A method for assessing the risk of hydraulic fracturing and pressure relief impact in coal mining faces

By measuring the apparent resistivity sequence and crack height of the coal mining surface roof and evaluating the impact hazard level, the problems of complex and inaccurate existing detection methods are solved, and the guidance and efficiency of coal mine safety production are improved.

CN114704251BActive Publication Date: 2024-11-08SHENHUA GUONENG ENERGY GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210346253.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-31
Publication Date
2024-11-08
Estimated Expiration
2042-03-31

AI Technical Summary

Technical Problem

The existing coal mining surface top plate pressure relief detection methods are complex, time-consuming and labor-intensive, lacking timeliness and accuracy, making it difficult to effectively evaluate the danger of impact ground pressure, affecting coal mine production safety.

Method used

By determining the position of the area to be unloaded, measuring its original and second apparent resistivity sequence set, calculating the average development height of the fracture after unloading, evaluating the impact hazard level, measuring the apparent resistivity using a transient electromagnetic meter, simplifying the detection process, Improve assessment accuracy.

Benefits of technology

It improves the accuracy and timeliness of impact hazard assessment, can more effectively guide coal mine production safety and reduce impact ground pressure risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114704251B_ABST
    Figure CN114704251B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for assessing the impact hazard of hydraulic fracturing unloading of a coal face, the method comprising the following steps: 1. determining the position of the area to be unloaded; 2. collecting the original apparent resistivity of the area to be unloaded before unloading; 3. unloading the area to be unloaded; 4. measuring the average development height of the internal cracks of the area to be unloaded after unloading; 5. assessing the level of the impact hazard of unloading of the area to be unloaded according to the average development height of the internal cracks of the area to be unloaded after unloading. The beneficial effect of the present invention is that by determining the position of the area to be unloaded, and measuring the apparent resistivity of the area to be unloaded before and after unloading, respectively, the average development height of the internal cracks of the area to be unloaded after unloading is obtained according to the change of the apparent resistivity of the area to be unloaded before and after unloading, and assessing the impact hazard level of the area to be unloaded, the impact hazard level determined by the assessment is more accurate, and can more effectively guide coal mine safety production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mining face roof pressure relief, and in particular relates to a method for assessing the impact hazard of coal mining face hydraulic fracturing pressure relief. Background Art

[0002] In recent years, with the needs of economic development, the depth of coal resource mining has increased year by year, and rock burst disasters have become increasingly severe. It has become the most important disaster affecting the safe production of coal mines in my country, and seriously threatens the safety of underground personnel and equipment. Roof fracture type rock burst is a typical rock burst disaster. The mechanism of roof fracture type rock burst is: with the mining of the working face, the hard roof is not easy to collapse in time, resulting in a large amount of elastic energy accumulating in the roof. Once the roof is unstable and fractured, it will instantly release huge elastic energy, thereby inducing coal body rupture and generating outward projection movement, which eventually causes rock burst, causing vibration and destruction of coal and rock mass, damage to supports and equipment, casualties, collapse and destruction of some tunnels and other dynamic phenomena. Rock burst will also cause or may cause other mine disasters, especially gas and coal dust explosions, fires and floods, interfere with ventilation systems, and cause ground vibrations and building damage in severe cases. At present, coal mines usually adopt deep hole roof blasting and other prevention and control measures to relieve pressure on the coal mine roof, so as to reduce the impact risk of the coal mine roof. After the above means are used to relieve pressure on the coal mine roof, it is necessary to evaluate the pressure relief effect of the coal mine roof. At present, the pressure relief effect of the coal mine roof is mainly detected by the drill cuttings detection method. The drill cuttings detection method requires drilling multiple drill cuttings holes on the coal mine roof to perform pressure relief detection on the coal mine roof. However, with the continuous advancement of the working face, the mining stress distribution is constantly changing. The drill cuttings method is complicated in construction, the detection process is time-consuming and labor-intensive, the detection results are inaccurate, lack of timeliness and accuracy, and the detection efficiency is low. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a method for assessing the impact hazard of hydraulic fracturing and pressure relief of a coal face in view of the deficiencies in the above-mentioned prior art. The method comprises the following steps: determining the position of the area to be relieved and measuring the apparent resistivity of the area to be relieved before and after pressure relief, obtaining an original apparent resistivity sequence set and a second apparent resistivity sequence set of the area to be relieved, and determining the average development height of the internal cracks in the area to be relieved after pressure relief based on the original apparent resistivity sequence set and the second apparent resistivity sequence set of the area to be relieved. Then, based on the average development height of the internal cracks in the area to be relieved after pressure relief and the maximum height of the area to be relieved and the area to be relieved, the impact hazard level of the area to be relieved is assessed. The assessed impact hazard level is more accurate and can more effectively guide coal mine safety production.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for assessing the risk of hydraulic fracturing and pressure relief impact of coal mining face, characterized in that the method comprises the following steps:

[0005] Step 1: Determine the location of the area to be depressurized;

[0006] Step 2: collecting the original apparent resistivity of the area to be depressurized before depressurization;

[0007] Step 3, depressurizing the area to be depressurized;

[0008] Step 4: measuring the average development height of the internal cracks in the area to be depressurized after depressurization;

[0009] Step 5: Evaluate the pressure relief impact hazard level of the area to be relieved based on the average development height of internal cracks in the area to be relieved after pressure relief.

[0010] The above-mentioned method for assessing the risk of hydraulic fracturing and pressure relief impact on a coal face is characterized in that: in step 1, the location of the area to be relieved is determined, and the specific process is as follows:

[0011] Determine the stratum of the hard roof of the coal seam overlying the coal mining working face. The area where the hard roof of the coal seam is located in the vertical downward movement zone is the area to be depressurized.

