Prediction system and prediction method for air preheater in power plant
By installing sensors and wireless communication modules in the air preheater of the power plant, real-time monitoring and prediction of the flue gas temperature difference and blockage level of the air preheater are performed, and the simulation identification code and detection identifier are used to process the messages, thus solving the problem of monitoring the air preheater of the power plant. And the lack of congestion prediction reduces the load of the controller and ensures stable access to the channel.
Patent Information
- Application Number
- CN202210706534.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-06-21
AI Technical Summary
The existing technology lacks a centralized monitoring system for the inlet and outlet flue gas temperatures, wind pressure, and motor current signals of the power plant's air preheater, as well as a prediction system for air preheater blockage, resulting in excessive load on the controller to transmit messages, which may lead to The channel cannot be accessed.
A power plant air preheater prediction system is designed, which uses temperature sensors, pressure sensors, current sensors and wireless communication modules to monitor and predict the flue gas temperature difference and blockage level of the air preheater in real time through the connection between the controller and the server. The cutting and storage of messages are realized through simulation identification codes and detection identifiers, reducing the load on the controller.
It achieves centralized monitoring of power plant air preheater messages and congestion prediction, reduces the storage load of the controller, avoids the problem of channel inaccessibility, and improves the reliability and efficiency of the system.
Smart Images

Figure CN115247802B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of air preheater prediction, and in particular to a power plant air preheater prediction system and prediction method. Background Art
[0002] The air preheater (aurpreheater) of a power plant is also referred to as an air preheater. It is a preheating device that improves the heat exchange performance of the boiler and reduces heat loss. The function of the air preheater is to transfer the heat carried by the flue gas discharged from the tail flue of the boiler to the air before entering the boiler through the heat sink, and preheat the air to a certain temperature.
[0003] Generally referred to as air preheater. It is mostly used in coal-fired power station boilers. It can be divided into two types: tube box type and rotary type. The rotary type is further divided into wind hood rotary type and heating surface rotary type. Power station boilers often use heating surface rotary preheaters. The application in boilers is generally two-compartment, three-compartment, and four-compartment types. Here, the four-compartment type is more commonly used in circulating fluidized bed boilers.
[0004] However, there is currently no centralized monitoring system for power plant air preheater information, such as the flue gas temperature at the inlet and outlet of the power plant air preheater, the wind pressure at the inlet and outlet of the power plant air preheater, the current signal of the air preheater motor and the flue gas temperature difference of the air preheater. In addition, there is no prediction system for the blockage of power plant air preheater.
[0005] In order to implement centralized monitoring of power plant air preheater messages, a dedicated server for storing power plant air preheater messages is required. The existing technology mainly uses an enhanced graph team detection method to cut the power plant air preheater messages stored on the server, reducing the comparison frequency between power plant air preheater messages, and has good compatibility with the structure storing huge power plant air preheater messages. It also improves the efficiency of the implementation of the private protection power plant air preheater message channel. Such existing technology ensures good reliability when comparing the overlap between more than three screening units for power plant air preheater messages by utilizing the characteristics of non-singular matrices and critical quantity secret public modes, thereby preventing the private information of the controller used to receive power plant air preheater messages from being obtained by hackers; however, as the frequency of the channel for transmitting power plant air preheater messages to be stored by a controller in the platform increases, the load of the controller for transmitting power plant air preheater messages to be stored will become higher and higher, and finally lead to the inability to access the channel. Summary of the invention
[0006] To solve the above problems, the present invention provides a power plant air preheater prediction system and method, which effectively avoids the defects in the prior art that there is no centralized monitoring system for power plant air preheater messages, no prediction system for power plant air preheater blockage, and the load stored by the controller for transmitting power plant air preheater messages will become higher and higher, which will eventually lead to the inability to access the channel.
[0007] To overcome the deficiencies in the prior art, the present invention provides a solution to a power plant air preheater prediction system and method, as follows:
[0008] A power plant air preheater prediction system, comprising:
[0009] A temperature sensor 1 and a pressure sensor 1 are provided at the inlet of the power plant air preheater, a temperature sensor 2 and a pressure sensor 2 are provided at the outlet of the power plant air preheater, and a current sensor is connected in series between the air preheater motor and its power supply;
[0010] Temperature sensor 1, pressure sensor 1, temperature sensor 2, pressure sensor 2, current sensor, wireless communication module, and LCD screen are all electrically connected to the controller;
[0011] The controller is connected to the server in the wireless network via the wireless communication module;
[0012] The components running on the controller include a transmission component 1, a transmission component 2 and a prediction component;
[0013] The transmission component 1 is used to obtain the flue gas temperature difference of the air preheater by subtracting the flue gas temperature at the inlet of the power plant air preheater from the collected flue gas temperature at the outlet of the power plant air preheater. Then the controller transmits the power plant air preheater message to the LCD screen for display, and transmits the power plant air preheater message to the server for storage via the wireless communication module.
[0014] The second transmission component is used to transmit the request instruction to the server;
[0015] The prediction component is used to predict the blockage level of the power plant air preheater according to the power plant air preheater message;
[0016] The components running on the server include a return component, a message protection component, a message processing component and a task processing component. The return component is used to return the associated historical message to the controller according to the request instruction, and the controller then transmits the historical message to the touch screen for display; the message protection component is used to process the set identification code of the controller to obtain the simulation identification code, the message processing component is used to cut and process the historical message, and the task processing component is used to register the task of the controller to give and obtain the historical message;
[0017] The controller that gives the historical message and obtains the historical message later is the interactive controller. The message processing component cuts the historical message transmitted by the interactive controller into R sub-messages, which are respectively stored in the message domains of S servers associated with the interactive controller. Before R reaches the highest critical quantity, R is equal to S. After R reaches the highest critical quantity, the highest critical quantity is maintained constant. Two sub-messages are stored in the message domain of a single server, and a single sub-message is stored in the message domains of more than two servers. When S is one, the historical message is stored as a whole in the message domain of the controller that gives the historical message. R and S are both natural numbers.
[0018] When another controller obtains the history message of the interactive controller from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the interactive controller and transmits them to the other controller, and synchronously cuts the sub-message with the highest message capacity in all sub-messages into a pair of new sub-messages according to the ratio of 0.65:1 and stores them in the message domain of the other controller, and in the message domain storing the sub-message before cutting, cuts the sub-message according to the ratio of 0.65:1, and only maintains one new sub-message in order;
[0019] The message protection component protects the setting identification code of the controller by constructing a simulation identification code, and the construction equation of the simulation identification code is:
[0020] H(u)={u1*J(u)+u2*J(u+1)+u3*J(u+2)}%2 4 ,u is not less than one
[0021] And u is not higher than K;
[0022] Here, H(u) is the content of the u-th bit of the newly constructed simulation identification code, J(u) is the character value of the u-th bit of the set identification code, u1, u2 and u3 are randomly set variable index one, variable index two and variable index three respectively, K is the capacity of the set identification code and the simulation identification code, and % is the remainder operator.
