A management method and system for power grid control operation workflow

Through the power grid regulation and operation workflow management system, the preset workflow of the fault type is obtained and displayed, the user is reminded of the operation steps and the relevant information is displayed, which solves the problem of lack of reminders and sorting of the workflow in the existing technology, and improves the operation of the power grid regulation. efficiency and information processing capabilities.

CN115130864BActive Publication Date: 2024-10-08JINAN LICHENG POWER SUPPLY CO OF STATE GRID SHANDONG ELECTRIC POWER CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210763647.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-30
Publication Date
2024-10-08
Estimated Expiration
2042-06-30

AI Technical Summary

Technical Problem

The existing power grid control scheme lacks effective reminders and combing in the work process, resulting in low operation efficiency of regulators in fault handling and maintenance. Especially during bad weather or centralized maintenance, the pressure of information collection and processing is high, making it difficult to achieve lean operation. The level of regulation has been improved.

Method used

Provide a management method and system for power grid regulation and operation workflow, which determines the fault type by obtaining remote signaling information, obtains and displays the corresponding preset workflow, responds to user operations, reminds unviewed steps, and displays related planned maintenance and logs Information, including data from the D5000 system, FA fault interval information, etc., to achieve rapid display of information and prompts for operating steps.

Benefits of technology

It improves the efficiency of information collection and the real-time display of alarm information, realizes fixed standardization of processes and unification of interfaces, reduces the operating pressure of regulators, and improves regulatory efficiency and decision-making accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115130864B_ABST
    Figure CN115130864B_ABST
Patent Text Reader

Abstract

The present invention provides a management method and system for the workflow of power grid control and operation, the method comprising obtaining telesignaling information, judging the current fault type based on the telesignaling information; obtaining the preset workflow corresponding to the current fault type from the process library, and displaying it on the screen; in response to the user's selection of a step in the workflow, obtaining the data information required for the current step and displaying it; obtaining the user's click operation, reminding the user of the step that he did not click to view, and displaying the planned maintenance related to this step and the content of this line and related contact lines in the log. The present invention sorts out the information used by the controller for control and disposal in advance, standardizes the display of a unified interface, prompts the key points to consider and the operation steps, and achieves the goal of step prompts and rapid information display, thereby effectively improving the control efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid control management, and in particular to a management method and system for a power grid control operation workflow. Background Art

[0002] There are many key points in the process of power grid control. Due to the omissions and negligence of operators, it is easy to make control decisions and work errors. Especially in the case of accident handling in severe weather and centralized spring and autumn maintenance work, the duty officer needs to collect information, verify judgments, notify units, and monitor. At present, with the improvement of the level of distribution network automation, the control of distribution network faces the problem of contradiction between personnel energy and increasing work intensity, which restricts the improvement of lean control level.

[0003] At present, there are many scientific research papers on the control and decision-making support system for large-voltage power grids, which mainly include the collection and analysis of power grid information, intelligent monitoring and decision-making support. Through technical means, the alarm information is screened and displayed to the controller in a centralized manner, thereby reducing the on-duty pressure of the controller, effectively improving the judgment and processing ability of the power grid alarm information, and realizing the functions of section monitoring and early warning, rapid accident analysis, power restriction analysis, risk management, accident alarm inversion, etc. For example, the document named "Regional Power Grid Intelligent Monitoring and Decision-making Support System Based on Control Integration" improves the flow calculation and state estimation methods based on technical regulations, models and reasoning expert system rules, adopts fast sensitivity analysis, completes the summary analysis of alarm information, and provides real-time decision-making support solutions, which is helpful for the controller to screen information and improve the control efficiency.