[0012] The above-mentioned method for assessing the risk of hydraulic fracturing and pressure relief impact on a coal face is characterized in that: in step 2, the original apparent resistivity of the area to be relieved before pressure relief is collected, and the specific process is as follows:

[0013] Step 201: M groups of measuring points are arranged in sequence from back to front along the length direction of the coal mining face, each group of measuring points includes a first measuring point located in the transport tunnel and a second measuring point located in the return air tunnel; wherein M is a positive integer, and M≥3;

[0014] Step 202: measuring the apparent resistivity of the area to be depressurized at M groups of measuring points respectively, and obtaining a set of original apparent resistivity sequences of the M areas to be depressurized. The measuring methods of the apparent resistivity of the area to be depressurized at the M groups of measuring points are the same. When measuring the apparent resistivity of the area to be depressurized at the mth group of measuring points, the following steps are mainly included:

[0015] Step 2021, placing a transient electromagnetic instrument at the first measuring point of the mth group of measuring points, so that the plane where the transmitting coil of the transient electromagnetic instrument is located is parallel to the vertical plane where the central axis of the transport lane is located, and then rotating the transmitting coil of the transient electromagnetic instrument by 90° clockwise. During the rotation of the transmitting coil of the transient electromagnetic instrument, the transient electromagnetic instrument measures the apparent resistivity of the area to be depressurized according to the set measuring interval, and obtains the original apparent resistivity of the area to be depressurized at different angles at the first measuring point of the mth group of measuring points; wherein m is the measuring point number, 1≤m≤M, and the measuring interval is 10°-15°;

[0016] Step 2022, placing the transient electromagnetic instrument at the second measuring point of the mth group of measuring points, so that the plane where the transmitting coil of the transient electromagnetic instrument is located is parallel to the vertical plane where the central axis of the return air tunnel is located, and then rotating the transmitting coil of the transient electromagnetic instrument counterclockwise by 90°. During the rotation of the transmitting coil of the transient electromagnetic instrument, the transient electromagnetic instrument measures the apparent resistivity of the area to be depressurized according to the set measurement interval, and obtains the original apparent resistivity of the area to be depressurized at different angles at the second measuring point of the mth group of measuring points;

[0017] Step 2023: Arrange the original apparent resistivity of the area to be depressurized at different angles at the first measuring point of the mth group of measuring points obtained in step 2021 and the original apparent resistivity of the area to be depressurized at different angles at the second measuring point of the mth group of measuring points obtained in step 2022 in the order of measurement time to obtain the original apparent resistivity sequence set ρ of the area to be depressurized at the mth group of measuring points 0m , the original apparent resistivity series set ρ 0m It includes A original apparent resistivity, and the original apparent resistivity sequence set ρ 0m The ath original apparent resistivity is denoted as ρ 0ma ; Where A is a positive integer, a is the original apparent resistivity number, 1≤a≤A.

[0018] The above-mentioned method for assessing the risk of hydraulic fracturing and pressure relief impact on a coal face is characterized in that: in step three, the pressure relief is performed on the pressure relief area, and the specific process is as follows:

[0019] Step 301, determining the aperture, starting position and ending position of a test borehole to be constructed in the area to be depressurized, constructing a test borehole in the area to be depressurized, and performing hydraulic fracturing in the test borehole; wherein the test borehole is arranged close to the left end of the area to be depressurized, and the center of the test borehole is located on the horizontal center line of the area to be depressurized;

[0020] Step 302: According to the method described in step 202, the apparent resistivity of the area to be depressurized is measured again at the M groups of measuring points to obtain the first apparent resistivity sequence set of the M areas to be depressurized; wherein the apparent resistivity of the area to be depressurized at the m-th group of measuring points is measured to obtain the first apparent resistivity sequence set ρ of the area to be depressurized at the m-th group of measuring points 1m , the first apparent resistivity sequence set ρ 1m A first apparent resistivity sequence set ρ 1m The ath first apparent resistivity is denoted as ρ 1ma ;

[0021] Step 303: Process the first apparent resistivity sequence set and the original apparent resistivity sequence set at the M group of measuring points to obtain the effective fracturing width and effective fracturing height of the test borehole at the M group of measuring points. The method for processing the first apparent resistivity sequence set and the original apparent resistivity sequence set at the M group of measuring points is the same. The first apparent resistivity sequence set ρ at the mth group of measuring points is processed. 1m and the original apparent resistivity series set ρ 0m The data processing mainly includes the following steps:

[0022] Step 3031: For the first apparent resistivity sequence set ρ 1m The A first apparent resistivity and original apparent resistivity series set ρ 0m The A original apparent resistivities in the mth group are matched one by one, and the decrease of the A first apparent resistivities at the mth group of measuring points is calculated respectively; among them, the calculation method of the decrease of the A first apparent resistivities is the same. When calculating the decrease of the ath first apparent resistivity, the formula is used. The decrease J of the ath first apparent resistivity is calculated 1a ;

[0023] Step 3032: According to the A first apparent resistivity drop amplitudes and the first apparent resistivity sequence set ρ 1m The effective fracturing area of ​​the test borehole at the mth group of measuring points is determined by the A first apparent resistivity in the test borehole; wherein, the division basis of the effective fracturing area of ​​the test borehole is: when the ath first apparent resistivity ρ 1ma ≤35Ω·m, and the ath first apparent resistivity ρ 1ma The decline in 1a When ≥50%, the area corresponding to the ath first apparent resistivity is located within the effective fracturing area of ​​the test borehole;

[0024] Step 3033: measure the average width of the effective fracturing area of ​​the test borehole at the mth group of measuring points as the effective fracturing width b of the test borehole at the mth group of measuring points. 1m , measure the average height of the effective fracturing area of ​​the test borehole at the mth group of measuring points as the effective fracturing height h of the test borehole at the mth group of measuring points 1m ;

[0025] Step 304: According to the formula Calculate the average effective fracturing height of the test boreholes in the area to be depressurized

[0026] According to the formula Calculate the average effective fracture width of the test boreholes in the area to be depressurized

[0027] when When , execute step 305, when When , execute step 306; wherein H1 is the maximum height of the area to be depressurized;

[0028] Step 305: construct N rows of pressure relief boreholes along the length direction of the area to be relieved, each row of pressure relief boreholes includes one pressure relief borehole, and perform hydraulic fracturing in the N pressure relief boreholes to complete the pressure relief of the area to be relieved; wherein, represents rounding up, B1 is the maximum width of the area to be depressurized, the structure of the depressurization borehole is the same as that of the test borehole, the centers of the multiple depressurization boreholes and the center of the test borehole are located on the same straight line, and the hole spacing between two adjacent rows of depressurization boreholes is k1.

