Sleep control method and control terminal of UPS system
The load rate of the UPS system is updated through the principle of real-time sampling and sliding window, and the UPS unit is awakened according to the preset value, which solves the problem of slow response speed of the UPS system in the prior art and improves the stability of the system.
Patent Information
- Application Number
- CN202210899792.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-28
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2042-07-28
AI Technical Summary
In the prior art, the response speed of the UPS system wakes up the UPS unit is too slow, resulting in the stability of the UPS system being affected when the load changes.
By obtaining the output current and output voltage of the UPS system sampled within the preset time before the current time, the load rate is updated in real time, and the UPS unit in the sleep state is awakened according to the preset value, and the sliding window principle is used for real-time monitoring.
Real-time monitoring and rapid response to the load rate of the UPS system is realized, preventing overloading, and improving the stability of the UPS system.
Smart Images

Figure CN115347661B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power supply, and in particular to a sleep control method and a control terminal of a UPS system. Background Art
[0002] UPS (Uninterruptible Power Supply) is an energy supply device used to provide uninterrupted power supply to power electronic equipment. Modern UPS systems usually use multiple UPS units in parallel to ensure the reliability of power supply. Since the load is constantly changing, when the load is small, if all UPS units are put into use, the loss of UPS operation will cause a lot of energy waste. Therefore, when the load is too low, some UPS units will be controlled to sleep; when the load becomes larger, the UPS units will be awakened.
[0003] In the prior art, when the UPS is in sleep mode, the power of the UPS system is usually detected every preset time to wake up the UPS unit. If the load suddenly increases, the response speed of the above wake-up method is too slow, which will cause the inverter waveform of the UPS unit to be distorted, affecting the stability of the UPS system. Summary of the invention
[0004] The embodiment of the present invention provides a sleep control method and a control terminal for a UPS system, so as to solve the problem in the prior art that the UPS unit wake-up response speed is slow and affects the stability of the UPS system.
[0005] In a first aspect, an embodiment of the present invention provides a sleep control method for a UPS system, wherein the UPS system includes at least one UPS unit; the method includes:
[0006] Acquire multiple output currents and multiple output voltages of the UPS system sampled within a preset time period before the current moment;
[0007] Determine the load rate of the UPS system at the current moment according to the multiple output currents and the multiple output voltages;
[0008] If the load rate of the UPS system at the current moment is greater than the first preset value, some or all of the UPS units in the UPS system that are in a dormant state are awakened.
[0009] In a second aspect, an embodiment of the present invention provides a control terminal, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the sleep control method for a UPS system according to the first aspect or any possible implementation method of the first aspect are implemented.
[0010] The embodiment of the present invention provides a sleep control method and control terminal for a UPS system, the UPS system including at least one UPS unit; the method includes: obtaining multiple output currents and multiple output voltages of the UPS system sampled within a preset time period before the current moment; determining the load rate of the UPS system at the current moment according to the multiple output currents and multiple output voltages; if the load rate of the UPS system at the current moment is greater than a first preset value, waking up some or all of the UPS units in the sleep state in the UPS system. The embodiment of the present invention is based on the sliding window principle, and at each moment, multiple output voltages and multiple output currents within a preset time period before the current moment are obtained, and the load rate is updated in real time according to the voltage and current, so that the load rate can be monitored in real time, load changes can be detected in time, and UPS units in the sleep state can be woken up, with fast response speed, overload prevention, and effective improvement of the stability of the UPS system. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0012] Figure 1 is a flowchart of a sleep control method for a UPS system provided by an embodiment of the present invention;
[0013] Figure 2 is a structural schematic diagram of a sleep control device for a UPS system provided by an embodiment of the present invention;
[0014] Figure 3 is a schematic diagram of a control terminal provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0015] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0016] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0017] See also Figure 1, which shows a flowchart of the implementation of the sleep control method of the UPS system provided by an embodiment of the present invention, wherein the UPS system includes at least one UPS unit; the details are as follows:
[0018] The sleep control method of the UPS system includes:
[0019] S101: Acquire multiple output currents and multiple output voltages of a UPS system sampled within a preset time period before a current moment;
[0020] S102: determining a load rate of the UPS system at a current moment according to the multiple output currents and the multiple output voltages;
[0021] S103: If the load rate of the UPS system at the current moment is greater than a first preset value, wake up some or all of the UPS units in the UPS system that are in a dormant state.