[0023] The task handling component constructs an attribute domain when the controller gives or obtains historical information. The attribute domain includes the simulation identification code of the controller, the storage instruction of historical information, and the acquisition frequency and information performance of historical information. The derivation equation of the information performance L is:
[0024] L={M1*S1-M2*S2+M3*S3}*X(S1+S2+S3-1)
[0025] Here, S1 is the number of messages identified as good, S2 is the number of messages identified as bad, S3 is the number of messages not identified, k1 is a randomly set index for identifying as good, k2 is a randomly set index for identifying as bad, k3 is an index for not identified, and X is a logarithmic operator with base ten;
[0026] The message handling component constructs a detection identifier Y for a single interactive controller, wherein the detection identifier Y is a bit stream, and the capacity is consistent with the number of sub-messages R. One bit of the detection identifier Y is associated with one sub-message, and a bit value of one in the detection identifier Y indicates that the associated sub-message is stored in the message domain associated with the controller, and a bit value of zero in the detection identifier Y indicates that the associated sub-message is not stored in the associated message domain. The message handling component obtains a complete historical message by performing detection on the detection identifier Y;
[0027] The process of the message processing component obtaining complete historical messages is as follows:
[0028] B-1: Send all detection identifiers Y to a detection queue;
[0029] B-2: Randomly select a detection identifier Y in the detection queue;
[0030] B-3: Identify the bit position where the bit value 1 in the obtained detection identifier Y is located, and this bit position is the target bit;
[0031] B-4: Send the obtained detection identifier Y to the output queue;
[0032] B-5: Detect and clear all detection identifiers Y with a destination bit value of 1 in the detection queue;
[0033] B-6: Loop through B-2 to B-5 until there is no more detection identifier Y in the detection queue;
[0034] B-7: Obtain the sub-messages of the message domain of the associated controller according to the detection identifier Y in the output queue to assemble a complete historical message;
[0035] The highest critical number of sub-messages R is RR1, and its equation is:
[0036] RR1=Z1÷Z2
[0037] Here, Z1 is the capacity of all historical messages, and Us is the capacity of a single historical message;
[0038] The message protection component constructs more than two simulation identification codes according to the frequency of the controller storing historical messages. The correlation equation between the number S of simulation identification codes and the frequency R of storage is:
[0039] S=C(R÷10+2)
[0040] The subsequently constructed simulation identification code is obtained by processing the previous simulation identification code, and C is a logarithmic operator with base 2.
[0041] A prediction method for a power plant air preheater prediction system, comprising:
[0042] Step 1: The temperature sensor 1, the pressure sensor 1, the temperature sensor 2, the pressure sensor 2, and the current sensor respectively transmit the sampled flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater, the wind pressure value at the outlet of the power plant air preheater, and the current signal of the air preheater motor to the controller;
[0043] Step 2: The controller obtains the flue gas temperature difference of the air preheater by subtracting the flue gas temperature at the inlet of the air preheater from the collected flue gas temperature at the outlet of the air preheater. Then the controller transmits the air preheater message to the LCD screen for display, and transmits the air preheater message to the server for storage via the wireless communication module.
[0044] The power plant air preheater message includes the flue gas temperature difference of the air preheater, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater, the wind pressure value at the outlet of the power plant air preheater and the current signal of the air preheater motor.
[0045] Step 3: If historical messages are to be obtained, the controller transmits a request instruction to the server, and then the server transmits the associated historical messages back to the controller according to the request instruction, and the controller transmits the historical messages to the touch screen for display;
[0046] Step 4: The controller also predicts the blockage level of the power plant air preheater based on the power plant air preheater message;
[0047] The step 4 specifically includes: the controller adds the flue gas temperature difference of the air preheater collected in real time, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater and the wind pressure value at the outlet of the power plant air preheater to obtain a sum value of one, and divides it by the sum value of the flue gas temperature difference of the air preheater under the condition of complete blockage of the power plant air preheater, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater and the wind pressure value at the outlet of the power plant air preheater to obtain a sum value of two, and the quotient thus obtained serves as the blockage level of the power plant air preheater, and finally transmits the blockage level to the touch screen for display;
[0048] The blockage level is: when the quotient is lower than 0.5, it is considered that the air preheater of the power plant is in normal condition and no blockage occurs;
[0049] When the quotient is between 0.5 and 0.7, it is determined that the air preheater of the power plant is in a slightly blocked state;
[0050] When the quotient is between 0.7 and 0.9, the air preheater of the power plant is considered to be in a moderately blocked state;
[0051] When the quotient is higher than 0.9, it is determined that the power plant air preheater is in a severe blockage state.
[0052] The steps 2 and 3 specifically include:
[0053] Step A-1: The controller transmits its own power plant air preheater message to the message processing component running on the server, and the message processing component transmits the power plant air preheater message to the message protection component running on the server;
[0054] Step A-2: After storing the power plant air preheater message, take out the storage instruction in the message, pass the storage instruction to the task processing component running on the server, the message protection component modulates the power plant air preheater message and passes it to the task processing component, and the task processing component pairs the storage instruction with the modulated power plant air preheater message and registers them in the attribute domain;
[0055] Step A-3: The controller reads the attribute domain by transmitting the request instruction to obtain the storage instruction, obtains the historical message from the message processing component according to the storage instruction, the message processing component transmits the historical message to the message protection component, the message protection component transmits the historical message after the modulation processing to the task processing component, the task processing component transmits the historical message after the modulation processing back to the controller, and transmits the demodulated historical message to the touch screen for display after demodulation;
[0056] Step A-4: The task processing component also registers the modulated and processed historical message and the request instruction acting as the task of obtaining the message in the attribute domain.
[0057] The task handling component includes the acquisition frequency and message performance of the historical message in the attribute domain content. When the initial acquirer of the historical message first registers the historical message in the attribute domain, the acquisition frequency is one. After that, a controller acquires the historical message, and the acquisition frequency increases by one. After acquiring the historical message, the controller can identify the historical message. The task handling component obtains the message performance of the historical message based on the identification derivation. When constructing the next attribute domain, the acquisition frequency and message performance of the historical message are refreshed.
[0058] The derivation equation for the identified message performance is:
[0059] L={M1*S1-M2*S2+M3*S3}*X(S1+S2+S3-1)
[0060] Here, S1 is the number of messages recognized as good, S2 is the number of messages recognized as bad, S3 is the number of messages not recognized, k1 is a randomly set index for recognition as good, k2 is a randomly set index for recognition as bad, k3 is an index for not recognized, and X is a logarithmic operator with base ten.
