A steel truss bridge pipe installation device and use method thereof

By designing the installation device of steel truss bridge bridge pipes and using the installation track mechanism and clamping mechanism, the problems of complex installation and low construction efficiency of large water supply pipeline bridges on steel truss bridges are solved, and a more efficient construction process and a wider range of construction applicability.

CN115370827BActive Publication Date: 2025-02-14CHINA CONSTR FIRST GROUP THE FIFTH CONSTR +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210868335.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-22
Publication Date
2025-02-14
Estimated Expiration
2042-07-22

AI Technical Summary

Technical Problem

The installation method of large water supply pipeline bridges on steel truss bridges is complicated, the construction is difficult and the construction efficiency is low.

Method used

Design a steel truss bridge bridge pipe installation device, adopts an installation track mechanism, rotates on the double-headed bolts through the bearing, reduces the resistance of the pipe when entering the steel truss, and sets up a clamping mechanism and a sliding shell to adjust the position of the pipe. Avoid offsets.

Benefits of technology

It reduces the installation difficulty of large water supply pipeline bridges on steel truss bridges, reduces construction difficulty, improves construction efficiency, and improves the adaptability and versatility of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115370827B_ABST
    Figure CN115370827B_ABST
Patent Text Reader

Abstract

The present application relates to a steel truss bridge pipe installation device and a method for using the same, and relates to the field of pipeline installation, which includes a steel truss, a mounting track mechanism is installed in the steel truss, and a pipeline is installed on the mounting track mechanism; the mounting track mechanism includes two symmetrically arranged I-beams, both of which are installed at the bottom of the inner wall of the steel truss, and a number of evenly distributed studs are threadedly connected between the two I-beams, and nuts are threadedly connected at both ends of the studs, and bearings are rotatably sleeved on the studs; a number of groups of symmetrically arranged sliding housings are arranged on the I-beams, and the sliding housings are slidably sleeved on the I-beams, and a clamping mechanism is installed on the sliding housing, and a first pulley mechanism is arranged on one side of the sliding housing, and a second pulley mechanism is arranged on the first pulley mechanism; a third pulley mechanism is installed on the side of the sliding housing away from the first pulley mechanism. The present application has the effect of reducing construction difficulty and improving construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of pipeline installation, and in particular to a steel truss bridge pipe installation device and a method of using the same. Background Art

[0002] In municipal water supply pipeline projects, when the pipeline is designed to be installed on a steel truss, it is usually considered to install the main truss first, and then hoist the pipeline as a whole, so that the construction can be completed in one go. However, when the design crosses a suburban river and the terrain environment is relatively complex, the installation of steel trusses and large-diameter water supply pipelines becomes more difficult. The steel truss bridge must be hoisted as a whole to ensure the ease of truss construction. Therefore, the pipeline cannot be hoisted.

[0003] With respect to the above-mentioned related technologies, the inventors believe that the current installation method of large water supply pipeline bridge pipes on steel truss bridges is complicated, the construction is difficult, and the construction efficiency is low. Summary of the invention

[0004] In order to reduce the difficulty of installing large water supply pipeline bridge pipes on steel truss bridges, reduce construction difficulty, and improve construction efficiency, the present application provides a steel truss bridge bridge pipe installation device and a method of using the same.

[0005] In a first aspect, the present application provides a steel truss bridge pipe installation device, which adopts the following technical solution:

[0006] A steel truss bridge pipe installation device comprises a steel truss, a mounting track mechanism is installed in the steel truss, and a pipe is installed on the mounting track mechanism;

[0007] The track installation mechanism comprises two symmetrically arranged I-beams, both of which are installed at the bottom of the inner wall of the steel truss, and a number of evenly distributed stud bolts are threadedly connected between the two I-beams, and nuts are threadedly connected at both ends of the stud bolts, and bearings are rotatably sleeved on the stud bolts;

[0008] The I-beam is provided with a plurality of symmetrically arranged sliding housings, the sliding housings are slidably sleeved on the I-beam, a clamping mechanism is installed on the sliding housing, a first pulley mechanism is provided on one side of the sliding housing, and a second pulley mechanism is provided on the first pulley mechanism;

[0009] A third pulley mechanism is installed in the sliding housing at a side away from the first pulley mechanism.

[0010] By adopting the above technical solution, an installation track mechanism is set up, which rotates on the stud bolts through bearings, thereby reducing the resistance encountered by the pipeline when entering the steel truss, reducing the difficulty of installing large water supply pipeline bridge pipes on the steel truss bridge, reducing the construction difficulty, and improving construction efficiency.

