Industrial user participation power auxiliary service business management method and system
Through baseline load analysis and time series model prediction, combined with peak shaving capacity assessment and declaration strategies, the problem of low efficiency in load forecasting and peak shaving management for industrial users to participate in power auxiliary services is solved, and efficient and accurate management of the power system is achieved. stability.
Patent Information
- Application Number
- CN202410779344.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-29
AI Technical Summary
Existing technology is difficult to accurately predict the baseline load and peak shaving capacity of industrial users, resulting in low efficiency of power auxiliary service management, and inaccurate peak shaving plan declaration and clearing capacity allocation, which affects the stability of the power system.
Through the steps of baseline load analysis, peak shaving capacity assessment, application strategy formulation, peak shaving results clearing and distribution, and task decomposition, a time series model based on historical data is used to predict load changes, realizing the full process of industrial users participating in power auxiliary services. Ensure the accurate execution of peak load shaving tasks.
It improves the accuracy and transparency of baseline load forecasting, clarifies the visual analysis of peak shaving capabilities, optimizes peak shaving plan declaration and clearing capacity allocation, achieves accurate decomposition and real-time monitoring of peak shaving tasks, and improves the stability of the power system. sex and user engagement.
Smart Images

Figure CN118868010A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power market management, and in particular to a method and system for managing industrial users' participation in power auxiliary service business. Background Art
[0002] With the continuous increase in the proportion of renewable energy power generation, the volatility and uncertainty of the power system have significantly increased, which makes the demand for peak-shaving and frequency-regulating auxiliary services of the power system increasingly urgent. Industrial users have become important participants in power auxiliary services because of their relatively large loads and certain regulation potential. However, there are many technical difficulties and shortcomings in the business process of traditional industrial users participating in power auxiliary services.
[0003] First, accurate prediction and reasonable comparison of baseline load is a key. Usually, it is difficult to accurately estimate the baseline load, which involves the influence of complex production processes, seasonal changes, holidays and other factors. The existing technology lacks the function of effectively using historical data to dynamically predict the baseline load and compare it with the actual settlement data in real time, which makes it difficult for users to accurately grasp the law of their own load changes when participating in peak load auxiliary services.
[0004] Secondly, in terms of peak-shaving capacity analysis, the load regulation capabilities of industrial users are often limited by multiple factors such as the characteristics of production equipment and production schedules. How to scientifically quantify their valley-filling or peak-shaving response capabilities in different time periods and intuitively display them on the baseline load curve, predicted load curve and response capacity curve is an issue that needs to be addressed urgently.
[0005] Thirdly, regarding the declaration and clearing mechanism of peak-shaving plans, when industrial users currently participate in the electricity market, the decision-making basis for their declared capacity and prices is still insufficient, especially the declared prices are subject to the upper limit provided by the power grid and lack market competitiveness. This has to some extent inhibited the enthusiasm of users to exert their own load regulation potential.
[0006] In addition, how to fairly and reasonably distribute the clearing capacity among the numerous declaring users while ensuring that users do not exceed their maximum response capabilities is also a technical difficulty.
[0007] Finally, during the specific execution phase of the peak-shaving task, how to accurately decompose the clearing capacity to each device belonging to the user and generate a reasonable scheduling curve based on this to guide the increase and decrease of load in the actual production process, as well as how to monitor the power situation during the execution of the peak-shaving service in real time to ensure that the peak-shaving effect meets expectations, is also a major test for existing technologies.
[0008] The application publication number CN117175570A discloses the "Joint Optimization Control Method and System for User-side Energy Storage Participating in Peak-shaving and Frequency-regulation Transactions". The core of the joint optimization control method for user-side energy storage participating in peak-shaving and frequency-regulation transactions is to efficiently integrate energy storage resources through a sophisticated market operation model and optimization model to ensure the flexibility and stability of the power system. Energy storage has advantages in rapid response and regulation, but this model cannot be applied to the participation of industrial users in power auxiliary services, mainly due to the uncertainty and complexity of industrial power loads. The power consumption patterns of industrial users are usually affected by multiple factors such as production plans, equipment conditions, seasonal changes, etc., which makes load forecasting more difficult, and their willingness and ability to participate in auxiliary services are subject to large variables. The present invention realizes the full process of industrial users participating in power auxiliary services through the innovative design of steps such as baseline load analysis, peak-shaving capacity assessment, declaration strategy formulation, peak-shaving result clearing and allocation, task decomposition and execution tracking.
