Electromagnetic compatibility testing device and testing method for fuel cell system
By designing a test device that includes hydrogen supply, exhaust gas/wastewater treatment, thermal management and power supply systems, the problem of the inability of the existing fuel cell system electromagnetic compatibility test to fully evaluate the coupling relationship of components has been solved, and system-level and unit-level testing has been achieved. Improved testing accuracy and efficiency.
Patent Information
- Application Number
- CN202210536693.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-17
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-05-17
AI Technical Summary
The electromagnetic compatibility test of the existing fuel cell system adopts a separated method, which cannot fully evaluate the coupling relationship between components, resulting in inconsistent test results and vehicle operation conditions, insufficient test conditions, long cycles, and repeated projects.
Design an electromagnetic compatibility test device that includes a hydrogen supply system, exhaust gas/wastewater treatment system, thermal management system and power supply system. Through the cooperation of these systems, the environmental requirements of electromagnetic compatibility testing are met, and the control and monitoring system is used to make the system under test Operate according to specified working conditions and conduct system-level and unit-level electromagnetic compatibility tests.
It achieves a comprehensive inspection of the electromagnetic compatibility characteristics of the fuel cell system, shortens the test time, can accurately locate electromagnetic compatibility-exceeding components, and improves the accuracy and efficiency of the test.
Smart Images

Figure CN114814601B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of fuel cell testing, and in particular to an electromagnetic compatibility testing device and a testing method for a fuel cell system. Background Art
[0002] Electromagnetic compatibility (EMC) refers to the ability of a device or system to work normally in its electromagnetic environment and not cause unbearable electromagnetic disturbance to other things in the environment.
[0003] Among them, the fuel cell system is a system unique to fuel cell vehicles. This system converts chemical energy into electrical energy through the chemical reaction between hydrogen and oxygen under the condition of an external hydrogen source. It mainly includes a hydrogen supply system, an exhaust / wastewater treatment system, a water / heat management system, a control system, etc. Conventional fuel cell electromagnetic compatibility testing uses a separate method to test each component of the fuel system one by one. It has problems such as insufficient test conditions, long test cycles, and repeated test items. Since the component separation test cannot fully evaluate the coupling relationship between the components, it is very different from the actual operating conditions of the vehicle, resulting in inconsistent electromagnetic compatibility test results of the components and the electromagnetic compatibility test results of the vehicle. Therefore, there is an urgent need for a system-level electromagnetic compatibility test system that combines the fuel cell system. Summary of the invention
[0004] The purpose of the present invention is to provide an electromagnetic compatibility testing device and method for a fuel cell system, so as to test the electromagnetic compatibility of the entire vehicle fuel cell system, and also to perform single-unit level testing to accurately locate components that exceed the electromagnetic compatibility standard.
[0005] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0006] An electromagnetic compatibility test device for a fuel cell system, comprising:
[0007] A semi-anechoic chamber, in which the system to be tested is placed;
[0008] A hydrogen supply system, connected to the system to be tested, and used for providing hydrogen to the system to be tested;
[0009] An exhaust gas / wastewater treatment system, connected to the system to be tested, and used to treat the exhaust gas and wastewater in the system to be tested;
[0010] A thermal management system, connected to the system to be tested, and used for thermal management of the system to be tested;
[0011] A power supply system, connected to the system under test, for providing power to the system under test or serving as a load;
[0012] The control monitoring system is connected to the system to be tested and is used to debug and monitor the working conditions of the system to be tested;
[0013] The environmental requirements of the electromagnetic compatibility test are met through the cooperation of the hydrogen supply system, exhaust gas / wastewater treatment system, thermal management system and power supply system. The system to be tested is operated according to the specified working conditions through the control and monitoring system. Then, the electromagnetic compatibility test is carried out in accordance with the electromagnetic compatibility test standards, including system-level operation tests and single-unit-level operation tests of the system to be tested.
[0014] According to the above technical means, by setting up a hydrogen supply system, an exhaust gas / wastewater treatment system, a thermal management system and a power supply system, and by the mutual cooperation between the systems, the environmental requirements of the electromagnetic compatibility test are met, and then the control monitoring system is used to control the equipment to be tested to operate according to the specified working conditions, and then the electromagnetic compatibility test is carried out according to the electromagnetic compatibility test standard. The electromagnetic compatibility of the fuel cell can be judged according to the test data results. The test system can not only realize the working condition test of the entire system level of the fuel cell, but also take into account the positioning of the interference source of the electromagnetic compatibility components. The system can also perform single-unit level testing, effectively realizing the electromagnetic compatibility characteristics inspection of the comprehensive working conditions of the fuel cell system, and at the same time shortening the test time.
[0015] Among them, the electromagnetic compatibility test standard is the general method of national testing standards.
[0016] Preferably, the unit-level operation test of the system to be tested includes a unit-level test of the DC / DC converter of the system to be tested, a unit-level test of the air compressor and a unit-level test of the fuel cell main controller.
