Optimal dispatching method and equipment based on mismatch of power generation flow of upstream and downstream cascade power stations
By calculating and optimizing the power generation flow mismatch problem of upstream and downstream cascade power stations, the optimal water level and amplitude range are determined, the problems of water abandonment and resource waste are solved, and the power generation efficiency and economic benefits are improved.
Patent Information
- Application Number
- CN202210444311.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-25
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-04-25
AI Technical Summary
The mismatch in power generation flows of upstream and downstream cascade hydropower stations leads to uncertainty in reservoir dispatching and operation, resulting in water abandonment and resource waste, affecting power generation efficiency.
By obtaining relevant information about the upstream and downstream cascade power stations, we calculate the water abandonment time, and determine the optimal starting water level and daily water level range of the downstream power stations according to different power generation operation modes. We optimize scheduling to match the upstream and downstream power generation flows and reduce water abandonment. Increase power generation.
It is possible to increase the power generation of downstream power stations without abandoning water, reduce waste of water resources, reduce the flood control pressure of upstream power stations on the downstream, and improve economic benefits.
Smart Images

Figure CN115099551B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydropower optimization, and in particular to an optimization scheduling method, device, equipment and storage medium based on mismatch of power generation flow of upstream and downstream cascade power stations. Background Art
[0002] my country is rich in water resources, and hydropower is an important type of power source in my country's power system. Therefore, the joint optimization of cascade hydropower in the basin has also become an important technical content of the dispatching and operation of my country's power system. The optimal dispatching of cascade hydropower generation is to optimize the power generation plan of the hydropower station on an annual cycle and a monthly basis, so as to reasonably arrange the hydropower station for power generation and make full use of water resources. As the importance of clean energy becomes more and more evident, more and more power systems have adopted a complementary approach between cascade hydropower stations, greatly reducing environmental pollution. However, in actual work, the mismatch of flow rates of upstream and downstream hydropower stations has brought many uncertainties to the dispatching and operation of reservoirs. Improper dispatching will cause unnecessary water abandonment and waste of water resources. On the contrary, if the dispatching is reasonable, it can not only play a peak-cutting role in the flood season, but also increase power generation and improve economic operation. Summary of the invention
[0003] The present invention provides an optimization scheduling method, device, equipment and storage medium based on the mismatch of power generation flow of upstream and downstream cascade power stations, aiming to increase the power generation of downstream power stations, reduce water abandonment and improve economic benefits.
[0004] To this end, the first object of the present invention is to propose an optimization scheduling method based on the mismatch of power generation flow of upstream and downstream cascade power stations, comprising:
[0005] Obtaining power station related information of the upstream and downstream cascade power stations, the power station related information at least includes water level and storage capacity information, power generation information of the upstream and downstream cascade power stations, and water inflow composition information of the downstream power station; wherein the water level and storage capacity information of the upstream and downstream cascade power stations includes: normal water storage level and corresponding storage capacity, dead water level and storage capacity, and water level and storage capacity curve; the power generation information is the maximum power generation flow of the upstream and downstream cascade power stations; the water inflow composition information of the downstream power station includes the outflow flow information of the upstream power station and the water inflow flow information of all tributaries;
[0006] Based on the relevant information of the upstream and downstream cascade power stations, determine the impact of the upstream power station and tributaries on the flow of the downstream power station, and calculate the water abandonment time of the downstream power station; the water abandonment time of the downstream power station is calculated by the full flow of the upstream and downstream power stations, the tributary water flow, the reservoir capacity corresponding to the normal water storage level, and the reservoir capacity corresponding to the starting reservoir water level of the downstream power station;
[0007] Different power generation and operation modes between the upstream and downstream power stations cause changes in the time and amount of water abandonment by the downstream power station. According to the time of water abandonment by the downstream power station, the optimal starting water level and daily water level fluctuation range for the downstream power station to avoid water abandonment within 24 hours are determined to achieve optimized scheduling for the mismatch of power generation flow of the upstream and downstream cascade power stations.
