A device suitable for gas and liquid drilling well completion under pressure and its use method
By using suspended packers and bypass valves in downhole pressure completion devices to achieve production layer sealing and pressure isolation, the problems of reservoir pollution and blowout risks in the prior art are solved, the drilling and completion process is simplified, and the drilling and completion process is reduced. Cost and safety hazards have been achieved, and the benefits of oil and gas resource development have been improved.
Patent Information
- Application Number
- CN202210617713.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-01
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-06-01
AI Technical Summary
The prior art has the risks of serious reservoir pollution, reduced output and blowout during the downhole completion process of gas and liquid drilling, and the packer is not suitable for use in a pressure environment, resulting in underground safety hazards and high costs.
A downhole compression-complete device consisting of an upper drill rod assembly, a formation sealer tool combination and a layer production tool assembly was designed. The layer production sealing and pressure isolation were achieved through suspension sealers and bypass valves, thereby simplifying drilling completion. well process, reducing risks and costs.
It has achieved safe completion of drilling and completion under pressure environments, reducing blowout risks and costs, improving the efficiency of oil and gas resource development, and is suitable for a variety of wellbore trajectories and production conditions.
Smart Images

Figure CN114991657B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of gas-liquid drilling and completion of petroleum and natural gas, and in particular to a device suitable for downhole pressure completion of gas and liquid drilling and a use method thereof. Background Art
[0002] Conventional completion operations can lead to serious reservoir contamination, and the production will decrease after completion, affecting the stable production of oil and gas wells. In order to effectively protect the reservoir and maximize the production capacity of oil and gas wells, pressure-assisted completion can be preferred. The method of pressure-assisted completion suitable for gas and liquid drilling needs to be further studied.
[0003] At present, the existing domestic pressure completion method "A gas well pressure completion process" (patent number: ZL201910009289.6) reduces the construction risk of the completion string under pressure, avoids the damage to the reservoir by replacing the working fluid, and prolongs the production cycle of the gas well, but this method belongs to the field of full-process underbalanced and gas drilling completion, and does not involve oil well production; the completion method "Packer, setting tool and drilling completion integration method" (patent number: ZL201811293653.8) pre-installs the packer on the casing, and opens it when needed by the setting tool installed on the drill pipe, but this method is not carried out under pressure. Therefore, it is necessary to design a downhole completion device with a downhole tool for pressure operation to make up for the shortcomings of the above-mentioned technology. Summary of the invention
[0004] The purpose of the present invention is to provide a device suitable for downhole pressure completion of gas and liquid drilling and a method of using the device, so as to reduce the risk and cost of traditional completion operations, simplify the drilling and completion operation process, and realize the integration of drilling and completion.
[0005] In order to achieve the above-mentioned purpose, the present invention provides a device suitable for downhole pressure completion of gas and liquid drilling, comprising: an upper drill pipe assembly, a formation packer tool combination, a production layer tool assembly, and an oil pipe assembly; wherein the upper drill pipe assembly comprises: a drill pipe and a hand-release joint installed at the lower end of the drill pipe; the oil pipe assembly comprises, arranged in sequence from top to bottom: an oil pipe, a centralizer, a guide shoe hand-release joint, and a hollow perforating gun.
[0006] The formation packer tool assembly includes: a lower sub-joint of a hand release, a suspension packer and a production layer packer arranged in sequence from top to bottom; the lower sub-joint of the hand release is detachably connected to the upper sub-joint of a hand release or the upper sub-joint of a guide shoe. The production layer tool assembly includes: a bypass valve, a check valve and a drill bit arranged in sequence from top to bottom, and a pressure-bearing ball that can be clamped to the input end of the bypass valve; the bypass valve is connected to the formation packer tool assembly.
[0007] During the drilling process, the upper drill pipe assembly, the formation packer tool assembly and the production layer tool assembly form a drilling string; during the completion production process, the oil pipe assembly, the formation packer tool assembly and the production layer tool assembly form a completion string.
[0008] Preferably, the upper joint of the release arm and the lower joint of the release arm are connected by a spline.
[0009] The present invention also provides another technical solution, a method for using a downhole pressure completion device suitable for gas and liquid drilling, comprising the following steps:
[0010] Step 1: According to the requirements of the well completion process, the formation is divided into a multi-layer casing section and an open hole production section; the open hole production section is divided into multiple sub-layers by a hanging packer and a production layer packer.
[0011] Step 2: During normal drilling, the upper drill pipe assembly, the formation packer tool assembly, and the production layer tool assembly are used to form a drilling string; the drilling medium passes through the hollow of the string and goes down through the check valve, enters the annular space outside the string from the drill bit, and goes up along the annular space back to the wellhead device.
