A subway pantograph simulation device and method thereof
By installing a subway pantograph simulation device on the contact network engineering vehicle, the elastic components and tension gauge are used to simulate the operating status of the pantograph, the difficulty of real-time observation of equipment after the subway contact network is solved, and the construction efficiency and The accuracy of equipment monitoring extends the service life of the contact network.
Patent Information
- Application Number
- CN202110393188.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-13
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-04-13
AI Technical Summary
After the subway contact network construction, it is difficult to observe the status of the pantograph and contact network in real time while the train is running, resulting in difficult time discovering and solving equipment problems in a timely manner, affecting construction efficiency and equipment life.
Design a subway pantograph simulation device, including a support frame, elastic components and carbon skateboard, simulate the operating state of the pantograph by installing it on a contact network engineering vehicle, and adjust the carbon skateboard and contact line using a tension gauge and a screw Contact force realizes rapid cold slip experiments and state observations of contact network equipment.
It realizes rapid cold slip experiments after the contact network construction is completed, reduces coordination work, can intuitively observe pantograph abnormalities and contact line defects, improves the monitoring efficiency of equipment installation quality and operating status, and extends the life of the contact network.
Smart Images

Figure CN115200632B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of traffic experimental equipment, and in particular to a subway pantograph simulation device and a method thereof. Background Art
[0002] The pantograph is a current-collecting device that allows the train to receive current from the contact wire of the overhead contact network. The pantograph makes frictional contact with the contact wire on the overhead contact network, so that the current is transmitted from the contact wire to the pantograph and then to the train, so that the train can move.
[0003] 1. After the construction of the subway contact network is completed, it is necessary to use the train to conduct a "cold sliding" test on the equipment to check the installation quality of the contact network equipment, whether there is insufficient insulation distance of the live body, whether the transition between the anchor section joint and the line branch is smooth, and whether there is any bow collision, bow penetration, or bow jumping. However, time is tight during construction, and all professionals are working intensively. When the train is running, no one is allowed to carry out construction within the track area. If the train is arranged to cold slide, a lot of coordination work will be required. In addition, the cold sliding speed is very fast. If a problem is found temporarily with the equipment, if the train cannot be stopped in time, it may cause equipment damage.
[0004] 2. As the speed of trains continues to increase, higher requirements are placed on their current-collecting performance. When the pantograph is running fast (the train is moving fast), the smoothness of the contact network is very high. For example, the carbonized plate of the pantograph wears quickly, the contact line wear increases suddenly, the contact line sparks, the bow jumps and other faults.
[0005] The contact wire of the rigid contact network of Tianjin Metro Line 6 is wearing faster and arcing occurs, which greatly affects the service life of the contact network. Daily maintenance of the contact network can only be carried out by inspecting the equipment after the train stops running, but the status of the train cannot be observed during operation. We also installed cameras on the pantograph, but there is still no way to observe the instantaneous stress state changes of the rigid contact network. In order to speed up the debugging work after the construction of the contact network is completed, reduce the large amount of coordination work caused by cold sliding work, and better observe the pantograph status and pantograph-network coupling status during train operation after the subway is officially put into operation, a subway pantograph simulation device and method are proposed to solve this problem. Summary of the invention
[0006] The main purpose of the present invention is to provide a subway pantograph simulation device and method thereof, which can effectively solve the problems in the background technology.
[0007] To achieve the above object, the technical solution adopted by the present invention is:
[0008] A subway pantograph simulation device comprises a support frame, wherein two groups of support beams on the support frame are provided with a first longitudinal rod and a second longitudinal rod at intervals, both ends of the first longitudinal rod are respectively fixedly connected to the two groups of support beams through a first fixing piece, both ends of the second longitudinal rod are respectively fixedly connected to the two groups of support beams through a second fixing piece, two groups of oblique support rods are symmetrically arranged on the second longitudinal rod, and one end of the two groups of oblique support rods close to the second longitudinal rod is fixedly connected to the second longitudinal rod through the first fixing piece, the upper ends of the two groups of oblique support rods are connected to a carbon slide plate through bolts, and the two groups of oblique support rods are connected to the first longitudinal rod through two groups of elastic components symmetrically arranged.