[0029] Step 306: construct N rows of pressure relief boreholes along the length direction of the area to be relieved, each row of pressure relief boreholes includes two pressure relief boreholes, and hydraulic fracturing is performed in the 2N pressure relief boreholes to complete the pressure relief of the area to be relieved; wherein the two pressure relief boreholes in each row of pressure relief boreholes are located at the upper and lower sides of the test borehole, respectively, and the hole spacing between the two pressure relief boreholes in each row of pressure relief boreholes is k2,

[0030] The above-mentioned method for assessing the risk of hydraulic fracturing and pressure relief impact on a coal face is characterized in that: in step 4, the average height of the internal cracks in the area to be relieved after pressure relief is measured, and the specific process is as follows:

[0031] Step 401: According to the method described in step 302, the apparent resistivity of the area to be depressurized is measured again at M groups of measuring points to obtain a second apparent resistivity sequence set of M areas to be depressurized; wherein, the apparent resistivity of the area to be depressurized at the mth group of measuring points is measured to obtain a second apparent resistivity sequence set ρ of the area to be depressurized at the mth group of measuring points 2m , the second apparent resistivity series set ρ 2m A second apparent resistivity sequence set ρ 2m The ath second apparent resistivity is denoted as ρ 2ma ;

[0032] Step 402: According to the method described in step 303, the second apparent resistivity sequence set and the original apparent resistivity sequence set at the M groups of measuring points are processed to obtain the effective fracturing area and effective fracturing height of the N columns of pressure relief boreholes at the M groups of measuring points; wherein the effective fracturing height of the nth column of pressure relief boreholes at the mth group of measuring points is h 2mn , n is a positive integer, and 1≤n≤N;

[0033] Step 403: According to the formula Calculate the average effective fracturing height of N rows of pressure relief boreholes at the mth group of measuring points

[0034] Step 404: According to the formula Calculate the average fracturing height of N rows of decompression boreholes in the decompression area Then the average development height H2 of the internal cracks in the area to be unloaded after unloading is obtained.

[0035] The above-mentioned method for assessing the risk of hydraulic fracturing pressure relief impact on a coal face is characterized in that: in step 5, the pressure relief impact risk level of the pressure relief area to be relieved is judged according to the average development height of the internal cracks in the pressure relief area after pressure relief, and the specific process is as follows:

[0036] When 0.1H1≤H2≤0.8H1, the impact hazard level of the area to be depressurized is Level I impact hazard;

[0037] When 0.8H1<H2

[0038] When H2≥H1, the impact hazard level of the area to be depressurized is level III impact hazard;

[0039] The risk of the level I impact hazard is higher than that of the level II impact hazard, and the risk of the level II impact hazard is higher than that of the level III impact hazard.

[0040] The above-mentioned method for assessing the hazard of hydraulic fracturing and pressure relief impact of coal mining faces is characterized in that: the starting position and the ending position of the test borehole in step 301 are both located in front of the cut eye of the working face, the starting position of the test borehole is determined by the width of the coal mining working face, and the distance L1 between the starting position of the test borehole and the cut eye of the working face is L1=2B0+L0, B0 is the width of the coal mining working face, L0 is the distance between the ending position of the test borehole and the cut eye of the working face, and the value range of L0 is 20m~40m.

[0041] The beneficial effect of the present invention is that by determining the position of the area to be unloaded and measuring the apparent resistivity of the area to be unloaded before and after the pressure relief, an original apparent resistivity sequence set and a second apparent resistivity sequence set of the area to be unloaded are obtained, and the average development height of the internal cracks in the area to be unloaded after the pressure relief is determined according to the original apparent resistivity sequence set and the second apparent resistivity sequence set of the area to be unloaded, and then according to the average development height of the internal cracks in the area to be unloaded after the pressure relief and the maximum height of the area to be unloaded and the area to be unloaded, the impact hazard level of the area to be unloaded is evaluated, and the impact hazard level determined by the evaluation is more accurate and can more effectively guide coal mine safety production.

[0042] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments.​ BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a flowchart of the method of the present invention.

[0044] Figure 2 This is a schematic diagram of the structure of Example 1 of the present invention.

[0045] Figure 3 This is a schematic diagram of the structure of Example 2 of the present invention.

[0046] Figure 4 It is a schematic diagram of the positional relationship of the area to be depressurized, the transport tunnel, the return air tunnel, the test borehole and the depressurization borehole of the present invention.

[0047] Description of reference numerals:

[0048] 1—coal mining face; 2—hard roof of coal seam; 3—vertical downward movement area;

[0049] 4—area to be depressurized; 4-1—depressurization section; 4-2—safety section;

[0050] 5—Transport tunnel; 6—Return air tunnel; 7—Transient electromagnetic instrument;

[0051] 8—test drilling hole; 9—pressure relief drilling hole; 10—first measuring point;

[0052] 11—The second measuring point. DETAILED DESCRIPTION

[0053] like Figures 1 to 4 As shown, a method for assessing the risk of hydraulic fracturing and pressure relief impact of a coal face according to the present invention comprises:

[0054] Step 1: Determine the location of the area to be depressurized;

[0055] Step 2: collecting the original apparent resistivity of the area to be depressurized before depressurization;

[0056] Step 3, depressurizing the area to be depressurized;

[0057] Step 4: measuring the average development height of the internal cracks in the area to be depressurized after depressurization;

[0058] Step 5: Evaluate the pressure relief impact hazard level of the area to be relieved based on the average development height of internal cracks in the area to be relieved after pressure relief.

