Method and apparatus for handling conflicts in next generation communication systems

By transmitting scheduling information in the 5G communication system and skipping or discarding UL packet transmission in conflict situations, the conflict problem between URLLC and eMBB packet transmission is solved, the resource utilization and delay performance of the system are improved, and low latency is achieved and highly reliable communication services.

CN115379587BActive Publication Date: 2024-10-25SAMSUNG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211113513.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2016-07-29
Filing Date
2017-07-26
Publication Date
2024-10-25
Estimated Expiration
2037-07-26

AI Technical Summary

Technical Problem

In the 5G communication system, there is a conflict between URLLC and eMBB packet transmission, resulting in resource overlap and increased delay. It is difficult for existing technology to effectively handle this conflict.

Method used

By transmitting scheduling information between the base station and the terminal, it is determined whether URLLC packet transmission in the time slot is restricted, and the corresponding UL packet transmission is skipped or discarded in case of conflict, and dynamic scheduling and semi-persistent scheduling mechanisms are adopted to avoid conflicts.

Benefits of technology

It effectively avoids conflicts between URLLC and eMBB packet transmission, improves the system's resource utilization and delay performance, and ensures low-latency and high-reliability communication services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115379587B_ABST
    Figure CN115379587B_ABST
Patent Text Reader

Abstract

Provided is a communication method and system for converging a 5th generation (5G) communication system and an Internet of Things (IoT) technology, wherein the 5th generation (5G) communication system is used to support a higher data rate than a 4th generation (4G) system. The system can be applied to smart services based on 5G communication technology and IoT-related technologies, such as smart homes, smart buildings, smart cities, smart cars, connected cars, healthcare, digital education, smart retail, security, and safety services. The method includes: receiving scheduling information for a first uplink packet transmission in a first time slot from a base station; determining whether the first uplink packet transmission in the first time slot is restricted based on information corresponding to a second uplink packet transmission in the first time slot of another terminal; and skipping the first uplink packet transmission in the first time slot if the first uplink packet transmission in the first time slot is restricted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a method and apparatus for handling conflicts in a next generation communication system. More specifically, the present disclosure relates to a method and apparatus for performing channel quality measurement and terminal signal transmission based on coexistence between different systems of cellular communication using a licensed shared frequency band. Background Art

[0002] In order to meet the increased demand for wireless data services since the deployment of the fourth generation (4G) communication system, efforts have been made to develop an improved fifth generation (5G) or pre-5G communication system. Therefore, the 5G or pre-5G communication system is also referred to as "Beyond 4G network" or "post-Long Term Evolution (LTE) system".

[0003] 5G communication systems are considered to be implemented in higher frequency (millimeter wave) bands, such as the 60 GHz band, in order to achieve higher data rates. In order to reduce the propagation loss of radio waves and increase the transmission distance, beamforming, massive multiple-input multiple-output (MIMO), full-dimensional MIMO (FD-MIMO), array antennas, analog beamforming, and massive antenna technology are discussed in 5G communication systems.

[0004] In addition, in the 5G communication system, development of system network improvements is underway based on advanced small cells, cloud radio access networks (RAN), ultra-dense networks, device-to-device (D2D) communication, wireless backhaul, mobile networks, cooperative communications, coordinated multipoint (CoMP), receiving-end interference cancellation, etc. In the 5G system, hybrid frequency shift keying (FSK) and quadrature amplitude modulation (QAM) (FQAM) and sliding window superposition coding (SWSC) have been developed as advanced coded modulation (ACM), and filter bank multi-carrier (FBMC), non-orthogonal multiple access (NOMA), and sparse code multiple access (SCMA) have been developed as advanced access technologies.

[0005] The Internet, as a human-centered connected network where humans generate and consume information, is now developing towards the Internet of Things (IoT), in which distributed entities (such as objects) exchange and process information without human intervention. The Internet of Everything (IoE) has emerged, which is a combination of IoT technology and big data processing technology through connection with cloud servers. As technical elements, IoT implementation requires elements such as "sensing technology", "wired / wireless communication and network infrastructure", "service interface technology" and "security technology", and sensor networks, machine-to-machine (M2M) communication, machine-type communication (MTC), etc. have been studied recently. This IoT environment can provide smart Internet technology services that create new value for human life by collecting and analyzing data generated between connected things. IoT can be applied to a variety of fields, including smart homes, smart buildings, smart cities, smart cars or connected cars, smart grids, healthcare, smart appliances, and advanced medical services through the convergence and combination between existing information technology (IT) and various industrial applications.

[0006] In line with this, various attempts have been made to apply 5G communication systems to IoT networks. For example, technologies such as sensor networks, MTC, and M2M communications can be implemented through beamforming, MIMO, and array antennas. Cloud RAN as an application of the above-mentioned big data processing technology can also be considered as an example of the convergence between 5G technology and IoT technology.

[0007] Compared with the existing 4G system, the 5G system is expected to support more diverse services. For example, representative services may include enhanced mobile broadband (eMBB), ultra-reliable and low-latency communication (URLLC), massive machine type communication (mMTC), and evolved multimedia broadcast / multicast service (eMBMS). A system that provides URLLC services may be referred to as a URLLC system, a system that provides eMBB services may be referred to as an eMMB system, and a system that provides mMTC services may be referred to as an mMTC system. The terms "service" and "system" may be used interchangeably.

[0008] The above information is provided as background information only to assist with an understanding of the present disclosure. No determination has been made, and no statement is made, as to whether any of the above might be applicable as prior art with respect to the present disclosure. Summary of the invention

[0009] Technical issues

[0010] Aspects of the present disclosure are to address at least the above problems and / or disadvantages and to provide at least the advantages described below. Therefore, one aspect of the present disclosure is to provide a method for handling packet collision in a next generation communication system.

[0011] Another aspect of the present disclosure is to provide a method and apparatus for channel quality measurement and terminal signal transmission for coexistence between different systems based on cellular communication using a licensed shared frequency band.

[0012] Solution to the problem

[0013] According to one aspect of the present disclosure, a communication method of a terminal is provided. The method includes: receiving scheduling information for a first uplink packet transmission in a first time slot from a base station; determining whether the first uplink packet transmission in the first time slot is restricted based on information corresponding to a second uplink packet transmission in the first time slot of another terminal; and skipping the first uplink packet transmission in the first time slot if the first uplink packet transmission in the first time slot is restricted.

[0014] In the method, it further includes: receiving information corresponding to a second uplink packet transmission in the first time slot of another terminal from the base station in a second time slot before the first time slot.

[0015] In the method, the information corresponding to the second uplink packet transmission in the first time slot of the other terminal includes an indication instructing the terminal to skip the first uplink packet transmission in the first time slot.

[0016] In the method, wherein the information corresponding to the second uplink packet transmission in the first time slot of the other terminal includes information indicating that the first time slot is scheduled for the second uplink packet transmission of the other terminal.

[0017] According to one aspect of the present disclosure, a communication method of a base station is provided. The method includes: transmitting first scheduling information for a first uplink packet transmission in a first time slot to a first terminal; transmitting second scheduling information for a second uplink packet transmission in the first time slot to a second terminal; determining whether the first uplink packet transmission in the first time slot is restricted based on the second scheduling information; and receiving the second uplink packet transmission in the first time slot from the second terminal if the first uplink packet transmission in the first time slot is restricted.

