A dynamic reactive power demand assessment method for weak grid areas considering large-scale wind power access

The BP neural network is used to dynamically evaluate the reactive power demand of the wind farm group online, which solves the problem of weak grid voltage caused by large-scale wind power access, achieves rapid response to faults, and improves the transient voltage stability of the grid.

CN115081313BActive Publication Date: 2024-10-11LIYANG RES INST OF SOUTHEAST UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210616961.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-01
Publication Date
2024-10-11
Estimated Expiration
2042-06-01

AI Technical Summary

Technical Problem

The integration of large-scale wind power leads to increased uncertainty in the power flow of the power system, which may aggravate the risk of local voltage instability in the system. The existing reactive power demand adjustment method of the wind farm group is difficult to apply online and cannot effectively utilize the reactive power adjustment capability of the wind farm group.

Method used

BP neural network is used to conduct online dynamic reactive power demand assessment, identify voltage weak nodes and areas, and output designated reactive power through the wind farm group for emergency voltage control to ensure system stability.

Benefits of technology

It improves the local transient voltage stability of the power grid, quickly responds to faults, increases the reactive power setting speed, fully utilizes the reactive power compensation capability of the wind farm group, and enhances the safety and stability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115081313B_ABST
    Figure CN115081313B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for evaluating dynamic reactive power demand in weak areas of a power grid considering large-scale wind power access, comprising step 1: identifying weak voltage nodes and weak voltage areas of the system; step 2: judging whether a wind farm group needs to play a voltage regulating role when a serious fault occurs in a weak voltage node causing voltage fluctuations at adjacent nodes; step 3: if the area where the wind power is accessed is not a weak voltage area, returning to step 1; if the area where the wind power is accessed is a weak voltage area, entering step 4; step 4: calculating a transient voltage stability index S of the weak voltage area TVS , train the BP neural network to fit the mapping relationship between the system operation status and the transient voltage stability index; Step 5: Real-time evaluation of the increase in wind power reactive power in the voltage weak area. The present invention uses the BP neural network to perform online dynamic reactive power demand evaluation, so that the wind farm group outputs specified reactive power, adjusts the voltage of the weak node, and ensures the safety and stability of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of reactive power evaluation for transient voltage stability of power systems, and in particular, relates to a method for evaluating dynamic reactive power demand in weak areas of power grids taking into account large-scale wind power access. Background Art

[0002] As my country's dual carbon goals approach, the relevant strategies for the construction of new energy bases and industrial development are driving my country to continuously increase the deployment of new energy such as wind power and photovoltaics. Among them, wind power occupies an important position in new energy due to its advantages such as sufficient resources, low operating costs, low geographical environment requirements, and simple operation and maintenance. It has become one of the renewable energy sources with complete technology, large-scale application, and good market prospects. With the support of national policies, the strong promotion of the government, and the positive response of the wind power market, the scale and control technology of wind power generation in my country have achieved rapid expansion and development, occupying a leading position in the wind power market.

[0003] However, due to the inherent volatility and intermittency of wind power, its large-scale access will lead to increased uncertainty in the power system's power flow, which may increase the risk of local voltage instability in the system. The voltage weakness in different areas of the power system varies under different operating conditions. When voltage weak nodes and weak areas are formed in the wind power access area and transient voltage stability problems occur, if emergency voltage control measures are not taken in time, local voltage instability may have an adverse impact on wind turbines and the voltage of the entire network.

[0004] At present, the more accurate method for setting reactive power demand of wind farm groups is mainly based on time domain simulation method, which has the disadvantages of slow simulation speed and difficulty in online application, and is difficult to apply to emergency voltage control in weak voltage areas. At present, the research on emergency reactive power compensation mainly focuses on independently installing dynamic reactive power compensation devices at weak voltage nodes, but ignores the reactive power regulation capability of new energy stations such as wind power in the power grid, and cannot use the reactive power flexibility of wind farm groups to provide voltage support for the system. Therefore, it is necessary to consider the reactive power compensation role of wind power, and dynamically calculate the reactive power demand online to make it output reasonable reactive power for emergency voltage control. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a method for dynamic reactive power demand assessment in weak areas of a power grid taking into account large-scale wind power access. When a fault occurs in a voltage weak area to which a wind farm group is connected, an online dynamic reactive power demand assessment is performed through a BP neural network, so that the wind farm group outputs a specified reactive power and adjusts the voltage of the weak node to ensure the safety and stability of the system.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] A method for evaluating dynamic reactive power demand in weak areas of a power grid considering large-scale wind power access of the present invention comprises the following steps:

