Analysis Method of Effective Residual Capacity of Ground-based Measurement and Control Network

By screening and quantitatively evaluating the available arc segments in the ground-based measurement and control network, the problem that the existing technology cannot accurately reflect the actual emergency support capability is solved, and rapid quantitative judgment and scheduling algorithm optimization of the emergency support capability of the ground-based measurement and control network are achieved.

CN114742424BInactive Publication Date: 2024-10-29CHINA XIAN SATELLITE CONTROL CENT
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210415696.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-20
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing ground-based measurement and control network residual capacity assessment method fails to accurately reflect the actual emergency support capacity and fails to consider factors such as satellite orbit, equipment performance, and operating environment, resulting in a discrepancy between the theoretical residual capacity and the actual capacity and the inability to respond quickly to spacecraft emergencies. Apply online.

Method used

By screening out the arc segments that can be used for emergency support, including idle arc segments, shadow arc segments, transferable arc segments and preemptible arc segments, a quantitative evaluation is performed to calculate the effective remaining capacity of the ground-based measurement and control network, taking into account equipment preparation time and Constraints are used to filter out available arc segments and perform quantification processing.

Benefits of technology

It achieves rapid quantitative judgment on the emergency support capability of the ground-based measurement and control network, can be applied to the evaluation of the pros and cons of different scheduling algorithms, provides indicators for the scientific management of the measurement and control network and the optimization of scheduling algorithms, and ensures effective emergency measurement and control support for the target spacecraft set.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114742424B_ABST
    Figure CN114742424B_ABST
Patent Text Reader

Abstract

The invention discloses a method for analyzing the effective remaining capacity of a ground-based measurement and control network, which is specifically implemented according to the following steps: step 1, forming a set of arc segments to be selected according to the visible windows of all resources of the ground-based measurement and control network to a target spacecraft set; step 2, filtering out arc segments with unavailable equipment from the set of arc segments to be selected; step 3, filtering out idle arc segments from the result of step 2; filtering out allocated arc segments from the result of step 2; filtering out idle arc segments and allocated arc segments from the result of step 2, and the remaining arc segments are all conflicting arc segments; filtering out transferable arc segments and preemptible arc segments from the conflicting arc segments; step 4, according to the above arc segment screening results, quantitatively evaluating the shadow arc segments, idle arc segments, transferable arc segments and preemptible arc segments that can be used for emergency support, and giving the effective remaining capacity value of the ground-based measurement and control network. It can quickly and quantitatively judge the ability of the measurement and control network to provide emergency measurement and control support for the target spacecraft set.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of aerospace measurement and control network management, and relates to an effective residual capacity analysis method for a ground-based measurement and control network. Background Art

[0002] The ground-based measurement and control network is a globally distributed network consisting of a management center and interconnected equipment. Its mission is to provide measurement and control and data transmission services for various types of spacecraft. With the continuous increase in tasks such as abnormal maintenance of spacecraft and fault rescue, higher requirements are placed on the emergency support capabilities of the management center, requiring the management center to quickly respond to emergency network applications from various users. In order to effectively perform the functions and missions of the management center and evaluate emergency support capabilities, this patent proposes the concept of residual capacity of the ground-based measurement and control network, which is used to intuitively reflect the emergency support capabilities of the ground-based measurement and control network for the target spacecraft.

[0003] Compared with the remaining capacity of natural gas and power grid, the remaining capacity of the ground-based measurement and control network can be simply understood as the set of idle time of station network resources remaining after excluding planned tasks and losses within the calculation cycle. However, this definition does not take into account relevant constraints and is only a theoretical remaining capacity. In fact, the tasks performed by the ground-based measurement and control network are complex and diverse, and are affected by satellite orbits, equipment performance, operating environment, etc. The theoretical remaining capacity cannot reflect the actual status of the measurement and control network. For example, in the next 2 hours, although there are many idle devices in the measurement and control network, the remaining capacity should be large in theory, but for a certain spacecraft, there is actually no equipment visible or the visible equipment cannot add tracking arcs for the target spacecraft. Summary of the invention

[0004] The purpose of the present invention is to provide a method for analyzing the effective remaining capacity of a ground-based measurement and control network, which can quickly and quantitatively determine the ability of the measurement and control network to provide emergency measurement and control support for a target spacecraft set.