[0059] The beneficial effect of the present invention is that by determining the position of the area to be unloaded, and measuring the apparent resistivity of the area to be unloaded 4 before and after the pressure relief, the original apparent resistivity sequence set and the second apparent resistivity sequence set of the area to be unloaded 4 are obtained, and the average development height of the internal cracks of the area to be unloaded 4 after the pressure relief is determined according to the original apparent resistivity sequence set and the second apparent resistivity sequence set of the area to be unloaded 4, and then according to the average development height of the internal cracks of the area to be unloaded 4 after the pressure relief and the maximum height of the area to be unloaded 4 and the area to be unloaded 4, the impact hazard level of the area to be unloaded 4 is evaluated, and the impact hazard level determined by the evaluation is more accurate and can more effectively guide coal mine safety production.

[0060] like Figure 2 and Figure 3 As shown, in this embodiment, the position of the area to be depressurized is determined in step 1, and the specific process is as follows:

[0061] The layer position of the hard roof 2 of the coal seam overlying the coal mining working face 1 is determined, and the area where the hard roof 2 of the coal seam is located in the vertical downward movement area 3 is the area 4 to be depressurized.

[0062] In the present embodiment, it should be noted that when determining the position of the area 4 to be unloaded, the position of the vertical downward movement zone 3 in the five overlying rock zones is first determined, and then the specific position of the area to be unloaded is determined according to the stratigraphic position of the hard roof 2 of the coal seam. The rock strata in the vertical downward movement zone 3 move perpendicularly to the ore layer under the action of gravity. The overlying rock in the vertical downward movement zone 3 is more prone to bending and deformation, and is more prone to weakening and cracking than the overlying rock in other areas. Therefore, the area with the hard roof 2 of the coal seam located in the vertical downward movement zone 3 is selected as the area 4 to be unloaded, so as to ensure the unloading effect of the hard roof 2 of the coal seam, and at the same time, can effectively reduce the unloading workload of the hard roof 2 of the coal seam.

[0063] In this embodiment, in actual use, the maximum width of the area to be relieved 4 is used as the overall width of the area to be relieved 4, so that the area to be relieved 4 has a rectangular structure, which is convenient for ensuring the pressure relief effect of the area to be relieved 4.

[0064] like Figure 3 and Figure 4 As shown, in this embodiment, in step 2, the original apparent resistivity of the area to be depressurized before depressurization is collected, and the specific process is as follows:

[0065] Step 201, M groups of measuring points are arranged in sequence from back to front along the length direction of the coal mining working face 1, each group of measuring points includes a first measuring point 10 located in the transport tunnel 5 and a second measuring point 11 located in the return air tunnel 6; wherein M is a positive integer, and M≥3;

[0066] Step 202, measuring the apparent resistivity of the area 4 to be depressurized at M groups of measuring points respectively, and obtaining a set of original apparent resistivity sequences of the M areas 4 to be depressurized. The measuring methods of the apparent resistivity of the area 4 to be depressurized at the M groups of measuring points are the same. When measuring the apparent resistivity of the area 4 to be depressurized at the mth group of measuring points, the following steps are mainly included:

[0067] Step 2021, placing the transient electromagnetic instrument 7 at the first measuring point 10 of the m-th group of measuring points, so that the plane where the transmitting coil of the transient electromagnetic instrument 7 is located is parallel to the vertical plane where the central axis of the transport tunnel 5 is located, and then rotating the transmitting coil of the transient electromagnetic instrument 7 90° clockwise. During the rotation of the transmitting coil of the transient electromagnetic instrument 7, the transient electromagnetic instrument 7 measures the apparent resistivity of the area to be depressurized 4 according to the set measuring interval, and obtains the original apparent resistivity of the area to be depressurized 4 at different angles at the first measuring point 10 of the m-th group of measuring points; wherein m is the measuring point number, 1≤m≤M, and the measuring interval is 10°~15°;

[0068] Step 2022, placing the transient electromagnetic instrument 7 at the second measuring point 11 of the m-th group of measuring points, so that the plane where the transmitting coil of the transient electromagnetic instrument 7 is located is parallel to the vertical plane where the central axis of the return air tunnel 6 is located, and then rotating the transmitting coil of the transient electromagnetic instrument 7 counterclockwise by 90°. During the rotation of the transmitting coil of the transient electromagnetic instrument 7, the transient electromagnetic instrument 7 measures the apparent resistivity of the area to be depressurized 4 according to the set measurement interval, and obtains the original apparent resistivity of the area to be depressurized 4 at different angles at the second measuring point 11 of the m-th group of measuring points;

[0069] Step 2023: Arrange the original apparent resistivity of the area 4 to be depressurized at different angles at the first measuring point 10 of the mth group of measuring points obtained in step 2021 and the original apparent resistivity of the area 4 to be depressurized at different angles at the second measuring point 11 of the mth group of measuring points obtained in step 2022 in the order of measurement time to obtain the original apparent resistivity sequence set ρ of the area 4 to be depressurized at the mth group of measuring points. 0m , the original apparent resistivity series set ρ 0m It includes A original apparent resistivity, and the original apparent resistivity sequence set ρ 0m The ath original apparent resistivity is denoted as ρ 0ma ; Where A is a positive integer, a is the original apparent resistivity number, 1≤a≤A.

[0070] In the present embodiment, it should be noted that when the transient electromagnetic instrument 7 is used to measure the apparent resistivity of the pressure relief area 4, a high-power transient electromagnetic instrument 7 is placed in the transport tunnel 5 or the return air tunnel 6 according to the principle of electromagnetic induction. The sudden change of the large current of the transient electromagnetic instrument 7 excites the transient electromagnetic field. The low-frequency part of these transient electromagnetic fields can effectively enter the rock formation where the pressure relief area 4 is located, and excite a secondary induced electromotive force in the rock formation where the pressure relief area 4 is located. The secondary induced electromotive force is related to the conductivity of the rock formation where the pressure relief area 4 is located. The secondary induced electromotive force can effectively pass through the rock formation and enter the receiving coil of the transient electromagnetic instrument 7 again. The apparent resistivity of the rock formation where the pressure relief area 4 is located is obtained by measuring the secondary induced electromotive force. The measurement is convenient, and no other drilling construction is required in the coal mine tunnel, which saves time and effort, and has high measurement accuracy, which is convenient for popularization and use.