[0012] Step 3: When entering the completion process, the hanging packer is positioned to the top of the open hole production layer section, and then the packer is set and the production layer is isolated. The isolation position is selected according to the downhole working conditions; at this time, the bypass flow channel in the bypass valve is closed to prevent the oil and gas products in the open hole production layer section from entering the middle channel of the tubing string.
[0013] Step 4: Disengage the upper drilling tool by connecting the lower release joint installed above the suspension packer to the upper release joint of the drill pipe.
[0014] Step 5: If the upper sub fails to detach, use explosive release to detach; if the upper sub is successfully detached, lift the entire upper drill pipe assembly to withdraw the upper drill pipe assembly from the wellbore.
[0015] Step 6: Lower the tubing assembly into the wellbore.
[0016] Step 7: The centralizer centers the upper joint of the guide shoe release arm and connects it to the lower joint of the release arm.
[0017] Step 8: If the drilling medium is liquid, a pressure ball is put in, and the upper wellhead device pressurizes the middle channel of the tubing to open the bypass flow channel in the bypass valve; if the drilling medium is not liquid, a pressure ball is put in, and liquid is poured into the hollow of the tubing, and the upper wellhead device pressurizes the hollow to open the bypass flow channel in the bypass valve.
[0018] Step 9: If the bypass flow channel in the bypass valve is successfully opened, the oil and gas products in the open hole production layer section can enter the hollow of the tubing string through the bypass flow channel for production operations; if the bypass flow channel in the bypass valve is not opened, use the hollow perforating gun in the tubing assembly to perforate to open up a spare flow channel, and the oil and gas products in the open hole production layer section can enter the hollow of the tubing string through the bypass flow channel for production operations.
[0019] Preferably, the hanging packer isolates the production layer pressure in the open hole production layer section away from the wellhead when the oil pipe assembly is connected back.
[0020] Preferably, when the suspended packer is set, the oil and gas products in the open hole production layer cannot enter the annular space of the tubing string of the multi-layer casing section, and the check valve installed on the top of the drill bit prevents the oil and gas products from entering the hollow of the tubing string through the drill bit and migrating upward.
[0021] Preferably, it is used in horizontal wells or inclined wells.
[0022] Beneficial effects of the present invention:
[0023] 1. In the prior art, the packer is a tool used for oil pipes. The normal use process is to seal the production layer after drilling along with the oil pipe into the oil and gas well. However, the working condition targeted by the present invention (pressure completion condition) is not suitable for this use case. After the drilling process is completed, the lower pressure in the well is greater than the upper pressure due to factors such as oil and gas products, so accidents such as blowouts may occur. Therefore, the present invention introduces a packer in the drilling process. After the drilling is completed, the lower production layer is first sealed, and then the next step is carried out, so that the well is completed under pressure; the purpose of drilling tool separation is achieved through the hand-free safety joint on the upper part of the packer; the purpose of production layer isolation is achieved by using the drill pipe to hang the packer; through the separation of drilling tools and production layer isolation, the process of lowering the completion string is simplified; the integration of drilling and completion is achieved, the cost of drilling and completion is reduced, and the benefits of oil and gas resource development are improved.
[0024] 2. During the completion process of pulling out the drill pipe and lowering the oil pipe, the production layer pressure is too high. The present invention can use the drill pipe suspension packer and the check valve and bypass valve in the lower drilling tool to isolate the production layer pressure, thereby reducing the hidden safety hazards at the wellhead. This not only ensures the safety of the wellhead workers during underbalanced drilling and completion conditions, but also reduces the risks of completion operations.
[0025] 3. The present invention can also reduce the high-pressure risk brought by oil and gas products during production operations; the high pressure brought by oil and gas products is isolated in the production layer by using a drill pipe suspension packer far away from the wellhead, and the oil and gas products cannot enter the upper annulus. The oil and gas products can only be collected through the hollow of the pipe string, and further cooperate with wellhead devices such as blowout preventers to deal with blowout accidents.
