A method and system for determining concrete slump

By obtaining the dumping parameters and concrete amount of the conveyor, a slump model is established, which solves the problem of low stability of the video captured by the camera, improves the accuracy of the concrete slump, and achieves higher measurement stability and accuracy.

CN114895008BActive Publication Date: 2024-10-15HUNAN SANY KUAIERJU RESIDENTIAL IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210579155.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-25
Publication Date
2024-10-15
Estimated Expiration
2042-05-25

AI Technical Summary

Technical Problem

In the existing technology, the slump obtained based on the concrete flow video captured by the camera is inaccurate, mainly due to the low stability of the flow state video caused by the change of the conveyor's inclination angle, and the unfixed flipping speed of the conveyor, which further reduces the video stability and collapse. Drop accuracy.

Method used

By obtaining the current amount of concrete in the conveyor and the dumping parameters at the initial pouring moment, the corresponding relationship between the slump, concrete amount and dumping parameters is established, the slump of the concrete is calculated, and the camera is used to obtain image information to determine the initial pouring moment. and current dumping parameters, and combine the flip speed and dumping duration to establish a mathematical model to improve video stability and calculation accuracy.

Benefits of technology

It improves the calculation accuracy of the concrete slump, reduces the technical difficulty, and achieves a more stable slump measurement identified in the low-speed overturning section, which is more reliable than the existing technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114895008B_ABST
    Figure CN114895008B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for determining concrete slump, wherein the method for determining concrete slump comprises: obtaining the current amount of concrete in a conveyor; obtaining the current pouring parameter of the conveyor at the time of initial pouring of concrete; obtaining the correspondence between the preset slump, the amount of concrete and the pouring parameter; and obtaining the slump of the concrete according to the corresponding relationship between the slump, the amount of concrete and the pouring parameter based on the current amount of concrete and the current pouring parameter of the conveyor. Compared with the concrete slump determined based on the concrete flow video, it is more accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to a method and system for determining concrete slump. Background Art

[0002] Slump is an important indicator to measure the quality and performance of concrete. Slump detection is widely used in the production, transportation and pouring of ready-mixed concrete. Slump refers to the workability of concrete, which reflects whether the concrete is easy to construct and has uniform and dense properties, including the water retention, fluidity and cohesion of concrete. It is an important indicator to measure the consistency of concrete mixture.

[0003] The slump detection of mixing stations is a difficult problem in the industry. When the slump of concrete produced at mixing stations is tested, the slump obtained will have a large error. At the same time, the concrete in the mixing station needs to be transported over a long distance to reach the PC production line. During the transportation process, factors such as temperature, vibration, and stagnation will further increase the error of the slump. Therefore, the slump information provided by the mixing station is not accurate.

[0004] The invention patent application with application publication number CN 114002415 A discloses a visual artificial intelligence real-time detection device and method for concrete slump. Specifically, the visual artificial intelligence real-time detection device for concrete slump includes a monitoring component, the monitoring component includes a monitoring camera, a longitudinal deflection block is fixedly installed at the bottom of the monitoring camera, a transverse deflection block is provided at the end of the longitudinal deflection block away from the monitoring camera, and the transverse deflection block and the longitudinal deflection block are pin-connected, a fixed block is provided at the end of the transverse deflection block away from the longitudinal deflection block, and the end of the transverse deflection block is pin-connected to the fixed block, a connecting plate is provided on the back of the transverse deflection block, and the connecting plate and the transverse deflection block are fixedly connected. The operation process of the software system is as follows: Sp1: When the mixer truck enters the warehouse, the mixing station unloads the material and starts the monitoring camera. Through the data collection of the monitoring camera, the video is processed in real time through the software system; Sp2: The on-site concrete flow video is accessed, collected, classified and labeled, and the video is pre-processed; Sp3: The features of the video are extracted, a concrete classification analysis model is established, and the hierarchical reasoning calculation of the model is performed; Sp4: For the analyzed video, the slump of the concrete is obtained, and the slump value is judged. When the slump is greater than 200mm, the concrete is too thin; when the slump is 180mm, the concrete is qualified; when the slump is less than 160mm, the concrete is too dry. When the concrete is too thin or too dry, the system alarms the monitoring personnel, and the staff will take corresponding remedial measures in time.

