A configuration planning method and system for inland river vessel water pollutant receiving and disposal vessels
By measuring the total amount of water pollutants to be delivered by inland river ships and establishing an optimization model for the allocation of receiving and disposal ships, the problem of mismatch between the allocation of water pollutants from inland river ships and the amount of water pollutants produced by ships has been solved, and the efficiency of receiving and disposal has been improved. And reduce costs and achieve effective treatment of water pollutants.
Patent Information
- Application Number
- CN202210200407.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-02
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-03-02
AI Technical Summary
The allocation of water pollutant reception and disposal vessels for inland river ships does not match the amount of water pollutants produced by ships, resulting in an imbalance between supply and demand, inability to effectively receive water pollutants, resulting in harm to the water environment and waste of management costs.
By obtaining inland river ship entry and exit data and water pollutant delivery information, the total amount of ship water pollutants to be delivered is calculated, and an optimization model for the configuration of receiving and disposal ships is established. With the goal of minimizing the total cost of receiving and disposing ships, different types of receiving and disposal ships are determined. configuration plan, optimizing the allocation amount to achieve a balance between supply and demand.
It improves the efficiency of receiving and treating water pollutants, reduces the cost of receiving and treating water pollutants, and realizes the collection of all water pollutants, which has the advantages of high efficiency and low cost.
Smart Images

Figure CN115034534B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of traffic environment protection, and more specifically, relates to a configuration planning method and system for an inland river vessel water pollutant receiving and disposal vessel. Background Art
[0002] Water transportation has the advantages of large carrying capacity, low cost, low energy consumption and low investment. It is an efficient and safe way to transport bulk goods over long distances. In recent years, with the continuous development of water transportation, the number of ships and the tonnage of ships have continued to increase. While promoting the development of water transportation, more and more ships have also generated more water pollutants, causing certain impacts on the water environment.
[0003] Relevant laws and regulations in my country require that water pollutants generated by inland vessels should be received on shore as much as possible. As water pollution issues become increasingly prominent, more and more reservoirs are being opened up as water sources. The safety of their water environment is directly related to water supply safety, especially drinking water safety. Receiving and disposal ships can receive and dispose of water pollutants generated by ships, reducing the harm of water pollutants to the water environment. Among them, the number of ships received by the receiving and disposal ship is defined as the number of receptions by the receiving and disposal ship, and the number of times the receiving and disposal ship delivers the received water pollutants to the water pollutant disposal point is defined as the number of berthing and delivery by the receiving and disposal ship. At the same time, the configuration and scheduling of receiving and disposal ships will increase economic costs. Therefore, it is necessary to determine the configuration quantity of receiving and disposal ships to improve the efficiency of receiving and disposing of water pollutants and reduce the cost of receiving water pollutants.
[0004] Currently, there is little research on optimizing the configuration of receiving and disposal ships for inland river ship water pollutants. The configuration of receiving and disposal ships in some areas does not match the amount of ship water pollutants generated in the region, and there are problems such as the inability to effectively receive ship water pollutants and waste of receiving and disposal ships' receiving resources. For example, in areas with busy delivery of ship water pollutants, the configuration of receiving and disposal ships is insufficient, ship water pollutants cannot be effectively received, and ship water pollutants discharged into the water body cause serious harm to the water environment; in some areas, less ship water pollutants are generated, and the configured receiving and disposal ships are idle for a long time, causing unnecessary waste of regional management costs. There is an imbalance between the amount of ship water pollutants to be received and the receiving capacity of receiving and disposal ships. Summary of the invention
[0005] The present invention solves the problem of imbalance between the amount of water pollutants to be received by ships and the receiving capacity of receiving and disposal ships in the prior art by providing a configuration planning method and system for inland river ship water pollutant receiving and disposal ships.
[0006] The present invention provides a configuration planning method for an inland river vessel water pollutant receiving and disposal vessel, comprising the following steps:
[0007] Step 1: Obtain inland waterway ship entry and exit data and water pollutant delivery information, and calculate the total amount of ship water pollutants to be delivered corresponding to all research ports in the research area;
[0008] Step 2: Based on the water pollutant receiving capacity of different types of receiving and disposal ships and the total amount of water pollutants to be delivered by the ship, the configuration schemes of different types of receiving and disposal ships are taken as the research object, the total receiving cost of the receiving and disposal ships is minimized, constraints are set, and an optimization model for the configuration of receiving and disposal ships is established;
[0009] Step 3: Solve the optimization model for the configuration of receiving and disposal ships to obtain the optimal solution for the configuration of inland river vessel water pollutant receiving and disposal ships.
[0010] Preferably, step 1 comprises the following sub-steps:
[0011] Step 101, obtaining inland river vessel entry and exit data, including ship name, entry and exit time, entry and exit port, total number of ship passengers, ship grade and ship type; obtaining the water pollutant delivery information, including delivery time and delivery port;
[0012] Step 102: select a study area and at least one study port within the study area, and select ships that pass through the study area and berth at any of the study ports during the study period to deliver water pollutants in combination with the inland river vessel entry and exit data; calculate the water pollutant generation time of each selected ship based on the inland river vessel entry and exit data and the water pollutant delivery information; the water pollutant generation time is defined as the cumulative sailing time of water pollutants generated from the departure of the ship from the port where the water pollutants were last delivered to the entry into the study port where the water pollutants were delivered;
[0013] Step 103: Calculate the amount of water pollutants to be delivered for each screened ship by combining the time of water pollutant generation, daily average water pollutant information, total number of ship passengers, ship type and ship grade of each screened ship; the daily average water pollutant information includes daily water pollutant data per capita or daily water pollutant data per ship, and the daily average water pollutant information is obtained according to the ship type and the ship grade;
[0014] Step 104: Accumulate the amount of water pollutants to be delivered of each screened ship to obtain the total amount of water pollutants to be delivered by the ship.