[0009] Preferably, the elastic component includes a return plate, a rod body is installed on the return plate through a block and the rod body is movably connected to the support rod, a baffle ring is fixed on the rod body, a spring is sleeved on the rod body and the upper and lower ends of the spring are respectively fixedly connected to the baffle ring and the return plate, an adjusting screw rod is provided under the return plate and the upper end of the adjusting screw rod is rotatably engaged with the return plate, and the upper end of the adjusting screw rod is installed on the first longitudinal rod.
[0010] Preferably, the adjusting screw rod is provided with a hexagonal rotating block and a second fixing nut, the hexagonal rotating block is fixedly sleeved with the rod body, the second fixing nut is threadedly connected with the rod body, and the end of the second fixing nut close to the first longitudinal rod is fixedly connected with the first longitudinal rod.
[0011] Preferably, the first fixing member comprises two groups of first fixing clamps, the upper and lower ends of the two groups of the first fixing clamps are welded and fixed together, and the two groups of the first fixing clamps are welded in a cross shape.
[0012] Preferably, the contact surfaces between the first fixing clamp and the first longitudinal rod, the supporting crossbeam, the second longitudinal rod and the oblique supporting rod are set to be rough surfaces.
[0013] Preferably, the second fixing member comprises a bearing, the bearing is fixedly sleeved on the second longitudinal rod, a connecting strip is fixed on the outer wall of the bearing and second fixing clamps are fixed on both ends of the connecting strip.
[0014] Preferably, the contact surface between the second fixing clamp and the supporting beam is set to be a rough surface.
[0015] A method for a subway pantograph simulation device, characterized in that: the method of using the device is as follows;
[0016] S1: Push the overhead line engineering vehicle onto the subway track and place the simulated pantograph components near the overhead line engineering vehicle;
[0017] S2: Install the second fixing part of the simulated pantograph, the supporting crossbeam, the oblique supporting rod, the elastic component and the carbon slide plate in sequence. During installation, please note that the supporting crossbeam, the second fixing part and the carbon slide plate must be installed perpendicular to the engineering vehicle, the oblique supporting rod must be installed parallel to the engineering vehicle, and the elastic component must be perpendicular to the oblique supporting rod;
[0018] S3: After the simulated pantograph is installed, the hexagonal rotating block of the elastic component is adjusted to change the extension length of the adjusting screw rod to make the carbon slide plate reliably contact with the contact line;
[0019] S4: By adjusting the hexagonal rotation of the elastic component to change the length of the adjustment screw, the length of the entire elastic component can be adjusted. However, the contact line and the pantograph are already in contact, so only the length of the spring on the elastic component can be changed. The more severe the spring compression, the greater the elastic force (lifting force). Use a dynamometer to pull the carbon slide plate downward. When the pulling force is 120N, the carbon slide plate slightly detaches from the contact line as standard. If the carbon slide plate leaves the contact line before the force reaches 120N, it means that the lifting force is too small. You need to turn the hexagonal rotating block downward to increase the length of the adjustment screw and increase the spring compression to increase the lifting force. If the pantograph leaves the contact line only when the downward pulling force is greater than 120N, it means that the lifting force is too large. You need to turn the hexagonal rotating block upward to reduce the length of the adjustment screw and reduce the spring compression to reduce the lifting force.
[0020] At this time, the spring receives a downward force of 120N. When we remove the tension gauge, the spring will have an upward force of 120N. Use the tension gauge to pull down until the pantograph is separated from the contact line. The value displayed on the tension gauge is the current tension value. Adjust the length of the screw rod to change it.