[0009] The application publication number CN116012041A proposed a method for market-based load-side resources to participate in power auxiliary services. Although this method aims to stimulate the flexibility of load-side resources through market mechanisms to cope with challenges in the power system, there are some potential limitations in technical means. For example, the accuracy of the load forecasting model is a key point. The comparative patent did not specifically propose a load forecasting method. In addition, its business process (coordination stage, opening stage, application stage, sorting stage, production stage, adjustment stage, settlement stage) is quite different from this patent in design, and the business thinking and design concept are completely different. Summary of the invention
[0010] The technical problem to be solved by the present invention is how to allow industrial users to participate in the management of power auxiliary services, improve the efficient and accurate management of power auxiliary services, and improve the stability of the power system.
[0011] The present invention solves the above technical problems through the following technical means:
[0012] The management method for industrial users to participate in power auxiliary service business includes the following steps:
[0013] S01. Baseline load analysis: Based on historical data analysis, the baseline load of the current period is predicted and compared with the historical period. Based on historical data, the baseline load curve in the historical peak-shaving period, the predicted load curve at the current time, and the valley-filling and peak-shaving response capacity curves calculated therefrom are calculated;
[0014] S02. Users independently declare peak-shaving plans based on the valley-filling and peak-shaving response curves, including declared capacity and declared prices based on the grid price limit, which are summarized to form the total declared amount of the virtual power plant.
[0015] S03. After the power grid releases the total clearing capacity and price, the clearing capacity of each user is allocated in proportion according to the user's maximum response capacity limit. If there is an excess, it is adjusted according to the limit; then the clearing capacity is subdivided into the equipment under the user's jurisdiction, and the specific dispatching power of each equipment is determined. The dispatching curve point is calculated by subtracting the clearing capacity from the predicted load;
[0016] S04. The peak-shaving execution process is monitored in real time, and the effective load and target load are calculated by increasing or decreasing the bid power by the baseline load, respectively, to ensure that the peak-shaving task is accurately executed and meets the expected goals.
[0017] Furthermore, in step S01, the historical data includes power compliance information for multiple consecutive time periods, covering load fluctuations in different scenarios of one day, different seasons, weekdays and weekends, and the load variation patterns of the historical data are mined through a time series model.
[0018] Furthermore, the time series model adopts a time series model based on dynamic weights. 1 ,y 2 ,…,y t ,…, represents the actual power load in each period of M consecutive operating days. 1 ,w 2 ,…,w t ,…are weight coefficients assigned to different observations, where ε describes the impact of changes in the company's order volume on the load. The selection of weight w is based on the principle of giving greater weight to recent data and decreasing weight to long-term data, while taking into account the historical performance of special scenarios for targeted adjustments; the weighted moving average method is used to generate the predicted value Y pre ,Right now:
[0019]
[0020] Furthermore, the valley filling response capability R{valley} in step 01 is calculated as follows:
[0021] R{valley}=P{baseline}-P{predict}
[0022] Among them, P{baseline} is the baseline load, P{predict} is the predicted load;
[0023] The peak clipping response capability R{peak} is calculated as follows:
[0024] R{peak}=P{predict}-P{baseline}.
[0025] The present invention also provides a management system for industrial users to participate in power auxiliary service business, including the following steps:
[0026] Baseline load analysis module: used to predict the baseline load of the current period based on historical data analysis and compare it with the historical period, and calculate the baseline load curve in the historical peak-shaving period, the predicted load curve at the current time, and the valley-filling and peak-shaving response capability curves calculated therefrom according to historical data;
[0027] The user peak-shaving plan self-declaration module allows users to self-declare peak-shaving plans based on the valley-filling and peak-shaving response curves, including declared capacity and declared price based on the power grid price limit, which are summarized into the total declared amount of the virtual power plant.
