A high-rise roof cantilever plate perforation repair structure and construction method thereof

By using perforated bolts, sealing gaskets and sealing slurry repair on the cantilever plates of high-rise buildings, the safety hazards of cantilever plate repair require high-altitude climbing, achieving efficient, safe and high-quality repair results.

CN115095184BActive Publication Date: 2025-04-04ANHUI WATER CONSERVANCY DEV CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210918515.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-01
Publication Date
2025-04-04
Estimated Expiration
2042-08-01

AI Technical Summary

Technical Problem

In high-rise building, the width of the cantilever board makes it difficult to install the hanging basket. The traditional repair method requires climbing at high altitude, which poses safety risks and poor repair quality.

Method used

A high-rise roof cantilever plate perforation repair structure is adopted, including perforation bolts, lower sealing gaskets, upper sealing gaskets and sealing slurry. By providing grooves and suspension fixtures on the cantilever plate, sealing and sealing using traction lines and locking nuts.

Benefits of technology

It realizes safe, fast and high-quality repair of cantilever plate perforations, reduces construction safety hazards, and improves sealing and durability after repair.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115095184B_ABST
    Figure CN115095184B_ABST
Patent Text Reader

Abstract

The present invention discloses a high-rise roof cantilever plate perforation repair structure and a construction method thereof. The high-rise roof cantilever plate perforation repair structure includes a perforation bolt, a lower sealing gasket, an upper sealing gasket and a plugging slurry. The head of the perforation bolt is located at the bottom end. The perforation bolt is inserted into the cantilever plate perforation from top to bottom and the bottom end of the perforation bolt is at the same horizontal height as the bottom of the cantilever plate perforation. The lower sealing gasket and the upper sealing gasket are both mounted on the perforation bolt and respectively plug the bottom and top end of the cantilever plate perforation. The plugging slurry is poured into the cantilever plate perforation to plug the gap between the lower sealing gasket and the upper sealing gasket. The high-rise roof cantilever plate perforation repair structure of the present invention can be directly constructed on the cantilever plate without high-altitude climbing construction, and the construction safety is high, and the construction is simple, and the cantilever plate perforation repair quality is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of high-rise building construction, in particular to a high-rise roof cantilever plate perforation repair structure and a construction method thereof. Background Art

[0002] At present, in high-rise buildings, in order to reflect the aesthetic effect of the building, most of them are equipped with cantilever panels around the top roof, and the width of the cantilever panels is relatively wide. When decorating the exterior wall, the traditional construction method is to install a hanging basket, but because the cantilever panel is wide, the length of the forearm of the hanging basket cannot meet the use requirements, which is bound to cause difficulties in the installation of the hanging basket. In order to ensure the safety of the installation and use of the hanging basket, it is necessary to drill holes on the cantilever panel for the steel wire rope of the hanging basket. However, after the hanging basket and the steel wire rope are removed, the repair construction of the cantilever panel perforation becomes a problem. In general, the traditional construction method requires construction workers to climb high to repair, but because it is a high-altitude operation, there are great safety hazards when the construction workers operate, the quality of the holes after repair is poor, the durability is low, and it is easy to leak, which affects the appearance of the building, and the cost is also high. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a high-rise roof cantilever plate perforation repair structure and a construction method thereof, which can be directly constructed on the cantilever plate without the need for high-altitude climbing construction, has high construction safety, is simple to construct, and has good cantilever plate perforation repair quality.

[0004] The technical solution of the present invention is:

[0005] A high-rise roof cantilever plate perforation repair structure includes a perforation bolt, a lower sealing gasket, an upper sealing gasket and a sealing slurry. The head of the perforation bolt is located at the bottom end. The perforation bolt is inserted into the cantilever plate perforation from top to bottom and the bottom end of the perforation bolt and the bottom of the cantilever plate perforation are located at the same horizontal height. The lower sealing gasket and the upper sealing gasket are both mounted on the perforation bolt and seal the bottom and top of the cantilever plate perforation respectively. The sealing slurry is poured into the cantilever plate perforation to seal the gap between the lower sealing gasket and the upper sealing gasket tightly.

[0006] A slot is provided at the top of the cantilever plate through-hole, and the horizontal height of the top end of the through-hole bolt is higher than the horizontal height of the bottom of the slot and lower than the horizontal height of the slot mouth. The lower sealing gasket is located in the through-hole of the cantilever plate and is in close contact with the head of the through-hole bolt, thereby sealing the bottom of the through-hole of the cantilever plate. The upper sealing gasket is placed on the bottom of the slot, and the locking nut is threadedly connected to the through-hole bolt from top to bottom and is in close contact with the upper sealing gasket, thereby sealing the opening of the cantilever plate through-hole at the bottom of the slot.

