Distribution network reliability assessment method, device and storage medium considering regional integrated energy system access
By establishing a joint RIES-distribution grid system model and sequential Monte Carlo simulation, the optimal load reduction strategy of distribution network and RIES equipment is calculated, and the impact of RIES on distribution network reliability is evaluated, and RIES in the prior art is solved. The lack of reliability assessment of access distribution networks has achieved reliability assessment and optimization of distribution networks and RIES.
Patent Information
- Application Number
- CN202210756280.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-06-29
AI Technical Summary
In the prior art, research on the reliability evaluation of regional integrated energy system (RIES) access to distribution network is relatively scarce, and it is difficult to design a reasonable operation strategy and build an optimal load reduction model for joint systems, revealing the reliability of RIES for distribution networks. The impact of
By establishing a joint RIES-distribution grid system model, the optimal load reduction strategy of the distribution network and RIES equipment components is calculated through sequential Monte Carlo simulation and mixed integer linear planning, the reliability indicators of the distribution network and RIES are evaluated. Including load point reliability, system reliability and power supply reliability.
Optimize the operation strategy of RIES from the perspective of economics and reliability, provide reference for the scheduling operation after RIES is connected to the distribution network, improve the accuracy of reliability evaluation of the distribution network and the RIES joint system, and improve the reliability of the distribution network Sex and economics of RIES.
Smart Images

Figure CN115333080B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a distribution network reliability assessment method, a device and a storage medium taking into account access to a regional integrated energy system, and belongs to the technical field of distribution network automation. Background Art
[0002] In order to alleviate environmental pollution and improve terminal energy efficiency, the Regional Integrated Energy System (RIES) has become an important direction for my country's energy structure adjustment. With the rapid development of the integrated energy system that emphasizes multi-energy integration and complementarity, as an important carrier of integrated energy services, RIES not only improves the economy and comprehensive energy efficiency of the energy system, but also provides a new way to improve the power supply reliability of the distribution system. The close connection of multiple energy systems also makes the reliability assessment of the distribution network more complicated, and the interaction between them also increases the risks faced by the entire system.
[0003] At present, there are many studies on the reliability assessment of distribution networks: considering large-scale distributed photovoltaic access, assessing the reliability risk of distribution networks under photovoltaic access of different quantities, capacities and locations; establishing a reliability model for battery energy storage systems, and conducting reliability assessments on different configuration schemes of battery energy storage systems in distribution systems; optimizing the decision-making of load aggregators’ load reduction and load transfer demand responses to improve distribution network operation reliability indicators; based on the spatiotemporal conversion model of electric vehicles, exploring the impact of large-scale cluster electric vehicle charging and discharging on the reliability of distribution network operation. However, most of the above studies focus on the reliability assessment of distribution networks with coordinated control after one or more distributed resources are connected, and there is a lack of research on the reliability assessment of distribution networks considering RIES access.
[0004] Therefore, how to design a reasonable operation strategy for RIES access to the distribution network, build an optimal load reduction model for the RIES-distribution network joint system, and reveal the impact of RIES on the reliability of the distribution network, which has a strong basic and forward-looking significance for the reliability assessment of the distribution network in the context of future integrated energy services. Summary of the invention
[0005] Objective: To overcome the deficiencies in the prior art, the present invention provides a distribution network reliability assessment method, device and storage medium taking into account the access of a regional integrated energy system, which can effectively assess the reliability of a distribution network containing RIES, reveal the impact of RIES on the reliability of the distribution network, and provide a reference for the dispatching operation of RIES after access to the distribution network from the perspective of system reliability.
[0006] Technical solution: To solve the above technical problems, the technical solution adopted by the present invention is:
[0007] In a first aspect, a distribution network reliability assessment method taking into account access to a regional integrated energy system comprises the following steps:
[0008] Establish a RIES-distribution network joint system model, and establish an optimal load reduction model of the RIES-distribution network joint system based on the RIES-distribution network joint system model;
[0009] According to the obtained operating status of the distribution network and RIES equipment components, the optimal load reduction model of the RIES-distribution network joint system on the fault day is calculated to obtain the optimal load reduction of the distribution network and RIES equipment components on the fault day.
[0010] According to the optimal load reduction of distribution network and RIES equipment components on the fault day, the distribution network load point reliability index, distribution network system reliability index and RIES energy supply reliability index are calculated.
[0011] As a preferred solution, the method for measuring the operating status of the distribution network and RIES equipment components includes the following steps:
[0012] Generate two random numbers ξ1 and ξ2 between [0,1], and calculate the fault-free operation time TTF and fault repair time TTR of the distribution network and RIES equipment components according to the failure rate and repair rate of the distribution network and RIES equipment components. The calculation formula is:
[0013]
[0014] Among them, γ and μ are the failure rate and repair rate of distribution network and RIES equipment components.
[0015] The status of distribution network and RIES equipment components converts between normal operation and fault shutdown. Based on sequential Monte Carlo simulation, the operation status of the RIES-distribution network joint system is randomly sampled. Each time the distribution network or RIES equipment component with the smallest TTF is selected as the fault component, and the TTR of the fault component is used as the fault time. By analogy, the hourly component failures within the simulation period are obtained, and the fault day is obtained according to the hourly component failures within the period.
[0016] As a preferred solution, a method for obtaining the optimal load reduction of the distribution network and RIES equipment components on a fault day includes the following steps:
[0017] The optimal load reduction model of the RIES-distribution network joint system on the fault day is solved, and the hourly RIES energy conversion equipment output, energy storage equipment output, load reduction, interconnection line power and the load that can be restored by RIES in the distribution network island are obtained.
[0018] The optimal load reduction model calculation formula of the RIES-distribution network joint system is as follows:
[0019] minF=f PSE +f ALW +f LC +f P
[0020] Where: f PSE is the cost of purchasing and selling energy; ALW is the cost of abandoning solar power and wind power; LC Cost reduction for load; P The constraints include equipment failure constraints, energy balance constraints, equipment output constraints, energy storage constraints, load reduction constraints and interconnection line power constraints.
[0021] As a preferred solution, f PSE The calculation formula is:
[0022]
[0023] Where: P E,t P is the RIES purchase / sale power at time t. G,t is the gas purchase power of RIES from the upper gas grid at time t, P E,t P is purchasing electricity from the distribution network on behalf of RIES. E,t Negative means RIES sells electricity to the distribution network; p G,t is the gas purchase price at time t; T is the dispatch period; p E,t The purchase / sale price of electricity at time t:
[0024]
[0025] Where: is the electricity purchase price at time t, is the electricity selling price at time t.
[0026] f ALW The calculation formula is:
[0027]
[0028] Where: R PV,t , R WT,t is the abandoned solar and wind power at time t; r PV 、r WT is the price of abandoned solar power and wind power; T is the dispatching period.
[0029] f LC The calculation formula is:
[0030]
[0031] Where: R E,tThe power reduction of the electric load at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced; r E,t The price reduction for the electricity load at time t; The price reduction for the heat load that allows limited cooling and heating at time t; is the heat load reduction price that causes the outage at time t; T is the scheduling period.
[0032] f P The calculation formula is:
[0033]
[0034] Where: N LP is the number of loads that cannot be powered in the isolated island; r i is the weight coefficient of the load that cannot be powered in the island; is the power of the i-th load that cannot be powered at time t in the island; T is the scheduling period.
[0035] As a preferred solution, the equipment failure constraint calculation formula is as follows:
[0036]
[0037] Where: is the device K at time t i The power of the RIES-distribution network combined system is m.
[0038] Energy balance constraints include:
[0039] The calculation formula of electric power balance constraint is as follows:
[0040]
[0041] Where: P is the charging and discharging power of the energy storage at time t; PV,t is the photovoltaic power generation power at time t, P WT,t is the wind power generation power at time t; R E,t is the load reduction power at time t, P E,t is the online RIES purchase / sale power at time t, R PV,t , R WT,t is the abandoned solar and wind power at time t, is the power output of the cogeneration unit at time t, is the air intake power of the electric boiler at time t, L E,t Interruptible load.
[0042] The thermal power balance constraint calculation formula is as follows:
[0043]
[0044] Where: is the thermal energy storage charging and discharging power at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced. is the thermal output of the electric boiler at time t, is the thermal output of the cogeneration unit at time t, is the thermal output of the gas boiler at time t, L H,t is the user's heat load demand at time t.
[0045] The calculation formula of gas power balance constraint is as follows:
[0046]
[0047] Where: is the charging and discharging power of the gas energy storage at time t, P G,t is the gas purchase power of RIES from the upper gas grid at time t, P CHP,t is the intake power of the cogeneration unit at time t, P GB,t is the gas boiler intake power at time t.
[0048] The calculation formula for tie line power balance constraint is as follows:
[0049]
[0050] Where: P E,t The power purchased / sold by RIES online at time t, is the sum of all load powers in the island at time t, is the rated power of the distribution network load at time t, N LP It is the number of loads that cannot get power supply in the isolated island.