[0011] Optionally, the clamping mechanism includes a first support plate, the first support plate is fixedly mounted on the sliding shell, a first shock absorbing assembly is fixedly mounted on one end of the first support plate away from the sliding shell, and a first connecting rod is mounted on the first shock absorbing assembly.

[0012] Optionally, the clamping mechanism further includes a second shock absorbing assembly, the second shock absorbing assembly is fixedly mounted on a side of the sliding housing close to the pipe, and a second connecting rod is mounted on the second shock absorbing assembly.

[0013] By adopting the above technical solution, a first shock-absorbing assembly and a second shock-absorbing assembly are set. When the pipeline vibrates during installation, the first shock-absorbing assembly and the second shock-absorbing assembly respectively produce a shock-absorbing effect on the first connecting rod or the second connecting rod, thereby avoiding damage to the structure or damage to the pipeline.

[0014] Optionally, one end of the first connecting rod away from the first shock absorbing assembly and one end of the second connecting rod away from the second shock absorbing assembly are both fixedly connected to an abutment plate, and a damping roller is rotatably connected to the abutment plate on a side close to the pipe, and the damping roller abuts against the outer wall of the pipe.

[0015] By adopting the above technical solution, a damping roller is provided and the damping roller is always in contact with the pipeline, thereby reducing the resistance when the pipeline enters the steel truss, and at the same time reducing the friction on the outer wall of the pipeline to avoid damage to the pipeline.

[0016] Optionally, the first shock absorbing assembly and the second shock absorbing assembly both comprise a shock absorbing shell, and a shock absorbing spring is arranged in the shock absorbing shell;

[0017] The shock absorbing shell of the first shock absorbing assembly is fixedly mounted on the first supporting plate, a first connecting rod is slidably sleeved in the shock absorbing shell of the first shock absorbing assembly, and one end of the first connecting rod away from the abutting plate abuts against the shock absorbing spring of the first shock absorbing assembly;

[0018] The shock absorbing shell of the second shock absorbing assembly is fixedly mounted on the sliding shell. A second connecting rod is slidably sleeved in the shock absorbing shell of the second shock absorbing assembly. One end of the second connecting rod away from the abutment plate abuts against the shock absorbing spring of the second shock absorbing assembly.

[0019] By adopting the above technical solution, the first shock absorbing assembly and the second shock absorbing assembly are both provided with a shock absorbing shell. When the pipeline vibrates during installation, the first connecting rod or the second connecting rod is displaced. Under the action of the shock absorbing spring, damage to the pipeline during installation is avoided.

[0020] Optionally, a plurality of limiting holes are evenly arranged on the first connecting rod and the second connecting rod, and a plurality of the limiting holes arranged on the first connecting rod and the second connecting rod each have a limiting rod sleeved thereon, and one end of the two limiting rods away from the limiting holes are symmetrically slidably sleeved in a limiting sleeve, and a first spring is arranged in the limiting sleeve, and two ends of the first spring are respectively fixedly connected to the two limiting rods sleeved in the limiting sleeve;

[0021] The outer wall of the limiting sleeve is fixedly connected to a third connecting rod, one end of the third connecting rod away from the limiting sleeve is slidably sleeved on the sleeve connecting rod, and both ends of the sleeve connecting rod are fixedly connected to second support plates, and two second support plates are fixedly mounted on the sliding housing;

[0022] Two second springs are sleeved on the circumferential side of the sleeve rod.

[0023] By adopting the above technical solution, a limit rod is set and a limit hole is opened on the limit rod, the limit rod is sleeved in the limit hole, and the limit rod is always sleeved in the limit hole through a first spring. A plurality of limit holes are set to control the length of the first connecting rod and the second connecting rod, and then the distance between the two symmetrically arranged clamping mechanisms is controlled. By adjusting the distance between the clamping mechanisms, the bridge pipe installation device of the steel truss bridge can be adapted to install pipes of various different diameters, thereby improving the adaptability and versatility of the bridge pipe installation device of the steel truss bridge.

[0024] Optionally, the first pulley mechanism includes a first roller, the first roller is installed in a steel groove on a side of the I-beam away from the bearing, the first roller is fixedly sleeved with a first rotating shaft, a fixing plate is fixedly sleeved on the first rotating shaft, a spiral groove is provided on the fixing plate, a stopper is slidably connected in the spiral groove, a stopper is abutted on one side of the stopper, and an end of the stopper away from the stopper is fixedly installed on the first rotating shaft;

[0025] One end of the first rotating shaft away from the first roller is rotatably connected to the sliding housing.