[0015] Preferably, in step 101, the ship type includes a passenger ship or a cargo ship; the ship grade is divided into first to fifth grades according to the ship tonnage; in step 102, the day with the largest number of ships arriving at the research port is selected as the research period.
[0016] Preferably, in step 103, the amount of water pollutants to be delivered of a single ship is calculated using the following calculation method:
[0017]
[0018] Among them, q w,i is the amount of domestic sewage to be delivered by the i-th ship, q o,i is the amount of oily wastewater to be delivered by the i-th ship, q g,i is the amount of domestic waste to be delivered by the i-th ship, q s,i is the amount of water pollutants to be delivered by the i-th ship; i = 1, 2, 3, ..., R; R is the total number of screened ships;
[0019] K i is the coefficient of the i-th ship. If the i-th ship is a passenger ship, then K i =0; if the i-th ship is a cargo ship, then K i =1; p i is the total number of persons on board the i-th ship;
[0020] q w,货,d is the daily per capita domestic sewage generation of cargo ships of class D, q w,客,d is the daily per capita domestic sewage generation of passenger ships of grade D, d is the ship grade, d = 1, 2, ..., 5; q o,货 , is the daily amount of oily wastewater produced by cargo ships, q o,客 , is the daily amount of oily wastewater produced by passenger ships; q g is the daily per capita household waste generation;
[0021] T D,i is the time when the i-th ship produced water pollutants; m is the total number of ports that the i-th ship passed from the port where it last delivered water pollutants to the research port where it delivered water pollutants; E i,j+1 is the port entry time U of the i-th ship passing through the j+1th port among the m ports i,j is the departure time of the i-th ship passing through the j-th port among the m ports.
[0022] Preferably, after obtaining the amount of water pollutants to be delivered of each screened ship and before accumulating the amount of water pollutants to be delivered, it also includes: setting a threshold value of the amount of water pollutants to be delivered and performing secondary screening on the ships; if the amount of water pollutants to be delivered of a certain ship is less than the threshold value of water pollutants to be delivered, then excluding the data of the ship; accumulating the amount of water pollutants to be delivered of each ship after the secondary screening to obtain the total amount of water pollutants to be delivered of the ships;
[0023] In step 104, the total amount of ship water pollutants to be delivered is calculated using the following calculation method:
[0024]
[0025] Among them, Q w is the total amount of domestic sewage to be delivered from ships, Q o is the total amount of oily wastewater to be delivered from ships, Q g is the total amount of domestic waste to be delivered from ships, Q S is the total amount of ship water pollutants to be delivered; n is the total number of ships after the second screening.
[0026] Preferably, in step 2, the different types of receiving and disposal ships include at least two types of receiving and disposal ships;
[0027] The configuration scheme of different types of receiving and disposal ships includes the configuration quantity of different types of receiving and disposal ships, the number of ships received by a receiving and disposal ship after leaving the port, and the number of times the receiving and disposal ship docks and delivers after receiving full cargoes every day;
[0028] The total receiving cost of the receiving and disposal ship includes the crew salary cost, ship maintenance cost, ship purchase cost and ship fuel cost of the receiving and disposal ship;
[0029] The constraints include the total amount of water pollutants received, the daily operating time of the receiving and disposal ship, and the receiving capacity of the receiving and disposal ship.
[0030] Preferably, the objective function in the receiving and disposal ship configuration optimization model is expressed as:
[0031]
[0032] Where C is the total cost of receiving and disposing ships; y = 1, 2, ..., s, s is the total number of types of receiving and disposing ships; N y is the number of receiving and disposal ships of the yth type; C 船,y is the number of ships received by the yth type of receiving and disposal ship leaving the port once; T y The number of times the receiving and disposal vessel of type y receives full cargo holds and makes deliveries at the port every day;
[0033] P r,y is the purchase cost of the yth type of receiving and disposal vessel, D a,y is the life of the yth type of receiving and disposal ship; m y is the maintenance cost of the yth type of receiving and disposal ship; P e,y is the number of crew members of the yth type of receiving and disposal ship, S is the wage cost of each crew member; P o,y is the main engine power of the yth type of receiving and disposal ship, P c is the ship fuel price, O p For fuel consumption;
[0034] t 船 is the water pollutant receiving time of a single ship, t 卸 is the time it takes for the receiving and disposal ship to unload all water pollutants in one go, l is the average distance the receiving and disposal ship travels each time it leaves the port and enters the research port for receiving water pollutants, and v is the ground speed of the receiving and disposal ship.
[0035] Preferably, the total amount of water pollutants received in the constraint condition is expressed as:
[0036]
[0037] Among them, V y,w V is the sewage receiving capacity of the yth type of receiving and disposal vessel, y,o V is the oily wastewater receiving capacity of the yth type of receiving and disposal vessel, y,g D is the domestic waste receiving capacity of the yth type of receiving and disposal ship; e,w is the density of ship sewage, D e,o is the density of ship oily wastewater, D e,g is the density of domestic garbage on board ships; Q w is the total amount of domestic sewage to be delivered from ships in the study area, Q o is the total amount of oily wastewater to be delivered from ships in the study area, Q g is the total amount of domestic waste to be delivered from ships in the study area;
[0038] The daily operation time constraint of the receiving and disposal ship in the constraint condition is expressed as:
[0039] C 船,y ×t 船 +T y ×(t 卸 +l÷v)≤t 日
[0040] Among them, t 日 The maximum daily operating time of the receiving and disposal vessel;
[0041] The receiving capacity constraint of the receiving and disposal ship in the constraint condition is expressed as:
[0042]
[0043] Q 船,a =Q a ÷C s
[0044] Among them, Q 船,a is the average amount of the a-th type of ship water pollutant to be delivered by a single ship, V y,ais the receiving capacity of the a-type ship water pollutants for the y-type receiving and disposal ship, D e,a is the density of the a-type ship water pollutant, Q a is the total amount of the a-th type of ship water pollutants to be delivered, a = w, o, g represent ship domestic sewage, ship oily sewage, ship domestic garbage respectively; C s It is the total number of ships after the initial screening or the total number of ships after the secondary screening.