[0005] However, in practice, it is found that the result obtained by calculating the slump of concrete by finding the correspondence between the video and the slump of concrete from the concrete flow video taken by the on-site surveillance camera is not accurate. Summary of the invention

[0006] In view of this, the embodiments of the present invention provide an electronic device, a method, device and system for determining concrete slump to solve the problem that the current slump obtained based on concrete flow videos captured by a camera is not accurate.

[0007] According to the first aspect, an embodiment of the present invention provides a method for determining the slump of concrete, comprising the following steps: obtaining the current amount of concrete in a conveyor; obtaining the current pouring parameters of the conveyor at the time when the concrete is initially poured out; obtaining the correspondence between the preset slump, the amount of concrete and the pouring parameters; and obtaining the slump of the concrete based on the current amount of concrete and the current pouring parameters of the conveyor and utilizing the correspondence between the slump, the amount of concrete and the pouring parameters.

[0008] In combination with the first aspect, in a first implementation of the first aspect, the current dumping parameter of the conveyor is the current inclination angle of the conveyor; and / or the current dumping parameter of the conveyor is the current dumping duration of the conveyor.

[0009] In combination with the first embodiment of the first aspect, in the second embodiment of the first aspect, obtaining the current pouring parameters of the conveyor at the initial pouring moment of concrete includes: obtaining image information of the pouring process when the concrete is poured out by the conveyor; determining the initial pouring moment of the concrete according to the image information; and determining the current pouring parameters of the conveyor based on the initial pouring moment of the concrete.

[0010] In combination with the second embodiment of the first aspect, in the third embodiment of the first aspect, when the current dumping parameter is the current dumping duration, determining the current dumping parameter of the conveyor based on the initial pouring time of the concrete includes: subtracting the initial dumping time of the conveyor from the initial pouring time of the concrete to obtain the current dumping duration; and / or, when the current dumping parameter is the current inclination angle, determining the current dumping parameter of the conveyor based on the initial pouring time of the concrete includes: subtracting the initial dumping time of the conveyor from the initial pouring time of the concrete to obtain the current dumping duration; obtaining the correspondence between the dumping duration and the inclination angle of the conveyor; and obtaining the current inclination angle according to the current dumping duration using the correspondence between the dumping duration and the inclination angle.

[0011] In combination with the first aspect to the third embodiment of the first aspect, in the fourth embodiment of the first aspect, obtaining the correspondence between the preset slump, concrete amount and pouring parameters includes: obtaining the correspondence between the slump, concrete amount and pouring time corresponding to the turning speed according to the turning speed of the conveyor.

[0012] In combination with the first aspect to the third embodiment of the first aspect, in the fifth embodiment of the first aspect, the method for determining the slump of concrete also includes: obtaining multiple sets of training data, wherein one set of training data includes: when concrete is poured out by a conveyor, the known pouring parameters of the conveyor at the initial pouring moment of the concrete, the known concrete amount of the concrete, and the known slump of the concrete; and using the multiple sets of training data to perform fitting to obtain the correspondence between the slump, the concrete amount, and the pouring parameters.

[0013] In combination with the first aspect to the third embodiment of the first aspect, in the sixth embodiment of the first aspect, after obtaining the slump of the concrete by utilizing the correspondence between the slump, the amount of concrete and the pouring parameters, it also includes: sending the slump to related equipment; and / or adjusting the working parameters of the related equipment according to the slump.

[0014] In combination with the sixth embodiment of the first aspect, in the seventh embodiment of the first aspect, the related equipment includes one or more of the following: material distribution equipment, vibration equipment, and maintenance equipment.

[0015] According to the second aspect, an embodiment of the present invention further provides a concrete slump determination system, comprising a conveyor and a controller, wherein the conveyor is used to transport and pour concrete; the controller stores computer instructions, and the controller executes the concrete slump determination method described in the first aspect or any embodiment of the first aspect by executing the computer instructions.

[0016] In combination with the second aspect, in a first implementation of the second aspect, the concrete slump determination system further includes a camera, which is communicatively connected to the controller and is used to obtain image information of the concrete during the process of being poured out by the conveyor.

[0017] The method and system for determining the slump of concrete provided in the embodiments of the present invention obtain the current amount of concrete in the conveyor, the current pouring parameters of the conveyor at the initial moment of pouring out the concrete, and the correspondence between the slump, the amount of concrete and the pouring parameters. According to the current amount of concrete and the current pouring parameters of the conveyor, the slump of the concrete can be obtained by using the correspondence between the slump, the amount of concrete and the pouring parameters.