[0007] The high-rise roof cantilever plate perforation repair structure also includes a suspension fixture and a traction line. The suspension fixture is fixed to the outside of the cantilever plate perforation, and the top of the perforation bolt is tied to the suspension fixture through the traction line.

[0008] The suspension fixing member is a suspension beam placed on the top of the cantilever plate. The suspension beam is located just above the through-holes of the cantilever plate, and the through-hole bolts are vertically suspended on the suspension beam through traction lines.

[0009] The perforated slot of the cantilever plate is densely filled with a waterproof sealing block, the top of the waterproof sealing block is flush with the top of the cantilever plate, and the part of the perforated bolt located in the slot, the upper sealing gasket and the locking nut are all covered in the waterproof sealing block.

[0010] The head of the perforated bolt, the lower sealing gasket, the part of the perforated bolt located in the slot, the upper sealing gasket and the outer surfaces of the locking nut are all coated with an anti-corrosion layer.

[0011] The plugging slurry is a quick-setting polymer cement slurry.

[0012] A construction method for a high-rise roof cantilever plate perforation repair structure specifically comprises the following steps:

[0013] (1) Make a groove at the top of the cantilever plate perforation and ensure that the bottom of the groove is flat;

[0014] (2) The perforated bolt is arranged vertically with the head of the perforated bolt located at the bottom, and then the top of the perforated bolt is tied to the suspension fixture through a traction line, the suspension fixture is fixed to the outside of the cantilever plate through the hole, and then the perforated bolt is inserted into the cantilever plate through the hole from top to bottom, and the length of the traction line between the suspension fixture and the perforated bolt is adjusted so that the bottom end of the perforated bolt and the bottom of the cantilever plate through the hole are at the same level;

[0015] (3) The lower sealing gasket is mounted on the perforated bolt from top to bottom and inserted into the perforated hole of the cantilever plate until the lower sealing gasket is in close contact with the head of the perforated bolt, thereby sealing the bottom of the perforated hole of the cantilever plate;

[0016] (4) Fill the plugging slurry from the top of the cantilever plate perforation into the cantilever plate perforation until the level of the top of the plugging slurry is consistent with the level of the bottom of the cantilever plate perforation slot;

[0017] (5) After the plugging slurry solidifies and meets the strength requirements, cut off the traction line at the top of the perforated bolt, then put the upper sealing gasket on the perforated bolt and place it at the bottom of the slot, and then thread the locking nut on the perforated bolt from top to bottom and make close contact with the upper sealing gasket, so that the upper sealing gasket seals the part below the perforated slot of the cantilever plate;

[0018] (6) Use waterproof mortar to fill the slotted part of the cantilever plate tightly to form a waterproof sealing block. The top of the waterproof sealing block is flush with the top of the cantilever plate.

[0019] After the top of the cantilever plate perforation is slotted, the entire hole of the cantilever plate perforation is cleaned, and the slot bottom is leveled with leveling mortar to make the slot bottom flat and facilitate close contact between the upper sealing gasket and the slot bottom.

[0020] Advantages of the present invention:

[0021] (1) During the construction of the present invention, construction workers can directly stand on the cantilever plate to repair the perforations of the cantilever plate without the need for high-altitude climbing construction, which greatly reduces the safety hazards of construction.

[0022] (2) The cantilever plate perforation repair structure of the present invention is simple and the construction is convenient and fast, which greatly improves the construction efficiency of the cantilever plate perforation repair of the high-rise roof.

[0023] (3) The present invention uses upper and lower sealing gaskets connected to the perforated bolts to seal the cantilever plate perforations at both ends, and uses a plugging slurry to make the cantilever plate perforation repair quality good, high durability, and not easy to leak;

[0024] (4) The present invention provides a waterproof sealing block at the slot, which further improves the sealing and waterproof properties of the cantilever plate after the perforation repair, and increases the service life of the repaired structure;

[0025] (5) The outer surfaces of the perforated bolt, lower sealing gasket, upper sealing gasket and locking nut of the present invention are all coated with an anti-corrosion layer, so that the present invention has high corrosion resistance and further improves the service life of the repaired structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structure of the suspension fixation of the perforated bolts of the present invention.

[0027] Figure 2 It is a structural schematic diagram of the high-rise roof cantilever plate perforation repair structure of the present invention.