[0021] S5: Observe whether the height of each overhead contact network device changes when the simulated pantograph is lifted upward with a force of 120N, and record the changed height;
[0022] S6: Drive the overhead contact network engineering vehicle and observe whether the insulation distance between the carbon slide plate and the non-electrical parts of the overhead contact network meets the requirement of more than 150 mm. If it is found to be less than 150 mm, it should be handled in time to prevent short circuit tripping after power is turned on later;
[0023] S7: Push the overhead contact network engineering vehicle to drive and observe whether the simulated pantograph passes smoothly when passing through the anchor section joint and the line branch, and whether there are any abnormal situations such as bow collision, bow penetration, bow jumping, etc. If the above situation occurs, the height of the point should be adjusted to ensure that the pantograph passes smoothly;
[0024] S8: Push the contact network engineering vehicle to drive, simulate whether the pantograph has any abnormal noise, abnormal shaking, etc. during driving, whether the contact network equipment has any shaking, observe whether there are copper wires, copper chips, etc. on the carbon slide plate caused by the friction of the contact line, and stop driving immediately if any abnormal situation occurs, observe the abnormal points, and check whether there is excessive wear, burrs, or uneven wear on the contact line.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] 1. Rapidly conduct a "cold sliding test" on the contact network equipment. We make a simulated pantograph to simulate the state of the pantograph when the train is running. After the construction of the subway contact network is completed, the simulated pantograph is installed on the contact network engineering vehicle. Only four people are needed to push the engineering vehicle to simulate the train running state. There is no need to coordinate with other professionals to cooperate in the construction. The installation of the contact network equipment can also be checked.
[0027] 2. More accurately locate the abnormal fluctuation and noise of the pantograph and discover the defects of the contact line. The maintenance personnel can stand on the maintenance engineering vehicle and observe the conditions of the simulated pantograph in motion more intuitively. If they find abnormal fluctuation or noise of the pantograph in time, they can immediately stop observing the conditions of the pantograph and contact line. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the overall structure of a subway pantograph simulation device of the present invention;
[0029] Figure 2 This is a schematic diagram of the elastic component structure of a subway pantograph simulation device of the present invention;
[0030] Figure 3 This is a schematic structural diagram of a second fixing member of a subway pantograph simulation device of the present invention;
[0031] Figure 4 The present invention is a schematic diagram of the structure of a first fixing part of a subway pantograph simulation device.
[0032] In the figure: 1. support frame; 2. supporting beam; 3. first longitudinal rod; 4. second longitudinal rod; 5. oblique support rod; 6. first fixing member; 61. first fixing clamp; 7. second fixing member; 71. connecting strip; 72. bearing; 73. second fixing clamp; 8. elastic component; 81. return plate; 82. adjusting screw; 821. hexagonal rotating block; 822. second fixing nut; 83. rod body; 84. retaining ring; 85. spring; 86. block; 9. carbon slide plate. DETAILED DESCRIPTION
[0033] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0034] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0035] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0036] like Figure 1-4 As shown, a subway pantograph simulation device comprises a support frame 1, two groups of support beams 2 on the support frame 1 are provided with a first longitudinal rod 3 and a second longitudinal rod 4 at intervals, both ends of the first longitudinal rod 3 are respectively fixedly connected to the two groups of support beams 2 through a first fixing piece 6, both ends of the second longitudinal rod 4 are respectively fixedly connected to the two groups of support beams 2 through a second fixing piece 7, two groups of oblique support rods 5 are symmetrically provided on the second longitudinal rod 4, and one end of the two groups of oblique support rods 5 close to the second longitudinal rod 4 is fixedly connected to the second longitudinal rod 4 through the first fixing piece 6, the upper ends of the two groups of oblique support rods 5 are connected to the carbon slide plate 9 through bolts, and the two groups of oblique support rods 5 are connected to the first longitudinal rod 3 through two groups of elastic components 8 symmetrically arranged.