[0008] Among them, in the step of determining the optimal starting water level and daily water level fluctuation range for the downstream power station to avoid water abandonment within 24 hours according to the water abandonment time of the downstream power station, it is assumed that the full flow rate of the upstream power station unit is x cubic meters per second, the full flow rate of the downstream power station is y cubic meters per second, and the tributary water flow rate is z cubic meters per second, then the water abandonment time of the downstream power station is:
[0009] T=(V 正 -V-ΔV)×10 8 / (x+zy) / 3600
[0010] Among them, V 正 is the storage capacity corresponding to the normal water level, V is the storage capacity corresponding to different starting water levels of the downstream power station, ΔV is the storage capacity after the specified working time t, ΔV=[(x+zy)×(t×3600)] / 10 8 .
[0011] Among them, the different power generation operation modes of the upstream power station and the downstream power station cause changes in the time and amount of water abandonment of the downstream power station; the optimal starting water level and daily water level fluctuation range without water abandonment of the downstream power station are determined by the following two methods to match the daily power generation of the upstream power station and the downstream power station;
[0012] The first method: the upstream power station units are fully stopped and then fully loaded, while the downstream power station is running at full load;
[0013] The second method: the upstream power station's units are completely shut down and then loaded to full capacity. The downstream power station maintains a balanced reservoir water level within the first t hours, and then fully generates power after t hours.
[0014] Among them, the impact of the upstream power station on the downstream power station is mainly limited by the tributary flow. Under different tributary flow conditions, the shortest and longest time for the downstream power station to open the gate and abandon water is calculated. The lower the starting water level of the downstream power station, the longer the time for abandoning water.
[0015] Among them, when the outflow of the upstream power station is 0 and the inflow of tributary water flow is z<y, the downstream power station will not abandon water. If z>y, the downstream power station will empty the reservoir in advance to increase power generation;
[0016] When the upstream power station is fully powered and the tributary inflow z≥0, the downstream power station abandons water according to the calculated abandonment time and controls the power generation load according to the initial water level of the downstream power station when the upstream power station is fully powered. When the downstream power station maintains full load operation, the power generation efficiency of the downstream power station is the highest and the abandonment time is delayed.
[0017] The second object of the present invention is to propose an optimization dispatching device based on the mismatch of power generation flow of upstream and downstream cascade power stations, comprising:
[0018] A data acquisition module is used to obtain power station related information of upstream and downstream cascade power stations, wherein the power station related information at least includes water level and storage capacity information, power generation information, and water inflow composition information of the downstream power station; wherein the water level and storage capacity information of the upstream and downstream cascade power stations includes: normal water storage level and corresponding storage capacity, dead water level and storage capacity, and water level and storage capacity curve; the power generation information is the maximum power generation flow of the upstream and downstream cascade power stations; the water inflow composition information of the downstream power station includes the outflow flow information of the upstream power station and the water inflow flow information of all tributaries;
[0019] The water abandonment time calculation module is used to determine the impact of the upstream power station and tributaries on the flow of the downstream power station based on the relevant information of the upstream and downstream cascade power stations, and calculate the water abandonment time of the downstream power station; wherein, the water abandonment time of the downstream power station is calculated by the full flow of the upstream and downstream power stations, the flow of tributaries, the storage capacity corresponding to the normal water storage level, and the storage capacity corresponding to the starting water level of the downstream power station;
[0020] The optimization scheduling module is used for the different power generation operation modes of the upstream power station and the downstream power station, which cause changes in the water abandonment time and amount of the downstream power station; according to the water abandonment time of the downstream power station, the optimal starting water level and daily water level fluctuation range of the downstream power station without water abandonment within 24 hours are determined to achieve optimized scheduling of the mismatched power generation flow of the upstream and downstream cascade power stations.