[0028] Clearing capacity allocation module: after the power grid releases the total clearing capacity and price, the clearing capacity of each user is allocated in proportion according to the user's maximum response capacity limit. If there is an excess, it is adjusted according to the limit; then the clearing capacity is subdivided into the user's equipment, and the specific dispatching power of each equipment is determined. The dispatching curve point is calculated by subtracting the clearing capacity from the predicted load;
[0029] The peak-shaving execution tracking module monitors the peak-shaving execution process in real time. The effective load and target load are calculated by increasing or decreasing the bid power by the baseline load, respectively, to ensure that the peak-shaving task is executed accurately and meets the expected goals.
[0030] Furthermore, in the baseline load analysis module, the historical data includes power compliance information for multiple consecutive time periods, covering load fluctuations in different scenarios of one day, different seasons, weekdays and weekends, and the load change patterns of the historical data are mined through a time series model.
[0031] Furthermore, the time series model adopts a time series model based on dynamic weights. 1 ,y 2 ,…,y t ,…, represents the actual power load in each period of M consecutive operating days. 1 ,w 2 ,…,w t ,…are weight coefficients assigned to different observations, where ε describes the impact of changes in the company's order volume on the load. The selection of weight w is based on the principle of giving greater weight to recent data and decreasing weight to long-term data, while taking into account the historical performance of special scenarios for targeted adjustments; the weighted moving average method is used to generate the predicted value Y pre ,Right now:
[0032]
[0033] Furthermore, the valley filling response capability R{valley} in the baseline load analysis module is calculated as follows:
[0034] R{valley}=P{baseline}-P{predict}
[0035] Among them, P{baseline} is the baseline load, P{predict} is the predicted load;
[0036] The peak clipping response capability R{peak} is calculated as follows:
[0037] R{peak}=P{predict}-P{baseline}.
[0038] The present invention also provides a processing device, comprising at least one processor and at least one memory communicatively connected to the processor, wherein: the memory stores program instructions executable by the processor, and the processor can execute the above method by calling the program instructions.
[0039] The present invention also provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions enable the computer to execute the above method.
[0040] The advantages of the present invention are:
[0041] The present invention realizes efficient and accurate management of industrial users' participation in power auxiliary services and improves the stability of the power system through innovative designs of baseline load analysis, peak load capacity assessment, declaration strategy formulation, peak load result clearing and allocation, task decomposition and execution tracking.
[0042] 1. Refined management of baseline load: The invention proposes to predict the baseline load through historical data analysis and compare it with the baseline load at the time of actual settlement, which improves the transparency and accuracy of baseline load prediction and facilitates users to reasonably arrange peak-shaving strategies.
[0043] 2. Visual analysis of peak-shaving capacity: A calculation method for valley-filling and peak-shaving response capacity based on baseline load is clearly proposed to form an intuitive response capacity curve, which helps users to clearly understand their own load regulation potential.
[0044] 3. Optimization of peak load plan declaration and clearing: A mechanism combining user self-declaration with proportional allocation has been established. Although it currently relies on the price cap provided by the power grid, it reserves space for future market bidding and achieves a fairer and more efficient allocation of resources.
[0045] 4. Intelligent decomposition of peak-shaving tasks: The invention covers the decomposition process of peak-shaving tasks from total clearing capacity to each user and then to the specific equipment level, which is conducive to users' refined management and execution of peak-shaving services.
[0046] 5. Real-time tracking and performance evaluation: By tracking the actual power situation, the invention introduces the concepts of effective load and target load to accurately evaluate the peak-shaving effect and user contribution, providing a scientific basis for subsequent service optimization and compensation mechanism. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 This is a full process block diagram of industrial users participating in the power auxiliary service peak load regulation business in an embodiment of the present invention. DETAILED DESCRIPTION
[0048] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] like Figure 1 As shown, the whole process of industrial users participating in the power auxiliary service peak load regulation business provided by this embodiment is as follows:
[0050] Step 1: Based on historical data analysis, predict the baseline load of the current period and compare it with the historical period. At the same time, display the baseline load curve and predicted load curve during the peak-shaving period, as well as the valley-filling and peak-shaving response capacity curves calculated thereby.
[0051] Step 2: Users independently declare peak-shaving plans based on this, including declared capacity and declared price based on the grid price limit. The responsive capacity is the average response capacity in half an hour, which is summarized to form the total declared amount of the virtual power plant.