[0045] On the other hand, the present invention provides a configuration planning system for an inland river vessel water pollutant receiving and disposal vessel, comprising:
[0046] A configuration optimization unit, used to execute the steps in the above-mentioned configuration planning method for the inland river vessel water pollutant receiving and disposal ship, and obtain an optimal solution for the configuration plan of the inland river vessel water pollutant receiving and disposal ship;
[0047] The database is used to provide the configuration optimization unit with required data.
[0048] Preferably, the configuration optimization unit includes:
[0049] The module for calculating the amount of water pollutants to be delivered by ships is used to calculate the total amount of water pollutants to be delivered by ships corresponding to all the research ports in the research area based on the inland river ship entry and exit data and water pollutant delivery information;
[0050] The module for optimizing the configuration of receiving and disposal ships is used to study the configuration plans of different types of receiving and disposal ships based on the water pollutant receiving capacity of different types of receiving and disposal ships and the total amount of water pollutants to be delivered by the ships, with the goal of minimizing the total receiving cost of receiving and disposal ships, and to obtain the optimal solution for the configuration plan of inland river ship water pollutant receiving and disposal ships under constraints.
[0051] One or more technical solutions provided in the present invention have at least the following technical effects or advantages:
[0052] The present invention first obtains the inland river ship entry and exit data and water pollutant delivery information, and calculates the total amount of ship water pollutants to be delivered corresponding to all research ports in the research area; then, according to the water pollutant receiving capacity of different types of receiving and disposal ships and the total amount of ship water pollutants to be delivered, the configuration schemes of different types of receiving and disposal ships are taken as the research object, and the total receiving cost of receiving and disposal ships is minimized as the goal, and constraints are set to establish a configuration optimization model for receiving and disposal ships; finally, the configuration optimization model for receiving and disposal ships is solved to obtain the optimal solution for the configuration scheme of inland river ship water pollutant receiving and disposal ships. That is, the present invention provides a method for determining the configuration amount of inland river receiving and disposal ships, which can calculate the amount of ship water pollutants to be delivered in the port area, and determine the configuration amount of different types of receiving and disposal ships in the research area according to the generation of regional ship water pollutants, which can improve the efficiency of receiving and disposing of water pollutants and reduce the cost of receiving and disposing of water pollutants. The present invention can timely and effectively optimize the reception and disposal of ship water pollutants in the inland river area, realize the collection of all water pollutants, and has the advantages of high efficiency and low cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 It is a flow chart of a method for configuring and planning an inland river vessel water pollutant receiving and disposal vessel provided in Example 1 of the present invention;
[0054] Figure 2 It is the port distribution map of the case adopted by the present invention;
[0055] Figure 3 It is a flow chart for optimizing the configuration of inland river receiving and disposal vessels in the case adopted by the present invention. DETAILED DESCRIPTION
[0056] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0057] Embodiment 1:
[0058] Example 1 provides a configuration planning method for an inland river vessel water pollutant receiving and disposal vessel, see Figure 1 , including the following steps:
[0059] Step 1: Obtain the inland vessel entry and exit data and water pollutant delivery information, and calculate the total amount of ship water pollutants to be delivered corresponding to all research ports in the study area.
[0060] Wherein, the step 1 includes the following sub-steps:
[0061] Step 101, obtaining the inland river vessel entry and exit data, including the ship name, entry and exit time, entry and exit port, total number of ship passengers, ship grade and ship type; obtaining the water pollutant delivery information, including the delivery time and delivery port.
[0062] For example, the ship type includes a passenger ship or a cargo ship; and the ship grade is divided into first to fifth grades according to the ship tonnage.
[0063] Step 102: select a study area and at least one study port within the study area, and select the ships that pass through the study area and dock at any of the study ports to deliver water pollutants during the study period in combination with the inland river vessel entry and exit data; calculate the water pollutant generation time of each selected ship based on the inland river vessel entry and exit data and the water pollutant delivery information; the water pollutant generation time is defined as the cumulative sailing time for the generation of water pollutants from the port where the ship last delivered water pollutants to the time it enters the study port where the water pollutants are delivered.
[0064] For example, the day with the largest number of ships arriving at the research port is selected as the research period.
[0065] Step 103: Calculate the amount of water pollutants to be delivered for each screened ship by combining the time of water pollutant generation, daily average water pollutant information, total number of ship passengers, ship type and ship grade of each screened ship; the daily average water pollutant information includes daily per capita water pollutant data or daily per ship water pollutant data, and the daily average water pollutant information is obtained according to the ship type and the ship grade.
[0066] Specifically, the following calculation method is used to calculate the amount of water pollutants to be delivered for a single ship:
[0067]
[0068] Among them, q w,i is the amount of domestic sewage to be delivered by the i-th ship, q o,i is the amount of oily wastewater to be delivered by the i-th ship, q g,i is the amount of domestic waste to be delivered by the i-th ship, q s,i is the amount of water pollutants to be delivered by the i-th ship; i = 1, 2, 3, ..., R; R is the total number of screened ships; K i is the coefficient of the i-th ship. If the i-th ship is a passenger ship, then K i =0; if the i-th ship is a cargo ship, then K i =1; p i is the total number of people on the i-th ship; q w,货,d is the daily per capita domestic sewage generation of cargo ships of class D, qw,客,d is the daily per capita domestic sewage generation of passenger ships of grade D, d is the ship grade, d = 1, 2, ..., 5; q o,货 , is the daily amount of oily wastewater produced by cargo ships, q o,客 , is the daily amount of oily wastewater produced by passenger ships; q g is the daily per capita household waste generation; T D,i is the time when the i-th ship produced water pollutants; m is the total number of ports that the i-th ship passed from the port where it last delivered water pollutants to the research port where it delivered water pollutants; E i,j+1 is the port entry time U of the i-th ship passing through the j+1-th port among the m ports i,j is the departure time of the i-th ship passing through the j-th port among the m ports.