[0004] The current control plan lacks effective reminders and sorting in the work process. It only conducts statistical analysis on the alarm information and provides technical support from a technical perspective. It does not fully cover the flexible handling process of each company and the various considerations in the corresponding control process. For example, there is a lack of effective reminders in terms of display of equipment-related information in fault handling, confirmation of controller execution process, planned maintenance and reminders of existing tasks. It cannot be effectively applied to the integrated control mode of the main and distribution networks under the distribution network dispatching situation of the county company. Summary of the invention

[0005] The present invention provides a method and system for managing a power grid control operation workflow, which are used to solve the problem that existing control schemes lack effective reminders and sorting in the workflow.

[0006] To achieve the above object, the present invention adopts the following technical solutions:

[0007] A first aspect of the present invention provides a method for managing a power grid control operation workflow, the method comprising the following steps:

[0008] Obtaining remote signaling information, and determining the current fault type based on the remote signaling information;

[0009] Obtain the preset workflow corresponding to the current fault type from the process library and display it on the screen;

[0010] In response to a user's selection of a step in the workflow, obtaining and displaying data information required for the current step;

[0011] Get the user's click operation, remind the user of the steps that he did not click to view, and display the planned maintenance related to this step and the content of this line and related contact lines in the log.

[0012] Furthermore, the fault type includes tripping and reclosing success.

[0013] Furthermore, the remote signal information includes accident tripping information, closing information within a preset time, and reclosing action information.

[0014] Furthermore, the data information includes telesignaling, telemetering and FA fault interval information from the D5000 system; as well as the line primary diagram, reclosing switch on and off, branch section FA function on and off, jurisdiction unit, interconnecting switch, small power supply status, OMS system planned maintenance application, and unterminated duty log information.

[0015] Furthermore, the fault type includes a ground fault.

[0016] Furthermore, the remote signaling information includes grounding information within the station and bus voltage information.

[0017] Furthermore, the data information includes telesignaling and telemetering from the D5000 system, small current line selection results within the station and FA line selection results information; retrieve the primary line diagram of the busbar outgoing line, the jurisdiction unit, the interconnecting switch, the small power supply status, the OMS system planned maintenance application, and the unterminated duty log information.

[0018] A second aspect of the present invention provides a management system for a power grid control operation workflow, the system comprising a process entry module, a data retrieval module, a human-computer interaction module and an information processing module;

[0019] The process entry module is used to enter the various steps of the control operation workflow corresponding to different fault types;

[0020] The data retrieval module is used to obtain the telesignaling and telemetry information of the main target and the equipment information associated with the main target;

[0021] The information processing module determines the fault type based on the remote signal information, and responds to the user's click operation on each step in the workflow, calling the data retrieval module to obtain corresponding data information;

[0022] The human-computer interaction module is used to display the workflow corresponding to the current fault, and obtain the user's operation on the display interface to perform a secondary display of the corresponding information.

[0023] Furthermore, the data retrieval module obtains information through the information management area, and the information sources of the information management area include equipment database, equipment operation and maintenance lean management system, power grid GIS platform and dispatching OMS system.

[0024] A fourth aspect of the present invention provides a computer storage medium, wherein the computer storage medium stores computer instructions, and when the computer instructions are executed on the system, the system executes the steps of the method.

[0025] The management system of the power grid regulation and operation workflow of the second aspect of the present invention can implement the methods in the first aspect and the various implementation methods of the first aspect, and achieve the same effect.

[0026] The effects provided in the content of the invention are only the effects of the embodiments, not all the effects of the invention. One of the above technical solutions has the following advantages or beneficial effects:

[0027] On the basis of improving information collection efficiency, real-time display of alarm information, remote signaling and telemetry monitoring and combing display, the present invention proposes a module operation under the actual control workflow, with the purpose of realizing fixed and standardized processes, combing the information used by controllers for control and disposal in advance, standardizing the display of unified interfaces, prompting key points to consider and operating steps, achieving the goals of step prompts and rapid display of information, thereby effectively improving control efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0029] Figure 1 It is a schematic diagram of the process of the method of the present invention;

[0030] Figure 2 is a schematic diagram of the process of Example 1 of the method of the present invention;

