual and automatic communication links are switched through the link switch; in manual mode, a single link quality indicator is used as the basis for link selection, such as link delay or packet loss rate, etc. In automatic mode, a comprehensive link quality indicator is used as the basis for link selection. When the ship is sailing in harsh environments, the manual mode is used to select the communication link, which is conducive to improving data communication quality, avoiding data loss, and avoiding navigation safety risks;
[0070] In view of the large amount of ship navigation information and the existence of information redundancy, an adaptive adjustment method for information reception and transmission is adopted. By judging the importance of information and simplifying the processing, as well as the regular self-excitation transmission and reception of information between the ship and the shore, information redundancy is reduced, the energy consumption of the receiving terminal is reduced, and the data processing speed, data quality and system real-time performance are improved;
[0071] Setting up intelligent monitoring devices on both sides of the waterway or in offshore areas can effectively enhance the ability of the shore-side system to obtain ship navigation information, expand the channels for obtaining ship navigation parameters and channel information, and facilitate the shore-side system to supervise and control ships. At the same time, the shore-side system can obtain richer basic ship navigation information (hydrology, meteorology, obstacles, channel management information, etc.) from the intelligent monitoring devices, provide navigation condition parameters for ship intelligent navigation, and serve as the basis for controlling ship navigation.
[0072] Another technical problem to be solved by the present invention is to provide an operation control method of the above-mentioned ship intelligent navigation control system including automatic control operation of the ship track.
[0073] In order to solve the above technical problems, the technical solution adopted by the present invention is: a ship track automatic control method based on any one of the above-mentioned ship intelligent navigation control systems, including ship track automatic control operations, the content of which is: the ship-side system collects the navigation information of the ship, including the position, heading angle, and speed, and at the same time the ship-side system receives the basic navigation information provided by the shore-side system, and calculates the instantaneous heading angle of the ship in combination with the planned navigation path, and controls the ship's rudder angle according to the instantaneous heading angle; the strip area formed by the specified ER width offset on both sides of the planned route is called the track allowable deviation zone; if the ship is sailing within the deviation zone, it is determined that the actual navigation accuracy of the ship has met the requirements of the planned navigation accuracy; once it is found that the ship has exceeded the deviation zone, a deviation alarm is issued and the track automatic control system is started to control the ship to return to the planned route;
[0074] The specific steps of the automatic track control system to control the ship to return to the planned route are as follows:
[0075] Step 1: Collect ship navigation information
[0076] The data acquisition module periodically collects the ship's navigation data, and the heading angle ψ collected for the jth timeξj , speed V j , j∈(1,2,3...), and according to the planned route and the collected ship position information, the track deviation η between the current ship position and the planned route is calculated j ;
[0077] Among them, η j The positive and negative of is defined as, along the route, if the ship is on the left side of the route, then η j >0, the ship is on the right side of the route, then η j <0, η j The unit is km;
[0078] The data acquisition module obtains shore system data through the communication link, adopts a multi-link communication method, realizes automatic switching of the best communication link, and transmits data. The information obtained is used for autonomous obstacle avoidance path planning during the ship's navigation;
[0079] Step 2: Calculate the instantaneous heading angle ψ of the ship r
[0080] When the ship deviates from the set route, the track automatic control system adjusts the track according to the track deviation η j Calculate the instantaneous heading angle ψ based on the allowable deviation ER r The current heading angle of the ship ξj The mapping relationship can be expressed as
[0081] ψ r =ψ ξj +Δθ
[0082] Among them, Δθ is the heading correction angle, which is determined by a multimodal algorithm;
[0083] Step 3: Control the ship's heading angle
[0084] According to the calculated instantaneous heading angle ψ r To control the steering angle ψ of the servo d According to the basic navigation information sent by the shore system 3, a calculation model is established and analyzed through software calculation to obtain the current navigation conditions, so that the ship's heading angle is ψ r When the required steering angle is ψ d , which is the target rudder angle.
[0085] As a preferred solution, the specific calculation process of the multi-modal algorithm of the heading correction angle is as follows:
[0086] ①When |η j |>ER
[0087] When the track deviation exceeds the limit value, that is, |η j|>ER, the ship is considered to have gone beyond the deviation band, the system issues a yaw alarm, and the correction angle Δθ takes the maximum value:
[0088] Δθ=sin(η j )Δθ max
[0089] Among them, Δθ max Take a value within the range of 15 to 20°;
[0090] ② When hour
[0091] Let the ship deviate from the existing track η j Return to the set route quickly in an exponentially decreasing manner
[0092]
[0093] Among them, k is a proportional coefficient, which can be selected according to the condition that Δθ has continuity at ER, that is, when the track deviation η j =ER,
[0094]
[0095] Then when When the heading correction angle Δθ = arcsin(kη j / V j );
[0096] ③When hour
[0097] Since the deviation is small, the PI proportional integral control method can be used to calculate the heading correction angle Δθ.
[0098]
[0099] Among them, K P , K I To control the parameters, it is determined according to the debugging; when When K I = 0, that is, the integral term is not enabled. When , the integral term is enabled and the integral correction angle is limited Not more than 3° to avoid the influence of integral saturation.
[0100] The beneficial effects of this method are:
[0101] In the ship track automatic control method, a multimodal algorithm is used to determine the ship's heading correction angle based on the accurate data transmitted by the platform. The heading correction angle is calculated in segments according to the size of the track deviation value, thereby improving the track control accuracy, stability and reliability.
[0102] Another technical problem to be solved by the present invention is to provide an operation control method for the above-mentioned ship intelligent navigation control system including navigation obstacle avoidance path planning operations.
[0103] In order to solve the above technical problems, the technical solution adopted by the present invention is: an operation control method of the ship intelligent navigation control system described in any one of the above, including a navigation obstacle avoidance path planning operation, which specifically includes the following steps:
[0104] Step 1: Get the work area information
[0105] The shore system 3 obtains the operation area information, including the target point location coordinates, fixed obstacle information in the operation area, sea condition information, etc.;
[0106] Step 2: Detection of moving obstacles in the work area
[0107] During navigation, the shore-side system can detect and track moving obstacles through satellite remote sensing, predict the movement trend of moving obstacles in real time, and send the shape, size and coordinate information of moving obstacles to the ship-side system in real time;
[0108] Step 3: Create a grid map of the work area
[0109] According to the ship's starting point position S and all target point positions, a grid map is established for the ship's operating area. The range of the grid map covers the starting point and the target point. If there is an unnavigable area near the starting point and the target point, the size of the grid map can be further expanded.