[0069] According to the water pollutant delivery information, the port where the last water pollutant was delivered before the ship entered the study area is taken as the starting port (i.e. the first port passed, at which j is assigned a value of 1), and the port that the ship passed last during the study period is taken as the end port (i.e. the mth port passed) (i.e. the study port where the water pollutants were delivered). The voyage time of the ship in the area from j = 1 to m is accumulated to obtain the time of water pollutant generation. For example, the ship left the port at 18:03 on 2018-01-01 after delivering water pollutants at Port A in other areas, entered the study port at 17:03 on 2018-01-12 and delivered water pollutants at 17:23 on 2018-01-12, then the time of water pollutant generation T is D It is 11 days and 23 hours.
[0070] Step 104: Accumulate the amount of water pollutants to be delivered of each screened ship to obtain the total amount of water pollutants to be delivered by the ship.
[0071] In a preferred solution, after obtaining the amount of water pollutants to be delivered of each screened ship and before accumulating the amount of water pollutants to be delivered, it also includes: setting a threshold for the amount of water pollutants to be delivered and performing a secondary screening of the ships; if the amount of water pollutants to be delivered of a certain ship is less than the threshold for the amount of water pollutants to be delivered, then the data of the ship is eliminated; based on the accumulation of the amount of water pollutants to be delivered of each ship after the secondary screening, the total amount of water pollutants to be delivered of the ship is obtained. In the step 104, the total amount of water pollutants to be delivered of the ship is calculated using the following calculation method:
[0072]
[0073] Among them, Q w is the total amount of domestic sewage to be delivered from ships, Q o is the total amount of oily wastewater to be delivered from ships, Q g is the total amount of domestic waste to be delivered from ships, QS is the total amount of ship water pollutants to be delivered; n is the total number of ships after the second screening.
[0074] Step 2: Based on the water pollutant receiving capacity of different types of receiving and disposal ships and the total amount of water pollutants to be delivered by the ships, the configuration plans of different types of receiving and disposal ships are taken as the research object, the total receiving cost of receiving and disposal ships is minimized, constraints are set, and an optimization model for the configuration of receiving and disposal ships is established.
[0075] Wherein, the different types of receiving and disposal ships include at least two types of receiving and disposal ships.
[0076] The configuration scheme of different types of receiving and disposal ships includes the configuration quantity of different types of receiving and disposal ships, the number of ships received by a receiving and disposal ship in one departure from the port, and the number of times the receiving and disposal ship calls at the port for delivery after receiving a full cargo hold per day.
[0077] The total receiving cost of the receiving and disposal ship includes the crew salary cost of the receiving and disposal ship, the ship maintenance cost, the ship purchase cost and the ship fuel cost.
[0078] The constraints include the total amount of water pollutants received, the daily operating time of the receiving and disposal ship, and the receiving capacity of the receiving and disposal ship.
[0079] Specifically, the objective function in the receiving and disposal ship configuration optimization model is expressed as:
[0080]
[0081] Where C is the total cost of receiving and disposing ships; y = 1, 2, ..., s, s is the total number of types of receiving and disposing ships; N y is the number of receiving and disposal ships of the yth type; C 船,y is the number of ships received by the yth type of receiving and disposal ship leaving the port once; T y P is the number of times the y-type receiving and disposal ship calls and delivers after receiving a full tank every day; r,y is the purchase cost of the yth type of receiving and disposal vessel, D a,y is the life of the yth type of receiving and disposal ship; m y is the maintenance cost of the yth type of receiving and disposal ship; P e,y is the number of crew members of the yth type of receiving and disposal ship, S is the wage cost of each crew member; P o,y is the main engine power of the yth type of receiving and disposal ship, P c is the ship fuel price, O p is the fuel consumption; t 船 is the water pollutant receiving time of a single ship, t 卸is the time it takes for the receiving and disposal ship to unload all water pollutants in one go, l is the average distance the receiving and disposal ship travels each time it leaves the port and enters the research port for receiving water pollutants, and v is the ground speed of the receiving and disposal ship.
[0082] The water pollutant receiving amount constraint in the constraint condition is expressed as:
[0083]
[0084] Among them, V y,w V is the sewage receiving capacity of the yth type of receiving and disposal vessel, y,o V is the oily wastewater receiving capacity of the yth type of receiving and disposal vessel, y,g D is the domestic waste receiving capacity of the yth type of receiving and disposal ship; e,w is the density of ship sewage, D e,o is the density of ship oily wastewater, D e,g is the density of domestic garbage on board ships; Q w is the total amount of domestic sewage to be delivered from ships in the study area, Q o is the total amount of oily wastewater to be delivered from ships in the study area, Q g It is the total amount of domestic waste to be delivered from ships in the study area.
[0085] The daily operation time constraint of the receiving and disposal ship in the constraint condition is expressed as:
[0086] C 船,y ×t 船 +T y ×(t 卸 +l÷v)≤t 日
[0087] Among them, t 日 The maximum daily operating time of a receiving and disposal vessel.