[0061] After S controllers obtain historical messages, the historical messages are cut into sub-messages. One sub-message is stored in the associated message domains of more than two controllers. R has the highest critical value. Before R reaches the highest critical value, R is consistent with S. After R reaches the highest critical value, R remains constant. The highest critical value of R is RR1, and its size is related to the size Suze of the entire historical message. The equation is:
[0062] RR1=Z1÷Z2
[0063] Here, Z1 is the capacity of all historical messages, and Us is the capacity of a single historical message.
[0064] Before R reaches the highest critical amount, when another controller obtains the historical message of the interactive controller from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the interactive controller and transmits them to the other controller, and synchronously cuts the sub-message with the highest message capacity in all sub-messages into a pair of new sub-messages according to the ratio of 0.65:1 and stores them in the message domain of the other controller, and in the message domain storing the sub-message before cutting, cuts the sub-message according to the ratio of 0.65:1, and only maintains one new sub-message in sequence;
[0065] When R reaches the highest critical amount, when another controller obtains the historical message from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the controller to form a complete historical message and transmits it to the other controller, and directly stores the pair of sub-messages with the lowest amount in the entire message domain in the message domain associated with the other controller;
[0066] The message handling component sets a detection identifier Y for the controller involved in storing the sub-message. The detection identifier Y is a bit stream. The detection identifier Y changes as another controller obtains the historical message. The capacity of the detection identifier Y is consistent with the number R of sub-messages. The sub-message is associated with a bit in the detection identifier Y. The bit value of one in the detection identifier Y indicates that the associated sub-message is stored in the message domain associated with the controller. The bit value of zero in the detection identifier Y indicates that the associated sub-message is not stored in the associated message domain.
[0067] Before R reaches the highest threshold, a message field is associated with a detection identifier Y;
[0068] After R reaches the highest threshold, there are more than two controller message fields associated with a detection identifier Y;
[0069] The message handling component constructs an association library of detection identifier Y and controller message domain;
[0070] The process of the message processing component obtaining complete historical messages is as follows:
[0071] B-1: Send all detection identifiers Y to a detection queue;
[0072] B-2: Randomly select a detection identifier Y in the detection queue;
[0073] B-3: Identify the bit position where the bit value 1 in the obtained detection identifier Y is located, and this bit position is the target bit;
[0074] B-4: Send the obtained detection identifier Y to the output queue;
[0075] B-5: Detect and clear all detection identifiers Y with a destination bit value of 1 in the detection queue;
[0076] B-6: Loop through B-2 to B-5 until there is no more detection identifier Y in the detection queue;
[0077] B-7: Obtain the sub-messages of the message field of the associated controller according to the detection identifier Y in the output queue to assemble into a complete historical message.
[0078] The method for detecting a change in the identifier Y comprises:
[0079] Before R reaches the highest threshold, the bit associated with the sub-message with the highest capacity in the detection identifier Y is initially identified, and the bit serves as a delimiter;
[0080] For the detection identifier Y that already has the message domain, the detection identifier Y is cut into a header identifier, a transition identifier and a tail identifier according to the delimiting bit. If the bit value of the delimiting bit is zero, the transition identifier is changed into a pair of bits with a bit value of zero, and the header identifier, the transition identifier and the tail identifier are again formed into a new detection identifier Y. If the bit value of the delimiting bit is one, the transition identifier is changed into a pair of bits with a bit value of zero and another bit value of one according to the new sub-message stored in the message domain associated with the controller, and the header identifier, the transition identifier and the tail identifier are again formed into a new detection identifier Y.
[0081] For the detection identifier Y of the message field of another controller, the transition identifier is set to a pair of bits with a bit value of one, the bit values of all bits on the header identifier and the tail identifier are set to zero, and the header identifier, the transition identifier and the tail identifier are sequentially combined into a new detection identifier Y;
[0082] When R reaches the highest threshold, the detection identifier Y of the message domain is kept constant, and the detection identifier Y of the other controller message domain is obtained by setting the associated bit of the sub-message stored therein to one and setting the bit values of the other bits to zero;
[0083] The message handling component is configured with a sequence library of sub-messages, and the sequence library is used to register the bit sequence of the sub-messages in the detection identifier Y;
[0084] When the controller transmits the identification of the historical message to the message handling component, the pointer value of the controller message domain is synchronously transmitted. The message handling component obtains the associated detection identifier according to the association library, and obtains another detection identifier Y with a value of one at the same bit according to the bit with a value of one in the detection identifier Y. The other detection identifier Y serves as a proofreading detection identifier. The message handling component obtains the sub-message in the associated controller message domain through the proofreading detection identifier, and proofreads it with the sub-message in the controller message domain of the transmitted identification. When the proofreading shows that they are the same, the identification is correct, and the identification is transmitted to the task handling component for deriving the message performance of the historical message.
[0085] The message protection component constructs a controller message protection library, in which the setting identification code of the controller and two or more associated simulation identification codes are registered. The simulation identification code indicates that the air preheater message of the power plant obtained by the controller is in the attribute domain. The higher the frequency of historical messages stored by the controller, the higher the number of simulation identification codes. The correlation equation between the number S of simulation identification codes and the frequency R of storage is:
[0086] S=C(R÷10+2)
[0087] C is the base-2 logarithm operator;
[0088] When constructing the simulation identification code for the first time, the simulation identification code is obtained by processing the set identification code. When constructing the simulation identification code for more than two times, the newly constructed simulation identification code is obtained by processing the previous simulation identification code. The construction equation of the simulation identification code is:
[0089] H(u)={u1*J(u)+u2*J(u+1)+u3*J(u+2)}%2 4 ,u is not less than one
[0090] And u is not higher than K;
[0091] Here, H(u) is the content of the u-th bit of the newly constructed simulation identification code, J(u) is the character value of the u-th bit of the set identification code, u1, u2 and u3 are randomly set variable index one, variable index two and variable index three respectively, K is the capacity of the set identification code and the simulation identification code, and % is the remainder operator.
[0092] The beneficial effects of the present invention are:
[0093] The present invention combines steps 1 to 4 to complete a centralized monitoring system for power plant air preheater messages and a prediction system for power plant air preheater blockage; the present invention also uses a simulation identification code to refresh the set identification code and register it in the attribute domain, forming a primary privacy protection for the interactive controller. The power plant air preheater message is cut and stored in the message domain of the server. The controller message domain associated with each historical message will change, forming a secondary privacy protection for the interactive controller. The message performance of the historical message is registered in the attribute domain, and under the condition of protecting the privacy of the controller, it acts as another controller to determine whether it is In order to obtain the basis of historical messages, the present invention establishes a detection identifier Y to associate with the interactive controller, and uses the detection identifier Y to obtain complete historical messages with the characteristics of high speed. After the historical messages are obtained by more and more controllers, the message capacity of the interactive controller for storing sub-messages will be lower, thereby reducing the storage load of the interactive controller; it effectively avoids the defects in the prior art that there is no centralized monitoring system for power plant air preheater messages, there is no prediction system for power plant air preheater blockage, and the load of the controller for transmitting power plant air preheater messages to store will become higher and higher, which will eventually lead to the inability to access the channel. BRIEF DESCRIPTION OF THE DRAWINGS
[0094] Figure 1 It is a schematic diagram of the structure of the components running on the controller of the present invention.