[0005] The technical solution adopted by the present invention is a method for analyzing the effective remaining capacity of a ground-based measurement and control network, which is specifically implemented according to the following steps:

[0006] Step 1: Based on the visible windows of all resources of the ground-based measurement and control network to the target spacecraft set, a set of arc segments to be selected is formed;

[0007] Step 2: Eliminate arcs with unavailable equipment from the arcs to be selected;

[0008] Step 3: Filter out idle arcs from the results of step 2. Idle arcs can be used for emergency support. Filter out allocated arcs from the results of step 2. Filter out shadow arcs from the allocated arcs. Shadow arcs can be used for emergency support. Filter out idle arcs and allocated arcs from the results of step 2. The remaining arcs are all conflicting arcs. Filter out transferable arcs and preemptible arcs from the conflicting arcs. Both transferable arcs and preemptible arcs can be used for emergency support.

[0009] Step 4: Based on the above arc screening results, quantitatively evaluate the shadow arcs, idle arcs, transferable arcs and preemptible arcs that can be used for emergency support, and give the effective remaining capacity value of the ground-based measurement and control network.

[0010] The present invention is also characterized in that:

[0011] In step 1, the equipment preparation time and equipment release time are added when forming the arc segment set to be selected.

[0012] In step 2, the equipment unavailable arc includes two categories: equipment network withdrawal and constraint unsatisfied; equipment network withdrawal is mainly caused by network access testing, shutdown maintenance, equipment modification, equipment transfer, bad weather and communication interruption. By comparing the set of candidate arcs with the equipment network withdrawal time, the set of candidate arcs with intersections are all equipment unavailable arcs; constraint unsatisfied is mainly caused by unsupported frequency band, unsupported mode, unsatisfied elevation angle, unsatisfied duration, etc. By querying the relevant constraints of the target spacecraft set, those that do not meet the constraints are all equipment unavailable arcs.

[0013] In step 3, when screening transferable arcs, as long as a conflicting arc that can be transferred to an idle device is found in the conflict set of arcs to be selected, the arc to be selected can be determined as a transferable arc; when screening preemptible arcs, as long as a priority lower than the priority of the arc to be selected is found in the conflict set of arcs to be selected, the arc to be selected can be determined as a preemptible arc.

[0014] In step 4, quantization is performed using the quantization formula (1):

[0015]

[0016] In formula (1), VR represents the value of the remaining capacity; Vti represents the value of the i-th arc segment, which can be evaluated according to the spacecraft priority; pi represents the arc attribute weight of the i-th arc segment, including the shadow arc segment, the idle arc segment, the transferable arc segment and the preemptible arc segment, and pi∈[0,1]; m is the number of arc segments included in the evaluation of the remaining capacity.

[0017] The beneficial effects of the present invention are as follows: the effective remaining capacity analysis method of the ground-based measurement and control network of the present invention can be applied to the use scenario of quantitatively judging the effective remaining capacity of the ground-based measurement and control network when the ground-based measurement and control network responds to emergency user applications of various users; it can also be adapted to judging the advantages and disadvantages of different scheduling algorithms, as an indicator basis for scientific management of the measurement and control network and optimization of the scheduling algorithm, and quickly and quantitatively judging the ability of the measurement and control network to provide emergency measurement and control support for the target spacecraft set (which can be one or more spacecraft). In the same evaluation cycle, different effective remaining capacities of the ground-based measurement and control network may be calculated for different station network resource allocation results, and by comparing them, the advantages and disadvantages of the scheduling algorithm can be judged. Therefore, the effective remaining capacity analysis method of the ground-based measurement and control network can also provide an indicator basis for scientific management of the measurement and control network and optimization of the scheduling algorithm. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a flow chart of the effective remaining capacity analysis method of the ground-based measurement and control network of the present invention;

[0019] Figure 2 It is a schematic diagram of arc segment formation to be selected in the effective residual capacity analysis method of the ground-based measurement and control network of the present invention;