[0026] By adopting the above technical solution, the rotation of the first roller drives the first rotating shaft to rotate, and then drives the gear lever to rotate. The rotation of the gear lever drives the stop block to slide from the center position to the direction away from the center position in the spiral groove until the gear lever is stuck at the end of the spiral groove and the position of the gear lever is limited, so that the first roller and the first rotating shaft stop rotating, and the sliding shell stops moving, so that the clamping mechanism can stop at the middle position of the I-beam, and the middle position of the pipeline is adjusted to ensure that the pipeline will not shift during installation.

[0027] Optionally, the second pulley mechanism includes an active bevel gear, the active bevel gear is fixedly sleeved on the first rotating shaft, the active bevel gear is meshedly connected with a driven bevel gear, the driven bevel gear is fixedly sleeved on the second rotating shaft, the second rotating shaft is rotatably sleeved on a third support plate, and the third support plate is fixedly mounted on the sliding housing;

[0028] A second roller is fixedly sleeved on one end of the second rotating shaft away from the driven bevel gear, and the second roller abuts against a side of the I-beam away from the bearing.

[0029] By adopting the above technical solution, the rotation of the first rotating shaft drives the active bevel gear to rotate, and the rotation of the active bevel gear drives the driven bevel gear to rotate, and the rotation of the driven bevel gear drives the second rotating shaft and the second roller to rotate, so that the second roller slides on the sliding shell, reducing the sliding resistance of the sliding shell on the I-beam.

[0030] Optionally, the third pulley mechanism includes two symmetrically arranged supporting rails, and the two supporting rails are fixedly mounted on a side of the sliding housing away from the first pulley mechanism;

[0031] A slide groove is provided on the side where the two supporting slide rails are close to each other, a third rotating shaft is slidably connected in the two slide grooves, and a third roller is rotatably sleeved on the third rotating shaft;

[0032] Two ends of the third rotating shaft are butted against by symmetrically arranged third springs, two of the third springs are respectively installed in two symmetrically arranged sliding grooves, and one end of the two third springs away from the third rotating shaft is fixedly installed on the sliding housing.

[0033] By adopting the above technical solution, under the thrust of the third spring, the third rotating shaft drives the third roller to move towards the I-beam, and the third roller is always in contact with the I-beam, thereby reducing the resistance between the sliding housing and the I-beam.

[0034] In a second aspect, the present application provides a method for using a steel truss bridge pipe installation device, which adopts the following technical solution:

[0035] A method for using a steel truss bridge pipe installation device comprises the following working steps:

[0036] S1. Preparation work: First, survey the steel trusses at the construction site to determine the length of the pipeline and the number of sliding shells on the I-beams and various mechanisms on the sliding shells;

[0037] S2. Lay and install the track mechanism, lay two symmetrically arranged I-beams on the steel truss, sleeve bearings on the stud bolts and thread a number of stud bolts on the I-beams;

[0038] S3. Install the anti-deviating device. According to the length of the pipeline, install several sets of sliding shells and various mechanisms installed on the sliding shells on the laid I-beams;

[0039] S4, installing the pipeline, installing the pipeline on the installation track mechanism;

[0040] S5. After the construction is completed and the pipeline is installed, the track mechanism is removed, the sliding shell and various mechanisms on the sliding shell are installed, and the position of the pipeline is fixed.

[0041] By adopting the above technical solution and setting up an installation track mechanism, the resistance encountered by the smaller pipeline when entering the steel truss is reduced, the construction difficulty is reduced, and the construction efficiency is improved. At the same time, by installing the sliding shell and various mechanisms on the sliding shell, the pipeline is adjusted to ensure that the pipeline is in the center of the steel truss and prevent the pipeline from shifting.