[0021] Among them, the optimization scheduling module determines the optimal starting water level and daily water level range for the downstream power station to avoid water abandonment through the following two methods, and matches the daily power generation of the upstream power station and the downstream power station;
[0022] The first method: the upstream power station units are fully stopped and then fully loaded, while the downstream power station is running at full load;
[0023] The second method: the upstream power station's units are completely shut down and then loaded to full capacity. The downstream power station maintains a balanced reservoir water level within the first t hours, and then fully generates power after t hours.
[0024] Among them, in the optimization and scheduling process of the optimization and scheduling module, when the outflow of the upstream power station is 0 and the inflow of the tributary is z<y, the downstream power station will not abandon water. If z>y, the downstream power station will vacate the reservoir in advance to increase power generation;
[0025] When the upstream power station is fully powered and the tributary inflow z≥0, the downstream power station abandons water according to the calculated abandonment time and controls the power generation load according to the initial water level of the downstream power station when the upstream power station is fully powered; when the downstream power station maintains full load operation, the power generation efficiency of the downstream power station is the highest and the abandonment time is delayed.
[0026] The third object of the present invention is to provide an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute each step in the method of the aforementioned technical solution.
[0027] A fourth object of the present invention is to provide a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to enable a computer to execute each step in the method according to the aforementioned technical solution.
[0028] Different from the prior art, the optimization scheduling method based on the mismatch of power generation flow of upstream and downstream cascade power stations provided by the present invention obtains power station related information of upstream and downstream cascade power stations, and based on the obtained related information of upstream and downstream cascade power stations, determines the influence of upstream power stations and tributaries on the flow of downstream power stations, and calculates the water abandonment time of downstream power stations; according to the water abandonment time of downstream power stations, determines the optimal starting water level and daily water level fluctuation range of downstream power stations within 24 hours without water abandonment. Through the present invention, the power generation of downstream power stations can be increased, water abandonment can be reduced, and peak elimination can be achieved when the incoming water is large, reducing the flood control pressure of upstream power stations on downstream power stations, and improving economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The present invention and / or additional aspects and advantages will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0030] Figure 1 It is a flow chart of an optimization scheduling method based on mismatch of power generation flow of upstream and downstream cascade power stations provided by the present invention.
[0031] Figure 2 It is a structural schematic diagram of an optimization scheduling device based on the mismatch of power generation flow of upstream and downstream cascade power stations provided by the present invention.
[0032] Figure 3 It is a structural schematic diagram of a non-temporary computer-readable storage medium provided by the present invention. DETAILED DESCRIPTION
[0033] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0034] Figure 1 An optimization scheduling method based on the mismatch of power generation flow of upstream and downstream cascade power stations provided in an embodiment of the present invention includes:
[0035] S101: Acquire power station related information of upstream and downstream cascade power stations, where the power station related information at least includes water level storage capacity information and power generation information of the upstream and downstream cascade power stations, and water composition information of the downstream power station.
[0036] Among them, the water level and storage capacity information of the upstream and downstream cascade power stations includes: normal water storage level and corresponding storage capacity, dead water level and storage capacity, and water level and storage capacity curve; the power generation information is the maximum power generation flow of the upstream and downstream cascade power stations. The water composition information of the downstream power station includes the outflow flow information of the upstream power station and the water flow information of all tributaries.
[0037] S102: Based on the acquired information about the upstream and downstream cascade power stations, determine the impact of the upstream power station and tributaries on the flow of the downstream power station, and calculate the water abandonment time of the downstream power station. The water abandonment time of the downstream power station is calculated by the full flow of the upstream and downstream power stations, the tributary water flow, the reservoir capacity corresponding to the normal water storage level, and the reservoir capacity corresponding to the starting reservoir water level of the downstream power station.
[0038] Assuming that the full flow rate of the upstream power station unit is x cubic meters per second, the full flow rate of the downstream power station is y cubic meters per second, and the tributary water flow rate is z cubic meters per second, the water abandonment time of the downstream power station is:
[0039] T=(V 正 -V-ΔV)×10 8 / (x+zy) / 3600
[0040] Among them, V 正 is the storage capacity corresponding to the normal water level, V is the storage capacity corresponding to different starting water levels of the downstream power station, ΔV is the storage capacity after the specified working time t, ΔV=[(x+zy)×(t×3600)] / 10 8 .