[0110] Step 4: Mark the non-navigable areas on the grid map
[0111] In the grid map, the non-navigable areas include reefs, no-fly zones, and moving obstacles. The shore-side system detects the coordinates and size information of reefs, no-fly zones, and moving obstacles, and then performs secondary expansion on the obstacle coverage area. The specific steps are as follows:
[0112] 4.1. First, regularize the shape of the obstacle, that is, use a circumscribed circle, circumscribed ellipse or circumscribed rectangle to represent the shape of the obstacle;
[0113] 4.2. According to the safety distance R' set by the user, the regularized non-navigable area is expanded and offset outward by a distance R';
[0114] In the grid map, the grid covered by the unnavigable area is marked as 1, and the navigable area is marked as 0, so as to realize the marking of the unnavigable area in the grid map; wherein, if the area of the grid covered by the unnavigable area accounts for more than the set percentage value of the area of the grid, the grid is considered to be fully covered, and the grid area is the unnavigable area;
[0115] Step 5: Ship navigation obstacle avoidance path planning
[0116] Based on the grid map with obstacle marks, the ship's obstacle avoidance navigation path is planned. If there is a fixed obstacle on the track connecting the ship's position and the target point, the grid midpoint or corner point of the navigable area around the unnavigable area is used as the navigation node. A safe navigation path can be obtained on both sides of the line connecting the ship and the target position, and the navigation path with the shortest distance is taken as the ship's track.
[0117] If there is a moving obstacle on the track connecting the ship's position and the target point, after the distance between the ship and the moving obstacle reaches the set value, its track is replanned, with the side behind the moving obstacle's moving track as the new path navigation direction, and the grid midpoint or corner point of the navigable area around the moving obstacle as the navigation node, to obtain a safe navigation path as the new ship track.
[0118] As a preferred solution, in step 4.2, the grid map is constructed using a rectangular grid, and the grid size of the grid map constructed using a rectangular grid is set to an arbitrary number of 2 to 15 times the length of the hull.
[0119] As a preferred solution, in step 4.2, the safety distance R' is any number between 2 and 5 times the length of the ship; in step 4.2, in the grid map, if the grid area covered by the unnavigable area accounts for more than 10% of the grid area, it is considered that the grid is fully covered and the grid area is an unnavigable area.
[0120] As a preferred solution, in step 5, if there is a moving obstacle on the track connecting the ship's position and the target point, the track is replanned within the interval where the distance between the ship and the moving obstacle reaches 10 to 20 times the length of the ship, with the side behind the moving obstacle's moving track as the new path navigation direction, and the grid midpoint or corner point of the navigable area around the moving obstacle as the navigation node, to obtain a safe navigation path as the new ship track.
[0121] The beneficial effects of this method are:
[0122] In the ship obstacle avoidance path planning method, based on the accurate data transmitted by the platform, the shape and position information of the obstacle is monitored in real time, and the secondary expansion method is used to obtain the ship's non-navigable area, which can ensure the accuracy of obstacle avoidance track planning, avoid ship navigation accidents, and improve ship navigation safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0123] Figure 1 This is a schematic diagram of the ship intelligent navigation control system of the present invention;
[0124] Figure 2 This is a schematic diagram of the structure of the ship intelligent navigation control system of the present invention;
[0125] Figure 3 This is a composition diagram of the intelligent monitoring device of the present invention;
[0126] Figure 4 This is a flow chart of the multi-link communication control method of the present invention;
[0127] Figure 5 This is a flow chart of the information receiving and sending adaptive adjustment method of the present invention;
[0128] Figure 6 This is a schematic diagram of the data format of the present invention;
[0129] Figure 7 This is a schematic diagram of the ship track automatic control system of the present invention;
[0130] Figure 8 This is a schematic diagram of the ship obstacle avoidance path planning of the present invention;
[0131] Fig. 9 This is a schematic diagram of the obstacle regularization of the present invention.
[0132] In the figure: 1-ship end system; 2-communication link; 20-communication link switching device; 21-ship end communication terminal; 22-shore end communication terminal; 23-satellite ground station; 24-public network base station; 3-shore end system; 4-intelligent monitoring device. DETAILED DESCRIPTION
[0133] The present invention will be further described below in conjunction with the accompanying drawings:
[0134] The present invention discloses a ship intelligent navigation control system. Figure 1 and Figure 2 As shown, it includes a ship-side system 1, a communication link 2, a shore-side system 3 and an intelligent monitoring device 4. The ship-side system 1 and the shore-side system 3 are wirelessly connected through the communication link 2 to transmit and receive data and share them, so as to provide basic data and decision support for realizing the intelligent navigation, energy consumption management, fault diagnosis and remote control functions of the ship; the ship-side system 1 and the shore-side system 3 include a controller, a data acquisition and processing module, a data storage device, a communication interface and a display terminal; the data storage device includes a local storage device and a cloud storage device; the ship-side communication terminal 21 and the shore-side communication terminal 22 are standard communication terminals, including a radio station, Beidou, 4G / 5G, and GPS; the data transmitted and received and shared by the ship-side system 1 and the shore-side system 3 include shore-side system data and ship-side system data; the shore-side system data is basic navigation information, including navigation water type, hydrological meteorology, terrain, traffic conditions, traffic management, port terminals and obstacle information; the ship-side data is the navigation status information of the ship, including the ship heading angle, speed information, position information, and engine room information;
[0135] The communication link 2 includes a ship-end communication terminal 21 arranged at the ship-end system 1 and a shore-end communication terminal 22 arranged at the shore-end system 3. A communication link switching device 20 is provided between the ship-end system 1 and the ship-end communication terminal 21 and between the shore-end system 3 and the shore-end communication terminal 22. The communication link switching device 20 is used to evaluate the quality of the communication link and can switch the communication link to the best communication link in manual or automatic mode.
[0136] like Figure 2 As shown, the communication link switching device 20 includes a main control module, a data processing module, a communication interface, a monitoring module, a switching module and a communication terminal interface; the main control module is connected to the ship-end system 1 or the shore-end system 3 through the communication interface to realize data transmission and reception between the communication link switching device 20 and the ship-end system 1 or the shore-end system 3; the communication terminal interface is connected to the ship-end or shore-end communication terminal to realize data transmission and reception between the communication link switching device 20 and the ship-end communication terminal 21 or the shore-end communication terminal 22; multiple communication terminal interfaces are respectively connected to multiple communication terminals externally and connected to the data processing module internally to form multiple communication links; the data processing module processes the data received from the communication terminal interface and sends it to the main control module, or processes the data received from the main control module and sends it to the communication terminal through the communication terminal interface; the communication interface and the communication terminal interface are standard interfaces, including Ethernet, standard serial port, and USB;
[0137] A monitoring module and a link switching switch are provided on the connection line between the communication terminal interface and the data processing module. The monitoring module can monitor and calculate the information and status of each communication link, and send the link information to the switching module. The communication link information includes communication link delay, packet loss rate, signal-to-noise ratio, energy consumption, and cost parameters; the link switching switch is controlled by the switching module. The switching module can realize the opening or closing of the communication link from the hardware through the link switching switch, and can also select to receive information from different links from the software through the control program to realize the switching of the communication link;
[0138] The communication link switching mode includes manual and automatic operation modes. In the manual mode, the operator judges the quality of each link according to the link information fed back by the main control module, and manually selects to switch to the appropriate communication link according to the communication requirements. In the automatic mode, the switching module uses the multi-link communication method to comprehensively evaluate the quality of the communication link according to the link information fed back by the monitoring module, and automatically switches to the communication link.