[0026] 4. The present invention has a wide range of applications, and can be applied to both gas pressure drilling and completion and liquid underbalanced drilling and completion; it is suitable for drilling and completion of various wellbore trajectories, such as vertical wells, inclined wells and horizontal wells; it can be applied to both casing inner production layer isolation and open hole production layer isolation. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of a completion string in a drilling condition of the present invention;
[0028] Figure 2 It is a schematic diagram of a completion string in an open hole setting and drilling pipe working condition of the present invention;
[0029] Figure 3 It is a schematic diagram of a completion string in a casing setting and drilling pipe lifting working condition of the present invention;
[0030] Figure 4 It is a schematic diagram of a completion string in the oil pipe lowering working condition of the present invention;
[0031] Figure 5 A flowchart of the use of the well completion device of the present invention;
[0032] Figure 6 It is a schematic diagram of the horizontal well application of the completion string and the completion device of the present invention;
[0033] Figure 7 It is a cross-sectional view of the AA section of the hand-free safety joint of the present invention;
[0034] Among them, 1. Upper drill pipe assembly; 11. Release hand upper joint; 12. Drill pipe; 2. Formation packer tool combination; 21. Release hand lower joint; 22. Suspension packer; 23. Production layer packer; 3. Production layer tool assembly; 31. Bypass valve; 32. Check valve; 33. Drill bit; 34. Pressure ball; 4. Tubing assembly; 41. Tubing; 42. Centralizer; 43. Guide shoe release hand upper joint; 44. Hollow perforating gun; 5. Multi-layer casing section; 6. Open hole production layer section; 7. Wellhead device. DETAILED DESCRIPTION
[0035] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] like Figure 1-Figure 4As shown, a schematic diagram of the tubular structure of a downhole pressurized completion device provided by an embodiment of the present invention corresponds to the drilling condition, the open hole sealing and drill pipe lifting condition, the casing sealing and drill pipe lifting condition and the tubing lowering condition, respectively. The downhole pressurized completion device comprises: an upper drill pipe assembly 1, a formation packer tool assembly 2, a production layer tool assembly 3, and a tubing assembly 4; during the drilling process, the upper drill pipe assembly 1, the formation packer tool assembly 2 and the production layer tool assembly 3 form a drilling tubular string; during the completion production process, the tubing assembly 4, the formation packer tool assembly 2 and the production layer tool assembly 3 form a completion tubular string.
[0037] In some embodiments, the upper drill pipe assembly 1 is composed of a drill pipe 12 and a drill pipe drop joint 11 installed at the lower end; each section of the drill pipe 12 is connected by a shoulder thread, and the drill pipe drop joint 11 and the drill pipe 12 are also connected by a shoulder thread; the upper drill pipe assembly 1 can not only withstand tensile pressure, but also transmit drilling torque; the oil pipe assembly 4 is composed of an oil pipe 41, a stabilizer 42, a guide shoe drop joint 43 and a hollow perforating gun 44; the various components in the oil pipe assembly 4 are connected by shoulder threads; the outer diameter of the stabilizer 42 is larger than the oil pipe, so that the guide shoe drop joint 43 is always centered; the hollow perforating gun 44 is located inside the pipe string as a backup means to open up a lower flow channel.
[0038] Some of the existing packers are equipped with a release joint, that is, they have a self-detaching function. The definition of a packer refers to a downhole tool that is connected to the downhole tubing and is used to isolate the oil pipe from the oil and gas well casing or the annular space of the open hole wall. Therefore, in the prior art, the packer is a tool for the oil pipe. The normal use process is to isolate the production layer after drilling with the oil pipe into the oil and gas well. However, the pressure completion condition is not suitable for this use. After the drilling process is completed, due to factors such as oil and gas products in the well, the lower pressure is greater than the upper pressure, so blowouts and other accidents may occur. Therefore, the present invention introduces a packer in the drilling process. After the drilling is completed, the lower production layer is first isolated, and then the next step is carried out to achieve pressure completion.
[0039] In some embodiments, the formation packer tool assembly 2 is composed of a drop-down joint 21, a hanging packer 22 and a production layer packer 23. The formation packer arranged in this way has a simple structure and the setting operation is also very simple. In the drilling and completion production process, the formation packer tool assembly 2 is always located at the bottom; the production layer packer 23 is arranged at the bottom to isolate the production layer as a tool for layered mining.
[0040] In some embodiments, the production layer tool assembly 3 is composed of a bypass valve 31, a check valve 32 and a drill bit 33, and also includes a pressure-bearing ball 34 that is subsequently put in; the drill pipe upper and lower joints 11 and 21 are combined to connect the pipe string of the entire drilling process, such as Figure 7As shown, the drill pipe release joint 11 and the release lower joint 21 are circumferentially connected by splines, which transmit a large torque during normal drilling; the guide shoe release joint 43 can also be combined with the release lower joint 21. The tapered design of the guide shoe release joint 43 facilitates its combination with the release lower joint 21 to connect the pipe string of the entire completion production process. The difference between the drill pipe and the oil pipe is that the drill pipe is required to withstand a large torque for drilling, so a spline is introduced into the release joint. The existing release joint part has this function, but the packer with its own release does not transmit it, so a split design is made.
