A structured process change approach

Through the structured process change method, the content of the process change is made explicit, which solves the problems in the existing process change process that the change content is not explicit and the impact is difficult to judge, achieving smoother review and production implementation, and ensuring product quality and planning. Stablize.

CN115048735BActive Publication Date: 2024-10-18SOUTHWEST CHINA RES INST OF ELECTRONICS EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210538075.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-18
Publication Date
2024-10-18
Estimated Expiration
2042-05-18

AI Technical Summary

Technical Problem

In the existing process change process, the content of the change is not obvious, which makes it difficult to review, estimate work, approve and implement production, and it is difficult to judge the impact of the change, resulting in product quality risks and plan delay risks.

Method used

Adopting a structured process change method, by creating process change tasks, selecting the change type, making partial or overall process changes, and generating a process change control sheet, marking and explaining the change content in detail, including the addition, deletion and modification of processes and steps , explicit change content to facilitate review and production implementation.

Benefits of technology

Explicit change content facilitates review and approval, ensuring that the impact of changes can be accurately judged during production, and quality control measures can be taken in a timely manner to ensure the stability of the production plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115048735B_ABST
    Figure CN115048735B_ABST
Patent Text Reader

Abstract

The present invention provides a structured process change method, comprising the following steps: S1, creating a process change task; S2, selecting a process change type; S3, process change; S4, generating a process change comparison sheet; S5, new version process release. The present invention can make the change content explicit, which is convenient for review, estimation, and approval. It is also beneficial to judge the impact of the change during production implementation, take quality control measures in a timely manner, and ensure the production plan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of process change, and in particular to a structured process change method. Background Art

[0002] In the field of electronic equipment, the current process change process is:

[0003] Create a process change process, generate a new version of the process by referencing the old version of the process content, modify the new version of the process content, fill out the process change form to explain the change item, change category, change reason, change content, change impact, etc. The process change process is released after review, estimation, and approval, and the new version of the process replaces the old version of the process to take effect.

[0004] The current process change process has the following problems:

[0005] (1) The changes are not explicit, which makes it difficult to review, estimate, approve, and implement production. Technologists usually only give a general description, such as adding a process or installing a component in a process, without comparing the specific changes. If a technologist needs to explain the specific changes, he needs to spend a lot of time copying or taking screenshots to show the changes in the two versions, which is not practical for electronic equipment products with multiple varieties, small batches, and frequent changes.

[0006] (2) The impact of the change is difficult to determine. The lack of explicitness of the change content directly leads to the inability to accurately and quickly identify the impact of the change, which brings difficulties to production disposal measures and causes product quality risks, plan delay risks and other hazards. Summary of the invention

[0007] The present invention aims to provide a structured process change method to solve the problems existing in the above-mentioned existing process changes.

[0008] The present invention provides a structured process change method, comprising the following steps:

[0009] S1, create a process change task;

[0010] S2, select the process change type;

[0011] S3, process change;

[0012] S4, generate a process change control sheet;

[0013] S5, new version process released.

[0014] Furthermore, the process change type selected in step S2 includes:

[0015] S21, local change, that is, the new version of the process refers to the old version of the process, and makes local modifications, additions, and deletions;

[0016] S22, overall change, that is, the process flow is completely changed, and completely different processing and assembly methods are adopted. The old version of the process cannot be used, and a new version of the process needs to be re-compiled.

[0017] Further, according to the work change type selected in step S2, the process change in step S3 includes:

[0018] S31, local process change;

[0019] S32, overall process change.

[0020] Furthermore, step S31 includes the following sub-steps:

[0021] S311, process level change;

[0022] S312, work step level change.

[0023] Furthermore, step S311 includes the following sub-steps:

[0024] S3111, process editing: The process engineer edits the process, including adding new processes, deleting redundant processes, and adjusting the order of each process;

[0025] S3112, process marking: The CAPP system automatically marks each process according to the editing status of the process: the default mark is "unchanged", and all referenced processes that have not been edited are marked as this; newly added processes are automatically marked as "added"; deleted processes are displayed in gray and automatically marked as "deleted", and cannot be edited later; processes with changed sequences are marked as "modified";

[0026] S3113, Process Change Description: There is a "Process Change Description" column after each process. The process engineer fills in the description in the "Process Change Description" column, including the reasons for the process change, the main changes and the impact of the change.