[0037] The elastic component 8 includes a return plate 81, on which a rod body 83 is installed through a block 86, and the rod body 83 is movably connected to the support rod 5, a baffle ring 84 is fixed to the rod body 83, a spring 85 is sleeved on the rod body 83, and the upper and lower ends of the spring 85 are respectively fixedly connected to the baffle ring 84 and the return plate 81, an adjusting screw rod 82 is provided below the return plate 81, and the upper end of the adjusting screw rod 82 is rotatably engaged with the return plate 81, and the upper end of the adjusting screw rod 82 is installed on the first longitudinal rod 3.
[0038] The adjusting screw rod 82 is provided with a hexagonal rotating block 821 and a second fixing nut 822 . The hexagonal rotating block 821 is fixedly sleeved with the rod body 83 . The second fixing nut 822 is threadedly connected to the rod body 83 . The end of the second fixing nut 822 close to the first longitudinal rod 3 is fixedly connected to the first longitudinal rod 3 .
[0039] The first fixing member 6 includes two groups of first fixing clamps 61 . The upper and lower ends of the two groups of first fixing clamps 61 are welded and fixed together. The two groups of first fixing clamps 61 are welded and arranged in a cross shape.
[0040] The contact surface between the first fixing clamp 61 and the first longitudinal rod 3, the supporting beam 2, the second longitudinal rod 4 and the diagonal supporting rod 5 is set to a rough surface, which can increase the friction between the first fixing clamp 61 and the first longitudinal rod 3, the supporting beam 2, the second longitudinal rod 4 and the diagonal supporting rod 5, thereby enhancing the fixing effect.
[0041] The second fixing member 7 comprises a bearing 72 , which is fixedly sleeved on the second longitudinal rod 4 , a connecting strip 71 is fixed on the outer wall of the bearing 72 , and second fixing clamps 73 are fixed at both ends of the connecting strip 71 .
[0042] The contact surface between the second fixing clamp 73 and the supporting crossbeam 2 is set to a rough surface, which can increase the friction between the second fixing clamp 73 and the supporting crossbeam 2 and enhance the fixing effect.
[0043] A method for a subway pantograph simulation device, the method of using the method is as follows;
[0044] S1: Push the overhead line engineering vehicle onto the subway track and place the simulated pantograph components near the overhead line engineering vehicle;
[0045] S2: Install the second fixing member 7 of the simulated pantograph, the supporting beam 2, the oblique supporting rod 5, the elastic component 8, and the carbon slide plate 9 in sequence. During installation, please note that the supporting beam 2, the second fixing member 7, and the carbon slide plate 9 must be installed perpendicular to the engineering vehicle, the oblique supporting rod 5 must be installed parallel to the engineering vehicle, and the elastic component 8 must be perpendicular to the oblique supporting rod 5;
[0046] S3: After the simulated pantograph is installed, the hexagonal rotating block 821 of the elastic component 8 is adjusted to change the extension length of the adjusting screw rod 82, so that the carbon slide plate 9 is reliably in contact with the contact line;
[0047] S4: By adjusting the hexagonal rotation 821 of the elastic component 8 to change the length of the adjustment screw, the length of the entire elastic component 8 can be adjusted. However, the contact line and the pantograph are already in contact, and only the length of the spring 85 on the elastic component 8 can be changed. The more severe the compression of the spring 85, the greater the elastic lifting force. Use a dynamometer to pull the carbon slide 9 downward. When the pulling force is 120N, the carbon slide 9 slightly detaches from the contact line. If the carbon slide 9 leaves the contact line before reaching 120N, it means that the lifting force is too small. It is necessary to turn the hexagonal rotation block 821 downward to increase the length of the adjustment screw 82 and increase the spring compression to increase the lifting force. If the pantograph leaves the contact line only when the downward pulling force is greater than 120N, it means that the lifting force is too large. It is necessary to turn the hexagonal rotation block 821 upward to reduce the length of the adjustment screw 82 and reduce the compression of the spring 85 to reduce the lifting force.
[0048] At this time, the spring 85 receives a downward force of 120N. When we remove the tension gauge, the spring 85 will have an upward force of 120N. Use the tension gauge to pull down until the pantograph is separated from the contact line. The value displayed on the tension gauge is the current tension value. Adjust the length of the screw rod 82 to change it.