[0008] Step 1: Perform three-phase short-circuit fault simulation on each node in the system base state, and use the single-loop theorem in random matrix theory to analyze the voltage response curve to identify the weak voltage nodes and weak voltage areas in the system;

[0009] Step 2: judging according to the weak voltage nodes and weak voltage areas of the system (the judging method is in step 3, and the judging here only states one method), whether the wind farm group needs to play a voltage regulating role when a serious fault occurs at the weak voltage node causing voltage fluctuations at the adjacent nodes;

[0010] Step 3: If the area where the wind power is connected is not a weak voltage area, the wind power does not need to take action, and returns to step 1 to re-perform offline identification; if the area where the wind power is connected is a weak voltage area, proceed to step 4 to perform offline sample training;

[0011] Step 4: Select multiple operating modes in the system base state neighborhood (multiple operating modes refer to setting the operating mode of the regional power grid, such as different wind power penetration rates, different load levels, etc., and generate sample data under multiple operating modes), set short-circuit faults for voltage-weak nodes, and calculate the transient voltage stability index S of the voltage-weak area TVS , train BP neural network to fit the mapping relationship between system operation status and transient voltage stability index;

[0012] Step 5: Calculate the sensitivity of wind power output reactive power to transient voltage stability index through the trained BP neural network, and evaluate the increase in wind power reactive power in the voltage weak area in real time according to the current system operation status.

[0013] In step 1, the method for identifying the weak voltage nodes and weak voltage areas of the system is:

[0014] Step 1-1: Set a short-circuit fault on the system node in the base state operation mode, and remove the fault after maintaining it for a set time until the system resumes stable operation, and obtain the voltage data of each node during the simulation process;

[0015] Step 1-2: Generate the original matrix within the time window T, and generate the N×T order augmented matrix of the corresponding node by copying the voltage state quantity of different nodes;

[0016] Step 1-3: Standardize and perform singular value equivalent processing on each augmented matrix, calculate the eigenvalues ​​of the processed matrix according to the single ring theorem and calculate the average spectral radius κ MSR ;

[0017] Step 1-4: Calculate the characteristic value statistic index s when the current node fails;

[0018] Step 1-5: Perform the same short-circuit fault on another node in the system and repeat steps 1-1 to 1-4 until the index s when any node fails is obtained;

[0019] Step 1-6: Sort the index s of each node. The larger the s value, the weaker the node voltage. Select the node with the weakest voltage, draw the average spectrum radius MSR curve of each augmented matrix when the node fails, select multiple nodes with a high degree of correlation with the system stability, and form a weak area with the weakest node.

[0020] In step 1-2, the method for generating an N×T-order augmented matrix of the corresponding node comprises the following specific steps:

[0021] Step 1-2-1: By monitoring the voltage amplitude of each node in the system, at each time t i Get n voltage state variables, expressed as:

[0022] x(t i )=[x1(t i ),x2(t i ),…x n (t i )] T

[0023] Step 1-2-2: To analyze the influence of each node on the system, the voltage state quantity of the jth node is replicated multiple times to form a vector containing N state variables, expressed as:

[0024]

[0025] Step 1-2-3: The N×T order augmented matrix formed by the column vectors at each sampling moment in the time window with a width of T can be described as:

[0026] X N×T =[x(t i-T+1 ),x(t i-T+2 ),…,x(t i )].

[0027] In step 1-3, the average spectral radius κ is calculated MSR The specific steps of the method are as follows:

[0028] Step 1-3-1: Augment the matrix X N×T Standardization is carried out in the following ways:

[0029]

[0030] in, and σ(x i ) are the mean and standard deviation of the i-th row vector of matrix X respectively; and The matrices are The mean and standard deviation of the i-th row vector, with values ​​of 0 and 1;

[0031] Step 1-3-2: Solve the normalized matrix The singular value equivalent matrix of is expressed as:

[0032]

[0033] Where U is a unitary matrix that satisfies the Haar distribution;

[0034] Step 1-3-3: Let the normalized node voltage random matrix Let L be 1, and the expression after normalizing the matrix Z is:

[0035]

[0036] Among them, z i and are matrices Z and The i-th row vector of i ) is the vector z i The standard deviation of

[0037] Step 1-3-4: Obtain the matrix The eigenvalue of κ is calculated according to the single ring theorem. MSR To judge the stability of the system and the correlation between each node and the system operation state, the average spectrum radius κ MSR The expression is:

[0038]

[0039] Among them, λ i is the matrix eigenvalue; N is the number of eigenvalues.