[0051] The equipment output constraint calculation formula is as follows:
[0052]
[0053] Where: It is the upper and lower limits of the thermal output of the cogeneration unit; It is the upper and lower limits of the thermal output of the gas boiler; It is the upper and lower limits of the thermal output of the electric boiler.
[0054] The energy storage constraint calculation formula is as follows:
[0055]
[0056] Where: E k,min 、E k,max P is the upper and lower limits of the energy storage capacity of the kth type of energy storage equipment; ch k,max , P dis k,max I is the upper and lower limits of the charging and discharging power of the k-th type of energy storage equipment; k,t is a 0-1 variable representing the charge and discharge state, I k,t 1 means that the k-th energy storage device is charged at time t, I k,t 0 means that the k-th energy storage device releases energy at time t; E k,0 is the initial storage energy of the kth type of energy storage device, E k,T is the energy storage capacity of the k-th type of energy storage device at time T, E k,t is the energy storage capacity of the kth type of energy storage device at time t, P ch k,t , P dis k,t is the charging and discharging power of the kth type of energy storage device at time t.
[0057] The load reduction constraint calculation formula is as follows:
[0058]
[0059] The calculation formula for tie line power constraint is as follows:
[0060]
[0061] Where: P E,max , P E,min P is the upper and lower limits of the interconnection line power; G,max It is the upper limit of RIES intake power.
[0062] As a preferred solution, the reliability index of the load point of the distribution network includes the annual average fault outage rate λ of the load point, the annual average outage duration u of the load point and the annual average outage duration r of the load point, and the calculation formula is:
[0063]
[0064]
[0065]
[0066] The distribution network system reliability index includes the system average power outage frequency SAIFI, the system average power outage duration SAIDI, the user average power outage duration CAIDI, the average system availability ASAI and the annual power shortage expected EENS, and the calculation formula is:
[0067]
[0068]
[0069]
[0070]
[0071]
[0072] The RIES energy supply reliability index includes the electricity / heat load reduction frequency FLC, the electricity / heat load reduction probability PLC and the annual load reduction expectation ELC, and the calculation formula is:
[0073]
[0074]
[0075]
[0076] As a preferred solution, the RIES-distribution network combined system includes: energy conversion equipment, energy storage equipment, renewable energy, multi-energy loads and distribution network.
[0077] The energy conversion equipment includes: a cogeneration unit, a gas boiler, and an electric boiler.
[0078] The calculation formula for the combined heat and power unit is:
[0079]
[0080] Where: P CHP,t is the air intake power of the cogeneration unit at time t; is the electrical and thermal output of the cogeneration unit at time t; It is the electrical and thermal efficiency of the cogeneration unit.
[0081] The calculation formula for gas boiler is:
[0082]
[0083] Where: P GB,t is the gas boiler intake power at time t; is the thermal output of the gas boiler at time t; η GB is the thermal efficiency of gas boiler.
[0084] The calculation formula for electric boiler is:
[0085]
[0086] Where: is the air intake power of the electric boiler at time t; is the thermal output of the electric boiler at time t; η EB is the thermal efficiency of the electric boiler.
[0087] The calculation formula for energy storage equipment is:
[0088]
[0089] Where: E k,t+1 E is the energy storage capacity of the kth type of energy storage device at time t+1; k,t P is the energy storage capacity of the kth type of energy storage device at time t; ch k,t , P dis k,t is the charging and discharging power of the k-th type of energy storage device at time t; η ch k , η dis k is the charging and discharging power efficiency of the k-th type of energy storage device; η s k is the self-damage rate of the kth type of energy storage equipment; the time interval Δt of energy storage state change is 1h.
[0090] Renewable energy includes wind power generation and photovoltaic power generation, both of which use regional measured power data.
[0091] The multi-energy load includes: RIES electric load, RIES thermal load, and distribution network load.
[0092] The RIES electrical load calculation formula is:
[0093]
[0094] Where: The interruptible load L E,t Minimum and maximum power at time t.
[0095] The RIES heat load calculation formula is:
[0096]
[0097] Where: C is the capacity of the hot water tank; R is the thermal resistance of the hot water tank; T t is the hot water temperature at time t; T t+1 is the hot water temperature at time t+1; T a,t is the ambient temperature at time t; c e is the specific heat capacity of water; q t T is the water consumption rate at time t; d is the expected temperature of hot water; T in is the cold water temperature entering the system; H t is the RIES heating power at time t; L H,t is the user's heat load demand at time t.
[0098] The distribution network load calculation formula is:
[0099]
[0100] Where: L DN,tis the actual power consumption of the distribution network load at time t; is the rated power of the distribution network load at time t.
[0101] In a second aspect, a distribution network reliability assessment device taking into account access to a regional integrated energy system includes the following modules:
[0102] A model building module is used to establish a RIES-distribution network joint system model, and to establish an optimal load reduction model of the RIES-distribution network joint system according to the RIES-distribution network joint system model;
[0103] The optimal load reduction acquisition module is used to calculate the optimal load reduction model of the RIES-distribution network joint system on the fault day according to the obtained operating status of the distribution network and RIES equipment components, and obtain the optimal load reduction of the distribution network and RIES equipment components on the fault day;
[0104] The index calculation module is used to calculate the reliability index of the distribution network load point, the reliability index of the distribution network system, and the RIES energy supply reliability index according to the optimal load reduction of the distribution network and RIES equipment components on the fault day.
[0105] As a preferred solution, the step of obtaining the operating status of the distribution network and the RIES equipment components includes the following steps:
[0106] Generate two random numbers ξ1 and ξ2 between [0,1], and calculate the fault-free operation time TTF and fault repair time TTR of the distribution network and RIES equipment components according to the failure rate and repair rate of the distribution network and RIES equipment components. The calculation formula is:
[0107]
[0108] Among them, γ and μ are the failure rate and repair rate of distribution network and RIES equipment components.
[0109] The status of distribution network and RIES equipment components converts between normal operation and fault shutdown. Based on sequential Monte Carlo simulation, the operation status of the RIES-distribution network joint system is randomly sampled. Each time the distribution network or RIES equipment component with the smallest TTF is selected as the fault component, and the TTR of the fault component is used as the fault time. By analogy, the hourly component failures within the simulation period are obtained, and the fault day is obtained according to the hourly component failures within the period.
[0110] As a preferred solution, a method for obtaining the optimal load reduction of the distribution network and RIES equipment components on a fault day includes the following steps:
[0111] The optimal load reduction model of the RIES-distribution network joint system on the fault day is solved, and the hourly RIES energy conversion equipment output, energy storage equipment output, load reduction, interconnection line power and the load that can be restored by RIES in the distribution network island are obtained.
[0112] The optimal load reduction model calculation formula of the RIES-distribution network joint system is as follows:
[0113] minF=f PSE +f ALW +f LC +f P
[0114] Where: f PSE is the cost of purchasing and selling energy; ALW is the cost of abandoning solar power and wind power; LC Cost reduction for load; P The constraints include equipment failure constraints, energy balance constraints, equipment output constraints, energy storage constraints, load reduction constraints and interconnection line power constraints.
[0115] As a preferred solution, f PSE The calculation formula is:
[0116]
[0117] Where: P E,t P is the RIES purchase / sale power at time t. G,t is the gas purchase power of RIES from the upper gas grid at time t, P E,t P is purchasing electricity from the distribution network on behalf of RIES. E,t Negative means RIES sells electricity to the distribution network; p G,t is the gas purchase price at time t; T is the dispatch period; p E,t The purchase / sale price of electricity at time t:
[0118]
[0119] Where: is the electricity purchase price at time t, is the electricity selling price at time t.
[0120] f ALW The calculation formula is:
[0121]
[0122] Where: R PV,t , R WT,t is the abandoned solar and wind power at time t; r PV 、r WTis the price of abandoned solar power and wind power; T is the dispatching period.
[0123] f LC The calculation formula is:
[0124]
[0125] Where: R E,t The power reduction of the electric load at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced; r E,t The price reduction for the electricity load at time t; The price reduction for the heat load that allows limited cooling and heating at time t; is the heat load reduction price that causes the outage at time t; T is the scheduling period.
[0126] f P The calculation formula is:
[0127]
[0128] Where: N LP is the number of loads that cannot be powered in the island; r i is the weight coefficient of the load that cannot be powered in the island; L iDN,t is the power of the i-th load that cannot be powered at time t in the island; T is the scheduling period.
[0129] As a preferred solution, the equipment failure constraint calculation formula is as follows:
[0130]
[0131] Where: is the device K at time t i The power of the RIES-distribution network combined system is m.
[0132] Energy balance constraints include:
[0133] The calculation formula of electric power balance constraint is as follows:
[0134]
[0135] Where: P is the charging and discharging power of the energy storage at time t; PV,t is the photovoltaic power generation power at time t, P WT,t is the wind power generation power at time t; R E,t is the load reduction power at time t, P E,t is the power purchased / sold by RIES at time t, PV,t, R WT,t is the abandoned solar and wind power at time t, is the power output of the cogeneration unit at time t, is the air intake power of the electric boiler at time t, L E,t Interruptible load.