[0071] In step 201, M groups of measuring points are arranged in sequence from back to front along the length direction of the area to be depressurized 4, the first group of measuring points in the M groups of measuring points and the end position of the test borehole 8 in the area to be depressurized 4 are located on the same vertical plane, and the last group of measuring points in the M groups of measuring points and the starting position of the test borehole 8 in the area to be depressurized 4 are located on the same vertical plane; each group of measuring points includes a first measuring point 10 and a second measuring point 11, and by measuring the apparent resistivity of the area to be depressurized 4 around the group of measuring points at the first measuring point 10 and the second measuring point 11 respectively, the apparent resistivity of the area to be depressurized 4 in a segment around the group of measuring points can be measured in all directions, and the measurement range is wide and the measurement accuracy is high;

[0072] By measuring the apparent resistivity of the area 4 to be depressurized at the M group of measuring points respectively, it is convenient to evaluate the overall depressurization effect of the area 4 to be depressurized later, and the evaluation accuracy is high;

[0073] In step 202, when measuring the apparent resistivity of the area to be depressurized 4 at each measuring point, the transient electromagnetic instrument 7 needs to be rotated to ensure that the measurement range of the transient electromagnetic instrument 7 covers the entire area to be depressurized 4, thereby improving the assessment accuracy of the assessment method.

[0074] In this embodiment, in step 2021, when the transmitting coil of the transient electromagnetic instrument 7 rotates 90° clockwise, the transient electromagnetic instrument 7 rotates with its bottom edge as the center; in step 2022, when the transmitting coil of the transient electromagnetic instrument 7 rotates 90° counterclockwise, the transient electromagnetic instrument 7 rotates with its bottom edge as the center.

[0075] like Figure 2 , Figure 3 and Figure 4 As shown, in this embodiment, in step three, the pressure is released in the area to be released, and the specific process is as follows:

[0076] Step 301, determining the aperture, starting position and ending position of the test borehole 8 to be constructed in the area 4 to be depressurized, constructing a test borehole 8 in the area 4 to be depressurized, and performing hydraulic fracturing in the test borehole 8; wherein the test borehole 8 is arranged close to the left end of the area 4 to be depressurized, and the center of the test borehole 8 is located on the horizontal center line of the area 4 to be depressurized;

[0077] Step 302: According to the method described in step 202, the apparent resistivity of the area to be depressurized 4 is measured again at the M groups of measuring points to obtain the first apparent resistivity sequence set of the M areas to be depressurized 4; wherein the apparent resistivity of the area to be depressurized 4 at the m-th group of measuring points is measured to obtain the first apparent resistivity sequence set ρ of the area to be depressurized 4 at the m-th group of measuring points 1m , the first apparent resistivity sequence set ρ 1m A first apparent resistivity sequence set ρ 1m The ath first apparent resistivity is denoted as ρ 1ma ;

[0078] Step 303: Process the first apparent resistivity sequence set and the original apparent resistivity sequence set at the M group of measuring points to obtain the effective fracturing width and effective fracturing height of the test borehole 8 at the M group of measuring points. The method for processing the first apparent resistivity sequence set and the original apparent resistivity sequence set at the M group of measuring points is the same. The first apparent resistivity sequence set ρ at the mth group of measuring points is processed. 1m and the original apparent resistivity series set ρ 0m The data processing mainly includes the following steps:

[0079] Step 3031: For the first apparent resistivity sequence set ρ 1m The A first apparent resistivity and original apparent resistivity series set ρ 0m The A original apparent resistivities in the mth group are matched one by one, and the decrease of the A first apparent resistivities at the mth group of measuring points is calculated respectively; among them, the calculation method of the decrease of the A first apparent resistivities is the same. When calculating the decrease of the ath first apparent resistivity, the formula is used. The decrease J of the ath first apparent resistivity is calculated 1a ;

[0080] Step 3032: According to the A first apparent resistivity drop amplitudes and the first apparent resistivity sequence set ρ 1m The effective fracturing area of ​​the test borehole 8 at the mth group of measuring points is determined by the A first apparent resistivity in the test borehole 8; wherein the division basis of the effective fracturing area of ​​the test borehole 8 is: when the ath first apparent resistivity ρ 1ma ≤35Ω·m, and the ath first apparent resistivity ρ 1ma The decline in 1a≥50%, the area corresponding to the ath first apparent resistivity is located within the effective fracturing area of ​​the test borehole 8;

[0081] Step 3033: measure the average width of the effective fracturing area of ​​the test borehole 8 at the mth group of measuring points as the effective fracturing width b of the test borehole 8 at the mth group of measuring points. 1m , measure the average height of the effective fracturing area of ​​the test borehole 8 at the mth group of measuring points as the effective fracturing height h of the test borehole 8 at the mth group of measuring points 1m ;

[0082] Step 304: According to the formula Calculate the average effective fracturing height of the test borehole 8 in the area 4 to be depressurized

[0083] According to the formula Calculate the average effective fracturing width of the test borehole 8 in the area 4 to be depressurized

[0084] when When , execute step 305, when When , execute step 306; wherein H1 is the maximum height of the area to be depressurized 4;

[0085] Step 305: construct N rows of pressure relief boreholes along the length direction of the pressure relief area 4, each row of pressure relief boreholes includes a pressure relief borehole 9, and perform hydraulic fracturing in the N pressure relief boreholes 9 to complete the pressure relief of the pressure relief area 4; wherein, represents rounding up, B1 is the maximum width of the pressure relief area 4, the structure of the pressure relief borehole 9 is the same as that of the test borehole 8, the centers of the multiple pressure relief boreholes 9 and the center of the test borehole 8 are located on the same straight line, and the hole spacing between two adjacent rows of pressure relief boreholes is k1,

[0086] Step 306: construct N rows of pressure relief boreholes along the length direction of the pressure relief area 4, each row of pressure relief boreholes includes two pressure relief boreholes 9, and implement hydraulic fracturing in the 2N pressure relief boreholes 9 to complete the pressure relief of the pressure relief area 4; wherein the two pressure relief boreholes 9 in each row of pressure relief boreholes 9 are respectively located at the upper and lower sides of the test borehole 8, and the hole spacing between the two pressure relief boreholes 9 in each row of pressure relief boreholes is k2,

[0087] In this embodiment, in actual use, in step 3, a test borehole 8 is constructed in the pressure relief area 4, and hydraulic fracturing is performed in the test borehole 8. The original apparent resistivity sequence set and the first apparent resistivity sequence set measured before and after the construction of the test borehole 8 are compared to determine the average effective fracturing height of the test borehole 8 in the pressure relief area 4. and the average effective fracture width And according to the average effective fracturing width of the test borehole 8 in the pressure relief area 4 Determine the number of columns of decompression boreholes to be constructed, based on the average effective fracturing height of the test boreholes 8 in the decompression area 4 The number of pressure relief boreholes 9 included in each column of pressure relief boreholes is determined.