[0040] In steps 1-4, the expression of the eigenvalue statistic indicator s is:

[0041]

[0042] Where n is the number of system nodes; E(MSR 0j ) and E(MSR j ) are the κ of the j-th node augmented matrix when the system is in a stable operation state and after being disturbed. MSR average value.

[0043] In step 4, the transient voltage stability index S of the voltage weak area is calculated TVS The specific method of the process is:

[0044] Step 4-1: According to the voltage response curve of each node, obtain the node transient voltage stability index Z TVS The expression is:

[0045]

[0046] Among them, V min is the lowest voltage value after the fault is removed; T cr is the time threshold; V cr is the voltage threshold; T b For voltages continuously below V cr The maximum time of k t is a constant; V R is the steady-state voltage after fault removal;

[0047] Step 4-2: According to the transient voltage stability index Z of each node TVS The transient voltage stability index S of the voltage weak area is obtained by the expression TVS expression:

[0048] S TVS =maxZ TVS,i

[0049] Among them, Z TVS,i is the transient voltage stability index of the ith node.

[0050] In step 5, the method for evaluating the increase in wind power reactive power in the voltage weak area is as follows:

[0051] Step 5-1: Based on the trained BP neural network model, the perturbation method is used to solve the transient voltage stability index S of the voltage weak area due to the reactive power output of the wind farm group TVS The sensitivity η is expressed as:

[0052]

[0053] Among them, Q W The reactive power output of the current wind farm group; ΔQ W is the reactive power disturbance output by the wind farm group; S TVS (Q W +ΔQ W ) is the reactive power Q output by the current wind farm group W Increase ΔQ W The transient voltage stability index S of the voltage weak area corresponding to the output of the BP neural network is TVS Index value; S TVS (Q W- ΔQ W ) is the reactive power Q output by the current wind farm group W Reduce ΔQ WThe transient voltage stability index S of the voltage weak area corresponding to the output of the BP neural network is TVS Index value;

[0054] Step 5-2: Calculate the total reactive power demand ΔQ of the wind farm group in the voltage weak area, expressed as:

[0055]

[0056] Among them, S TVS0 is the index value of the most stable node voltage after fault removal, let V min =V cr , T b =0, find S TVS0 ; S TVS (Q W ) is the current wind farm group output reactive power Q W Transient voltage stability index in weak voltage area when

[0057] Compared with the prior art, the present invention has the following beneficial effects:

[0058] 1. This method predicts the transient voltage stability of the wind farm cluster access area when a fault occurs by identifying voltage-weak nodes and voltage-weak areas. If the wind farm cluster access area is a voltage-weak area, the wind farm cluster is required to make emergency voltage control pre-decision in advance to quickly respond to future faults, thereby improving the transient voltage stability of local areas of the power grid;

[0059] 2. This method is based on the mapping relationship between the BP neural network offline fitting system operating status and transient voltage stability indicators, and uses the perturbation method to solve the sensitivity of the wind farm group output reactive power to the transient voltage stability index. When a fault occurs, fast dynamic reactive demand calculation can be performed based on the current system operating status, the trained BP neural network model and sensitivity, effectively improving the reactive setting speed and the transient voltage stability of the power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] Figure 1 Flow chart of the dynamic reactive power demand assessment method for weak grid areas for large-scale wind power access;

[0061] Figure 2 This is a structural diagram of a 10-machine 39-node system containing a large-scale wind farm group;

[0062] Figure 3 is the node voltage response curve;

[0063] Figure 4 It is the average spectrum radius MSR curve of the three-phase short circuit fault at node 38;

[0064] Figure 5 It is the structure diagram of BP neural network;

[0065] Figure 6 is the fluctuation curve of system load and wind power in a typical day;

