The invention provides a tunnel mixed loading
emulsion explosive blasting excavation construction method, and belongs to the technical field of tunnel blasting. The method comprises the following steps that 1, drilling construction is conducted on a tunnel; 2, preparing an on-site mixed
emulsion explosive; 3, primary explosive
processing and charging; 4, designing an underground or tunnel mixed loading explosive construction process; and 5,
field quality technology detection and control are carried out, and construction is completed. An
emulsion matrix and a sensitizing solution are mixed according to a certain proportion by using a mixed loading explosive
truck to generate a gelatinous mixed loading explosive, and then the mixed loading explosive is filled into a shot hole in an injection form, so that the problems of
poor quality of a
deep mining drill hole, hole clamping, blockage and miss-fire of a packaged explosive entering the hole, uncoupled explosive loading, waste of the explosive dosage and the like are solved, the explosive loading efficiency is improved, and the blind shot rate is reduced; the safety of underground blasting construction is ensured, the drilling
utilization rate is effectively increased, the
rock breaking lumpiness is reduced, and the digging efficiency is improved.