[0018] In the prior art, slump is obtained based on concrete flow video captured by a camera. Since the slump is determined based on the concrete flow video, it is necessary to monitor the continuous flow state of concrete for a period of time during the unloading process. The inclination angle of the conveyor is constantly changing during the unloading process, which will lead to low video stability of the flow state. Therefore, the slump obtained based on the concrete flow video is not accurate and technically difficult. In addition, in some cases, since the conveyor does not flip at a fixed speed but is slow at the front and fast at the back, the change in the conveyor inclination angle is accelerated. In this case, the video stability is even lower and the slump obtained is even more inaccurate.

[0019] After research, it was found that there is a corresponding relationship between the slump, the amount of concrete, and the dumping parameters of the conveyor at the time when the concrete is initially poured out. Therefore, the embodiment of the present invention can calculate the slump by obtaining the current dumping parameters of the conveyor at the time when the concrete is initially poured out and linking it with the current amount of concrete. It can be seen that since the current amount of concrete in the conveyor is easy to obtain, the embodiment of the present invention only needs to monitor the current dumping parameters of the conveyor at the start of pouring. It can be understood that the parameters at one moment are equivalent to the video stability of the flow state, so the concrete slump obtained by the embodiment of the present invention is more accurate than the prior art. In addition, for a conveyor with a slow turnover speed at the beginning and a fast turnover speed at the end, the initial moment of pouring concrete in the embodiment of the present invention belongs to the low-speed section of the conveyor flipping, which is easy to identify and has low technical difficulty. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The features and advantages of the present invention will be more clearly understood by referring to the accompanying drawings, which are schematic and should not be construed as limiting the present invention in any way. In the accompanying drawings:

[0021] Figure 1 Schematic diagram of the process of determining the concrete slump in Example 1 of the present invention;

[0022] Figure 2 It is a structural diagram of visual detection of slump;

[0023] Figure 3 It is a schematic diagram of the principle of visual detection of slump;

[0024] Figure 4 It is a structural schematic diagram of a device for determining concrete slump in Example 2 of the present invention;

[0025] Among them, 1. conveyor; 2. material placing machine; 3. camera; 4. flip motor. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0027] Example 1

[0028] After research, it was found that in the prior art, slump is obtained based on concrete flow video taken by a camera. Since the slump is determined based on the concrete flow video, it is necessary to monitor the continuous flow state of concrete for a period of time during the unloading process. The inclination angle of the conveyor is constantly changing during the unloading process, which will lead to low video stability of the flow state. Therefore, the slump obtained based on the concrete flow video is not accurate and technically difficult. In addition, in some cases, since the conveyor does not flip at a fixed speed, but is slow at the front and fast at the back, the change in the conveyor inclination angle is accelerated. In this case, the video stability is even lower and the slump is even more inaccurate.

[0029] Embodiment 1 of the present invention provides a method for determining the slump of concrete. Figure 1 Schematic diagram of the process of determining the concrete slump in Example 1 of the present invention, Figure 2 It is a schematic diagram of the structure for visual detection of slump, such as Figure 1 and Figure 2 As shown, the method for determining the slump of concrete according to Embodiment 1 of the present invention comprises the following steps:

[0030] S101: Obtain the current amount of concrete in the conveyor.

[0031] Specifically, the current amount of concrete transported by the conveyor 1 may be obtained in the mixing station control program.

[0032] Specifically, the conveyor 1 may be a tipping conveyor 1, such as a torpedo tank; the tipping conveyor 1 includes a tipping motor 4.

[0033] S102: Acquire the current pouring parameters of the conveyor at the initial pouring time of concrete.

[0034] Specifically, the current dumping parameter of the conveyor 1 is the current inclination angle of the conveyor 1, that is, the inclination angle at which the conveyor 1 can just pour out concrete; or, the current dumping parameter of the conveyor 1 is the current dumping duration of the conveyor 1, that is, the time taken for the conveyor 1 to tilt from the beginning to the angle at which the first drop of concrete can be poured out.