[0136] The thermal power balance constraint calculation formula is as follows:
[0137]
[0138] Where: is the thermal energy storage charging and discharging power at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced. is the thermal output of the electric boiler at time t, is the thermal output of the cogeneration unit at time t, is the thermal output of the gas boiler at time t, L H,t is the user's heat load demand at time t.
[0139] The calculation formula of gas power balance constraint is as follows:
[0140]
[0141] Where: is the charging and discharging power of the gas energy storage at time t, P G,t is the gas purchase power of RIES from the upper gas grid at time t, P CHP,t is the intake power of the cogeneration unit at time t, P GB,t is the gas boiler intake power at time t.
[0142] The calculation formula for tie line power balance constraint is as follows:
[0143]
[0144] Where: P E,t The power purchased / sold by RIES online at time t, is the sum of all load powers in the island at time t, is the rated power of the distribution network load at time t, N LP It is the number of loads that cannot get power supply in the isolated island.
[0145] The equipment output constraint calculation formula is as follows:
[0146]
[0147] Where: It is the upper and lower limits of the thermal output of the cogeneration unit; It is the upper and lower limits of the thermal output of the gas boiler; It is the upper and lower limits of the thermal output of the electric boiler.
[0148] The energy storage constraint calculation formula is as follows:
[0149]
[0150] Where: E k,min 、E k,max P is the upper and lower limits of the energy storage capacity of the kth type of energy storage equipment; ch k,max , P dis k,max I is the upper and lower limits of the charging and discharging power of the k-th type of energy storage equipment; k,t is a 0-1 variable representing the charge and discharge state, I k,t 1 means that the k-th energy storage device is charged at time t, I k,t 0 means that the k-th energy storage device releases energy at time t; E k,0 is the initial storage energy of the kth type of energy storage device, E k,T is the energy storage capacity of the kth type of energy storage device at time T, E k,t is the energy storage capacity of the kth type of energy storage device at time t, P ch k,t , P dis k,t is the charging and discharging power of the kth type of energy storage device at time t.
[0151] The load reduction constraint calculation formula is as follows:
[0152]
[0153] The calculation formula for tie line power constraint is as follows:
[0154]
[0155] Where: P E,max , P E,min P is the upper and lower limits of the interconnection line power; G,max It is the upper limit of RIES intake power.
[0156] As a preferred solution, the reliability index of the load point of the distribution network includes the annual average fault outage rate λ of the load point, the annual average outage duration u of the load point and the annual average outage duration r of the load point, and the calculation formula is:
[0157]
[0158]
[0159]
[0160] The distribution network system reliability index includes the system average power outage frequency SAIFI, the system average power outage duration SAIDI, the user average power outage duration CAIDI, the average system availability ASAI and the annual power shortage expected EENS, and the calculation formula is:
[0161]
[0162]
[0163]
[0164]
[0165]
[0166] The RIES energy supply reliability index includes the electricity / heat load reduction frequency FLC, the electricity / heat load reduction probability PLC and the annual load reduction expectation ELC, and the calculation formula is:
[0167]
[0168]
[0169]
[0170] As a preferred solution, the RIES-distribution network combined system includes: energy conversion equipment, energy storage equipment, renewable energy, multi-energy loads and distribution network.
[0171] The energy conversion equipment includes: a cogeneration unit, a gas boiler, and an electric boiler.
[0172] The calculation formula for the combined heat and power unit is:
[0173]
[0174] Where: P CHP,t is the air intake power of the cogeneration unit at time t; is the electrical and thermal output of the cogeneration unit at time t; It is the electrical and thermal efficiency of the cogeneration unit.
[0175] The calculation formula for gas boiler is:
[0176]
[0177] Where: P GB,t is the gas boiler intake power at time t; is the thermal output of the gas boiler at time t; η GB is the thermal efficiency of gas boiler.
[0178] The calculation formula for electric boiler is:
[0179]
[0180] Where: is the air intake power of the electric boiler at time t; is the thermal output of the electric boiler at time t; η EB is the thermal efficiency of the electric boiler.
[0181] The calculation formula for energy storage equipment is:
[0182]
[0183] Where: E k,t+1 E is the energy storage capacity of the kth type of energy storage device at time t+1; k,t P is the energy storage capacity of the kth type of energy storage device at time t; ch k,t , P dis k,t is the charging and discharging power of the k-th type of energy storage device at time t; η ch k , η dis k is the charging and discharging power efficiency of the k-th type of energy storage device; η s k is the self-damage rate of the kth type of energy storage equipment; the time interval Δt of energy storage state change is 1h.
[0184] Renewable energy includes wind power generation and photovoltaic power generation, both of which use regional measured power data.
[0185] The multi-energy load includes: RIES electric load, RIES thermal load, and distribution network load.
[0186] The RIES electrical load calculation formula is:
[0187]
[0188] Where: The interruptible load L E,t Minimum and maximum power at time t.
[0189] The RIES heat load calculation formula is:
[0190]
[0191] Where: C is the capacity of the hot water tank; R is the thermal resistance of the hot water tank; T t is the hot water temperature at time t; T t+1 is the hot water temperature at time t+1; T a,t is the ambient temperature at time t; c e is the specific heat capacity of water; q t T is the water consumption rate at time t; d is the expected temperature of hot water; T inis the cold water temperature entering the system; H t is the RIES heating power at time t; L H,t is the user's heat load demand at time t.
[0192] The distribution network load calculation formula is:
[0193]
[0194] Where: L DN,t is the actual power consumption of the distribution network load at time t; is the rated power of the distribution network load at time t.
[0195] In a third aspect, a computer-readable storage medium stores a computer program, which, when executed by a processor, implements the distribution network reliability assessment method taking into account the access of a regional integrated energy system as described in the first aspect.
[0196] Beneficial effects: The distribution network reliability assessment method, device and storage medium provided by the present invention taking into account the access of regional integrated energy system, aiming at the problem of distribution network reliability assessment, coordinates RIES economy and distribution network reliability, and reasonably constructs the optimal load reduction model of RIES-distribution network joint system. Compared with the prior art, the following progress has been achieved:
[0197] (1) Starting from the RIES-distribution network joint system topology, this paper establishes a mathematical model of the RIES-distribution network joint system equipment, and explores the mechanism of RIES multi-energy complementarity, renewable energy consumption, and two-way power interaction with the distribution network.
[0198] (2) The RIES-distribution network combined system load reduction model established in the present invention ensures the economy of RIES, optimizes the operation strategy of RIES from the perspective of distribution network reliability, and provides a reference for the dispatching operation of RIES after it is connected to the distribution network.
[0199] (3) The sequential Monte Carlo fault simulation method adopted in the present invention randomly samples the equipment operating status without being affected by the system scale and complexity, and can reveal the impact of RIES access on the reliability of the distribution network and make an accurate assessment of the reliability of the RIES-distribution network combined system. BRIEF DESCRIPTION OF THE DRAWINGS
[0200] Figure 1 It is a schematic flow chart of the method of the present invention.
[0201] Figure 2 It is a schematic diagram of the device structure of the present invention.
[0202] Figure 3 It is a flow chart of distribution network reliability assessment considering RIES access.
[0203] Figure 4 It is a schematic diagram of the RIES-distribution network joint system structure.
[0204] Figure 5 It is a schematic diagram of the two-state model of fault.
[0205] Figure 6 It is a schematic diagram of the improved IEEE RBTS-BUS6 F4 power distribution system. DETAILED DESCRIPTION
[0206] The present invention will be further described below in conjunction with specific embodiments.
[0207] like Figure 1 As shown, a first embodiment of a distribution network reliability assessment method taking into account access to a regional integrated energy system comprises the following steps:
[0208] Establish a RIES-distribution network joint system model, and establish an optimal load reduction model of the RIES-distribution network joint system based on the RIES-distribution network joint system model;
[0209] According to the obtained operating status of the distribution network and RIES equipment components, the optimal load reduction model of the RIES-distribution network joint system on the fault day is calculated to obtain the optimal load reduction of the distribution network and RIES equipment components on the fault day.
[0210] According to the optimal load reduction of distribution network and RIES equipment components on the fault day, the distribution network load point reliability index, distribution network system reliability index and RIES energy supply reliability index are calculated.
[0211] like Figure 2 As shown, a second embodiment of a distribution network reliability assessment device taking into account access to a regional integrated energy system includes the following modules:
[0212] A model building module 201 is used to establish a RIES-distribution network joint system model, and to establish an optimal load reduction model of the RIES-distribution network joint system according to the RIES-distribution network joint system model;
[0213] The optimal load reduction acquisition module 202 is used to calculate the optimal load reduction model of the RIES-distribution network joint system on the fault day according to the obtained operating status of the distribution network and the RIES equipment components, and obtain the optimal load reduction of the distribution network and the RIES equipment components on the fault day;
[0214] The index calculation module 203 is used to calculate the distribution network load point reliability index, the distribution network system reliability index, and the RIES energy supply reliability index according to the optimal load reduction of the distribution network and RIES equipment components on the fault day.