[0049] S5: Observe whether the height of each overhead contact network device changes when the simulated pantograph is lifted upward with a force of 120N, and record the changed height;
[0050] S6: Push the overhead contact engineering vehicle to drive and observe whether the insulation distance between the carbon slide plate 9 and the non-electric parts of the overhead contact network meets the requirement of being greater than 150 mm. If it is found to be less than 150 mm, it should be handled in time to prevent short circuit tripping after power is turned on later;
[0051] S7: Push the overhead contact network engineering vehicle to drive and observe whether the simulated pantograph passes smoothly when passing through the anchor section joint and the line branch, and whether there are any abnormal situations such as bow collision, bow penetration, bow jumping, etc. If the above situation occurs, the height of the point should be adjusted to ensure that the pantograph passes smoothly;
[0052] S8: Push the contact network engineering vehicle to drive, simulate whether the pantograph has any abnormal noise, abnormal shaking, etc. during driving, whether the contact network equipment has any shaking, observe whether there are copper wires, copper chips, etc. caused by the friction of the contact line on the carbon slide plate 9, and stop driving immediately if any abnormal situation occurs, observe the abnormal points, and check whether there is excessive wear, burrs, or uneven wear on the contact line.
[0053] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A subway pantograph simulation device, characterized in that: The invention comprises a support frame (1), wherein two groups of support beams (2) on the support frame (1) are provided with a first longitudinal rod (3) and a second longitudinal rod (4) at intervals, both ends of the first longitudinal rod (3) are respectively fixedly connected to the two groups of support beams (2) via a first fixing member (6), both ends of the second longitudinal rod (4) are respectively fixedly connected to the two groups of support beams (2) via a second fixing member (7), two groups of oblique support rods (5) are symmetrically provided on the second longitudinal rod (4), and one end of the two groups of oblique support rods (5) close to the second longitudinal rod (4) is fixedly connected to the second longitudinal rod (4) via a first fixing member (6), the upper ends of the two groups of oblique support rods (5) are connected to a carbon slide plate (9) via bolts, and the two groups of oblique support rods (5) are connected to the first longitudinal rod (3) via two groups of elastic components (8) arranged symmetrically; The elastic component (8) comprises a return plate (81), a rod body (83) is mounted on the return plate (81) via a stopper (86), and the rod body (83) is movably connected to the support rod (5), a stopper ring (84) is fixed on the rod body (83), a spring (85) is sleeved on the rod body (83), and the upper and lower ends of the spring (85) are respectively fixedly connected to the stopper ring (84) and the return plate (81), an adjusting screw rod (82) is arranged below the return plate (81), and the upper end of the adjusting screw rod (82) is rotatably engaged with the return plate (81), and the upper end of the adjusting screw rod (82) is mounted on the first longitudinal rod (3); The first fixing member (6) comprises two groups of first fixing clamps (61), the upper and lower ends of the two groups of the first fixing clamps (61) are welded together, and the two groups of the first fixing clamps (61) are welded in a cross shape; The second fixing member (7) comprises a bearing (72), the bearing (72) being fixedly sleeved on the second longitudinal rod (4), a connecting strip (71) being fixed on the outer wall of the bearing (72), and second fixing clamps (73) being fixed at both ends of the connecting strip (71).
2. A subway pantograph simulation device according to claim 1, characterized in that: The adjusting screw rod (82) is provided with a hexagonal rotating block (821) and a second fixing nut (822); the hexagonal rotating block (821) is fixedly sleeved with the rod body (83); the second fixing nut (822) is threadedly connected to the rod body (83); and one end of the second fixing nut (822) close to the first longitudinal rod (3) is fixedly connected to the first longitudinal rod (3).
3. A subway pantograph simulation device according to claim 1, characterized in that: The contact surfaces of the first fixing clamp (61) with the first longitudinal rod (3), the supporting crossbeam (2), the second longitudinal rod (4) and the oblique supporting rod (5) are arranged to be rough surfaces.