[0035] Specifically, the current dumping parameter of the conveyor at the time when the concrete is initially poured out may be an input value, or the current dumping parameter of the conveyor 1 at the time when the concrete is initially poured out may be obtained according to the image information acquired by the camera 3 .

[0036] Specifically, when the current dumping parameters of the conveyor 1 at the initial pouring moment of concrete are obtained based on the image information acquired by the camera 3, the following technical solution can be adopted: obtain image information of the pouring process when the concrete is poured out by the conveyor 1; determine the initial pouring moment of the concrete based on the image information; and determine the current dumping parameters of the conveyor 1 based on the initial pouring moment of the concrete.

[0037] More specifically, when the current dumping parameter is the current dumping duration, the current dumping parameter of the conveyor 1 can be determined based on the initial pouring time of the concrete by the following technical solution: subtract the initial dumping time of the conveyor 1 from the initial pouring time of the concrete to obtain the current dumping duration.

[0038] More specifically, when the current dumping parameter is the current inclination angle, the current dumping parameter of the conveyor 1 based on the initial pouring time of the concrete can be determined by the following technical solution: the current dumping duration is obtained by subtracting the initial dumping time of the conveyor 1 from the initial pouring time of the concrete to obtain the corresponding relationship between the dumping duration and the inclination angle of the conveyor 1; according to the current dumping duration, the current inclination angle is obtained by using the corresponding relationship between the dumping duration and the inclination angle.

[0039] S103: Obtaining the corresponding relationship between the preset slump, concrete quantity and pouring parameters.

[0040] Furthermore, before obtaining the preset corresponding relationship among the slump, the amount of concrete and the pouring parameters, the corresponding relationship among the slump, the amount of concrete and the pouring parameters is established by analyzing known data.

[0041] Specifically, the corresponding relationship between slump, concrete quantity and pouring parameters can be established by the following scheme: obtain multiple sets of training data, where one set of training data includes: obtain multiple sets of training data, where one set of training data includes: when concrete is poured out by conveyor 1, the known pouring parameters of the conveyor 1 at the initial pouring moment of the concrete, the known concrete quantity of the concrete, and the known slump of the concrete; use the multiple sets of training data to perform fitting to obtain the corresponding relationship between the slump, concrete quantity and pouring parameters.

[0042] S104: According to the current amount of concrete and the current dumping parameter of the conveyor, the slump of the concrete is obtained by using the corresponding relationship among the slump, the amount of concrete and the dumping parameter.

[0043] Specifically, when the current dumping parameter of the conveyor 1 is the current tilt angle of the conveyor 1, the slump of the concrete can be obtained by using the corresponding relationship between the slump, the amount of concrete and the dumping parameter according to the current amount of concrete and the current dumping parameter of the conveyor 1. The following scheme can be adopted: According to the current amount of concrete and the current dumping parameter of the conveyor 1, the slump of the concrete can be obtained by using the corresponding relationship between the slump, the amount of concrete and the tilt angle. This is because, for concrete with different slumps and different volumes under the same flipping motion trajectory, the tilt angle at the initial pouring of concrete can be mathematically modeled. By monitoring the current tilt angle at the initial pouring of concrete and linking the concrete volume, the slump can be calculated.

[0044] For example, the correspondence between the slump, the amount of concrete and the inclination angle can be constructed in the following manner: concrete with a known slump and a known amount of concrete is loaded into the conveyor 1, and the inclination angle at which the conveyor 1 can just pour out the concrete is obtained, and a set of training data containing a known slump, a known amount of concrete and a known inclination angle is obtained at this time; based on multiple sets of training data containing a known slump, a known amount of concrete and a known inclination angle, the correspondence between the slump, the amount of concrete and the inclination angle is obtained.

[0045] Specifically, when the current dumping parameter of the conveyor 1 is the current dumping duration of the conveyor 1, the slump of the concrete can be obtained according to the current amount of concrete and the current dumping parameter of the conveyor, using the corresponding relationship between the slump, the amount of concrete and the dumping parameter. The following scheme can be adopted: According to the current amount of concrete and the current dumping parameter of the conveyor 1, using the corresponding relationship between the slump, the amount of concrete and the dumping duration, the slump of the concrete can be obtained. This is because, for concrete with different slumps and different cubic volumes under the same flipping motion trajectory, a mathematical model can be established for the dumping duration of the concrete at the initial pouring moment. By monitoring the current dumping duration and linking the concrete volume, the slump can be calculated.