[0020] Figure 3 It is a schematic diagram of arc-segment conflict relationship in the effective residual capacity analysis method of the ground-based measurement and control network of the present invention;

[0021] Figure 4 It is a flow chart of selecting transferable arc segment sets in the effective residual capacity analysis method of the ground-based measurement and control network of the present invention;

[0022] Figure 5 It is a flow chart for selecting a set of arc segments that can be seized in the effective remaining capacity analysis method of the ground-based measurement and control network of the present invention. DETAILED DESCRIPTION

[0023] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0024] The effective remaining capacity analysis method of the ground-based measurement and control network of the present invention is as follows: Figure 1 As shown, the specific implementation steps are as follows:

[0025] Step 1: Based on the visible windows of all resources of the ground-based measurement and control network to the target spacecraft set, a set of arc segments to be selected is formed;

[0026] In step 1, the equipment preparation time and equipment release time are added when forming the arc segment set to be selected.

[0027] Step 2: Eliminate arcs with unavailable equipment from the arcs to be selected;

[0028] In step 2, the equipment unavailable arc includes two categories: equipment network withdrawal and constraint unsatisfied; equipment network withdrawal is mainly caused by network access testing, shutdown maintenance, equipment modification, equipment transfer, bad weather and communication interruption. By comparing the set of candidate arcs with the equipment network withdrawal time, the set of candidate arcs with intersections are all equipment unavailable arcs; constraint unsatisfied is mainly caused by unsupported frequency band, unsupported mode, unsatisfied elevation angle, unsatisfied duration, etc. By querying the relevant constraints of the target spacecraft set, those that do not meet the constraints are all equipment unavailable arcs.

[0029] Step 3: Filter out idle arcs from the results of step 2. Idle arcs can be used for emergency support. Filter out allocated arcs from the results of step 2. Filter out shadow arcs from the allocated arcs. Shadow arcs can be used for emergency support. Filter out idle arcs and allocated arcs from the results of step 2. The remaining arcs are all conflicting arcs. Filter out transferable arcs and preemptible arcs from the conflicting arcs. Both transferable arcs and preemptible arcs can be used for emergency support.

[0030] In step 3, when screening transferable arcs, as long as a conflicting arc that can be transferred to an idle device is found in the conflict set of arcs to be selected, the arc to be selected can be determined as a transferable arc; when screening preemptible arcs, as long as a priority lower than the priority of the arc to be selected is found in the conflict set of arcs to be selected, the arc to be selected can be determined as a preemptible arc.

[0031] Step 4: Based on the above arc screening results, quantitatively evaluate the shadow arcs, idle arcs, transferable arcs and preemptible arcs that can be used for emergency support, and give the effective remaining capacity value of the ground-based measurement and control network.

[0032] In step 4, quantization is performed using the quantization formula (1):

[0033]

[0034] In formula (1), VR represents the value of the remaining capacity; Vti represents the value of the i-th arc segment, which can be evaluated according to the spacecraft priority; pi represents the arc attribute weight of the i-th arc segment, including the shadow arc segment, the idle arc segment, the transferable arc segment and the preemptible arc segment, and pi∈[0,1]; m is the number of arc segments included in the evaluation of the remaining capacity.

[0035] The core of the effective remaining capacity analysis method of the ground-based measurement and control network of the present invention lies in the analysis and calculation of emergency support. Although the scheduling and allocation of measurement and control resources has been proved to be an NP problem, the emergency support calculation is only a verification of the scheduling and allocation results. All visible windows (satellite-ground visible time period) of the target spacecraft set can be divided into five states: unavailable arc segment, allocated arc segment, idle arc segment, and conflicting arc segment according to the situation of the equipment executing the task. All arc segment states are traversed in turn, and the arc segment set that can be used for target satellite support is found. After quantification processing, it is the remaining capacity of the measurement and control network for the target satellite set, which specifically includes:

[0036] S1, add equipment preparation time (added before the visible window) and equipment cleaning time (added after the visible window) to the visible window of the target spacecraft set of all resources of the ground-based measurement and control network, such as Figure 2 As shown, a set of arc segments to be selected is formed.