[0215] As a preferred solution, the step of obtaining the operating status of the distribution network and the RIES equipment components includes the following steps:
[0216] Generate two random numbers ξ1 and ξ2 between [0,1], and calculate the fault-free operation time TTF and fault repair time TTR of the distribution network and RIES equipment components according to the failure rate and repair rate of the distribution network and RIES equipment components. The calculation formula is:
[0217]
[0218] Among them, γ and μ are the failure rate and repair rate of distribution network and RIES equipment components.
[0219] The status of distribution network and RIES equipment components converts between normal operation and fault shutdown. Based on sequential Monte Carlo simulation, the operation status of the RIES-distribution network joint system is randomly sampled. Each time the distribution network or RIES equipment component with the smallest TTF is selected as the fault component, and the TTR of the fault component is used as the fault time. By analogy, the hourly component failures within the simulation period are obtained, and the fault day is obtained according to the hourly component failures within the period.
[0220] As a preferred solution, a method for obtaining the optimal load reduction of the distribution network and RIES equipment components on a fault day includes the following steps:
[0221] The optimal load reduction model of the RIES-distribution network joint system on the fault day is solved, and the hourly RIES energy conversion equipment output, energy storage equipment output, load reduction, interconnection line power and the load that can be restored by RIES in the distribution network island are obtained.
[0222] The optimal load reduction model calculation formula of the RIES-distribution network joint system is as follows:
[0223] minF=f PSE +f ALW +f LC +f P
[0224] Where: f PSE is the cost of purchasing and selling energy; ALW is the cost of abandoning solar power and wind power; LC Cost reduction for load; P The constraints include equipment failure constraints, energy balance constraints, equipment output constraints, energy storage constraints, load reduction constraints and interconnection line power constraints.
[0225] As a preferred solution, f PSE The calculation formula is:
[0226]
[0227] Where: P E,t P is the RIES purchase / sale power at time t. G,t is the gas purchase power of RIES from the upper gas grid at time t, P E,t P is purchasing electricity from the distribution network on behalf of RIES. E,t Negative means RIES sells electricity to the distribution network; p G,t is the gas purchase price at time t; T is the dispatch period; p E,t The purchase / sale price of electricity at time t:
[0228]
[0229] Where: is the electricity purchase price at time t, is the electricity selling price at time t.
[0230] f ALW The calculation formula is:
[0231]
[0232] Where: R PV,t , R WT,t is the abandoned solar and wind power at time t; r PV 、r WT is the price of abandoned solar power and wind power; T is the dispatching period.
[0233] f LC The calculation formula is:
[0234]
[0235] Where: R E,t The power reduction of the electric load at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced; r E,t The price reduction for the electricity load at time t; The price reduction for the heat load that allows limited cooling and heating at time t; is the heat load reduction price that causes the outage at time t; T is the scheduling period.
[0236] f P The calculation formula is:
[0237]
[0238] Where: N LPis the number of loads that cannot be powered in the isolated island; r i is the weight coefficient of the load that cannot be powered in the island; is the power of the i-th load that cannot be powered at time t in the island; T is the scheduling period.
[0239] As a preferred solution, the equipment failure constraint calculation formula is as follows:
[0240]
[0241] Where: is the device K at time t i The power of the RIES-distribution network combined system is m.
[0242] Energy balance constraints include:
[0243] The calculation formula of electric power balance constraint is as follows:
[0244]
[0245] Where: P is the charging and discharging power of the energy storage at time t; PV,t is the photovoltaic power generation power at time t, P WT,t is the wind power generation power at time t; R E,t is the load reduction power at time t, P E,t is the online RIES purchase / sale power at time t, R PV,t , R WT,t is the abandoned solar and wind power at time t, is the power output of the cogeneration unit at time t, is the air intake power of the electric boiler at time t, L E,t Interruptible load.
[0246] The thermal power balance constraint calculation formula is as follows:
[0247]
[0248] Where: is the thermal energy storage charging and discharging power at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced. is the thermal output of the electric boiler at time t, is the thermal output of the cogeneration unit at time t, is the thermal output of the gas boiler at time t, L H,t is the user's heat load demand at time t.
[0249] The calculation formula of gas power balance constraint is as follows:
[0250]
[0251] Where: is the charging and discharging power of the gas energy storage at time t, P G,t is the gas purchase power of RIES from the upper gas grid at time t, P CHP,t is the intake power of the cogeneration unit at time t, P GB,t is the gas boiler intake power at time t.
[0252] The calculation formula for tie line power balance constraint is as follows:
[0253]
[0254] Where: P E,t The power purchased / sold by RIES online at time t, is the sum of all load powers in the island at time t, is the rated power of the distribution network load at time t, N LP It is the number of loads that cannot get power supply in the isolated island.
[0255] The equipment output constraint calculation formula is as follows:
[0256]
[0257] Where: It is the upper and lower limits of the thermal output of the cogeneration unit; It is the upper and lower limits of the thermal output of the gas boiler; It is the upper and lower limits of the thermal output of the electric boiler.
[0258] The energy storage constraint calculation formula is as follows:
[0259]
[0260] Where: E k,min 、E k,max P is the upper and lower limits of the energy storage capacity of the kth type of energy storage equipment; ch k,max , P dis k,max I is the upper and lower limits of the charging and discharging power of the k-th type of energy storage equipment; k,t is a 0-1 variable representing the charge and discharge state, I k,t 1 means that the k-th energy storage device is charged at time t, I k,t 0 means that the k-th energy storage device releases energy at time t; E k,0 is the initial storage energy of the kth type of energy storage device, E k,T is the energy storage capacity of the kth type of energy storage device at time T, E k,t is the energy storage capacity of the kth type of energy storage device at time t, P ch k,t , Pdis k,t is the charging and discharging power of the kth type of energy storage device at time t.
[0261] The load reduction constraint calculation formula is as follows:
[0262]
[0263] The calculation formula for tie line power constraint is as follows:
[0264]
[0265] Where: P E,max , P E,min P is the upper and lower limits of the interconnection line power; G,max It is the upper limit of RIES intake power.
[0266] As a preferred solution, the reliability index of the load point of the distribution network includes the annual average fault outage rate λ of the load point, the annual average outage duration u of the load point and the annual average outage duration r of the load point, and the calculation formula is:
[0267]
[0268]
[0269]
[0270] The distribution network system reliability index includes the system average power outage frequency SAIFI, the system average power outage duration SAIDI, the user average power outage duration CAIDI, the average system availability ASAI and the annual power shortage expected EENS, and the calculation formula is:
[0271]
[0272]
[0273]
[0274]
[0275]
[0276] The RIES energy supply reliability index includes the electricity / heat load reduction frequency FLC, the electricity / heat load reduction probability PLC and the annual load reduction expectation ELC, and the calculation formula is:
[0277]
[0278]
[0279]
[0280] As a preferred solution, the RIES-distribution network combined system includes: energy conversion equipment, energy storage equipment, renewable energy, multi-energy loads and distribution network.
[0281] The energy conversion equipment includes: a cogeneration unit, a gas boiler, and an electric boiler.
[0282] The calculation formula for the combined heat and power unit is:
[0283]
[0284] Where: P CHP,t is the air intake power of the cogeneration unit at time t; is the electrical and thermal output of the cogeneration unit at time t; It is the electrical and thermal efficiency of the cogeneration unit.
[0285] The calculation formula for gas boiler is:
[0286]
[0287] Where: P GB,t is the gas boiler intake power at time t; is the thermal output of the gas boiler at time t; η GB is the thermal efficiency of gas boiler.
[0288] The calculation formula for electric boiler is:
[0289]
[0290] Where: is the air intake power of the electric boiler at time t; is the thermal output of the electric boiler at time t; η EB is the thermal efficiency of the electric boiler.
[0291] The calculation formula for energy storage equipment is:
[0292]
[0293] Where: E k,t+1 E is the energy storage capacity of the kth type of energy storage device at time t+1; k,t P is the energy storage capacity of the kth type of energy storage device at time t; ch k,t , P dis k,t is the charging and discharging power of the k-th type of energy storage device at time t; η ch k , η dis k is the charging and discharging power efficiency of the k-th type of energy storage device; η s k is the self-damage rate of the kth type of energy storage equipment; the time interval Δt of energy storage state change is 1h.
[0294] Renewable energy includes wind power generation and photovoltaic power generation, both of which use regional measured power data.
[0295] The multi-energy load includes: RIES electric load, RIES thermal load, and distribution network load.
[0296] The RIES electrical load calculation formula is:
[0297]
[0298] Where: The interruptible load L E,t Minimum and maximum power at time t.
[0299] The RIES heat load calculation formula is:
[0300]
[0301] Where: C is the capacity of the hot water tank; R is the thermal resistance of the hot water tank; T t is the hot water temperature at time t; T t+1 is the hot water temperature at time t+1; T a,t is the ambient temperature at time t; c e is the specific heat capacity of water; q t T is the water consumption rate at time t; d is the expected temperature of hot water; T in is the cold water temperature entering the system; H t is the RIES heating power at time t; L H,t is the user's heat load demand at time t.
[0302] The distribution network load calculation formula is:
[0303]
[0304] Where: L DN,t is the actual power consumption of the distribution network load at time t; is the rated power of the distribution network load at time t.