[0027] Furthermore, step S312 includes the following sub-steps:

[0028] S3121, process step editing: The process engineer edits the process steps, including adding new process steps, deleting redundant process steps, and modifying the content of each process step;

[0029] S3122, work step marking: The CAPP system automatically marks each work step according to the editing status of the work step: the default mark is "unchanged", and all referenced work steps that have not been edited are marked as this; new work steps are automatically marked as "added"; deleted work steps are displayed in gray and automatically marked as "deleted"; work steps with modified content are marked as "modified";

[0030] S3123, secondary marking of process: The CAPP system determines the process of all steps marked as "added", "deleted", and "modified". If the process is marked as "unchanged", it is updated to "modified";

[0031] S3124, Process Step Change Description: There is a "Process Step Change Description" column after each process step. The process engineer fills in the description in the "Process Step Change Description" column, including the reasons for the change of this process step, the main changes and the impact of the change.

[0032] Further, step S32 includes the following sub-steps:

[0033] S321, New process preparation: The process engineer completes the new process preparation.

[0034] S322, process marking: The CAPP system marks all processes as "new".

[0035] S323, Process Change Description: There is a "Process Change Description" column after each process. If necessary, the process engineer will fill in the description in the "Process Change Description" column, including the reasons for the change and the impact of the change.

[0036] Furthermore, step S4 includes the following sub-steps:

[0037] S41, local change comparison sheet;

[0038] S42, overall change comparison sheet.

[0039] Furthermore, the local change comparison sheet in step S41 refers to:

[0040] When the process engineer selects the partial change type, the process change comparison sheet includes not only the process engineer-filled information of the change item, change category, and change reason, but also the comparison of the old and new versions of the process; it is divided into three parts: the old version of the process on the left, the new version of the process in the middle, and the change difference on the right. The change difference is divided into process change difference and step change difference, and the formats are "process mark + process change description" and "step mark + step change description", respectively, as follows:

[0041] a) When the new version of the process is marked as "unchanged", the change difference is displayed as "process unchanged + process change description". Similarly, when the new version of the process is marked as "unchanged", the change difference is displayed as "process unchanged + process change description";

[0042] b) When the new version of the process is marked as "new", the change difference is displayed as "new process + process change description". Similarly, when the new version of the process step is marked as "new", the change difference is displayed as "new process step + process change description";

[0043] c) When the new version of the process is marked as "deleted", the change difference is displayed as "process deleted + process change description". Similarly, when the new version of the process step is marked as "deleted", the change difference is displayed as "process deleted + process change description";

[0044] d) When the new version of the process is marked as "modified", the change difference is displayed as "process modification + process change description". Similarly, when the new version of the process step is marked as "modified", the change difference is displayed as "process modification + process change description".

[0045] Furthermore, the overall change comparison sheet in step S42 refers to:

[0046] When the process engineer selects the overall change type, the process change comparison sheet includes not only the information filled in by the process engineer on the change item, change category, and reason for change, but also the "process change instructions" for each process of the new version of the process.

[0047] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0048] The present invention can make the content of the change explicit, which is convenient for review, estimation and approval. It is also helpful for judging the impact of the change during production implementation, taking quality control measures in time and ensuring the production plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0050] Figure 1 is a flow chart of a structured process change method in an embodiment of the present invention;

[0051] Figure 2 is a schematic flow chart of a partial process change in step S31 in an embodiment of the present invention;

[0052] Figure 3 is a schematic diagram of a process flow of a process level change in step S311 in an embodiment of the present invention;

[0053] Figure 4 1 is a flow chart of the step level change of step S312 in an embodiment of the present invention;

[0054] Figure 5 1 is a flow chart of the overall process change of step S32 in an embodiment of the present invention;

[0055] Figure 6is a schematic diagram of a local change comparison sheet in an embodiment of the present invention;

[0056] Figure 7 It is a schematic diagram of an overall change comparison list in an embodiment of the present invention. DETAILED DESCRIPTION

[0057] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0058] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] Example

[0060] like Figure 1 As shown, this embodiment proposes a structured process change method, comprising the following steps:

[0061] S1, create a process change task;

[0062] S2, select the process change type;

[0063] S3, process change;

[0064] S4, generate a process change control sheet;

[0065] S5, new version process released.

[0066] Specifically:

[0067] S1, create a process change task: The process engineer determines whether a process change is needed based on factors such as design changes, changes in production requirements, quality improvements, raw material changes, error corrections, etc., and creates a process change task when it is determined that a process change is needed.

[0068] S2, select the process change type. There are two types of process change:

[0069] S21, local change, that is, the new version of the process refers to the old version of the process, and makes local modifications, additions, and deletions;

[0070] S22, overall change, that is, the process flow is completely changed, and completely different processing and assembly methods are adopted. The old version of the process cannot be used, and a new version of the process needs to be re-compiled.