[0139] like Figure 3 As shown, the intelligent monitoring device 4 includes a control module, which is connected to the AIS module, RFID module, monitoring module, broadcast module, GPS module, WIFI module and communication antenna through a standard communication interface, and the control module is connected to the shore system through a standard interface to realize data transmission;
[0140] The AIS module and RFID module are used to identify the ship information of passing ships; the monitoring module is used to obtain the ship's navigation images and video data, and directly transmit them to the shore system 3. The shore system 3 can judge whether the ship is overloaded, whether the crew wears life jackets, whether the ship discards garbage, and capture the ship's unsafe or illegal behavior through image analysis; the broadcast module is used to instantly play instructions and prompt information; the GPS module is used for the current intelligent monitoring device to self-position; the WIFI module and communication antenna can realize wireless communication with the wireless equipment on the ship; the intelligent monitoring device 4 can obtain the information of waterway congestion and waterway obstacles in real time through the monitoring module;
[0141] Intelligent monitoring devices are deployed on both sides of inland waterways or in offshore areas. The monitoring and information acquisition operation process is as follows;
[0142] (1) Obtain ship and navigation information / data, as well as self-positioning information of intelligent monitoring devices, and transmit them to the shore system;
[0143] (2) The shore-side system processes the collected data in an unstructured manner, comprehensively evaluates the structured data, and classifies the results, including whether the ship is overloaded, whether the crew wears life jackets, whether there is any garbage dumping, whether there is any unsafe or illegal behavior on the ship, and information on waterway congestion and obstacles;
[0144] (3) If there is information or instructions in the processing results that need to be notified directly to the ship, the shore system will send the information to the intelligent monitoring device and play it immediately through the broadcast module;
[0145] When the ship's intelligent navigation control system is in operation, the shore system 3 collects basic navigation information through the intelligent monitoring device 4, and then uses a data transmission and reception adaptive adjustment method to simplify the data specification and determine the information type. The shore system 3 sends the simplified data and data type to the communication link switching device through the communication interface; the communication link switching device adopts a multi-link communication method to monitor the communication quality of each communication link in real time, and evaluates the comprehensive quality of each communication link according to the type of data information to be sent. In automatic mode, the communication link with the best comprehensive quality is used as the data transmission and reception link. In manual mode, the communication link selected by the user is used as the data transmission and reception link; after determining the communication link, the communication link switching device uses the corresponding communication terminal to send the data to the ship-side system, and the ship-side system performs automatic track control and obstacle avoidance path planning based on the received basic navigation information data.
[0146] The traditional ship-shore information transmission and reception time is scheduled, which has the problems of large amount of data transmission, much redundant information, delay in receiving information on the ship side, and high energy consumption on the ship side receiving end. In addition, different types of information have different importance, so the requirements for information transmission frequency, delay, and data integrity are different. The present invention adopts a data transmission and reception adaptive adjustment method. The shore system 3 determines the information transmission frequency according to the type and importance of the transmitted data, and pre-sends the instruction to adjust the receiving frequency to ensure that the important data sent is received in time and effectively; for example, when sending storm warning information, the shore system predicts the storm status information of each route in advance according to the meteorological information. When the information is sent next time, the opening time and frequency of the ship side receiving end are added to the data packet to ensure that the dangerous meteorological information sent is received in time;
[0147] like Figure 4 As shown, the data transmission and reception adaptive adjustment method of the shore system 3 includes the following steps:
[0148] Step 1: Standardize the data format sent by the shore system
[0149] There are various types of basic ship navigation information, such as navigation water type, hydrometeorology, terrain, traffic conditions, traffic management, ports and terminals, obstacles and additional information; when standardizing the data format, some information that has little impact on ship navigation (such as navigation water type, port and terminal, etc.) is discarded to determine the final data format. The data format contains information such as receiving time and frequency, traffic conditions, hydrometeorology, traffic management and obstacle information, among which hydrometeorology includes wind speed, rainfall, visibility, waves and other information; additional information includes timestamp and communication link number information;
[0150] Step 2: The shore system obtains basic navigation information and ship information
[0151] The shore system 3 first obtains the information of each ship through AIS data, including latitude and longitude coordinates, speed, heading and other information; determines the number of ships going out to sea w, and determines the sea area where the ship is located according to the current latitude and longitude coordinates of each ship; obtains the hydrological and meteorological information of the sea area where each ship is located through the Ocean Hydrological and Meteorological Center; obtains the information of each obstacle in the sea area where each ship is located through Beidou or GPS, including the latitude and longitude coordinates of the obstacle, obstacle diameter, etc.; obtains the traffic conditions and traffic management information of the sea area where each ship is located through the electronic nautical chart;
[0152] Step 3: Calculate the weight of the impact of basic ship navigation information on the ship's navigation status.