[0305] A third embodiment is a computer-readable storage medium having a computer program stored thereon. When the program is executed by a processor, the method for evaluating the reliability of a distribution network taking into account the access of a regional integrated energy system as described in the first embodiment is implemented.
[0306] Embodiment 1:
[0307] like Figure 3As shown, the reliability evaluation method of the distribution network taking into account the access of the regional integrated energy system described in the present invention firstly models the RIES-distribution network joint system, takes the economy of RIES as the goal, takes into account the reliability of the distribution network, and establishes the optimal load reduction model of the joint system; secondly, considering the two-state failure of the distribution network and the RIES equipment, based on the sequential Monte Carlo simulation, the reliability of the distribution network taking into account the access of RIES is evaluated, and the implementation steps include:
[0308] (1) Figure 4 As shown, a RIES-distribution network joint system model including energy conversion equipment, energy storage equipment, renewable energy and multi-energy loads is established.
[0309] The energy conversion equipment includes: a cogeneration unit, a gas boiler, and an electric boiler.
[0310] 1) Combined heat and power unit. The combined heat and power unit burns natural gas to drive the gas turbine to generate electricity, and recovers heat energy through the waste heat boiler for heating, supplying energy to the electricity and heat loads. The calculation formula is:
[0311]
[0312] Where: P CHP,t is the air intake power of the cogeneration unit at time t; is the electrical and thermal output of the cogeneration unit at time t; It is the electrical and thermal efficiency of the cogeneration unit.
[0313] 2) Gas boiler. The heat supply of gas boiler consumes natural gas to heat the load. The calculation formula is:
[0314]
[0315] Where: P GB,t is the gas boiler intake power at time t; is the thermal output of the gas boiler at time t; η GB is the thermal efficiency of gas boiler.
[0316] 3) Electric boiler. Electric boiler consumes electricity to provide heat to the load. The calculation formula is:
[0317]
[0318] Where: is the air intake power of the electric boiler at time t; is the thermal output of the electric boiler at time t; η EB is the thermal efficiency of the electric boiler.
[0319] 4) Energy storage equipment. Electricity, gas, and heat energy storage equipment can be represented by a unified charging and discharging model, and the calculation formula is:
[0320]
[0321] Where: E k,t+1 E is the energy storage capacity of the kth type of energy storage device at time t+1; k,t P is the energy storage capacity of the kth type of energy storage device at time t; ch k,t , P dis k,t is the charging and discharging power of the k-th type of energy storage device at time t; η ch k , η dis k is the charging and discharging power efficiency of the k-th type of energy storage device; η s k is the self-damage rate of the kth type of energy storage equipment; the time interval Δt of energy storage state change is 1h.
[0322] 5) Renewable energy output: The renewable energy sources include wind power generation and photovoltaic power generation, both of which use regional measured power data.
[0323] The multi-energy load includes: RIES electric load, RIES thermal load, and distribution network load.
[0324] 6) RIES electric load. The RIES electric load is regarded as an interruptible flexible load. In the case of insufficient energy supply, the load is reduced to maintain the power balance of the combined system. The RIES electric load at time t can be expressed as:
[0325]
[0326] Where: The interruptible load L E,t Minimum and maximum power at time t.
[0327] 7) RIES heat load. The energy consumption of RIES heat load is essentially to maintain a certain temperature for a period of time, and it is not necessary to meet the heat load power in real time. When the heating temperature is not less than the minimum acceptable temperature of the heat load, it is considered that RIES continues to supply heat to the load. The RIES heat load inertia model can be expressed as:
[0328]
[0329] Where: C is the capacity of the hot water tank; R is the thermal resistance of the hot water tank; T t is the hot water temperature at time t; T t+1 is the hot water temperature at time t+1; T a,t is the ambient temperature at time t; c e is the specific heat capacity of water; q t T is the water consumption rate at time t; d is the expected temperature of hot water; T in is the cold water temperature entering the system; H t is the RIES heating power at time t; L H,tis the user's heat load demand at time t.
[0330] 8) Distribution network load. In order to simplify the reliability assessment process, the demand response of the distribution network load is not considered. It is regarded as an uninterruptible load and its power supply must be guaranteed when conditions permit. The distribution network load can be expressed as:
[0331]
[0332] Where: L DN,t is the actual power consumption of the distribution network load at time t; is the rated power of the distribution network load at time t.
[0333] (2) In the RIES-distribution network joint system, RIES purchases and sells electricity from the distribution network through interconnection lines to meet its own interests. When a fault occurs, the power of the interconnection line between the two has a profound impact on the power supply reliability of the distribution network and the energy supply margin of RIES. Therefore, with the economy of RIES as the goal and the reliability of the distribution network taken into account, an optimal load reduction model of the joint system is established.
[0334] After RIES is connected to the grid, it is necessary to optimize the load reduction of the RIES-distribution network joint system and optimize the dispatch of each device under different system operation conditions to achieve the highest economic benefit of RIES itself. Under a reasonable operation strategy, it should meet the following requirements: when the system is operating normally without faults, it fully absorbs regional photovoltaic and wind power generation. If the energy conversion equipment cannot meet its own load demand, RIES needs to purchase electricity from the upper power grid to maintain its own operation; otherwise, RIES sells excess electricity, and the upper power grid and RIES jointly maintain the normal operation of the regional distribution network. When the energy conversion equipment in RIES fails, the faulty equipment in RIES is shut down through the action of the control and protection device, which does not affect the upper feeder to continue to supply power to the distribution network load. In the case of serious faults, RIES reduces the load, and the energy supply of RIES' own load will be affected. When the upper feeder of the distribution network island fails, RIES sells electricity through the tie line to provide power support for the load in the island. Under the premise of the optimal economic operation of RIES itself, the output of each RIES device is dispatched to provide a dynamic island operation plan.
[0335] The objective function of the optimal load reduction model of the RIES-distribution network joint system is to study the operating cost within the dispatch period T while taking into account the reliability of the distribution network:
[0336] minF=f PSE +f ALW +f LC +f P
[0337] Where: f PSEis the cost of purchasing and selling energy; ALW is the cost of abandoning solar power and wind power; LC Cost reduction for load; P Penalty for island load loss.
[0338] 1) Energy purchase and sale costs
[0339] The cost of RIES energy purchase and sale consists of three parts: electricity purchase, electricity sale, and gas purchase. The calculation formula is:
[0340]
[0341] Where: P E,t P is the RIES purchase / sale power at time t. G,t is the gas purchase power of RIES from the upper gas grid at time t, P E,t P is purchasing electricity from the distribution network on behalf of RIES. E,t Negative means RIES sells electricity to the distribution network; p G,t is the gas purchase price at time t; T is the dispatch period; p E,t The purchase / sale price of electricity at time t:
[0342]
[0343] Where: is the electricity purchase price at time t, is the electricity selling price at time t.
[0344] 2) Cost of curtailing solar and wind power
[0345] Without considering the passive abandonment of solar power and wind power caused by failure of photovoltaic and wind power generation equipment, the abandonment cost of solar power and wind power of RIES is only generated by the photovoltaic and wind power that cannot be absorbed in the region. The calculation formula is:
[0346]
[0347] Where: R PV,t , R WT,t is the abandoned solar and wind power at time t; r PV 、r WT is the price of abandoned solar power and wind power; T is the dispatching period.
[0348] 3) Load reduction cost. Load reduction fully utilizes the controllable characteristics of RIES electrical and thermal loads. The calculation formula is:
[0349]
[0350] Where: R E,t The power reduction of the electric load at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced; r E,t The price reduction for the electricity load at time t; The price reduction for the heat load that allows limited cooling and heating at time t; is the heat load reduction price that causes the outage at time t; T is the scheduling period.
[0351] 4) Island load loss penalty. The island load loss penalty is generated by the uninterruptible load of the distribution network that cannot be powered on the island. The calculation formula is:
[0352]
[0353] Where: N LP is the number of loads that cannot be powered in the island; r i is the weight coefficient of the load that cannot be powered in the island; is the power of the i-th load that cannot be powered at time t in the island; T is the scheduling period.
[0354] The constraints of the optimal load reduction model of the RIES-distribution network joint system include equipment failure constraints, energy balance constraints, equipment output constraints, energy storage constraints, load reduction constraints and tie line power constraints:
[0355] 1) Equipment failure constraints. To ensure the safe operation of the system, when a device fails, the fault should be removed in time. Assuming that the fault removal time is extremely short, the corresponding equipment power is 0 during the fault repair time:
[0356]
[0357] Where: is the device K at time t i The power of the RIES-distribution network combined system is m.
[0358] 2) Energy balance constraint. Under normal operation mode without faults, the power balance constraint of the RIES-distribution network combined system can be expressed as:
[0359]
[0360] Where: P is the charging and discharging power of the energy storage at time t; PV,t is the photovoltaic power generation power at time t, P WT,t is the wind power generation power at time t; R E,t The power reduction of the electrical load at time t.
[0361] The thermal power balance constraint of the RIES-distribution network combined system can be expressed as:
[0362]
[0363] Where: is the thermal energy storage charging and discharging power at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The power is reduced for the heat load that causes the power outage at time t.