[0041] Corresponding to different starting water levels, the time for downstream power station to abandon water is shown in Table 1 below:
[0042]
[0043] Table 1 Impact of upstream power station on water abandonment time of downstream power station
[0044] The present invention is based on the premise of making full use of water resources. By analyzing that no water abandonment occurs under different water inflows and power generation operation modes of upstream and downstream cascade power stations, the daily power generation of upstream and downstream cascade power stations is matched to achieve the purpose of increasing power generation and reducing water abandonment.
[0045] Step S103: Different power generation operation modes between the upstream power station and the downstream power station cause changes in the water abandonment time and amount of the downstream power station; according to the water abandonment time of the downstream power station, the optimal starting water level and daily water level fluctuation range of the downstream power station without water abandonment within 24 hours are determined to achieve optimal scheduling of the mismatched power generation flow of the upstream and downstream cascade power stations.
[0046] Different power generation operation modes of the upstream power station and the downstream power station cause changes in the time and amount of water abandonment of the downstream power station. The optimal starting water level and daily water level range for the downstream power station to avoid water abandonment are determined by the following two methods to match the daily power generation of the upstream power station and the downstream power station;
[0047] The first method: the upstream power station units are fully stopped and then fully loaded, while the downstream power station is running at full load;
[0048] The second method: the upstream power station's units are completely shut down and then loaded to full capacity. The downstream power station maintains a balanced reservoir water level within the first t hours, and then fully generates power after t hours.
[0049] The impact of the upstream power station on the downstream power station is mainly limited by the tributary flow. Under different tributary flow conditions, the shortest and longest time for the downstream power station to open the gate and abandon water is calculated. The lower the starting water level of the downstream power station, the longer the time for abandoning water.
[0050] When the outflow of the upstream power station is 0 and the inflow of the tributary is z<y, the downstream power station will not abandon water. If z>y, the downstream power station will empty the reservoir in advance to increase power generation.
[0051] When the upstream power station is fully powered and the tributary inflow z≥0, the downstream power station abandons water according to the calculated abandonment time and controls the power generation load according to the initial water level of the downstream power station when the upstream power station is fully powered. When the downstream power station maintains full load operation, the power generation efficiency of the downstream power station is the highest and the abandonment time is delayed.
[0052] When the flow of the upstream power station and tributaries gradually increases, the daily power generation of the downstream power station changes as shown in Table 2:
[0053]
[0054]
[0055] Table 2 The matching relationship between the daily power generation of the downstream power station and the upstream power station and tributary flow
[0056] In addition, if Figure 2As shown, the present invention provides an optimization scheduling device based on the mismatch of power generation flow of upstream and downstream cascade power stations, comprising:
[0057] The data acquisition module 310 is used to acquire power station related information of the upstream and downstream cascade power stations, and the power station related information at least includes water level storage capacity information and power generation information of the upstream and downstream cascade power stations, and water composition information of the downstream power station;
[0058] A water abandonment time calculation module 320 is used to determine the impact of the upstream power station and tributaries on the flow of the downstream power station based on the acquired information related to the upstream and downstream cascade power stations, and calculate the water abandonment time of the downstream power station;
[0059] The optimization scheduling module 330 is used to determine the optimal starting water level and daily water level fluctuation range of the downstream power station within 24 hours without water abandonment according to the water abandonment time of the downstream power station, so as to achieve the optimization scheduling of the mismatched power generation flow of the upstream and downstream cascade power stations.
[0060] In order to implement the embodiment, the present invention also proposes an electronic device, comprising: at least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute each step of the optimization scheduling method based on the mismatch of power generation flow of upstream and downstream cascade power stations in the aforementioned technical solution.