[0153] First, the shore system 3 uses an intelligent data processing algorithm (such as a Logistics regression prediction algorithm) to arrange the basic navigation information of each ship according to its importance based on the tonnage, type, breadth, and draft of the ship, and at the same time refers to such past data to regress and fit a function to calculate the influence values Aw1, Aw2, Aw3, and Aw4 of the four basic navigation information of each ship, namely, traffic conditions, hydrological and meteorological conditions, traffic management, and obstacle information, and Aw1+Aw2+Aw3+Aw4=1;
[0154] As shown in Table 1; for example, ship 1 is a small-tonnage passenger ship, and the influence of each basic navigation information on the navigation of the ship is arranged as obstacle information> hydrological and meteorological> traffic management> traffic conditions, then the influence values of each basic navigation information of the ship are as follows: A11=0.45; A12=0.4; A13=0.1; A14=0.05;
[0155] Table 1 The influence value of basic navigation information of each ship
[0156]
[0157]
[0158] Then, the shore system 3 queries the weight table (Table 2) according to the content of each specific ship navigation basic information to determine the weight of each basic information on the navigation of each ship:
[0159] The weight of traffic conditions on the navigation of w ships is N = [N1, N2, ..., Nw-1, Nw], where the value Nw can be obtained by looking up Table 3 according to the traffic status;
[0160] The weight of the impact of hydrological and meteorological factors on the navigation of w ships is M = [M1, M2, ..., Mw-1, Mw], where the value Mw is calculated as follows:
[0161]
[0162] Among them, s is the information of sea breeze, rainfall, visibility and sea waves included in the hydrological and meteorological content;
[0163] M s-ks The weight value of the impact of each specific hydrological and meteorological factor on ship navigation can be obtained by looking up Table 3;
[0164] ks is the number of specific hydrological and meteorological grade divisions;
[0165] The weight of traffic management on the navigation of w ships is Q = [Q1, Q2, ..., Qw-1, Qw], where the value Qw can be obtained by looking up Table 3 according to the traffic management content;
[0166] The weight of the obstacle information on the navigation of w ships is H = [H1, H2, ..., Hw-1, Hw], where the value Hw can be obtained by looking up Table 2 based on the obstacle information;
[0167] Table 2 Weights of the impact of basic ship navigation information on ship navigation
[0168]
[0169]
[0170] Step 4: Timed transmission and reception of information between the ship and the shore
[0171] The shore system 3 calculates the importance F of the data sent to each ship receiving end:
[0172] F=[F1, F2,…,Fw-1,Fw]
[0173] Among them, F w =A w1 *N w +A w2 *M w +A w3 *Q w +A w4 *H w ;
[0174] Based on the original set importance and the corresponding relationship between the opening time, time interval and simplified signal of the ship-side receiving end, the shore-side system generates a simplified signal group X of time and frequency according to the importance F of the data sent to each ship-side receiving end:
[0175] X=[X1, X2,…,Xw-1,Xw]
[0176] Among them, Xw is the simplified signal code of the w-th ship, which can be obtained by looking up the importance and the corresponding table of the opening time and frequency of the ship-side receiving end (Table 3);
[0177] Table 3. Correspondence between importance and opening time and frequency of the ship-side receiving terminal
[0178] Code X-1 X-2 X-3 X-4 X-5 Importance 0~Y1 Y1~Y2 Y2~Y3 Y3~Y4 Y4~1 Receiving time T1 T2 T3 T4 T5 Frequency f1 f2 f3 f4 f5
[0179] Among them, 0 <Y1<Y2<Y3<Y4<1;
[0180] Take the maximum value of the weight of each navigation basic information in the data, that is, Max{A w1 *N w , A w2 *M w , A w3 *Q w , A w4 *H w}The corresponding data type is the main influencing data type;
[0181] Step 5: The shore system sends data to each ship
[0182] Before sending data to each ship, the shore system 3 simplifies the data content again as follows:
[0183] The content of the T-secondary data is compared with the content of the T-1-time sent data in sequence. If the receiving time and frequency change, it is modified, otherwise it is replaced by letter a; if the traffic conditions change, it is modified, otherwise it is replaced by letter b; compare and analyze the various contents in the hydrological and meteorological information. If the difference is within △Rs, it is replaced by letter c, otherwise it is modified; if the traffic management content changes, it is modified, otherwise it is replaced by letter d; if the obstacle information changes, it is modified, otherwise it is replaced by letter e; where △Rs is the difference corresponding to s types of hydrological and meteorological information;
[0184] When a ship is sailing on an inland river, the public network base station signal has a wide coverage range and a strong signal, and there is no problem of poor communication link quality; when a ship is sailing in the near sea or the open sea, there are problems such as weak signal strength of a certain communication link, high latency, and easy data loss. The present invention adopts a multi-link communication method based on a communication link switching device, which comprehensively evaluates the communication quality of each link, timely selects and switches to the communication link with the best comprehensive quality, and sends the simplified and standardized data to the ship-side systems of w ships, ensuring that the ship-shore information interaction is stable, reliable, and efficient.
[0185] like Figure 5 As shown, the multi-link communication method includes the following steps:
[0186] Step 1: Initialize the communication link
[0187] Establish a communication link with the shore system through an initial communication link, such as a public network or Beidou communication link, and send and receive data through the communication link;
[0188] Step 2: Switch to running mode
[0189] In the initial state, the link switching mode is manual switching, that is, the operator manually switches the link on and off according to the quality of the communication link; when the operator selects the link switching mode to be automatic, the system automatically switches the communication link on and off according to the quality of the communication link; in the automatic switching mode, when the ship-side system 1 or the shore-side system 3 detects an emergency situation requiring the operator to manually switch the link, the operator will be prompted to switch the communication link;
[0190] Each communication terminal includes a transmitting end and a receiving end. The receiving end is in an open state by default. In this case, no matter whether the ship sends data to the shore or the shore sends data to the ship, there is no inconsistency in the communication link, which can avoid communication errors. This situation will have the problem of high energy consumption. Therefore, the user can use the communication link switching device to set one of the ship system or the shore system as the master device and the other as the slave device. The link selected by the master device shall prevail. After the master device selects the best communication link, the link number information is added to the transmitted data. After the slave device receives the information, it automatically switches to the corresponding communication link and continues to communicate with the master device through the link until data containing different communication link number information is received.
[0191] Step 3: Communication link performance monitoring
[0192] The monitoring module monitors the link performance of each communication link. The performance parameters include communication link delay A, packet loss rate B, signal-to-noise ratio C, energy consumption D, and cost E, and sends the link performance parameter information to the switching module and the main control module; each performance parameter sets the evaluation interval range, for example, the delay evaluation interval is [2-10], the unit is s, and the interval value can be changed. The measured link delay value is normalized in proportion within this evaluation interval to obtain the communication link delay performance parameter index A, and the value range of A is [0, 1]; after the other performance parameters are normalized according to the set evaluation interval, the performance parameter of the communication link i is expressed as
[0193]
[0194] Wherein, A~E∈[0,1], i=1,2,…,k; k is the number of communication links;
[0195] A=1 indicates the lowest communication link delay, and A=0 indicates the highest communication link delay;
[0196] B = 1 means the communication link packet loss rate is the lowest, and A = 0 means the communication link packet loss rate is the highest;
[0197] C = 1 means the communication link has the lowest signal-to-noise ratio, and A = 0 means the communication link has the highest signal-to-noise ratio;
[0198] D = 1 means the communication link has the lowest energy consumption, and A = 0 means the communication link has the highest energy consumption;
[0199] E = 1 means the communication link cost is the lowest, and E = 0 means the communication link cost is the highest;
[0200] At the same time, the communication link switching device 20 displays the communication link information with the highest single performance parameter, providing a basis for the operator to manually switch the communication link in an emergency situation in step 2. For example, when sending information with a large amount of data, a communication link with a low cost is preferentially selected;
[0201] Step 4: Communication data classification and rating
[0202] After receiving the data from the ship-side or shore-side system, the communication link switching device determines whether the data contains link number information. If the data contains link number information, step 6 is executed to switch to the corresponding link according to the link number information.
[0203] If the link number information is not included, the data to be sent is classified and rated according to the type of data to be sent, including traffic conditions, hydrological and meteorological conditions, traffic management, and obstacle information. The dependence of each type of data on one or more performance parameters of the communication link is determined, and the dependence level is set; the dependence of the main impact category data on the communication link performance is determined and expressed as: K j =[P A P B P C P D P E ];
[0204] Where j is the type number corresponding to the main impact category data transmitted by the ship-side communication; P A is the dependency value of data on the communication link delay, P B is the dependency value of the data on the packet loss rate of the communication link, P C is the dependency value of the data on the signal-to-noise ratio of the communication link, P D P is the dependency value of data on the energy consumption of the communication link; E is the dependency value of the data on the cost setting; and P A +P B +P C +P D +P E =1;
[0205] The dependency of each number data type on the communication link performance is shown in Table 4. The data in the table can be defined or added by the user;
[0206] Table 4 Dependence of data types on communication link performance
[0207]
[0208] Step 5: Communication link quality assessment
[0209] The switching module comprehensively evaluates the quality of k links P according to the performance parameters of each link and the dependence of the current main influencing data type on the communication link performance. i , P i =I i ×K j (i=1, 2, 3, ..., k);
[0210] Take the maximum value from all the calculation results, that is, P n , indicating that the nth link is the best communication link for current data transmission;
[0211] P n =max(P 1 ,P 2 ,...,P k )
[0212] Step 6: Communication link switching
[0213] After waiting for the current data to be sent, the switching module controls the on and off of each link, connects the link corresponding to the link number information in step 4, or connects the communication link n with the best overall quality in step 5, and uses the communication link to send the data to be sent.