[0031] Figure 3 is a schematic diagram of the process of Example 2 of the method of the present invention;

[0032] Figure 4 It is a schematic diagram of the structure of the system of the present invention;

[0033] Figure 5 It is a schematic diagram of the connection structure of the data retrieval module of the present invention. DETAILED DESCRIPTION

[0034] In order to clearly illustrate the technical features of the present solution, the present invention is described in detail below through specific implementation methods and in conjunction with the accompanying drawings. The disclosure below provides many different embodiments or examples for realizing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. In addition, the present invention may repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. It should be noted that the components illustrated in the accompanying drawings are not necessarily drawn to scale. The present invention omits the description of known components and processing techniques and processes to avoid unnecessary limitations on the present invention.

[0035] like Figure 1 As shown, an embodiment of the present invention provides a method for managing a power grid control operation workflow, the method comprising the following steps:

[0036] S1, obtaining remote signaling information, and determining the current fault type based on the remote signaling information;

[0037] S2, obtain the preset workflow corresponding to the current fault type from the process library and display it on the screen;

[0038] S3, in response to the user's selection of a step in the workflow, obtaining and displaying data information required for the current step;

[0039] S4, obtaining the user's click operation, reminding the user of the steps that the user did not click to view, and displaying the planned maintenance related to this step and the content of this line and related contact lines in the log.

[0040] like Figure 2 As shown, the fault type includes tripping and reclosing success.

[0041] The telesignaling information is determined by the total telesignaling of the accident plus the accident tripping, closing within 20 seconds and the reclosing action information to determine that the fault type is a successful tripping and reclosing. The corresponding fault handling workflow is started and displayed. According to the process content, the data retrieval module is instructed to retrieve the telesignaling, telemetry and FA fault interval information of the D5000 system. At the same time, the line primary diagram, reclosing switch, branch section FA function switch, jurisdiction unit, interconnecting switch, small power supply status, OMS system planned maintenance application, unterminated duty log, etc. are retrieved and displayed on the line information interface.

[0042] After the user clicks "View", the line information display interface is entered. The displayed information includes the accident-related telesignal signal and the telemetry curve of this line, and FA action information. Clicking the line information display interface will display detailed line primary diagram, reclosing switch, branch section FA function switch, jurisdiction unit, contact switch, small power supply and other information. After the user enters the line name, the corresponding line related information is retrieved, and the controller clicks the module to view it. The viewing interface sets the manual option. The default is "Not Viewed Yet". After manually selecting "Viewed", the module will change.

[0043] After viewing the line information, the user enters the live line inspection and information release phase. This phase provides personnel contact information and is connected to the State Grid OMS SMS platform to facilitate immediate information release.

[0044] Important message reminders include reminders for information that has not been viewed and reminders for related equipment conditions. Users who have not clicked on the viewed module to enter the important message reminder are reminded of the planned maintenance in the OMS system and the relevant content of this line and related communication lines in the existing logs, reminding the controller whether the corresponding equipment has any faults and the planned maintenance situation.

[0045] like Figure 3 As shown, the fault type includes a ground fault.

[0046] By analyzing the telesignaling information, the fault type is determined to be single-phase grounding based on the grounding signal in the station and the characteristics of the bus voltage. The corresponding fault handling workflow is started and displayed. According to the process content instructions, the telesignaling and telemetry of the D5000 system, the small current line selection results in the station and the FA line selection results information are retrieved. At the same time, the primary diagram of the outgoing line on this bus, the jurisdiction unit, the interconnecting switch, the small power supply status, the OMS system planned maintenance application, the unterminated duty log, etc. are retrieved and displayed on the line information interface.