[0022] The embodiment of the present invention is based on the sliding window principle. At each moment, multiple output currents and multiple output voltages of the UPS system sampled within a preset time period before the current moment are obtained. For example, at 10ms, multiple output currents and multiple output voltages collected within 8 to 9ms are obtained, at 11ms, multiple output currents and multiple output voltages collected within 9 to 10ms are obtained, at 12ms, multiple output voltages and multiple output currents collected within 10 to 11ms are obtained, and so on, to form a sliding window. In the embodiment of the present invention, steps S101 to S103 are repeatedly executed at each moment, and the load rate is updated in real time according to the output voltage and output current. The load rate can be monitored in real time. When it is found that the load rate is large, some or all UPS units in the dormant state are awakened in time to prevent overload. The response speed is fast, and the stability of the UPS system is effectively improved.
[0023] At the same time, by using multiple output voltages and multiple output currents within a preset time period to update the load rate, no malfunction will occur due to a single sampling error, effectively improving the accuracy of the control method.
[0024] In a possible implementation, S102 may include:
[0025] S1021: Determine a target output current of the UPS system according to the multiple output currents;
[0026] S1022: Determine a target output voltage of the UPS system according to the multiple output voltages;
[0027] S1023: Multiply the target output current by the target output voltage to obtain the actual output power of the UPS system
[0028] S1024: Divide the actual output power of the UPS system by the rated output power of the current UPS system to obtain the load rate of the UPS system at the current moment.
[0029] The load rate is the ratio of the actual output power of the device to the rated output power. In the embodiment of the present invention, the actual output power of the UPS system is determined according to the sliding window voltage and current, and then the load rate of the UPS system is calculated.
[0030] In a possible implementation manner, before S1024, S102 may further include:
[0031] S1025: Obtain the number of UPS units in the current UPS system that are in working state;
[0032] S1026: Multiply the number of UPS units in the current UPS system that are in working state by the rated output power of a single UPS unit to obtain the rated output power of the current UPS system.
[0033] Normally, the rated output power of each UPS unit is the same. The UPS units are connected in parallel to form a UPS system. The rated output power can be obtained by multiplying the number of UPS units in operation by the rated output power of a single UPS unit.
[0034] In a possible implementation, S1021 may include:
[0035] 1. Determine the average of multiple output currents to obtain the target output current;
[0036] S1022 may include:
[0037] 1. Determine the average of multiple output voltages to obtain the target output voltage.
[0038] In the embodiment of the present invention, the average value of multiple output currents can be used as the target output current, and the average value of multiple output voltages can be used as the target output voltage, so as to calculate and obtain the actual output power of the UPS system.
[0039] In a possible implementation, S103 may include:
[0040] S1031: Obtain the number of UPS units in the current UPS system that are in a dormant state;
[0041] S1032: If the number of UPS units in the current UPS system that are in a dormant state is less than a preset number, all the UPS units in a dormant state are awakened;
[0042] S1033: If the number of UPS units in the current UPS system that are in a dormant state is not less than a preset number, then wake up a preset number of UPS units that are in a dormant state.
[0043] In the embodiment of the present invention, when it is detected that the load rate of the UPS is greater than a first preset value, for example, the first preset value may be 0.9, that is, when the load rate of the UPS is already very high, the UPS units in the dormant state are awakened. Since the UPS is not overloaded at this time and the load change cannot be predicted, a preset number of UPS units may be awakened each time.
[0044] The preset number may be 2. Specifically, the value of the preset number may be set according to actual application conditions.
[0045] For example, when the load rate is greater than 0.9, two UPS units are awakened; at the next moment, the load rate is updated according to the sliding window voltage and current. If the load rate is still greater than 0.9, two more UPS units are awakened, and so on. This ensures that the number of awakened UPS units in the UPS system remains within a reasonable range, which can ensure power supply to the load without causing energy waste.
[0046] In a further implementation manner, the number of UPS units to be awakened may be determined according to the load rate.
