A tunnel waterproof drainage structure

By setting up elastic rods and scrapers in the tunnel, the tunnel seepage problem is solved, the drainage capacity of the tunnel is improved, and the water flow smoothness and waterproof effect are ensured.

CN115324645BActive Publication Date: 2024-12-06YUYAO TRAFFIC PLANNING & DESIGN INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211069276.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-01
Publication Date
2024-12-06
Estimated Expiration
2042-09-01

AI Technical Summary

Technical Problem

After excavation, the tunnel is caused by natural water seepage in the mountain, resulting in the accumulation of sediment and sediment in the blind pipe and drainage pipe, which reduces the drainage capacity of the tunnel and leads to water seepage in the tunnel.

Method used

A tunnel waterproof drainage structure is designed, using elastic rods and scrapers to set up in the blind pipe and drain pipe. The elastic rods and scrapers are driven to rotate through the driving parts to scrape off the mud and sand deposited in the blind pipe and drain pipe, and pass through three Structures such as pipes and blades improve the stability of water flow power and water flow channels, and enhance drainage capacity.

Benefits of technology

It effectively reduces the possibility of blind pipe blockage, improves the drainage capacity of the tunnel, and ensures the smoothness of the water flow and waterproofing effect in the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115324645B_ABST
    Figure CN115324645B_ABST
Patent Text Reader

Abstract

The present application relates to a tunnel waterproof drainage structure, belonging to the technical field of tunnels, comprising a blind pipe arranged on the inner wall of the tunnel and a drainage pipe arranged on both sides of the tunnel, the blind pipe being connected to the drainage pipe, a first elastic rod being rotatably arranged in the blind pipe, the first elastic rod being coaxially arranged with the blind pipe, the first elastic rod rotating along the axis of the first elastic rod, a plurality of rubber plates being arranged on the first elastic rod, the rubber plates contacting the inner wall of the blind pipe, the drainage structure further comprising a first driving member for driving the first elastic rod to rotate; a second elastic rod being rotatably arranged in the drainage pipe, the second elastic rod being coaxially arranged with the drainage pipe, the second elastic rod rotating along the axis of the second elastic rod, a scraper being arranged on the second elastic rod, the scraper abutting against the side wall of the drainage pipe, and the drainage structure further comprising a second driving member for driving the second elastic rod to rotate. The present application has the effect of improving the drainage capacity of the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of tunnel technology, and in particular to a tunnel waterproofing and drainage structure. Background Art

[0002] Tunnels are engineering structures buried in the ground, and are a form of human use of underground space. Tunnels can be divided into traffic tunnels, hydraulic tunnels, municipal tunnels, and mining tunnels. In the route selection of mountain roads with complex terrain, tunnels can provide the best solution for route selection. Tunnels can overcome elevation obstacles, shorten the route length, reduce slope and curvature, and thus improve the technical standards of the route. After the construction of the tunnel, the original water system balance of the mountain is destroyed, and the tunnel becomes a channel for the accumulation of groundwater near the mountain. When the tunnel is connected to the aquiferous stratum, the tunnel needs to be waterproofed.

[0003] At present, after the tunnel is excavated and formed, the blind pipe is first installed on the inner wall of the tunnel, and at the same time, the single-side opening of the blind pipe is made close to the inner wall of the tunnel; then the drainage pipes are installed on both sides of the tunnel, and the drainage pipes are arranged along the length of the tunnel, and then the blind pipes are connected to the drainage pipes using three-way pipe fittings; then the geotextile is laid on the inner wall of the tunnel, and then the waterstop and waterproof board are constructed, and then the secondary lining is constructed.

[0004] Regarding the above-mentioned related technologies, the inventors believe that the following defects exist: natural water in the mountain penetrates into the blind pipe through the openings. During the above process, the natural water carries some silt into the blind pipe and then into the drainage pipe. The silt may accumulate in the blind pipe and the drainage pipe, thereby reducing the drainage capacity of the tunnel and causing water seepage in the tunnel. Summary of the invention

[0005] In order to improve the drainage capacity of a tunnel, the present application provides a tunnel waterproof drainage structure.

