Logistics management system based on intelligent scheduling

The invention relates to the technical field of logistics transportation scheduling, in particular to a logistics management system based on intelligent scheduling, which comprises a data acquisition module, a demand analysis module, an intelligent scheduling module, a path planning module, a monitoring and feedback module, an optimization module and the like. The data acquisition module is used for collecting information such as goods, vehicles, storage, customer demands and traffic road conditions; the demand analysis module predicts logistics demands by using a time sequence analysis or machine learning algorithm; the intelligent scheduling module adopts a greedy and dynamic programming mixed algorithm to allocate resources; the path planning module calculates an optimal path according to road conditions and starting and ending points; the monitoring and feedback module monitors logistics parameters in real time and feeds back abnormity; and the optimization module optimizes the scheduling scheme according to the fitness function based on the genetic algorithm. According to the invention, data and resources of all links of logistics are effectively integrated, accurate demand prediction, efficient resource configuration, transportation path optimization, real-time monitoring feedback and overall performance improvement of the system are realized, the logistics cost is significantly reduced, and the transportation efficiency and the service quality are improved.
Owner:FUJIAN ORANGE INFORMATION TECHNOLOGY CO LTD

Intelligent logistics system based on optimal scheduling

The invention discloses an intelligent logistics system based on optimal scheduling, and relates to the field of logistics management, and the system comprises the steps: arranging environment sensors at key nodes of a logistics network, and transmitting collected real-time data to edge computing equipment for preprocessing; analyzing the preprocessed data by using a deep learning model, and predicting an environment change trend in a non-period of time; dynamically adjusting a logistics scheduling strategy based on the prediction result; after receiving the adjusted scheduling strategy, defining a state space, an action space and a reward function of the logistics system; training a reinforcement learning algorithm model, and continuously optimizing a decision strategy through interaction with the environment; and calling the reinforcement learning model through an API interface to make a real-time decision, and generating an optimal scheduling scheme. According to the invention, by integrating environment perception, deep learning prediction, adaptive scheduling and reinforcement learning, the defects of an existing intelligent logistics system in the aspects of environment perception, prediction and dynamic scheduling optimization are overcome, and the intelligent level and operation efficiency of logistics management are significantly improved.
Owner:WUXI FANGDA ENVIRONMENTAL PROTECTION TECH CO LTD

Power transformation equipment abnormity identification system and identification method based on machine learning

The invention belongs to the technical field of anomaly recognition, and discloses a power transformation equipment anomaly recognition system and recognition method based on machine learning. The method includes the steps that insulation parameters, temperature data and electrical parameters of a transformer are collected, the health condition of equipment is evaluated in combination with a machine learning model, then an Actor-Critic algorithm is used for training a reinforcement learning model, the model considers factors such as the equipment state and the resource state, and the equipment state and the resource state are optimized; decisions are made in an action space including equipment selection, detection degree, personnel scheduling and frequency adjustment to balance the detection effect, resource utilization and cost control.
Owner:SHANGHAI YUNENG ZHIHUI ELECTRIC POWER TECHNOLOGY CO LTD +1

Intelligent office area management system and method based on Internet of Things

The invention provides an intelligent office area management system and method based on the Internet of Things, and the method comprises the steps: building a BIM model according to the three-dimensional data, design data and function description data of an office area; deploying an intelligent sensor in the office area, collecting area data in real time and transmitting the area data to the cloud service platform; the cloud service platform performs statistical analysis on the data, establishes a digital model, and analyzes an environment parameter state, personnel flow distribution and a resource use state; according to an analysis result, environment facilities are adjusted through intelligent control equipment, and shared resources are intelligently managed, so that efficient utilization is realized; and if the abnormal event is identified, pushing alarm information, and generating an exception handling measure according to the real-time area data and the digital model. Through the scheme of the invention, data acquisition, digital modeling and intelligent management based on the Internet of Things technology are realized, and the operation efficiency and the use experience of an office area are improved.
Owner:深圳市裕熙科技有限公司

Full-link monitoring method and system for state application in edge distribution scene