[0018] In the method, it also includes: transmitting information corresponding to the second uplink packet transmission in the first time slot of the second terminal to the first terminal in a second time slot before the first time slot; and the information corresponding to the second uplink packet transmission in the first time slot of the second terminal includes an indication instructing the first terminal to skip the first uplink packet transmission in the first time slot.

[0019] In the method, it also includes: transmitting information corresponding to the second uplink packet transmission in the first time slot of the second terminal to the first terminal in a broadcast signal; and the information corresponding to the second uplink packet transmission in the first time slot of the second terminal includes information indicating that the first time slot is scheduled for the second uplink packet transmission of the second terminal.

[0020] According to one aspect of the present disclosure, a terminal is provided. The terminal includes: a transceiver configured to receive and transmit signals; and at least one processor configured to: receive scheduling information for a first uplink packet transmission in a first time slot from a base station; determine whether the first uplink packet transmission in the first time slot is restricted based on information corresponding to a second uplink packet transmission in the first time slot of another terminal; and skip the first uplink packet transmission in the first time slot if the first uplink packet transmission in the first time slot is restricted.

[0021] According to one aspect of the present disclosure, a base station is provided. The base station includes: a transceiver configured to receive and transmit signals; and at least one processor configured to: transmit first scheduling information for a first uplink packet transmission in a first time slot to a first terminal; transmit second scheduling information for a second uplink packet transmission in the first time slot to a second terminal; determine whether the first uplink packet transmission in the first time slot is restricted based on the second scheduling information; and receive the second uplink packet transmission in the first time slot from the second terminal if the first uplink packet transmission in the first time slot is restricted.

[0022] Advantageous Effects of the Invention

[0023] In features of the present disclosure, a method and apparatus for handling packet collisions in a next generation communication system may be provided.

[0024] Other aspects, advantages, and salient features of the disclosure will become apparent to those skilled in the art from the following detailed description, which, taken in conjunction with the annexed drawings, discloses various embodiments of the disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 An operation of handling conflicts according to an embodiment of the present disclosure is shown.

[0026] Figure 2 The message flow between a user equipment (UE) and a 5G NodeB / base station (gNB / BS) for conflict handling in the case of dynamic scheduling according to an embodiment of the present disclosure is shown.

[0027] Figure 3The message flow between the UE and the gNB / BS for conflict handling in the case of dynamic scheduling according to an embodiment of the present disclosure is shown.

[0028] Figure 4 An operation of handling conflicts according to an embodiment of the present disclosure is shown.

[0029] Figure 5 The message flow between the UE and the gNB / BS for conflict handling in the case of semi-persistent scheduling (SPS) according to an embodiment of the present disclosure is shown.

[0030] Figure 6 An operation of handling conflicts according to an embodiment of the present disclosure is shown.

[0031] Figure 7 The message flow between the UE and the gNB / BS for conflict handling in the case of dynamic scheduling according to an embodiment of the present disclosure is shown.

[0032] Figure 8 The message flow between the UE and the gNB / BS for conflict handling in the case of SPS according to an embodiment of the present disclosure is shown.

[0033] Fig. 9 An operation of handling conflicts according to an embodiment of the present disclosure is shown.

[0034] Fig.10 An operation of handling a conflict in a downlink according to an embodiment of the present disclosure is shown.

[0035] Fig.11 An operation of handling a conflict in a downlink according to an embodiment of the present disclosure is shown.

[0036] Fig.12 An indication method according to an embodiment of the present disclosure is shown.

[0037] Fig.13 The message flow between the UE and the gNB / BS for conflict handling in the case of dynamic scheduling according to an embodiment of the present disclosure is shown.

[0038] Fig.14 An operation of handling a conflict between a channel state information reference signal (CSI-RS) and an ultra-reliable low delay communication (URLLC) according to an embodiment of the present disclosure is shown.

[0039] Fig.15 is a block diagram of a user equipment according to an embodiment of the present disclosure.

[0040] Fig.16 is a block diagram of a base station according to an embodiment of the present disclosure.

[0041] Throughout the drawings, it should be noted that like reference numbers are used to depict the same or similar elements, features, and structures. DETAILED DESCRIPTION

[0042] The following description with reference to the accompanying drawings is provided to facilitate a comprehensive understanding of the various embodiments of the present disclosure as defined by the claims and their equivalents. The present disclosure includes various specific details that facilitate a comprehensive understanding, but these should be considered as merely exemplary. Therefore, it will be appreciated by those of ordinary skill in the art that various changes and modifications may be made to the various embodiments described herein without departing from the scope and spirit of the present disclosure. In addition, for the sake of clarity and brevity, descriptions of well-known functions and configurations may be omitted.

[0043] The terms and words used in the following description and claims are not limited to the bibliographical meanings, but are merely used by the inventor to enable a clear and consistent understanding of the present disclosure. Therefore, it should be apparent to those skilled in the art that the following description of various embodiments of the present disclosure is provided for illustrative purposes only and not for the purpose of limiting the present disclosure as defined by the claims and their equivalents.

[0044] It should be understood that the singular forms "a," "an," and "the" include plural referents unless the context clearly dictates otherwise. Thus, for example, reference to "a component surface" includes reference to one or more of such surfaces.

[0045] The term "substantially" means that the stated characteristic, parameter or value need not be achieved precisely, but deviations or changes may occur in an amount that does not impair the effect intended to be provided by the characteristic, including, for example, tolerances, measurement errors, measurement accuracy limitations and other factors known to those skilled in the art.

[0046] In the drawings, some elements are exaggerated, omitted or only briefly outlined and thus may not be drawn to scale. The same or similar reference numerals are used throughout the drawings to denote the same or similar parts.

[0047] At the same time, it is known to those skilled in the art that each frame of the flowchart (or sequence diagram) and the combination of the flowchart can be represented and executed by computer program instructions. These computer program instructions can be loaded on a processor of a general-purpose computer, a special-purpose computer or a programmable data processing device. When the loaded program instructions are executed by the processor, they create a device for performing the functions described in the flowchart. Since the computer program instructions can be stored in a computer-readable memory that can be used in a special-purpose computer or a programmable data processing device, it is also possible to create a product that performs the functions described in the flowchart. Since the computer program instructions can be loaded on a computer or a programmable data processing device, when executed as a process, it can perform the operation of the functions described in the flowchart.

[0048] The blocks of the flow chart may correspond to a module, segment or code containing one or more executable instructions that implement one or more logical functions, or a portion thereof. In some cases, the functions described by the blocks may be performed in an order different from the order listed. For example, two blocks listed in order may be performed simultaneously or in reverse order.

[0049] In the description, the words "unit", "module", etc. may refer to software components or hardware components, such as field programmable gate arrays (FPGAs) or application specific integrated circuits (ASICs) that can perform functions or operations. However, "units", etc. are not limited to hardware or software. Units, etc. may be configured to reside in an addressable storage medium or drive one or more processors. Units, etc. may refer to software components, object-oriented software components, class components, task components, processes, functions, attributes, procedures, subroutines, program code segments, drivers, firmware, microcodes, circuits, data, databases, data structures, tables, arrays, or variables. The functions provided by components and units may be a combination of smaller components and units, and may be combined with others to form large components and units. Components and units may be configured to drive devices or one or more processors in a secure multimedia card. Components or units may include one or more processors.