[0214] like Figure 7 As shown, the ship track automatic control method based on the above-mentioned ship-shore collaborative ship intelligent navigation platform includes: the ship-side system 1 collects the navigation information of the ship, including the position, heading angle, speed, etc., and at the same time, the ship-side system 1 receives the basic navigation information provided by the shore-side system 3, combines the planned navigation path, calculates the instantaneous heading angle of the ship, and controls the rudder angle of the ship according to the instantaneous heading angle; Figure 8 As shown in the figure, points A and B on the planned route are any two adjacent turning points. The strip area formed by the deviation ER width on both sides of the planned route is called the track allowable deviation zone. For different track maintenance accuracies, the ship can achieve it by adjusting the deviation zone ER; if the ship is sailing within the deviation zone, it can be considered that the actual navigation accuracy of the ship has met the requirements of the planned navigation accuracy; once it is found that the ship exceeds the deviation zone, such as point P in the figure, a deviation alarm is issued and the track automatic control system is started to control the ship to quickly return to the planned route. The specific steps of the ship track automatic control method are as follows;
[0215] Step 1: Collect ship navigation information
[0216] The data acquisition module periodically collects the ship's navigation data, and the heading angle ψ collected for the jth time ξj , speed V j , j∈(1,2,3...), and according to the planned route and the collected ship position information, the track deviation η between the current ship position and the planned route is calculated j (The vertical line of the ship's position is the vertical line of the route, and the distance of the vertical line segment is the track deviation η j );
[0217] Among them, η j The positive and negative of is defined as, along the route, the ship is on the left side of the route η j >0, the ship is on the right side of the routeηj <0, η j The unit is km;
[0218] The data acquisition module obtains shore system data through communication link 2. To ensure reliable and fast data transmission, a multi-link communication method is adopted to achieve automatic switching of the optimal communication link and transmit data. The information obtained can be used for autonomous obstacle avoidance path planning during the ship's navigation process.
[0219] Step 2: Calculate the instantaneous heading angle ψ of the ship r
[0220] When the ship deviates from the set route, the track automatic control system adjusts the track according to the track deviation η j Calculate the instantaneous heading angle ψ based on the allowable deviation ER r The current heading angle of the ship ξj The mapping relationship can be expressed as
[0221] ψ r =ψ ξj +Δθ
[0222] Among them, Δθ is the heading correction angle, which is determined by a multimodal algorithm. The specific calculation method is as follows;
[0223] ①When |η j |>ER
[0224] When the track deviation exceeds the limit value, that is, |η j |>ER, the ship is considered to have gone beyond the deviation band, the system issues a yaw alarm, and the correction angle Δθ takes the maximum value:
[0225] Δθ=sin(η j )Δθ max
[0226] Among them, Δθ max It is a positive number, related to the weather, ranging from 15 to 20°, and can be adjusted;
[0227] ② When hour
[0228] Let the ship deviate from the existing track η j Return to the set route quickly in an exponentially decreasing manner
[0229]
[0230] Among them, k is a proportional coefficient, which can be selected according to the condition that Δθ has continuity at ER, that is, when the track deviation η j =ER,
[0231]
[0232] Then when When the heading correction angle Δθ = arcsin(kη j / V j );
[0233] ③When hour
[0234] Since the deviation is small, the PI proportional integral control method is used to calculate the heading correction angle Δθ.
[0235]
[0236] Among them, K P , K I To control the parameters, it is determined according to the debugging; when When K I = 0, that is, the integral term is not enabled. When the integral term is enabled, the integral correction angle is limited. Not more than 3° to avoid the influence of integral saturation;
[0237] Step 3: Control the ship's heading angle
[0238] According to the calculated instantaneous heading angle ψ r To control the steering angle ψ of the servo d According to the basic navigation information sent by the shore system 3, a calculation model is established and analyzed through software calculation to obtain the current navigation conditions, so that the ship's heading angle is ψ r When the required steering angle is ψ d , which is the target rudder angle.
[0239] like Figure 8-9 As shown, the ship navigation obstacle avoidance path planning method based on the above-mentioned ship intelligent navigation control system includes the following steps:
[0240] Step 1: Get the work area information
[0241] The shore system 3 obtains the operation area information, including the target point location coordinates, the fixed obstacle (reef) information in the operation area, the sea condition information, etc.;
[0242] Step 2: Detection of moving obstacles in the work area
[0243] During navigation, the shore-side system 3 can detect and track moving obstacles through satellite remote sensing, predict the movement trend of moving obstacles in real time, and send the shape, size and coordinate information of the moving obstacles to the ship-side system 1 in real time;
[0244] Step 3: Create a grid map of the work area
[0245] According to the ship's starting point position S and target point position E1 、E 2 …, establish a grid map of the ship operation area, such as Fig. 9 As shown, the range of the grid map covers the starting point and the target point. If there is an unnavigable area near the starting point and the target point, the size of the grid map can be further expanded;
[0246] The grid map is constructed using rectangular grids, which has moderate computational complexity and easy-to-control accuracy. The size of the grid affects the computational complexity and accuracy of the obstacle avoidance algorithm and is usually set to 2 to 15 times the length of the ship.
[0247] Step 4: Mark the non-navigable areas on the grid map
[0248] In the grid map, the non-navigable areas mainly include reefs, no-fly zones, mobile obstacles, etc. The shore system 3 detects the coordinates, size and other information of reefs, no-fly zones and mobile obstacles. Since obstacles are usually irregular objects and the size of reefs changes significantly during high and low tides, it is necessary to expand the area covered by the obstacles for a second time, such as Fig. 9 As shown, the specific steps are as follows;
[0249] 4.1. First, regularize the shape of the obstacle, that is, use a circumscribed circle, a circumscribed ellipse, or a circumscribed rectangle to represent the shape of the obstacle. For example, use a circumscribed circle to represent the shape of the obstacle, and get a radius of R. 1 The circular area of
[0250] 4.2. To further ensure navigation safety, according to the safety distance R' set by the user, the regularized non-navigable area is expanded and offset outward by a distance R' to obtain a radius of R 2 =R 1 +R', the radius is R 2 The circular area is the non-navigable area; the safety distance R' is generally 2 to 5 times the length of the ship;
[0251] In the grid map, the grid covered by the unnavigable area is marked as 1, and the navigable area is marked as 0 (blank), so as to realize the marking of the unnavigable area in the grid map; wherein, if the grid area covered by the unnavigable area accounts for more than 10-20% of the grid area, it is considered that the grid is fully covered and the grid area is an unnavigable area;
[0252] Step 5: Ship navigation obstacle avoidance path planning
[0253] Based on the grid map with obstacle marks, the ship's obstacle avoidance navigation path is planned. If there is a fixed obstacle on the track connecting the ship's position and the target point, the grid midpoint or corner point of the navigable area around the unnavigable area is used as the navigation node. One safe navigation path can be obtained on both sides of the line connecting the ship and the target position, and the navigation path with the shortest distance is taken as the ship's track.