[0364] The gas power balance constraint of the RIES-distribution network joint system can be expressed as:
[0365]
[0366] Where: is the charging and discharging power of the gas energy storage at time t.
[0367] After entering the planned island operation mode, RIES supplies power to the distribution network load through the tie line. At this time, the tie line power is:
[0368]
[0369] Where: It is the sum of all load powers in the island at time t.
[0370] 3) Equipment output constraints. The output of each unit and boiler equipment in RIES is limited by the equipment capacity, which can be expressed as:
[0371]
[0372] Where: It is the upper and lower limits of the thermal output of the cogeneration unit; It is the upper and lower limits of the thermal output of the gas boiler; It is the upper and lower limits of the thermal output of the electric boiler.
[0373] 4) Energy storage constraints. In RIES, the energy storage capacity and energy storage charging and discharging power of each energy storage device are within the upper and lower limits, and the energy storage capacity at the beginning and end of each scheduling day is the same, which can be expressed as:
[0374]
[0375] Where: E k,min 、E k,max P is the upper and lower limits of the energy storage capacity of the kth type of energy storage equipment; ch k,max , P dis k,max I is the upper and lower limits of the charging and discharging power of the k-th type of energy storage equipment; k,t is a 0-1 variable representing the charge and discharge state, I k,t 1 means that the k-th energy storage device is charged at time t, I k,t0 means that the k-th energy storage device releases energy at time t; E k,0 is the initial storage energy of the kth type of energy storage device, E k,T The energy storage capacity of the k-th type of energy storage device at time T.
[0376] 5) Load reduction constraints. The power and heat loads in RIES are completely interruptible, which can be expressed as:
[0377]
[0378] 6) Tie-line power constraint. The RIES input gas power, electric power and output electric power per unit time are subject to the maximum transmission power of the tie-line, which can be expressed as:
[0379]
[0380] Where: P E,max , P E,min P is the upper and lower limits of the interconnection line power; G,max It is the upper limit of RIES intake power.
[0381] (3) Considering the two-state faults of the distribution network and RIES equipment, the operating status of the RIES-distribution network combined system is randomly sampled based on sequential Monte Carlo simulation.
[0382] The distribution network and RIES equipment components adopt a two-state fault model. The distribution network and RIES equipment components switch between normal operation and fault shutdown. The two-state fault model is as follows: Figure 5 As shown, γ and μ are the failure rate and repair rate of distribution network and RIES equipment components.
[0383] First, two random numbers ξ1 and ξ2 between [0,1] are generated. The failure rate and repair rate of the distribution network and RIES equipment components are used to calculate the fault-free operation time TTF and the fault repair time TTR of the distribution network and RIES equipment components. The calculation formula is:
[0384]
[0385] Then, based on the sequential Monte Carlo simulation, the operating status of the RIES-distribution network combined system is randomly sampled. Each time, the distribution network or RIES equipment component with the smallest TTF is selected as the fault component, and the TTR of the fault component is used as the fault time. The distribution network or RIES equipment components corresponding to the remaining TTFs are used as the normal operating components. And so on, the component failure / normal operating status is obtained hour by hour within the simulation period, and the random sampling of the operating status of the RIES-distribution network combined system is completed.
[0386] (4) Evaluate the reliability of the distribution network taking into account RIES access, and count and analyze the reliability indicators of the RIES-distribution network combined system.
[0387] Firstly, the optimal load reduction of the RIES-distribution network combined system is calculated according to the operating status of the distribution network and RIES equipment components obtained by random sampling. The mixed integer linear programming problem is solved by the commercial solver CPLEX under Matlab. During the normal operation days without faults of the RIES-distribution network combined system, the distribution network and RIES equipment components can meet the load demand without load reduction. During the fault days of the RIES-distribution network combined system, the optimal load reduction calculation is used to obtain the hourly output of RIES energy conversion equipment, energy storage equipment output, load reduction, tie line power and the load that can be restored by RIES in the distribution network island.
[0388] Then, the reliability of the RIES-distribution network joint system is evaluated based on the optimal load reduction calculation results, and the reliability indicators are calculated, including the distribution network load point reliability indicator, the distribution network system reliability indicator, and the RIES energy supply reliability indicator. For the RIES load, the total number of load reductions and the total duration of load reductions are obtained by the hourly load reduction statistics; for the load points outside the distribution network island, the total number of power outages is the total number of upstream transmission line and transformer failures, and the total duration of power outages is the total duration of repair of upstream transmission line and transformer failures; for the load points within the distribution network island, the total number of power outages and the total duration of power outages are updated according to the hourly island operation plan.
[0389] The reliability index of the load point of the distribution network includes the annual average fault outage rate λ of the load point, the annual average outage duration u of the load point and the average fault outage time r of the load point, and the calculation formula is:
[0390]
[0391]
[0392]
[0393] The distribution network system reliability index includes the system average interruption frequency index (SAIFI), the system average interruption duration index (SAIDI), the customer average interruption duration index (CAIDI), the average system availability index (ASAI) and the expected annual power supply shortage (EENS). The calculation formula is:
[0394]
[0395]
[0396]
[0397]
[0398]
[0399] The RIES energy supply reliability index includes the frequency of load curtailment (FLC), the probability of load curtailment (PLC) and the expected load curtailment (ELC). The calculation formula is:
[0400]
[0401]
[0402]
[0403] Finally, when the EENS variance coefficient of the distribution network is less than 0.05 or the number of simulation years is greater than 10,000, the reliability index of the RIES-distribution network combined system is output.
[0404] The present invention is further described below by taking the improved IEEE RBTS-BUS6 F4 power distribution system as an example.
[0405] In such Figure 6Two identical RIES are connected at the locations shown. The failure rate and repair rate of the combined system equipment are shown in Table 1, and the RIES equipment parameters are shown in Table 2.
[0406] Table 1 Equipment failure rate and repair rate
[0407] equipment γ(f / yr) μ(f / yr) Transmission lines 0.0046 / km 0.125 transformer 0.015 0.067 Wind power 0.5 0.05 Photovoltaic power generation 0.4 0.05 Combined heat and power unit 1.5 0.083 Gas boiler 2 0.1 Electric boiler 0.4 0.2
[0408] Table 2 RIES equipment parameters
[0409]
[0410] The main steps of distribution network reliability assessment are as follows:
[0411] Firstly, the RIES-distribution network joint system is modeled according to the system topology, and the system operation state sequence is sampled sequentially using the failure rate and repair rate of the equipment.
[0412] Next, the optimal load reduction calculation of the RIES-distribution network combined system is performed based on the operating status of the sampled RIES-distribution network combined system equipment. Assuming that feeder 12 fails from 6:00 to 12:00, the hourly load of island 2 during the typical daily fault time is shown in Table 3.
[0413] Table 3 Hourly load in island 2
[0414] Island operation time (h) Load in Crysis 2 1 LP19,LP20,LP21,LP22,LP23 2 LP19,LP20,LP21,LP22,LP23 3 LP19,LP20,LP21,LP22,LP23 4 LP19,LP20,LP21,LP22 5 L19 6 LP19,LP20,LP21 7 LP19,LP20,LP21,LP22,LP23
[0415] Finally, the reliability of the RIES-distribution network joint system is evaluated based on the RIES load reduction and island operation scheme, and the system reliability index is calculated. The obtained distribution network load point reliability index is shown in Table 4, and the distribution network and RIES reliability index are shown in Table 5.
[0416] Table 4 Reliability index of distribution network load points
[0417]
[0418] Table 5 RIES-distribution network joint system reliability index
[0419]
[0420]
[0421] It can be seen that before RIES access, the closer the load is to the end of the feeder on the main feeder of the distribution network, the worse the power supply reliability is. After RIES access, the power supply reliability index of the load outside the island does not change; for the loads LP14~18 and LP19~23 in the island, since the power support of RIES to the island does not always meet the needs of all loads in the island in real time during the island operation time, the annual average fault outage rate λ is higher than before RIES access, but compared with not accessing RIES, the average outage time r of the load point in the island is greatly reduced, thereby reducing the annual average outage duration u, and the reliability of the load point of the distribution network is generally improved. Except for the slight deterioration of the system average power outage frequency SAIFI, the other indicators of the distribution network reliability index have been significantly improved; and all the reliability indicators of RIES have been greatly improved. The reliability of the RIES-distribution network joint system has been significantly improved. It can be seen that the method in this paper can accurately evaluate the reliability of the distribution network after RIES access, reveal the impact of RIES access on the reliability of the distribution network, and obtain the reliability index of the RIES-distribution network joint system, which provides a reference for the dispatching operation after RIES access to the distribution network from the perspective of reliability.