The invention discloses a full-link monitoring method and system for state application in an edge distribution scene, and the method comprises the steps: S1, deploying a monitoring agent at an edge calculation node, and collecting the state data and performance indexes of edge equipment; s2, sending the collected data to a central monitoring system in real time through an efficient data transmission protocol; s3, storing and managing synchronous data between the edge nodes and the center node by using a distributed database; s4, preprocessing the collected data by applying a real-time data stream processing technology; s5, performing anomaly detection and mode recognition on the preprocessed data, and generating intelligent early warning; s6, adopting a full-link tracking tool to monitor and record a full-link path requested in the system, and identifying and analyzing a performance bottleneck and a fault point; and S7, optimizing a data transmission process by using a message queue system, and implementing a data encryption and access control strategy. The method has the advantages of low delay, high data security and high system response speed.
Owner:HENAN XUANTONG INTELLIGENT TECHNOLOGY CO LTD

Joint beam forming optimization method for RIS-assisted low-altitude communication system

The invention discloses a joint beam forming optimization method for an RIS auxiliary low-altitude communication system. The problem of performance bottleneck caused by interaction of active beam forming and passive beam forming is solved by adopting a genetic algorithm based on a dynamic adaptive theory. Aiming at the limitation of a standard optimization method, a hybrid strategy of genetic algorithm optimization and a full-connection neural network is explored, and intelligent collaborative setting of system parameters is realized. Simulation results show that the hybrid algorithm not only simplifies the calculation process to obtain the optimal network parameters, but also effectively optimizes the system structure by dynamically adjusting the RIS reflection configuration. On the basis, the signal transmission quality is improved, interference is reduced, and it is guaranteed that the RIS-assisted low-altitude unmanned aerial vehicle intelligent communication system stably and efficiently operates in a complex wireless transmission environment.
Owner:NANJING CHINA SPACENET SATELLITE TELECOM CO LTD

Digital processing system and method applied to road construction

The invention discloses a digital processing system and method applied to road construction, and belongs to the technical field of artificial intelligence. The method comprises the following steps: acquiring real-time video data of a construction site, and identifying movable obstacles and immovable obstacles in the real-time video data by adopting a convolutional neural network; generating a movement plan for the movable obstacle, recording the position for the immovable obstacle, and updating the database; according to the position and the movement plan of the movable obstacle, an instruction is sent to an operator of the construction site; if the movable obstacle cannot move automatically, using Canny edge detection to identify the edge of the obstacle, extracting the coordinates of edge points, and when the movable obstacle is located in the operation range of the automation equipment, controlling the automation equipment to remove the movable obstacle; path planning is carried out, an optimal road construction route is designed, and immovable obstacles are avoided; and formulating a road construction plan by using a genetic algorithm, and dynamically adjusting the construction scheme in the construction process.
Owner:QINGDAO WEST COAST URBAN CONSTR GRP CO LTD

Digital video device control method and device

The invention relates to the technical field of digital video devices, in particular to a digital video device control method and device. The method comprises the following steps: acquiring digital monitoring data, performing real-time scene acquisition and dynamic region optimization according to the data, and generating optimized dynamic region data; video frames are read based on the dynamic region optimization data, and abnormal behavior analysis and behavior intention evaluation are carried out; calculating the complexity of monitoring behaviors by combining video frame data and behavior intention data, and evaluating resource consumption increase; the processing bottleneck is evaluated according to the resource consumption growth data, and the processing capability attenuation analysis is carried out, so that the monitoring device is adjusted, and the system performance is optimized; according to the method, the resource allocation and processing capability of the video device is dynamically adjusted through real-time analysis and processing of monitoring data. According to the invention, the digital video device is adjusted, so that the prediction identification of the digital video device is more accurate and efficient.
Owner:GANSU DIGITAL TECHNOLOGY CO LTD

Operation method of unattended intelligent mobile emergency cabin

The invention relates to an operation method of an unattended intelligent mobile emergency cabin. Comprising the steps of system initialization, material information configuration, authority verification, order generation, material warehouse-in and warehouse-out, inventory monitoring, intelligent prediction, decision support, data processing and synchronization and the like. Various parameters are obtained and configured through the system configuration module, material information is managed through the material detail directory tree module, accuracy of access authority is ensured through the face recognition and authority verification module, and automatic order generation and inventory updating are achieved through the automatic order generation and inventory updating module. A gravity sensing unit is used for monitoring warehouse-in and warehouse-out of materials, an inventory alarm and decision-making auxiliary module is used for monitoring an inventory state and sending an alarm signal, an intelligent prediction unit is used for predicting a material use trend and generating a replenishment plan, and finally data processing and synchronous management are realized through a data processing module. Manual operation is reduced, management efficiency is improved, timeliness and reliability of material supply are ensured, and the method is suitable for the fields of electric power engineering and the like.
Owner:BEIJING GUODIANTONG NETWORK TECH CO LTD +1