[0052] Step 3: After the power grid releases the total clearing capacity and price, the platform allocates the clearing capacity to each user in proportion to the user's maximum response capacity limit. If there is an excess, it is adjusted according to the limit. The clearing capacity is then subdivided into the user's equipment, and the specific dispatching power of each device is determined. The dispatching curve point is calculated by subtracting the clearing capacity from the predicted baseline load.
[0053] Step 4. The final stage is to monitor the peak-shaving execution process in real time. The effective load and target load are calculated by increasing or decreasing the bid power by the baseline load, respectively, to ensure that the peak-shaving task is accurately executed and meets the expected goals.
[0054] The following is a detailed description of each of the above steps:
[0055] 1. Baseline Load Analysis
[0056] Baseline load analysis is the basic link of power system dispatching management and ancillary service peak load regulation. Its purpose is to accurately predict the normal load status of industrial users when there is no peak load regulation demand. This prediction is crucial for the rational arrangement of power generation resources, the formulation of peak load regulation plans, and the evaluation of peak load regulation effects.
[0057] Baseline load forecasting relies on historical load data. Data collected from industrial user gateway meters usually contain power load information for multiple consecutive periods, covering load fluctuations in various scenarios such as different seasons, working days and weekends in a day or even a year. Based on these massive data, time series models and machine learning algorithms are used to explore the load change patterns.
[0058] 1. Data preprocessing
[0059] After collecting historical load data, data cleaning and preprocessing are required, including missing value filling, outlier detection and correction, data standardization or normalization, etc., so that subsequent prediction models can effectively extract features and build models.
[0060] 2. Feature Engineering
[0061] Select and construct meaningful feature variables, such as date, time (hour, minute level), day of the week, holiday sign, temperature, humidity, seasonal changes, load data for the same period of previous years, etc. These features can reflect the various influencing factors behind load changes.
[0062] 3. Baseline load forecasting model
[0063] Use time series models or machine learning algorithms, and use the optimal method for forecasting when necessary.
[0064] Time Series Models:
[0065] Using the dynamic weight-based time series model, iterative learning and parameter adjustment are performed on the training set. In the model structure, for the time series y 1 ,y 2 ,…,y t ,…, represents the actual power load in each period of 30 consecutive operating days. 1 ,w 2 ,…,w t ,…are weight coefficients assigned to different observations, where ε describes the impact of changes in the company's order volume on the load. The selection of weight w is set according to the rule of thumb. The basic principle is to give a larger weight to recent data and a decreasing weight to long-term data. At the same time, historical performance in special scenarios such as holidays is considered for targeted adjustments. The weighted moving average method is used to generate the predicted value Y pre ,Right now:
[0066]
[0067] Machine learning models: such as support vector machine (SVM), random forest, gradient boosted tree (GBDT), etc., which learn the nonlinear relationship between load and various features through training sets.
[0068] 4. Model training and validation
[0069] The selected model is trained using historical data sets, and model parameters are optimized through cross-validation, grid search, etc., striving to make the performance of the model on the training set as close to the actual load as possible. Then, an independent validation set is used to evaluate the generalization performance of the model to ensure prediction accuracy.
[0070] 5. Results comparison and correction
[0071] The predicted baseline load needs to be compared with the actual load during the same period of the previous day, and the prediction model should be adjusted and optimized through error analysis. If the prediction deviation is large, it may be necessary to introduce more complex factors, such as the impact of special events on the load, or to make further adjustments to the model structure and parameters.
[0072] 2. Peak Loading Capacity Analysis
[0073] During the peak load period, the following three key curves are calculated and displayed: baseline load curve; predicted load curve; response capacity curve. Peak load capacity analysis is the core link in the operation of the power system. It mainly explores the ability of the power system to meet load changes through adjustment means at different time periods, especially during peak and trough periods. The following is a detailed expansion of the above three key curves:
[0074] 1. Baseline load curve:
[0075] The baseline load curve represents the basic power demand of the power system in a normal cycle. It is a typical load pattern predicted based on historical load data and trend analysis. For example, in the absence of special events, there is usually a relatively stable load demand at a certain time of day, week, or even year. The purpose of constructing a baseline load curve is to provide a reference benchmark for subsequent analysis. Its mathematical expression is generally based on a time series model or other prediction algorithms.