[0061] like Figure 3 As shown, the non-transitory computer-readable storage medium includes a memory 810 of instructions, an interface 830, and the instructions can be executed by a processor 820 to complete the method. Optionally, the storage medium can be a non-transitory computer-readable storage medium, for example, the non-transitory computer-readable storage medium can be a ROM, a random access memory (RAM), a CD-ROM, a magnetic tape, a floppy disk, an optical data storage device, etc.
[0062] In order to implement the embodiment, the present invention also proposes a non-temporary computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, it implements the optimized scheduling based on the mismatch of power generation flow of upstream and downstream cascade power stations as in the embodiment of the present invention.
[0063] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0064] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0065] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.
[0066] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0067] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the described embodiment, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0068] A person skilled in the art may understand that all or part of the steps of implementing the method of the embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0069] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0070] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the embodiments are exemplary and cannot be construed as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the embodiments within the scope of the present invention.
Claims
1. An optimization scheduling method based on the mismatch of power generation flow of upstream and downstream cascade power stations, characterized in that: include: Obtaining power station related information of the upstream and downstream cascade power stations, the power station related information at least includes water level and storage capacity information, power generation information of the upstream and downstream cascade power stations, and water inflow composition information of the downstream power station; wherein the water level and storage capacity information of the upstream and downstream cascade power stations includes: normal water storage level and corresponding storage capacity, dead water level and storage capacity, and water level and storage capacity curve; the power generation information is the maximum power generation flow of the upstream and downstream cascade power stations; the water inflow composition information of the downstream power station includes the outflow flow information of the upstream power station and the water inflow flow information of all tributaries; Based on the relevant information of the upstream and downstream cascade power stations, determine the impact of the upstream power station and tributaries on the flow of the downstream power station, and calculate the water abandonment time of the downstream power station; the water abandonment time of the downstream power station is calculated by the full flow of the upstream and downstream power stations, the tributary water flow, the reservoir capacity corresponding to the normal water storage level, and the reservoir capacity corresponding to the starting reservoir water level of the downstream power station; Different power generation operation modes between the upstream power station and the downstream power station cause changes in the time and amount of water abandonment of the downstream power station. According to the time of water abandonment of the downstream power station, the optimal starting water level and daily water level fluctuation range of the downstream power station without water abandonment within 24 hours are determined to achieve optimal scheduling of the mismatched power generation flow of the upstream and downstream cascade power stations. The different power generation operation modes of the upstream power station and the downstream power station cause changes in the water abandonment time and amount of the downstream power station; the optimal starting water level and daily water level variation range without water abandonment in the downstream power station are determined by the following two methods to match the daily power generation of the upstream power station and the downstream power station; The first method: the upstream power station units are fully stopped and then fully loaded, while the downstream power station is running at full load; The second method: the upstream power station units are fully stopped and then fully loaded, and the downstream power station maintains the reservoir water level balance within the first t hours, and then fully generates power after t hours; The impact of the upstream power station on the downstream power station is mainly limited by the tributary flow. Under different tributary flow conditions, the shortest and longest time for the downstream power station to open the gate and abandon water is calculated. The lower the starting water level of the downstream power station, the longer the time for abandoning water. When the outflow of the upstream power station is 0 and the inflow of the tributary is z<y, the downstream power station will not abandon water. If z>y, the downstream power station will empty the reservoir in advance to increase power generation. When the upstream power station is fully powered and the tributary inflow z≥0, the downstream power station abandons water according to the calculated abandonment time and controls the power generation load according to the initial water level of the downstream power station when the upstream power station is fully powered; when the downstream power station maintains full load operation, the power generation efficiency of the downstream power station is the highest and the abandonment time is delayed.