[0037] S2, filter out the equipment unavailable arcs from the set of arcs to be selected. The equipment unavailable arcs include equipment network withdrawal and constraint unsatisfied. Equipment network withdrawal is mainly caused by network access testing, downtime maintenance, equipment modification, equipment transfer, bad weather and communication interruption. By comparing the set of arcs to be selected with the equipment network withdrawal time, the arcs to be selected that have intersections are all equipment unavailable arcs; constraint unsatisfied is mainly caused by unsupported frequency band, unsupported mode, unsatisfied elevation angle, unsatisfied duration, etc. By querying the relevant constraints of the target spacecraft set, those that do not meet the constraints are all equipment unavailable arcs.

[0038] S3, compare the result of S2 with the scheduled plans. The arc segments that have no intersection with all the scheduled plans are idle arc segments, and the idle arc segments can be used for emergency support.

[0039] Compare the S2 results with the scheduled plan, and the arcs that match the spacecraft, equipment, and tracking window are the allocated arcs. Filter out the shadow arcs from the allocated arcs (for the same spacecraft, a new data transmission (measurement and control) task can be added to the already scheduled measurement and control (data transmission) arcs), and the shadow arcs can be used for emergency support.

[0040] The S2 result is filtered out of the idle arcs and the allocated arcs, and the remaining arcs are all conflicting arcs, such as Figure 3As shown. In the conflicting arcs, transferable arcs (transferable arcs refer to arcs that meet the tracking requirements of the target spacecraft, but the tracking tasks of spacecraft outside the target spacecraft set have been arranged within the arc time, and the tracking arc of this spacecraft can be transferred to other idle devices) and preemptible arcs (preemptible arcs refer to arcs that meet the tracking requirements of the target spacecraft, but the tracking tasks of spacecraft outside the target spacecraft set have been arranged within the arc time, and the tracking arc of this spacecraft cannot be transferred to other idle devices) are selected. Both transferable arcs and preemptible arcs can be used for emergency support.

[0041] S4. Based on the above arc screening results, the shadow arcs, idle arcs, transferable arcs and preemptible arcs that can be used for emergency support are quantitatively evaluated to provide an effective remaining capacity value.

[0042] Example 1

[0043] The present invention proposes a simple and feasible method for analyzing the effective remaining capacity of a ground-based measurement and control network. Taking a low-orbit satellite anomaly as an example, the effective remaining capacity of the ground-based measurement and control network (the measurement and control network resources in Example 1 include 21 sets of S-band full-function equipment) for this low-orbit satellite is calculated from 9:00 to 12:00 on June 13, 2019 for a total of 3 hours. The method includes the following steps:

[0044] S1, the visible windows of all resources of the ground-based measurement and control network for the target spacecraft set, adding equipment preparation time and equipment cleaning time, form a set of arc segments to be selected. The visible windows of the target spacecraft in the calculation time period are shown in Table 1, of which 17 sets of equipment are visible, 4 sets are invisible, and there are 33 arc segments to be selected.

[0045] Table 1. Visible window and arc segment screening results of target spacecraft

[0046]

[0047] S2, filter out the arc segments where the device is unavailable from the set of arc segments to be selected. The arc segments where the device is unavailable include two types: device disconnection and constraint failure.

[0048] The information about devices going offline during the calculation period is collected. Device 4 is offline due to equipment maintenance, Device 6 is offline due to equipment transfer, and Device 8 and Device 9 are offline due to task joint debugging. The involved arcs need to be screened out, including arcs 4, 6, 8, 9, 20, 22, 24, and 27, a total of 8 arcs.

[0049] The task constraints are queried, and arcs that do not meet the constraints are screened out from the candidate arc set, including arcs 10, 11, 12, 13, 14, 15, and 16, a total of 7 arcs (all of which do not meet the elevation angle). Finally, 18 candidate arc sets remain.

[0050] Compare the S2 result with the scheduled plans. The arc segments that have no intersection with all the scheduled plans are idle arc segments, which can be used for emergency support.

[0051] The remaining 18 arc segments of S2 are compared with all the scheduled time one by one, and all of them have intersections, so there is no idle arc segment.