[0066] Figure 7 is the transient voltage stability index S of weak areas on a typical day TVS Comparison chart of actual value and predicted value;

[0067] Figure 8 This is the reactive power demand assessment result diagram of wind farm group;

[0068] Fig. 9 Output reactive power curve for wind farm group;

[0069] Fig.10 It is the node voltage simulation curve diagram. DETAILED DESCRIPTION

[0070] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0071] like Figure 1 As shown, the method is divided into the following steps:

[0072] (1) Step 1: A three-phase short-circuit fault simulation is performed on each node in the base state of a 10-machine 39-node system containing a large-scale wind farm group, and the single-loop theorem in random matrix theory is used to analyze the voltage response curve to identify the system voltage weak nodes and voltage weak areas.

[0073] In the first step, a 10-machine 39-node system with a large-scale wind farm group was built using the PSAT 2.1.11 software package on the MATLAB R2018a platform. The specific system structure is as follows: Figure 2 shown.

[0074] In the second step, a short circuit fault is set at a node of the system in the base state operation mode, and the fault is removed after a period of time until the system resumes stable operation. The simulation data is obtained and the single loop theorem in random matrix theory is used to analyze the following: Figure 3 The node voltage response curve is shown.

[0075] In the third step, the original matrix is ​​first generated within the time window T, and the N×T order augmented matrix of the corresponding node is generated by replicating the voltage state quantity of different nodes. By monitoring the voltage amplitude of each node in the system, at each time t i The n voltage state variables are obtained, which can be expressed as:

[0076] x(t i )=[x1(t i ),x2(t i),...x n (t i )] T

[0077] In order to analyze the influence of each node on the system, the voltage state quantity of the jth node is replicated multiple times to form a vector containing N state variables, which can be expressed as:

[0078]

[0079] Let the column vectors at each sampling time form an N×T order augmented matrix in a time window with a width of T, which can be described as:

[0080] X N×T =[x(t i-T+1 ),x(t i-T+2 ),…,x(t i )]

[0081] Then, each augmented matrix is ​​standardized and singular value equivalent, and the eigenvalues ​​of the processed matrix are calculated according to the single ring theorem and the average spectral radius κ is calculated. MSR For the augmented matrix X N×T Standardization is carried out, and the specific standardization method is:

[0082]

[0083] in, and σ(x i ) are the mean and standard deviation of the i-th row vector of matrix X respectively; and The matrices are The mean and standard deviation of the i-th row vector, and the values ​​are 0 and 1.

[0084] Solving for the Normalized Matrix The singular value equivalent matrix of is expressed as:

[0085]

[0086] Where U is a unitary matrix that satisfies the Haar distribution.

[0087] Let the normalized node voltage random matrix Let L be 1, and the expression after normalizing the matrix Z is:

[0088]

[0089] Among them, z i and are matrices Z and The i-th row vector of i ) is the vector z iThe standard deviation of .

[0090] Find the matrix The eigenvalue of κ is calculated according to the single ring theorem. MSR To judge the stability of the system and the correlation between each node and the system operation state, the average spectrum radius κ MSR The expression is:

[0091]

[0092] Among them, λ i is the matrix eigenvalue; N is the number of eigenvalues.

[0093] Calculate the characteristic value statistic index s when the current node fails, and its expression is:

[0094]

[0095] Where n is the number of system nodes; E(MSR 0j ) and E(MSR j ) are the κ of the j-th node augmented matrix when the system is in a stable operation state and after being disturbed. MSR average value.

[0096] The same short-circuit fault is applied to all nodes of the system until the index s of any node fault is obtained. The index s of each node is sorted. The larger the s value, the weaker the voltage of the node. The sorting results are shown in Table 1.

[0097] Table 1. Voltage weak node ranking table

[0098]

[0099] From Table 1, we can see that node 38 is the weakest node in voltage. The average spectrum radius MSR curve of each augmented matrix when the node is short-circuited is plotted, as shown in Figure 4 As shown. Figure 4 Select the nodes that have a greater impact on system stability and the weakest node to form a voltage weak area, such as Figure 2 The range is indicated by the dotted box.

[0100] (2) Step 2: According to the demarcation of the weak voltage area, it can be seen that the weak voltage area is the access area of ​​a large-scale wind farm group.