[0006] The present application provides a tunnel waterproof drainage structure adopting the following technical solution:

[0007] A tunnel waterproof drainage structure comprises a blind pipe arranged on an inner wall of the tunnel and drainage pipes arranged on both sides of the tunnel, the blind pipe being connected to the drainage pipe, a first elastic rod being rotatably arranged in the blind pipe, the first elastic rod being coaxially arranged with the blind pipe, the first elastic rod being rotated along the axis of the first elastic rod, a plurality of rubber plates being arranged on the first elastic rod, the rubber plates being in contact with the inner wall of the blind pipe, the drainage structure further comprising a first driving member for driving the first elastic rod to rotate; a second elastic rod being rotatably arranged in the drainage pipe, the second elastic rod being coaxially arranged with the drainage pipe, the second elastic rod being rotated along the axis of the second elastic rod, a scraper being arranged on the second elastic rod, the scraper being abutted against the side wall of the drainage pipe, and the drainage structure further comprising a second driving member for driving the second elastic rod to rotate.

[0008] By adopting the above technical solution, during the use of the blind pipe, the first elastic rod is driven to rotate by the first driving member, and the rotation of the first elastic rod drives the rubber plate to rotate with the first elastic rod as the rotation axis. During the rotation process, the rubber plate scrapes off the sediment settled in the blind pipe, and under the action of natural water, the sediment is washed into the drainage pipe, thereby reducing the possibility of blockage of the blind pipe and improving the drainage capacity of the tunnel; at the same time, the natural water entering the drainage pipe carries the sediment into the drainage pipe, and the second elastic rod is driven to rotate by the second driving member, and the rotation of the second elastic rod drives the scraper to rotate, and the rotation of the scraper scrapes off the sediment deposited in the drainage pipe, so that the sediment is discharged from the drainage pipe driven by the water flow, thereby improving the drainage capacity of the tunnel; because the blind pipe is installed on the inner wall of the tunnel in an arc shape, and the drainage pipe is arranged along the direction of the tunnel, under the action of the elastic rod, it is convenient for the elastic rod to rotate with its own axis; at the same time, under the action of the rubber plate, the possibility of the first elastic rod being unable to rotate due to the blockage of the rubber plate is reduced.

[0009] Optionally, a tee is arranged between the drain pipe and the blind pipe, and the tee is respectively connected to the drain pipe and the blind pipe; the first driving member includes a first blade arranged in the tee, the first blade is located in a branch pipe of the tee parallel to the direction of the drain pipe, the rotation axis of the first blade is parallel to the ground, the first elastic rod is located in the tee at one end close to the tee, a first universal joint is arranged at the end of the first elastic rod, a side of the first universal joint facing away from the first elastic rod is parallel to the first blade, a first driving rod is rotatably arranged in the tee, the length direction of the first driving rod is perpendicular to the length direction of the first blade, first bevel gears are arranged at both ends of the first driving rod, and second bevel gears meshing with the first bevel gear are arranged on the first blade and the first universal joint.

[0010] By adopting the above technical solution, the natural water in the blind pipe flows into the branch pipe of the tee pipe and enters the tee pipe. The natural water entering the tee pipe impacts the first blade, driving the first blade to rotate. The rotation of the first blade drives the second bevel gear to rotate. The rotation of the second bevel gear drives the first driving rod to rotate. The rotation of the first driving rod drives the first bevel gear to rotate. The rotation of the first bevel gear drives another second bevel gear to rotate, thereby driving the first universal joint to rotate. The rotation of the first universal joint drives the first elastic rod to rotate. The operation is simple and convenient. At the same time, when the natural water flows in the blind pipe, the rubber plate rotates to increase the kinetic energy of the water, thereby increasing the impact force of the water flow on the first blade.

[0011] Optionally, the first blade is slidably arranged in the three-way pipe, and the first blade slides in the vertical direction. The drainage structure also includes a third driving member for driving the first blade to slide so that the bottommost blade of the first blade is located below the liquid surface, and the first driving rod is a retractable structure.