[0047] For example, when the load is large, a larger number of UPS units are awakened; when the load rate is relatively small, a smaller number of UPS units are awakened, and the number of awakened units is determined according to the load rate. The details are not repeated here.
[0048] In a possible implementation, the above method may further include:
[0049] S104: Obtaining a change in the load rate of the UPS system;
[0050] S105: Adjusting the preset duration according to the change in the load factor of the UPS system.
[0051] The setting of the sliding window size (i.e., the preset duration) will have a certain impact on the monitoring of the load rate. For example, when the load rate changes greatly, setting the preset duration too long may cause the calculated load rate to be inaccurate. Therefore, the embodiment of the present invention can dynamically adjust the sliding window size (preset duration) according to the change in the load rate, thereby improving the accuracy of the control.
[0052] In a possible implementation, S105 may:
[0053] S1051: If the absolute value of the load rate change is greater than the preset change, setting the preset time length to a first preset time length;
[0054] S1051: If the absolute value of the change in the load rate is not greater than the preset change, setting the preset time length to a second preset time length;
[0055] Among them, the first preset time length is shorter than the second preset time length.
[0056] Based on the above, when the load rate changes greatly, the preset time length is set to a smaller first preset time length; when the load amount changes less, the preset time length is set to a larger second preset time length. The preset time length is dynamically adjusted to improve the control accuracy.
[0057] Furthermore, the preset duration may be dynamically adjusted according to the change in load, and is not limited to two values (the first preset duration and the second preset duration).
[0058] In a possible implementation, the above method may further include:
[0059] S106: if the load rate of the UPS system at the current moment is not greater than a second preset value, determining the number of dormant UPS units according to the load rate of the UPS system at the current moment; wherein the second preset value is less than the first preset value;
[0060] S107: Control a corresponding number of UPS units in the current UPS system that are in working state to enter a dormant state.
[0061] When the load rate of the UPS decreases, similarly, the corresponding number of UPS units are controlled to enter the sleep state according to the load rate, so as to control the number of UPS units in the awake state within a reasonable range to avoid resource waste. Among them, the second preset value can be smaller than the first preset value, and the two values are different and have a certain difference, so as to ensure that the UPS can work stably and will not wake up or sleep frequently due to errors.
[0062] In a possible implementation manner, the first preset value may range from 0.85 to 0.95.
[0063] In a possible implementation manner, the second preset value may range from 0.75 to 0.85.
[0064] In a possible implementation, S106 may include:
[0065] S1061: Determine the target number of UPS units in working state according to the load rate of the UPS system at the current moment;
[0066] S1062: Subtract the target number from the number of UPS units in the current UPS system that are in working state to obtain the number of dormant UPS units.
[0067] Specifically, the target number m xThe calculation formula can be:
[0068]
[0069] Among them, m t is the number of UPS units currently in operation, k t is the load rate at the current moment, and k0 is the optimal load rate.
[0070] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0071] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.
[0072] Figure 2 A schematic diagram of the structure of a sleep control device for a UPS system provided by an embodiment of the present invention is shown. For ease of description, only the parts related to the embodiment of the present invention are shown, which are described in detail as follows:
[0073] The UPS system includes at least one UPS unit; Figure 2 As shown, the sleep control device of the UPS system includes:
[0074] The sampling and obtaining module 21 is used to obtain multiple output currents and multiple output voltages of the UPS system sampled within a preset time period before the current moment;
[0075] A load rate updating module 22, used to determine the load rate of the UPS system at the current moment according to the multiple output currents and the multiple output voltages;
[0076] The wake-up control module 23 is used to wake up some or all of the UPS units in the UPS system that are in a dormant state if the load rate of the UPS system at the current moment is greater than a first preset value.
[0077] In a possible implementation, the load rate updating module 22 may include:
[0078] A target current determination unit, used to determine a target output current of the UPS system according to a plurality of output currents;
[0079] A target voltage determination unit, used to determine a target output voltage of the UPS system according to a plurality of output voltages;
[0080] The output power determination unit is used to multiply the target output current by the target output voltage to obtain the actual output power of the UPS system.