[0101] (3) Step 3: Since the voltage-weak area is the access area of ​​a large-scale wind farm group, when a serious fault occurs at a voltage-weak node, causing voltage fluctuations at adjacent nodes, the wind farm group can perform emergency voltage control and play a voltage regulation role. Therefore, the offline sample training link based on the BP neural network method is entered.

[0102] (4) Step 4: Select multiple operation modes in the system base state neighborhood to set short-circuit faults on voltage-weak nodes and calculate the transient voltage stability index S in the voltage-weak area. TVS , train the BP neural network to fit the mapping relationship between the system operating status and the transient voltage stability index.

[0103] Among them, the first step is to set the same short-circuit fault on the voltage weak node under different operating modes, and remove the fault after maintaining it for a period of time until the system resumes stable operation to obtain simulation data.

[0104] The second step is to calculate the transient voltage stability index of the voltage weak area. First, according to the voltage response curve of each node, the node transient voltage stability index Z is obtained. TVS expression:

[0105]

[0106] Among them, V min is the lowest voltage value after the fault is removed; T cr is the time threshold; V cr is the voltage threshold; T b For voltages continuously below V cr The maximum time of k t is a constant; V R is the steady-state voltage after the fault is removed.

[0107] Then, according to the transient voltage stability index Z of each node TVS The transient voltage stability index S in the voltage weak area is obtained TVS expression:

[0108] S TVS =maxZ TVS,i

[0109] Among them, Z TVS,i is the transient voltage stability index of the ith node.

[0110] The third step is based on Figure 5 The BP neural network model shown fits the mapping relationship between the system operation status and the transient voltage stability index, and the corresponding model is obtained by training.

[0111] (5) Step 5: Calculate the sensitivity of wind power output reactive power to transient voltage stability index through the trained BP neural network, and evaluate the increase in wind power reactive power in the voltage weak area in real time according to the current system operation status.

[0112] The first step is to Figure 6 The system load and wind power fluctuation curves in a typical day, as well as the trained BP neural network, are used to calculate the transient voltage stability index S of the weak area in a typical day.TVS The predicted value is compared with the actual value. Figure 7 The error between the actual value and the predicted value of the transient voltage stability index is calculated and analyzed, and the maximum error is 0.0331, the minimum error is 0, and the average error is 0.0053. It can be concluded that the transient voltage stability index S of this typical day is TVS The deviation between the predicted value and the actual value is small, that is, the BP neural network is better for predicting transient voltage stability indicators.

[0113] In the second step, the disturbance method is used to solve the transient voltage stability index S of the voltage weak area due to the reactive power output of the wind farm group. TVS The sensitivity η is expressed as:

[0114]

[0115] Among them, Q W The reactive power output of the current wind farm group; ΔQ W is the reactive power disturbance output by the wind farm group; S TVS (Q W +ΔQ W ) is the reactive power Q output by the current wind farm group W Increase ΔQ W The transient voltage stability index S of the voltage weak area corresponding to the output of the BP neural network is TVS Index value; S TVS (Q W- ΔQ W ) is the reactive power Q output by the current wind farm group W Reduce ΔQ W The transient voltage stability index S of the voltage weak area corresponding to the output of the BP neural network is TVS Indicator value.

[0116] The third step is to calculate the total reactive power demand of the wind farm group in the weak voltage area. The expression is:

[0117]

[0118] Among them, S TVS0 is the index value of the most stable node voltage after fault removal, let V min =V cr , T b =0, we can find S TVS0 ; S TVS (Q W ) is the current wind farm group output reactive power Q W Transient voltage stability index in weak voltage area when

[0119] The reactive power demand assessment results of wind farm groups are as follows: Figure 8 As shown in the figure, the reactive power demand of the wind farm group reaches the highest peak in the 10th to 12th hour period, which are 140.5Mvar, 152.1Mvar and 128.8Mvar respectively; while in the 1st to 7th hour, 15th to 18th hour and 22nd to 24th hour period, the wind farm group does not need to output reactive power. Figure 7 The transient voltage stability index value and Figure 8 By comparing the reactive power demand results, it can be seen that when the transient voltage stability index value is small, that is, the system transient voltage stability is poor, the reactive power demand of the wind farm group is large; otherwise, the reactive power demand of the wind farm group is small.