[0088] The receiving capacity constraint of the receiving and disposal ship in the constraint condition is expressed as:
[0089]
[0090] Q 船,a =Q a ÷C s
[0091] Among them, Q 船,a is the average amount of the a-th type of ship water pollutant to be delivered by a single ship, V y,a is the receiving capacity of the a-type ship water pollutants for the y-type receiving and disposal ship, D e,a is the density of the a-type ship water pollutant, Q ais the total amount of the a-th type of ship water pollutants to be delivered, a = w, o, g represent ship domestic sewage, ship oily sewage, ship domestic garbage respectively; C s It is the total number of ships after the initial screening or the total number of ships after the secondary screening.
[0092] Step 3: Solve the optimization model for the configuration of receiving and disposal ships to obtain the optimal solution for the configuration of inland river vessel water pollutant receiving and disposal ships.
[0093] Embodiment 2:
[0094] Embodiment 2 provides a configuration planning system for an inland river vessel water pollutant receiving and disposal ship, comprising a configuration optimization unit and a database. The configuration optimization unit is used to execute the steps in the configuration planning method for an inland river vessel water pollutant receiving and disposal ship as described in Embodiment 1, and obtain an optimal solution for the configuration scheme of the inland river vessel water pollutant receiving and disposal ship. The database is used to provide the required data for the configuration optimization unit.
[0095] Among them, the configuration optimization unit includes a module for calculating the amount of water pollutants to be delivered by ships and a module for optimizing the configuration of receiving and disposal ships. The module for calculating the amount of water pollutants to be delivered by ships is used to calculate the total amount of water pollutants to be delivered by ships corresponding to all research ports in the research area according to the inland ship entry and exit data and water pollutant delivery information. The module for optimizing the configuration of receiving and disposal ships is used to take the configuration schemes of different types of receiving and disposal ships as the research object, and the minimum total receiving cost of receiving and disposal ships as the goal, based on the water pollutant receiving capacity of different types of receiving and disposal ships and the total amount of water pollutants to be delivered by the ships, and obtain the optimal solution of the configuration scheme of receiving and disposal ships for inland ships under constraints.
[0096] The system provided in Example 2 corresponds to the method provided in Example 1, and therefore will not be described in detail.
[0097] The present invention is further described below.
[0098] Obtaining the total amount of ship water pollutants to be delivered mainly includes three stages: sorting out ship entry and exit data and water pollution delivery information, screening ships to be delivered, and calculating the amount of ship water pollutants to be delivered.
[0099] The collation of ship entry and exit data includes: sorting out all fields of all ship entry and exit data, and expanding information such as ship type, ship grade, and total number of ship passengers, in preparation for the subsequent calculation of the amount of water pollutants to be delivered. The collation of water pollution delivery information includes: sorting out the time and relevant fields of water pollutant delivery. The screening of ships to be delivered includes: the port entry and exit data contains the location information of the ship's berthing port, setting the size of the research area, selecting at least one research port, and preliminarily screening the ships that enter and exit the area and berth at the research port within a certain period of time; the port entry and exit data contains the entry and exit time of the ship at each port, based on this and combined with the water pollutant delivery information, the time of water pollutant generation of the preliminarily screened ships in the research area is accumulated, and the amount of water pollutants to be delivered by ships is calculated in combination with the per capita daily water pollutants (applicable to domestic sewage and domestic garbage) or the per capita daily water pollutants (applicable to oily sewage), ship type, ship grade, total number of ships, etc., and the ships with a to-be-delivered amount greater than a certain threshold are recorded. The calculation of the total amount of water pollutants to be delivered from ships includes: accumulating the amount of various water pollutants to be delivered from recorded ships to obtain the total amount of water pollutants to be delivered from ships in the study area.
[0100] The following is an explanation using different types of receiving and disposal ships, specifically two types of receiving and disposal ships, as examples.
[0101] 1) Since the capacity of receiving and disposal ships is not uniform, receiving and disposal ships are divided into large receiving and disposal ships and small receiving and disposal ships according to their water pollutant receiving capacity. The total receiving cost of receiving and disposal ships is divided into crew salary cost, ship maintenance cost, ship purchase cost and ship fuel cost, and the amount of water pollutants delivered by ships in the study area is determined.
[0102] 2) The total amount of water pollutants to be delivered in the research area is used as the input of the optimization model for the configuration of receiving and disposal ships. The goal is to minimize the total cost required for receiving water pollutants. The large and small receiving and disposal ships in the research area (configuration quantity, number of ships departing from the port for one trip, and number of daily port deliveries) are the optimization objects. The configuration of inland receiving and disposal ships is optimized with the constraints of the total amount of water pollutants received, the daily operating time of receiving and disposal ships, the receiving capacity of receiving and disposal ships, and integer constraints. Finally, the optimization of the configuration of large receiving and disposal ships in the research area is obtained. 大 The number of ships that can be received by the receiving and disposal ship after leaving the port for one trip (i.e. leaving the port and returning to the port after receiving full cargo holds) is C 船,1 , the number of times a receiving and disposal ship calls and delivers after receiving a full tank in a single day is T1; the number of times a small receiving and disposal ship N 小 The number of ships that can be received by the receiving and disposal ship after leaving the port for one trip (i.e. leaving the port and returning to the port after receiving full cargo holds) is C 船,2 , the number of times the receiving and disposal ship calls at the port for delivery after receiving a full hold in a single day is T2.
[0103] The present invention is described below in conjunction with specific data.
[0104] (1) Data collation
[0105] The day with the largest number of ships entering the port in the ship entry and exit data was selected for analysis (such as the day of 2018-01-12 in Table 1. In this case, the amount of ship water pollutants to be received is high. After the system optimization solution, it can meet the receiving needs of the study area to the maximum extent). The ships in the region can be screened through the berthing location field of the ship entry and exit data. According to the ship type and gross tonnage field information, the ship type can be divided into passenger ships and cargo ships, and the ships can be divided into first to fifth grades according to the ship tonnage.