[0095] Figure 2 It is a schematic diagram of the structure of the components of the present invention running on the server.
[0096] Figure 3 It is a flow chart of steps 1 to 4 of the present invention.
[0097] Figure 4 It is a flowchart of step A-1 to step A-4 of the present invention.
[0098] Figure 5 It is a flowchart of step B-1 to step B-7 of the present invention. DETAILED DESCRIPTION
[0099] The present invention will be preferably described below in conjunction with the accompanying drawings and embodiments.
[0100] like Figure 1-Figure 5 As shown, the power plant air preheater prediction system includes:
[0101] A temperature sensor 1 and a pressure sensor 1 are provided at the inlet of the power plant air preheater, a temperature sensor 2 and a pressure sensor 2 are provided at the outlet of the power plant air preheater, and a current sensor is connected in series between the air preheater motor and its power supply;
[0102] Temperature sensor 1, pressure sensor 1, temperature sensor 2, pressure sensor 2, current sensor, wireless communication module, and LCD screen are all electrically connected to the controller;
[0103] The controller is connected to the server in the wireless network via the wireless communication module; the controller can be a single-chip microcomputer or an ARM chip, the wireless communication module can be a WuFu module or a 4G module, and the wireless network can be a WKAN or a 4G network.
[0104] The components running on the controller include a transmission component 1, a transmission component 2 and a prediction component;
[0105] The transmission component 1 is used to obtain the flue gas temperature difference of the air preheater by subtracting the flue gas temperature at the inlet of the power plant air preheater from the collected flue gas temperature at the outlet of the power plant air preheater. Then the controller transmits the power plant air preheater message to the LCD screen for display, and transmits the power plant air preheater message to the server for storage via the wireless communication module.
[0106] The second transmission component is used to transmit the request instruction to the server;
[0107] The prediction component is used to predict the blockage level of the power plant air preheater according to the power plant air preheater message;
[0108] The components running on the server include a return component, a message protection component, a message processing component and a task processing component. The return component is used to return the associated historical message to the controller according to the request instruction, and the controller then transmits the historical message to the touch screen for display; the message protection component is used to process the set identification code of the controller to obtain the simulation identification code, the message processing component is used to cut and process the historical message, and the task processing component is used to register the task of the controller to give and obtain the historical message;
[0109] The controller that gives the historical message and obtains the historical message later is the interactive controller. The message processing component cuts the historical message transmitted by the interactive controller into R sub-messages, which are respectively stored in the message domains of S servers associated with the interactive controller. Before R reaches the highest critical amount, R is equal to S. After R reaches the highest critical amount, the highest critical amount is maintained constant. Two sub-messages are stored in the message domain of a single server, and a single sub-message is stored in the message domains of more than two servers. In particular, when S is one, the historical message is stored as a whole in the message domain of the controller that gives the historical message. R and S are both natural numbers.
[0110] When another controller obtains the historical messages of the interactive controller from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the interactive controller and transmits them to the other controller, and synchronously cuts the sub-message with the highest message capacity in all sub-messages into a pair of new sub-messages at a ratio of 0.65:1 and stores them in the message domain of the other controller; in the message domain storing the sub-message before cutting, the sub-message is cut at a ratio of 0.65:1, and only one new sub-message is maintained in sequence; the other controller here is also an interactive controller.
[0111] The message protection component protects the setting identification code of the controller by constructing a simulation identification code, and the construction equation of the simulation identification code is:
[0112] H(u)={u1*J(u)+u2*J(u+1)+u3*J(u+2)}%2 4 ,u is not less than one and u is not greater than K;
[0113] Here, H(u) is the content of the u-th bit of the newly constructed simulation identification code, J(u) is the character value of the u-th bit of the set identification code, u1, u2 and u3 are randomly set change index one, change index two and change index three respectively, K is the capacity of the set identification code and the simulation identification code, in particular, J(K+1)=J(1), J(K+2)=J(2), % is the remainder operator; the set identification code of the controller is an identification code that uniquely identifies the controller.
[0114] The task handling component constructs an attribute domain when the controller gives or obtains historical information. The attribute domain includes the simulation identification code of the controller, the storage instruction of historical information, and the acquisition frequency and information performance of historical information. The derivation equation of the information performance L is:
[0115] L={M1*S1-M2*S2+M3*S3}*X(S1+S2+S3-1)
[0116] Here, S1 is the number of messages recognized as good, S2 is the number of messages recognized as poor, S3 is the number of messages not recognized, k1 is a randomly set indicator for being recognized as good, k2 is a randomly set indicator for being recognized as poor, k3 is an indicator not recognized, and X is a logarithmic operator with base ten. Whether a message is recognized as good mainly depends on whether the time it takes for the message to be transmitted to the server is less than the set time. If so, the message is recognized as good, and if not, the message is recognized as poor.
[0117] The server can determine whether to obtain relevant historical information through the acquisition frequency and information performance in the attribute domain.
[0118] The message handling component constructs a detection identifier Y for a single interactive controller, wherein the detection identifier Y is a bit stream, and the capacity is consistent with the number of sub-messages R. One bit of the detection identifier Y is associated with one sub-message, and a bit value of one in the detection identifier Y indicates that the associated sub-message is stored in the message domain associated with the controller, and a bit value of zero in the detection identifier Y indicates that the associated sub-message is not stored in the associated message domain. The message handling component obtains a complete historical message by performing detection on the detection identifier Y;
[0119] The process of the message processing component obtaining complete historical messages is as follows:
[0120] B-1: Send all detection identifiers Y to a detection queue;
[0121] B-2: Randomly select a detection identifier Y in the detection queue;
[0122] B-3: Identify the bit position where the bit value 1 in the detection identifier Y obtained in B-2 is located, and this bit position is the target bit;
[0123] B-4: Send the detection identifier Y obtained in B-2 to the output queue;
[0124] B-5: Detect and clear all detection identifiers Y with a destination bit value of 1 in the detection queue;
[0125] B-6: Loop through B-2 to B-5 until there is no more detection identifier Y in the detection queue;
[0126] B-7: Obtain the sub-messages of the message domain of the associated controller according to the detection identifier Y in the output queue to assemble into a complete historical message;
[0127] The highest critical number of sub-messages R is RR1, and its equation is:
[0128] RR1=Z1÷Z2
[0129] Here, Z1 is the capacity of all historical messages, and Us is the capacity of a single historical message;
[0130] The message protection component constructs more than two simulation identification codes according to the frequency of the controller storing historical messages. The correlation equation between the number S of simulation identification codes and the frequency R of storage is:
[0131] S=C(R÷10+2)
[0132] The subsequently constructed simulation identification code is obtained by processing the previous simulation identification code, and C is a logarithmic operator with base 2.