[0042] In summary, the present application includes at least one of the following beneficial technical effects:

[0043] 1. Set up the installation track mechanism, which rotates on the stud bolts through the bearings to reduce the resistance of the pipeline when entering the steel truss, reduce the difficulty of installing large water supply pipeline bridge pipes on the steel truss bridge, reduce the construction difficulty, and improve the construction efficiency;

[0044] 2. A limit rod is provided and a limit hole is opened on the limit rod, the limit rod is sleeved in the limit hole, and the limit rod is always sleeved in the limit hole by a first spring. A plurality of limit holes are provided to control the length of the first connecting rod and the second connecting rod, and then the distance between the two symmetrically arranged clamping mechanisms is controlled. By adjusting the distance between the clamping mechanisms, the steel truss bridge pipe installation device can be adapted to install a variety of pipes with different pipe diameters, thereby improving the adaptability and versatility of the steel truss bridge pipe installation device;

[0045] 3. The rotation of the first roller drives the first rotating shaft to rotate, and then drives the shift rod to rotate. The rotation of the shift rod drives the stop block to slide from the center position to the direction away from the center position in the spiral groove until the shift rod is stuck at the end of the spiral groove and the position of the shift rod is limited, so that the first roller and the first rotating shaft stop rotating, and the sliding shell stops moving, so that the clamping mechanism can stop at the middle position of the I-beam, and the middle position of the pipeline is adjusted to ensure that the pipeline will not shift during installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application;

[0047] Figure 2 It is a structural schematic diagram of the track mechanism installed in the embodiment of the present application;

[0048] Figure 3is a schematic structural diagram of the clamping mechanism of an embodiment of the present application;

[0049] Figure 4 is a cross-sectional view of the clamping mechanism of an embodiment of the present application;

[0050] Figure 5 is a cross-sectional view of the first pulley mechanism of the embodiment of the present application;

[0051] Figure 6 It is an enlarged view of Example A of the present application.

[0052] Description of reference numerals: 1. steel truss; 2. mounting rail mechanism; 21. I-beam; 22. stud bolt; 23. nut; 24. bearing; 3. pipeline; 4. sliding housing; 5. clamping mechanism; 51. first support plate; 52. first shock-absorbing assembly; 521. shock-absorbing housing; 522. shock-absorbing spring; 53. first connecting rod; 54. second shock-absorbing assembly; 55. second connecting rod; 56. abutment plate; 57. damping roller; 58. limiting hole; 59. limiting rod; 510. limiting sleeve; 511. first spring; 512 , the third connecting rod; 513, the sleeve rod; 514, the second support plate; 515, the second spring; 6, the first pulley mechanism; 61, the first roller; 62, the first rotating shaft; 63, the fixed plate; 64, the spiral groove; 65, the block; 66, the gear lever; 7, the second pulley mechanism; 71, the active bevel gear; 72, the driven bevel gear; 73, the second rotating shaft; 74, the third support plate; 75, the second roller; 8, the third pulley mechanism; 81, the supporting slide rail; 82, the slide groove; 83, the third rotating shaft; 84, the third roller; 85, the third spring. DETAILED DESCRIPTION

[0053] The following is combined with Figure 1-6 This application is described in further detail.

[0054] An embodiment of the present application discloses a bridge tube installation device for a steel truss bridge.

[0055] Reference Figure 1 A steel truss bridge pipe installation device includes a steel truss 1, a mounting track mechanism 2 is installed on the steel truss 1, a pipe 3 is abutted on the mounting track mechanism 2, clamping mechanisms 5 are abutted at both ends of the pipe 3, the clamping mechanism 5 is installed on a sliding shell 4, and the sliding shell 4 is symmetrically slidably installed on both sides of the mounting track mechanism 2. A first pulley mechanism 6 is also installed on the sliding shell 4, a second pulley mechanism 7 is installed on the first pulley mechanism 6, and a third pulley mechanism 8 is installed at one end of the sliding shell 4 away from the first pulley mechanism 6.

[0056] When a steel truss bridge pipe installation device is working, the pipeline 3 is transported by the installation track mechanism 2 so that the pipeline 3 is installed in the steel truss 1. At the same time, the sliding shell 4 slides on both sides of the installation track mechanism 2 to control the position of the clamping mechanism 5, and adjusts the different positions of the pipeline 3 to ensure that the pipeline 3 will not shift during the installation process. At the same time, by setting the second pulley mechanism 7 and the third sliding mechanism, the sliding resistance of the sliding shell 4 on the installation track mechanism 2 is reduced, the difficulty of installing the pipeline 3 is reduced, and the construction efficiency is improved.

[0057] Reference Figure 1 and Figure 2 The mounting track mechanism 2 includes two symmetrically arranged I-beams 21, which are installed on the inner wall of the steel truss 1. The two I-beams 21 are fixedly connected by a number of evenly arranged stud bolts 22 threadedly connected to the steel groove. Nuts 23 are threadedly connected to both ends of the stud bolts 22. A bearing 24 is sleeved on the circumference of the stud bolt 22. The bearing 24 is a linear optical axis. The axial length of the bearing 24 is less than the distance between the steel grooves of the two I-beams 21, and the bearing 24 is abutted against a pipe 3.