[0041] like Figure 5 As shown, it is a flow chart of the method for using the downhole pressure completion device for gas and liquid drilling provided by the present invention, including the following steps:
[0042] Step 1: According to the requirements of the well completion process, the formation is divided into a multi-layer casing section 5 and an open hole production section 6; the open hole production section 6 is divided into multiple sub-layers by a hanging packer 22 and a production layer packer 23;
[0043] Step 2: During normal drilling, the upper drill pipe assembly 1, the formation packer tool assembly 2, and the production layer tool assembly 3 form a drilling string; the drilling medium passes through the hollow of the string and goes down through the check valve 32, enters the annular space outside the string from the drill bit 33, and goes up along the annular space to the wellhead device 7;
[0044] Step 3: When entering the completion process, the suspension packer 22 is positioned to the top of the open hole production layer section 6, and then the packer is set to isolate the production layer. The isolation position is selected according to the downhole working conditions. At this time, the bypass flow channel in the bypass valve 31 is closed to prevent the oil and gas products in the open hole production layer section 6 from entering the middle channel of the pipe string.
[0045] Step 4: The upper drilling tool is separated by the lower release joint 21 installed above the suspension packer 22 and the upper release joint 11 of the drill pipe;
[0046] Step 5: If the upper sub 11 fails to be released, explosive release is used to release; if the upper sub 11 is released successfully, the entire upper drill pipe assembly 1 is lifted up to allow the upper drill pipe assembly 1 to exit the wellbore;
[0047] Step 6: lower the tubing assembly 4 into the wellbore;
[0048] Step 7: The centralizer 42 centers the upper connector 43 of the guide shoe release hand and connects it to the lower connector 21 of the release hand;
[0049] Step 8: If the drilling medium is liquid, the pressure ball 34 is put in, and the upper wellhead device pressurizes the middle channel of the pipe string to open the bypass flow channel in the bypass valve 31; if the drilling medium is not liquid, the pressure ball 34 is put in, and liquid is poured into the hollow of the pipe string, and the upper wellhead device pressurizes the hollow to open the bypass flow channel in the bypass valve 31;
[0050] Step 9: If the bypass flow channel in the bypass valve 31 is successfully opened, the oil and gas products in the open hole production layer section 6 can enter the hollow of the tubing string through the bypass flow channel for production operations; if the bypass flow channel in the bypass valve 31 is not opened, use the hollow perforating gun 44 in the oil pipe assembly 4 to perforate and open up a spare flow channel, and the oil and gas products in the open hole production layer section 6 can enter the hollow of the tubing string through the bypass flow channel for production operations.
[0051] The present invention achieves the purpose of drilling tool separation through the release safety joint on the upper part of the packer; the purpose of producing layer isolation is achieved by using the hanging packer; the process of lowering the completion string is simplified by drilling tool separation and producing layer isolation; the integration of drilling and completion is realized, the drilling and completion costs are reduced, and the benefits of oil and gas resource development are improved; during the completion process of pulling out the drill pipe and lowering the oil pipe, if the producing layer pressure is too high, the hanging packer and the check valve and bypass valve in the lower drilling tool can be used to isolate the producing layer pressure, thereby reducing the hidden safety hazards at the wellhead, ensuring the safety of the wellhead personnel during underbalanced drilling and completion and other working conditions, and reducing the risks of completion operations.
[0052] like Figure 6 As shown, in some embodiments, the downhole pressure completion device can also be applied to horizontal wells and inclined wells. The present invention can also reduce the high-pressure risk brought by oil and gas products during production operations, and use a hanging packer far away from the wellhead to isolate the high pressure brought by oil and gas products in the production layer. The oil and gas products cannot enter the upper annular space, and can only be collected through the hollow of the pipe string, and further cooperate with wellhead devices such as blowout preventers to deal with blowout accidents. The present invention has a wide range of applications and can be applied to gas pressure drilling and completion, as well as liquid underbalanced drilling and completion; it is suitable for drilling and completion of various wellbore trajectories, such as vertical wells, inclined wells and horizontal wells; it can be applied to both casing production layer isolation and open hole production layer isolation.
[0053] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.