[0133] The prediction method of the power plant air preheater prediction system includes:
[0134] Step 1: The temperature sensor 1, the pressure sensor 1, the temperature sensor 2, the pressure sensor 2, and the current sensor respectively transmit the sampled flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater, the wind pressure value at the outlet of the power plant air preheater, and the current signal of the air preheater motor to the controller;
[0135] Step 2: The controller obtains the flue gas temperature difference of the air preheater by subtracting the flue gas temperature at the inlet of the air preheater from the collected flue gas temperature at the outlet of the air preheater. Then the controller transmits the air preheater message to the LCD screen for display, and transmits the air preheater message to the server for storage via the wireless communication module.
[0136] The power plant air preheater message includes the flue gas temperature difference of the air preheater, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater, the wind pressure value at the outlet of the power plant air preheater and the current signal of the air preheater motor.
[0137] Step 3: If you want to obtain historical messages, the controller transmits a request instruction to the server, and then the server transmits the associated historical messages back to the controller according to the request instruction, and the controller transmits the historical messages to the touch screen for display; and if you want to obtain historical messages, the controller transmits the request instruction to the server in the following way: enter the request instruction on the interactive interface of the touch screen, and then transmit it to the controller and then to the server via the controller. Historical messages are historical power plant air preheater messages.
[0138] Step 4: The controller also predicts the blockage level of the power plant air preheater based on the power plant air preheater message;
[0139] The step 4 specifically includes: the controller adds the flue gas temperature difference of the air preheater collected in real time, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater and the wind pressure value at the outlet of the power plant air preheater to obtain a sum value of one, and divides it by the sum value of the flue gas temperature difference of the air preheater under the condition of complete blockage of the power plant air preheater, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater and the wind pressure value at the outlet of the power plant air preheater to obtain a sum value of two, and the quotient thus obtained serves as the blockage level of the power plant air preheater, and finally transmits the blockage level to the touch screen for display;
[0140] The blockage level is: when the quotient is lower than 0.5, it is considered that the air preheater of the power plant is in normal condition and no blockage occurs;
[0141] When the quotient is between 0.5 and 0.7, it is determined that the air preheater of the power plant is in a slightly blocked state;
[0142] When the quotient is between 0.7 and 0.9, the air preheater of the power plant is considered to be in a moderately blocked state;
[0143] When the quotient is higher than 0.9, it is determined that the power plant air preheater is in a severe blockage state.
[0144] The steps 2 and 3 specifically include:
[0145] Step A-1: The controller transmits its own power plant air preheater message to the message processing component running on the server, and the message processing component transmits the power plant air preheater message to the message protection component running on the server;
[0146] Step A-2: After storing the power plant air preheater message, take out the storage instruction in the message, pass the storage instruction to the task processing component running on the server, the message protection component modulates the power plant air preheater message and passes it to the task processing component, the task processing component pairs the storage instruction with the modulated power plant air preheater message and registers them in the attribute domain; the modulation method can be an existing modulation method.
[0147] Step A-3: The controller reads the attribute domain by transmitting the request instruction to obtain the storage instruction, obtains the historical message from the message processing component according to the storage instruction, the message processing component transmits the historical message to the message protection component, the message protection component transmits the historical message after the modulation processing to the task processing component, the task processing component transmits the historical message after the modulation processing back to the controller, and transmits the demodulated historical message to the touch screen for display after demodulation;
[0148] Step A-4: The task processing component also registers the modulated and processed historical message and the request instruction acting as the task of obtaining the message in the attribute domain.
[0149] The task handling component includes the acquisition frequency and message performance of the historical message in the attribute domain content. When the initial acquirer of the historical message first registers the historical message in the attribute domain, the acquisition frequency is one. After that, a controller acquires the historical message, and the acquisition frequency increases by one. After acquiring the historical message, the controller can identify the historical message. The task handling component obtains the message performance of the historical message based on the identification derivation. When constructing the next attribute domain, the acquisition frequency and message performance of the historical message are refreshed.
[0150] The derivation equation for the identified message performance is:
[0151] L={M1*S1-M2*S2+M3*S3}*X(S1+S2+S3-1)
[0152] Here, S1 is the number of messages recognized as good, S2 is the number of messages recognized as bad, S3 is the number of messages not recognized, k1 is a randomly set index for recognition as good, k2 is a randomly set index for recognition as bad, k3 is an index not recognized, and X is a logarithmic operator with a base of 10. The recognition of a message as good mainly refers to whether the time it takes for the message to be transmitted to the server is less than the set time. If it is less, the message is recognized as good, and if it is not less, the message is recognized as bad.
[0153] The controller determines whether to obtain relevant historical information through the acquisition frequency and information performance in the attribute domain;
[0154] The message processing component will disperse and store the historical messages in the message domains associated with the controllers that have obtained the historical messages. In particular, when the historical messages are not obtained by other controllers, the historical messages are all stored in the message domains associated with the original obtainers.
[0155] After S controllers obtain historical messages, the historical messages are cut into sub-messages. One sub-message is stored in the associated message domains of more than two controllers. R has the highest critical value. Before R reaches the highest critical value, R is consistent with S. After R reaches the highest critical value, R remains constant. The highest critical value of R is RR1, and its size is related to the size Suze of the entire historical message. The equation is:
[0156] RR1=Z1÷Z2
[0157] Here, Z1 is the capacity of all historical messages, and Us is the capacity of a single historical message.
[0158] Before R reaches the maximum critical amount, when another controller obtains the historical message of the interactive controller from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the interactive controller and transmits them to the other controller, and synchronously cuts the sub-message with the highest message capacity in all sub-messages into a pair of new sub-messages according to the ratio of 0.65:1 and stores them in the message domain of the other controller; in the message domain storing the sub-message before cutting, the sub-message is cut according to the ratio of 0.65:1, and only one new sub-message is maintained in sequence; the other controller here is also an interactive controller.
[0159] When R reaches the highest critical amount, when another controller obtains the historical message from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the controller to form a complete historical message and transmits it to the other controller, and directly stores the pair of sub-messages with the lowest amount in the entire message domain in the message domain associated with the other controller;
[0160] The message processing component sets a detection identifier Y for the controller involved in storing the sub-message. The detection identifier Y is a bit stream. The detection identifier Y changes as another controller obtains the historical message. The capacity of the detection identifier Y is consistent with the number R of sub-messages. The sub-message is associated with a bit in the detection identifier Y. The bit value one in the detection identifier Y indicates that the associated sub-message is stored in the message domain associated with the controller. The bit value zero in the detection identifier Y indicates that the associated sub-message is not stored in the associated message domain. The detection identifier Y has a pair of bit values one.