[0058] When the track mechanism 2 is installed, the pipe 3 abuts against the bearing 24, and the construction personnel push the end of the pipe 3 away from the steel truss 1 to move toward the end close to the steel truss 1. During the movement of the pipe 3, the bearing 24 rotates in the axial direction of the stud bolt 22, reducing the resistance encountered by the pipe 3 when entering the steel truss 1 and reducing the difficulty of the construction operation.

[0059] Reference Figure 3 and Figure 4The clamping mechanism 5 includes two symmetrically arranged second support plates 514, a sleeve rod 513 is fixedly installed between the two second support plates 514, and two symmetrically arranged second springs 515 are sleeved on the circumferential side of the sleeve rod 513. The ends of the two second springs 515 away from each other are respectively abutted on the sides of the two second support plates 514 close to each other, and the ends of the two second springs 515 close to each other are abutted on the third connecting rod 512. The end of the third connecting rod 512 away from the sleeve rod 513 is fixedly connected to the limiting sleeve 510. The limiting sleeve 510 is symmetrically slidably sleeved with two limiting rods 59 in the axial direction, and the ends of the two limiting rods 59 close to each other are connected to the first spring 511. A first connecting rod 53 is provided at one end of the limiting rod 59 away from the bearing 24 of the two limiting rods 59, and a plurality of evenly arranged limiting holes 58 are opened on the first connecting rod 53. One end of the limiting rod 59 away from the bearing 24 is slidably sleeved in one of the plurality of limiting holes 58, and one end of the first connecting rod 53 away from the pipeline 3 is slidably sleeved in the shock absorbing shell 521 of the first shock absorbing assembly 52. ​​A shock absorbing spring 522 is also installed in the shock absorbing shell 521 of the first shock absorbing assembly 52, and the shock absorbing spring 522 of the first shock absorbing assembly 52 abuts against the first connecting rod 53. The shock absorbing shell 521 of the first shock absorbing assembly 52 is fixedly installed on the first support plate 51, and one end of the first support plate 51 away from the shock absorbing shell 521 of the first shock absorbing assembly 52 is fixedly installed on the sliding shell 4. The second connecting rod 55 is provided at one end of the limiting rod 59 close to the bearing 24 of the two limiting rods 59. The second connecting rod 55 is provided with a plurality of uniformly arranged limiting holes 58. The limiting rod 59 close to the bearing 24 is slidably sleeved in one of the plurality of limiting holes 58. The end of the second connecting rod 55 away from the pipe 3 is slidably sleeved in the damping housing 521 of the second damping assembly 54. A damping spring 522 is also installed in the damping housing 521 of the second damping assembly 54. The damping spring 522 of the second damping assembly 54 abuts against the second connecting rod 55. The damping housing 521 of the second damping assembly 54 is fixedly installed on the sliding housing 4. The ends of the first connecting rod 53 and the second connecting rod 55 away from the damping housing 521 are fixedly installed with abutting plates 56. The cross-sectional shape of the abutting plates 56 is trapezoidal. A damping roller 57 is installed on the side of the abutting plates 56 close to the pipe 3.

[0060] When the clamping mechanism 5 is working, firstly, the limiting hole 58 in which the limiting rod 59 is slidably sleeved is adjusted, and then the distance between the two symmetrically arranged clamping mechanisms 5 is adjusted, so that the clamping mechanism 5 can adapt to pipes 3 of different diameters. When the pipe 3 moves on the mounting track mechanism 2, under the thrust of the shock-absorbing spring 522, the damping roller 57 always abuts against the outer wall of the pipe 3, ensuring that the pipe 3 is in the center position of the mounting track mechanism 2, thereby avoiding the pipe 3 from being offset during the installation process, thereby causing damage to the outer wall of the pipe 3.

[0061] Reference Figure 3 and Figure 5 The first pulley mechanism 6 includes a first roller 61, which is arranged in a steel groove on the side of the I-beam 21 away from the stud bolt 22. A first rotating shaft 62 is fixedly sleeved on the side of the first roller 61 away from the stud bolt 22. One end of the first rotating shaft 62 away from the first roller 61 is rotatably connected to the sliding housing 4. A shift rod 66 is fixedly connected to the end of the first rotating shaft 62 close to the sliding housing 4. A stopper 65 is abutted against the end of the shift rod 66 away from the first rotating shaft 62. A fixing plate 63 is rotatably sleeved on the first rotating shaft 62. The fixing plate 63 is fixedly installed on the sliding housing 4. A spiral groove 64 is provided on the side of the fixing plate 63 away from the first roller 61. A stopper 65 is slidably connected in the spiral groove 64.