[0071] S3, process change, according to the work change type selected in step S2, the process change in step S3 includes:

[0072] S31, local process changes, such as Figure 2 As shown:

[0073] S311, process level changes, such as Figure 3 As shown:

[0074] S3111, process editing: The process engineer edits the process, including adding new processes, deleting redundant processes, and adjusting the order of each process;

[0075] S3112, process marking: The CAPP system automatically marks each process according to the editing status of the process: the default mark is "unchanged", and all referenced processes that have not been edited are marked as this; newly added processes are automatically marked as "added"; deleted processes are displayed in gray and automatically marked as "deleted", and cannot be edited later; processes with changed sequences are marked as "modified";

[0076] S3113, Process Change Description: There is a "Process Change Description" column after each process. The process engineer fills in the description in the "Process Change Description" column, including the reasons for the process change, the main changes and the impact of the change.

[0077] S312, process step level change, such as Figure 4 As shown:

[0078] S3121, process step editing: The process engineer edits the process steps, including adding new process steps, deleting redundant process steps, and modifying the content of each process step;

[0079] S3122, work step marking: The CAPP system automatically marks each work step according to the editing status of the work step: the default mark is "unchanged", and all referenced work steps that have not been edited are marked as this; new work steps are automatically marked as "added"; deleted work steps are displayed in gray and automatically marked as "deleted"; work steps with modified content are marked as "modified";

[0080] S3123, secondary marking of process: The CAPP system determines the process of all steps marked as "added", "deleted", and "modified". If the process is marked as "unchanged", it is updated to "modified";

[0081] S3124, Process Step Change Description: There is a "Process Step Change Description" column after each process step. The process engineer fills in the description in the "Process Step Change Description" column, including the reasons for the change of this process step, the main changes and the impact of the change.

[0082] S32, overall process changes, such as Figure 5 As shown:

[0083] S321, New process preparation: The process engineer completes the new process preparation.

[0084] S322, process marking: The CAPP system marks all processes as "new".

[0085] S323, Process Change Description: There is a "Process Change Description" column after each process. If necessary, the process engineer will fill in the description in the "Process Change Description" column, including the reasons for the change and the impact of the change.

[0086] S4, generate process change control sheet:

[0087] S41, Local Change Comparison Sheet:

[0088] When the process engineer selects the partial change type, the process change comparison sheet includes not only the process engineer-filled information of the change item, change category, and change reason, but also the comparison of the old and new versions of the process; it is divided into three parts: the old version of the process on the left, the new version of the process in the middle, and the change difference on the right. The change difference is divided into process change difference and step change difference, and the formats are "process mark + process change description" and "step mark + step change description", respectively, as follows:

[0089] a) When the new version of the process is marked as "unchanged", the change difference is displayed as "process unchanged + process change description". Similarly, when the new version of the process is marked as "unchanged", the change difference is displayed as "process unchanged + process change description";

[0090] b) When the new version of the process is marked as "new", the change difference is displayed as "new process + process change description". Similarly, when the new version of the process step is marked as "new", the change difference is displayed as "new process step + process change description";

[0091] c) When the new version of the process is marked as "deleted", the change difference is displayed as "process deleted + process change description". Similarly, when the new version of the process step is marked as "deleted", the change difference is displayed as "process deleted + process change description";

[0092] d) When the new version of the process is marked as "modified", the change difference is displayed as "process modification + process change description". Similarly, when the new version of the process step is marked as "modified", the change difference is displayed as "process modification + process change description".

[0093] S42, Overall Change Comparison Sheet: When the process engineer selects the overall change type, the process change comparison sheet includes not only the information filled in by the process engineer on the change item, change category, and change reason, but also the "process change instructions" for each process of the new version of the process.

[0094] S5, New version of process release: The new version of process and process change comparison sheet will be released after review, estimation and approval. The new version will take effect and the old version will become invalid.

[0095] Example:

[0096] S1, create a process change task: The process engineer determines that a process change is needed due to changes in production requirements and creates a process change task.

[0097] S2, select the process change type. Since the old version of the process can be referenced to make partial modifications, additions, and deletions, the process engineer selects the change type as S21 partial change.

[0098] S3, process change: Because the process engineer selects the change type as S21 local change, it automatically enters step S31 local process change.