[0088] In this embodiment, when The average effective fracturing height of test borehole 8 is shown as It cannot cover the maximum height of the pressure relief area 4. If only one pressure relief borehole 9 is constructed in each row, it is difficult to achieve the ideal pressure relief effect after the pressure relief area 4 is relieved. When two pressure relief holes 9 are constructed in each row, the pressure relief area 4 is effectively relieved, saving time and effort; The average effective fracturing height of test borehole 8 is shown as The height that can cover the hard roof 2 of the coal seam, theoretically, one pressure relief borehole 9 is constructed in each row, and the pressure relief area 4 can achieve an ideal pressure relief effect after the pressure relief is completed.

[0089] In this embodiment, the area to be depressurized 4 includes a depressurization section 4-1 and a safety section 4-2. The test borehole 8 and the depressurization borehole 9 are both located in the depressurization section 4-1. The safety section 4-2 is located between the depressurization section 4-1 and the working face opening. The distance between the end position of the test borehole 8 and the working face opening is the length of the safety section 4-2. By setting the safety section 4-2, it is avoided that the normal operation of the working face opening is affected when the test borehole 8 and the depressurization borehole 9 are injected with water in the depressurization section 4-1, and a safety range is left, which has good safety.

[0090] In this embodiment, the test borehole 8 and the pressure relief borehole 9 are both directional long-distance boreholes, the aperture of the pressure relief borehole 9 is equal to the aperture of the test borehole 8, the starting position of the pressure relief borehole 9 is the same as the starting position of the test borehole 8, and the ending position of the pressure relief borehole 9 is the same as the ending position of the test borehole 8.

[0091] In this embodiment, hydraulic fracturing is implemented in the pressure relief borehole 9 to pre-form multiple fracturing cracks in the pressure relief area 4, so that the strength of the hard roof 2 of the coal seam is reduced along the crack direction, which makes the hard roof 2 of the coal seam easy to collapse, reduces the hanging length of the hard roof 2 of the coal seam, and thus the impact ground pressure strength of the hard roof 2 of the coal seam.

[0092] In this embodiment, in step 4, the average development height of the internal cracks in the area to be unloaded after unloading is measured, and the specific process is as follows:

[0093] Step 401: According to the method described in step 302, the apparent resistivity of the area to be depressurized 4 is measured again at M groups of measuring points to obtain a second apparent resistivity sequence set of M areas to be depressurized 4; wherein the apparent resistivity of the area to be depressurized 4 is measured at the m-th group of measuring points to obtain a second apparent resistivity sequence set ρ of the area to be depressurized 4 at the m-th group of measuring points 2m , the second apparent resistivity series set ρ 2m A second apparent resistivity sequence set ρ 2m The ath second apparent resistivity is denoted as ρ 2ma ;

[0094] Step 402: According to the method described in step 303, the second apparent resistivity sequence set and the original apparent resistivity sequence set at the M groups of measuring points are processed to obtain the effective fracturing area and effective fracturing height of the N columns of pressure relief boreholes 9 at the M groups of measuring points; wherein the effective fracturing height of the nth column of pressure relief boreholes 9 at the mth group of measuring points is h 2mn , n is a positive integer, and 1≤n≤N;

[0095] Step 403: According to the formula Calculate the average effective fracturing height of N rows of pressure relief boreholes at the mth group of measuring points

[0096] Step 404: According to the formula Calculate the average fracturing height of N rows of decompression boreholes in the decompression area 4 Then the average development height H2 of the internal cracks in the area to be unloaded after unloading is obtained.

[0097] In this embodiment, it should be noted that the effective fracturing height of the nth column of relief boreholes 9 at the mth group of measuring points in step 402 refers to the sum of the effective fracturing heights of all relief boreholes 9 in the nth column of relief boreholes 9 at the mth group of measuring points.

[0098] In this embodiment, in step 4, the apparent resistivity of the area to be unloaded 4 after the unloading is completed is measured by the transient electromagnetic instrument 7 to obtain a second apparent resistivity sequence set, and the original apparent resistivity sequence set collected before and after the unloading of the area to be unloaded 4 and the second apparent resistivity sequence set are compared to obtain the average development height H2 of the cracks in the area to be unloaded 4. The average development height H2 of the cracks in the area to be unloaded 4 is the average fracturing height of the N columns of unloading boreholes at the M group of measuring points. The average value of the average development height H2 of the cracks in the area to be unloaded 4 can effectively and accurately represent the development height of the cracks inside the area to be unloaded 4 after the unloading of the entire area to be unloaded 4 is completed, and the measurement result has good accuracy.

[0099] In this embodiment, in step 5, the pressure relief impact hazard level of the pressure relief area to be relieved is evaluated according to the average development height of the internal cracks in the pressure relief area after pressure relief, and the specific process is as follows:

[0100] When 0.1H1≤H2≤0.8H1, the impact hazard level of the area 4 to be depressurized is level I impact hazard;

[0101] When 0.8H1<H2

[0102] When H2≥H1, the impact hazard level of the area 4 to be depressurized is level III impact hazard;

[0103] The risk of the level I impact hazard is higher than that of the level II impact hazard, and the risk of the level II impact hazard is higher than that of the level III impact hazard.