Optimal maintenance position determination method and device for power grid fault prediction

The invention relates to an optimal maintenance position determination method and device for power grid fault prediction, belongs to the technical field of data preprocessing and recognition, and solves the problem of how to determine an optimal maintenance position after a power grid fault under natural disasters. The method comprises the following steps: acquiring historical fault data and related influence factor data, and performing interpolation processing through an adversarial network; selecting a plurality of key influence factors; judging the correlation degree between the power grid fault and each key influence factor by adopting an improved anti-entropy-grey correlation analysis method so as to select part of key influence factors as influence indexes; constructing and training a neural network to obtain a prediction model, taking the geological disaster probability and the influence index as input parameters of the prediction model, and constructing a geological disaster early warning model to obtain the geological disaster probability; and an optimal maintenance position optimization model is constructed based on the predicted power grid fault, and an optimal maintenance position is obtained by combining an objective function and a constraint condition. And accurately predicting the maintenance demand by using the geological disaster probability and the key influence index.
Owner:ECONOMIC TECH RES INST OF STATE GRID HENAN ELECTRIC POWER

Bidding and bidding quotation data analysis method and system and storage medium thereof

The invention discloses a bid inviting and bidding quotation data analysis method and system and a storage medium thereof, and relates to the technical field of data analysis. The method comprises the following steps: a bid invitation person issues a bid invitation scheme on a bid invitation and bidding service platform; the bidder downloads a bidding document template from the bidding and tendering service platform according to the insurance invitation document; the bidder fills in actual bidding information according to the bidding document template and uploads the bidding document to the bidding and bidding service platform; a bid invitation person downloads a bidding document from the bid invitation and bidding service platform for information extraction; analyzing the business bearing capacity information and the estimated cost data of the bidder, and inputting the two items of data into a quotation data calculation model to generate quotation information; and calculating the income by adopting a Nash balanced quotation model. According to the method, the quotation data calculation model and the Nash balanced quotation model are arranged on the bid inviting and tendering service platform, and the optimal quotation is gradually approached by using data simulation, so that effective configuration of social resources is realized, and the requirement level and the bid inviting efficiency of the bid inviting and tendering industry on information services are improved.
Owner:FUJIAN BEIYOU INFORMATION TECHNOLOGY CO LTD

Modularized movable variable-structure floating body platform and operation method thereof

The invention belongs to the field of ocean engineering and floating body structures, discloses a modularized movable variable-structure floating body platform and an operation method thereof, and is suitable for multi-scene application of short-term or temporary operation on the sea. In the towing process of the platform, chain type arrangement is adopted, all floating body units are connected through spherical hinge connectors, water resistance is effectively reduced, towing efficiency is improved, and safe transfer is achieved through a tugboat and an auxiliary boat. After the platform arrives at a target area, the platform flexibly adjusts the floating body units through the tugboats, the auxiliary boats, the mechanical arms and the connecting rods, chain type arrangement is changed into an array type structure, stable multi-column arrangement is formed, and different operation requirements are met. Due to the modular design, the platform has high expansibility and is convenient to maintain and recombine. The marine floating body platform is flexible, low in cost and environmentally friendly, has high wind wave resistance and wide application prospects, and is particularly suitable for various temporary marine operations such as marine monitoring, equipment installation and marine emergency.
Owner:HAINAN UNIV

Industrial user participation power auxiliary service business management method and system

The invention provides a business management method and system for industrial users to participate in electric power auxiliary services, and the method comprises the following steps: S01, baseline load analysis: predicting a baseline load in a current period based on historical data analysis, and comparing the baseline load with the historical period in the same period; calculating a baseline load curve in a historical peak shaving period, a predicted load curve at the current time and a valley filling and peak clipping response capability curve calculated according to the baseline load curve and the predicted load curve; and S02, the user autonomously declarates a peak shaving plan according to the valley filling and peak clipping response curve, and summarizes to form a virtual power plant declaration total amount. And S03, after the power grid releases the total clearing capacity and the price, allocating the clearing capacity of each user in proportion according to the limit of the maximum response capacity of the user, and adjusting the clearing capacity according to the limit if the clearing capacity is excessive. The whole peak regulation auxiliary service business process designed by the invention covers six core links including baseline load prediction, peak regulation capability evaluation, plan declaration, result clearing, task decomposition, execution tracking and the like, and aims to realize power supply and demand balance, optimize the power grid operation efficiency and improve the power supply efficiency by flexibly regulating and controlling industrial user side resources. And the economical efficiency and the stability of the power system are improved under the driving of a marketization mechanism.
Owner:CHINA DATANG CORP SCI & TECH RES INST CO LTD EAST CHINA BRANCH +3