[0161] Before R reaches the highest threshold, a message field is associated with a detection identifier Y;
[0162] After R reaches the highest threshold, there are more than two controller message fields associated with a detection identifier Y;
[0163] The message handling component constructs an association library of detection identifier Y and controller message domain;
[0164] The process of the message processing component obtaining complete historical messages is as follows:
[0165] B-1: Send all detection identifiers Y to a detection queue;
[0166] B-2: Randomly select a detection identifier Y in the detection queue;
[0167] B-3: Identify the bit position where the bit value 1 in the detection identifier Y obtained in B-2 is located, and this bit position is the target bit;
[0168] B-4: Send the detection identifier Y obtained in B-2 to the output queue;
[0169] B-5: Detect and clear all detection identifiers Y with a destination bit value of 1 in the detection queue;
[0170] B-6: Loop through B-2 to B-5 until there is no more detection identifier Y in the detection queue;
[0171] B-7: Obtain the sub-messages of the message field of the associated controller according to the detection identifier Y in the output queue to assemble into a complete historical message.
[0172] The method for detecting a change in the identifier Y comprises:
[0173] Before R reaches the highest threshold, the bit associated with the sub-message with the highest capacity in the detection identifier Y is initially identified, and the bit serves as a delimiter;
[0174] For the detection identifier Y that already has the message domain, the detection identifier Y is cut into a header identifier, a transition identifier and a tail identifier according to the delimiting bit. If the bit value of the delimiting bit is zero, the transition identifier is changed into a pair of bits with a bit value of zero, and the header identifier, the transition identifier and the tail identifier are again formed into a new detection identifier Y. If the bit value of the delimiting bit is one, the transition identifier is changed into a pair of bits with a bit value of zero and another bit value of one according to the new sub-message stored in the message domain associated with the controller, and the header identifier, the transition identifier and the tail identifier are again formed into a new detection identifier Y.
[0175] For the detection identifier Y of the message field of another controller, the transition identifier is set to a pair of bits with a bit value of one, the bit values of all bits on the header identifier and the tail identifier are set to zero, and the header identifier, the transition identifier and the tail identifier are sequentially combined into a new detection identifier Y;
[0176] When R reaches the highest threshold, the detection identifier Y of the message domain is kept constant, and the detection identifier Y of the other controller message domain is obtained by setting the associated bit of the sub-message stored therein to one and setting the bit values of the other bits to zero;
[0177] The message processing component is set with a sequence library of sub-messages, and the sequence library is used to register the bit sequence of sub-messages in the detection identifier Y. When the sequence library of the sub-message is changed, it is only necessary to change the association between the detection identifier Y and the detection identifier Y in the association library of the controller message domain. In B-5, to improve the detection efficiency, the sequence library of the sub-message is changed so that the destination bit is located at the last two bits of the detection identifier Y. The message processing component only needs to identify the last two bits of the detection identifier Y to detect the detection identifier Y to be cleared;
[0178] When the controller transmits the identification of the historical message to the message handling component, the pointer value of the controller message domain is synchronously transmitted. The message handling component obtains the associated detection identifier according to the association library, and obtains another detection identifier Y with a value of one at the same bit according to the bit with a value of one in the detection identifier Y. The other detection identifier Y serves as a proofreading detection identifier. The message handling component obtains the sub-message in the associated controller message domain through the proofreading detection identifier, and proofreads it with the sub-message in the controller message domain of the transmitted identification. When the proofreading shows that they are the same, the identification is correct, and the identification is transmitted to the task handling component for deriving the message performance of the historical message.
[0179] The message protection component constructs a controller message protection library, in which the setting identification code of the controller and two or more associated simulation identification codes are registered. The simulation identification code indicates that the air preheater message of the power plant obtained by the controller is in the attribute domain. The higher the frequency of historical messages stored by the controller, the higher the number of simulation identification codes. The correlation equation between the number S of simulation identification codes and the frequency R of storage is:
[0180] S=C(R÷10+2)
[0181] C is the base-2 logarithm operator;
[0182] When constructing the simulation identification code for the first time, the simulation identification code is obtained by processing the set identification code. When constructing the simulation identification code for more than two times, the newly constructed simulation identification code is obtained by processing the previous simulation identification code. The construction equation of the simulation identification code is:
[0183] H(u)={u1*J(u)+u2*J(u+1)+u3*J(u+2)}%2 4 ,u is not less than one and u is not greater than K;
[0184] Here, H(u) is the content of the u-th bit of the newly constructed simulation identification code, J(u) is the character value of the u-th bit of the set identification code, u1, u2 and u3 are randomly set change index one, change index two and change index three respectively, K is the capacity of the set identification code and the simulation identification code, in particular, J(K+1)=J(1), J(K+2)=J(2), % is the remainder operator; the set identification code of the controller is an identification code that uniquely identifies the controller.
[0185] The present invention has been described above in an illustrative manner using embodiments. It is obvious to those skilled in the art that the present disclosure is not limited to the embodiments described above, and various changes, modifications and substitutions can be made without departing from the scope of the present invention.
Claims
1. A power plant air preheater prediction system, characterized in that: include: A temperature sensor 1 and a pressure sensor 1 are provided at the inlet of the power plant air preheater, a temperature sensor 2 and a pressure sensor 2 are provided at the outlet of the power plant air preheater, and a current sensor is connected in series between the air preheater motor and its power supply; Temperature sensor 1, pressure sensor 1, temperature sensor 2, pressure sensor 2, current sensor, wireless communication module, and LCD screen are all electrically connected to the controller; The controller is connected to the server in the wireless network via the wireless communication module; The components running on the controller include a transmission component 1, a transmission component 2 and a prediction component; The transmission component 1 is used to obtain the flue gas temperature difference of the air preheater by subtracting the flue gas temperature at the inlet of the power plant air preheater from the collected flue gas temperature at the outlet of the power plant air preheater. Then the controller transmits the power plant air preheater message to the LCD screen for display, and transmits the power plant air preheater message to the server for storage via the wireless communication module. The second transmission component is used to transmit the request instruction to the server; The prediction component is used to predict the blockage level of the power plant air preheater according to the power plant air preheater message; The components running on the server include a return component, a message protection component, a message processing component and a task processing component. The return component is used to return the associated historical message to the controller according to the request instruction, and the controller then transmits the historical message to the touch screen for display; the message protection component is used to process the set identification code of the controller to obtain the simulation identification code, the message processing component is used to cut and process the historical message, and the task processing component is used to register the task of the controller to give and obtain the historical message; The controller that gives the historical message and obtains the historical message later is the interactive controller. The message processing component cuts the historical message transmitted by the interactive controller into R sub-messages, which are respectively stored in the message domains of S servers associated with the interactive controller. Before R reaches the highest critical quantity, R is equal to S. After R reaches the highest critical quantity, the highest critical quantity is maintained constant. Two sub-messages are stored in the message domain of a single server, and a single sub-message is stored in the message domains of more than two servers. When S is one, the historical message is stored as a whole in the message domain of the controller that gives the historical message. R and S are both natural numbers. When another controller obtains the history message of the interactive controller from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the interactive controller and transmits them to the other controller, and synchronously cuts the sub-message with the highest message capacity in all sub-messages into a pair of new sub-messages according to the ratio of 0.65:1 and stores them in the message domain of the other controller, and in the message domain storing the sub-message before cutting, cuts the sub-message according to the ratio of 0.65:1, and only maintains one new sub-message in order; The message protection component protects the setting identification code of the controller by constructing a simulation identification code, and the construction equation of the simulation identification code is: H(u)={u1*J(u)+u2*J(u+1)+u3*J(u+2)}%2 4 ,uFlow Yuichi And u is not higher than K; Here, H(u) is the content of the u-th bit of the newly constructed simulation identification code, J(u) is the character value of the u-th bit of the set identification code, u1, u2 and u3 are randomly set variable index one, variable index two and variable index three respectively, K is the capacity of the set identification code and the simulation identification code, and % is the remainder operator.