[0120] Step 4: Build in PSCAD simulation software Figure 2 The system model shown is set according to the system operation status at the 12th hour of a typical day. A three-phase short circuit fault is performed at node 38. The fault starts at the 3rd second and lasts for 0.25 seconds. The wind farm group is set to output at the beginning of the fault. Figure 8 The reactive power required in the 12th hour is obtained. The wind farm group output reactive power simulation curve and node voltage simulation curve are obtained as follows: Fig. 9 and Fig.10 As shown. Fig. 9 It can be seen that when a short-circuit fault occurs, the wind farm group outputs a specified reactive power of about 130 Mvar, which is consistent with the reactive power demand assessment result of the voltage weak area. Fig.10 It can be obtained that when the wind farm group does not output reactive power, the node voltage still has multiple severe voltage drops after 7s after the fault is removed, and the lowest voltage can drop to 0.5pu. The results show that if the wind farm group does not output reactive power, the node voltage cannot be restored to the normal voltage range, and serious voltage instability will occur. When the wind farm group outputs the specified reactive power, the node voltage drops to the lowest value of 0.612pu at 5.70s after the fault is removed, and the longest time the voltage is lower than 0.8 times the steady-state voltage is 1.03s, and then the voltage begins to rise, and no severe voltage drops occur. The results show that it can quickly restore the node voltage to the normal voltage range after the fault is removed, and there is no voltage instability.

[0121] In summary, the proposed method for dynamic reactive power demand assessment in weak areas of power grids considering large-scale wind power access is to identify weak nodes and weak areas of system voltage in order to enable wind farm groups to quickly respond to severe voltage fluctuations caused by future faults. If the area where the wind farm group is connected is a weak voltage area, the wind farm group is required to make emergency voltage control pre-decision in advance. When a fault occurs, the wind farm group can use the BP neural network model to quickly and dynamically assess the reactive power demand in the weak voltage area to which it is connected, thereby improving the reactive power setting speed, giving full play to the reactive power support capacity of wind power, and enhancing the transient voltage stability in the weak voltage area of ​​the system.

