A subway heavy load rescue slope control method and system

Through real-time traction control and coupler gap management, the train traction and braking capabilities are integrated to solve the problem of braking relief and coupler collision during heavy-load rescue hill start, improve the hill start success rate and operating efficiency, and avoid rolling stock and motor damage. , improving the stability and image of subway operations.

CN115402371BActive Publication Date: 2024-10-18SHANDONG JIAOTONG UNIV +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202211175261.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-26
Publication Date
2024-10-18
Estimated Expiration
2042-09-26

AI Technical Summary

Technical Problem

Existing train control methods fail to effectively consider braking relief timing, collision problems caused by coupler clearance, human operation cooperation errors, integration of traction and braking capabilities, and coupler impact at extreme slopes during heavy-load rescue hill start. This can lead to problems such as car slipping, affecting operational efficiency and image.

Method used

Through real-time tracking of traction control, we manage and control the braking and mitigation of the two trains, reasonably control the coupler gap, and use sensors and control systems to integrate the traction and braking capabilities of the rescue train and the rescued train to ensure high power output of traction torque and avoid hook collision. damage and motor damage.

Benefits of technology

It effectively avoids hook damage, backsliding and motor damage under heavy-load hill-lift rescue conditions, improves the hill-lift success rate and operational efficiency, reduces human operating errors, and improves the stability and image of subway operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115402371B_ABST
    Figure CN115402371B_ABST
Patent Text Reader

Abstract

The present invention provides a subway heavy-load rescue slope start control method and system, which relates to the field of train control technology, including obtaining a train driver's rescue instruction and starting a rescue process, determining the state of a rescued train, judging whether the rescued train has communication capability and whether it has controlled traction and braking capabilities; establishing communication with the rescued train according to the rescue instruction and the rescued vehicle situation, obtaining the speed, load, maximum applicable traction, line information, and coupler gap data of the current rescued vehicle and the rescue vehicle; interactively analyzing the obtained data, determining the output control instruction according to the current train state and the rescue stage, and then sending the control instruction to the rescue vehicle and the rescued vehicle, wherein the vehicle controls the corresponding traction and braking according to the control instruction, thereby realizing a rescue closed-loop control process, and avoiding the problem that traditional vehicle control methods are not applicable under heavy-load rescue slope start conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of train control, and in particular to a subway heavy-load rescue slope start control method and system. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] Heavy-load rescue is a rescue condition that subway trains may encounter during operation. When the rescued train fails under full-load conditions and loses traction or even braking ability, another train is needed to serve as a rescue train, connect with the rescued train, and tow or push the vehicle back to the station to achieve rescue.

[0004] If a steep section of road is encountered during the rescue process, such as a slope of more than 38‰, or even if the rescue train itself breaks down on a steep section of road, the problem of heavy-load rescue on the slope will arise.

[0005] When starting a heavy-load rescue on a slope, there are several factors that affect the success rate and quality of the slope start. The first is the slope of the ramp. In some subway operating lines and foreign subway lines, the maximum slope can even reach 60‰. The second is that if the rescued train and the rescue train are fully loaded, the slope component of the vehicle gravity due to the large slope is very large. The third is that the two trains are connected by couplers, but there is a coupler gap between the couplers. The existence of this free gap will cause impact force in the case of unfavorable towing or pushing. This impact force is a great challenge to the traction motor and the car body. The fourth is whether the holding brake is relieved in time. When the rescued train and the rescue train are not started on the slope, the holding brake will be applied to prevent slipping. Timely release of the holding brake can keep the train stable on the slope. The fifth is whether the traction braking capacity of the rescued train can be effectively exerted during the rescue process. Only by fully integrating the traction braking capacity of the rescue train and the rescued train can the slope start process be better controlled.

[0006] Among the existing train control methods, one is that when a subway vehicle encounters a heavy-load rescue slope start, it is treated as a normal working condition, that is, after the two trains are successfully coupled, the rescued vehicle releases and maintains braking, and the rescue vehicle outputs traction. When the train traction is greater than a certain threshold, the brakes are kept released. If a situation occurs where the two trains need to cooperate in outputting traction / braking force, the drivers of the two trains communicate and cooperate manually. Another method is to use an empty car for rescue and transfer the passengers of the rescued train to the rescue train.

[0007] The inventors found that the above existing methods still have the following problems:

[0008] (1) The difference between the timing of brake release and normal operating conditions is not considered.

[0009] (2) The collision between two trains caused by the gap between the couplers was not considered.

[0010] (3) Human operation can easily lead to errors in coordination between the two train drivers.

[0011] (4) The traction and braking capabilities of the rescue train and the rescued train were not effectively integrated.

[0012] (5) Once a large slope or extreme situation occurs, it is very easy to cause impact on the coupler and even cause the vehicle to slip.

[0013] (6) When using an empty vehicle for rescue, the vehicle closest to the faulty vehicle must be cleared of passengers, which will inevitably affect operational efficiency.