[0046] For example, the correspondence between slump, concrete quantity and pouring time can be constructed in the following way: concrete with known slump and known concrete quantity is loaded into conveyor 1, and the tilting time for conveyor 1 to just pour out the concrete is obtained. At this time, a set of training data containing known slump, known concrete quantity and known tilting time is obtained; based on multiple sets of training data containing known slump, known concrete quantity and known tilting time, the correspondence between slump, concrete quantity and tilt angle is obtained.

[0047] Embodiment 1 of the present invention obtains the current pouring parameters of the conveyor at the time of initial concrete pouring, and links it with the current amount of concrete to calculate the slump. It can be seen that since the current amount of concrete in the conveyor 1 is easy to obtain, the embodiment of the present invention only needs to monitor the current pouring parameters of the conveyor at the start of pouring. It can be understood that the parameters at one moment are equivalent to the video stability of the flow state, so the concrete slump obtained by the embodiment of the present invention is more accurate than the prior art. In addition, for a conveyor with a slow turnover speed at the beginning and a fast turnover speed at the end, the initial moment of pouring concrete in Embodiment 1 of the present invention belongs to the low-speed section of the conveyor turnover, which is easy to identify and has low technical difficulty.

[0048] Furthermore, the corresponding relationship between the preset slump, the amount of concrete and the pouring time can be obtained by the following scheme: the corresponding relationship between the slump, the amount of concrete and the pouring time corresponding to the turning program is obtained according to the turning program of the conveyor 1. This is because, for different conveyors, if the turning program (reflected in the turning speed and the speed change curve) is different, even if the amount of concrete and the slump of concrete are the same, the current pouring parameters at the initial pouring time are different.

[0049] Furthermore, after obtaining the slump of the concrete by using the correspondence between the slump, the amount of concrete and the pouring parameters, the method further includes: sending the slump to relevant equipment; and / or adjusting the working parameters of the relevant equipment according to the slump.

[0050] Specifically, the related equipment includes one or more of the following: material distribution equipment, vibration equipment, and maintenance equipment. The following is a more detailed description of the method for determining the slump of concrete based on a specific example. Figure 3 The schematic diagram of the principle of visual detection of slump. Figure 2 and Figure 3 As shown, the current pouring parameters of the conveyor 1 when pouring from the conveyor 1 to the concrete placing machine 2 can be collected by the camera, wherein the current pouring parameters of the conveyor 1 can be the current tilt angle at the start time of pouring the concrete by the conveyor 1, and can also be the current pouring time from the start of pouring to the start time of pouring the concrete by the conveyor 1. The collection processing module obtains the slump of the concrete according to the collection data of the camera 3 and the expert database.

[0051] Specifically, for a fixed overturning unloading procedure, multiple groups of data including slump, concrete quantity and pouring time are obtained, and the corresponding relationship between slump, concrete quantity and pouring time (also called expert database) is obtained; the current concrete volume provided by the mixing station or conveyor 1 is obtained, and the current pouring time of the conveyor 1 from the beginning of pouring to the starting time of pouring the concrete is obtained. The current slump data is obtained based on the corresponding relationship between the current concrete volume, current pouring time, slump, concrete quantity and pouring time. Furthermore, the current slump data can also be transmitted to other equipment until subsequent production, such as Figure 3 As shown, the parameters of the automatic concrete placing machine 2, including the travel speed, the speed of the discharge shaft, etc., can be adjusted according to the slump; the vibration parameters of the automatic vibrating equipment, including the vibration frequency, the vibration duration, etc., can also be adjusted according to the slump; the parameters of the pre-curing equipment, including the curing temperature, duration, etc., can also be adjusted according to the slump; the parameters of the curing equipment, including the curing temperature, humidity, duration, etc., can also be adjusted according to the slump.

[0052] It can be seen that the method for determining the slump of concrete provided in Example 1 of the present invention has the following technical effects:

[0053] (1) The slump of concrete used for placing can be directly measured, eliminating the influence of slump changes between the mixing plant and the placing machine;

[0054] (2) A very accurate data model can be established, which is more reliable than visual images within a short working cycle;

[0055] (3) Use slump data to guide the automated configuration and operation of subsequent operations such as material distribution, vibration, pre-curing, roughening, and maintenance;

[0056] (4) Slump data can provide reverse guidance for mixing station production;

[0057] (5) It helps to realize the automation control of PC production line.