4. A subway pantograph simulation device according to claim 1, characterized in that: The contact surface between the second fixing clamp (73) and the supporting crossbeam (2) is configured as a rough surface.
5. A method for a subway pantograph simulation device as claimed in claim 1, characterized in that: The usage is as follows; S1: Push the overhead line engineering vehicle onto the subway track and place the simulated pantograph components near the overhead line engineering vehicle; S2: sequentially install the second fixing member (7) of the simulated pantograph, the supporting crossbeam (2), the oblique supporting rod (5), the elastic component (8), and the carbon slide plate (9). During the installation, it is noted that the supporting crossbeam (2), the second fixing member (7), and the carbon slide plate (9) must be installed perpendicularly to the engineering vehicle, the oblique supporting rod (5) must be installed parallel to the engineering vehicle, and the elastic component (8) must be perpendicular to the oblique supporting rod (5); S3: After the simulated pantograph is installed, the hexagonal rotating block (821) of the elastic component (8) is adjusted to change the extension length of the adjusting screw (82) so that the carbon slide plate (9) is reliably in contact with the contact line; S4: By adjusting the hexagonal rotating block (821) of the elastic component (8) to change the length of the adjusting screw rod, the length of the entire elastic component (8) is adjusted. However, the contact line and the pantograph are already in contact, and only the length of the spring (85) on the elastic component (8) can be changed. The more severe the compression of the spring (85), the greater the elastic force. The carbon slide plate (9) is pulled downward using a dynamometer. When the pulling force is 120N, the carbon slide plate (9) slightly detaches from the contact line. If the carbon slide plate (9) leaves the contact line before reaching 120N, it means that the lifting force is too small. It is necessary to turn the hexagonal rotating block (821) downward to increase the length of the adjusting screw rod (82) and increase the compression of the spring to increase the lifting force. If the pantograph leaves the contact line only when the downward pulling force is greater than 120N, it means that the lifting force is too large. It is necessary to turn the hexagonal rotating block (821) upward to reduce the length of the adjusting screw rod (82) and reduce the compression of the spring (85) to reduce the lifting force. At this time, the spring (85) receives a downward force of 120N under compression. When we remove the tension gauge, the spring (85) will have an upward force of 120N. Use the tension gauge to pull down until the pantograph is separated from the contact line. The value displayed on the tension gauge is the current tension value. Adjust the length of the screw rod (82) to change it. S5: Observe whether the height of each overhead contact network device changes when the simulated pantograph is lifted upward with a force of 120N, and record the changed height; S6: Push the overhead contact network engineering vehicle to move, and observe whether the insulation distance between the carbon slide plate (9) and the non-electrical parts of the overhead contact network meets the requirement of being greater than 150 mm. If it is found to be less than 150 mm, timely treatment should be carried out to prevent short circuit tripping after power is turned on later; S7: Push the overhead contact network engineering vehicle to drive and observe whether the simulated pantograph passes smoothly when passing through the anchor section joint and the line branch, and whether there are any abnormal situations such as bow collision, bow penetration, bow jumping, etc. If the above situation occurs, the height of the point should be adjusted to ensure that the pantograph passes smoothly; S8: Push the overhead contact network engineering vehicle to drive, simulate whether the pantograph has abnormal noise, abnormal shaking, etc. during driving, whether the overhead contact network equipment has shaking, and observe whether there are copper wires, copper chips, etc. caused by the friction of the contact line on the carbon slide plate (9). If an abnormal situation occurs, the vehicle should be stopped immediately, and the abnormal point should be observed to see whether there is excessive wear, burrs on the contact line, or uneven wear.
Citation Information
Patent Citations
Locomotive pantograph active control device and experimental method
CN102721879A
Pantograph maintenance training system based on simulation and training method thereof
CN109326163A
Bow net detection simulation test device
CN212159975U
Subway pantograph simulation device
CN215573072U
Lift force estimation method and device for pantograph and lift force compensation method and device for pantograph
JP2017204930A