[0081] The load factor determination unit is used to divide the actual output power of the UPS system by the rated output power of the current UPS system to obtain the load factor of the UPS system at the current moment.
[0082] In a possible implementation, the load rate updating module 22 may include:
[0083] A parameter acquisition unit, used to acquire the number of UPS units in working state in the current UPS system;
[0084] The rated power determination unit is used to multiply the number of UPS units in working state in the current UPS system by the rated output power of a single UPS unit to obtain the rated output power of the current UPS system.
[0085] In a possible implementation manner, the target current determination unit may be specifically configured to:
[0086] Determine the average of multiple output currents to obtain a target output current;
[0087] The target voltage determination unit may be specifically configured to:
[0088] An average of the multiple output voltages is determined to obtain a target output voltage.
[0089] In a possible implementation, the wake-up module 23 may include:
[0090] A dormant number acquisition unit, used to acquire the number of UPS units in a dormant state in the current UPS system;
[0091] A first judgment unit is used to wake up all the UPS units in the dormant state if the number of UPS units in the current UPS system in the dormant state is less than a preset number;
[0092] The second judgment unit is used to wake up a preset number of UPS units in a dormant state if the number of UPS units in a dormant state in the current UPS system is not less than a preset number.
[0093] In a possible implementation manner, the above device may further include:
[0094] A change acquisition module is used to acquire the change of the load rate of the UPS system;
[0095] The sliding window adjustment module is used to adjust the preset duration according to the change in the load rate of the UPS system.
[0096] In a possible implementation, the sliding window adjustment module may include:
[0097] a third judgment unit, configured to set the preset time length to a first preset time length if the absolute value of the load rate change is greater than a preset change;
[0098] a fourth judgment unit, configured to set the preset time length to a second preset time length if the absolute value of the load rate change is not greater than the preset change;
[0099] Among them, the first preset time length is shorter than the second preset time length.
[0100] In a possible implementation manner, the above device may further include:
[0101] A sleep quantity determination module, used to determine the sleep quantity of UPS units according to the load rate of the UPS system at the current moment if the load rate of the UPS system at the current moment is not greater than a second preset value; wherein the second preset value is less than the first preset value;
[0102] The sleep control module is used to control a corresponding number of UPS units in the current UPS system that are in working state to enter a sleep state.
[0103] In a possible implementation, the sleep quantity determination module may include:
[0104] A target quantity determination unit, used to determine the target quantity of UPS units in working state according to the load rate of the UPS system at the current moment;
[0105] The sleep quantity output unit is used to subtract the target quantity from the quantity of UPS units in working state of the current UPS system to obtain the sleep quantity of UPS units.
[0106] Figure 3 Schematic diagram of a control terminal provided by an embodiment of the present invention. Figure 3 As shown, the control terminal 3 of this embodiment includes: a processor 30 and a memory 31. The memory 31 is used to store a computer program 32, and the processor 30 is used to call and run the computer program 32 stored in the memory 31 to execute the steps in the above-mentioned embodiments of the sleep control method of each UPS system, such as Figure 1 Alternatively, the processor 30 is used to call and run the computer program 32 stored in the memory 31 to implement the functions of each module / unit in the above-mentioned device embodiments, such as Figure 2 The functions of modules 21 to 23 are shown.
[0107] Exemplarily, the computer program 32 may be divided into one or more modules / units, one or more modules / units are stored in the memory 31 and executed by the processor 30 to implement the present invention. One or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, and the instruction segments are used to describe the execution process of the computer program 32 in the control terminal 3. For example, the computer program 32 may be divided into Figure 2 Modules / units 21 to 23 are shown.
[0108] The control terminal 3 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The control terminal 3 may include, but is not limited to, a processor 30 and a memory 31. Those skilled in the art will appreciate that Figure 3 It is only an example of the control terminal 3 and does not constitute a limitation on the control terminal 3. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the terminal may also include input and output devices, network access devices, buses, etc.
[0109] The processor 30 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0110] The memory 31 may be an internal storage unit of the control terminal 3, such as a hard disk or memory of the control terminal 3. The memory 31 may also be an external storage device of the control terminal 3, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the control terminal 3. Further, the memory 31 may also include both an internal storage unit of the control terminal 3 and an external storage device. The memory 31 is used to store computer programs and other programs and data required by the terminal. The memory 31 may also be used to temporarily store data that has been output or is to be output.