[0012] By adopting the above technical solution, when rainwater enters the mountain, the speed of natural water entering the blind pipe increases, causing the liquid level in the drainage pipe to rise, and there is a possibility that the first blade is immersed below the liquid surface, resulting in the obstruction of the rotation of the first blade; when the liquid level in the drainage pipe rises, under the action of the third driving member, the first blade is driven to slide, so that the rotation axis of the first blade is located on the liquid surface, and the fan blade at the bottom of the first blade is located below the liquid surface, thereby facilitating the water flow to impact the first blade, so as to drive the first blade to rotate; the first driving rod is a retractable structure, so that when the first blade slides, the first bevel gear and the second bevel gear are in a meshing state, thereby facilitating the rotation of the first elastic rod.

[0013] Optionally, the third driving member includes a float arranged in a tee tube, a guide rod is arranged in the tee tube, the length direction of the guide rod is parallel to the sliding direction of the first blade, the float is slidably arranged on the guide rod, the first blade is rotatably arranged on the float, and the first driving rod is arranged on the guide rod and is parallel to the guide rod.

[0014] By adopting the above technical solution, when the liquid level rises, the first blade is driven to rise under the action of the float, and the operation is simple and convenient; under the action of the guide rod, the sliding of the float is guided, thereby facilitating the float to slide to the desired location; the first driving rod is located on the guide rod, which facilitates the extension and retraction of the first driving rod under the drive of the float.

[0015] Optionally, the second driving member includes a third bevel gear rotatably arranged on the float, the third bevel gear is meshed with the second bevel gear on the first blade, the axial direction of the third bevel gear is parallel to the length direction of the branch pipe of the drainage pipe and the tee pipe is parallel to the length direction of the branch pipe of the drainage pipe, the second driving member also includes a second universal joint arranged on the ends of the second elastic rod and the third bevel gear close to each other, a second driving rod is arranged between the two second universal joints, and the second driving rod is a telescopic structure.

[0016] By adopting the above technical solution, the first blade drives the second bevel gear to rotate during the rotation process, the rotation of the second bevel gear drives the third bevel gear to rotate, the rotation of the third bevel gear drives the second universal joint to rotate, and then drives the second drive rod to rotate, thereby driving the second universal joint on the second elastic rod to rotate, and then drives the second elastic rod to rotate. The operation is simple and convenient; the second drive rod is a retractable structure, which is convenient for the first blade to transfer the kinetic energy of the first blade to the second elastic rod during the floating process.

[0017] Optionally, the drainage structure also includes a partition, which is used to block the natural water flow in the drainage pipe, and a water outlet is opened at the center of the partition. A sliding cover is slidably arranged on the partition to close the water outlet. The sliding cover is provided with a strip notch for the second elastic rod to pass through, and the length direction of the strip notch is parallel to the sliding direction of the sliding cover. The drainage structure also includes a fourth driving member for driving the sliding cover to slide, so as to open the water outlet and place the water outlet below the liquid level.

[0018] By adopting the above technical solution, natural water passes through the water outlet and then passes through the partition, and then drives the first blade to rotate; at the same time, the sliding cover slides to the required position, so that the water outlet is below the liquid surface, so as to alleviate the flow speed and shaking degree of the water flow, so that the water flow impacting the first blade is relatively stable, thereby reducing the possibility of the first blade rising and falling significantly, and making it easier to drive the first elastic rod and the second elastic rod to rotate; under the action of the strip mouth, it is convenient for the elastic rod to pass through the sliding cover.

[0019] Optionally, the fourth driving member includes an airbag arranged on the sliding cover, the airbag is located on the water flow impact surface of the sliding cover, and the airbag is located between the bottom and the end of the sliding cover.

[0020] By adopting the above technical solution, the partition and the sliding cover separate the three-way pipe, so that the liquid level on one side of the drain pipe rises, and drives the air bag to float up, and then drives the sliding cover to slide to open the water outlet, which is simple and convenient to operate; the air bag is located between the bottom and the end of the sliding cover, so that the water outlet is below the liquid level.