[0017] Among them, the system-level operation test refers to the electromagnetic compatibility test of the components involved in the entire fuel system together, and the unit-level operation test is the electromagnetic compatibility test of each component separately. Therefore, the unit-level operation test cannot fully evaluate the system operation status.
[0018] The systems under test include:
[0019] The fuel cell stack is capable of electrochemically reacting externally supplied fuel and oxidant;
[0020] DC / DC converter, which can achieve voltage conversion;
[0021] Air compressor, providing air for the fuel cell stack;
[0022] The fuel cell main controller (FCU) is used to perform functional diagnosis on the system under test.
[0023] Preferably, the power supply system includes a high-voltage dual power supply system and a low-voltage direct current power supply system;
[0024] The high-voltage dual power supply system includes a high-voltage dual power supply device placed outside the semi-anechoic chamber. The high-voltage dual power supply system can be used as a high-voltage input power supply and a high-voltage load simultaneously or separately according to system-level test and single-unit-level test requirements;
[0025] The low-voltage direct current power supply system comprises a low-voltage power supply placed in the semi-anechoic chamber, and a low-voltage artificial network connecting the low-voltage power supply and the system to be tested.
[0026] Preferably, when performing system-level testing, the high-voltage dual power supply system serves as a high-voltage load, and the high-voltage dual power supply device is sequentially connected to the high-voltage power supply output end of the DC / DC converter of the system to be tested through a switching switch, a load-end high-voltage filter, a first high-voltage artificial network, and a first impedance matching network;
[0027] The low-voltage power supply is connected to the low-voltage power supply input terminal of the system to be tested through a low-voltage artificial network.
[0028] Preferably, when performing a single-unit level test of a DC / DC converter, the high-voltage dual power supply system simultaneously serves as a high-voltage DC output and a high-voltage load, and the high-voltage dual power supply device is sequentially connected to the high-voltage power supply output end of the DC / DC converter of the system to be tested through a switching switch, a load-end high-voltage filter, a first high-voltage artificial network, and a first impedance matching network, and at the same time, the high-voltage dual power supply device is connected to the high-voltage power supply input end of the DC / DC converter of the system to be tested through a switching switch, a power-end high-voltage filter, a second high-voltage artificial network, and a second impedance matching network;
[0029] The low-voltage power supply is connected to the low-voltage power supply input terminal of the DC / DC converter of the system to be tested through a low-voltage artificial network.
[0030] Preferably, when performing a single-unit level test on an air compressor, the high-voltage dual power supply system is used as a high-voltage DC output, and the high-voltage dual power supply device is connected to the high-voltage power supply input terminal of the air compressor of the system to be tested through a switching switch, a high-voltage filter at the power supply end, a second high-voltage artificial network, and a second impedance matching network;
[0031] The low-voltage power supply is connected to the low-voltage power supply input terminal of the air compressor of the system to be tested through a low-voltage artificial network.
[0032] Preferably, when performing a single-level test on a fuel cell main controller (FCU), the low-voltage power supply is connected to a low-voltage power supply input terminal of the fuel cell main controller (FCU) of the system to be tested via a low-voltage artificial network.
[0033] Preferably, the hydrogen supply system comprises a hydrogen supply device placed outside the semi-anechoic chamber, and a first connecting pipe connecting the hydrogen supply device and the system to be tested;
[0034] The tail gas / wastewater treatment system comprises a tail gas / wastewater treatment device placed outside the semi-anechoic chamber, and a second connecting pipe connecting the tail gas / wastewater treatment device and the system to be tested;
[0035] The thermal management system comprises a cooling circulation device arranged outside the semi-anechoic chamber, and a third connecting pipe connecting the cooling circulation device and the system to be tested;
[0036] The first connecting tube and the second connecting tube are gas waveguide tubes, and the third connecting tube is a pipeline.
[0037] Preferably, the control and monitoring system comprises a simulation and monitoring device placed outside the semi-anechoic chamber, and the simulation and monitoring device is connected to the system to be tested via an optical fiber feedthrough and an optoelectronic conversion communication device.
[0038] The present invention also provides a method for performing an electromagnetic compatibility test on a fuel cell system using the electromagnetic compatibility test device of the present invention, comprising the following steps:
[0039] S1. Operate the hydrogen supply system, tail gas / wastewater treatment system and thermal management system in accordance with the environmental requirements of the fuel cell electromagnetic compatibility test;
[0040] S2, turn on the power system, and control the system to be tested to operate according to the specified working conditions through the control monitoring system;
[0041] S3. Conduct tests according to electromagnetic compatibility test standards and determine the electromagnetic compatibility of the fuel cell based on the test data results.