Claims

1. A method for evaluating dynamic reactive power demand in weak areas of power grid considering large-scale wind power access, characterized in that: The steps include: Step 1: Perform three-phase short-circuit fault simulation on each node in the system base state, and use the single-loop theorem in random matrix theory to analyze the voltage response curve to identify the weak voltage nodes and weak voltage areas in the system; In step 1, the method for identifying the weak voltage nodes and weak voltage areas of the system is: Step 1-1: Set a short-circuit fault on the system node in the base state operation mode, and remove the fault after maintaining it for a set time until the system resumes stable operation, and obtain the voltage data of each node during the simulation process; Step 1-2: Generate the original matrix within the time window T, and generate the N×T order augmented matrix of the corresponding node by copying the voltage state quantity of different nodes; Step 1-3: Standardize and perform singular value equivalent processing on each augmented matrix, calculate the eigenvalues ​​of the processed matrix according to the single ring theorem and calculate the average spectral radius κ MSR ; Step 1-4: Calculate the characteristic value statistic index s when the current node fails; Step 1-5: Perform the same short-circuit fault on another node in the system and repeat steps 1-1 to 1-4 until the index s when any node fails is obtained; Step 1-6: Sort the index s of each node. The larger the s value, the weaker the node voltage. Select the node with the weakest voltage. Draw the average spectrum radius MSR curve of each augmented matrix when the node fails. Select multiple nodes with a high degree of correlation with system stability to form a weak area with the weakest node. Step 2: judging whether the wind farm group needs to play a voltage regulation role when a serious fault occurs in a weak voltage node and causes voltage fluctuations in adjacent nodes according to the weak voltage nodes and weak voltage areas of the system; Step 3: If the area where the wind power is connected is not a weak voltage area, the wind power does not need to take action, and returns to step 1 to re-perform offline identification; if the area where the wind power is connected is a weak voltage area, proceed to step 4 to perform offline sample training; Step 4: Select multiple operation modes in the system base state neighborhood to set short-circuit faults on voltage-weak nodes and calculate the transient voltage stability index S in the voltage-weak area. TVS , train BP neural network to fit the mapping relationship between system operation status and transient voltage stability index; In step 4, the transient voltage stability index S of the voltage weak area is calculated TVS The specific method of the process is: Step 4-1: According to the voltage response curve of each node, obtain the node transient voltage stability index Z TVS The expression is: Among them, V min is the lowest voltage value after the fault is removed; T cr is the time threshold; V cr is the voltage threshold; T b For voltages continuously below V cr The maximum time of k t is a constant; V R is the steady-state voltage after the fault is removed; Step 4-2: According to the transient voltage stability index Z of each node TVS The transient voltage stability index S of the voltage weak area is obtained by the expression TVS expression: S TVS =maxZ TVS,i Among them, Z TVS,i is the transient voltage stability index of the i-th node; Step 5: Calculate the sensitivity of wind power output reactive power to transient voltage stability index through the trained BP neural network, and evaluate the wind power reactive power increase in the voltage weak area in real time according to the current system operation status; In step 5, the method for evaluating the increase in wind power reactive power in the voltage weak area is as follows: Step 5-1: Based on the trained BP neural network model, the perturbation method is used to solve the transient voltage stability index S of the voltage weak area due to the reactive power output of the wind farm group TVS The sensitivity η is expressed as: Among them, Q W The reactive power output of the current wind farm group; ΔQ W is the reactive power disturbance output by the wind farm group; S TVS (Q W +ΔQ W ) is the reactive power Q output by the current wind farm group W Increase ΔQ W The transient voltage stability index S of the voltage weak area corresponding to the output of the BP neural network is TVS Index value; S TVS (Q W- ΔQ W ) is the reactive power Q output by the current wind farm group W Reduce ΔQ W The transient voltage stability index S of the voltage weak area corresponding to the output of the BP neural network is TVS Index value; Step 5-2: Calculate the total reactive power demand ΔQ of the wind farm group in the voltage weak area, expressed as: Among them, S TVS0 is the index value of the most stable node voltage after fault removal, let V min =V cr , T b =0, find S TVS0 ; S TVS (Q W ) is the current wind farm group output reactive power Q W Transient voltage stability index in weak voltage area when 2. According to the method for dynamic reactive power demand assessment in weak grid areas considering large-scale wind power access as described in claim 1, it is characterized in that: In step 1-2, the method for generating an N×T-order augmented matrix of the corresponding node comprises the following specific steps: Step 1-2-1: By monitoring the voltage amplitude of each node in the system, at each time t i Get n voltage state variables, expressed as: x(t i )=[x1(t i ),x2(t i ),…x n (t i )] T Step 1-2-2: To analyze the influence of each node on the system, the voltage state quantity of the jth node is replicated multiple times to form a vector containing N state variables, expressed as: Step 1-2-3: The N×T order augmented matrix formed by the column vectors at each sampling moment in the time window with a width of T can be described as: X N×T =[x(t i-T+1 ),x(t i-T+2 ),...,x(t i )]。 3. According to the method for dynamic reactive power demand assessment in weak grid areas considering large-scale wind power access as described in claim 1, it is characterized in that: In step 1-3, the average spectral radius κ is calculated MSR The specific steps of the method are as follows: Step 1-3-1: Augment the matrix X N×T Standardization is carried out in the following ways: in, and σ(x i ) are the mean and standard deviation of the i-th row vector of matrix X respectively; and The matrices are The mean and standard deviation of the i-th row vector, with values ​​of 0 and 1; Step 1-3-2: Solve the normalized matrix The singular value equivalent matrix of is expressed as: Where U is a unitary matrix that satisfies the Haar distribution; Step 1-3-3: Let the normalized node voltage random matrix Let L be 1, and the expression after normalizing the matrix Z is: Among them, z i and are matrices Z and The i-th row vector of i ) is the vector z i The standard deviation of Step 1-3-4: Obtain the matrix The eigenvalue of κ is calculated according to the single ring theorem. MSR To judge the stability of the system and the correlation between each node and the system operation state, the average spectrum radius κ MSR The expression is: Among them, λ i is the matrix eigenvalue; N is the number of eigenvalues.

4. According to the method for evaluating dynamic reactive power demand in weak grid areas considering large-scale wind power access as described in claim 1, it is characterized in that: In steps 1-4, the expression of the eigenvalue statistic indicator s is: Where n is the number of system nodes; E(MSR 0j ) and E(MSR j ) are the κ of the j-th node augmented matrix when the system is in a stable operation state and after being disturbed. MSR average value.