[0050] Before the detailed description, terms or definitions necessary for understanding the present disclosure are described. However, these terms should be interpreted in a non-limiting manner.

[0051] A "base station" (BS) is an entity that communicates with a user equipment and may be referred to as a BS, a base transceiver station (BTS), a NodeB (NB), an eNodeB (eNB), an access point (AP), or a 5G NodeB (GNB). A "user equipment" (UE) is an entity that communicates with a base station and may be referred to as a UE, a device, a mobile station (MS), a mobile equipment (ME), or a terminal. Symbols in the description refer to orthogonal frequency division multiplexing (OFDM) symbols.

[0052] In recent years, several broadband wireless technologies have been developed to meet the growing number of broadband subscribers and to provide more and better applications and services. The second generation of wireless communication systems has been developed to provide voice services while ensuring the mobility of users. The third generation of wireless communication systems supports not only voice services but also data services. In recent years, the fourth generation of wireless communication systems has been developed to provide high-speed data services. However, at present, the fourth generation of wireless communication systems lacks resources to meet the growing demand for high-speed data services. Therefore, the fifth generation of wireless communication systems are being developed to meet the growing demand for high-speed data services, support ultra-reliable and low-latency applications and support large-scale MTC.

[0053] A scheduling control channel (e.g., a physical downlink common control channel (PDCCH)) is first used in time slot (e.g., subframe) N to allocate resources for uplink (UL) packet transmission (UE, terminal) (e.g., UE1), and the UE (UE1) uses the allocated resources for transmission in time slot N+P. The value of "P" is different for different types of services / packets. For enhanced mobile broadband (eMBB) services / packets, "P" is greater than ultra-low latency (URLL) (e.g., ultra-reliable and low latency communication (URLLC)) services / packets. In order to support low latency, "P" is smaller for URLLC packets. This may cause conflicts between URLLC and eMBB packet transmissions from different UEs (e.g., UE1 and UE3).

[0054] In another case, a UE (e.g., UE2) may be allocated semi-persistent scheduling (SPS) resources. The allocated SPS resources occur periodically at each SPS interval. In this case, the URLLC packet resources allocated to another UE (e.g., UE3) using dynamic scheduling may conflict with the SPS resources.

[0055] Therefore, a method for handling grouping conflicts is needed.

[0056] Conflict handling in UL

[0057] Method 1:

[0058] Figure 1 An operation of handling conflicts according to an embodiment of the present disclosure is shown.

[0059] refer to Figure 1In method 1, if a URLLC packet 135 scheduled in time slot (e.g., subframe) 'X' (e.g., N+4 subframe) 130 overlaps with one or more eMBB packets 131, 133, the gNB / BS (base station) transmits (broadcast or dedicated) an indication (e.g., skip indication or preempt indication) 150 to the eMBB UE (e.g., UE1 and UE2) in time slot 'X-P' (P>0) (e.g., N+3 subframe) 120 to skip UL transmission (i.e., eMBB packet) in the URLLC symbol in time slot 'X' 130 or discard the UL packet transmission (i.e., eMBB packet) in time slot 'X' 130. The UE (i.e., UE1 and / or UE2) skips the UL transmission (i.e., eMBB packet) in the URLLC symbol overlapping with the UL packet transmission, or the UE (i.e., UE1 and / or UE2) discards the UL packet transmission if the UL packet transmission (i.e., eMBB packet) overlaps with the URLLC symbol. In an embodiment of the present disclosure, if the number of symbols in which there is a conflict is higher than a threshold, the UE (i.e., UE1 and / or UE2) skips the entire packet transmission, otherwise it only skips the transmission in the conflicting symbols. The threshold may be signaled by the gNB / BS in indication 150 and / or in broadcast and / or dedicated signaling.

[0060] In an embodiment of the present disclosure, 'P' may be in units of symbols and / or subframes and / or time slots. In an embodiment of the present disclosure, information of 'P' may be broadcast and / or explicitly indicated in RRC signaling. In an alternative embodiment, 'P' may be at a fixed offset from the time slot 'X' 130 in which the UL (uplink) eMBB packet is to be transmitted. In an embodiment of the present disclosure, the gNB / BS may configure the UE to monitor the indication (i.e., skip indication or preempt indication) 150 in the time slot 'X-P' 120 or not monitor. This may be determined by the UE capabilities. In an embodiment of the present disclosure, the UE monitors the indication 150 from the time slot 110 in which the UL packet is scheduled (i.e., the PDCCH scheduled packet is received) until the time slot 130 in which the UL packet is scheduled for transmission. The gNB / BS may configure the UE to monitor the indication (i.e., skip or preempt indication) 150. In another embodiment of the present disclosure, the UE monitors the indication 150 in a time interval including the 'X1' time slot prior to the time slot in which the UL packet is scheduled for transmission. 'X1' may be signaled by the gNB / BS or may be predefined. The gNB / BS may configure the UE to monitor for an indication (ie, a skip or preempt indication) 150.

[0061] In an embodiment of the present disclosure, one or more time slots 'X' 130 may be explicitly indicated in the indication 150. In an alternative embodiment of the present disclosure, one or more time slots 'X' 130 may be at a fixed offset from the time slot 120 in which the indication 150 is transmitted by the gNB / BS.

[0062] In an embodiment of the present disclosure, one or more URLLC symbols to be skipped in one or more time slots 'X' 130 may be explicitly indicated by the gNB / BS in an indication 150. In an alternative embodiment of the present disclosure, the one or more URLLC symbols may be predefined. In another embodiment of the present disclosure, the one or more URLL symbols may be broadcast by the gNB / BS in system information.

[0063] In an embodiment of the present disclosure, the indication 150 may be signaled in a broadcast or dedicated manner. In the case of dedicated signaling, the indication 150 may be addressed to the cell-radio network temporary identifier (C-RNTI) of the UE. For example, if only the scheduled resources of UE1 and the scheduled resources of UE3 overlap, and the scheduled resources of UE2 and the scheduled resources of UE3 do not overlap, the indication 150 may be addressed to the C-RNTI of UE1. Depending on whether there is a conflict with one or more UEs, the gNB / BS may use an appropriate signaling method. In the case of broadcast signaling, the indication 150 may be addressed to the broadcast radio network temporary identifier (RNTI). Alternatively, in the case of broadcast signaling, the indication 150 may be addressed to a new RNTI (e.g., skip-RNTI). UEs that have already scheduled UL packets (and / or UL packets (e.g., eMBB) with low priority compared to other packets (e.g., URLLC)) may only monitor the indication 150 addressed to the skip-RNTI. In an embodiment of the present disclosure, indication 150 may be a radio resource control (RRC) message or a media access control (MAC) control element (CE) included in a DLMAC packet data unit (PDU) or a downlink control information (DCI) in a PDCCH or a group common DCI in a PDCCH. In an embodiment of the present disclosure, a group common DCI for skip indication may be transmitted separately from a group common DCI for slot format indication. In an embodiment of the present disclosure, control resource group (CORESET) information for monitoring the group common DCI for skip indication may be signaled in system information or RRC signaling. In an embodiment of the present disclosure, a monitoring interval for monitoring the group common DCI for skip indication may be signaled in system information or RRC signaling. In an embodiment of the present disclosure, a broadcast channel (BCH) may also be used to signal indication 150.