[0042] Preferably, the steps of the system-level testing method are:
[0043] S1. Operate the hydrogen supply system, tail gas / wastewater treatment system and thermal management system in accordance with the environmental requirements of the electromagnetic compatibility test of the fuel cell system;
[0044] S2, turn on the power system, and control the system under test to operate between 0-100% of the rated power through the control monitoring system;
[0045] S3. Test the electromagnetic compatibility characteristics at different rated powers according to the electromagnetic compatibility test standard, and determine the electromagnetic compatibility at the corresponding rated power based on the data results obtained from the tests at different rated powers.
[0046] Preferably, the steps of the monomer level testing method are:
[0047] S1. Operate the hydrogen supply system, tail gas / wastewater treatment system and thermal management system in accordance with the environmental requirements of the electromagnetic compatibility test of the fuel cell system;
[0048] S2, turning on the power system, and controlling one of the DC / DC converter, the air compressor and the fuel cell main controller (FCU) in the system to be tested to work through the control monitoring system;
[0049] S3. Test the electromagnetic compatibility characteristics of the DC / DC converter, air compressor or fuel cell main controller (FCU) when they are working according to the electromagnetic compatibility test standards, and use the test data results to determine whether the corresponding electromagnetic compatibility characteristics exceed the limit.
[0050] Beneficial effects of the present invention:
[0051] The electromagnetic compatibility testing device and testing method of the fuel cell system of the present invention are suitable for electromagnetic compatibility testing of the fuel cell system. The above scheme can realize the operating condition test of the entire system level of the fuel cell, so as to examine the electromagnetic anti-interference characteristics of the entire fuel cell system. At the same time, considering the positioning of the interference source of the electromagnetic compatibility components, the system can also perform a single-level test to locate whether the electromagnetic compatibility characteristics of the corresponding components exceed the limit. It not only effectively realizes the investigation of the electromagnetic compatibility characteristics of the fuel cell system under comprehensive working conditions, but also realizes single-level testing, greatly shortening the test time. In the field of automotive fuel cell testing technology, it has promotion and application value. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 It is a schematic structural diagram of the electromagnetic compatibility testing device of the fuel cell system of the present invention.
[0053] Among them, 1-semi-anechoic chamber; 2-system under test, 201-fuel cell stack, 202-DC / DC converter, 203-air compressor, 204-fuel cell main controller; 3-hydrogen supply equipment; 4-first connecting pipe; 5-exhaust / wastewater treatment equipment; 6-second connecting pipe; 7-cooling circulation equipment; 8-third connecting pipe; 9-high-voltage dual power supply equipment; 10-low-voltage power supply; 11-low-voltage artificial network; 12-switching switch; 13-load-end high-voltage filter; 14-first high-voltage artificial network; 15-first impedance matching network; 16-power supply-end high-voltage filter; 17-second high-voltage artificial network; 18-second impedance matching network; 19-simulation and monitoring equipment; 20-optical fiber feedthrough; 21-photoelectric conversion communication equipment; 22-reference ground plane; 23-load; 24-shielding box. DETAILED DESCRIPTION
[0054] The following will describe the embodiments of the present invention with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be understood that the preferred embodiments are only for illustrating the present invention, not for limiting the scope of protection of the present invention.
[0055] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.
[0056] Example 1
[0057] like Figure 1 As shown, an electromagnetic compatibility test device for a vehicle fuel cell system can be used to test when the system to be tested 2 is operating at the system level, and can also be used to test when the system to be tested is operating at the single-unit level, specifically including:
[0058] A semi-anechoic chamber 1, in which a system to be tested 2 is placed;
[0059] Among them, the system to be tested 2 includes: a fuel cell stack 201 capable of electrochemically reacting externally supplied fuel and oxidant, a DC / DC converter 202 that converts the DC high voltage output by the fuel cell stack 201 into an air compressor 203 and a high-voltage dual power supply device 9 for output, an air compressor 203 that controls and provides air to the fuel cell stack 201, and an FCU 204 that performs functional diagnosis on the device to be tested; the fuel cell stack 201, the DC / DC converter 202, the air compressor 203 and the FCU 204 are integrated together as the test object of this embodiment, that is, the system to be tested 2, the fuel cell stack 201, the DC / DC converter 202, the air compressor 203 and the FCU 204 can all work normally at the same time, and according to the requirements of the single unit test, they can also work separately;
[0060] A hydrogen supply system, which includes a hydrogen supply device 3 placed outside the semi-anechoic chamber 1, and a first connecting pipe 4 connecting the hydrogen supply device 3 and the system to be tested 2, the hydrogen supply device 3 can provide hydrogen with a suitable flow rate and concentration for the system to be tested 2, the first connecting pipe 4 is a gas waveguide, the gas waveguide is arranged on the wall or floor of the semi-anechoic chamber 1, one end of the gas waveguide is connected to the hydrogen supply device 3, and the other end is connected to the hydrogen input port of the battery stack 201 of the system to be tested 2, so as to meet the electromagnetic compatibility environment requirements of the semi-anechoic chamber;