Intelligent recommendation method and system based on shared robot

The invention belongs to the field of intelligent manufacturing, and provides an intelligent recommendation method and system based on a shared robot, and the method comprises the steps: receiving a picture and a processing demand provided by a user; determining the processing attribute of the target workpiece according to the picture; determining a processing sub-task according to the processing attribute; determining an optimal shared robot combination according to the processing subtasks and the processing requirements; and displaying the optimal shared robot combination to the user.
Owner:DONGGUAN XINBAIREN ROBOT TECH CO LTD

ITSS operation and maintenance resource configuration optimization method and system

The invention discloses an ITSS operation and maintenance resource configuration optimization method and system. The method comprises the following steps: firstly, establishing a network node model of operation and maintenance resources to be allocated; constructing a constraint model of the operation and maintenance resources to be allocated according to the constraint conditions of the operation and maintenance resources to be allocated; determining a to-be-allocated operation and maintenance resource configuration model based on the to-be-allocated operation and maintenance resource network node model and the to-be-allocated operation and maintenance resource constraint model; according to the to-be-allocated operation and maintenance resource configuration model, obtaining an initial configuration scheme of optimal configuration of to-be-allocated operation and maintenance resources and a resource configuration deviation matrix; and according to the initial configuration scheme and the resource configuration deviation matrix, obtaining a target configuration scheme for optimal configuration of the operation and maintenance resources to be allocated. Through the systematized and modeled operation and maintenance resource configuration optimization method, efficient, accurate and flexible configuration of the operation and maintenance resources is realized, and the method has remarkable effects of improving the operation and maintenance service quality, reducing the cost and enhancing the enterprise competitiveness.
Owner:SHANDONG WUKESONG ELECTRIC TECH CO LTD

Optimal locating and sizing planning method for energy storage system and distributed power generation

The invention discloses an optimal locating and sizing planning method for an energy storage system and distributed power generation. The method comprises the following steps: representing the condition of installing an energy storage and distributed power supply in each node in a topological graph of a power system through a decision vector; establishing an admittance matrix according to the topological graph of the power system, and then performing conversion to obtain an impedance matrix of the nodes; and by taking the lowest operation cost as an objective function and combining constraint conditions, optimizing decision vectors by combining sensitivity analysis of an impedance matrix and a simulated annealing algorithm to obtain an optimal locating and sizing scheme of the energy storage system and distributed power generation. According to the method, the overall operation environment of a power grid and physical limitations of equipment are more considered, including consideration of the capacity of a transformer, and it is ensured that the safe operation range of the transformer is not exceeded while BESS and DG are increased; greater flexibility is provided, and the number and scale of energy storage and power generation facilities are allowed to be dynamically adjusted.
Owner:STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED +2

Load balancing equipment automatic configuration method and device

The present invention discloses a method and device for automatic configuration of a load balancing device, which belongs to the field of network technology. The method includes the following steps: obtaining load balancing planning information; extracting data center network area, load balancing device and IPv4 / IPv6 planning information and parsing their corresponding relationship, and forming a network matrix in combination with the current status of financial services; setting a load balancing demand template, receiving and sorting out load balancing configuration requirements; remotely connecting to a load balancing device and reading device configuration, parsing existing device configurations and sorting them out by categories; matching the load balancing configuration requirements with the network matrix, incrementally and automatically generating configuration command lines or API interface change templates, and obtaining the final load balancing configuration; remotely connecting to each load balancing device in the data center and issuing the final load balancing configuration. The present invention can concisely and efficiently complete the load balancing configuration work, improve the efficiency and accuracy of load configuration, and ensure the security of the financial cloud data center.
Owner:SHANDONG CITY COMMERCIAL BANK COOP ALLIANCE CO LTD