2. The optimization scheduling method based on the mismatch of power generation flow of upstream and downstream cascade power stations according to claim 1 is characterized in that: In the step of determining the optimal starting water level and daily water level fluctuation range for the downstream power station to avoid water abandonment within 24 hours according to the water abandonment time of the downstream power station, it is assumed that the full generation flow of the upstream power station unit is x cubic meters per second, the full generation flow of the downstream power station is y cubic meters per second, and the tributary water flow is z cubic meters per second, then the water abandonment time of the downstream power station is: T=(V 正 -V-ΔV)×10 8 / (x+z-y) / 3600 Among them, V 正 is the storage capacity corresponding to the normal water level, V is the storage capacity corresponding to different starting water levels of the downstream power station, ΔV is the storage capacity after the specified working time t, ΔV=[(x+zy)×(t×3600)] / 10 8 .
3. An optimization dispatching device based on the mismatch of power generation flow of upstream and downstream cascade power stations, characterized in that: include: A data acquisition module is used to obtain power station related information of upstream and downstream cascade power stations, wherein the power station related information at least includes water level and storage capacity information, power generation information, and water inflow composition information of the downstream power station; wherein the water level and storage capacity information of the upstream and downstream cascade power stations includes: normal water storage level and corresponding storage capacity, dead water level and storage capacity, and water level and storage capacity curve; the power generation information is the maximum power generation flow of the upstream and downstream cascade power stations; the water inflow composition information of the downstream power station includes the outflow flow information of the upstream power station and the water inflow flow information of all tributaries; The water abandonment time calculation module is used to determine the impact of the upstream power station and tributaries on the flow of the downstream power station based on the relevant information of the upstream and downstream cascade power stations, and calculate the water abandonment time of the downstream power station; wherein, the water abandonment time of the downstream power station is calculated by the full flow of the upstream and downstream power stations, the flow of tributaries, the storage capacity corresponding to the normal water storage level, and the storage capacity corresponding to the starting water level of the downstream power station; The optimization scheduling module is used for the different power generation operation modes of the upstream power station and the downstream power station, which causes the changes in the water abandonment time and amount of the downstream power station. According to the water abandonment time of the downstream power station, the optimal starting water level and daily water level fluctuation range of the downstream power station within 24 hours without water abandonment are determined, so as to realize the optimization scheduling of the mismatched power generation flow of the upstream and downstream cascade power stations; The optimization scheduling module determines the optimal starting water level and daily water level range for the downstream power station to avoid water abandonment in the following two ways, and matches the daily power generation of the upstream power station with that of the downstream power station; The first method: the upstream power station units are fully stopped and then fully loaded, while the downstream power station is running at full load; The second method: the upstream power station units are fully stopped and then fully loaded, and the downstream power station maintains the reservoir water level balance within the first t hours, and then fully generates power after t hours; The impact of the upstream power station on the downstream power station is mainly limited by the tributary flow. Under different tributary flow conditions, the shortest and longest time for the downstream power station to open the gate and abandon water is calculated. The lower the starting water level of the downstream power station, the longer the time for abandoning water. During the optimization and scheduling process of the optimization and scheduling module, when the outflow of the upstream power station is 0 and the inflow of the tributary is z<y, the downstream power station will not abandon water. If z>y, the downstream power station will vacate the reservoir in advance to increase power generation; When the upstream power station is fully powered and the tributary inflow z≥0, the downstream power station abandons water according to the calculated abandonment time and controls the power generation load according to the initial water level of the downstream power station when the upstream power station is fully powered; when the downstream power station maintains full load operation, the power generation efficiency of the downstream power station is the highest and the abandonment time is delayed.
4. An electronic device comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform each step in the method described in any one of claims 1-2.
5. A non-transitory computer-readable storage medium storing computer instructions, wherein: The computer instructions are used to enable the computer to execute each step in the method according to any one of claims 1-2.
Citation Information
Patent Citations
Cascade hydroelectric station surplus water optimizing method and system
CN101718084A
Method for real-time optimal dispatching and benefit evaluation of cascade reservoir group
CN106920001A
Scheduling method based on influence of upstream reservoir operation on downstream power station power generation capacity
CN111126693A
Cascade hydropower station constant load optimization operation method and system
CN113300414A
Coupling and clustering analysis and decision-making tree based short-term power generation scheduling method for cascaded hydroelectric station group
WO2019174040A1