[0021] Optionally, a closing plate is slidably provided on the sliding cover, and the closing plate is used to close the strip-shaped gap, and the closing plate abuts against the second elastic rod.

[0022] By adopting the above technical solution, the strip gap is closed under the action of the closing plate, which reduces the speed of water flowing through the strip gap, making the water flow to the other side of the partition more stable.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] 1. During the use of the blind pipe, the first elastic rod is driven to rotate by the first driving member, and the rotation of the first elastic rod drives the rubber plate to rotate with the first elastic rod as the rotation axis. During the rotation process, the rubber plate scrapes off the sediment settled in the blind pipe, and under the action of natural water, the sediment is washed into the drainage pipe, thereby reducing the possibility of blockage of the blind pipe and improving the drainage capacity of the tunnel; at the same time, the natural water entering the drainage pipe carries the sediment into the drainage pipe, and the second elastic rod is driven to rotate by the second driving member, and the rotation of the second elastic rod drives the scraper to rotate, and the rotation of the scraper scrapes off the sediment deposited in the drainage pipe, so that the sediment is discharged from the drainage pipe driven by the water flow, thereby improving the drainage capacity of the tunnel; because the blind pipe is installed on the inner wall of the tunnel in an arc shape, and the drainage pipe is arranged along the direction of the tunnel, under the action of the elastic rod, it is convenient for the elastic rod to rotate with its own axis; at the same time, under the action of the rubber plate, the possibility of the first elastic rod being unable to rotate due to the blockage of the rubber plate is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a schematic diagram of the overall structure of a tunnel waterproof drainage structure according to an embodiment of the present application;

[0026] Figure 2 is a cross-sectional view of a tunnel waterproof drainage structure according to an embodiment of the present application;

[0027] Figure 3 yes Figure 2 A magnified schematic diagram of part A;

[0028] Figure 4 yes Figure 3 A magnified schematic diagram of part B;

[0029] Figure 5 It is a cross-sectional view of a drainage pipe in a tunnel waterproof drainage structure according to an embodiment of the present application;

[0030] Figure 6 yes Figure 5 A magnified schematic diagram of part C;

[0031] Figure 7 It is a schematic diagram of a partition in a tunnel waterproof drainage structure according to an embodiment of the present application.

[0032] Explanation of the accompanying drawings: 1. blind pipe; 2. drain pipe; 3. tee pipe; 4. first elastic rod; 5. rubber plate; 6. second elastic rod; 7. scraper; 8. first blade; 9. first universal joint; 10. first mounting plate; 11. first drive rod; 12. first bevel gear; 13. second bevel gear; 14. guide rod; 15. second mounting plate; 16. third bevel gear; 17. second universal joint; 18. second drive rod; 19. float; 20. partition; 21. water outlet; 22. sliding cover; 23. strip notch; 24. closing plate. DETAILED DESCRIPTION

[0033] The following is combined with Figure 1-7 This application is described in further detail.

[0034] The present application embodiment discloses a tunnel waterproof drainage structure. Figure 1 and Figure 2 The tunnel waterproof drainage structure includes a blind pipe 1 arranged on the inner wall of the tunnel and a drainage pipe 2 arranged on both sides of the tunnel, and the blind pipe 1 is connected to the drainage pipe 2; in the embodiment of the present application, the plane where the blind pipe 1 is located is parallel to the vertical section of the tunnel and is attached to the side wall of the tunnel, and the drainage pipe 2 is arranged on the bottom surface of the tunnel along the direction of the tunnel, and a tee pipe 3 is arranged between the drainage pipe 2 and the blind pipe 1, and the tee pipe 3 is connected to the drainage pipe 2 and the blind pipe 1 respectively. In the embodiment of the present application, the blind pipe 1 is connected to the tee pipe 3 through a first branch pipe, and the drainage pipe 2 is connected to the tee pipe 3 through a second branch pipe, and the length direction of the second branch pipe is parallel to the length direction of the drainage pipes 2 on both sides; rainwater infiltrated from the upper layer of the tunnel enters the blind pipe 1, flows along the blind pipe 1 into the drainage pipe 2, and is discharged from the tunnel along the drainage pipe 2;