[0064] refer to Figure 1 , shows an example of using method 1 to handle conflicts. Figure 1 As shown, the gNB schedules UE1 and UE2 (e.g., uplink eMBB packet transmissions 131, 133) in subframe N+4 130 by transmitting scheduling control information (i.e., PDCCH) 115 in subframe N 110. Later, there is an urgent need to schedule UE3 (e.g., URLLC service). UE3 is scheduled in the same subframe N+4 130 by transmitting scheduling control information (i.e., PDCCH) 125 in subframe N+3 120. In this case, the gNB / BS knows that it has already scheduled UE1 and UE2 in subframe N+4 130. To avoid collision, URLLC service takes precedence over eMBB service. The gNB / BS sends an indication 150 before subframe N+4 130, instructing UE1 and UE2 to skip transmission (of uplink eMBB packets) in URLLC symbol 135 in SF (subframe) N+4 130. Alternatively, the gNB / BS sends an indication 150 before subframe N+4 130, instructing UE1 and UE2 to discard the UL packet transmission in SF N+4 130.

[0065] Figure 2 The message flow between the UE and the gNB / BS for conflict handling in the case of dynamic scheduling according to an embodiment of the present disclosure is shown.

[0066] refer to Figure 2 At operation 250, the gNB / BS 210 determines to schedule UE1 220 for uplink eMBB packet transmission and determines packet scheduling information for UE1 220. At operation 255, the eMBB packet in subframe (SF) X is first scheduled for UE1 220 by scheduling control information transmitted by gNB / BS 210 in subframe N1. At operation 260, UE1 220 prepares the uplink eMBB packet for transmission.

[0067] At operation 265, the gNB / BS 210 determines to schedule UE3 230 for URLLC packet transmission and determines packet scheduling information for UE3 230. At operation 270, the URLLC packet in SF X is scheduled for UE3 230 by scheduling control information transmitted by the gNB / BS 210 in subframe N2, where N2>N1.

[0068] At operation 275, the gNB / BS 210 determines whether to transmit a skip indication 150 to UE1 220. At operation 280, if there is a conflict between the eMBB packet scheduled for UE1 220 and the URLLC packet scheduled for UE3 230, the skip indication 150 is sent from the GNB / BS 210 to UE1 220 in subframe N3, where N3>N2.

[0069] If UE1 220 receives the skip indication 150, then at operation 285, UE1 220 determines whether the skip indication 150 corresponds to its UL packet transmission. If UE1 220 is applicable to its UL packet transmission, then at operation 290, UE1 220 skips the UL transmission in the URLLC symbol or discards the UL packet transmission. The skip indication 150 is applicable to UE1 220, it is addressed to UE1 220 and / or its UL packet transmission conflicts with the URLLC symbol.

[0070] Figure 3 The message flow between the UE and the gNB / BS for conflict handling in the case of dynamic scheduling according to an embodiment of the present disclosure is shown.

[0071] refer to Figure 3 , and Figure 2 Same as above, except that the skip indication 150 is sent in subframe N3, where N3 is equal to N2.

[0072] At operation 310, the gNB / BS 210 determines to schedule UE1 220 for uplink eMBB packet transmission and determines packet scheduling information for UE1 220. At operation 320, the eMBB packet is first scheduled for UE1 220 in SF X by scheduling control information transmitted by the gNB / BS 210 in subframe N1. At operation 330, UE1 220 prepares the uplink eMBB packet for transmission.

[0073] At operation 340, the gNB / BS 210 determines to schedule UE3 230 for URLLC packet transmission and determines packet scheduling information for UE3 230. The gNB / BS 210 determines whether to transmit a skip indication 150 to UE1 220.

[0074] At operation 355, the URLLC packet in SF X is scheduled for UE3 230 by scheduling control information transmitted by gNB / BS 210 in subframe N2, where N2>N1. At operation 350, if there is a conflict between the eMBB packet scheduled for UE1 220 and the URLLC packet scheduled for UE3 230, a skip indication 150 is sent from GNB / BS 210 to UE1 220 in subframe N3, where N3=N2.

[0075] If UE1 220 receives the skip indication 150, then at operation 360, UE1 220 determines whether the skip indication 150 corresponds to its UL packet transmission. If UE1 220 is applicable to its UL packet transmission, then at operation 370, UE1 220 skips the UL transmission in the URLLC symbol or discards the UL packet transmission. The skip indication 150 is applicable to UE1 220, it is addressed to UE1 220 and / or its UL packet transmission conflicts with the URLLC symbol.

[0076] Figure 4 The operation of handling conflicts according to an embodiment of the present disclosure is shown, and Figure 5 The message flow between the UE and the gNB / BS for conflict handling in the case of SPS according to an embodiment of the present disclosure is shown.

[0077] refer to Figure 4 , UE (e.g., UE1) 220 may be allocated SPS resources 415, 417. The allocated SPS resources 415, 417 occur periodically in each SPS interval 410. There is an urgent need to schedule UE3 230 (e.g., URLLC service). Therefore, UE3 230 is scheduled in the same subframe N+4 430 by transmitting scheduling control information (i.e., PDCCH) 425 in subframe N+3 420. URLLC packet resources 417 allocated to another UE (e.g., UE3) 230 using dynamic scheduling conflict with SPS resources 417.

[0078] In this case, if a URLLC packet 435 scheduled in time slot (e.g., subframe) 'X' (e.g., N+4 subframe) 430 overlaps with one or more SPS resources 417, the gNB / BS 210 transmits (in a broadcast or dedicated manner) an indication (e.g., a skip indication) 450 to UE1 220 in time slot 'X-P' (P>0) (e.g., N+3 subframe) 420 to skip UL transmission in the URLLC symbol in time slot 'X' 430 or to discard UL packet transmission in time slot 'X' 430. UE1 220 skips UL transmission in the URLLC symbol that overlaps with the UL packet transmission, or UE1 220 discards the UL packet transmission if the UL packet transmission overlaps with the URLLC symbol. The indication 450 is almost the same as described in the above example.

[0079] refer to Figure 5, at operation 510, SPS resource activation is first scheduled by gNB / BS 210 to UE1 220. In an embodiment of the present disclosure, SPS resource activation in SF X is scheduled to UE1 220 by scheduling control information transmitted by gNB / BS 210 in subframe N1. At operation 520, UE1 220 prepares and transmits uplink packets in the SPS resources scheduled by gNB / BS 210. UE1 220 monitors skip indication 450. Skip indication 450 can be only in a designated subframe before the SPS subframe.

[0080] At operation 530, the gNB / BS 210 determines to schedule UE3 230 for URLLC packet transmission and determines packet scheduling information for UE3 230. At operation 540, the URLLC packet in SF X is scheduled for UE3 230 by scheduling control information transmitted by the gNB / BS 210 in subframe N2. In an embodiment of the present disclosure, N2 is greater than N1.

[0081] At operation 550, the gNB / BS 210 determines whether to transmit the skip indication 450 to UE1 220. In an embodiment of the present disclosure, the gNB / BS 210 determines to schedule UE3 230 for URLLC packet transmission, and determines whether to transmit the skip indication 450 to UE1 220 at the same time.