[0106] The total number of people on board is obtained based on the number of crew members and the actual passenger capacity field information in the port entry and exit data. The time of water pollutant generation is obtained by combining the time of ship entry into the port and the time of water pollutant delivery at the previous port. After sorting, it is convenient to query the ship type, grade, total number of people on board, time of water pollutant generation and other information for each ship.
[0107] According to the ship type, ships in the region are divided into passenger ships and cargo ships. According to the ship classification standards, ships over 1,600 tons are divided into first-class ships according to their gross tonnage, ships with a gross tonnage of 600-1,600 tons are divided into second-class ships, ships with a gross tonnage of 200-600 tons are divided into third-class ships, ships with a gross tonnage of 50-200 tons are divided into fourth-class ships, and ships with a gross tonnage of less than 50 tons are divided into fifth-class ships.
[0108] Assume that after the ship delivers water pollutants at ports A, B, and C, it enters the study area E and enters the study port D. The location distribution of each port is as follows: Figure 2 As shown, the ship information table of ports A, B and C after processing is shown in Table 1.
[0109] Table 1 Vessel information of each port
[0110]
[0111]
[0112]
[0113]
[0114]
[0115]
[0116]
[0117] (2) Screening of ships to receive water pollutants
[0118] Assuming that ships with a water pollutant delivery volume greater than 50 kg need to be received by a receiving and disposal ship, we first obtained that there are 60 ships in the study area through the location information of the port entry and exit data, and then calculated the daily water pollutant delivery volume (q s,i ), for q s,i Ships with a weight of more than 50kg are screened, among which the calculation method for the total amount of water pollution to be delivered for the i-th ship is as follows:
[0119]
[0120] (3) Calculation of the amount of water pollutants to be delivered from ships
[0121] Assume that after screening, there are 60 (i.e., n=60) ships with a total amount of water pollutants to be delivered greater than 50 kg. Based on the methods proposed in (1) and (2), the total amount of water pollutants generated by ships in the study area is obtained:
[0122]
[0123] It is assumed that the average daily oily sewage generation of passenger ships is 16.44kg, and the average daily oily sewage generation of cargo ships is 5.48kg. The daily per capita domestic garbage generation of ships is 0.49kg. The daily per capita domestic sewage generation of first to fifth class passenger ships is 23.2kg, 22.5kg, 20.6kg, 24.1kg, and 26.4kg respectively. The daily per capita domestic sewage generation of first to fifth class cargo ships is 21.7kg, 22.6kg, 27.5kg, 24.1kg, and 26.4kg respectively. After sorting out the data of ships entering and leaving the port, the average number of people on board first to fifth class passenger ships is 220, 115, 112, 36, and 26 respectively. The average number of people on board first to fifth class cargo ships is 13, 10, 7, 5, and 3 respectively.
[0124] Finally, the data of 60 ships were put into the formula to obtain the total amount of water pollutants to be delivered in the study area, which was 45477.13 kg. The amount of domestic sewage to be delivered was 285769.26 kg, the amount of oily sewage to be delivered was 5431.85 kg, the amount of domestic garbage to be delivered was 6143.05 kg, and the total amount of water pollutants to be delivered was 297344.16 kg.
[0125] like Figure 3 As shown in the figure, the optimization of the configuration of receiving and disposal ships in inland areas mainly includes four parts: data preparation, setting of objective function, setting of model constraints and model solving.
[0126] (1) Data preparation
[0127] The average amount of water pollutants to be received by a single ship is calculated based on the total amount of ships in the region in the port entry and exit data and the total amount of water pollutants to be delivered by ships in the inland river region obtained by the calculation method of the amount of water pollutants to be delivered by ships:
[0128] Q 船,a =Q a ÷C s
[0129] According to the data of ships entering and leaving the port, the number of ships waiting to receive water pollutants in the area every day is 60, the amount of domestic sewage, oily sewage, domestic garbage generated by ships and the amount of water pollutants to be delivered are 285769.26kg, 5431.85kg, 6143.05kg and 297344.16kg respectively. Substituting the amount into the formula, the average amount of domestic sewage, oily sewage, domestic garbage to be received by a single ship in the region is 4762.82kg, 90.53kg, 102.38kg and 4955.73kg respectively.
[0130] (2) Setting of objective function
[0131] The model is solved with the goal of minimizing the total cost C of receiving and disposal ships in the region:
[0132]
[0133] Among them, y=1, 2 indicates that the receiving and disposal ship is a large and small receiving and disposal ship, respectively. Assume that the purchase cost of large and small receiving and disposal ships is 1,000,000 yuan and 600,000 yuan, respectively, the life of the receiving and disposal ship is 10,950 days, and the daily maintenance cost is 82.2 yuan and 54.8 yuan, respectively. The fuel price in the study area is 5.01 yuan / liter, and the main engine power of large and small receiving and disposal ships is 150kw and 79kw, respectively. The main engine working efficiency of large and small receiving and disposal ships is 0.8. The number of crew members of large and small receiving and disposal ships is 5 and 3, respectively, the fuel consumption is 5.88 liters / kW day, and the average salary of the crew members of the receiving and disposal ship is 167 yuan / day. The time for a single ship to receive water pollutants is 0.17 days, and it takes 0.06 days for the receiving and disposal ship to unload all water pollutants in a single time. The average speed of the receiving and disposal ship is 360km / day, and the average receiving distance in the study area is 46.10km.
[0134] (3) Setting model constraints
[0135] First, the total amount of water pollutants received by ships in the study area needs to be constrained:
[0136]
[0137] According to the calculation method module of the amount of water pollutants to be delivered by ships in inland areas, the daily amount of domestic sewage, oily sewage and domestic garbage to be delivered by ships in the study area is determined to be 285769.26kg, 5431.85kg and 6143.05kg respectively. It is assumed that the receiving capacity of large receiving and disposal ships for domestic sewage, oily sewage and domestic garbage is 20m 3 、10m 3 、10m 3 ; The receiving capacity of small receiving and disposal vessels for domestic sewage, oily sewage and domestic garbage is 10m 3 、5m 3 、5m 3 ; Assume that the density of various types of ship water pollutants is approximately 1000kg / m 3 .