[0035] Reference Figure 2 and Figure 3 , in the process of infiltration water entering the blind pipe 1, it may carry mud and sand into the drainage pipe 2, causing the mud and sand to accumulate in the blind pipe 1 and the drainage pipe 2; in order to facilitate the removal of the mud and sand accumulated in the blind pipe 1 and the drainage pipe 2, a first elastic rod 4 is rotatably arranged in the blind pipe 1, the first elastic rod 4 is coaxially arranged with the blind pipe 1, and the first elastic rod 4 rotates along the axis of the first elastic rod 4. A plurality of rubber plates 5 are arranged on the first elastic rod 4, and the rubber plates 5 have the advantage of good deformation, so that the first elastic rod 4 rotates to drive the rubber plates 5 to rotate, and the rubber plates 5 contact the inner wall of the blind pipe 1, and the drainage structure also includes a first driving member for driving the first elastic rod 4 to rotate;

[0036] Reference Figure 4 and Figure 5 A second elastic rod 6 is rotatably arranged in the drain pipe 2. The second elastic rod 6 is coaxially arranged with the drain pipe 2. The second elastic rod 6 rotates along the axis of the second elastic rod 6. A scraper 7 is arranged on the second elastic rod 6. The scraper 7 abuts against the side wall of the drain pipe 2. The drainage structure also includes a second driving member for driving the second elastic rod 6 to rotate.

[0037] When clearing the silt in the blind pipe 1 and the drainage pipe 2, the first elastic rod 4 is first driven to rotate by the first driving member, and the rotation of the first elastic rod 4 drives the rubber plate 5 to rotate. During the rotation process, the rubber plate 5 scrapes the silt accumulated in the blind pipe 1 to reduce the adhesion between the silt and the blind pipe 1, thereby separating the silt from the blind pipe 1, and driving the silt to move out of the blind pipe 1 under the action of the infiltrated water; at the same time, the second elastic rod 6 is driven to rotate by the second driving member, and the rotation of the second elastic rod 6 drives the scraper 7 to rotate, and the scraper 7 rotates to loosen the silt in the drainage pipe 2, and moves the scraped silt out of the drainage pipe 2 under the action of the infiltrated water.

[0038] Reference Figure 2 , Figure 3 and Figure 4 In the embodiment of the present application, the first driving member includes a first blade 8 arranged in the tee pipe 3, the first blade 8 is located in the branch pipe of the tee pipe 3 parallel to the direction of the drain pipe 2, further, the first blade 8 is located in the second branch pipe, the rotation axis of the first blade 8 is parallel to the ground and perpendicular to the length direction of the second branch pipe, further, when rainwater and infiltrated water flow in the drain pipe 2, they impact the first blade 8 to drive the first blade 8 to rotate, the end of the first elastic rod 4 close to the tee pipe 3 is located in the tee pipe 3, the end of the first elastic rod 4 is provided with a first universal joint 9, further, the second branch pipe is provided with A first mounting plate 10, a first universal joint 9 is rotatably arranged on the first mounting plate 10, a side of the first universal joint 9 facing away from the first elastic rod 4 is parallel to the first blade 8, a first driving rod 11 is rotatably arranged in the tee pipe 3, a length direction of the first driving rod 11 is perpendicular to the length direction of the first blade 8 and is along the vertical direction, first bevel gears 12 are arranged at both ends of the first driving rod 11, the two first bevel gears 12 are coaxial with the first driving rod 11, and at the same time, the two first bevel gears 12 face away from each other, and a second bevel gear 13 meshing with the first bevel gear 12 is arranged on the first blade 8 and the first universal joint 9.

[0039] When the infiltrated water and rainwater flow in the drainage pipe 2, they enter the second branch pipe and impact the first blade 8 to drive the first blade 8 to rotate. The rotation of the first blade 8 drives the second bevel gear 13 to rotate. The rotation of the second bevel gear 13 drives the first driving rod 11 to rotate. The rotation of the first driving rod 11 drives another second bevel gear 13 to rotate. The rotation of the second bevel gear 13 drives the first universal joint 9 to rotate. The rotation of the first universal joint 9 drives the first elastic rod 4 to rotate, and then drives the rubber plate 5 to rotate to remove the mud and sand in the blind pipe 1. The operation is simple and convenient.