[0099] S31, partial process change, the process engineer refers to the old version of the process, and makes partial modifications, additions, and deletions:

[0100] S311, process level changes:

[0101] S3111, process editing: The process engineer edits the process, adds a new process 0040 plating, and deletes the process 0030 grinding;

[0102] S3112, process marking: The CAPP system automatically marks each process according to the editing status of the process: process 0010 material preparation, process 0020 milling, and process 0030 digital milling are marked as "unchanged" by default; process 0030 grinding is marked as "deleted"; process 0040 plating is marked as "added";

[0103] S3113, Process Change Description: The process engineer fills in the description in the "Process Change Description" column, including the reasons for the process change, the main changes and the impact of the change.

[0104] S312, step-level change, that is, change each step in the process:

[0105] S3121, Work step editing: The process engineer edits the work step. For example, the work step (2) in process 0020 milling is modified, the original work step (3) is deleted, and a new work step (3) is added. For example, the work step (1) in process 0030 digital milling is modified, and the work step (3) is deleted.

[0106] S3122, work step marking: The CAPP system automatically marks each work step according to the editing status of the work step: the unedited work step is marked as "unchanged" by default; the work step (2) in process 0020 milling is marked as "modified", the original work step (3) is marked as "deleted", and the new work step (3) is marked as "added"; the work step (1) in process 0030 digital milling is marked as "modified", and the work step (3) is marked as "deleted".

[0107] S3123, process secondary marking: The CAPP system determines the processes where all steps marked as "added", "deleted", and "modified" are located. If the process is marked as "unchanged", it is updated to "modified". Processes 0020 milling and 0030 digital milling are updated to "modified".

[0108] S3124, Process step change description: The process engineer fills in the description in the "Process step change description" column, including the reason for the change of this process step, the main changes and the impact of the change.

[0109] S4, generate a process change comparison sheet. The process engineer fills in the change item, change category, change reason and other information in the process change task. The CAPP system automatically generates a process change comparison sheet, which contains the above information and displays the difference between the old version of the process and the new version of the process. Because the process engineer selects the change type as S21 local change, it automatically enters step S41 local change comparison sheet:

[0110] When the process engineer selects the partial change type, the process change comparison sheet includes not only the change item, change category, change reason and other information filled in by the process engineer, but also the comparison between the old and new versions of the process. It is divided into three parts: the old version of the process on the left, the new version of the process in the middle, and the change difference on the right. The change difference is divided into process change difference and step change difference. The formats are "process mark + process change description" and "step mark + step change description", respectively. Figure 6 As shown, the details are as follows:

[0111] a) When the new version of the process is marked as "unchanged", the change difference is displayed as "process unchanged + process change description". Similarly, when the new version of the process step is marked as "unchanged", the change difference is displayed as "process unchanged + process change description".

[0112] b) When the new version of the process is marked as "new", the change difference is displayed as "new process + process change description". Similarly, when the new version of the process step is marked as "new", the change difference is displayed as "new process step + process change description".

[0113] c) When the new version of the process is marked as "deleted", the change difference is displayed as "process deleted + process change description". Similarly, when the new version of the process step is marked as "deleted", the change difference is displayed as "process deleted + process change description".

[0114] d) When the new version of the process is marked as "modified", the change difference is displayed as "process modification + process change description". Similarly, when the new version of the process step is marked as "modified", the change difference is displayed as "process modification + process change description".

[0115] S5, New version of process release: The new version of process and process change comparison sheet will be released after review, estimation and approval. The new version will take effect and the old version will become invalid.

[0116] Example 2:

[0117] S1, create a process change task: The process engineer determines that a process change is needed due to changes in production requirements and creates a process change task.

[0118] S2, select the process change type. Because the drawings have been significantly changed and the process flow has changed greatly, the old version of the process cannot be referenced. The process engineer selects the change type as S22 overall change.

[0119] S3, process change: Because the process engineer selects the change type as S22 overall change, it automatically enters step S32 overall process change.

[0120] S32 overall process change: The process flow has been completely changed, using completely different processing and assembly methods. The old version of the process cannot be used, and a new version of the process is compiled, including:

[0121] S321, New process preparation: The process engineer completes the new process preparation.

[0122] S322, process marking: The CAPP system marks all processes as "new".

[0123] S323, Process Change Description: If necessary, the process engineer shall fill in the description in the "Process Change Description" column, including the reasons for the process change and the impact of the change.