[0254] If there is a moving obstacle on the track connecting the ship's position and the target point, the ship will replan its track after it is a certain distance away from the obstacle (10 to 20 times the length of the ship). The side behind the moving obstacle's moving track will be used as the navigation direction of the new path, and the grid midpoint or corner point of the navigable area around the moving obstacle will be used as the navigation node to obtain a safe navigation path as the new ship track.
[0255] The above-mentioned embodiments are only illustrative of the principles and effects of the invention, as well as some embodiments of its application, and are not intended to limit the invention. It should be pointed out that a person skilled in the art can make several modifications and improvements without departing from the inventive concept of the invention, and all of these belong to the protection scope of the invention.
Claims
1. A ship intelligent navigation control system, including a ship-side system, a communication link, a shore-side system and an intelligent monitoring device. The ship-side system and the shore-side system are wirelessly connected through the communication link to transmit and receive data and share data, providing basic data and decision support for realizing ship intelligent navigation, energy consumption management, fault diagnosis, and remote control functions; Features: The communication link includes a ship-end communication terminal arranged in the ship-end system and a shore-end communication terminal arranged in the shore-end system. A communication link switching device is provided between the ship-end system and the ship-end communication terminal and between the shore-end system and the shore-end communication terminal. The communication link switching device is used to evaluate the quality of the communication link and can switch the communication link to the best communication link in manual or automatic mode. The communication link switching device includes a main control module, a data processing module, a communication interface, a monitoring module, a switching module and a communication terminal interface; the main control module is connected to the ship-end system or the shore-end system through the communication interface to realize data transmission and reception between the communication link switching device and the ship-end system or the shore-end system; the communication terminal interface is connected to the ship-end or shore-end communication terminal to realize data transmission and reception between the communication link switching device and the ship-end communication terminal or the shore-end communication terminal; multiple communication terminal interfaces are respectively connected to multiple communication terminals externally and connected to the data processing module internally to form multiple communication links; The data processing module processes the data received from the communication terminal interface and sends it to the main control module, or processes the data received from the main control module and sends it to the communication terminal through the communication terminal interface; The communication interface and communication terminal interface are standard interfaces, including Ethernet, standard serial port, and USB; A monitoring module and a link switching switch are provided on the connection line between the communication terminal interface and the data processing module. The monitoring module monitors and calculates the information and status of each communication link and sends the link information to the switching module. The communication link information includes communication link delay, packet loss rate, signal-to-noise ratio, energy consumption, and cost parameters; the link switching switch is controlled by the switching module. The switching module can realize opening or closing of the communication link from the hardware through the link switching switch, and can also realize switching of the communication link by selecting to receive information of different links from the software through the control program; When the ship's intelligent navigation control system is in operation, the shore-side system collects basic navigation information through the intelligent monitoring device, and then uses the data transmission and reception adaptive adjustment method to simplify the data specification and determine the information type. The shore-side system sends the simplified data and data type to the communication link switching device through the communication interface; the communication link switching device adopts a multi-link communication method to monitor the communication quality of each communication link in real time, and evaluates the comprehensive quality of each communication link according to the type of data information to be sent. In the automatic mode, the communication link with the best comprehensive quality is used as the data transmission and reception link. In the manual mode, the communication link selected by the user is used as the data transmission and reception link; after determining the communication link, the communication link switching device uses the corresponding communication terminal to send the data to the ship-side system, and the ship-side system performs automatic track control and obstacle avoidance path planning based on the received basic navigation information data; The adaptive adjustment method adopted by the data transmission and reception includes the following steps: the standardized message transmission data format is implemented in sequence, the shore system obtains the basic navigation information of the ship and the ship information, the shore system calculates the influence weight of the basic navigation information of the ship on the navigation state of the ship, the ship and the shore information are transmitted and received at regular intervals and self-stimulated, and the shore system simplifies the data information and sends it; The specific contents of the standardized message sending data format are: standardized message content and the order of arrangement of each content, the message sending content is the receiving time and frequency, traffic conditions, hydrological and meteorological conditions, traffic management, obstacle information and additional information; the hydrological and meteorological conditions include wind speed, rainfall, visibility, and wave information; the additional information includes timestamp and communication link number information; The specific content of simplified data information of the shore system is as follows: the content of the T-secondary data is compared with the content of the T-1-time data. If the receiving time and frequency change, it is modified, otherwise it is replaced by letter a; if the traffic conditions change, it is modified, otherwise it is replaced by letter b; compare and analyze the various contents in the hydrological and meteorological data. If the difference is within the set value, it is replaced by letter c, otherwise it is modified; if the traffic management content changes, it is modified, otherwise it is replaced by letter d; If the obstacle information changes, it will be modified, otherwise it will be replaced by the letter e; The shore-side system calculates the weight of the influence of the basic navigation information of the ship on the navigation status of the ship, which specifically includes the following steps: Step 1: The shore system obtains basic navigation information and ship information, and determines the number of ships going out to sea w; Step 2: The shore system calculates the influence of four basic navigation information of each ship, namely traffic conditions, hydrological and meteorological conditions, traffic management, and obstacle information on the navigation status of the ship, Aw1, Aw2, Aw3, and Aw4; and Aw1+Aw2+Aw3+Aw4=1; Step 3: The shore-side system determines the weight of each basic information on the navigation of each ship according to the basic navigation information of each specific ship, as follows: According to the set weight of the impact of traffic conditions on ship navigation, the weight of the impact of traffic conditions on the navigation of w ships is recorded as N = [N1, N2, ..., Nw-1, Nw]; The weight of the impact of hydrological and meteorological factors on the navigation of w ships is M = [M1, M2, ..., Mw-1, Mw], where the value Mw is calculated as follows: Among them, s is the number of information types contained in the hydrological and meteorological content; M s-ks The weight value of the impact of each specific hydrological and meteorological factor on ship navigation; ks is the number of specific hydrological and meteorological grade divisions; According to the set weight of the impact of traffic management on ship navigation, the weight of the impact of traffic management on the navigation of w ships is recorded as Q = [Q1, Q2, ..., Qw-1, Qw]; According to the set weights of the impact of obstacle information on ship navigation, the weights of the impact of obstacle information on the navigation of w ships are recorded as H = [H1, H2, ..., Hw-1, Hw].