[0422] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A distribution network reliability assessment method considering access to a regional integrated energy system, characterized in that: The steps include: Establish a RIES-distribution network joint system model, and establish an optimal load reduction model of the RIES-distribution network joint system based on the RIES-distribution network joint system model; According to the obtained operating status of the distribution network and RIES equipment components, the optimal load reduction model of the RIES-distribution network joint system on the fault day is calculated to obtain the optimal load reduction of the distribution network and RIES equipment components on the fault day; According to the optimal load reduction of the distribution network and RIES equipment components on the fault day, the reliability index of the distribution network load point, the reliability index of the distribution network system, and the RIES energy supply reliability index are calculated; The method for obtaining the optimal load reduction of the distribution network and RIES equipment components on a fault day includes the following steps: Solve the optimal load reduction model of the RIES-distribution network joint system on the fault day, and obtain the hourly RIES energy conversion equipment output, energy storage equipment output, load reduction, interconnection line power and the load that can be restored by RIES in the distribution network island; The optimal load reduction model calculation formula of the RIES-distribution network joint system is as follows: minF=f PSE +f ALW +f LC +f P Where: f PSE is the cost of purchasing and selling energy; ALW is the cost of abandoning solar power and wind power; LC Cost reduction for load; P Penalty for island load loss; Constraints include equipment failure constraints, energy balance constraints, equipment output constraints, energy storage constraints, load reduction constraints and tie line power constraints; f PSE The calculation formula is: Where: P E,t P is the RIES purchase / sale power at time t. G,t is the gas purchase power of RIES from the upper gas grid at time t, P E,t P is the purchase of electricity from the distribution network on behalf of RIES. E,t Negative means RIES sells electricity to the distribution network; p G,t is the gas purchase price at time t; T is the scheduling period; p E,t The purchase / sale price of electricity at time t: Where: is the electricity purchase price at time t, is the electricity selling price at time t; f ALW The calculation formula is: Where: R PV,t , R WT,t is the abandoned solar and wind power at time t; r PV 、r WT is the price of abandoned solar and wind power; T is the dispatching period; f LC The calculation formula is: Where: R E,t The power reduction of the electric load at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced; r E,t The price reduction for the electricity load at time t; The price reduction for the heat load that allows limited cooling and heating at time t; is the heat load reduction price that causes the outage at time t; T is the dispatch period; f P The calculation formula is: Where: N LP is the number of loads that cannot be powered in the island; r i is the weight coefficient of the load that cannot be powered in the island; is the power of the i-th load that cannot be powered at time t in the island; T is the scheduling period.
2. A distribution network reliability assessment method taking into account regional integrated energy system access according to claim 1, characterized in that: The step of obtaining the operating status of the distribution network and the RIES equipment components comprises the following steps: Generate two random numbers ξ1 and ξ2 between [0,1], and calculate the fault-free operation time TTF and fault repair time TTR of the distribution network and RIES equipment components according to the failure rate and repair rate of the distribution network and RIES equipment components. The calculation formula is: Among them, γ and μ are the failure rate and repair rate of the distribution network and RIES equipment components; The status of distribution network and RIES equipment components converts between normal operation and fault shutdown. Based on sequential Monte Carlo simulation, the operation status of the RIES-distribution network joint system is randomly sampled. Each time the distribution network or RIES equipment component with the smallest TTF is selected as the fault component, and the TTR of the fault component is used as the fault time. By analogy, the hourly component failures within the simulation period are obtained, and the fault day is obtained according to the hourly component failures within the period.
3. A distribution network reliability assessment method taking into account access to a regional integrated energy system according to claim 1, characterized in that: The calculation formula of the equipment failure constraint is as follows: Where: is the device K at time t i The power of, m is the total number of equipment in the RIES-distribution network joint system; Energy balance constraints include: The calculation formula of electric power balance constraint is as follows: Where: P is the charging and discharging power of the energy storage at time t; PV,t is the photovoltaic power generation power at time t, P WT,t is the wind power generation power at time t; R E,t is the load reduction power at time t, P E,t is the power purchased / sold by RIES at time t, PV,t , R WT,t is the abandoned solar and wind power at time t, is the power output of the cogeneration unit at time t, is the air intake power of the electric boiler at time t, L E,t It is an interruptible load; The thermal power balance constraint calculation formula is as follows: Where: is the thermal energy storage charging and discharging power at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced. is the thermal output of the electric boiler at time t, is the thermal output of the cogeneration unit at time t, is the thermal output of the gas boiler at time t, L H,t is the user's heat load demand at time t; The calculation formula of gas power balance constraint is as follows: Where: is the charging and discharging power of the gas energy storage at time t, P G,t is the gas purchase power of RIES from the upper gas grid at time t, P CHP,t is the intake power of the cogeneration unit at time t, P GB,t is the gas boiler intake power at time t; The calculation formula for tie line power balance constraint is as follows: Where: P E,t The power purchased / sold by RIES online at time t, is the sum of all load powers in the island at time t, is the rated power of the distribution network load at time t, N LP The number of loads that cannot be powered in the isolated island; The equipment output constraint calculation formula is as follows: Where: It is the upper and lower limits of the thermal output of the cogeneration unit; It is the upper and lower limits of the thermal output of the gas boiler; It is the upper and lower limits of the thermal output of the electric boiler; The energy storage constraint calculation formula is as follows: Where: E k,min 、E k,max P is the upper and lower limits of the energy storage capacity of the kth type of energy storage equipment; ch k,max , P dis k,max I is the upper and lower limits of the charging and discharging power of the k-th type of energy storage equipment; k,t is a 0-1 variable representing the charge and discharge state, I k,t 1 means that the k-th energy storage device is charged at time t, I k,t 0 means that the k-th energy storage device releases energy at time t; E k,0 is the initial storage energy of the kth type of energy storage device, E k,T is the energy storage capacity of the kth type of energy storage device at time T, E k,t is the energy storage capacity of the kth type of energy storage device at time t, P ch k,t , P dis k,t is the charging and discharging power of the k-th type of energy storage device at time t; The load reduction constraint calculation formula is as follows: The calculation formula for tie line power constraint is as follows: Where: P E,max , P E,min P is the upper and lower limits of the interconnection line power; G,max It is the upper limit of RIES intake power.
4. A distribution network reliability assessment method taking into account regional integrated energy system access according to claim 1, characterized in that: The reliability index of the load point of the distribution network includes the annual average fault outage rate λ of the load point, the annual average outage duration u of the load point and the annual average outage duration r of the load point, and the calculation formula is: The distribution network system reliability index includes the system average power outage frequency SAIFI, the system average power outage duration SAIDI, the user average power outage duration CAIDI, the average system availability ASAI and the annual power shortage expected EENS, and the calculation formula is: The RIES energy supply reliability index includes the electricity / heat load reduction frequency FLC, the electricity / heat load reduction probability PLC and the annual load reduction expectation ELC, and the calculation formula is:
5. A distribution network reliability assessment method taking into account regional integrated energy system access according to claim 1, characterized in that: RIES-distribution network joint system includes: energy conversion equipment, energy storage equipment, renewable energy, multi-energy loads and distribution network; The energy conversion equipment includes: cogeneration units, gas boilers, and electric boilers; The calculation formula for the combined heat and power unit is: Where: P CHP,t is the air intake power of the cogeneration unit at time t; is the electrical and thermal output of the cogeneration unit at time t; The electrical and thermal efficiency of the cogeneration unit; The calculation formula for gas boiler is: Where: P GB,t is the gas boiler intake power at time t; is the thermal output of the gas boiler at time t; η GB is the thermal efficiency of the gas boiler; The calculation formula for electric boiler is: Where: is the air intake power of the electric boiler at time t; is the thermal output of the electric boiler at time t; η EB is the thermal efficiency of the electric boiler; The calculation formula for energy storage equipment is: Where: E k,t+1 E is the energy storage capacity of the kth type of energy storage device at time t+1; k,t P is the energy storage capacity of the kth type of energy storage device at time t; ch k,t , P dis k,t is the charging and discharging power of the k-th type of energy storage device at time t; η ch k , η dis k is the charging and discharging power efficiency of the k-th type of energy storage device; η s k is the self-damage rate of the k-th type of energy storage equipment; the time interval Δt for energy storage state change is 1h; Renewable energy includes wind power generation and photovoltaic power generation, both of which use regional measured power data; The multi-energy load includes: RIES electric load, RIES thermal load, and distribution network load; The RIES electrical load calculation formula is: Where: The interruptible load L E,t Minimum and maximum power at time t; The RIES heat load calculation formula is: Where: C is the capacity of the hot water tank; R is the thermal resistance of the hot water tank; T t is the hot water temperature at time t; T t+1 is the hot water temperature at time t+1; T a,t is the ambient temperature at time t; c e is the specific heat capacity of water; q t T is the water consumption rate at time t; d is the desired temperature of hot water; T in is the cold water temperature entering the system; H t is the RIES heating power at time t; L H,t is the user's heat load demand at time t; The distribution network load calculation formula is: Where: L DN,t is the actual power consumption of the distribution network load at time t; is the rated power of the distribution network load at time t.