[0082] At operation 560, if there is a conflict between the SPS resource scheduled for UE1 220 and the URLLC packet scheduled for UE3 230, a skip indication 450 is sent from the GNB / BS 210 to UE1 220 in subframe N3. In an embodiment of the present disclosure, N3 is greater than or equal to N2. For example, the gNB / BS 210 transmits the scheduling information of the URLLC packet to UE3 and transmits the skip indication 450 at the same time.

[0083] If UE1 220 receives the skip indication 450, then at operation 570, UE1 220 determines whether the skip indication 450 corresponds to its UL packet transmission. If UE1 220 is applicable to its UL packet transmission, then at operation 580, UE1 220 skips the UL transmission in the URLLC symbol or discards the UL packet transmission. The skip indication 450 is applicable to UE1 220, it is addressed to UE1 220 and / or its UL packet transmission conflicts with the URLLC symbol.

[0084] In one embodiment, whether the UE has to apply the skip / drop rule for the scheduled UL packets may be signaled by the gNB / BS 210. Only when this is signaled, the UE skips / drops based on the skip indication 150, 450.

[0085] 1. It may be indicated in dedicated signaling whether the UE has to apply the skip rules or handle the skip indication.

[0086] 2. Whether the UE must apply skip rules or process skip indications may be specified for each logical channel or logical channel group (LCG). The scheduling information may be specific to a logical channel or LCG. Thus, the UE applies skip rules or processes skip indications for UL packets of a logical channel or LCG that allows it.

[0087] 3. Whether to apply skip rules or process skip indications can be specified for each radio access network (RAN) slice.

[0088] 4. The packet type may be present in the scheduling information. Whether to apply the skip rule or process the skip indication may be applied for a specific packet type. Therefore, the UE applies the skip rule or processes the skip indication for UL packets of the packet type that allows it.

[0089] In an embodiment of the present disclosure, the skip indication 150, 450 may be named as a URLLC usage indication or an overlap indication. The gNB / BS 210 transmits (broadcast or dedicated mode) an indication that the UL URLLC symbol in time slot 'X' is used. The UE skips the UL transmission in the URLLC symbol overlapping with the UL packet transmission, or the UE discards the UL packet transmission if the UL packet transmission overlaps with the URLLC symbol. In an embodiment of the present disclosure, one or more time slots 'X' may be explicitly indicated in the indication 150, 450. In an alternative embodiment of the present disclosure, the one or more time slots 'X' may be at a fixed offset from the time slot in which the indication 150, 450 is transmitted by the gNB / BS 210. In an embodiment of the present disclosure, the one or more URLLC symbols used in the one or more time slots 'X' may be explicitly indicated in the indication 150, 450 by the gNB / BS 210. In an alternative embodiment of the present disclosure, the one or more URLLC symbols may be predefined. In another embodiment of the present disclosure, the one or more URLLC symbols may be broadcast by the gNB / BS 210 in the system information.

[0090] Method 2:

[0091] Figure 6 An operation of handling conflicts according to an embodiment of the present disclosure is shown.

[0092] refer to Figure 6In method 2, if slot X 630 is a URLLC slot or a slot with URLLC symbols, and UL packets 631, 633 are scheduled to UEs (UE1 and / or UE2) in slot X 630, and the resources allocated to UL packets 631, 633 overlap with URLLC resources 635, the UE (e.g., UE1 and / or UE2) skips transmission in one or more URLLC symbols 635 in slot X (e.g., N+4 subframe) 630. In an embodiment of the present disclosure, one or more URLLC slots 630 are signaled by the gNB / BS in broadcast signaling. In an embodiment of the present disclosure, one or more URLLC symbols 635 in the URLLC slot 630 may be predefined in the system. Alternatively, one or more URLLC symbols 635 in the URLLC slot 630 may also be signaled by the gNB / BS in broadcast signaling. If the symbol is partially used for URLLC, the frequency resources in the URLLC symbol 635 may also be signaled.

[0093] refer to Figure 6 , shows an example of using method 2 to handle conflicts. Figure 6 As shown, the gNB / BS schedules UE1 and UE2 (e.g., uplink eMBB packet transmissions 631, 633) in subframe N+4 630 by transmitting scheduling control information (i.e., PDCCH) 615 in subframe N 610. There is an urgent need to schedule UE3 (e.g., URLLC service). Therefore, UE3 is scheduled in the same subframe N+4 630 by transmitting scheduling control information (i.e., PDCCH) 625 in subframe N+3 620. Alternatively, UE3 can autonomously use URLLC resources 635 in subframe N+4 630. To avoid collision, URLLC service takes precedence over eMBB service. If SF N+4 630 is a URLLC subframe and the resources allocated for its UL packets 631, 633 in SF N+4 630 overlap with URLLC resources 635, UE1 and / or UE2 skip transmission in URLLC symbol 635 in SF N+4 630. Alternatively, if SF N+4 630 is a URLLC subframe and resources allocated for its UL packets 631 , 633 in SF N+4 630 overlap with URLLC 635 resources, UE1 and UE2 drop UL packet transmission in SF N+4 630 .

[0094] Figure 7 The message flow between the UE and the gNB / BS for conflict handling in the case of dynamic scheduling according to an embodiment of the present disclosure is shown.

[0095] refer to Figure 7, at operation 710, URLLC configuration information (e.g., subframe, OFDM symbol, physical resource block (PRB) or subcarrier, etc.) is broadcast by the gNB / BS 210. At operation 720, the gNB / BS 210 determines to schedule UE1 220 for uplink eMBB packet transmission and determines packet scheduling information for UE1 220. At operation 730, eMBB packets are first scheduled for UE1 220 in SF X 630 by scheduling control information transmitted by the gNB / BS 210. At operation 740, UE1 220 prepares packets for transmission.

[0096] At operation 750, UE1 220 determines whether SF X is a URLLC subframe.

[0097] At operation 760, if it (the scheduled subframe of UE1 220) is a URLLC subframe and the resources allocated for its UL packets in SF X 630 overlap with the URLLC resources 635 in this subframe 630, UE1 220 skips transmission in the URLLC symbol 635 in SF X 630. Alternatively, if SF X 630 is a URLLC subframe and the resources allocated for its UL packets in SF X 630 overlap with the URLLC resources 635 in this subframe 630, UE1 220 drops UL packet transmission in the subframe 630.

[0098] Figure 8 The message flow between the UE and the gNB / BS for conflict handling in the case of SPS according to an embodiment of the present disclosure is shown.

[0099] refer to Figure 8 At operation 810, URLLC configuration information (e.g., subframe, OFDM symbol, PRB or subcarrier, etc.) is broadcast by gNB / BS 210. At operation 820, SPS resource activation is first scheduled for UE1 220 by gNB / BS 210. In an embodiment of the present disclosure, SPS resource activation is scheduled for UE1 220 in SF X. At operation 830, UE1 220 prepares and transmits an uplink packet in the SPS resource scheduled by gNB / BS 210.

[0100] At operation 840, UE1 220 determines whether SF X is a URLLC subframe.

[0101] At operation 850, if it (the scheduled SPS subframe X of UE1 220) is a URLLC subframe and the resources allocated for its UL packets in SF X overlap with the URLLC resources in this subframe, UE1 220 skips transmission in the URLLC symbols in SF X. Alternatively, if SF X is a URLLC subframe and the resources allocated for its UL packets in SF X overlap with the URLLC resources in this subframe, UE1 220 discards the UL packet transmission.