[0062] When the pipeline 3 is being installed, when the pipeline 3 moves in the direction of entering the steel truss 1, the sliding shell 4 is driven to slide on the I-beam 21 under the action of the clamping mechanism 5, and at the same time, the first roller 61 rolls on the I-beam 21. While the first roller 61 rolls, it drives the first rotating shaft 62 to rotate. The rotation of the first rotating shaft 62 drives the shift rod 66 to rotate around the axis of the first rotating shaft 62. The rotation of the shift rod 66 drives the stopper 65 to slide in the spiral groove 64. As the first rotating shaft 62 drives the shift rod 66 to rotate, it drives the stopper 65 to slide in the spiral groove 64 from the center position to the direction away from the center position until the stopper 65 slides to the end of the spiral groove 64 and the stopper 65 stops sliding. When the stopper 65 stops sliding, the stopper 65 abuts against the lever 66, causing the lever 66 to stop rotating, thereby causing the first rotating shaft 62 to stop rotating. When the first rotating shaft 62 stops rotating, the first roller 61 stops rotating, causing the first pulley mechanism 6 to stop sliding on the I-beam 21, thereby causing the sliding housing 4 to stop sliding on the I-beam 21. When the pipeline 3 enters the steel truss 1, the sliding housing 4 and the various mechanisms provided on the sliding housing 4 enter the steel truss 1 together with the pipeline 3. Then, under the action of the first pulley mechanism 6, the sliding housing 4 stops sliding when it slides to the middle section of the I-beam 21, so that the clamping mechanism 5 can adjust the position of the middle section of the pipeline 3.

[0063] Reference Figure 3 and Figure 4 The second pulley mechanism 7 includes an active bevel gear 71, which is fixedly sleeved on the first rotating shaft 62, and a driven bevel gear 72 is meshedly connected to the active bevel gear 71, and a second rotating shaft 73 is fixedly sleeved on the driven bevel gear 72. The second rotating shaft 73 is rotatably sleeved on a third supporting plate 74, and one end of the third supporting plate 74 away from the second rotating shaft 73 is fixedly installed on the sliding housing 4, and one end of the second rotating shaft 73 away from the driven bevel gear 72 is fixedly sleeved with a second roller 75, and the second roller 75 abuts against the I-beam 21.

[0064] When the first roller 61 rotates on the I-beam 21, the first roller 61 drives the first rotating shaft 62 to rotate, the first rotating shaft 62 drives the active bevel gear 71 to rotate, the first active bevel gear 71 drives the driven bevel gear 72 to rotate, the driven bevel gear 72 drives the second roller 75 to rotate through the second rotating shaft 73, so as to facilitate the sliding of the sliding housing 4 on the I-beam 21 and reduce the resistance of the sliding housing 4 when sliding.

[0065] Reference Figure 4 and Figure 6 The third pulley mechanism 8 includes two support rails 81 symmetrically fixedly mounted on the sliding housing 4. A slide groove 82 is provided on the side of the two support rails 81 close to each other. A third rotating shaft 83 is slidably connected in the two slide grooves 82. A third roller 84 is slidably sleeved on the third rotating shaft 83. The third roller 84 abuts against the I-beam 21. A third spring 85 is installed in each of the two slide grooves 82. One end of the third spring 85 is fixedly connected to the inner wall of the slide groove 82. One end of the third spring 85 away from the inner wall of the slide groove 82 abuts against the third rotating shaft 83.

[0066] When the third pulley mechanism 8 is working, the third roller 84 is always in contact with the I-beam 21 under the push of the third spring 85, reducing the resistance between the I-beam 21 and the sliding housing 4. When the sliding housing 4 moves on the I-beam 21, it drives the third roller 84 to rotate.

[0067] The implementation principle of one embodiment of the present application is as follows: when a steel truss bridge pipe installation device is working, the pipeline 3 is transported by installing a track mechanism 2, so that the pipeline 3 is installed in the steel truss 1, thereby reducing the difficulty of installing the pipeline 3 and improving the construction efficiency. At the same time, by setting a first pulley mechanism 6, the first pulley mechanism 6 drives the clamping mechanism 5 to move, so that the clamping mechanism 5 adjusts the different positions of the pipeline 3 to ensure that the pipeline 3 will not be offset during the installation process. A second pulley mechanism 7 and a third sliding mechanism are set to reduce the resistance of the sliding shell 4 to sliding on the installation track mechanism 2.