[0052] The S2 results are compared with the scheduled plan, and the arcs that match the spacecraft, equipment and tracking window are the allocated arcs, and the shadow arcs are selected.

[0053] The remaining 18 arc sets of S2 are compared with the time of all plans arranged in the calculation cycle. It is found that the spacecraft and the equipment are not consistent, and the tracking windows are overlapped (sometimes due to orbit changes and other reasons, the visible window and the tracking window may not completely overlap, and 90% overlap is generally defined), indicating that the target spacecraft tracking plan is not arranged in the calculation cycle.

[0054] The S2 result is filtered out of idle arcs and allocated arcs, and the remaining arcs are all conflicting arcs. Among the conflicting arcs, transferable arcs and preemptible arcs are filtered out.

[0055] The remaining 18 arc segments to be selected in S2 are screened out of the idle arc segments and the allocated arc segments (both are none), and there are 18 arc segments to be selected, all of which are conflicting arc segments.

[0056] Take out an arc segment mi from the conflict arc segment set A, compare it with the time period scheduled in the calculation cycle, and select the arc segments that overlap with it in time, which is the conflict set Pi of arc segment mi; ​​take out an arc segment nj from the conflict set Pi in turn, and find out whether the same spacecraft has an idle arc segment ki that meets the constraints. If not, take out the next arc segment nj+1 from the conflict set Pi, and continue to find out whether there is an idle arc segment that meets the same constraints. If not, repeat the above process until all potential conflict sets Pi are traversed; if arc segment nx is found to have an idle arc segment kx that meets the same constraints, the task of arc segment nx in the conflict set Pi can be transferred to the idle arc segment kx, and the equipment of arc segment nx can be freed to support arc segment mi, then mi is a transferable arc segment, the search for mi is completed, and arc segment mi is added to the transferable arc segment set B, and the next arc segment is taken out from the conflict arc segment set A, and the above process is repeated until all arc segments in the conflict arc segment set A are traversed. After actual calculation, arc segments 25 and 30 are transferable arc segments.

[0057] The transferable arc B is screened out from the conflicting arc set A. If the remaining arc set C is to be used for emergency support, the original task must be cancelled. Priority should be introduced here (based on actual application), and it is stipulated that the high priority can preempt the low priority. From the remaining arc set C, take out an arc segment mi, and screen out the conflict set Pi of mi; take out an arc segment nj from the conflict set Pi in turn, compare the priority of arc segment nj and arc segment mi, if mi has a low priority, take out the next arc segment nj+1 from the conflict set Pi, and continue to compare the priority of nj+1 and arc segment mi, if arc segment mi has a low priority, repeat the above process until all potential conflict sets Pi are traversed; if the priority of arc segment nx is lower than the priority of arc segment mi, the task of arc segment nx can be canceled, and the equipment of arc segment nx can be freed to provide support for arc segment mi, then mi is a transferable arc, the search for mi is completed, and arc segment mi is added to the preemptible arc set D, and then take out an arc segment from the remaining arc set C, and repeat the above process until all arcs in the remaining arc set C are traversed; since the target spacecraft is defined with a higher priority, the remaining 16 arcs are all preemptible arcs after actual calculation.

[0058] S4, based on the screening results of S1 to S5, quantitatively evaluate the shadow segment set, idle segment set, transferable segment set and preemptible segment set that can be used for emergency support, and give an effective remaining capacity value.

[0059] According to the screening results from S1 to S3, only the transferable arc set B and the preemptible arc set C are included. According to the quantitative formula (1), it is necessary to determine the arc value Vti and the arc attribute weight pi. Since the target spacecraft is the same spacecraft, the arc value defaults to 1. The arc attributes of the shadow arc, free arc, transferable arc and preemptible arc are defined as 1, 0.95, 0.8 and 0.6 respectively. Therefore, the effective remaining capacity value can be calculated as 11.2 through formula (1).

[0060] By expanding the target spacecraft to all spacecraft supported by the station network resources, the effective remaining capacity of the entire network can be calculated. By expanding the calculation cycle to the entire scheduling cycle, the effective remaining capacity of the entire scheduling cycle can be calculated. In the same evaluation cycle, different residual capacities of the ground-based measurement and control network may be calculated for different station network resource allocation results. By comparing them, the advantages and disadvantages of the scheduling algorithm can be judged.