[0061] The tail gas / wastewater treatment system includes a tail gas / wastewater treatment device 5 placed outside the semi-anechoic chamber 1, and a second connecting pipe 6 connecting the tail gas / wastewater treatment device 5 and the system to be tested 2. The tail gas / wastewater treatment device 5 can discharge the excess hydrogen, air and wastewater generated during the chemical reaction in the system to be tested 2 out of the semi-anechoic chamber 1. The second connecting pipe 6 is a gas waveguide, which is arranged on the wall or floor of the semi-anechoic chamber 1. One end of the gas waveguide is connected to the tail gas / wastewater treatment device 5, and the other end is connected to the exhaust and drain outlets of the system to be tested 2 to meet the electromagnetic compatibility environment requirements of the semi-anechoic chamber;
[0062] The thermal management system includes a cooling circulation device 7 arranged outside the semi-anechoic chamber 1, and a third connecting pipe 8 connecting the cooling circulation device 7 and the cooling circulation interface of the system to be tested 2. The cooling circulation device 7 can provide a cooling circulation channel for the system to be tested 2 to ensure that the system to be tested operates under a reasonable temperature environment. The third connecting pipe 8 is a pipeline, and the waveguide is arranged on the wall or floor of the semi-anechoic chamber 1 to meet the electromagnetic compatibility environment requirements of the semi-anechoic chamber;
[0063] The power supply system includes a high-voltage dual power supply system and a low-voltage DC power supply system;
[0064] The high-voltage dual power supply system includes a high-voltage dual power supply device 9 placed outside the semi-anechoic chamber 1. The high-voltage dual power supply system can be used as a high-voltage input power supply and a high-voltage load simultaneously or separately according to the system-level test and the single-unit-level test requirements;
[0065] The low-voltage DC power supply system includes a low-voltage power supply 10 placed in a semi-anechoic chamber 1, and a low-voltage artificial network 11 connecting the low-voltage power supply 10 and the system to be tested 2;
[0066] The control and monitoring system includes a simulation and monitoring device 19, an optical fiber feedthrough 20 and an optoelectronic conversion communication device 21. The simulation and monitoring device 19 is placed outside the semi-anechoic chamber 1 and is used to control and monitor the fuel cell system; the optical fiber feedthrough 20 is arranged on the wall or floor of the semi-anechoic chamber 1; the optoelectronic conversion communication device 21 is arranged inside the semi-anechoic chamber 1 and is located above the reference ground plane 22; the simulation and monitoring device 19 is connected to the optical fiber feedthrough 16 through an optical fiber; the test end of the optoelectronic conversion communication device 17 is connected to the test system 2 through the actual vehicle wiring harness, and the device end is connected to the optical fiber feedthrough 16 through an optical fiber.
[0067] 1) When performing system-level testing, the high-voltage dual power supply system is used as a high-voltage load, and the high-voltage dual power supply device 9 is connected to the high-voltage power supply output terminal of the DC / DC converter 202 of the system under test 2 through the switching switch 12, the load-end high-voltage filter 13, the first high-voltage artificial network 14 and the first impedance matching network 15 in sequence.
[0068] The low-voltage power supply 10 is connected to the low-voltage power supply input end of the system under test 2 through a low-voltage artificial network 11. The voltage of the low-voltage power supply 10 is 12V. The input end of the low-voltage artificial network 11 is connected to the low-voltage power supply 10, and the output end is connected to the system under test 2. The low-voltage artificial network 11 is a pair, and its test port is connected to a 50Ω load 23 in the non-test state.
[0069] 2) When performing a single-unit level test on the DC / DC converter 202, the high-voltage dual power supply system simultaneously serves as a high-voltage DC output and a high-voltage load, and the high-voltage dual power supply device 9 is connected to the high-voltage power supply output end of the DC / DC converter 202 of the system under test 2 via the switching switch 12, the load-end high-voltage filter 13, the first high-voltage artificial network 14, and the first impedance matching network 15 in sequence, and at the same time, the high-voltage dual power supply device 9 is connected to the high-voltage power supply input end of the DC / DC converter 202 of the system under test 2 via the switching switch 12, the power-end high-voltage filter 16, the second high-voltage artificial network 17, and the second impedance matching network 18;
[0070] The low-voltage power supply 10 is connected to the low-voltage power supply input terminal of the DC / DC converter 202 of the system under test 2 through a low-voltage artificial network 11 .
[0071] 3) When performing a single-unit test of the air compressor 203, the high-voltage dual power supply system serves as a high-voltage DC output device, and the high-voltage dual power supply device 9 is connected to the high-voltage power supply input terminal of the air compressor 203 of the system to be tested 2 through the switching switch 12, the power supply end high-voltage filter 16, the second high-voltage artificial network 17, and the second impedance matching network 18;
[0072] The low-voltage power supply 10 is connected to the low-voltage power input terminal of the air compressor 203 of the system to be tested 2 through a low-voltage artificial network 11 .