[0124] S4, generate a process change comparison sheet. The process engineer fills in the change item, change category, change reason and other information in the process change task. The CAPP system automatically generates a process change comparison sheet, which contains the above information and displays the difference between the old version of the process and the new version of the process. Because the process engineer selects the change type as S22 overall change, it automatically enters step S42 overall change comparison sheet:

[0125] When the process engineer selects the overall change type, the process change comparison sheet contains not only the information filled in by the process engineer, such as the change item, change category, and change reason, but also the "process change description" of each process of the new version of the process, such as Figure 7 shown.

[0126] S5, New version of process release: The new version of process and process change comparison sheet will be released after review, estimation and approval. The new version will take effect and the old version will become invalid.

[0127] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A structured process change method, characterized in that: The steps include: S1, create a process change task; S2, select the process change type; S3, process change; S4, generate a process change control sheet; S5, new version of the process is released; The process change types selected in step S2 include: S21, local change, that is, the new version of the process refers to the old version of the process, and makes local modifications, additions, and deletions; S22, overall change, that is, the process flow is completely changed, using completely different processing and assembly methods, the old version of the process cannot be used, and a new version of the process needs to be re-compiled; According to the work change type selected in step S2, the process change in step S3 includes: S31, local process change; S32, overall process change; Step S31 includes the following sub-steps: S311, process level change; S312, work step level change; Step S311 includes the following sub-steps: S3111, process editing: The process engineer edits the process, including adding new processes, deleting redundant processes, and adjusting the order of each process; S3112, process marking: The CAPP system automatically marks each process according to the editing status of the process: the default mark is "unchanged", and all referenced processes that have not been edited are marked as this; newly added processes are automatically marked as "added"; deleted processes are displayed in gray and automatically marked as "deleted", and cannot be edited later; processes with changed sequences are marked as "modified"; S3113, Process Change Description: There is a "Process Change Description" column after each process. The process engineer fills in the description in the "Process Change Description" column, including the reasons for the process change, the main changes and the impact of the change; Step S312 includes the following sub-steps: S3121, process step editing: The process engineer edits the process steps, including adding new process steps, deleting redundant process steps, and modifying the content of each process step; S3122, work step marking: The CAPP system automatically marks each work step according to the editing status of the work step: the default mark is "unchanged", and all referenced work steps that have not been edited are marked in this way; newly added work steps are automatically marked as "added"; deleted work steps are displayed in gray and automatically marked as "deleted"; work steps with modified content are marked as "modified"; S3123, secondary marking of process: The CAPP system determines the process of all steps marked as "added", "deleted", and "modified". If the process is marked as "unchanged", it is updated to "modified"; S3124, Process Step Change Description: There is a "Process Step Change Description" column after each process step. The process engineer fills in the description in the "Process Step Change Description" column, including the reason for the change of this process step, the main change content and the impact of the change; Step S32 includes the following sub-steps: S321, New process preparation: The process engineer completes the new process preparation; S322, process marking: the CAPP system marks all processes as "new"; S323, Process Change Description: There is a "Process Change Description" column after each process. If necessary, the process engineer fills in the description in the "Process Change Description" column, including the reasons for the process change and the impact of the change; Step S4 includes the following sub-steps: S41, local change comparison sheet; S42, overall change comparison sheet; The local change comparison sheet in step S41 refers to: When the process engineer selects the partial change type, the process change comparison sheet includes not only the process engineer-filled information of the change item, change category, and change reason, but also the process comparison between the old and new versions. It is divided into three parts: the old version of the process on the left, the new version of the process in the middle, and the change difference on the right. The change difference is divided into process change difference and step change difference. The formats are "process mark + process change description" and "step mark + step change description", respectively. The details are as follows: a) When the new version of the process is marked as "Unchanged", the change difference is displayed as "Process Unchanged + Process Change Description"; if the process steps are similar and the new version of the process steps are marked as "Unchanged", the change difference is displayed as "Process Unchanged + Process Change Description"; b) When the new version of the process is marked as "new", the change difference is displayed as "new process + process change description"; if the process steps are similar and the new version of the process steps are marked as "new", the change difference is displayed as "new process step + process step change description"; c) When the new version of the process is marked as "deleted", the change difference is displayed as "process deleted + process change description"; if the work step is similar and the new version of the work step is marked as "deleted", the change difference is displayed as "work step deleted + work step change description"; d) When the new version of the process is marked as "modified", the change difference is displayed as "process modification + process change description"; if the process steps are similar and the new version of the process steps is marked as "modified", the change difference is displayed as "process modification + process change description"; The overall change comparison sheet in step S42 refers to: When the process engineer selects the overall change type, the process change comparison sheet includes the "process change description" of each process of the new version of the process in addition to the information filled in by the process engineer on the change item, change category, and change reason.