Dynamic traffic distribution and signal control combined optimization method

The invention discloses a dynamic traffic distribution and signal control combined optimization method, and belongs to the field of intelligent traffic. The method specifically comprises the steps that firstly, a road section impedance function is constructed, node impedance is introduced to obtain an intersection impedance combination function, and the intersection impedance combination function is optimized through the traffic flow, density and speed relation based on dynamic adjustment parameters, vehicle type differences, weather conditions and traffic flow speed to obtain a combination optimization traffic impedance model; and solving the combinatorial optimization traffic impedance model by using a particle swarm algorithm to output a traffic distribution scheme. According to the method, dynamic traffic distribution and adaptive signal control are integrated, the road network emergency response capability is improved, traffic prediction and signal regulation and control synchronization is realized, and an accurate impedance model is introduced to dynamically adapt to driver preferences, so that congestion is relieved, and travel time and resource allocation are optimized.
Owner:CHANGAN UNIV

Parameter configuration method and device in multi-computing-cluster environment and computer equipment

The invention relates to a parameter configuration method and device in a multi-computing-cluster environment, computer equipment, a computer readable storage medium and a computer program product. The method comprises the following steps: determining a value space of each database parameter in a to-be-configured database; according to the plurality of query tasks, determining a performance index function for the to-be-configured database; traversing each value point in the value space, and executing a plurality of query tasks according to database parameters represented by the traversed value points to obtain execution index scores of performance index functions under the database parameters represented by the traversed value points; and determining a target value point in the targeted value space, and performing parameter configuration on the to-be-configured database according to database parameters represented by the target value point. By adopting the method, the overall performance of the database can be improved, and meanwhile it is guaranteed that the computing clusters under different hardware configurations can play the optimal performance.
Owner:CHINA TELECOM CLOUD TECH CO LTD

Knowledge graph-based remote control instruction construction method and management system for low-orbit flyer cluster

The invention provides a knowledge graph-based remote control instruction construction method and management system for a low-orbit flyer cluster, designs an instruction metadata model based on knowledge ontology, and realizes classification, treatment and semantic association of instruction elements by constructing a'concept layer-strength layer-instruction layer 'multi-level instruction generation mechanism. A business-driven instruction collaboration network concept is provided, and a multi-satellite, multi-system and multi-task collaboration instruction cluster generation mechanism oriented to a complex task scene is supported. Trial is carried out on the realized low earth orbit satellite remote control instruction generation and management system, and the feasibility of the method and the system is verified. According to the method, the flexibility and expandability of an instruction system are improved, support is provided for efficient configuration, generalization multiplexing, new instruction discovery, safety and reliability of future complex instructions, and deep exploration can be continued in future research work. The method is not only suitable for the field of low-orbit satellites, but also has reference significance for other satellite system networks.
Owner:DACE INFORMATION TECH CO LTD

Eye fundus image-based retina fixation point training method and device

The invention discloses a retina fixation point training method and device based on an eye fundus image, and belongs to the technical field of retina training, and the method comprises the following steps: S1, carrying out the shooting adjustment of an eye fundus camera, and obtaining a real-time image of the eye fundus of a patient based on the eye fundus camera; s2, processing the real-time image of the eye fundus of the patient, and determining an eye fundus feature image of the patient; s3, analyzing and evaluating the eye fundus feature image of the patient, and determining an eye fundus image analysis and evaluation result of the patient; s4, performing intelligent retina fixation point training on the patient; and S5, optimizing and adjusting the retina fixation point training scheme based on the feedback suggestions of the patient. According to the retina fixation point training method and device, the problem that the retina fixation point training effect of the patient is poor due to the fact that an individualized retina fixation point training scheme cannot be formulated for the patient based on the fundus image in the prior art is solved, and the individualized retina fixation point training scheme can be formulated for the patient based on the fundus image; the retina fixation point training effect of the patient can be improved.
Owner:SHENZHEN EYE HOSPITAL

Method for generating optimal solution and feasible solution of actual measurement scheme for multiple filing declaration values

The invention belongs to the technical field of whole vehicle detection and authentication, and particularly relates to a method for generating an optimal solution and a feasible solution of an actual measurement scheme for a multi-record declaration value, which comprises the following steps of: performing logic association classification on parameters according to enterprise record information to form an entry system, and generating an optimal solution and a feasible solution of the actual measurement scheme based on preset logic of the entry system in combination with a binding relationship; project configuration information can be obtained; project configurations which cannot be covered by a similar report are screened, the configurations needing to be actually measured are integrated, only parameters related to actually measured projects and parameters with multiple declaration values in results are reserved, final actually measured analysis configurations are formed, and an actually measured scheme which most meets the requirements is found out through step-by-step combined analysis; and traversing other entries to generate a complete actual measurement configuration. According to the method, the technical problem of how to quickly and efficiently formulate the optimal detection scheme for the recorded parameters and the existing video report by a vehicle production enterprise is solved.
Owner:CATARC AUTOMOTIVE TEST CENTER (WUHAN) CO LTD

Data processing method and device based on low-power-consumption multi-core processor

The invention relates to a data processing method and device based on a low-power-consumption multi-core processor. The method comprises the steps that a register block is configured by multi-core processor data through a configuration network, and the register block sends a starting instruction to a data selector to start data transmission. After receiving the starting instruction, the data selector obtains data of the multi-core processor and determines first data participating in reduction, the first data is correspondingly stored in the FIFO register set according to the address of the multi-core processor, and storage information is obtained. And the control unit performs reduction operation on the first data according to the storage information to obtain a multi-core data processing result, and the multi-core data processing result is processed by the operation unit and then sent to the shared memory. By adopting the method, the memory access power consumption and delay in the reduction operation can be reduced under the condition that an instruction set is not changed.
Owner:NAT UNIV OF DEFENSE TECH

Parking lot planning method based on parking lot real-time operation big data

The invention discloses a parking lot planning method based on real-time operation big data of a parking lot, and the method can dynamically optimize the use and management of the parking lot based on the real-time operation big data of the parking lot. Firstly, in combination with vehicle access time and direction data and operator mobile phone signaling data, a trip starting point and a trip ending point of regional traffic flow are accurately calculated, and accurate analysis of traffic flow modes and parking requirements is facilitated. And secondly, a space-time state model of the parking lot is constructed through real-time flow data, the utilization rate and the turnover rate of the parking spaces in different time periods can be reflected in real time, and the parking demand and the vehicle flow trend in the future are predicted, so that a scientific basis is provided for resource optimization configuration of the parking lot. And finally, performing path planning by using the real-time vehicle position, the destination and the predicted parking lot state data, dynamically adjusting the vehicle driving route, and optimizing the optimal path for the vehicle to arrive at the destination.
Owner:CHINA THREE GORGES UNIV

Data processing method and device based on low-power multi-core processor

The present application relates to a data processing method and device based on a low-power multi-core processor. The method includes: the multi-core processor data is configured through a network configuration register group, and the register group sends an enable instruction to a data selector to start data transmission. After receiving the enable instruction, the data selector obtains the multi-core processor data and determines the first data involved in the reduction. The first data is stored in the FIFO register group according to the address of the multi-core processor to obtain storage information. The control unit performs a reduction operation on the first data according to the storage information to obtain a multi-core data processing result, and sends the multi-core data processing result to a shared memory after being processed by an operation unit. The use of this method can reduce the memory access power consumption and delay in the reduction operation without changing the instruction set.
Owner:NAT UNIV OF DEFENSE TECH

High-altitude platform multi-test task production scheduling method based on clustering algorithm and multi-objective optimization

The invention belongs to the technical field of intelligent manufacturing and industrial scheduling, and provides a high-altitude platform multi-test task production scheduling method based on a clustering algorithm and multi-objective optimization, and the method comprises the steps: automatically calculating the exclusive resource demands of all working condition points in a plurality of aero-engine test tasks based on a multi-parameter coupling model; for each task, dividing a plurality of work packages by adopting a clustering algorithm based on the multi-dimensional features containing exclusive resource requirements in the task; a multi-objective model of multiple optimization objectives is constructed, all the work packages are jointly sorted globally, and the optimization objectives comprise the equipment utilization rate; and finally, under the condition that constraint of resource capacity, mutual exclusion of test cabins and task continuity is satisfied, allocating an available tester and a continuous time window to each work package, and generating an initial production scheduling plan. According to the method, the production scheduling efficiency and the resource utilization rate are effectively improved, the plan robustness is enhanced, and the method is suitable for high-complexity aero-engine test scheduling scenes.
Owner:AECC SICHUAN GAS TURBINE RES INST