2. The ship intelligent navigation control system according to claim 1, characterized in that: The ship-side system and the shore-side system both include a controller, a data acquisition and processing module, a data storage device, a communication interface and a display terminal; the data storage device includes a local storage device and a cloud storage device; the ship-side communication terminal and the shore-side communication terminal are both standard communication terminals, including radio stations, Beidou, 4G / 5G, and GPS; the data sent and received and shared by the ship-side system and the shore-side system include shore-side system data and ship-side system data; the shore-side system data is basic navigation information, including navigation water type, hydrometeorology, terrain, traffic conditions, traffic management, port terminals and obstacle information; the ship-side data is ship navigation status information, including ship heading angle, speed information, position information, and engine room information.
3. The ship intelligent navigation control system according to claim 1, characterized in that: The intelligent monitoring device includes a control module, which is connected to the AIS module, RFID module, monitoring module, broadcast module, GPS module, WIFI module and communication antenna through a standard communication interface, and is connected to the shore system through a standard interface to realize data transmission; The AIS module and RFID module are used to identify the ship information of passing ships; the monitoring module is used to obtain the ship's navigation images and video data, and transmit them directly to the shore system. The shore system uses image analysis to determine whether the ship is overloaded, whether the crew is wearing life jackets, whether the ship has discarded garbage, and capture unsafe or illegal behaviors of the ship; The broadcast module is used to instantly play instructions and prompt information; the GPS module is used for self-positioning of the current intelligent monitoring device; the WIFI module and communication antenna can realize wireless communication with the wireless equipment on the ship; the intelligent monitoring device obtains real-time information on channel congestion and channel obstacles through the monitoring module.
4. The ship intelligent navigation control system according to claim 1, characterized in that: The self-excitation of the timing reception and transmission of information between the ship and the shore specifically comprises the following steps: Step 1: The shore system calculates the importance F of the data sent to each ship receiving end: F=[F1, F2,…,Fw-1,Fw] Among them, F w = A w1 * N w + A w2 * M w + A w3 * Q w + A w4 * H w ; Step 2: Based on the original set importance and the corresponding relationship between the ship-side receiving terminal opening time, time interval and simplified signal, the shore-side system generates a simplified signal group X of time and frequency according to the importance F of the data sent to each ship-side receiving terminal: X = [X1, X2, ..., Xw-1, Xw] Among them, X1, X2, ..., Xw-1, Xw are the corresponding codes of the importance of w ships, which are obtained by looking up the corresponding table of importance and the opening time and frequency of the ship-side receiving end; Take the maximum value of the weight of each navigation basic information in the data, that is, Max{A w1 *N w , A w2 *M w , A w3 *Q w , A w4 *H w }The corresponding data type is the main influencing data type.
5. The ship intelligent navigation control system according to claim 1, characterized in that: The multi-link communication method comprises the following steps: Step 1: Initialize the communication link Establishing a communication link with the shore system through an initial communication link, and sending and receiving data through the communication link; Step 2: Switch to running mode In the initial state, the link switching mode is manual switching, that is, the operator manually switches the link on and off according to the quality of the communication link; when the operator selects the link switching mode to be automatic, the system automatically switches the communication link on and off according to the quality of the communication link; in the automatic switching mode, when the ship-side system or the shore-side system detects an emergency situation that requires the operator to manually switch the link, the operator is prompted to switch the communication link; The receiving end of each communication terminal is in the open state by default. The user sets one of the ship-side system or the shore-side system as the master device and the other as the slave device through the communication link switching device. The link selected by the master device shall prevail. After the master device selects the best communication link, the link number information is added to the transmitted data. After the slave device receives the information, it automatically switches to the corresponding communication link and continues to communicate with the master device through the link until it receives data containing different communication link number information; Step 3: Communication link performance monitoring The monitoring module monitors the link performance of each communication link. The performance parameters include communication link delay A, packet loss rate B, signal-to-noise ratio C, energy consumption D, and cost E, and sends the link performance parameter information to the switching module and the main control module; each performance parameter sets the evaluation interval range, and the measured value is normalized in proportion within this evaluation interval to obtain a certain performance parameter index of the communication link; after normalizing the remaining performance parameters according to the set evaluation interval, the performance parameter matrix of the communication link i is obtained as follows: Wherein, A~E∈[0,1], i=1,2,…,k; k is the number of communication links; A=1 indicates the lowest communication link delay, and A=0 indicates the highest communication link delay; B = 1 means the communication link packet loss rate is the lowest, and A = 0 means the communication link packet loss rate is the highest; C = 1 means the communication link has the lowest signal-to-noise ratio, and A = 0 means the communication link has the highest signal-to-noise ratio; D = 1 means the communication link has the lowest energy consumption, and A = 0 means the communication link has the highest energy consumption; E = 1 means the communication link cost is the lowest, and E = 0 means the communication link cost is the highest; At the same time, the communication link switching device displays the communication link information with the highest single performance parameter, providing a basis for the operator to manually switch the communication link in an emergency situation in step 2; Step 4: Communication data classification and rating After receiving the data from the ship-side or shore-side system, the communication link switching device determines whether the data contains link number information. If the data contains link number information, step 6 is executed to switch to the corresponding link according to the link number information. If the link number information is not included, the data to be sent is classified and rated according to the type of data to be sent, including traffic conditions, hydrological and meteorological conditions, traffic management, and obstacle information. The dependence of each type of data on one or more performance parameters of the communication link is determined, and the dependence level is set; the dependence of the main impact category data on the communication link performance is determined and expressed as: K j =[P A P B P C P D P E ]; Where j is the type number corresponding to the main impact category data transmitted by the ship-side communication; P A is the dependency value of data on the communication link delay, P B is the dependency value of the data on the packet loss rate of the communication link, P C is the dependency value of the data on the signal-to-noise ratio of the communication link, P D P is the dependency value of data on the energy consumption of the communication link; E is the dependency value of the data on the cost setting; and P A +P B +P C +P D +P E =1; Step 5: Communication link quality assessment The switching module comprehensively evaluates the quality of k links P according to the performance parameters of each link and the dependence of the current main influencing data type on the communication link performance. i , P i =I i ×K j (i=1, 2, 3, ..., k); Take the maximum value from all the calculation results, that is, P n , indicating that the nth link is the best communication link for current data transmission; P n =max(P1,P2,...,P k ) Step 6: Communication link switching After waiting for the current data to be sent, the switching module controls the on and off of each link, connects the link corresponding to the link number information in step 4, or connects the communication link n with the best overall quality in step 5, and uses the communication link to send the data to be sent.