[0040] Reference Figure 3 , Figure 4 and Figure 6Furthermore, a guide rod 14 is provided in the tee pipe 3, a second mounting plate 15 is provided on the guide rod 14, the first blade 8 is rotatably provided on the second mounting plate 15, the second driving member includes a third bevel gear 16 rotatably provided on the second mounting plate 15, the third bevel gear 16 is meshed with the second bevel gear 13 on the first blade 8, the axial direction of the third bevel gear 16 is parallel to the length direction of the branch pipe of the tee pipe 3 and parallel to the drain pipe 2, the second driving member also includes a second universal joint 17 provided on the end portions where the second elastic rod 6 and the third bevel gear 16 are close to each other, and a second driving rod 18 is fixedly provided between the two second universal joints 17.

[0041] During the rotation of the first blade 8, the third bevel gear 16 is driven to rotate, the rotation of the third bevel gear 16 drives the second universal joint 17 to rotate, the rotation of the second universal joint 17 drives the second driving rod 18 to rotate, and then drives the second elastic rod 6 to rotate, thereby driving the scraper 7 to rotate, and the operation is simple and convenient.

[0042] In order to reduce the possibility of the first blade 8 being submerged in water, the first blade 8 is slidably arranged in the three-way pipe 3. Furthermore, the second mounting plate 15 is slidably penetrated on the guide rod 14. In the implementation of the present application, the guide rod 14 is in the vertical direction, and the first blade 8 slides in the vertical direction. The drainage structure also includes a third driving member for driving the first blade 8 to slide so that the bottommost blade of the first blade 8 is located below the liquid surface.

[0043] Reference Figure 2 and Figure 3 The third driving member includes a float arranged in the three-way pipe 3, the float 19 is an inflatable bag, and the float 19 is slidably arranged on the guide rod 14. Further, the float 19 is fixedly arranged on the second mounting plate 15, and the first driving rod 11 is arranged on the guide rod 14 and is parallel to the guide rod 14.

[0044] When the liquid level in the drain pipe 2 rises, the float 19 is driven to float up, thereby driving the second mounting plate 15 to rise, and the second mounting plate 15 drives the first blade 8 to rise, so that the rotation axis of the first blade 8 is above the liquid level, thereby facilitating the water flow to impact the first blade 8 to rotate.

[0045] Reference Figure 2 and Figure 3Furthermore, in the embodiment of the present application, the first driving rod 11 is a telescopic structure, the first driving rod 11 includes a first sliding rod located on both sides and a first sleeve rod arranged between the first sliding rods on both sides, the first bevel gear 12 is arranged at the end of the first sliding rod away from the first sleeve rod, the first sliding rod is slidably sleeved in the first sleeve rod, the length direction of the first sleeve rod is parallel to the length direction of the guide rod 14, further, the first sliding rod close to the first universal joint 9 is rotatably set on the guide rod 14; further, a first limit block is arranged in the first sleeve rod, and the first sliding rod is provided with a first sliding groove for sliding the first limit block.

[0046] When the first blade 8 floats up and moves down, the first sliding rod slides along the first sleeve rod, thereby facilitating the transmission of the kinetic energy of the first blade 8 to the first elastic rod 4 .

[0047] Reference Figure 6 Similarly, the second driving rod 18 is a retractable structure to facilitate the transmission of the kinetic energy of the first blade 8 to the second elastic rod 6 .