[0138] Secondly, restrictions are imposed on the daily travel time of large and small receiving and disposal vessels:
[0139] C 船,y ×t 船 +T y ×(t 卸 +l÷v)≤t 日
[0140] Assume that the maximum daily operating time of the receiving and disposal ship is t 日 It is 0.67 days.
[0141] Finally, the receiving capacity of a single receiving and disposal ship is constrained:
[0142]
[0143] (4) Model solution
[0144] In summary, the model is solved with the minimum total cost C of receiving and disposal ships as the goal of solving the model, and the constraints such as the total amount of water pollutants received by ships, the daily driving time of receiving and disposal ships, and the receiving capacity of a single receiving and disposal ship are set. The model is solved with the amount of water pollutants to be delivered in the study area as input. Finally, the optimized study area is configured with 0 large receiving and disposal ships, and the number of ships that can be received by the receiving and disposal ships after leaving the port once (that is, leaving the port and returning to the port after receiving a full tank) is 0, and the number of times the receiving and disposal ships can deliver to the port after receiving a full tank in a single day is 0. There are 9 small receiving and disposal ships, and the number of ships that can be received by the receiving and disposal ships after leaving the port once (that is, leaving the port and returning to the port after receiving a full tank) is 7, and the number of times the receiving and disposal ships can deliver to the port after receiving a full tank in a single day is 1. The total cost of receiving and dispatching the receiving and disposal ships per day is 16,700 yuan.
[0145] The configuration planning method and system of an inland river vessel water pollutant receiving and disposal vessel provided by the embodiment of the present invention at least include the following technical effects:
[0146] The present invention analyzes the amount of water pollutants to be delivered and their distribution by ships through information such as inland river ship entry and exit data, and optimizes the configuration of inland river receiving and disposal ships, which plays a very important role and significance in reducing the harm caused by water pollutants to the water environment.
[0147] Finally, it should be noted that the above specific implementation methods are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to examples, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A method for planning the configuration of an inland river vessel water pollutant receiving and disposal vessel, characterized in that: The following steps are involved: Step 1: Obtain inland waterway ship entry and exit data and water pollutant delivery information, and calculate the total amount of ship water pollutants to be delivered corresponding to all research ports in the research area; Step 101, obtaining inland river vessel entry and exit data, including ship name, entry and exit time, entry and exit port, total number of ship passengers, ship grade and ship type; obtaining the water pollutant delivery information, including delivery time and delivery port; Step 102: select a study area and at least one study port within the study area, and select ships that pass through the study area and berth at any of the study ports during the study period to deliver water pollutants in combination with the inland river vessel entry and exit data; calculate the water pollutant generation time of each selected ship based on the inland river vessel entry and exit data and the water pollutant delivery information; the water pollutant generation time is defined as the cumulative sailing time of water pollutants generated from the departure of the ship from the port where the water pollutants were last delivered to the entry into the study port where the water pollutants were delivered; Step 103: Calculate the amount of water pollutants to be delivered for each screened ship by combining the time of water pollutant generation, daily average water pollutant information, total number of ship passengers, ship type and ship grade of each screened ship; the daily average water pollutant information includes daily water pollutant data per capita or daily water pollutant data per ship, and the daily average water pollutant information is obtained according to the ship type and the ship grade; In step 103, the amount of water pollutants to be delivered for a single ship is calculated using the following calculation method: Among them, q w,i is the amount of domestic sewage to be delivered by the i-th ship, q o,i is the amount of oily wastewater to be delivered by the i-th ship, q g,i is the amount of domestic waste to be delivered by the i-th ship, q s,i is the amount of water pollutants to be delivered by the i-th ship; i = 1, 2, 3, …, R; R is the total number of screened ships; K i is the coefficient of the i-th ship. If the i-th ship is a passenger ship, then K i =0; if the i-th ship is a cargo ship, then K i =1; p i is the total number of persons on board the i-th ship; q w,货,d is the daily per capita domestic sewage generation of cargo ships of class D, q w,客,d is the daily per capita domestic sewage generation of passenger ships of grade D, d is the ship grade, d = 1, 2, ..., 5; q o,货 is the daily amount of oily wastewater produced by cargo ships, q o,客 is the daily amount of oily wastewater produced by passenger ships; q g is the daily per capita household waste generation; T D,i is the time when the i-th ship produced water pollutants; m is the total number of ports that the i-th ship passed from the port where it last delivered water pollutants to the research port where it delivered water pollutants; E i,j+1 is the port entry time U of the i-th ship passing through the j+1th port among the m ports i,j is the departure time of the i-th ship passing through the j-th port among the m ports; Step 104, accumulating the amount of water pollutants to be delivered of each screened ship to obtain the total amount of water pollutants to be delivered by the ship; Step 2: Based on the water pollutant receiving capacity of different types of receiving and disposal ships and the total amount of water pollutants to be delivered by the ship, the configuration schemes of different types of receiving and disposal ships are taken as the research object, the total receiving cost of the receiving and disposal ships is minimized, constraints are set, and an optimization model for the configuration of receiving and disposal ships is established; Step 3: Solve the optimization model for the configuration of receiving and disposal ships to obtain the optimal solution for the configuration of inland river vessel water pollutant receiving and disposal ships.
2. The configuration planning method for inland river vessel water pollutant receiving and disposal vessels according to claim 1 is characterized in that: In step 101, the ship type includes a passenger ship or a cargo ship; the ship grade is divided into first to fifth grades according to the ship tonnage; in step 102, the day with the largest number of ships arriving at the research port is selected as the research period.