[0076] 2. Forecast load curve:
[0077] The predicted load curve is an estimate of the electricity demand in a certain period of time in the future, taking into account various factors that may affect electricity consumption, such as seasonal changes, weather conditions, economic activities, etc. This curve reflects the changing trend of electricity demand and helps the grid dispatching department to make arrangements for power supply in advance. The predicted load P{predict} can be calculated through a variety of prediction models, such as time series and machine learning models.
[0078] 3. Response capability curve:
[0079] The response capacity curve shows the ability of the power system to adjust the power supply in real time. Depending on the type of peak load regulation, there are two ways to calculate the response capacity:
[0080] Valley filling responsiveness:
[0081] During the period of low electricity demand, in order to balance the supply and demand relationship and optimize resource utilization, it is necessary to increase load or reduce power generation to "fill" the valley. At this time, the valley filling response capacity R{valley} is defined as:
[0082] R{valley}=P{baseline}-P{predict}
[0083] That is, the baseline load P{baseline} minus the predicted load P{predict}, which reflects how much additional electricity the system can absorb.
[0084] Peak shaving response capability:
[0085] During the peak period of electricity demand, in order to avoid overload and ensure power supply security, the system needs to be able to reduce part of the load or quickly increase power generation to "flatten" the peak. At this time, the peak shaving response capability R{peak} is calculated as:
[0086] R{peak}=P{predict}-P{baseline}
[0087] That is, the predicted load P{predict} minus the baseline load P{baseline}, showing how much power the system can effectively reduce to accommodate peak demand.
[0088] 3. Application for Peak Load Shaving Plan
[0089] In order to cope with the load difference between peak and off-peak periods and ensure the balance of power supply and demand, a peak load plan declaration mechanism has been introduced. Users can fill in the peak load plan based on the operating characteristics of their own equipment or system, which mainly includes two parts: declared capacity and declared price.
[0090] The declared capacity refers to the amount of load regulation that the user is willing and able to provide within a specific time period. Its calculation method follows the following principle: Assuming that the user's response capacity within a certain time period (i.e., the amount of load that can be reduced or increased without affecting normal operation) fluctuates, then the declared capacity is equal to the average of the response capacity within any two adjacent half-hours within the time period. Expressed in mathematical formula:
[0091] Declared capacity = (response capacity (t1) + response capacity (t2)) / 2
[0092] Among them, t1 and t2 represent two consecutive half-hour time points respectively.
[0093] After all users calculate their respective declared capacities according to this method, the declared capacities of all users are aggregated to obtain the overall declared capacity of the virtual power plant. This overall declared capacity is the total amount of adjustable peak loads promised by the virtual power plant to the power grid, which plays an important role in achieving peak load shaving and valley filling and optimizing resource allocation of the power grid.
[0094] As for the declared price, users can bid freely within the price cap set by the power grid, which is determined through market competition.
[0095] 4. Clearing of Peak Shaving Results
[0096] The power grid formulates peak load demand and announces the total clearing capacity and corresponding clearing price based on the real-time power supply and demand and future forecasts. The clearing process is essentially a process of matching supply and demand, the purpose of which is to enable the power grid to effectively dispatch various resources to participate in peak load service and ensure the safe and stable operation of the power grid.
[0097] When the power grid announces the total peak-shaving and clearing capacity, the virtual power plant platform will fairly allocate capacity according to the application of each user. The specific allocation principles are as follows:
[0098] First, the initial allocation capacity Pi of each user i can be calculated by the following formula:
[0099] Pi = Ci*(clearing capacity / C_total)
[0100] Among them, Ci represents the declared capacity of user i, C_total represents the sum of the declared capacities of all users, and the clearing capacity is the total amount of peak load that the power grid actually needs to regulate based on system demand.
[0101] However, in actual operation, the actual response capacity of user i may be limited by its own equipment and technical conditions, which is expressed as a maximum response capacity MaxCi. Therefore, if the Pi initially allocated to user i according to the above formula exceeds its maximum response capacity MaxCi, the allocation result needs to be adjusted. The adjusted Pi is directly taken as the maximum response capacity MaxCi of user i. At the same time, the power grid needs to subtract the allocated MaxCi from the total clearing capacity to form a new clearing capacity to be allocated.