[0014] (7) After the rescue vehicle clears the passengers, the rescued vehicle must clear the passengers again, and the passengers need to be transferred to the rescue vehicle, which has a significant impact on the image of subway operations. Summary of the invention

[0015] In order to solve the above problems, the present invention proposes a subway heavy-load rescue slope start control method and system, which ensures high-power output of traction torque when the train starts on a slope through real-time tracking traction control, manages and controls the braking relief of the two trains, ensures that the braking curves of the rescued train and the rescue train are consistent with the traction force growth curve, and reasonably controls the coupler gap through sensors and control to ensure that abnormal collision between the couplers does not occur between the two trains, thereby effectively avoiding the problems of hook damage, slipping back, and motor damage in subway heavy-load slope start rescue conditions.

[0016] According to some embodiments, the present invention adopts the following technical solutions:

[0017] A subway heavy load rescue slope start control method, comprising:

[0018] Obtain the rescue instruction from the train driver and start the rescue process, determine the status of the rescued train, and judge whether the rescued train has the communication capability and the controllable capability of traction and braking;

[0019] According to the rescue instructions and the situation of the rescued vehicle, establish communication with the rescued train to obtain the speed, load, maximum traction, line information, and coupler gap data of the current rescued vehicle and the rescue vehicle;

[0020] The acquired data are interactively analyzed, and the output control instructions are determined according to the current status of the train and the rescue stage. The control instructions are then sent to the rescue vehicle and the rescued vehicle. The vehicle controls the corresponding traction and braking according to the control instructions to realize the rescue closed-loop control process.

[0021] According to other embodiments, the present invention adopts the following technical solutions:

[0022] A subway heavy load rescue slope start control system, comprising:

[0023] The rescue control module is used to control the entire heavy-load slope rescue process, receive information and send control instructions, and provide a human-computer interaction interface for the rescue train driver to operate;

[0024] The rescue control module establishes a communication connection with the traction adjustment module, the brake control module and the coupler gap management module.

[0025] Furthermore, the rescue control module obtains the driver's rescue command through the human-machine interaction interface to start the rescue process, determine the state of the rescued train, and judge whether the rescued train has the communication capability and whether it has the controlled capability of traction and braking;

[0026] The rescue control module obtains the speed, load, maximum applicable traction, line information, and coupler gap data of the current rescued vehicle and the rescue vehicle, and interacts with the traction adjustment module, the braking force control module, and the coupler gap management module to determine and output control instructions based on the current state of the train and the rescue stage.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] Compared with traditional vehicle control methods, the present invention takes into account the difference between the braking release timing and the normal operating conditions during heavy-load rescue slope starting conditions, the collision problem between the two trains caused by the coupler gap, and the coordination errors easily caused by manual operation by the drivers of the two trains, thereby effectively integrating the traction and braking capabilities of the rescue train and the rescued train.

[0029] The subway heavy-load rescue slope-start control system provided by the present invention aims at the special working conditions of heavy-load rescue slope-starting, and avoids the problem that traditional vehicle control methods are not applicable under the working conditions of heavy-load rescue slope-starting by managing the heavy-load rescue slope-starting control process, integrating the traction and braking capabilities of the rescue vehicle and the rescued vehicle, controlling the timing of maintaining the brake release of the two trains, and managing the coupler gap during the slope-starting process. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0031] Figure 1 A schematic diagram of a system structure provided in an embodiment of the present invention;

[0032] Figure 2A flow chart of a heavy load rescue slope start control method provided in an embodiment of the present invention;

[0033] Figure 3 A control block diagram of coupler gap control using a PID algorithm provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0034] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0035] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0036] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0037] Example 1

[0038] An embodiment of the present invention provides a subway heavy load rescue slope start control method, comprising:

[0039] Step 1: Obtain the rescue instruction from the train driver and start the rescue process, determine the status of the rescued train, and judge whether the rescued train has the communication capability and the controllable capability of traction and braking;

[0040] Step 2: According to the rescue instructions and the situation of the rescued vehicle, establish communication with the rescued train to obtain the speed, load, maximum traction, line information, and coupler gap data of the current rescued vehicle and the rescue vehicle;

[0041] Step 3: Interactively analyze the acquired data, determine the output control instructions based on the current train status and rescue stage, and then send the control instructions to the rescue vehicle and the rescued vehicle. The vehicle controls the corresponding traction and braking according to the control instructions to realize the rescue closed-loop control process.

[0042] Specifically, the control process includes the rescue mode activation phase, coupler gap control during the startup phase, traction force increase and brake release control, stable traction phase, and emergency stop control. According to the speed, load, and line data during the rescue process, the ideal traction force-time rescue curve is calculated, and the reference traction force torque and instructions are given. The control instructions include brake release instructions and brake application instructions; the coupler gap change trend information is obtained, and the coupler gap management is achieved through the control of traction. When the driving force generated by the traction force can provide the gravity component of the two trains brought by the brake release to ensure the stable start of the vehicle, the two trains are controlled to release the brake separately.