[0102] In an embodiment of the present disclosure, whether the UE must apply the skip / drop rule for the scheduled UL packets can be signaled by the gNB / BS. Only when this is signaled, the UE skips / drops if the resources allocated for its UL packets in SF X overlap with the URLLC resources in this subframe.

[0103] 1. It may be indicated in dedicated signaling whether the UE has to apply the skip rules.

[0104] 2. Whether the UE must apply the skip rule may be specified for each logical channel or LCG. The scheduling information may be specific to a logical channel or LCG. Thus, the UE applies the skip rule for the UL packets of the logical channel or LCG that allows it.

[0105] 3. Whether to apply skip rules can be specified for each RAN slice.

[0106] 4. The packet type may be present in the scheduling information. Whether to apply the skip rule may be applied for a specific packet type. Therefore, the UE applies the skip rule for UL packets of the packet type that allows it.

[0107] Method 3:

[0108] Fig. 9 An operation of handling conflicts according to an embodiment of the present disclosure is shown.

[0109] refer to Fig. 9 In method 3, if UL packets 931, 933 are scheduled to UE (UE1 and / or UE2) in time slot X 930 and scheduling information 915 indicates skipping of one or more URLLC symbols 935, the UE (e.g., UE1 and / or UE2) skips transmission in one or more URLLC symbols 935 in time slot X (e.g., N+4 subframe) 930. In an embodiment of the present disclosure, the URLLC symbols 935 to be skipped are indicated in the scheduling information.

[0110] refer to Fig. 9 , shows an example of handling collisions using the proposed method. Fig. 9As shown, the gNB / BS schedules UE1 and UE2 (e.g., uplink eMBB packet transmissions 931, 933) in subframe N+4 930 by transmitting scheduling control information (i.e., PDCCH) 915 in subframe N 910. There is an urgent need to schedule UE3 (e.g., URLLC service). Therefore, UE3 is scheduled in the same subframe N+4 930 by transmitting scheduling control information (i.e., PDCCH) 925 in subframe N+3 920. Alternatively, UE3 can autonomously use URLLC resources 935 in subframe N+4 930. To avoid conflicts, URLLC services take precedence over eMBB services. If URLLC symbols 935 in SFN+4 930 are indicated in the scheduling information 915 transmitted in subframe N 910, UE1 and / or UE2 skip transmissions in these symbols. This approach may result in waste if URLLC symbols 935 are not used for URLLC services for UE3. However, the signaling overhead of broadcasting URLLC configuration and skip indication is reduced.

[0111] The above method for handling the conflict between URLLC and eMBB on the UE has been explained. In the event of a conflict between URLLC and eMBB transmissions within the same UE, the UE is aware of the URLLC and eMBB transmission resources, so the UE can skip the transmission of URLLC packets or eMBB packets in the conflicting resources. In an embodiment of the present disclosure, the UE skips the transmission of URLL packets or eMBB packets only in symbols where there is a conflict. In an embodiment of the present disclosure, the UE can skip the transmission of a complete URLL packet or EMBB packet in the event of a conflict. In an embodiment of the present disclosure, URLLC is prioritized and eMBB transmission is skipped. In another embodiment of the present disclosure, whether to prioritize eMBB or URLLC can be indicated by the network.

[0112] In the methods explained above (method 1 to method 3), whether to skip only symbols or the entire packet when there is a collision can be decided based on the number of symbols with collisions. If the number of symbols with collisions is higher than a threshold, the UE skips the entire packet transmission. Otherwise, the UE skips transmission only in the collision symbols. The threshold can be signaled by the gNB / BS in broadcast or dedicated signaling to the UE.

[0113] Conflict handling in DL

[0114] Method 1:

[0115] Fig.10 An operation of handling a conflict in a downlink according to an embodiment of the present disclosure is shown.

[0116] refer to Fig.10In method 1, resources for URLLC 1040 are reserved and indicated to the UE in broadcast or dedicated signaling. The gNB / BS sends indications 1010, 1015, indicating whether to use the reserved resources in the corresponding time slot (e.g., subframe, transmission time interval (TTI), etc.) (i.e., whether to schedule URLLC services). In an embodiment of the present disclosure, indications 1010, 1015 may be present in an authorization or DCI. In an embodiment of the present disclosure, indications 1010, 1015 may be used for a group of UEs, such as eMBBUEs. In an embodiment of the present disclosure, the gNB / BS may notify the UE via RRC signaling whether to monitor indications 1010, 1015. In an embodiment of the present disclosure, indications 1010, 1015 may be transmitted in a dedicated channel or in a normal PDCCH at a predefined position. In an embodiment of the present disclosure, a specific RNTI may be reserved for shielding the PDCCH for the indications 1010, 1015. Fig.10 This method is shown in . The gNB / BS schedules the UE (e.g., downlink eMBB packet transmission, 1030) by transmitting scheduling control information (i.e., PDCCH) 1020. If the UE DL packet resources (e.g., eMBB resources) 1030 conflict with the URLLC resources 1040 and the URLLC reserved resources are in use, the gNB / BS transmits an indication 1015 indicating the use of the URLLC resources 1040. Thereafter, during decoding, the UE does not consider the information in the conflicting resources 1040. In an embodiment of the present disclosure, if the UE DL packet resources 1030 conflict with the URLLC resources 1040 and the URLLC reserved resources are not in use, the gNB / BS transmits an indication 1010 indicating that the URLLC resources 1040 are not used. In an embodiment of the present disclosure, the indication is transmitted only when the URLLC reserved resources are in use.

[0117] Method 2:

[0118] Fig.11 An operation of handling a conflict in a downlink according to an embodiment of the present disclosure is shown.

[0119] refer to Fig.11In method 2, resources for URLLC 1140 are dynamically scheduled. The gNB / BS sends an indication 1115 indicating that certain resources (OFDM symbols and / or PRBs) are used for URLLC in a subframe. The URLLC resources 1140 may be predefined or indicated in the indication 1110 or broadcast. In an embodiment of the present disclosure, for the URLLC resource usage indication 1110, the UE may read the PDCCH region used for URLLC. The gNB / BS schedules the UE (e.g., downlink eMBB packet transmission, 1130) by transmitting scheduling control information (i.e., PDCCH) 1120. If the UE DL packet resources (e.g., eMBB resources) 1130 conflict with the URLLC resources 1140, the gNB / BS transmits an indication 1115 indicating the use of the URLLC resources 1040. Thereafter, during decoding, the UE does not consider the information in the conflicting resources 1140. In Fig.11 This method is shown in .

[0120] The above method for handling conflicts between URLLC and cMBB transmissions on the UE has been explained. In the event of a conflict between URLLC and eMBB transmissions within the same UE, the UE knows the URLLC and eMBB reception resources, so the UE can skip the reception information of the URLLC packet or eMBB packet in the conflicting resources during decoding. In an embodiment of the present disclosure, URLLC is prioritized and eMBB information is skipped. In another embodiment of the present disclosure, whether to prioritize eMBB or URLLC can be indicated by the network.