[0104] In the present embodiment, it should be noted that in step five, by judging the relationship between the average development height H2 of the internal cracks in the to-be-unloaded area after pressure relief and the maximum height H1 of the to-be-unloaded area 4, the impact hazard degree of the to-be-unloaded area 4 during the mining of the coal mining face 1 is evaluated to obtain the rock burst hazard level of the to-be-unloaded area 4 after pressure relief; when H2≥H1, the to-be-unloaded area 4 after pressure relief is less affected by the stress disturbance of the mining of the coal mining face 1, and at this time, the impact hazard level of the to-be-unloaded area 4 is level III impact hazard; when 0.8H1<H2

[0105] In this embodiment, the starting position and the ending position of the test borehole 8 in step 301 are both located in front of the cut hole of the working face. The starting position of the test borehole 8 is determined by the width of the coal mining working face 1. The distance L1 between the starting position of the test borehole 8 and the cut hole of the working face is L1=2b0+L0, where b0 is the width of the coal mining working face 1, and L0 is the distance between the ending position of the test borehole 8 and the cut hole of the working face. The value range of L0 is 20m to 40m.

[0106] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.​​

Claims

1. A method for assessing the risk of hydraulic fracturing and pressure relief impact at a coal mining face. It is characterized in that The method comprises the following steps: Step 1: Determine the location of the area to be depressurized; Step 2: collecting the original apparent resistivity of the area to be depressurized before depressurization; Step 3, depressurizing the area to be depressurized; Step 4: measuring the average development height of the internal cracks in the area to be depressurized after depressurization; Step 5: Evaluate the pressure relief impact hazard level of the pressure relief area according to the average development height of the internal cracks in the pressure relief area after pressure relief; Among them, in step 2, the original apparent resistivity of the area to be depressurized before depressurization is collected, and the specific process is as follows: Step 201: M groups of measuring points are arranged in sequence from back to front along the length direction of the coal mining working face (1), each group of measuring points includes a first measuring point (10) located in the transport tunnel (5) and a second measuring point (11) located in the return air tunnel (6); wherein M is a positive integer, and M≥3; Step 202, measuring the apparent resistivity of the area to be relieved (4) at M groups of measuring points respectively, to obtain a set of original apparent resistivity sequences of the M areas to be relieved (4), wherein the measuring methods of the apparent resistivity of the areas to be relieved (4) at the M groups of measuring points are the same, and when measuring the apparent resistivity of the area to be relieved (4) at the mth group of measuring points, the following steps are included: Step 2021, placing the transient electromagnetic instrument (7) at the first measuring point (10) of the m-th group of measuring points, so that the plane where the transmitting coil of the transient electromagnetic instrument (7) is located is parallel to the vertical plane where the central axis of the transport tunnel (5) is located, and then rotating the transmitting coil of the transient electromagnetic instrument (7) 90° clockwise. During the rotation of the transmitting coil of the transient electromagnetic instrument (7), the transient electromagnetic instrument (7) measures the apparent resistivity of the area to be depressurized (4) according to the set measurement interval, and obtains the original apparent resistivity of the area to be depressurized (4) at different angles at the first measuring point (10) of the m-th group of measuring points; wherein m is the measuring point number, 1≤m≤M, and the measurement interval is 10° to 15°; Step 2022, placing the transient electromagnetic instrument (7) at the second measuring point (11) of the m-th group of measuring points, so that the plane where the transmitting coil of the transient electromagnetic instrument (7) is located is arranged parallel to the vertical plane where the central axis of the return air tunnel (6) is located, and then rotating the transmitting coil of the transient electromagnetic instrument (7) counterclockwise by 90°. During the rotation of the transmitting coil of the transient electromagnetic instrument (7), the transient electromagnetic instrument (7) measures the apparent resistivity of the area to be depressurized (4) according to the set measurement interval, and obtains the original apparent resistivity of the area to be depressurized (4) at different angles at the second measuring point (11) of the m-th group of measuring points; Step 2023: Arrange the original apparent resistivity of the area to be depressurized (4) at different angles at the first measuring point (10) of the m-th group of measuring points obtained in step 2021 and the original apparent resistivity of the area to be depressurized (4) at different angles at the second measuring point (11) of the m-th group of measuring points obtained in step 2022 in the order of measurement time to obtain an original apparent resistivity sequence set ρ of the area to be depressurized (4) at the m-th group of measuring points. 0m , the original apparent resistivity series set ρ 0m It includes A original apparent resistivity, and the original apparent resistivity sequence set ρ 0m The ath original apparent resistivity is denoted as ρ 0ma ; Where A is a positive integer, a is the original apparent resistivity number, 1≤a≤A; Among them, in step three, the pressure is relieved in the area to be relieved, and the specific process is as follows: Step 301, determining the aperture, starting position and ending position of a test borehole (8) to be constructed in the area to be depressurized (4), constructing a test borehole (8) in the area to be depressurized (4), and performing hydraulic fracturing in the test borehole (8); wherein the test borehole (8) is arranged close to the left end of the area to be depressurized (4), and the center of the test borehole (8) is located on the horizontal center line of the area to be depressurized (4); Step 302: According to the method described in step 202, the apparent resistivity of the area to be depressurized (4) is measured again at M groups of measuring points to obtain a first apparent resistivity sequence set of M areas to be depressurized (4); wherein the apparent resistivity of the area to be depressurized (4) at the mth group of measuring points is measured to obtain a first apparent resistivity sequence set ρ of the area to be depressurized (4) at the mth group of measuring points 1m , the first apparent resistivity sequence set ρ 1m A first apparent resistivity sequence set ρ 1m The ath first apparent resistivity is denoted as ρ 1ma ; Step 303: Data processing is performed on the first apparent resistivity sequence set and the original apparent resistivity sequence set at the M group of measuring points to obtain the effective fracturing width and effective fracturing height of the test borehole (8) at the M group of measuring points. The data processing method for the first apparent resistivity sequence set and the original apparent resistivity sequence set at the M group of measuring points is the same. The first apparent resistivity sequence set ρ at the mth group of measuring points is processed. 1m and the original apparent resistivity series set ρ 0m The data processing includes the following steps: Step 3031: For the first apparent resistivity sequence set ρ 1m The A first apparent resistivity and original apparent resistivity series set ρ 0m The A original apparent resistivities in the mth group are matched one by one, and the decrease of the A first apparent resistivities at the mth group of measuring points is calculated respectively; among them, the calculation method of the decrease of the A first apparent resistivities is the same. When calculating the decrease of the ath first apparent resistivity, the formula is used. The decrease J of the ath first apparent resistivity is calculated 1a ; Step 3032: According to the A first apparent resistivity drop amplitudes and the first apparent resistivity sequence set ρ 1m The effective fracturing area of ​​the test borehole (8) at the mth group of measuring points is determined by the A first apparent resistivity in the test borehole (8); wherein the effective fracturing area of ​​the test borehole (8) is divided according to: when the ath first apparent resistivity ρ 1ma ≤35Ω·m, and the ath first apparent resistivity ρ 1ma The decline in 1a When ≥50%, the area corresponding to the ath first apparent resistivity is located within the effective fracturing area of ​​the test borehole (8); Step 3033: measure the average width of the effective fracturing area of ​​the test borehole (8) at the mth group of measuring points as the effective fracturing width b of the test borehole (8) at the mth group of measuring points. 1m , measure the average height of the effective fracturing area of ​​the test borehole (8) at the mth group of measuring points as the effective fracturing height h of the test borehole (8) at the mth group of measuring points 1m ; Step 304: According to the formula Calculate the average effective fracturing height of the test borehole (8) in the area to be depressurized (4) According to the formula Calculate the average effective fracturing width of the test borehole (8) in the area to be depressurized (4) when When , execute step 305, when When , execute step 306; wherein, H 1 is the maximum height of the area to be depressurized (4); Step 305: construct N rows of pressure relief boreholes along the length direction of the pressure relief area (4), each row of pressure relief boreholes includes a pressure relief borehole (9), and perform hydraulic fracturing in the N pressure relief boreholes (9) to complete the pressure relief of the pressure relief area (4); wherein: Indicates rounding up, B 1 is the maximum width of the pressure relief area (4), the structure of the pressure relief borehole (9) is the same as that of the test borehole (8), the centers of the plurality of pressure relief boreholes (9) and the center of the test borehole (8) are located on the same straight line, and the hole spacing between two adjacent rows of pressure relief boreholes is k 1 , Step 306: construct N rows of pressure relief boreholes along the length direction of the pressure relief area (4), each row of pressure relief boreholes includes two pressure relief boreholes (9), and implement hydraulic fracturing in the 2N pressure relief boreholes (9) to complete the pressure relief of the pressure relief area (4); wherein the two pressure relief boreholes (9) in each row of pressure relief boreholes (9) are located at the upper and lower sides of the test borehole (8), respectively, and the hole spacing between the two pressure relief boreholes (9) in each row of pressure relief boreholes is k. 2 , In step 5, the pressure relief impact hazard level of the pressure relief area is evaluated according to the average development height of the internal cracks in the pressure relief area after pressure relief. The specific process is as follows: When 0.1H 1 ≤H 2 ≤0.8H 1 When the pressure is released, the impact hazard level of the area to be depressurized (4) is level I impact hazard; When 0.8H 1 <H 2 <H 1 When the pressure is released, the impact hazard level of the area to be depressurized (4) is level II impact hazard; When H 2 ≥H 1 When the pressure is released, the impact hazard level of the area to be depressurized (4) is level III impact hazard; The risk of the level I impact hazard is higher than that of the level II impact hazard, and the risk of the level II impact hazard is higher than that of the level III impact hazard.