3. The configuration planning method for inland river vessel water pollutant receiving and disposal vessels according to claim 1 is characterized in that: After obtaining the amount of water pollutants to be delivered of each screened ship and before accumulating the amount of water pollutants to be delivered, the method further includes: setting a threshold value of the amount of water pollutants to be delivered and performing secondary screening on the ships; if the amount of water pollutants to be delivered of a ship is less than the threshold value of water pollutants to be delivered, the data of the ship is eliminated; and accumulating the amount of water pollutants to be delivered of each ship after the secondary screening to obtain the total amount of water pollutants to be delivered of the ships; In step 104, the total amount of ship water pollutants to be delivered is calculated using the following calculation method: Among them, Q w is the total amount of domestic sewage to be delivered from ships, Q o is the total amount of oily wastewater to be delivered from ships, Q g is the total amount of domestic waste to be delivered from ships, Q S is the total amount of ship water pollutants to be delivered; n is the total number of ships after the second screening.
4. The configuration planning method for inland river vessel water pollutant receiving and disposal vessels according to claim 1 is characterized in that: In step 2, the different types of receiving and disposal ships include at least two types of receiving and disposal ships; The configuration scheme of different types of receiving and disposal ships includes the configuration quantity of different types of receiving and disposal ships, the number of ships received by a receiving and disposal ship after leaving the port once, and the number of times the receiving and disposal ship calls at the port for delivery after receiving full cargo holds per day; The total receiving cost of the receiving and disposal ship includes the crew salary cost, ship maintenance cost, ship purchase cost and ship fuel cost of the receiving and disposal ship; The constraints include the total amount of water pollutants received, the daily operating time of the receiving and disposal ship, and the receiving capacity of the receiving and disposal ship.
5. The configuration planning method for inland river vessel water pollutant receiving and disposal vessels according to claim 4 is characterized in that: The objective function in the receiving and disposal ship configuration optimization model is expressed as: Where C is the total cost of receiving and disposing ships; y = 1, 2, ..., s, s is the total number of types of receiving and disposing ships; N y is the number of receiving and disposal ships of the yth type; C 船,y is the number of ships received by the yth type of receiving and disposal ship leaving the port once; T y The number of times the receiving and disposal vessel of type y receives full cargo holds and makes deliveries at the port every day; P r,y is the purchase cost of the yth type of receiving and disposal vessel, D a,y is the life of the yth type of receiving and disposal ship; m y is the maintenance cost of the yth type of receiving and disposal ship; P e,y is the number of crew members of the yth type of receiving and disposal ship, S is the wage cost of each crew member; P o,y is the main engine power of the yth type of receiving and disposal ship, P c is the ship fuel price, O p For fuel consumption; t 船 is the water pollutant receiving time of a single ship, t 卸 is the time it takes for the receiving and disposal ship to unload all water pollutants in one go, l is the average distance the receiving and disposal ship travels each time it leaves the port and enters the research port for receiving water pollutants, and v is the ground speed of the receiving and disposal ship.
6. The configuration planning method for inland river vessel water pollutant receiving and disposal vessels according to claim 5 is characterized in that: The water pollutant receiving amount constraint in the constraint condition is expressed as: Among them, V y,w V is the sewage receiving capacity of the yth type of receiving and disposal vessel, y,o V is the oily wastewater receiving capacity of the yth type of receiving and disposal vessel, y,g D is the domestic waste receiving capacity of the yth type of receiving and disposal ship; e,w is the density of ship sewage, D e,o is the density of ship oily wastewater, D e,g is the density of domestic garbage on board ships; Q w is the total amount of domestic sewage to be delivered from ships, Q o is the total amount of oily wastewater to be delivered from ships, Q g The total amount of domestic waste to be delivered from ships; The daily operation time constraint of the receiving and disposal ship in the constraint condition is expressed as: C 船,y ×t 船 +T y ×(t 卸 +l÷v)≤t 日 Among them, t 日 The maximum daily operating time of the receiving and disposal vessel; The receiving capacity constraint of the receiving and disposal ship in the constraint condition is expressed as: Q 船,a =Q a ÷C s Among them, Q 船,a is the average amount of the a-th type of ship water pollutant to be delivered by a single ship, V y,a is the receiving capacity of the a-type ship water pollutants for the y-type receiving and disposal ship, D e,a is the density of the a-type ship water pollutant, Q a is the total amount of the a-th type of ship water pollutants to be delivered, a = w, o, g represent ship domestic sewage, ship oily sewage, ship domestic garbage respectively; C s It is the total number of ships after the initial screening or the total number of ships after the secondary screening.
7. A configuration planning system for inland river vessel water pollutant receiving and disposal vessels, characterized in that: include: A configuration optimization unit, used to execute the steps in the configuration planning method for an inland river vessel water pollutant receiving and disposal vessel as described in any one of claims 1 to 6, to obtain an optimal solution for the configuration scheme of the inland river vessel water pollutant receiving and disposal vessel; The database is used to provide the configuration optimization unit with required data.
8. The configuration planning system for inland river vessel water pollutant receiving and disposal vessels according to claim 7 is characterized in that: The configuration optimization unit comprises: The module for calculating the amount of water pollutants to be delivered by ships is used to calculate the total amount of water pollutants to be delivered by ships corresponding to all the research ports in the research area based on the inland river ship entry and exit data and water pollutant delivery information; The module for optimizing the configuration of receiving and disposal ships is used to study the configuration plans of different types of receiving and disposal ships based on the water pollutant receiving capacity of different types of receiving and disposal ships and the total amount of water pollutants to be delivered by the ships, with the goal of minimizing the total receiving cost of receiving and disposal ships, and to obtain the optimal solution for the configuration plan of inland river ship water pollutant receiving and disposal ships under constraints.