2. The power plant air preheater prediction system according to claim 1, characterized in that: The task handling component constructs an attribute domain when the controller gives or obtains historical information. The attribute domain includes the simulation identification code of the controller, the storage instruction of historical information, and the acquisition frequency and information performance of historical information. The derivation equation of the information performance L is: L={M1*S1-M2*S2+M3*S3}*X(S1+S2+S3-1) Here, S1 is the number of messages identified as good, S2 is the number of messages identified as bad, S3 is the number of messages not identified, M1 is a randomly set index for identifying as good, M2 is a randomly set index for identifying as bad, M3 is an index not identified, and X is a logarithmic operator with base ten; The message handling component constructs a detection identifier Y for a single interactive controller, wherein the detection identifier Y is a bit stream, and the capacity is consistent with the number of sub-messages R. One bit of the detection identifier Y is associated with one sub-message, and a bit value of one in the detection identifier Y indicates that the associated sub-message is stored in the message domain associated with the interactive controller, and a bit value of zero in the detection identifier Y indicates that the associated sub-message is not stored in the associated message domain. The message handling component obtains a complete historical message by performing detection on the detection identifier Y; The process of the message processing component obtaining complete historical messages is as follows: B-1: Send all detection identifiers Y to a detection queue; B-2: Randomly select a detection identifier Y in the detection queue; B-3: Identify the bit position where the bit value 1 in the obtained detection identifier Y is located, and this bit position is the target bit; B-4: Send the obtained detection identifier Y to the output queue; B-5: Detect and clear all detection identifiers Y with a destination bit value of 1 in the detection queue; B-6: Loop through B-2 to B-5 until there is no more detection identifier Y in the detection queue; B-7: Obtain the sub-messages of the message domain of the associated controller according to the detection identifier Y in the output queue to assemble into a complete historical message; The highest critical number of sub-messages R is RR1, and its equation is: RR1=Z1÷Z2 Here, Z1 is the capacity of all historical messages, and Z2 is the capacity of a single historical message; The message protection component constructs more than two simulation identification codes according to the frequency of the controller storing historical messages. The correlation equation between the number S of simulation identification codes and the frequency R of storage is: S=C(R÷10+2) The subsequently constructed simulation identification code is obtained by processing the previous simulation identification code, and C is a logarithmic operator with base 2.
3. A prediction method for a power plant air preheater prediction system according to claim 1, characterized in that: include: Step 1: The temperature sensor 1, the pressure sensor 1, the temperature sensor 2, the pressure sensor 2, and the current sensor respectively transmit the sampled flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater, the wind pressure value at the outlet of the power plant air preheater, and the current signal of the air preheater motor to the controller; Step 2: The controller obtains the flue gas temperature difference of the air preheater by subtracting the flue gas temperature at the inlet of the air preheater from the collected flue gas temperature at the outlet of the air preheater. Then the controller transmits the air preheater message to the LCD screen for display, and transmits the air preheater message to the server for storage via the wireless communication module. Step 3: If historical messages are to be obtained, the controller transmits a request instruction to the server, and then the server transmits the associated historical messages back to the controller according to the request instruction, and the controller transmits the historical messages to the touch screen for display; Step 4: The controller also predicts the blockage level of the power plant air preheater based on the power plant air preheater message; The steps 2 and 3 specifically include: Step A-1: The controller transmits its own power plant air preheater message to the message processing component running on the server, and the message processing component transmits the power plant air preheater message to the message protection component running on the server; Step A-2: After storing the power plant air preheater message, take out the storage instruction in the message, pass the storage instruction to the task processing component running on the server, the message protection component modulates the power plant air preheater message and passes it to the task processing component, and the task processing component pairs the storage instruction with the modulated power plant air preheater message and registers them in the attribute domain; Step A-3: The controller reads the attribute domain by transmitting the request instruction to obtain the storage instruction, obtains the historical message from the message processing component according to the storage instruction, the message processing component transmits the historical message to the message protection component, the message protection component transmits the historical message after the modulation processing to the task processing component, the task processing component transmits the historical message after the modulation processing back to the controller, and transmits the demodulated historical message to the touch screen for display after demodulation; Step A-4: The task processing component also registers the modulated and processed historical message and the request instruction acting as the task of obtaining the message in the attribute domain.
4. The prediction method of the power plant air preheater prediction system according to claim 3 is characterized in that: The power plant air preheater message includes the flue gas temperature difference of the air preheater, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater, the wind pressure value at the outlet of the power plant air preheater and the current signal of the air preheater motor; The step 4 specifically includes: the controller adds the flue gas temperature difference of the air preheater collected in real time, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater and the wind pressure value at the outlet of the power plant air preheater to obtain a sum value of one, and divides it by the sum value of the flue gas temperature difference of the air preheater under the condition of complete blockage of the power plant air preheater, the flue gas temperature at the inlet of the power plant air preheater, the wind pressure value at the inlet of the power plant air preheater, the flue gas temperature at the outlet of the power plant air preheater and the wind pressure value at the outlet of the power plant air preheater to obtain a sum value of two, and the quotient thus obtained serves as the blockage level of the power plant air preheater, and finally transmits the blockage level to the touch screen for display; The blockage level is: when the quotient is lower than 0.5, it is considered that the air preheater of the power plant is in normal condition and no blockage occurs; When the quotient is between 0.5 and 0.7, it is determined that the air preheater of the power plant is in a slightly blocked state; When the quotient is between 0.7 and 0.9, the air preheater of the power plant is considered to be in a moderately blocked state; When the quotient is higher than 0.9, it is determined that the power plant air preheater is in a severe blockage state.