6. An operation control method of the ship intelligent navigation control system as described in any one of claims 1 to 5 above, including ship track automatic control operation, the content of which is: the ship-side system collects the navigation information of the ship, including the position, heading angle, and speed, and at the same time the ship-side system receives the basic navigation information provided by the shore-side system, and calculates the instantaneous heading angle of the ship in combination with the planned navigation path, and controls the ship's rudder angle according to the instantaneous heading angle; the strip area formed by the specified ER width offset on both sides of the planned route is called the track allowable deviation zone; if the ship is navigating within the deviation zone, it is determined that the actual navigation accuracy of the ship has met the requirements of the planned navigation accuracy; once it is found that the ship has exceeded the deviation zone, a deviation alarm is issued and the track automatic control system is started to control the ship to return to the planned route; The specific steps of the automatic track control system to control the ship to return to the planned route are as follows: Step 1: Collect ship navigation information The data acquisition module periodically collects the ship's navigation data, and the heading angle ψ collected for the jth time ξj , speed V j , j∈(1,2,3...), and according to the planned route and the collected ship position information, the track deviation η between the current ship position and the planned route is calculated j ; in, η j The positive and negative of is defined as, along the route, if the ship is on the left side of the route, then η j >0, the ship is on the right side of the route, then η j <0, η j The unit is km; The data acquisition module obtains shore system data through the communication link, adopts a multi-link communication method, realizes automatic switching of the best communication link, and transmits data. The information obtained is used for autonomous obstacle avoidance path planning during the ship's navigation; Step 2: Calculate the instantaneous heading angle ψ of the ship r When the ship deviates from the set route, the track automatic control system adjusts the track according to the track deviation η j Calculate the instantaneous heading angle ψ based on the allowable deviation ER r The current heading angle of the ship ξj The mapping relationship can be expressed as ψ r =ψ ξj +Δθ Among them, Δθ is the heading correction angle, which is determined by a multimodal algorithm; Step 3: Control the ship's heading angle According to the calculated instantaneous heading angle ψ r To control the steering angle ψ of the servo d According to the basic navigation information sent by the shore system, a calculation model is established and analyzed through software calculation to obtain the current navigation conditions, making the ship's heading angle ψ r When the required steering angle is ψ d , which is the target rudder angle.
7. The operation control method of the ship intelligent navigation control system according to claim 6, characterized in that: The specific calculation process of the multi-modal algorithm of the heading correction angle is as follows: ①When |η j | > ER When the track deviation exceeds the limit value, that is, |η j |>ER, the ship is considered to have gone beyond the deviation zone, the system issues a yaw alarm, and the correction angle Δθ takes the maximum value: Δθ=sin(η j )Δθ max Among them, Δθ max Take a value within the range of 15 to 20°; ② When hour Let the ship deviate from the existing track η j Quickly return to the set route in an exponentially decreasing manner: Among them, k is a proportional coefficient, which can be selected according to the condition that Δθ has continuity at ER, that is, when the track deviation η j =ER, Then when When the heading correction angle Δθ = arcsin(kη j / V j ); ③When hour Since the deviation is small, the PI proportional integral control method can be used to calculate the heading correction angle Δθ. Among them, K P , K I To control the parameters, it is determined according to the debugging; when When K I = 0, that is, the integral term is not enabled. When , the integral term is enabled and the integral correction angle is limited Not more than 3° to avoid the influence of integral saturation.
8. An operation control method of the ship intelligent navigation control system according to any one of claims 1 to 5, comprising a navigation obstacle avoidance path planning operation, the contents of which include the following steps: Step 1: Get the work area information The shore system 3 obtains the operation area information, including the target point location coordinates, the fixed obstacle information in the operation area, and the sea condition information; Step 2: Detection of moving obstacles in the work area During navigation, the shore-side system can detect and track moving obstacles through satellite remote sensing, predict the movement trend of moving obstacles in real time, and send the shape, size and coordinate information of moving obstacles to the ship-side system in real time; Step 3: Create a grid map of the work area According to the ship's starting point position S and all target point positions, a grid map is established for the ship's operating area. The range of the grid map covers the starting point and the target point. If there is an unnavigable area near the starting point and the target point, the size of the grid map can be further expanded. Step 4: Mark the non-navigable areas on the grid map In the grid map, the non-navigable areas include reefs, no-fly zones, and moving obstacles. The shore-side system detects the coordinates and size information of reefs, no-fly zones, and moving obstacles, and then performs secondary expansion on the obstacle coverage area. The specific steps are as follows: 4.
1. First, regularize the shape of the obstacle, that is, use a circumscribed circle, circumscribed ellipse or circumscribed rectangle to represent the shape of the obstacle; 4.
2. According to the safety distance R' set by the user, the regularized non-navigable area is expanded and offset outward by a distance R'; In the grid map, the grid covered by the unnavigable area is marked as 1, and the navigable area is marked as 0, so as to realize the marking of the unnavigable area in the grid map; wherein, if the area of the grid covered by the unnavigable area accounts for more than the set percentage value of the area of the grid, the grid is considered to be fully covered, and the grid area is the unnavigable area; Step 5: Ship navigation obstacle avoidance path planning Based on the grid map with obstacle marks, the ship's obstacle avoidance navigation path is planned. If there is a fixed obstacle on the track connecting the ship's position and the target point, the grid midpoint or corner point of the navigable area around the unnavigable area is used as the navigation node. A safe navigation path can be obtained on both sides of the line connecting the ship and the target position, and the navigation path with the shortest distance is taken as the ship's track. If there is a moving obstacle on the track connecting the ship's position and the target point, after the distance between the ship and the moving obstacle reaches the set value, its track is replanned, with the side behind the moving obstacle's moving track as the new path navigation direction, and the grid midpoint or corner point of the navigable area around the moving obstacle as the navigation node, to obtain a safe navigation path as the new ship track.
9. The operation control method of the ship intelligent navigation control system according to claim 8, characterized in that: In the step 4.2, the grid map is constructed by using a rectangular grid, and the grid size of the grid map constructed by using a rectangular grid is set to any number of 2 to 15 times the length of the ship.
10. The operation control method of the ship intelligent navigation control system according to claim 8, characterized in that: In step 4.2, the safety distance R' is any number between 2 and 5 times the length of the ship; in step 4.2, in the grid map, if the grid area covered by the unnavigable area accounts for more than 10% of the grid area, the grid is considered to be fully covered and the grid area is an unnavigable area.
11. The operation control method of the ship intelligent navigation control system according to any one of claims 8 to 10, characterized in that: In step 5, if there is a moving obstacle on the track connecting the ship's position and the target point, the track is replanned within the interval where the distance between the ship and the moving obstacle reaches 10 to 20 times the length of the ship, and the side behind the moving obstacle's moving track is used as the navigation direction of the new path. The grid midpoint or corner point of the navigable area around the moving obstacle is used as the navigation node to obtain a safe navigation path as the new ship track.
Citation Information
Patent Citations
Automatic route planning method for unmanned ship
CN111538332A
Real time perception obstacle evading system and method for unmanned hydrographical survey ship obstacles
CN106909145A
Ship intelligent obstacle avoidance method and system based on artificial potential field
CN107608346A
Shore-side intelligent supervision system
CN108897272A
Intelligent collision avoidance method for ship formation based on path planning and artificial potential field method
CN110471427A