[0073] 4) When performing a single-unit test of the fuel cell main controller (FCU) 204, the low-voltage power supply 10 is connected to the low-voltage power supply input terminal of the fuel cell main controller (FCU) 204 of the system to be tested 2 through the low-voltage artificial network 11;
[0074] The switch 12 is arranged outside the semi-anechoic chamber 1, and the load-end high-voltage filter 13 and the power-end high-voltage filter 16 are arranged on the wall or floor of the semi-anechoic chamber 1;
[0075] The first high-voltage artificial network 14 and the second high-voltage artificial network 17 are both a pair, both are placed in the semi-anechoic chamber 1 and are located on the reference ground plane 22, and the test ports of the two pairs of the first high-voltage artificial network 14 and the second high-voltage artificial network 17 are respectively connected to a 50Ω load 23 in a non-test state, and the load 23 is located on the reference ground plane 22; the first high-voltage artificial network 14, the load 23 connected to the first high-voltage artificial network 14, and the first impedance matching network 15 share a shielding box 24; the second high-voltage artificial network 17, the load 23 connected to the second high-voltage artificial network 17, and the second impedance matching network 18 share another shielding box 24;
[0076] The environmental requirements of the electromagnetic compatibility test are met through the cooperation of the hydrogen supply system, the exhaust gas / wastewater treatment system, the thermal management system and the power supply system. At the same time, the control monitoring system controls the system 2 to be tested to operate according to the specified working conditions, and then the electromagnetic compatibility test is carried out according to the electromagnetic compatibility test standard.
[0077] In this embodiment, the thermal management system is a cooling circulation system, and the system to be tested 2 is a fuel cell system for a vehicle to be tested.
[0078] Example 2
[0079] The method for testing the electromagnetic compatibility of a vehicle fuel cell system using the electromagnetic compatibility test device in Example 1, the method in this Example 2 is a system-level test method, specifically including six working conditions:
[0080] The test method steps for the first condition are:
[0081] S1. Arrange the test system according to Example 1, wherein the high-voltage dual power supply system is used as the high-voltage load. Then, turn on the 12V low-voltage power supply 10, debug the simulation and monitoring equipment 19, ensure that the communication of the system to be tested 2 (i.e., the vehicle fuel cell system) is normal, turn on the exhaust gas / wastewater treatment system, ensure that the gas environment in the semi-anechoic chamber 1 is normal, turn on the hydrogen supply system, ensure that the hydrogen supply is normal, turn on the thermal management system, and ensure that the temperature of the system to be tested 2 is normal;
[0082] S2, turning on the high-voltage dual power supply system, and making the system under test 2 operate at 100% of the rated power by controlling the simulation and monitoring device 19;
[0083] S3. Test according to the electromagnetic compatibility test standard, record the test data results, and determine whether the electromagnetic compatibility characteristics exceed the limit based on the test results;
[0084] S4, shut down the system to be tested 2, the hydrogen supply system, the high-voltage dual power supply system, and the thermal management system, and shut down the exhaust gas / wastewater treatment system and the 12V low-voltage power supply 10 after the exhaust gas treatment is completed;
[0085] The test method steps for the second working condition are:
[0086] S1. Arrange the test system according to Example 1, wherein the high-voltage dual power supply system is used as the high-voltage load. Then, turn on the 12V low-voltage power supply 10, debug the simulation and monitoring equipment 19, ensure that the communication of the system to be tested 2 (i.e., the vehicle fuel cell system) is normal, turn on the exhaust gas / wastewater treatment system, ensure that the gas environment in the semi-anechoic chamber 1 is normal, turn on the hydrogen supply system, ensure that the hydrogen supply is normal, turn on the thermal management system, and ensure that the temperature of the system to be tested 2 is normal;
[0087] S2, turning on the high-voltage dual power supply system, and making the system under test 2 operate at 75% of the rated power by controlling the simulation and monitoring device 19;
[0088] S3. Test according to the electromagnetic compatibility test standard, record the test data results, and determine whether the electromagnetic compatibility characteristics exceed the limit based on the test results;
[0089] S4, shut down the system to be tested 2, the hydrogen supply system, the high-voltage dual power supply system, and the thermal management system, and shut down the exhaust gas / wastewater treatment system and the 12V low-voltage power supply 10 after the exhaust gas treatment is completed;
[0090] The test method steps for the third working condition are:
[0091] S1. Arrange the test system according to Example 1, wherein the high-voltage dual power supply system is used as the high-voltage load. Then, turn on the 12V low-voltage power supply 10, debug the simulation and monitoring equipment 19, ensure that the communication of the system to be tested 2 (i.e., the vehicle fuel cell system) is normal, turn on the exhaust gas / wastewater treatment system, ensure that the gas environment in the semi-anechoic chamber 1 is normal, turn on the hydrogen supply system, ensure that the hydrogen supply is normal, turn on the thermal management system, and ensure that the temperature of the system to be tested 2 is normal;
[0092] S2, turn on the high-voltage dual power supply system; control the simulation and monitoring device 19 to make the system 2 under test operate at 50% of the rated power;
[0093] S3. Test according to the electromagnetic compatibility test standard, record the test data results, and determine whether the electromagnetic compatibility characteristics exceed the limit based on the test results;
[0094] S4, shut down the system to be tested 2, the hydrogen supply system, the high-voltage dual power supply system, and the thermal management system, and shut down the exhaust gas / wastewater treatment system and the 12V low-voltage power supply 10 after the exhaust gas treatment is completed;
[0095] The test method steps for the fourth working condition are:
[0096] S1. Arrange the test system according to Example 1, wherein the high-voltage dual power supply system is used as the high-voltage load. Then, turn on the 12V low-voltage power supply 10, debug the simulation and monitoring equipment 19, ensure that the communication of the system to be tested 2 (i.e., the vehicle fuel cell system) is normal, turn on the exhaust gas / wastewater treatment system, ensure that the gas environment in the semi-anechoic chamber 1 is normal, turn on the hydrogen supply system, ensure that the hydrogen supply is normal, turn on the thermal management system, and ensure that the temperature of the system to be tested 2 is normal;
[0097] S2, turn on the high-voltage dual power supply system, and control the simulation and monitoring device 19 to make the system 2 under test operate at 25% of the rated power;
[0098] S3. Test according to the electromagnetic compatibility test standard, record the test data results, and determine whether the electromagnetic compatibility characteristics exceed the limit based on the test results;
[0099] S4, shut down the system to be tested 2, the hydrogen supply system, the high-voltage dual power supply system, and the thermal management system, and shut down the exhaust gas / wastewater treatment system and the 12V low-voltage power supply 10 after the exhaust gas treatment is completed;
[0100] The test method steps for the fifth working condition are:
[0101] S1. Arrange the test system according to the embodiment 1, then turn on the 12V low-voltage power supply 10, debug the simulation and monitoring equipment 19, and ensure that the communication of the system to be tested 2 (i.e., the vehicle fuel cell system) is normal;
[0102] S2, by controlling the simulation and monitoring device 19, the system under test 2 is powered on at low voltage and operates normally;
[0103] S3. Test according to the electromagnetic compatibility test standard, record the test data results, and determine whether the electromagnetic compatibility characteristics exceed the limit based on the test results;
[0104] S4, turn off the system under test 2 and the 12V low voltage power supply 10;
[0105] The test method steps for the sixth working condition are:
[0106] S1, arrange the test system according to the embodiment 1, and control the simulation and monitoring device 19 to make the system 2 to be tested not powered on, and the whole system does not work;
[0107] S2. Test according to the electromagnetic compatibility test standards and record the test data results;
[0108] S3, turn on the 12V low-voltage power supply 10, debug the simulation and monitoring equipment 19, ensure that the communication of the system to be tested 2 (i.e., the vehicle fuel cell system) is normal, turn on the exhaust gas / wastewater treatment system, ensure that the gas environment in the semi-anechoic chamber 1 is normal, turn on the hydrogen supply system, ensure that the hydrogen supply is normal, turn on the thermal management system, and ensure that the temperature of the system to be tested 2 is normal;
[0109] S4, turn on the high-voltage dual power supply device 9 and the control simulation and monitoring device 19 to verify whether the system under test 2 can operate normally;
[0110] S5. Turn off the system to be tested 2, the hydrogen supply system, the high-voltage dual power supply system, and the thermal management system. After the exhaust gas treatment is completed, turn off the exhaust gas / wastewater treatment system and the 12V low-voltage power supply 10.
[0111] Among them, the first to fourth working conditions respectively examine the electromagnetic compatibility characteristics of the fuel cell system under different working conditions when it is powered on normally; the fifth working condition examines the electromagnetic anti-interference characteristics of the fuel cell system only under normal low-voltage working conditions; the sixth working condition examines the electromagnetic compatibility characteristics of the fuel cell system during electrostatic discharge when it is not powered on.