[0068] The embodiment of the present application also discloses a method for using a steel truss bridge pipe installation device.

[0069] Reference Figure 1 and Figure 3 A method for using a steel truss bridge pipe installation device comprises the following working steps:

[0070] S1. Preparation work: first, survey the steel truss 1 at the construction site to determine the length of the pipeline 3 and the number of the sliding shell 4 on the I-beam 21 and the various mechanisms on the sliding shell 4;

[0071] S2, laying and installing the track mechanism 2, laying two symmetrically arranged I-beams 21 on the steel truss 1, sleeve bearings 24 on the stud bolts 22 and threading a plurality of stud bolts 22 on the I-beam 21;

[0072] S3, installing the anti-deviating device, according to the length of the pipeline 3, installing several groups of sliding housings 4 and various mechanisms installed on the sliding housings 4 on the laid I-beams 21;

[0073] S4, installing the pipeline 3, installing the pipeline 3 on the installation track mechanism 2;

[0074] S5, after the construction is completed and the pipeline 3 is installed, the track mechanism 2 is removed, the sliding housing 4 and various mechanisms on the sliding housing 4 are installed, and the position of the pipeline 3 is fixed.

[0075] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A bridge pipe installation device for a steel truss bridge, characterized in that: It comprises a steel truss (1), a mounting track mechanism (2) is installed inside the steel truss (1), and a pipeline (3) is installed on the mounting track mechanism (2); The rail mounting mechanism (2) comprises two symmetrically arranged I-beams (21), the two I-beams (21) are both mounted on the bottom of the inner wall of the steel truss (1), a number of evenly distributed stud bolts (22) are threadedly connected through the two I-beams (21), nuts (23) are threadedly connected at both ends of the stud bolts (22), and bearings (24) are rotatably sleeved on the stud bolts (22); The I-beam (21) is provided with a plurality of groups of symmetrically arranged sliding housings (4), the sliding housings (4) are slidably sleeved on the I-beam (21), a clamping mechanism (5) is installed on the sliding housing (4), a first pulley mechanism (6) is provided on one side of the sliding housing (4), and a second pulley mechanism (7) is provided on the first pulley mechanism (6); A third pulley mechanism (8) is installed on a side of the sliding housing (4) away from the first pulley mechanism (6); The clamping mechanism (5) comprises a first support plate (51), the first support plate (51) being fixedly mounted on the sliding housing (4), a first shock absorbing assembly (52) being fixedly mounted on one end of the first support plate (51) away from the sliding housing (4), and a first connecting rod (53) being mounted on the first shock absorbing assembly (52); The clamping mechanism (5) further comprises a second shock absorbing assembly (54), wherein the second shock absorbing assembly (54) is fixedly mounted on a side of the sliding housing (4) close to the pipeline (3), and a second connecting rod (55) is mounted on the second shock absorbing assembly (54); The first shock absorbing assembly (52) and the second shock absorbing assembly (54) both comprise a shock absorbing shell (521), and a shock absorbing spring (522) is arranged inside the shock absorbing shell (521); The shock absorbing shell (521) of the first shock absorbing assembly (52) is fixedly mounted on the first support plate (51), a first connecting rod (53) is slidably sleeved in the shock absorbing shell (521) of the first shock absorbing assembly (52), and one end of the first connecting rod (53) away from the abutment plate (56) abuts against the shock absorbing spring (522) of the first shock absorbing assembly (52); The shock absorbing shell (521) of the second shock absorbing assembly (54) is fixedly mounted on the sliding shell (4); a second connecting rod (55) is slidably sleeved in the shock absorbing shell (521) of the second shock absorbing assembly (54); and one end of the second connecting rod (55) away from the abutment plate (56) abuts against the shock absorbing spring (522) of the second shock absorbing assembly (54); A plurality of limiting holes (58) are evenly arranged on the first connecting rod (53) and the second connecting rod (55), and each of the plurality of limiting holes (58) arranged on the first connecting rod (53) and the second connecting rod (55) has a limiting rod (59) sleeved thereon, and one end of the two limiting rods (59) away from the limiting holes (58) is symmetrically slidably sleeved in a limiting sleeve (510), and a first spring (511) is arranged in the limiting sleeve (510), and two ends of the first spring (511) are respectively fixedly connected to the two limiting rods (59) sleeved in the limiting sleeve (510); The outer wall of the limiting sleeve (510) is fixedly connected to a third connecting rod (512); one end of the third connecting rod (512) away from the limiting sleeve (510) is slidably sleeved on a sleeve connecting rod (513); both ends of the sleeve connecting rod (513) are fixedly connected to second support plates (514); and two second support plates (514) are fixedly mounted on the sliding housing (4); Two second springs (515) are sleeved on the circumferential side of the sleeve connecting rod (513); The first pulley mechanism (6) comprises a first roller (61), the first roller (61) being installed in a steel groove on a side of the I-beam (21) away from the bearing (24), the first roller (61) being fixedly sleeved with a first rotating shaft (62), a fixing plate (63) being fixedly connected to the sliding housing (4), the first rotating shaft (62) being inserted in the middle of the plate surface of the fixing plate (63), and the first rotating shaft (62) being rotatably connected to the fixing plate (63), a spiral groove (64) being provided on the fixing plate (63), a stopper (65) being slidably connected in the spiral groove (64), and a stopper rod (66) being fixedly connected to one end of the first rotating shaft (62) away from the first roller (61); When the first roller (61) rotates, the first rotating shaft (62) drives the gear lever (66) to rotate synchronously around the axis of the first rotating shaft (62). After the gear lever (66) abuts against the stopper (65), it can drive the stopper (65) to slide in the spiral groove (64). When the stopper (65) stops sliding at the end of the spiral groove (64), the stopper (65) can stop the gear lever (66) from rotating.