[0061] The effective remaining capacity analysis method of the ground-based measurement and control network of the present invention can be applied to the use scenario of quantitatively judging the effective remaining capacity of the ground-based measurement and control network when the ground-based measurement and control network responds to emergency user applications of various users; it can also be adapted to judging the advantages and disadvantages of different scheduling algorithms, as an indicator basis for scientific management of the measurement and control network and optimization of the scheduling algorithm, to quickly and quantitatively judge the ability of the measurement and control network to provide emergency measurement and control support for the target spacecraft set (which can be one or more spacecraft). In the same evaluation cycle, different effective remaining capacities of the ground-based measurement and control network may be calculated for different station network resource allocation results, and by comparing them, the advantages and disadvantages of the scheduling algorithm can be judged. Therefore, the effective remaining capacity analysis method of the ground-based measurement and control network can also provide an indicator basis for scientific management of the measurement and control network and optimization of the scheduling algorithm.

Claims

1. The effective remaining capacity analysis method of the ground-based measurement and control network is characterized by: Follow the steps below to implement it: Step 1: Based on the visible windows of all resources of the ground-based measurement and control network to the target spacecraft set, a set of arc segments to be selected is formed; Step 2: Eliminate arcs with unavailable equipment from the arcs to be selected; Step 3: Filter out idle arcs from the results of step 2, where the idle arcs can be used for emergency support; filter out allocated arcs from the results of step 2; Filter out shadow arc segments from the allocated arc segments, and the shadow arc segments can be used for emergency support; Remove the idle arcs and the allocated arcs from the results of step 2, and the remaining arcs are all conflicting arcs; select the transferable arcs and the preemptible arcs from the conflicting arcs, and both the transferable arcs and the preemptible arcs can be used for emergency support; Step 4: Based on the arc screening results, quantitatively evaluate the shadow arcs, idle arcs, transferable arcs and preemptible arcs that can be used for emergency support, and give the effective remaining capacity value of the ground-based measurement and control network; In step 4, quantization is performed using the quantization formula (1): In formula (1), VR represents the residual capacity value; Vti represents the value of the i-th arc segment, which can be evaluated according to the spacecraft priority; pi represents the arc segment attribute weight of the i-th arc segment, including shadow arc segment, idle arc segment, transferable arc segment and preemptible arc segment, and pi∈[0,1]; m is the number of arcs included in the evaluation of residual capacity.

2. The method for analyzing effective residual capacity of a ground-based measurement and control network according to claim 1, characterized in that: In the step 1, the device preparation time and the device release time are added when forming the arc segment set to be selected.

3. The method for analyzing effective residual capacity of a ground-based measurement and control network according to claim 1, characterized in that: In step 2, the device unavailable arc includes two categories: device network withdrawal and constraint unsatisfied; device network withdrawal is mainly caused by network access testing, shutdown maintenance, equipment modification, equipment transfer, bad weather, and communication interruption. By comparing the set of selected arcs with the device network withdrawal time, the set of selected arcs with intersections all belong to the device unavailable arc; constraint unsatisfied is mainly caused by unsupported frequency band, unsupported mode, unsatisfied elevation angle, and unsatisfied duration. By querying the relevant constraints of the target spacecraft set, those that do not meet the constraints all belong to the device unavailable arc.

4. The method for analyzing effective residual capacity of a ground-based measurement and control network according to claim 1, characterized in that: In step 3, when selecting transferable arcs, as long as a conflicting arc that can be transferred to an idle device is found in the conflicting set of selected arcs, the selected arc can be determined as a transferable arc. When screening preemptible arcs, as long as an arc with a priority lower than that of the arc to be selected is found in the conflict set of the arcs to be selected, the arc to be selected can be determined as a preemptible arc.

Citation Information

Patent Citations

  • Multi-objective optimization scheduling method and system for remote-sensing satellite earth stations

    CN107909207A

  • Satellite remote sensing task planning and ground resource scheduling combined solving method

    CN112580906A