[0048] Reference Figure 7 In order to reduce the possibility of large-scale shaking of the liquid surface and improve the stability of the first blade 8, the drainage structure also includes a partition 20, which is located in the drainage pipe 2. The partition 20 is used to block the natural water flow in the drainage pipe 2. A water outlet 21 is provided at the center of the partition 20. A sliding cover 22 for closing the water outlet 21 is slidably provided on the partition 20. Further, the sliding cover 22 is located on the water flow impact surface of the partition 20. A strip-shaped notch 23 for the second elastic rod 6 to pass through is provided on the sliding cover 22. The length direction of the strip-shaped notch 23 is parallel to the sliding direction of the sliding cover 22. The drainage structure also includes a fourth driving member for driving the sliding cover 22 to slide, open the water outlet 21 and place the water outlet 21 below the liquid surface;

[0049] Reference Figure 7 The fourth driving member includes an air bag arranged on the sliding cover 22, the air bag is located on the water flow impact surface of the sliding cover 22, and the air bag is located between the bottom and the end of the sliding cover 22.

[0050] Under the action of the partition 20 and the sliding cover 22, water accumulates on one side of the partition 20. When the liquid level rises to the air bag, the sliding cover 22 is driven to slide, and the water outlet 21 is properly opened. The opened water outlet 21 is located below the liquid level, so that the water below the liquid surface passes through the water outlet 21, thereby reducing the possibility of large-scale shaking of the liquid surface; further, the partition 20 buffers the large-scale shaking of the water flow, so that the water flow passing through the water outlet 21 is relatively stable, thereby reducing the possibility of large-scale shaking of the first blade 8.

[0051] Reference Figure 7A closing plate 24 is slidably provided on the sliding cover 22. The closing plate 24 is used to close the strip-shaped gap 23. The closing plate 24 abuts against the second elastic rod 6. The closing plate 24 includes two plate bodies. The two plate bodies are symmetrically arranged along the second elastic rod 6. The ends of the two plate bodies close to the second elastic rod 6 are both provided with semi-arc-shaped openings to facilitate the fit between the plate bodies and the second elastic rod 6; the closing plate 24 closes the strip opening to facilitate the partition 20 to buffer the water flow.

[0052] The implementation principle of a tunnel waterproof drainage structure in the embodiment of the present application is:

[0053] During the flow of water in the blind pipe 1 and the drainage pipe 2, the water flows into the second branch pipe and impacts the first blade 8 to drive the first blade 8 to rotate. The rotation of the first blade 8 drives the second bevel gear 13 to rotate. The rotation of the second bevel gear 13 drives the first driving rod 11 to rotate. The rotation of the first driving rod 11 drives another second bevel gear 13 to rotate. The rotation of the second bevel gear 13 drives the first universal joint 9 to rotate. The rotation of the first universal joint 9 drives the first elastic rod 4 to rotate, thereby driving the rubber plate 5 to rotate to remove the sediment in the blind pipe 1.

[0054] During the rotation of the first blade 8, the third bevel gear 16 is driven to rotate, the rotation of the third bevel gear 16 drives the second universal joint 17 to rotate, the rotation of the second universal joint 17 drives the second driving rod 18 to rotate, and then drives the second elastic rod 6 to rotate, thereby driving the scraper 7 to rotate, and then scraping the silt in the drainage pipe 2, and under the action of the water flow, the silt is moved out of the tunnel.