2. The steel truss bridge pipe installation device according to claim 1, characterized in that: One end of the first connecting rod (53) away from the first shock absorbing assembly (52) and one end of the second connecting rod (55) away from the second shock absorbing assembly (54) are both fixedly connected to an abutment plate (56); a damping roller (57) is rotatably connected to a side of the abutment plate (56) close to the pipe (3); the damping roller (57) abuts against the outer wall of the pipe (3).

3. The steel truss bridge pipe installation device according to claim 1, characterized in that: The second pulley mechanism (7) comprises a driving bevel gear (71), the driving bevel gear (71) is fixedly sleeved on the first rotating shaft (62), a driven bevel gear (72) is meshingly connected to the driving bevel gear (71), the driven bevel gear (72) is fixedly sleeved on the second rotating shaft (73), the second rotating shaft (73) is rotatably sleeved on a third support plate (74), and the third support plate (74) is fixedly mounted on the sliding housing (4); A second roller (75) is fixedly sleeved on one end of the second rotating shaft (73) away from the driven bevel gear (72), and the second roller (75) abuts against a side of the I-beam (21) away from the bearing (24).

4. The steel truss bridge pipe installation device according to claim 1, characterized in that: The third pulley mechanism (8) comprises two symmetrically arranged support rails (81), and the two support rails (81) are both fixedly mounted on a side of the sliding housing (4) away from the first pulley mechanism (6); A slide groove (82) is provided on the side where the two supporting slide rails (81) are close to each other, a third rotating shaft (83) is slidably connected in the two slide grooves (82), and a third roller (84) is rotatably sleeved on the third rotating shaft (83); The two ends of the third rotating shaft (83) are butted against by symmetrically arranged third springs (85), the two third springs (85) are respectively installed in two symmetrically arranged sliding grooves (82), and one end of the two third springs (85) away from the third rotating shaft (83) is fixedly installed on the sliding housing (4).

5. The method for using the steel truss bridge pipe installation device according to any one of claims 1 to 4, characterized in that: The following steps are included: S1. Preparation work: first, survey the steel truss (1) at the construction site to determine the length of the pipeline (3) and the number of the sliding shell (4) on the I-beam (21) and the number of each mechanism on the sliding shell (4); S2, laying and installing the track mechanism (2), laying two symmetrically arranged I-beams (21) on the steel truss (1), sleeve bearings (24) on the stud bolts (22) and threading a plurality of stud bolts (22) on the I-beam (21); S3, installing the anti-deviating device, and installing several groups of sliding housings (4) and various mechanisms installed on the sliding housings (4) on the laid I-beams (21) according to the length of the pipeline (3); S4, installing the pipeline (3), installing the pipeline (3) on the installation track mechanism (2); S5. After the construction is completed and the pipeline (3) is installed, the track mechanism (2) is removed, the sliding housing (4) and various mechanisms on the sliding housing (4) are installed, and the position of the pipeline (3) is fixed.

Citation Information

Patent Citations

  • Tilting wall

    CN1654285A

  • Municipal pipeline jacking device

    CN210770648U