[0102] This process will continue until the allocated capacity of all users does not exceed their maximum response capacity. This is a dynamic adjustment and one-by-one verification allocation mechanism that ensures that while meeting the peak load demand of the power grid, the capacity boundaries of each user are fully respected and taken into account, thus achieving efficient and rational use of peak load resources.
[0103] 5. Decomposition of Peak Load Shaving Tasks
[0104] After the peak-shaving capacity is cleared and allocated to each user, the virtual power plant will further refine the peak-shaving task, decompose it into the specific controllable equipment level under each user, and accurately stipulate the target power value that each device should be adjusted to during the peak-shaving period. This is a key link in the peak-shaving execution phase, ensuring that the entire virtual power plant can accurately and effectively implement load regulation according to the needs of the power grid.
[0105] For a single user or device, its dispatch target during the peak load period can be determined by calculating the "dispatch curve point". The dispatch curve point reflects the load adjustment required by the device during the peak load period relative to its normal operating state (i.e., baseline load). The calculation formula is:
[0106] Dispatch curve point = predicted baseline load - clearing capacity allocation
[0107] Among them, "predicted baseline load" refers to the amount of electricity or power that a user or device might have consumed in the corresponding period of time, inferred based on historical data and prediction models when there is no peak-shaving demand. Clearing capacity allocation refers to the specific peak-shaving contribution value allocated to the user or device after the clearing process according to the peak-shaving plan.
[0108] For example, if a user's predicted baseline load during a peak-shaving period is 100 kilowatts, and after peak-shaving and clearing, the clearing capacity allocated to the user is 20 kilowatts, then the dispatch curve point of the user during this period is 80 kilowatts, which means that the user needs to reduce its load to 80 kilowatts to cooperate with the grid in peak-shaving.
[0109] Through such refined decomposition and scheduling, virtual power plants can maximize the flexibility of each component while maintaining the balance of supply and demand in the overall power grid, thereby improving the operating efficiency and stability of the power system.
[0110] 6. Peak Shaving Execution Tracking
[0111] In the actual implementation of the peak load auxiliary service, the key link is to monitor and manage the actual power operation of the virtual power plant and its various user devices in real time to ensure that the peak load task can be accurately executed. Effective load is an important indicator to measure the peak load effect, and its calculation is based on the baseline load and the winning bid power.
[0112] The effective load is calculated as:
[0113] Effective load = baseline load ± bid power
[0114] The positive or negative sign of ± depends on the type of peak load regulation. During the valley filling period (i.e. when the overall system load is lower than expected and the load needs to be increased), the effective load is equal to the baseline load plus the bid electricity, because users need to increase the load to fill the load gap of the power grid. During the peak shaving period (i.e. when the overall system load is too high and the load needs to be reduced), the effective load is equal to the baseline load minus the bid electricity, which means that users need to reduce the load to assist the power grid in peak shaving.
[0115] From the above discussion, it can be seen that the entire peak-shaving auxiliary service business process designed in this embodiment covers six core links from baseline load forecasting, peak-shaving capacity assessment, plan declaration, result clearing, task decomposition to execution tracking. It aims to achieve power supply and demand balance and optimize power grid operation efficiency through flexible regulation of industrial user-side resources, and improve the economy and stability of the power system driven by market mechanisms.
[0116] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for industrial users to participate in the management of power auxiliary service business, characterized in that: The following steps are involved: S01. Baseline load analysis: Based on historical data analysis, the baseline load of the current period is predicted and compared with the historical period. Based on historical data, the baseline load curve in the historical peak-shaving period, the predicted load curve at the current time, and the valley-filling and peak-shaving response capacity curves calculated therefrom are calculated; S02. Users independently declare peak-shaving plans based on the valley-filling and peak-shaving response curves, including declared capacity and declared prices based on the power grid price limit, which are summarized to form the total declared amount of the virtual power plant. S03. After the power grid releases the total clearing capacity and price, the clearing capacity of each user is allocated in proportion according to the user's maximum response capacity limit. If there is an excess, it is adjusted according to the limit; then the clearing capacity is subdivided into the equipment under the user's jurisdiction, and the specific dispatching power of each equipment is determined. The dispatching curve point is calculated by subtracting the clearing capacity from the predicted load; S04. The peak-shaving execution process is monitored in real time, and the effective load and target load are calculated by increasing or decreasing the bid power by the baseline load, respectively, to ensure that the peak-shaving task is accurately executed and meets the expected goals.