[0047] After the user clicks "View", the information display interface is entered. The information display interface sorts out and summarizes the accident-related telesignaling signals, the line selection results within the station, and the line selection results of FA action, and generates a grounding test pull sequence table, as well as the corresponding line primary diagram, reclosing switch, branch section FA function switch, jurisdiction unit, interconnecting switch, small power supply status and other information. Important information reminders, click on the line in the grounding test pull sequence table, and you can click to view the corresponding line information.

[0048] For ground faults, the ground test sequence table is formulated as follows:

[0049] 1. FA line selection results: All remote-controlled sectional switches are determined to be tested in combination with on-site requirements. The following sectional switches are similar. If the sectional switches of the entire line are tested and grounded but not restored, power will be supplied.

[0050] 2. As a result of the line selection in the station, all the sectional switches can be remotely controlled. If the sectional switches of the entire line are tested and grounded but the grounding is not restored, power will be supplied.

[0051] For other line section switches, if the entire line section switch is tested and grounding fails to return to normal, power will be supplied.

[0052] 3. For switches within the station, the order of FA line selection, station line selection, and other lines shall be determined in advance according to the order of first pulling the no-load standby lines, branches with multiple faults and lines without important users, etc. If the test pull does not restore the power supply, the power supply shall be restored.

[0053] 4. If it is still not found, open the switches in the station one by one until the grounding is restored. Finally, open the line to make it a grounded line. Open the switches in the station one by one until the grounding appears and the power transmission line becomes a grounded line.

[0054] 5. If all switches in the outgoing station are opened and grounded but not restored, close the section switch after stopping the busbar and PT. If the other busbar is grounded, the low-voltage outgoing line of the main transformer is grounded, otherwise the high-voltage lead of the PT is grounded.

[0055] like Figure 4 As shown, an embodiment of the present invention further provides a management system for a power grid control operation workflow, the system comprising a process entry module, a data retrieval module, a human-computer interaction module and an information processing module.

[0056] The process entry module is used to enter the various steps of the control and operation workflow corresponding to different fault types to form a process library; the data retrieval module is used to obtain the telesignaling and telemetry information of the main target and the equipment information associated with the main target; the information processing module determines the fault type based on the telesignaling information, and responds to the user's click operations on each step in the workflow, calling the data retrieval module to obtain the corresponding data information; the human-computer interaction module is used to display the workflow corresponding to the current fault, and obtain the user's operation on the display interface to perform a secondary display of the corresponding information.

[0057] like Figure 5As shown in the figure, the data retrieval module is connected with the D5000 system and the distribution automation system and the OMS system. The data acquisition method of the data retrieval module is that, on the one hand, the automation terminal uploads information through the automation substation, the backbone communication network, and the automation main station in turn, and then accesses the production control area and the management information area. There is a forward and reverse physical isolation between the two areas. The data retrieval module links the management information area and directly retrieves the telesignaling and telemetry information of the main target. It also retrieves the equipment information related to the main target, the planned maintenance and existing fault conditions of the corresponding equipment in the OMS system through the OMS system, GIS system, and marketing business system connected to the management information area. After screening and refining, the telesignaling information is conducive to the decision and judgment of the control duty officer, and the redundant information is removed; on the other hand, it is connected with the equipment database. The equipment database is formed by combining the data integration of the marketing business system and the equipment operation and maintenance lean management system, and is linked to the management information area. The data retrieval module retrieves the primary and secondary information, contact, current limit, and jurisdiction of the main target equipment, and sorts out the connection to save search time.

[0058] The human-computer interaction module is the user interface for the control operator, which realizes the functions of process click, module introduction, execution completion record, important information reminder, process reminder and data visualization.

[0059] The information processing module is a comprehensive data entry processing module. Its main function is to coordinate data retrieval, determine the fault type based on the received telesignal and telemetering calculations, retrieve the disposal process and issue retrieval instructions to the data retrieval module based on the content required in the disposal process. At the same time, it screens the data dispatch module to retrieve information, integrates the D5000 system and distribution automation telesignals, removes duplication and irrelevant items, and displays the core processing functional area of ​​human-computer interaction.