5. The prediction method of the power plant air preheater prediction system according to claim 3, characterized in that: The task handling component includes the acquisition frequency and message performance of the historical message in the attribute domain content. When the initial acquirer of the historical message first registers the historical message in the attribute domain, the acquisition frequency is one. After that, a controller acquires the historical message, and the acquisition frequency increases by one. After acquiring the historical message, the controller can identify the historical message. The task handling component obtains the message performance of the historical message based on the identification derivation. When constructing the next attribute domain, the acquisition frequency and message performance of the historical message are refreshed. The derived equation for determining message performance is: L={M1*S1-M2*S2+M3*S3}*X(S1+S2+S3-1) Here, S1 is the number of messages recognized as good, S2 is the number of messages recognized as bad, S3 is the number of messages not recognized, M1 is a randomly set index for recognition as good, M2 is a randomly set index for recognition as bad, M3 is an index for not recognized, and X is a logarithmic operator with base ten.
6. The prediction method of the power plant air preheater prediction system according to claim 5, characterized in that: After S controllers obtain historical messages, the historical messages are cut into sub-messages. One sub-message is stored in the associated message domains of more than two controllers. R has the highest critical value. Before R reaches the highest critical value, R is consistent with S. After R reaches the highest critical value, R remains constant. The highest critical value of R is RR1, and its size is related to the size Suze of the entire historical message. The equation is: RR1=Z1÷Z2 Here, Z1 is the capacity of all historical messages, and Z2 is the capacity of a single historical message.
7. The prediction method of the power plant air preheater prediction system according to claim 6, characterized in that: Before R reaches the highest critical amount, when another controller obtains the history message of the interactive controller from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the interactive controller and transmits them to the other controller, and synchronously cuts the sub-message with the highest message capacity in all sub-messages into a pair of new sub-messages according to the ratio of 0.65:1 and stores them in the message domain of the other controller, and in the message domain storing the sub-message before cutting, cuts the sub-message according to the ratio of 0.65:1, and only maintains one new sub-message in sequence; When R reaches the highest critical amount, when another controller obtains the historical message from the message processing component, the message processing component obtains R sub-messages from the message domain associated with the controller to form a complete historical message and transmits it to the other controller, and directly stores the pair of sub-messages with the lowest amount in the entire message domain in the message domain associated with the other controller; The message handling component sets a detection identifier Y for the controller involved in storing the sub-message. The detection identifier Y is a bit stream. The detection identifier Y changes as another controller obtains the historical message. The capacity of the detection identifier Y is consistent with the number R of sub-messages. The sub-message is associated with a bit in the detection identifier Y. The bit value of one in the detection identifier Y indicates that the associated sub-message is stored in the message domain associated with the controller. The bit value of zero in the detection identifier Y indicates that the associated sub-message is not stored in the associated message domain. Before R reaches the highest threshold, a message field is associated with a detection identifier Y; After R reaches the highest threshold, there are more than two controller message fields associated with a detection identifier Y; The message handling component constructs an association library of detection identifier Y and controller message domain; The process of the message processing component obtaining complete historical messages is as follows: B-1: Send all detection identifiers Y to a detection queue; B-2: Randomly select a detection identifier Y in the detection queue; B-3: Identify the bit position where the bit value 1 in the obtained detection identifier Y is located, and this bit position is the target bit; B-4: Send the obtained detection identifier Y to the output queue; B-5: Detect and clear all detection identifiers Y with a destination bit value of 1 in the detection queue; B-6: Loop through B-2 to B-5 until there is no more detection identifier Y in the detection queue; B-7: Obtain the sub-messages of the message field of the associated controller according to the detection identifier Y in the output queue to assemble into a complete historical message.
8. The prediction method of the power plant air preheater prediction system according to claim 7, characterized in that: The method for detecting a change in the identifier Y comprises: Before R reaches the highest threshold, the bit associated with the sub-message with the highest capacity in the detection identifier Y is initially identified, and the bit serves as a delimiter; For the detection identifier Y that already has the message domain, the detection identifier Y is cut into a header identifier, a transition identifier and a tail identifier according to the delimiting bit. If the bit value of the delimiting bit is zero, the transition identifier is changed into a pair of bits with a bit value of zero, and the header identifier, the transition identifier and the tail identifier are again formed into a new detection identifier Y. If the bit value of the delimiting bit is one, the transition identifier is changed into a pair of bits with a bit value of zero and another bit value of one according to the new sub-message stored in the message domain associated with the controller, and the header identifier, the transition identifier and the tail identifier are again formed into a new detection identifier Y. For the detection identifier Y of the message field of another controller, the transition identifier is set to a pair of bits with a bit value of one, the bit values of all bits on the header identifier and the tail identifier are set to zero, and the header identifier, the transition identifier and the tail identifier are sequentially combined into a new detection identifier Y; When R reaches the highest threshold, the detection identifier Y of the message domain is kept constant, and the detection identifier Y of the other controller message domain is obtained by setting the associated bit of the sub-message stored therein to one and setting the bit values of the other bits to zero; The message handling component is configured with a sequence library of sub-messages, and the sequence library is used to register the bit sequence of the sub-messages in the detection identifier Y; When the controller transmits the identification of the historical message to the message handling component, the pointer value of the controller message domain is synchronously transmitted. The message handling component obtains the associated detection identifier according to the association library, and obtains another detection identifier Y with a value of one at the same bit according to the bit with a value of one in the detection identifier Y. The other detection identifier Y serves as a proofreading detection identifier. The message handling component obtains the sub-message in the associated controller message domain through the proofreading detection identifier, and proofreads it with the sub-message in the controller message domain of the transmitted identification. When the proofreading shows that they are the same, the identification is correct, and the identification is transmitted to the task handling component for deriving the message performance of the historical message. The message protection component constructs a controller message protection library, in which the setting identification code of the controller and two or more associated simulation identification codes are registered. The simulation identification code indicates that the air preheater message of the power plant obtained by the controller is in the attribute domain. The higher the frequency of historical messages stored by the controller, the higher the number of simulation identification codes. The correlation equation between the number S of simulation identification codes and the frequency R of storage is: S=C(R÷10+2) C is the base-2 logarithm operator; When constructing the simulation identification code for the first time, the simulation identification code is obtained by processing the set identification code. When constructing the simulation identification code for more than two times, the newly constructed simulation identification code is obtained by processing the previous simulation identification code. The construction equation of the simulation identification code is: H(u)={u1*J(u)+u2*J(u+1)+u3*J(u+2)}%2 4 ,uFlow Yuichi And u is not higher than K; Here, H(u) is the content of the u-th bit of the newly constructed simulation identification code, J(u) is the character value of the u-th bit of the set identification code, u1, u2 and u3 are randomly set variable index one, variable index two and variable index three respectively, K is the capacity of the set identification code and the simulation identification code, and % is the remainder operator.