[0028] Figure markings: 1-perforated bolt, 2-lower sealing gasket, 3-upper sealing gasket, 4-locking nut, 5-sealing slurry, 6-suspension beam, 7-traction line, 8-waterproof sealing block, 9-slot, 10-cantilever plate. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] See Figure 1 and Figure 2 A high-rise roof cantilever plate perforation repair structure includes a perforated bolt 1, a lower sealing gasket 2, an upper sealing gasket 3, a locking nut 4, a plugging slurry 5, a suspension beam 6, a traction line 7 and a waterproof sealing block 8. A slot 9 is provided at the top of the cantilever plate perforation. The head of the perforated bolt 1 is located at the bottom. The perforated bolt 1 is inserted into the cantilever plate perforation from top to bottom and the bottom of the perforated bolt 1 is at the same horizontal height as the bottom of the cantilever plate perforation. The horizontal height of the top of the perforated bolt 1 is higher than the horizontal height of the bottom of the slot 9 and lower than the horizontal height of the notch of the slot 9. The suspension beam 6 is fixed directly above the cantilever plate perforation. The top of the perforated bolt 1 is vertically suspended on the suspension beam 6 through the traction line 7. The lower sealing gasket 2 and the upper sealing gasket 3 are both mounted on On the perforated bolt 1, the lower sealing gasket 2 is located in the perforation of the cantilever plate and is in close contact with the head of the perforated bolt 1, thereby sealing the bottom of the cantilever plate perforation, and the upper sealing gasket 3 is placed on the bottom of the slot 9. The locking nut 4 is threadedly connected to the perforated bolt 1 from top to bottom and is in close contact with the upper sealing gasket 3, thereby sealing the opening of the cantilever plate perforation at the bottom of the slot 9. The sealing slurry 5 is poured into the perforation of the cantilever plate to seal the gap between the lower sealing gasket 2 and the upper sealing gasket 3. The slot 9 of the cantilever plate perforation is densely filled with a waterproof sealing block 8, and the top of the waterproof sealing block 8 is flush with the top of the cantilever plate 10. The part of the perforated bolt 1 located in the slot 9, the upper sealing gasket 3 and the locking nut 4 are all covered in the waterproof sealing block 8.

[0031] Among them, the head of the perforated bolt 1, the lower sealing gasket 2, the part of the perforated bolt 1 located in the groove 9, the upper sealing gasket 3 and the outer surfaces of the locking nut 4 are all coated with an anti-corrosion layer; the sealing slurry 5 uses quick-setting polymer cement slurry (model FY-DL-5).

[0032] A construction method for a high-rise roof cantilever plate perforation repair structure specifically comprises the following steps:

[0033] (1) A slot 9 is made at the top of the cantilever plate perforation, and then the entire hole of the cantilever plate perforation is cleaned, and the bottom of the slot 9 is leveled with leveling mortar to make the bottom of the slot 9 flat, so that the upper sealing gasket 3 is in close contact with the bottom of the slot 9;

[0034] (2) The piercing bolt 1 is arranged vertically with the head of the piercing bolt 1 located at the bottom, and then the top of the piercing bolt 1 is tied to the suspension beam 6 through the traction line 7. The suspension beam 6 is supported on the top of the cantilever plate 10 and is located directly above the through hole of the cantilever plate. Then, the piercing bolt 1 is inserted into the through hole of the cantilever plate from top to bottom, and the length of the traction line 7 between the suspension beam 6 and the piercing bolt 1 is adjusted so that the bottom end of the piercing bolt 1 and the bottom of the through hole of the cantilever plate are at the same horizontal height;

[0035] (3) The lower sealing gasket 2 is mounted on the perforated bolt 1 from top to bottom and inserted into the perforated hole of the cantilever plate until the lower sealing gasket 2 is in close contact with the head of the perforated bolt 1, thereby sealing the bottom of the perforated hole of the cantilever plate;

[0036] (4) Fill the plugging slurry 5 from the top of the cantilever plate perforation into the cantilever plate perforation until the level of the top of the plugging slurry 5 is consistent with the level of the bottom of the cantilever plate perforation slot 9;

[0037] (5) After the plugging slurry 5 solidifies and meets the strength requirements, cut off the traction line 7 at the top of the perforated bolt 1, and then put the upper sealing gasket 3 on the perforated bolt 1 and place it at the bottom of the slot 9, and then thread the locking nut 4 on the perforated bolt 1 from top to bottom and make close contact with the upper sealing gasket 3, so that the upper sealing gasket 3 seals the part below the perforated slot 9 of the cantilever plate;

[0038] (6) Use waterproof mortar to fill the slotted part of the cantilever plate tightly to form a waterproof sealing block 8, and the top of the waterproof sealing block 8 is flush with the top of the cantilever plate 10.