2. The management method for industrial users to participate in power auxiliary service business according to claim 1 is characterized in that: In step S01, the historical data includes power compliance information for multiple consecutive time periods, covering load fluctuations in different scenarios such as one day, different seasons, weekdays and weekends, and the load variation patterns of the historical data are mined through a time series model.
3. The management method for industrial users to participate in power auxiliary service business according to claim 2 is characterized in that: The time series model adopts a time series model based on dynamic weights. t ,…, represents the actual power load in each period of M consecutive operating days. t ,…are weight coefficients assigned to different observations, where ε describes the impact of changes in the company's order volume on the load. The selection of weight w is based on the principle of giving greater weight to recent data and decreasing weight to long-term data, while taking into account the historical performance of special scenarios for targeted adjustments; the weighted moving average method is used to generate the predicted value Y pre ,Right now:
4. The management method for industrial users to participate in power auxiliary service business according to claim 1 is characterized in that: The valley filling response capability R{valley} in step 01 is calculated as follows: R{valley}=P{baseline}-P{predict} Among them, P{baseline} is the baseline load, P{predict} is the predicted load; The peak clipping response capability R{peak} is calculated as follows: R{peak}=P{predict}-P{baseline}.
5. Industrial users participate in the power auxiliary service business management system, characterized by: The following steps are involved: Baseline load analysis module: used to predict the baseline load of the current period based on historical data analysis and compare it with the historical period, and calculate the baseline load curve in the historical peak-shaving period, the predicted load curve at the current time, and the valley-filling and peak-shaving response capability curves calculated therefrom according to historical data; The user peak-shaving plan self-declaration module allows users to self-declare peak-shaving plans based on the valley-filling and peak-shaving response curves, including declared capacity and declared price based on the power grid price limit, which are summarized into the total declared amount of the virtual power plant. Clearing capacity allocation module: after the power grid releases the total clearing capacity and price, the clearing capacity of each user is allocated in proportion according to the user's maximum response capacity limit. If there is an excess, it is adjusted according to the limit; then the clearing capacity is subdivided into the user's equipment, and the specific dispatching power of each equipment is determined. The dispatching curve point is calculated by subtracting the clearing capacity from the predicted load; The peak-shaving execution tracking module monitors the peak-shaving execution process in real time. The effective load and target load are calculated by increasing or decreasing the bid power by the baseline load, respectively, to ensure that the peak-shaving task is executed accurately and meets the expected goals.
6. The management system for industrial users to participate in power auxiliary service business according to claim 5, characterized in that: In the baseline load analysis module, the historical data includes power compliance information for multiple consecutive time periods, covering load fluctuations in different scenarios of one day, different seasons, weekdays and weekends, and the load variation patterns of the historical data are mined through a time series model.
7. The management system for industrial users to participate in power auxiliary service business according to claim 6, characterized in that: The time series model adopts a time series model based on dynamic weights. t ,…, represents the actual power load in each period of M consecutive operating days. t ,…are weight coefficients assigned to different observations, where ε describes the impact of changes in the company's order volume on the load. The selection of weight w is based on the principle of giving greater weight to recent data and decreasing weight to long-term data, while taking into account the historical performance of special scenarios for targeted adjustments; the weighted moving average method is used to generate the predicted value Y pre ,Right now:
8. The management system for industrial users to participate in power auxiliary service business according to claim 5, characterized in that: The valley filling response capability R{valley} in the baseline load analysis module is calculated as follows: R{valley}=P{baseline}-P{predict} Among them, P{baseline} is the baseline load, P{predict} is the predicted load; The peak clipping response capability R{peak} is calculated as follows: R{peak}=P{predict}-P{baseline}.
9. A processing device, characterized in that: It comprises at least one processor and at least one memory in communication with the processor, wherein the memory stores program instructions executable by the processor, and the processor calls the program instructions to execute any method according to claims 1 to 4.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions enable the computer to execute the method according to any one of claims 1 to 4.