6. A distribution network reliability assessment device taking into account access to a regional integrated energy system, characterized in that: Includes the following modules: A model building module is used to establish a RIES-distribution network joint system model, and to establish an optimal load reduction model of the RIES-distribution network joint system according to the RIES-distribution network joint system model; The optimal load reduction acquisition module is used to calculate the optimal load reduction model of the RIES-distribution network joint system on the fault day according to the obtained operating status of the distribution network and RIES equipment components, and obtain the optimal load reduction of the distribution network and RIES equipment components on the fault day; The index calculation module is used to calculate the reliability index of the distribution network load point, the reliability index of the distribution network system, and the RIES energy supply reliability index according to the optimal load reduction of the distribution network and RIES equipment components on the fault day; The method for obtaining the optimal load reduction of the distribution network and RIES equipment components on a fault day includes the following steps: Solve the optimal load reduction model of the RIES-distribution network joint system on the fault day, and obtain the hourly RIES energy conversion equipment output, energy storage equipment output, load reduction, interconnection line power and the load that can be restored by RIES in the distribution network island; The optimal load reduction model calculation formula of the RIES-distribution network joint system is as follows: minF=f PSE +f ALW +f LC +f P Where: f PSE is the cost of purchasing and selling energy; ALW is the cost of abandoning solar power and wind power; LC Cost reduction for load; P Penalty for island load loss; Constraints include equipment failure constraints, energy balance constraints, equipment output constraints, energy storage constraints, load reduction constraints and tie line power constraints; f PSE The calculation formula is: Where: P E,t P is the RIES purchase / sale power at time t. G,t is the gas purchase power of RIES from the upper gas grid at time t, P E,t P is the purchase of electricity from the distribution network on behalf of RIES. E,t Negative means RIES sells electricity to the distribution network; p G,t is the gas purchase price at time t; T is the scheduling period; p E,t The purchase / sale price of electricity at time t: Where: is the electricity purchase price at time t, is the electricity selling price at time t; f ALW The calculation formula is: Where: R PV,t , R WT,t is the abandoned solar and wind power at time t; r PV 、r WT is the price of abandoned solar and wind power; T is the dispatching period; f LC The calculation formula is: Where: R E,t The power reduction of the electric load at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced; r E,t The price reduction for the electricity load at time t; The price reduction for the heat load that allows limited cooling and heating at time t; is the heat load reduction price that causes the outage at time t; T is the dispatch period; f P The calculation formula is: Where: N LP is the number of loads that cannot be powered in the island; r i is the weight coefficient of the load that cannot be powered in the island; is the power of the i-th load that cannot be powered at time t in the island; T is the scheduling period.
7. A distribution network reliability assessment device taking into account access to a regional integrated energy system according to claim 6, characterized in that: The step of obtaining the operating status of the distribution network and the RIES equipment components comprises the following steps: Generate two random numbers ξ1 and ξ2 between [0,1], and calculate the fault-free operation time TTF and fault repair time TTR of the distribution network and RIES equipment components according to the failure rate and repair rate of the distribution network and RIES equipment components. The calculation formula is: Among them, γ and μ are the failure rate and repair rate of the distribution network and RIES equipment components; The status of distribution network and RIES equipment components converts between normal operation and fault shutdown. Based on sequential Monte Carlo simulation, the operation status of the RIES-distribution network joint system is randomly sampled. Each time the distribution network or RIES equipment component with the smallest TTF is selected as the fault component, and the TTR of the fault component is used as the fault time. By analogy, the hourly component failures within the simulation period are obtained, and the fault day is obtained according to the hourly component failures within the period.
8. A distribution network reliability assessment device taking into account access to a regional integrated energy system according to claim 6, characterized in that: The calculation formula of the equipment failure constraint is as follows: Where: is the device K at time t i The power of, m is the total number of equipment in the RIES-distribution network joint system; Energy balance constraints include: The calculation formula of electric power balance constraint is as follows: Where: P is the charging and discharging power of the energy storage at time t; PV,t is the photovoltaic power generation power at time t, P WT,t is the wind power generation power at time t; R E,t is the load reduction power at time t, P E,t is the power purchased / sold by RIES at time t, PV,t , R WT,t is the abandoned solar and wind power at time t, is the power output of the cogeneration unit at time t, is the air intake power of the electric boiler at time t, L E,t It is an interruptible load; The thermal power balance constraint calculation formula is as follows: Where: is the thermal energy storage charging and discharging power at time t; The power reduction is for the heat load that allows limited cooling and heating at time t; The heat load that causes the power outage at time t is reduced. is the thermal output of the electric boiler at time t, is the thermal output of the cogeneration unit at time t, is the thermal output of the gas boiler at time t, L H,t is the user's heat load demand at time t; The calculation formula of gas power balance constraint is as follows: Where: is the charging and discharging power of the gas energy storage at time t, P G,t is the gas purchase power of RIES from the upper gas grid at time t, P CHP,t is the intake power of the cogeneration unit at time t, P GB,t is the gas boiler intake power at time t; The calculation formula for tie line power balance constraint is as follows: Where: P E,t The power purchased / sold by RIES online at time t, is the sum of all load powers in the island at time t, is the rated power of the distribution network load at time t, N LP The number of loads that cannot be powered in the isolated island; The equipment output constraint calculation formula is as follows: Where: It is the upper and lower limits of the thermal output of the cogeneration unit; It is the upper and lower limits of the thermal output of the gas boiler; It is the upper and lower limits of the thermal output of the electric boiler; The energy storage constraint calculation formula is as follows: Where: E k,min 、E k,max P is the upper and lower limits of the energy storage capacity of the kth type of energy storage equipment; ch k,max , P dis k,max I is the upper and lower limits of the charging and discharging power of the k-th type of energy storage equipment; k,t is a 0-1 variable representing the charge and discharge state, I k,t 1 means that the k-th energy storage device is charged at time t, I k,t 0 means that the k-th energy storage device releases energy at time t; E k,0 is the initial storage energy of the kth type of energy storage device, E k,T is the energy storage capacity of the kth type of energy storage device at time T, E k,t is the energy storage capacity of the kth type of energy storage device at time t, P ch k,t , P dis k,t is the charging and discharging power of the k-th type of energy storage device at time t; The load reduction constraint calculation formula is as follows: The calculation formula for tie line power constraint is as follows: Where: P E,max , P E,min P is the upper and lower limits of the interconnection line power; G,max It is the upper limit of RIES intake power.
9. A distribution network reliability assessment device taking into account access to a regional integrated energy system according to claim 6, characterized in that: The reliability index of the load point of the distribution network includes the annual average fault outage rate λ of the load point, the annual average outage duration u of the load point and the annual average outage duration r of the load point, and the calculation formula is: The distribution network system reliability index includes the system average power outage frequency SAIFI, the system average power outage duration SAIDI, the user average power outage duration CAIDI, the average system availability ASAI and the annual power shortage expected EENS, and the calculation formula is: The RIES energy supply reliability index includes the electricity / heat load reduction frequency FLC, the electricity / heat load reduction probability PLC and the annual load reduction expectation ELC, and the calculation formula is:
10. A distribution network reliability assessment device taking into account access to a regional integrated energy system according to claim 6, characterized in that: RIES-distribution network joint system includes: energy conversion equipment, energy storage equipment, renewable energy, multi-energy loads and distribution network; The energy conversion equipment includes: cogeneration units, gas boilers, and electric boilers; The calculation formula for the combined heat and power unit is: Where: P CHP,t is the air intake power of the cogeneration unit at time t; is the electrical and thermal output of the cogeneration unit at time t; The electrical and thermal efficiency of the cogeneration unit; The calculation formula for gas boiler is: Where: P GB,t is the gas boiler intake power at time t; is the thermal output of the gas boiler at time t; η GB is the thermal efficiency of the gas boiler; The calculation formula for electric boiler is: Where: is the air intake power of the electric boiler at time t; is the thermal output of the electric boiler at time t; η EB is the thermal efficiency of the electric boiler; The calculation formula for energy storage equipment is: Where: E k,t+1 E is the energy storage capacity of the kth type of energy storage device at time t+1; k,t P is the energy storage capacity of the kth type of energy storage device at time t; ch k,t , P dis k,t is the charging and discharging power of the k-th type of energy storage device at time t; η ch k , η dis k is the charging and discharging power efficiency of the kth type of energy storage device; η s k is the self-damage rate of the k-th type of energy storage equipment; the time interval Δt for energy storage state change is 1h; Renewable energy includes wind power generation and photovoltaic power generation, both of which use regional measured power data; The multi-energy load includes: RIES electric load, RIES thermal load, and distribution network load; The RIES electrical load calculation formula is: Where: The interruptible load L E,t Minimum and maximum power at time t; The RIES heat load calculation formula is: Where: C is the capacity of the hot water tank; R is the thermal resistance of the hot water tank; T t is the hot water temperature at time t; T t+1 is the hot water temperature at time t+1; T a,t is the ambient temperature at time t; c e is the specific heat capacity of water; q t T is the water consumption rate at time t; d is the desired temperature of hot water; T in is the cold water temperature entering the system; H t is the RIES heating power at time t; L H,t is the user's heat load demand at time t; The distribution network load calculation formula is: Where: L DN,t is the actual power consumption of the distribution network load at time t; is the rated power of the distribution network load at time t.
11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, a distribution network reliability assessment method taking into account access to a regional integrated energy system as described in any one of claims 1 to 5 is implemented.