Claims
1. A method for using a device for gas and liquid drilling and completion under pressure, characterized in that: The device comprises: an upper drill pipe assembly (1), a formation packer tool assembly (2), a production layer tool assembly (3), and an oil pipe assembly (4); The upper drill rod assembly (1) comprises: a drill rod (12) and a hand-release upper joint (11) installed at the lower end of the drill rod (12); The oil pipe assembly (4) comprises, arranged in order from top to bottom: an oil pipe (41), a centralizer (42), a guide shoe release hand joint (43), and a hollow perforating gun (44); The formation packer tool assembly (2) comprises: a lower drop joint (21), a suspension packer (22) and a production layer packer (23) arranged in sequence from top to bottom; the lower drop joint (21) is detachably connected to the upper drop joint (11) or the upper guide shoe drop joint (43); The production layer tool assembly (3) comprises: a bypass valve (31), a check valve (32) and a drill bit (33) arranged in sequence from top to bottom, and a pressure-bearing ball (34) that can be clamped to the input end of the bypass valve (31); the bypass valve (31) is connected to the formation packer tool assembly (2); During the drilling process, the upper drill pipe assembly (1), the formation packer tool assembly (2) and the production layer tool assembly (3) form a drilling string; during the completion production process, the oil pipe assembly (4), the formation packer tool assembly (2) and the production layer tool assembly (3) form a completion string; The method for using the device comprises the following steps: Step 1: According to the requirements of the well completion process, the formation is divided into a multi-layer casing section (5) and an open hole production section (6); the open hole production section (6) is divided into a plurality of sub-layers by a hanging packer (22) and a production layer packer (23); Step 2: During normal drilling, an upper drill pipe assembly (1), a formation packer tool assembly (2), and a production layer tool assembly (3) are used to form a drilling string; the drilling medium passes through the hollow of the string and moves downward through the check valve (32), enters the annular space outside the string from the drill bit (33), and moves upward along the annular space back to the wellhead device (7); Step 3: When entering the completion process, the suspension packer (22) is positioned at the top of the open hole production layer section (6), and then the packer is set to isolate the production layer. The isolation position is selected according to the downhole working conditions. At this time, the bypass flow channel in the bypass valve (31) is closed to prevent the oil and gas products in the open hole production layer section (6) from entering the middle channel of the pipe string; Step 4: The upper drilling tool is separated by the lower release joint (21) installed above the suspension packer (22) and the upper release joint (11) of the drill pipe; Step 5: If the upper sub (11) fails to be released, explosive release is used to release it; if the upper sub (11) is released successfully, the entire upper drill pipe assembly (1) is lifted up to allow the upper drill pipe assembly (1) to exit the wellbore; Step 6: Lower the tubing assembly (4) into the wellbore; Step 7: The centralizer (42) centers the upper connector (43) of the guide shoe release hand and connects it to the lower connector (21); Step 8: If the drilling medium is liquid, a pressure ball (34) is put in, and the upper wellhead device pressurizes the middle channel of the pipe string to open the bypass flow channel in the bypass valve (31); if the drilling medium is not liquid, a pressure ball (34) is put in, and liquid is poured into the hollow of the pipe string, and the upper wellhead device pressurizes the hollow to open the bypass flow channel in the bypass valve (31); Step 9: If the bypass flow channel in the bypass valve (31) is successfully opened, the oil and gas products in the open hole production layer section (6) enter the hollow of the pipe string through the bypass flow channel for production operations; if the bypass flow channel in the bypass valve (31) is not opened, a hollow perforating gun (44) in the oil pipe assembly (4) is used to perforate to open a spare flow channel, and the oil and gas products in the open hole production layer section (6) enter the hollow of the pipe string through the bypass flow channel for production operations.
2. The method for using the device for gas and liquid drilling and completion under pressure according to claim 1, characterized in that: The hand release upper joint (11) and the hand release lower joint (21) are connected via a spline.
3. The method for using the device for gas and liquid drilling and completion under pressure according to claim 1, characterized in that: The hanging packer (22) isolates the production layer pressure in the open hole production layer section (6) far away from the wellhead when the oil pipe assembly (4) is connected back.
4. The method for using the device for gas and liquid drilling and completion under pressure according to claim 1, characterized in that: When the suspension packer (22) is set, the oil and gas products in the open hole production layer section (6) cannot enter the annular space of the pipe string of the multi-layer casing section (5), and the check valve (32) installed on the upper part of the drill bit (33) prevents the oil and gas products from entering the hollow of the pipe string through the drill bit (33) and moving upward.
5. The method for using the device for gas and liquid drilling and completion under pressure according to claim 1, characterized in that: Used in horizontal or inclined wells.
Citation Information
Patent Citations
Under-pressure well completion process method for gas well
CN109826586A
Packer, setting tool and integrated method of well drilling and well completion
CN111119786A
Continuous oil pipe unlatching slide sleeve staged fracturing completion pipe string and fracturing completion method
CN105134154A
Multilateral well barefoot well completion method
CN110748293A
Sidetrack well optional drilling-grinding-free well completion device and method
CN111101858A