[0058] It can be seen from this that embodiment 1 of the present invention only needs to monitor the current dumping parameters of the conveyor at the starting moment of material dumping. This moment belongs to the low-speed section of the conveyor flipping, which is easy to identify and has low technical difficulty. Moreover, a moment in an embodiment of the present invention is more stable than a time period in the prior art.

[0059] Example 2

[0060] Corresponding to the first embodiment of the present invention, the second embodiment of the present invention provides a device for determining the slump of concrete. Figure 4 FIG. 2 is a schematic diagram of the structure of a device for determining the slump of concrete in Embodiment 2 of the present invention. Figure 4As shown, the device for determining the concrete slump of embodiment 2 of the present invention includes a first acquisition module 20 , a second acquisition module 21 , a third acquisition module 22 and a processing module 23 .

[0061] Specifically, the first acquisition module 20 is used to acquire the current amount of concrete in the conveyor.

[0062] The second acquisition module 21 is used to acquire the current pouring parameters of the conveyor at the initial moment of pouring concrete.

[0063] The third acquisition module 22 is used to obtain the corresponding relationship between the preset slump, concrete volume and pouring parameters.

[0064] The processing module 23 is used to obtain the slump of the concrete according to the current concrete amount and the current dumping parameter of the conveyor by using the corresponding relationship between the slump, the concrete amount and the dumping parameter.

[0065] Specifically, the current dumping parameter of the conveyor is the current inclination angle of the conveyor; or, the current dumping parameter of the conveyor is the current dumping duration of the conveyor.

[0066] The second acquisition module 21 is specifically used to: acquire image information of the pouring process when the concrete is poured out by the conveyor; determine the initial pouring time of the concrete according to the image information; and determine the current pouring parameters of the conveyor based on the initial pouring time of the concrete.

[0067] More specifically, when the current dumping parameter is the current dumping duration, the second acquisition module 21 is used to obtain the current dumping duration by subtracting the initial dumping time of the conveyor from the initial pouring time of the concrete.

[0068] More specifically, when the current dumping parameter is the current tilt angle, the second acquisition module 21 is used to: obtain the current dumping duration by subtracting the initial dumping time of the conveyor from the initial pouring time of the concrete; obtain the dumping program of the conveyor, the dumping program at least including the correspondence between the dumping duration and the tilt angle; and obtain the current tilt angle according to the current dumping duration by utilizing the correspondence between the dumping duration and the tilt angle.

[0069] The third acquisition module 22 is specifically used to: acquire the corresponding relationship between the slump, the amount of concrete and the pouring time corresponding to the turning speed according to the turning speed of the conveyor.

[0070] After obtaining the slump of the concrete by using the correspondence between the slump, the amount of concrete and the pouring parameters, the processing module 23 is further used to send the slump to relevant equipment; and / or adjust the working parameters of the relevant equipment according to the slump.

[0071] Furthermore, the concrete slump determination device also includes a training module 24, which is specifically used to: obtain multiple groups of training data, where one group of training data includes: concrete slump, concrete quantity, and pouring parameters of the conveyor at the initial pouring moment of concrete when poured out by the conveyor; use the multiple groups of training data to perform fitting to obtain the corresponding relationship between the slump, concrete quantity and pouring parameters.

[0072] The specific details of the above concrete slump determination device can be found in Figures 1 to 3 The corresponding related descriptions and effects in the illustrated embodiments can be understood and will not be repeated here.

[0073] Example 3

[0074] Embodiment 3 of the present invention further provides a concrete slump determination system, including a conveyor and a controller, wherein the conveyor is used to transport and pour concrete, and the controller stores computer instructions. The controller executes the computer instructions to implement the concrete slump determination method of Embodiment 1 of the present invention.

[0075] Specifically, the conveyor may be a tipping conveyor, such as a torpedo tank.

[0076] Furthermore, the concrete slump determination system also includes a camera, which is communicatively connected to the controller and is used to obtain image information of the pouring process when the concrete is poured out from the conveyor.

[0077] Specifically, the camera is arranged on the material placing machine, or the camera is arranged on the track of the conveyor.

[0078] Specifically, the controller includes a processor and a memory.