[0043] Furthermore, during heavy-load slope starting, the traction force is controlled to adjust with the changes in the rescue load to ensure a balance between the traction force and the gravity component of the slope, and between the increase in traction force and maintaining brake relief, thereby ensuring the stability of the train start and stop during the rescue process.

[0044] Based on a subway heavy-load rescue slope start control system, the system includes a rescue control module, a traction adjustment module, a brake control module, and a coupler gap management module.

[0045] As an embodiment, a subway heavy load rescue automatic slope start control process includes:

[0046] S1: Rescue mode start stage

[0047] S10: The rescue train driver enters the rescue mode through the human-computer interaction interface;

[0048] S11: Determine the state of the rescued train, and determine whether the rescued train has the communication capability and whether it has the controlled traction and braking capabilities;

[0049] S12: The rescue driver pushes the traction handle to limit the speed of the train to 5 km / h. The rescue train slowly approaches the rescued train, and the couplers are automatically connected to achieve the coupling of the two trains. After the coupling is successful, the driver is prompted through the human-machine interface, the driver's handle returns to zero, and the holding brake is automatically applied.

[0050] S13: The rescue train establishes communication with the rescued train, and the two trains send test messages to each other, automatically performing communication tests, traction and braking capacity tests, etc.

[0051] S14: Calculate the rescue traction capacity and rescue braking capacity of the two trains in the coupled state based on the traction and braking capacity of the rescued train obtained from the test. If the rescued train loses its communication capacity, the rescue train cannot control the braking, traction and other operations of the rescued train. At this time, the rescue traction capacity is the traction capacity of the rescue train, and the rescue braking capacity is the braking capacity of the rescue train. If the rescued train has normal communication capacity, traction capacity and braking capacity, the rescue traction capacity is the sum of the traction capacities of the two trains, and the rescue braking capacity is the sum of the braking capacities of the two trains. If the rescued train has normal communication capacity and partially lost its traction and braking capacities, the rescue traction capacity is calculated as a percentage of the traction capacity, and the braking capacity is calculated as a percentage of the braking capacity.

[0052] The currently available rescue traction braking capacity is displayed on the HMI to prompt the driver.

[0053] S2: Coupler gap control during the start-up phase

[0054] S20: Determine whether the rescue process is dragging or pushing according to the coupling position and the line ramp information. If the coupling position is at the occupied end, it is a push-up slope start; if the coupling position is at the non-occupied end, it is a drag-up slope start.

[0055] S21: According to the situation of towing and pushing, the rescue vehicle fine-tunes the coupler gap by moving forward or backward. If it is towing, the coupler gap needs to be increased; if it is pushing, the coupler gap needs to be tightened.

[0056] S22: According to the data transmitted by the coupler gap sensor, the coupler gap data obtained is used to analyze the change state of the coupler gap during the rescue process. When an abnormal change trend occurs, the abnormal data is fed back to control the traction braking behavior of the train and adjust the coupler gap distance between the two trains during the rescue process. Check whether the coupler gap meets the conditions for heavy-load slope rescue. If it is towing, the coupler gap should be greater than X mm; if it is pushing, the coupler gap should be less than Y mm. X and Y are determined by the size of the coupler gap, and generally a margin of about 10% is taken, that is, X is generally 90% of the coupler gap, and Y is generally 10% of the coupler gap.

[0057] S3: Traction increase and brake release control

[0058] S30: Calculate the minimum slope starting traction force according to the total mass of the rescue train, the total mass of the rescued train, the slope of the line and other information;

[0059] The calculation formula is: minimum traction force on slope = vehicle weight * slope angle,

[0060] That is, F = (M1 + M2) * 9.8 * X‰ (unit: KN)

[0061] S31: The rescue train enters the traction mode, and the rescue train maintains braking and releases when the rescue train traction force ≥ X, where X is the minimum traction force of a single fully loaded train starting from a slope;

[0062] S32: The rescue train sends a control command to the rescued train through the communication network, and the rescued train outputs traction force according to its traction capacity and feeds back the traction force output value to the rescue train;

[0063] S33: The rescue train calculates the real-time traction of the two trains, and when the traction reaches the minimum slope starting traction of the two fully loaded trains, the brakes of the rescued train are released.

[0064] That is, the rescue train obtains the real-time traction force of each traction unit (including the traction unit of the rescue train and the traction unit of the rescued train) through the communication network, and calculates the sum of the real-time traction forces of the two trains. That is:

[0065] F total = F rescue + F rescued

[0066] S34: During the entire braking release process, it is necessary to compare the traction force, the slope sliding force, and the braking force to ensure that:

[0067] Traction force + maintaining braking force > sliding force down the slope.

[0068] To ensure that the braking force decrease curve of the rescued train and the rescue train is consistent with the traction force increase curve.

[0069] That is to ensure that the train will not slip. