Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

941results about How to "Reasonable configuration" patented technology

Method of controlling V2X service transmission and device

The embodiment of the invention discloses a method of controlling V2X service transmission. The method comprises steps: transmission index parameters for transmitting a V2X service by a terminal are acquired; transmission protocols are selected according to the transmission index parameters, wherein the transmission protocols comprise a transmission protocol based on D2D discovery technology and a transmission protocol based on D2D communication technology; according to the transmission index parameters and the transmission protocols, a resource scheduling model is determined or a resource scheduling model allocated by a base station is received so as to enable the terminal to complete V2X service transmission according to the transmission protocols and the resource scheduling model, wherein the resource scheduling model comprises a base station scheduling model and a resource pool model. The embodiment of the invention also discloses a device for controlling V2X service transmission. By adopting the method and the device of the invention, a transmission mode for different V2X services can be reasonably allocated, and transmission needs of different V2X services can be met.
Owner:YULONG COMPUTER TELECOMM SCI (SHENZHEN) CO LTD

New-concept intelligent multifunctional spaying machine chassis

The invention discloses a new-concept intelligent multifunctional spaying machine chassis. The new-concept intelligent multifunctional spaying machine chassis comprises a chassis rack, a pesticide tank fixing support, a spray lance lifting support, a spray lance conversion mechanism, a spray head and wheels, wherein the pesticide tank fixing support is arranged at the rear end of the chassis rack, the spray lance lifting support is arranged at the front end of the chassis rack in a rotatable mode, the spray lance conversion mechanism and the spray lance lifting support constitute a vertical moving pair, the spray head is arranged on the spray lance conversion mechanism, and the wheels are installed at the bottom of the chassis rack through a longitudinal adjusting device and a transverse adjusting device. The new-concept intelligent multifunctional spaying machine chassis has the advantages of applying full-hydraulic power, and being stable in driving, large in drive torque, flexible in steering, simple in transmission, concise in overall structure, reasonable in configuration, and stable in center of gravity. In addition, the new-concept intelligent multifunctional spaying machine chassis has the advantages that due to the facts that stepless adjustment of the wheel torque, the ground clearance height and the like can be achieved and the spray lance conversion mechanism can descend, ascend and rotate, the spray lance conversion mechanism can achieve line-shaped conversion, U-shaped conversion and reverse-U-shaped conversion, the effect of omni-directional spraying is achieved, the requirement for all-terrain omni-directional spraying of different plants and different growth cultivation periods of one plant can be overall achieved through the new-concept intelligent multifunctional spaying machine chassis.
Owner:NANJING FORESTRY UNIV +1

Complete roll forming configuring method for wide flat steel hot rolling finish mill set

The invention relates to a complete roll forming configuring method for a wide flat steel hot rolling finish mill set. According to the characteristics that an upstream machine frame controls the convexity and a downstream machine frame controls the flatness in the seven-machine frame and four-roll hot rolling wide flat steel finish mill, a finish rolling inlet machine frame F1 adopts negative convexity working roll forming, a machine frame F2, a machine frame F3 and a machine frame F4 adopt cubic CVC working roll forming, and a machine frame F5, a machine frame F6, and a machine frame F7 adopt negative convexity working roll forming of sine curves and are matched with periodic roll shifting of the working roll with long stroke. The supporting rolls of all the machine frames of the finish mill set adopt positive convexity roll forming of sextic polynomes. The method improves the transverse rigidity of the machine frames of the finish mill, improves regulation and control efficiency of roll bending force of the working roll, and reduces flexibility deformation of the roll. The roll forming configuring method for the finish mill set improves stability of the wide flat steel rolling, reduces the deflection amount of the wide flat steel, prolongs the planned length for rolling and greatly improves profile shape control precision of the wide flat steel.
Owner:SHOUGANG CORPORATION

Public transit exclusive lane resource sharing method and system for guaranteeing bus rapid transit priority

The invention discloses a public transit exclusive lane resource sharing method and a resource sharing system for guaranteeing bus rapid transit (BRT) priority. On the premise of guaranteeing the BRT priority, a common transit bus can enter a BRT bus exclusive lane to run according to the following control rules: (1) a control flow that the common transit bus borrows the BRT bus exclusive lane: calculating a distance between the common transit bus on a non-BRT bus exclusive lane and a BRT bus and marking the distance as d according to geographic location information, setting a minimum value as d borrow, when d is more than or equal to d borrow, determining that the common transit bus is allowed to borrow the BRT bus exclusive lane and enabling the common transit bus to freely select whether to enter the exclusive lane or not, otherwise preventing the common transit bus from entering the exclusive lane; and (2) a control flow that the common transit bus returns the lane after borrowing the BRT bus exclusive lane: sending a lane-returning control instruction to the common transit bus in front of the BRT bus when the distance D between the common transit bus and the BRT bus is less than the minimum safe distance d save, and making the common transit bus to pull out from the BRT bus exclusive lane in set time T. The method and the system effectively improve the utilization ratios of bus lanes.
Owner:ZHEJIANG UNIV OF TECH

Process for recovering iron and carbon elements from blast furnace gas ash

The invention relates to the technical field of blast furnace ash resource reutilization, in particular to a process for recovering iron and carbon elements from blast furnace gas ash. A flotation method is adopted for recovering carbon, a re-separation and magnetic separation method is adopted for recovering iron, the total separation process is the combined technical process flow of flotation, re-separation and magnetic separation, the gas ash enters the coarse flotation after the slurry preparation and medicine adding, coarse flotation concentrates enter fine flotation, the fine flotation concentrates are final carbon concentrates, coarse flotation tailings and fine flotation tailings enter a re-separation coarse separation spiral chute to separate out re-separation tailings, the coarse spiral concentrates enter a fine separation spiral chute to obtain re-separation concentrates, ores in a fine separation spiral chute carries out self circulation, the tailings in the fine separation spiral chute enter a weak magnetic separation machine for carrying out magnetic separation, the weak magnetic concentrates and the re-separation concentrates are combined into final iron concentrates, and the weak magnetic tailings and the re-separation tailings are combined into final tailings. The process has the beneficial effects that the process is simple, the varieties of reagents are few,the process configuration is reasonable, the purification and impurity removal effects are obvious, the product quality is better, the recovery rate is high, and a new path is provided for the comprehensive utilization of the blast furnace gas ash.
Owner:ANSTEEL GRP MINING CO LTD

Double arc four wire automatic arc-submerging welder and manufacture method thereof

ActiveCN101306488AMeet the welding process requirementsImprovement of process technical parametersWelding accessoriesWelding power supplyEngineering
The invention discloses a double-arc four-wire automatic submerged arc welding machine and the manufacturing method thereof. The automatic submerged arc welding machine include a welding power supply, an upright post which is arranged on a trolley and a running gear and is provided with a top part with a lifting mechanism, a cross arm which is movably connected with the lifting mechanism and can move up and down along the upright post, a welding head which is equipped with a welding gun and a solder hopper, a wire guide arranged between the welding gun and a welding wire spool, a wire feeding device, a swing mechanism which is arranged on the trolley and is used for control the upright post to rotate relatively to the trolley, and an electric control cabinet which is fixed on the upright post. Compared with the prior art, the double-arc four-wire automatic submerged arc welding machine of the invention has the advantages as follows: the structure is novel, the arrangement is reasonable; the process engineering parameters such as power efficiency and so on are improved for satisfying technological requirements of welding a gas steam turbine; the welding efficiency can be increases by at least three times; a machine head, an operator seat lifting arm, a corner, a falling protector and other devices are arranged; the solder can be automatically reclaimed and fed, and applied continuously, thereby reducing labor intensity, improving operational environment and conducing to operation.
Owner:SHANGHAI ELECTRIC POWER GENERATION EQUIPMENT CO LTD

Audio track configuration method, intelligent terminal and corresponding system

The embodiment of the invention discloses an audio track configuration method, an intelligent terminal and a corresponding system. The method comprises the steps that the intelligent terminal sends a first control instruction to a first loudspeaker box for instructing the first loudspeaker box to start a left audio collecting device and a right audio collecting device which are arranged on the two sides of the first loudspeaker box; an audio playing device on a second loudspeaker box is triggered for playing testing audio data; audio signals which are sent by the first loudspeaker box and collected by the left and right audio collecting devices and come from the second loudspeaker box are received, and left and right opposite positions of the first loudspeaker box and the second loudspeaker box are determined according to the received audio signals; or the left and right opposite positions, determined by the first loudspeaker box according to the audio signals, of the first loudspeaker box and the second loudspeaker box are obtained, wherein the audio signals are collected by the left and right audio collecting devices and come from the second loudspeaker box; based on the left and right opposite positions, audio tract configuration is carried out on the first loudspeaker box and the second loudspeaker box. According to the technical scheme, the attribution of loudspeaker box audio tracks in a loudspeaker box system can be automatically configured.
Owner:GUANGDONG OPPO MOBILE TELECOMM CORP LTD

A resource scheduling method based on dynamic gaming in a cloud environment

InactiveCN107168797AImplement resourcesThe most reasonable and effective configurationResource allocationForecastingCloud computingResource scheduling
The invention belongs to the technical field of cloud computing-based resource scheduling and in particular provides a resource scheduling method based on dynamic gaming in a cloud environment. The method comprises the steps of building a model of resource scheduling based on dynamic gaming in a cloud environment; based on the model of resource scheduling based on dynamic gaming, distributing priority of resource selection user task attributes; employing a strategy that those who apply first select distribution priority first for users with the same task attributes and defining the earnings of each user as the satisfaction degree of QoS; obtaining a Nash equilibrium solution of the gaming by using a backward induction method. For the problem of resource competition caused by simultaneous submitting of tasks by users in a cloud environment, the method builds the cloud environment dynamic gaming resource scheduling model, performs modeling and analysis on resource competition between the users by using the dynamic gaming theory, and satisfies the QoS requirements of all the users as much as possible; the method meets the requirement of each user to the greatest extent; the method obtains a Nash equilibrium solution of the dynamic gaming model by using a backward induction method, thereby achieving the most reasonable and effective allocation of resources.
Owner:THE PLA INFORMATION ENG UNIV

Dual-machine loading-and-walking type hydraulic numerical control deck erection gantry and control system and control method

The invention provides a dual-machine loading-and-walking type hydraulic numerical control deck erection gantry, which comprises two sets of loading-and-walking type hydraulic numerical control deck erection gantries and a control system, wherein each set of the loading-and-walking type hydraulic numerical control deck erection gantries comprises the following four parts: a transverse truss girder, two sets of walking type loading-and-walking devices arranged at two ends of the transverse truss girder, a hydraulic lifting device and a carrying pole of a hanger; each set of the walking type loading-and-walking devices consists of a guideway, a walking mechanism steel framework, m traction jacks, 4n load conversion jacks, a supporting pull rod, a walking roller bracket and P guideway walking jacks; all the components are connected with one another by pin shafts; and the control system of the deck erection gantry is a distributed computer network control system which consists of a main control station, Y field controllers, Y pump stations, Y pump station starting boxes, a data acquisition system, and a plurality of data wires and communication wires. The deck erection gantry has the advantages of great lifting force and high work efficiency and stability; and when the deck erection gantry walks with load, the control system of the deck erection gantry can effectively and synchronously control every jack.
Owner:LIUZHOU OVM MASCH CO LTD

Overhead cultivation method of Dendrobium huoshanense test-tube seedlings

The invention relates to an overhead cultivation method of Dendrobium huoshanense test-tube seedlings. The method comprises the following steps: leveling land, building a greenhouse, arranging stereoscopic racks (seedling beds), disinfecting the greenhouse, arranging planting media, planting seedlings in field, carrying out fertilizer and water management and harvesting. The method comprises the following specific steps of: firstly constructing infrastructure of a base, after the greenhouse is built up, arranging the stereoscopic racks, disinfecting the greenhouse before transplanting seedlings, and then arranging cultivation containers containing the planting media on the stereoscopic racks or directly arranging the planting media on nets of the cultivation racks, planting seedlings in field after the temperature inside the greenhouse is more than 10 DEG C, then carrying out fertilizer and water management according to the requirement and harvesting 2 years later. By using the cultivation method, the transplanting survival rate of Dendrobium huoshanense can be obviously improved, diseases and insect pests can be effectively prevented, the production period is shortened, and the product quality is uniform and consistent; and the method is simple to operate and is favorable to the mass production of Dendrobium huoshanense seedlings.
Owner:安徽康顺名贵中草药产业开发有限公司

Magnetron sputtering device and magnetron sputtering method

ActiveCN105543792AReasonable device configurationVersatileVacuum evaporation coatingSputtering coatingPhysicsThin membrane
The invention discloses a magnetron sputtering device and a magnetron sputtering method. The magnetron sputtering device comprises a substrate table for placing a substrate, a target opposite to the substrate table and used for sputtering the substrate, and a reaction cavity for accommodating the substrate table and the target. The magnetron sputtering device further comprises an angle adjusting device corresponding to the target and used for adjusting an angle of the corresponding target to the substrate table. The magnetron sputtering method comprises the following steps: (1) the reaction cavity and the substrate are cleaned; and the target is mounted; (2) the angle of the target corresponding to the substrate and the distance between the target and the substrate are adjusted; (3) the reaction cavity is vacuumized; (4) the presputtering is performed; and meanwhile, the rotating and swinging functions of the substrate table are started; and (5) the magnetron sputtering is performed. The device can be applied to deposition of large-area films with high uniformity and excellent repeatability, and can realize continuous magnetron sputtering of multiple layers of films; and the method can save the film plating time and improve the film plating efficiency.
Owner:48TH RES INST OF CHINA ELECTRONICS TECH GROUP CORP

Electric transmission line carbon fiber composite core manufacturing method

An electric transmission line carbon fiber composite core manufacturing method mainly includes the following steps of conducting preprocessing, dehumidification and glue infiltration, pre-hardening carbon fibers in a two-section heating mode, enabling high-strength glass fibers or basalt fibers to cover a pre-hardened carbon fiber core according to certain rules, hardening the carbon fiber core covered by the high-strength glass fibers or the basalt fibers in a three-section mode, and conducting post curing and cooling, wherein consumed epoxy resin is high-temperature-resistant special type pultrusion epoxy resin which is prepared by adding modified anhydride compounds in the glue infiltration process. The electric transmission line carbon fiber composite core manufacturing method has the advantages that the carbon fibers are preformed in a pultrusion mode to be in a semi-hardened state after being infiltrated, heating temperature sections are controlled so that the carbon fiber core with excellent performance can be obtained, particularly, heating and hardening are conducted in the three-section mode in the final covering and forming process, therefore, the rigidity of final products is ensured, the smoothness of production and production efficiency are improved, and the carbon fiber composite core produced through combination can completely meet the requirements of electric power transmission.
Owner:SUZHOU SUYUE NEW MATERIAL

Testing method for color fastness to saliva of textile

The invention relates to the technical field of color fastness testing of textile, in particular to a testing method for color fastness to saliva of the textile. The testing method comprises the following steps of preparing artificial saliva, bonding a to-be-tested sample cut to a given size with multi-fiber accompanying fabric to form a composite sample, soaking in the artificial saliva, extruding the composite sample with a glass rod after soaking, pressing the composite sample with a counter weight, placing the composite sample in a drying oven simulating human body temperature, drying, placing the composite sample under standard atmospheric conditions with the temperature of 18-22 DEG C and the relative humidity of 61-69%, humidifying for at least four hours, and conducting an evaluation test on discoloring of the to-be-tested sample and staining of the accompanying fabric with a standard discoloring gray card and a standard staining gray card respectively. With the adoption of the testing method, the degree and the grade of the color fastness to saliva of the textile can be evaluated, deficiencies of the traditional staining test with filter paper are overcome, preparation of the artificial saliva is more reasonable, and the testing method is simple and easy to operate.
Owner:SGS STANDARD TECHNICAL SERVICES SHANGHAI CO LTD

Process and equipment for treating high-concentration pyridine waste water

The invention relates to a process for treating high-concentration pyridine waste water, which comprises the following steps of: regulating raw water of waste water to be acidic, and treating the raw water in electro-catalytic oxidation equipment; leading effluent to a micro-electrolysis device for treatment under the condition of maintaining the acidity and oxygen enrichment of the waste water; regulating the effluent to be meta-alkalescent, and adding chemicals to perform coagulating sedimentation; and controlling the salinity of the waste water to be below 2 percent, and performing biochemical treatment in an anaerobic hydrolyzing device and a pressurizing biological contact oxidation device, so that the effluent reaches the conventional first-level standards for sewage discharge. Due to the adoption of a physico-chemical treatment process serving electro-catalytic oxidation as a core, pyridine pollutants can be decomposed effectively, the toxicity of the waste water can be reduced, and the biodegradability of the waste water can be improved; for biochemical treatment is realized by a combination process of anaerobic hydrolysis and pressurizing biological contact oxidation, the organic loads, treatment efficiency and salt-tolerant capacity of the biochemical treatment are improved; and the process has the characteristics of high impact load resistant capacity, good treatment effect and low operating cost, and the treated high-concentration pyridine waste water can reach the standard stably before discharge.
Owner:JIANGSU PROVINCIAL ACAD OF ENVIRONMENTAL SCI +1

Flight time resource configuration and optimization method suitable for airline hubs

A flight time resource configuration and optimization method suitable for airline hubs is disclosed. The flight time resource configuration and optimization method comprises the steps of calculating the quantity of first-type time resources; optimizing the first-type time resources; calculating the quantity of second-type time resources; optimizing the second-type time resources for the first time; performing primary real-time analog simulation and conflict regulation; optimizing the second-type time resources for the second time; and performing secondary real-time analog simulation and conflict regulation, and the like. The flight time resource configuration and optimization method can bring benefits for multiple sides and can realize the maximum of social benefit; for passengers, reasonable flight time can greatly reduce probability of flight delays, so that the passengers can enjoy the more good-quality air transportation service; for airports, the airline hubs can optimize the airport management systems, expand international market shares and improve the competitiveness of the airports; and for airlines, the airlines can establish and construct main center radiation type airline network, ensure the flight service quality and improve the reputation of the airlines consequently.
Owner:CIVIL AVIATION UNIV OF CHINA

Processing method and system for implementation of net element collocation in multi-standard communication system

The invention provides a processing method and a system of realizing network element configuration in a multi-standard communication system. In the processing steps of the method: after adjusting the configuration information of different standards, the multi-standard network element initiates the configuration of the configuration information to other multi-standard system network elements; and the network element not only can directly provide the configuration information for other multi-standard system network elements, but also can provide the configuration information for other multi-standard system network elements through a set operation and maintenance module. According to the proposal provided by the invention, the multi-standard communication system can allocate the whole multi-standard communication system more reasonably according to such configuration condition as the load information, resource using condition, etc., of each single-modulation network element; if idle resource is dynamically allocated to the multi-standard network element which is relatively lack of the resource so as to comprehensively consider supported configuration information of different standards, the dynamic configuration and the dynamic adjustment of the resource are realized; the resource utilization rate of the multi-standard communication system is increased; and the operation cost of the multi-standard communication system is reduced.
Owner:HUAWEI TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products