[0079] The processor may be a central processing unit (CPU). The processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.

[0080] The memory, as a non-transitory computer-readable storage medium, can be used to store non-transitory software programs, non-transitory computer executable programs and modules, such as program instructions / modules corresponding to the method for determining the slump of concrete in the embodiment of the present invention (for example, Figure 4 The processor executes various functional applications and data processing of the processor by running the non-transient software programs, instructions and modules stored in the memory, that is, the method for determining the concrete slump in the above method embodiment is implemented.

[0081] The memory may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the processor, etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory may optionally include a memory remotely arranged relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0082] The one or more modules are stored in the memory and when executed by the processor, perform the following steps: Figures 1 to 3 The method for determining the slump of concrete in the illustrated embodiment.

[0083] The specific details of the above concrete slump determination system can be found in Figures 1 to 4 The corresponding related descriptions and effects in the illustrated embodiments can be understood and will not be repeated here.

[0084] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory, a hard disk drive (HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above-mentioned types of memory.

[0085] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for determining concrete slump, It is characterized in that include: Get the current amount of concrete in the conveyor; Obtaining current pouring parameters of the conveyor at the initial pouring time of concrete; Obtaining the correspondence between the preset slump, concrete volume and pouring parameters; According to the current amount of concrete and the current dumping parameter of the conveyor, the slump of the concrete is obtained by using the corresponding relationship among the slump, the amount of concrete and the dumping parameter; The current dumping parameter of the conveyor is the current tilt angle of the conveyor, wherein the current tilt angle is the tilt angle at which the conveyor can just dump concrete; And / or, the current pouring parameter of the conveyor is the current pouring duration of the conveyor, wherein the current pouring duration is the time taken by the conveyor from starting to tilt to tilting to an angle just capable of pouring out the first drop of concrete; The method for obtaining the current pouring parameters of the conveyor at the initial concrete pouring time includes: Acquiring image information of a pouring process when the concrete is poured out from the conveyor; Determining the initial pouring time of the concrete according to the image information; Determining current pouring parameters of the conveyor based on the initial pouring time of the concrete; When the current dumping parameter is the current dumping duration, the current dumping parameter of the conveyor is determined based on the initial pouring time of the concrete, including: The current pouring time is obtained by subtracting the initial pouring time of the conveyor from the initial pouring time of the concrete; And / or, when the current dumping parameter is the current tilt angle, determining the current dumping parameter of the conveyor based on the initial pouring time of the concrete includes: The current pouring time is obtained by subtracting the initial pouring time of the conveyor from the initial pouring time of the concrete; Obtaining the corresponding relationship between the dumping time and the tilt angle of the conveyor; According to the current tilting time, the current tilting angle is obtained by utilizing the corresponding relationship between the tilting time and the tilting angle.

2. The method according to claim 1, It is characterized in that The obtaining of the corresponding relationship between the preset slump, the amount of concrete and the pouring parameters includes: According to the overturning program of the conveyor, the corresponding relationship between the slump, the amount of concrete and the pouring time corresponding to the overturning program is obtained.

3. The method according to claim 1, It is characterized in that Also includes: Acquire multiple sets of training data, wherein one set of training data includes: when pouring concrete from a conveyor, at the initial pouring moment of the concrete, a known pouring parameter of the conveyor, a known amount of the concrete, and a known slump of the concrete; The corresponding relationship among the slump, the amount of concrete and the pouring parameters is obtained by fitting using the multiple sets of training data.

4. The method according to claim 1, It is characterized in that After obtaining the slump of the concrete by using the corresponding relationship among the slump, the amount of concrete and the pouring parameter, the method further includes: sending the slump to relevant equipment; And / or, adjusting the operating parameters of the relevant equipment according to the slump.

5. The method according to claim 4, It is characterized in that The related equipment includes one or more of the following: material distribution equipment, vibration equipment, and maintenance equipment.

6. A system for determining concrete slump, It is characterized in that include: A conveyor for transporting and pouring concrete; A controller having computer instructions stored therein, wherein the controller executes the method for determining the concrete slump according to any one of claims 1 to 5 by executing the computer instructions.

7. The concrete slump determination system according to claim 6, It is characterized in that It also includes a camera, which is in communication with the controller and is used to obtain image information of the pouring process when the concrete is poured out from the conveyor.