[0112] Example 3
[0113] The method for testing the electromagnetic compatibility of a vehicle fuel cell system by using the fuel cell electromagnetic compatibility test system in Example 1, the method in this Example 3 is a single-unit level test method, after the six working conditions in Example 2 are tested respectively, if the test results are out of limit, the single-unit level test method in this Example 3 is used, which specifically includes three working conditions;
[0114] Working condition 1 is the single-stage test of air compressor 203. The test method and steps are as follows:
[0115] S1. Arrange the test system according to Example 1, wherein the high-voltage dual power supply system is used as a high-voltage DC output device, turn on the 12V low-voltage power supply 10, debug the simulation and monitoring device 19, ensure that the air compressor 203 in the system to be tested 2 communicates normally, turn on the tail gas / wastewater treatment system, ensure that the gas environment in the semi-anechoic chamber 1 is normal, turn on the thermal management system, and ensure that the temperature of the air compressor 203 is normal;
[0116] S2, turn on the high-voltage dual power supply system, and make the air compressor 203 work normally by controlling the simulation and monitoring device 19;
[0117] S3. Test according to the electromagnetic compatibility test standard and record the test data results. According to the test results, determine whether the electromagnetic compatibility characteristics of the air compressor exceed the limit;
[0118] S4, shut down the air compressor 203, the high-voltage dual power supply system and the thermal management system, and shut down the exhaust gas / wastewater treatment system and the 12V low-voltage power supply 10 after the exhaust gas treatment is completed;
[0119] Working condition 2 is the FCU 204 single-unit level test, and the test method steps are as follows:
[0120] S1. Arrange the test system according to the embodiment 1, turn on the 12V low-voltage power supply 10, debug the simulation and monitoring equipment 19, and ensure that the FCU 204 in the system to be tested 2 communicates normally;
[0121] S2, by controlling the simulation and monitoring device 19, only the FCU 204 works normally;
[0122] S3. Test according to the electromagnetic compatibility test standard and record the test data results. According to the test results, determine whether the electromagnetic compatibility characteristics of the FCU exceed the limit;
[0123] S4, turn off the FCU 204 and the 12V low voltage power supply 10;
[0124] Working condition three is a single-unit level test of the DC / DC converter 202, and the test method steps are as follows:
[0125] S1. Arrange the test system according to Example 1, wherein the high-voltage dual power supply system is used as a high-voltage DC output and a high-voltage load at the same time, turn on the 12V low-voltage power supply 10, debug the simulation and monitoring equipment 19, ensure that the DC / DC converter 202 in the system under test 2 communicates normally, turn on the thermal management system, and ensure that the temperature of the DC / DC converter 202 is normal;
[0126] S2, turn on the high-voltage dual power system, and make the DC / DC converter 202 work normally by controlling the simulation and monitoring device 19;
[0127] S3. Test according to the electromagnetic compatibility test standard and record the test data results. According to the test results, determine whether the electromagnetic compatibility characteristics of the DC / DC converter exceed the limit;
[0128] S4 , shut down the DC / DC converter 202 , the high-voltage dual power supply system, the thermal management system and the 12V low-voltage power supply 10 .
[0129] In summary, the electromagnetic compatibility testing device and testing method of the fuel cell system of the present invention are suitable for electromagnetic compatibility testing of the fuel cell system. The above scheme can realize the operating condition test of the entire system level of the fuel cell. At the same time, considering the positioning of the interference source of the electromagnetic compatibility components, the system can also perform single-cell level testing, which not only effectively realizes the electromagnetic compatibility characteristics inspection of the fuel cell system under comprehensive working conditions, but also shortens the test time.
[0130] The above embodiments are only preferred embodiments for fully illustrating the present invention, and the protection scope of the present invention is not limited thereto. Any equivalent substitution or change made by a person skilled in the art based on the present invention is within the protection scope of the present invention.
Claims
1. An electromagnetic compatibility test device for a fuel cell system, characterized in that: include: A semi-anechoic chamber (1) in which a system to be tested (2) is placed; A hydrogen supply system connected to the system to be tested (2) and used to provide hydrogen to the system to be tested (2); An exhaust gas / wastewater treatment system connected to the system to be tested (2) and used to treat the exhaust gas and wastewater in the system to be tested (2); A thermal management system connected to the system to be tested (2) and used to perform thermal management on the system to be tested (2); A power supply system connected to the system under test (2) and used to provide power to the system under test (2) or to serve as a load; A control monitoring system connected to the system to be tested (2) and used for debugging and monitoring the working condition of the system to be tested (2); The environmental requirements of the electromagnetic compatibility test are met by the cooperation of the hydrogen supply system, the tail gas / wastewater treatment system, the thermal management system and the power supply system. The system to be tested (2) is operated according to the specified working conditions through the control and monitoring system. Then, the electromagnetic compatibility test is performed according to the electromagnetic compatibility test standard, including the system-level operation test and the unit-level operation test of the system to be tested (2); The power supply system includes a high-voltage dual power supply system and a low-voltage direct current power supply system; The high-voltage dual power supply system comprises a high-voltage dual power supply device (9) placed outside the semi-anechoic chamber (1), and the high-voltage dual power supply system can be used as a high-voltage input power supply and a high-voltage load simultaneously or separately according to system-level test and