[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high-rise roof cantilever plate perforation repair structure, characterized in that: It comprises a perforated bolt, a lower sealing gasket, an upper sealing gasket and a plugging slurry, wherein the head of the perforated bolt is located at the bottom, the perforated bolt is inserted into the perforation of the cantilever plate from top to bottom, and the bottom end of the perforated bolt and the bottom of the perforation of the cantilever plate are at the same horizontal height, the lower sealing gasket and the upper sealing gasket are both mounted on the perforated bolt and respectively plug the bottom end and the top end of the perforation of the cantilever plate, and the plugging slurry is poured into the perforation of the cantilever plate to plug the gap between the lower sealing gasket and the upper sealing gasket tightly; The top of the cantilever plate through-hole is provided with a slot, the horizontal height of the top of the through-hole bolt is higher than the horizontal height of the bottom of the slot and lower than the horizontal height of the slot opening, the lower sealing gasket is located in the through-hole of the cantilever plate and is in close contact with the head of the through-hole bolt, thereby sealing the bottom of the through-hole of the cantilever plate, the upper sealing gasket is placed on the bottom of the slot, the locking nut is threadedly connected to the through-hole bolt from top to bottom and is in close contact with the upper sealing gasket, thereby sealing the opening of the cantilever plate through-hole at the bottom of the slot; The high-rise roof cantilever plate perforation repair structure also includes a suspension fixture and a traction line, the suspension fixture is fixed to the outside of the cantilever plate perforation, and the top of the perforation bolt is tied to the suspension fixture through the traction line; The perforated slot of the cantilever plate is densely filled with a waterproof sealing block, the top of the waterproof sealing block is flush with the top of the cantilever plate, and the part of the perforated bolt located in the slot, the upper sealing gasket and the locking nut are all covered in the waterproof sealing block.

2. A high-rise roof cantilever plate perforation repair structure according to claim 1, characterized in that: The suspension fixing member is a suspension beam placed on the top of the cantilever plate. The suspension beam is located just above the through-holes of the cantilever plate, and the through-hole bolts are vertically suspended on the suspension beam through traction lines.

3. A high-rise roof cantilever plate perforation repair structure according to claim 1, characterized in that: The head of the perforated bolt, the lower sealing gasket, the part of the perforated bolt located in the slot, the upper sealing gasket and the outer surfaces of the locking nut are all coated with an anti-corrosion layer.

4. A high-rise roof cantilever plate perforation repair structure according to claim 1, characterized in that: The plugging slurry is a quick-setting polymer cement slurry.

5. The construction method of a high-rise roof cantilever plate perforation repair structure according to claim 1, characterized in that: The specific steps include: (1) Make a groove at the top of the cantilever plate perforation and ensure that the bottom of the groove is flat; (2) Set the perforated bolt vertically with the head of the perforated bolt at the bottom, then tie the top of the perforated bolt to the suspension fixture through a traction line, fix the suspension fixture to the outside of the cantilever plate through the hole, and then insert the perforated bolt into the cantilever plate through the hole from top to bottom, and adjust the length of the traction line between the suspension fixture and the perforated bolt so that the bottom end of the perforated bolt and the bottom of the cantilever plate through the hole are at the same level; (3) Put the lower sealing gasket on the perforated bolt from top to bottom and extend it into the perforated hole of the cantilever plate until the lower sealing gasket is in close contact with the head of the perforated bolt, thereby sealing the bottom of the perforated hole of the cantilever plate; (4) Pour the plugging slurry from the top of the cantilever plate perforation into the cantilever plate perforation until the level of the top of the plugging slurry is consistent with the level of the bottom of the cantilever plate perforation slot; (5) After the plugging slurry solidifies and meets the strength requirements, cut off the traction line at the top of the perforated bolt, then put the upper sealing gasket on the perforated bolt and place it at the bottom of the slot, then thread the locking nut on the perforated bolt from top to bottom and make close contact with the upper sealing gasket, so that the upper sealing gasket seals the part below the perforated slot of the cantilever plate; (6) Use waterproof mortar to fill the slotted part of the cantilever board tightly to form a waterproof sealing block. The top of the waterproof sealing block is flush with the top of the cantilever board.

6. The construction method of a high-rise roof cantilever plate perforation repair structure according to claim 5, characterized in that: After the top of the cantilever plate perforation is slotted, the entire hole of the cantilever plate perforation is cleaned, and the slot bottom is leveled with leveling mortar to make the slot bottom flat, which is convenient for the upper sealing gasket to closely contact the slot bottom.

Citation Information

Patent Citations

  • Plugging device of reserved holes of suspended concrete floor

    CN203201142U

  • Outer wall bolt hole novel to drawing block structure

    CN205153571U

  • High-rise roof cantilever plate perforation repairing structure

    CN217812541U