[0111] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0112] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0113] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0114] In the embodiments provided by the present invention, it should be understood that the disclosed devices / terminals and methods can be implemented in other ways. For example, the device / terminal embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0115] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0116] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0117] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signal, telecommunication signal and software distribution medium, etc.
[0118] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.
Claims
1. A sleep control method for a UPS system, characterized in that: The UPS system comprises at least one UPS unit; the method comprises: Acquire multiple output currents and multiple output voltages of the UPS system sampled within a preset time period before the current moment; Determining a load rate of the UPS system at a current moment according to the multiple output currents and the multiple output voltages; If the load rate of the UPS system at the current moment is greater than a first preset value, waking up some or all of the UPS units in the UPS system that are in a dormant state; The method further comprises: Obtaining a change in the load rate of the UPS system; If the absolute value of the load rate change is greater than the preset change, the preset time length is set to a first preset time length; If the absolute value of the load rate change is not greater than the preset change, setting the preset time length to a second preset time length; Among them, the first preset time length is shorter than the second preset time length.
2. The sleep control method of the UPS system according to claim 1, characterized in that: Determining the load rate of the UPS system at a current moment according to the multiple output currents and the multiple output voltages includes: Determining a target output current of the UPS system according to the multiple output currents; Determining a target output voltage of the UPS system according to the multiple output voltages; The target output current is multiplied by the target output voltage to obtain the actual output power of the UPS system. The actual output power of the UPS system is divided by the current rated output power of the UPS system to obtain the load rate of the UPS system at the current moment.
3. The sleep control method of the UPS system according to claim 2, characterized in that: Before obtaining the load rate of the UPS system at the current moment by dividing the actual output power of the UPS system by the current rated output power of the UPS system, the method further includes: Obtaining the number of UPS units currently in operation in the UPS system; The rated output power of the current UPS system is obtained by multiplying the number of UPS units in working state in the current UPS system by the rated output power of a single UPS unit.
4. The sleep control method of the UPS system according to claim 2, characterized in that: The step of determining a target output current of the UPS system according to the multiple output currents includes: Determining an average value of the multiple output currents to obtain the target output current; The step of determining a target output voltage of the UPS system according to the multiple output voltages includes: An average value of the plurality of output voltages is determined to obtain the target output voltage.
5. The sleep control method of a UPS system according to any one of claims 1 to 4, characterized in that: The step of waking up some or all of the UPS units in the UPS system that are in a dormant state comprises: Obtaining the number of UPS units currently in the UPS system that are in a dormant state; If the number of UPS units in the current UPS system that are in a dormant state is less than a preset number, waking up all the UPS units in a dormant state; If the number of UPS units in the current UPS system that are in a dormant state is not less than the preset number, the preset number of UPS units in a dormant state are awakened.
6. The sleep control method of a UPS system according to any one of claims 1 to 4, characterized in that: The method further comprises: If the load rate of the UPS system at the current moment is not greater than a second preset value, determining the number of dormant UPS units according to the load rate of the UPS system at the current moment; wherein the second preset value is less than the first preset value; Control a corresponding number of UPS units currently in the UPS system that are in working state to enter a dormant state.
7. The sleep control method of a UPS system according to claim 6, characterized in that: The step of determining the number of dormant UPS units according to the load rate of the UPS system at the current moment includes: Determining a target number of UPS units in working state according to a load rate of the UPS system at a current moment; The number of UPS units in the current working state of the UPS system is subtracted from the target number to obtain the number of dormant UPS units.
8. A control terminal, characterized in that: The system comprises a processor and a memory, wherein the memory is used to store a computer program, and the processor is used to call and run the computer program stored in the memory to execute the sleep control method of the UPS system according to any one of claims 1 to 7.
Citation Information
Patent Citations
Energy-saving control circuit, energy-saving control method and switching power supply
CN104935160A
Electrical equipment operation control method and terminal equipment
CN111697556A
Device and method for power control
JP2017011857A