2. A method for assessing the risk of hydraulic fracturing and pressure relief impact in a coal face according to claim 1, Features: In step 1, the location of the area to be depressurized is determined. The specific process is as follows: The layer position of the hard roof (2) of the coal seam overlying the coal mining working face (1) is determined, and the area of ​​the hard roof (2) of the coal seam located in the vertical downward movement area (3) is the area to be depressurized (4).

3. A method for assessing the risk of hydraulic fracturing and pressure relief impact at a coal face according to claim 1, Features: In step 4, the average height of the internal cracks in the area to be unloaded after unloading is measured. The specific process is as follows: Step 401: According to the method described in step 302, the apparent resistivity of the area to be depressurized (4) is measured again at M groups of measuring points to obtain a second apparent resistivity sequence set of M areas to be depressurized (4); wherein the apparent resistivity of the area to be depressurized (4) is measured at the m-th group of measuring points to obtain a second apparent resistivity sequence set ρ of the area to be depressurized (4) at the m-th group of measuring points. 2m , the second apparent resistivity series set ρ 2m A second apparent resistivity sequence set ρ 2m The ath second apparent resistivity is denoted as ρ 2ma ; Step 402: According to the method described in step 303, data processing is performed on the second apparent resistivity sequence set and the original apparent resistivity sequence set at the M groups of measuring points to obtain the effective fracturing area and effective fracturing height of the N columns of pressure relief boreholes (9) at the M groups of measuring points; wherein the effective fracturing height of the nth column of pressure relief boreholes (9) at the mth group of measuring points is h 2mn , n is a positive integer, and 1≤n≤N; Step 403: According to the formula Calculate the average effective fracturing height of N rows of pressure relief boreholes at the mth group of measuring points Step 404: According to the formula Calculate the average fracturing height of N rows of decompression boreholes in the decompression area (4) Then the average development height H of the internal cracks in the area to be unloaded after unloading is obtained. 2 , 4. A method for assessing the risk of hydraulic fracturing and pressure relief impact at a coal face according to claim 1, Features: In step 301, the starting position and the ending position of the test borehole (8) are both located in front of the cut hole of the working face. The starting position of the test borehole (8) is determined by the width of the coal mining working face (1). The distance L between the starting position of the test borehole (8) and the cut hole of the working face is 1 =2B 0 +L 0 , B 0 is the width of the coal mining face (1), L 0 The distance between the end position of the test hole (8) and the cut hole on the working surface, L 0 The value range is 20m~40m.