[0055] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A tunnel waterproof drainage structure, comprising a blind pipe (1) arranged on the inner wall of the tunnel and drainage pipes (2) arranged on both sides of the tunnel, wherein the blind pipe (1) is connected to the drainage pipe (2), and is characterized in that: A first elastic rod (4) is rotatably arranged in the blind pipe (1), the first elastic rod (4) is coaxially arranged with the blind pipe (1), the first elastic rod (4) rotates along the axis of the first elastic rod (4), a plurality of rubber plates (5) are arranged on the first elastic rod (4), the rubber plates (5) contact the inner wall of the blind pipe (1), and the drainage structure further comprises a first driving member for driving the first elastic rod (4) to rotate; a second elastic rod (6) is rotatably arranged in the drainage pipe (2), the second elastic rod (6) is coaxially arranged with the drainage pipe (2), the second elastic rod (6) rotates along the axis of the second elastic rod (6), and a plurality of rubber plates (5) are arranged on the second elastic rod (6) A scraper (7), the scraper (7) abutting against the side wall of the drainage pipe (2), the drainage structure also comprising a second driving member for driving the second elastic rod (6) to rotate; a three-way pipe (3) is arranged between the drainage pipe (2) and the blind pipe (1), the three-way pipe (3) being connected to the drainage pipe (2) and the blind pipe (1) respectively; the first driving member comprises a first blade (8) arranged in the three-way pipe (3), the first blade (8) being located in a branch pipe of the three-way pipe (3) parallel to the drainage pipe (2), the rotation axis of the first blade (8) being parallel to the ground, the end of the first elastic rod (4) close to the three-way pipe (3) being located in the three-way pipe (3), the first blade (8) being located in a branch pipe of the three-way pipe (3) parallel to the drainage pipe (2), the rotation axis of the first blade (8) being parallel to the ground, the end of the first elastic rod (4) close to the three-way pipe (3) being located in the three-way pipe (3), the first blade (8) being located in the three-way pipe (3), the first blade (8) being located in a branch pipe of the three-way pipe (3) parallel to the drainage pipe (2), the rotation axis of the first blade (8) being parallel to the ground A first universal joint (9) is arranged at the end of the first elastic rod (4); a side of the first universal joint (9) facing away from the first elastic rod (4) is parallel to the first blade (8); a first driving rod (11) is rotatably arranged in the three-way pipe (3); the length direction of the first driving rod (11) is perpendicular to the length direction of the first blade (8); first bevel gears (12) are arranged at both ends of the first driving rod (11); and second bevel gears (13) meshing with the first bevel gear (12) are arranged on the first blade (8) and the first universal joint (9); the first blade (8) is slidably arranged in the three-way pipe (3); the first blade (8) is arranged along the vertical direction. The drainage structure further comprises a third driving member for driving the first blade (8) to slide so that the bottom blade of the first blade (8) is located below the liquid surface, and the first driving rod (11) is a retractable structure; the third driving member comprises a float (19) arranged in the three-way pipe (3), a guide rod (14) is arranged in the three-way pipe (3), the length direction of the guide rod (14) is parallel to the sliding direction of the first blade (8), the float (19) is slidably arranged on the guide rod (14), the first blade (8) is rotatably arranged on the float (19), and the first driving rod (11) is arranged on the guide rod (14) and is parallel to the guide rod (14).

2. A tunnel waterproof drainage structure according to claim 1, characterized in that: The second driving member comprises a third bevel gear (16) rotatably arranged on the float (19), the third bevel gear (16) being meshed with the second bevel gear (13) on the first blade (8), the axial direction of the third bevel gear (16) being parallel to the length direction of the branch pipe of the drainage pipe (2) and the tee pipe (3), the second driving member also comprises a second universal joint (17) arranged on the ends close to each other of the second elastic rod (6) and the third bevel gear (16), a second driving rod (18) being arranged between the two second universal joints (17), and the second driving rod (18) being a telescopic structure.

3. A tunnel waterproof drainage structure according to claim 1, characterized in that: The drainage structure further comprises a partition (20), the partition (20) being used to block the natural water flow in the drainage pipe (2), a water outlet (21) being provided at the center of the partition (20), a sliding cover (22) being slidably provided on the partition (20) for closing the water outlet (21), a strip-shaped notch (23) being provided on the sliding cover (22) for the second elastic rod (6) to pass through, the length direction of the strip-shaped notch (23) being parallel to the sliding direction of the sliding cover (22), and the drainage structure further comprises a fourth driving member for driving the sliding cover (22) to slide, so as to open the water outlet (21) and place the water outlet (21) below the liquid surface.

4. A tunnel waterproof drainage structure according to claim 3, characterized in that: The fourth driving member comprises an air bag arranged on the sliding cover (22), the air bag is located on the water flow impact surface of the sliding cover (22), and the air bag is located between the bottom and the end of the sliding cover (22).

5. A tunnel waterproof drainage structure according to claim 3, characterized in that: A closing plate (24) is slidably arranged on the sliding cover (22), and the closing plate (24) is used to close the strip-shaped gap (23). The closing plate (24) abuts against the second elastic rod (6).