[0060] An embodiment of the present invention further provides a computer storage medium, in which computer instructions are stored. When the computer instructions are executed on the system, the system executes the steps of the method.

[0061] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A method for managing a power grid control operation workflow, characterized in that: The method comprises the following steps: Obtaining remote signaling information, and determining the current fault type based on the remote signaling information; Obtain the preset workflow corresponding to the current fault type from the process library and display it on the screen; In response to a user's selection of a step in the workflow, obtaining and displaying data information required for the current step; Obtain the user's click operation, remind the user of the steps that he / she has not clicked to view, and display the planned maintenance related to this step and the content of this line and related contact lines in the log; The fault type includes a ground fault, and the processing flow is as follows: By analyzing the telesignal information, the fault type is determined to be single-phase grounding based on the grounding signal in the station and the characteristics of the busbar voltage. The corresponding fault handling workflow is started and displayed. According to the process content instructions, the telesignal telemetry of the D5000 system, the results of the small current line selection in the station, and the FA line selection results are retrieved. At the same time, the primary diagram of the outgoing line on this bus, the jurisdiction unit, the contact switch, the small power supply, the OMS system planned maintenance application, and the unterminated duty log are retrieved and displayed on the line information interface; After the user clicks "View", the information display interface is entered. The information display interface summarizes the accident-related telesignaling signals and the line selection results in the station and the FA action line selection results, generates a grounding test sequence table, and the corresponding line primary diagram, reclosing switch, branch section FA function switch, jurisdiction unit, contact switch, small power supply information, important information reminder, click the line in the grounding test sequence table, and click to view the corresponding line information; For ground faults, the ground test sequence table is formulated as follows: 1) FA line selection results: All remote-controlled sectional switches are determined according to the site requirements to test the switches. If the grounding of the sectional switches of the entire line is not restored after the test, power will be supplied; 2) As a result of the line selection in the station, all the remote-controlled sectional switches are tested and the sectional switches of the entire line are not restored to ground when they are pulled to ground, and then power is supplied; For other line section switches, if the entire line section switch is pulled to ground but does not return to normal, power will be supplied; 3) For switches in the station, the order of FA line selection, station line selection, and other lines shall be determined in advance according to the order of first pulling the no-load standby line, branch lines with multiple faults, and lines without important users. If the test pull fails to restore the power supply, the power supply shall be restored; 4) If the fault is still not found, open the switches in the station one by one until the grounding is restored. Finally, open the line to make it a grounded line. Open the switches in the station one by one until the grounding is restored. 5) If all switches in the outgoing station are opened and grounded but not restored, close the section switch after stopping the busbar and PT. If the other busbar is grounded, the low-voltage outgoing line of the main transformer is grounded, otherwise the high-voltage lead of the PT is grounded.

2. A management system for power grid control and operation workflow, characterized in that: The system is used to implement the method described in claim 1, and the system includes a process entry module, a data retrieval module, a human-computer interaction module and an information processing module; The process entry module is used to enter the various steps of the control operation workflow corresponding to different fault types; The data retrieval module is used to obtain the telesignaling and telemetry information of the main target and the equipment information associated with the main target; The information processing module determines the fault type based on the remote signal information, and responds to the user's click operation on each step in the workflow, calling the data retrieval module to obtain corresponding data information; The human-computer interaction module is used to display the workflow corresponding to the current fault, and obtain the user's operation on the display interface to perform a secondary display of the corresponding information.

3. The management system for the power grid control operation workflow according to claim 2 is characterized in that: The data retrieval module obtains information through the information management area, and the information sources of the information management area include equipment database, equipment operation and maintenance lean management system, power grid GIS platform and dispatching OMS system.

4. A computer storage medium having computer instructions stored therein, characterized in that: When the computer instructions are executed on the system of claim 2 or 3, the system is caused to perform the steps of the method of claim 1.