unit-level test requirements; The low-voltage DC power supply system comprises a low-voltage power supply (10) placed in the semi-anechoic chamber (1), and a low-voltage artificial network (11) connecting the low-voltage power supply (10) and the system to be tested (2); When performing a system-level test, the high-voltage dual power supply system serves as a high-voltage load, and the high-voltage dual power supply device (9) is sequentially connected to the high-voltage power supply output end of the DC / DC converter (202) of the system to be tested (2) via a switching switch (12), a load-end high-voltage filter (13), a first high-voltage artificial network (14), and a first impedance matching network (15); The low-voltage power supply (10) is connected to the low-voltage power supply input terminal of the system to be tested (2) via a low-voltage artificial network (11); When performing a single-unit level test on the DC / DC converter (202), the high-voltage dual power supply system simultaneously serves as a high-voltage direct current output and a high-voltage load, and the high-voltage dual power supply device (9) is sequentially connected to the high-voltage power supply output end of the DC / DC converter (202) of the system to be tested (2) via a switching switch (12), a load-end high-voltage filter (13), a first high-voltage artificial network (14), and a first impedance matching network (15), and at the same time, the high-voltage dual power supply device (9) is connected to the high-voltage power supply input end of the DC / DC converter (202) of the system to be tested (2) via a switching switch (12), a power-end high-voltage filter (16), a second high-voltage artificial network (17), and a second impedance matching network (18); The low-voltage power supply (10) is connected to a low-voltage power supply input terminal of a DC / DC converter (202) of the system to be tested (2) via a low-voltage artificial network (11); When performing a single-unit test of the air compressor (203), the high-voltage dual power supply system is used as a high-voltage direct current output, and the high-voltage dual power supply device (9) is connected to the high-voltage power supply input terminal of the air compressor (203) of the system to be tested (2) via a switching switch (12), a power supply end high-voltage filter (16), a second high-voltage artificial network (17), and a second impedance matching network (18); The low-voltage power supply (10) is connected to the low-voltage power supply input terminal of the air compressor (203) of the system to be tested (2) via a low-voltage artificial network (11); When performing a single-unit level test on the fuel cell main controller (204), the low-voltage power supply (10) is connected to the low-voltage power supply input terminal of the fuel cell main controller (204) of the system to be tested (2) via the low-voltage artificial network (11).
2. The electromagnetic compatibility testing device according to claim 1, characterized in that: The hydrogen supply system comprises a hydrogen supply device (3) placed outside the semi-anechoic chamber (1), and a first connecting pipe (4) connecting the hydrogen supply device (3) and the system to be tested (2); The tail gas / wastewater treatment system comprises a tail gas / wastewater treatment device (5) placed outside the semi-anechoic chamber (1), and a second connecting pipe (6) connecting the tail gas / wastewater treatment device (5) and the system to be tested (2); The thermal management system comprises a cooling circulation device (7) arranged outside the semi-anechoic chamber (1), and a third connecting pipe (8) connecting the cooling circulation device (7) and the system to be tested (2); The first connecting tube (4) and the second connecting tube (6) are gas waveguide tubes, and the third connecting tube (8) is a pipeline; The control and monitoring system comprises a simulation and monitoring device (19) placed outside the semi-anechoic chamber (1), wherein the simulation and monitoring device (19) is connected to the system to be tested (2) via an optical fiber feedthrough (20) and a photoelectric conversion communication device (21).
3. A method for performing electromagnetic compatibility testing on a fuel cell system using the electromagnetic compatibility testing device according to claim 1 or claim 2, characterized in that: The following steps are involved: S1. Operate the hydrogen supply system, tail gas / wastewater treatment system and thermal management system in accordance with the environmental requirements of the fuel cell electromagnetic compatibility test; S2, turn on the power supply system, and control the system under test (2) to operate according to the specified working conditions through the control monitoring system; S3. Conduct tests according to electromagnetic compatibility test standards and determine the electromagnetic compatibility of the fuel cell based on the test data results.
4. The method according to claim 3, characterized in that: The steps of the system-level testing method are: S1. Operate the hydrogen supply system, tail gas / wastewater treatment system and thermal management system in accordance with the environmental requirements of the electromagnetic compatibility test of the fuel cell system; S2, turning on the power supply system, and controlling the system under test (2) to operate between 0% and 100% of the rated power through the control monitoring system; S3. Test the electromagnetic compatibility characteristics at different rated powers according to the electromagnetic compatibility test standard, and determine the electromagnetic compatibility at the corresponding rated power based on the data results obtained from the tests at different rated powers.
5. The method according to claim 3, characterized in that: The steps of the monomer level testing method are: S1. Operate the hydrogen supply system, tail gas / wastewater treatment system and thermal management system in accordance with the environmental requirements of the electromagnetic compatibility test of the fuel cell system; S2, turning on the power supply system, and controlling one of the DC / DC converter (202), the air compressor (203) and the fuel cell main controller (204) in the system to be tested (2) to operate through the control monitoring system; S3. Testing the electromagnetic compatibility characteristics of the DC / DC converter (202), the air compressor (203) or the fuel cell main controller (204) when they are working according to the electromagnetic compatibility test standard, and determining whether the corresponding electromagnetic compatibility characteristics exceed the limit through the data results obtained from the test.