Configuration interaction method and device, equipment, medium and product

The embodiment of the invention discloses a configuration interaction method and device, equipment, a medium and a product, and the method comprises the steps: displaying a configuration interface for a target system, and the configuration interface comprises an instruction interaction region; in response to an interaction instruction received through the instruction interaction area, a dynamic configuration panel is displayed in the configuration interface, and the dynamic configuration panel comprises interaction configuration elements matched with the interaction instruction; and in response to a trigger operation for the interaction configuration element, displaying a visual display interface, and updating and displaying a rendering result of the target system in real time in the visual display interface so as to present a visual effect consistent with the interaction configuration element after the trigger operation. According to the technical scheme of the embodiment of the invention, efficient interaction of instruction-on-demand configuration element display-real-time feedback is constructed, and the accuracy and efficiency of configuration interaction are improved.
Owner:TENCENT TECHNOLOGY (SHENZHEN) CO LTD

Cost optimization method, cargo loading method and device and cloud control center of mine charging and battery swapping station

The invention discloses a cost optimization method, a cargo loading method and device and a cloud control center of a mine charging and battery swapping station. The optimization method comprises the following steps: firstly, obtaining a peak-valley-flat time period in the time-of-use electricity price of a power grid; then, judging whether the current actual time falls into the power utilization peak time period in the power grid peak-valley-flat time period or not: if the current time is not in the power utilization peak time period, directly charging a non-fully-charged preparation battery of the mine charging and battery swapping station; if the current time is in the power utilization peak period, determining whether to charge the non-fully-charged preparation batteries in the mine charging and battery swap station according to the relationship between the number of the non-fully-charged preparation batteries of the mine charging and battery swap station and the number of the low-electric-quantity mine cards; the low-electric-quantity mine cards refer to mine cards of which the residual electric quantity is lower than a second threshold value of battery charging and replacing. Through the method, the charging strategy can be flexibly adjusted, the electric power cost is effectively reduced, the economic benefit of mine operation is improved, and meanwhile reasonable utilization of resources and improvement of the operation efficiency are promoted.
Owner:XINJIANG TIANCHI ENERGY SOURCES CO LTD

Emergency nursing resource optimal distribution system

The invention relates to the technical field of resource management, in particular to an emergency nursing resource optimal distribution system, which comprises a resource association analysis module, a resource allocation module, a resource allocation module, a resource allocation module, a resource allocation module and a resource allocation module, wherein the resource association analysis module is used for analyzing relationships among medical equipment, medical personnel and medicines, counting interaction frequencies among various resources, and summarizing resource flow modes according to geographic positions and time parameters; and calculating the interaction strength between the nodes to obtain a resource dependency strength table. According to the method and the device, the interaction modes and the dependency relationships of various medical resources are comprehensively analyzed, the dynamic interaction of the resources in the emergency treatment event is accurately mapped, the accuracy of resource utilization is improved, each resource can be efficiently configured according to actual requirements, the response speed and the processing quality of the emergency treatment event are greatly improved, and in addition, the method and the device have good application prospects. Through deep mining of historical data and real-time event monitoring, the prediction model can accurately predict the resource demand of each time-space node, which not only enhances the adaptability of the system to changes, but also optimizes the prospective allocation of resources.
Owner:SHIJIAZHUANG THIRD HOSPITAL

Converter-free photovoltaic control method applied to wind-light-storage hybrid energy system

The invention discloses a converter-free photovoltaic control method applied to a wind-light-storage hybrid energy system, which integrates photovoltaic power generation into a hybrid system by reducing the number of control loops and converters. The designed controller is suitable for a grid-connected system with wind energy and photovoltaic power as main power supplies, BESS as a secondary power supply and FC and an electrolytic cell as three-level power supplies. And through the combination of the pre-compensator and the integrator, the stability of the controller is enhanced, and the steady-state error is eliminated. In the proposed configuration, the GSC maximizes photovoltaic power generation, injects its power into the grid, while sharing the grid load with the RSC. By coordinating the control of the BESS and the fuel cell, the intermittent influence of wind energy and photovoltaic power generation is reduced, and redundant electric energy is used for hydrogen production of the electrolytic cell to support power generation of the fuel cell in adverse weather. And an energy management strategy is provided, so that BESS overcharging is avoided, intermittency and volatility are reduced, and stable power output and service continuity are ensured.