[0121] Instructions

[0122] The purpose of the indication is to inform some UEs (e.g., one or more UEs with eMBB services), for example, that if a certain amount of resources in a time slot are allocated to the UE for URLLC service, these resources are preempted and not used in actual transmission. If there is a conflict between the preempted resources and the resources allocated for eMBB data scheduling in the DCI, the UE can assume that the preempted resources are punctured or rate matched from the allocated resources. Preempted resources may include resources in the time domain and the frequency domain. For time domain resources, the indication may be an OFDM symbol in a time slot with a predefined duration, for example, a 7-symbol or 14-symbol time slot targeted for eMBB service based on the system configuration. For example, a symbol bitmap may be used to indicate which symbol(s) need to be preempted. For frequency domain resources, by default, it may be the full bandwidth or a configured bandwidth portion in the system bandwidth. Alternatively, the indication may be based on a resource block (RB) group. Based on predefined rules, there may be multiple RB groups in the full bandwidth. For example, the size of the RB group (e.g., M RBs) may be predefined or configured by higher layer signaling. If the full bandwidth is represented by N RBs, there is a rounding of (N / M) RB groups. It can be indicated which RB groups need to be preempted. The UE can obtain how many bits are used to indicate the preemption information of the RB groups in the frequency domain. Alternatively, the indicated bitmap size can be predefined or configured by higher layer signaling, for example, X bits, and the size of the RB group can be derived based on the total number of RBs and the predefined / indicated bitmap size, for example, M=rounding (N / X).

[0123] Instructions

[0124] Fig.12 An indication method according to an embodiment of the present disclosure is shown.

[0125] refer to Fig.12 , the preemption indication may be for a group of UEs, e.g., one or more eMBB UEs. The gNB / BS may inform the UEs via RRC signaling whether to monitor for the preemption indication. The preemption indication may be transmitted in a dedicated channel or in a normal PDCCH at a predefined location. The indication may be addressed by a certain RNTI assigned by the gNB / BS. For example, it may be addressed by a skip-RNTI with a predefined or configured value.

[0126] In an embodiment of the present disclosure, the preemption indication or the skip indication may be an RRC message or a MAC CE included in a DL MAC PDU or in a DCI in a PDCCH or in a group common DCI in a PDCCH. In an embodiment of the present disclosure, the group common DCI for the preemption indication or the skip indication may be transmitted separately from the group common DCI for the slot format indication. In an embodiment of the present disclosure, CORESET information for monitoring the group common DCI for the preemption indication or the skip indication may be signaled in the system information or the RRC signaling. In an embodiment of the present disclosure, a monitoring interval for monitoring the group common DCI for the preemption indication or the skip indication may be signaled in the system information or the RRC signaling.

[0127] The preemption indication transmitted in time slot m can apply to the current time slot or the previous time slot, for example, mP (P>=0). The information of P can be predefined as a fixed offset or can be configured by higher layer signaling. The exact value can be indicated from a set of predefined values, for example {0,1,2,3}. On the other hand, if the UE is scheduled in the nth time slot, the UE assumes that there may be a preemption indication in time slot n+P. If the UE fails to decode the downlink data transmission, it can decode it again after receiving the preemption indication, for example, by puncturing the indicated preemption resources from the allocated resources. The value P can be explicitly indicated to the UE by dedicated signaling. The gNB / BS can configure different values ​​of P to different UEs. This can be determined by UE capabilities. If the UE reports its capabilities related to PDCCH blind decoding and physical downlink shared channel (PDSCH) processing, the gNB / BS can determine the appropriate P value taking into account the processing capabilities of the UE. Fig.12 In FIG. 1 , examples of P=0 and P=1 are shown to illustrate that the preemption indication may be for the current time slot (ie, P=0), or may be for the previous time slot (ie, P=1).

[0128] Fig.13 The message flow between the UE and the gNB / BS for conflict handling in the case of dynamic scheduling according to an embodiment of the present disclosure is shown.

[0129] refer to Fig.13 , at operation 1310, the gNB / BS 210 determines to schedule UE1 220 for downlink eMBB packet transmission and determines packet scheduling information for UE1 220. At operation 1320, the eMBB packet is first scheduled for UE1 220 in subframe N1 by scheduling control information transmitted by the gNB / BS 210 in subframe N1.

[0130] And, at operation 1330, the gNB / BS 210 determines to schedule UE3 230 for URLLC packet transmission, and determines packet scheduling information for UE3 230. At operation 1340, the URLLC packet is scheduled for UE3 230 in SF N1 by scheduling control information transmitted by the gNB / BS 210 in subframe N1.

[0131] At operation 1350, the gNB / BS 210 determines whether to transmit a preemption indication to UE1 220. At operation 1360, if there is a conflict between the eMBB packet scheduled for UE1 220 and the URLLC packet scheduled for UE3 230, a preemption indication is sent from the GNB / BS 210 to UE1 220 in subframe N2, where N2 is greater than or equal to N1.

[0132] If UE1 220 receives the preemption indication, UE1 220 determines whether the preemption indication 150 corresponds to its DL packet transmission at operation 1370. If the preemption indication 150 corresponds to its DL packet transmission, UE1 220 punctures the preemption resource during the DL packet transmission in subframe N1 and decodes again at operation 1380.

[0133] Conflict handling between channel state information reference signal (CSI RS) and URLLC transmission

[0134] Fig.14 The operation of handling the conflict between CSI-RS and URLLC according to an embodiment of the present disclosure is shown.

[0135] refer to Fig.14 , in order to support low latency, fast data scheduling is required. Therefore, there is a conflict between CSI-RS and URLLC transmission. 'P' is the delay between the CSI-RS trigger 1410 and the transmission 1430 of the CSI-RS. 'Q' is the delay between the URLL trigger 1420 and the transmission 1430 of the URLLC packet. In this case, the CSI-RS transmission is discarded and the URLLC packet is transmitted. URLLC packet transmission is more urgent than CSI-RS transmission. In an embodiment of the present disclosure, CSI-RS transmission and CSI-RS reporting can be re-triggered by the gNB / BS.

[0136] In case of a collision, URLLC packets are transmitted instead of CSI-RS, so the UE measuring the CSI-RS will have incorrect measurements and the CSI report will be incorrect. When CSI-RS is transmitted periodically and there is no measurement restriction, the UE can send a CSI report based on the measurement of any CSI-RS transmission. Therefore, the CSI report should be based on the measurement of the latest N CSI-RS transmissions. In an embodiment of the present disclosure, N can be one. Based on this situation, the gNB / BS will know whether the CSI report is correct because it knows which CSI-RS has a collision. In an embodiment of the present disclosure, it can be signaled whether the restriction is applied. It can also be implicit, that is, the UE applies it if URLLC is configured.

[0137] Fig.15 is a block diagram of a user equipment according to an embodiment of the present disclosure.

[0138] refer to Fig.15 , the UE may include a transceiver 1510 and a controller 1520 that controls the overall operation thereof.

[0139] The transceiver 1510 may transmit signals to other network entities and receive signals from other network entities.

[0140] The controller 1520 may control the UE to perform a function according to one of the previously described embodiments. For example, the controller 1520 may receive scheduling information for a first uplink packet transmission in a first time slot from a base station; determine whether the first uplink packet transmission in the first time slot is restricted based on information corresponding to a second uplink packet transmission in the first time slot of another terminal; and if the first uplink packet transmission in the first time slot is restricted, skip the first uplink packet transmission in the first time slot.

[0141] Although the controller 1520 and the transceiver 1510 are shown as separate entities, they may be implemented as a single entity, such as a single chip. The controller 1520 and the transceiver 1510 may be electrically connected to each other.

[0142] The controller 1520 may be a circuit, a dedicated circuit, or at least one processor. A memory unit storing corresponding program codes may be used to implement UE operations. Specifically, the UE may be equipped with a memory unit to store program codes that implement the desired operations, and the controller 1520 may read and execute the program codes stored in the memory unit.

[0143] Fig.16 is a block diagram of a base station according to an embodiment of the present disclosure.

[0144] refer to Fig.16, the base station may include a transceiver 1610 and a controller 1620 that controls the overall operation thereof.

[0145] The transceiver 1610 may transmit signals to other network entities and receive signals from other network entities.

[0146] The controller 1620 may control the base station to perform functions according to one of the previously described embodiments. For example, the controller 1620 may transmit first scheduling information for a first uplink packet transmission in a first time slot to a first terminal; transmit second scheduling information for a second uplink packet transmission in a first time slot to a second terminal; determine whether the first uplink packet transmission in the first time slot is restricted based on the second scheduling information; and if the first uplink packet transmission in the first time slot is restricted, receive the second uplink packet transmission in the first time slot from the second terminal.

[0147] Although the controller 1620 and the transceiver 1610 are shown as separate entities, they may be implemented as a single entity, such as a single chip. The controller 1620 and the transceiver 1610 may be electrically connected to each other.

[0148] Controller 1620 may be a circuit, a dedicated circuit, or at least one processor. A memory unit storing corresponding program codes may be used to implement base station operations. Specifically, the base station may be equipped with a memory unit to store program codes that implement the desired operations, and controller 1620 may read and execute the program codes stored in the memory unit.

[0149] It should be understood that Figures 1 to 16 The schemes or methods and devices or components shown in the present disclosure are not intended to limit the scope of the present disclosure. It is obvious to those skilled in the art that the present disclosure can be practiced with only some aspects, including Figures 1 to 16 The components, entities, and operations described in .

[0150] The BS operation and UE operation described herein can be implemented using a memory unit storing corresponding program codes. Specifically, the BS or UE can be equipped with a memory unit to store program codes that implement the desired operation. In order to perform the desired operation, the controller of the BS or UE can read and execute the program code stored in the memory unit by using at least one processor or central processing unit (CPU).

[0151] The various components and modules of the entities, base stations or user equipment described in this specification may be implemented using hardware (such as complementary metal oxide semiconductor (CMOS) logic circuits), software, firmware (such as software stored in a machine-readable medium), or a combination thereof. For example, various electrical structures and schemes may be implemented using circuits such as transistors, logic gates, and ASICs.

[0152] While the present disclosure has been shown and described with reference to various embodiments thereof, it will be understood by those skilled in the art that various changes in form and details may be made without departing from the spirit and scope of the present disclosure as defined by the appended claims and their equivalents.

Claims

1. A method performed by a first terminal in a wireless communication system, the method include: receiving from a base station information about a radio network temporary identifier RNTI related to preemption, the RNTI being dedicated for monitoring a preemption indication in a physical downlink control channel PDCCH; Based on the RNTI associated with the preemption, receiving the preemption indication in the PDCCH from the base station by monitoring the PDCCH, wherein the preemption indication indicates a physical resource block (PRB) of an orthogonal frequency division multiplexing (OFDM) symbol and resources for an ultra-reliable and low-delay communication (URLLC) transmission sent to a second terminal; and Downlink data is received from the base station without resources indicated by the preemption indication.

2. The method according to claim 1, in, The receiving of the information about the RNTI related to the preemption also includes: Information about resources of the PDCCH is received from the base station.

3. The method according to claim 1, in, Said information about said preemption related RNTI is provided by higher layer signaling.

4. The method according to claim 1, further comprising: include: identifying skipping of uplink transmissions scheduled in the resources, the resources indicated by the preemption indication; as well as Wherein, reception of a channel state information reference signal CSI-RS on the resource is interrupted for the URLLC transmission sent to another terminal.

5. A method performed by a base station in a wireless communication system, the method include: Sending information about a radio network temporary identifier RNTI related to preemption to the first terminal, where the RNTI is dedicated to monitoring a preemption indication in a physical downlink control channel PDCCH; Sending the preemption indication in the PDCCH to the terminal based on the preemption-related RNTI, wherein the preemption indication indicates a physical resource block (PRB) of an orthogonal frequency division multiplexing (OFDM) symbol and resources of an ultra-reliable and low-delay communication (URLLC) transmission sent to the second terminal; and Sending the URLLC transmission to the second terminal on resources not indicated by the preemption indication.

6. The method according to claim 5, in, The sending of the information about the RNTI related to the preemption also includes: Information on resources of the PDCCH is sent to the terminal.

7. The method according to claim 5, in, Said information about said preemption related RNTI is provided by higher layer signaling.

8. The method according to claim 5, further comprising: include: identifying skipping of uplink transmissions scheduled in the resources, the resources indicated by the preemption indication; as well as Wherein, the transmission of the channel state information reference signal CSI-RS on the resource is interrupted for the URLLC transmission sent to another terminal.

9. A first terminal in a wireless communication system, the terminal include: Transceiver; as well as At least one processor coupled to the transceiver, configured to: receiving information about a radio network temporary identifier RNTI related to preemption from a base station, the RNTI being dedicated to monitoring a preemption indication on a physical downlink control channel PDCCH, Based on the RNTI related to preemption, receiving the preemption indication in the PDCCH from the base station by monitoring the PDCCH, wherein the preemption indication indicates a physical resource block PRB of an orthogonal frequency division multiplexing OFDM symbol and resources for ultra-reliable and low-delay communication URLLC transmission sent to the second terminal; as well as Downlink data is received from the base station without resources indicated by the preemption indication.

10. The terminal according to claim 9, in, The at least one processor is further configured to: Information about resources of the PDCCH is received from the base station.

11. The terminal according to claim 9, in, Said information about said preemption related RNTI is provided by higher layer signaling.

12. The terminal of claim 9, wherein the at least one processor is further configured to: identify skipping of uplink transmissions scheduled in the resources, the resources indicated by the preemption indication; and in, Interrupt reception of a channel state information reference signal CSI-RS on the resource for the URLLC transmission to be sent to another terminal.

13. A base station in a new wireless communication system, the base station include: Transceiver; as well as At least one processor coupled to the transceiver, configured to: Sending information about a radio network temporary identifier RNTI related to preemption to the first terminal, where the RNTI is dedicated to preemption indication in a physical downlink control channel PDCCH, Sending the preemption indication in the PDCCH to the terminal based on the preemption-related RNTI, wherein the preemption indication indicates a physical resource block (PRB) of an orthogonal frequency division multiplexing (OFDM) symbol and resources for an ultra-reliable and low-delay communication (URLLC) transmission sent to a second terminal; and Sending the URLLC transmission to the second terminal on resources not indicated by the preemption indication.

14. The base station according to claim 13, in, The at least one processor is further configured to: Information on resources of the PDCCH is sent to the terminal.

15. The base station according to claim 13, in, Said information about said preemption related RNTI is provided by higher layer signaling.

16. The base station according to claim 13, wherein the at least one processor is further configured to: identify skipping of uplink transmissions scheduled in the resources, the resources indicated by the preemption indication; and in, Interrupt the transmission of the channel state information reference signal CSI-RS on the resource for the URLLC transmission sent to another terminal.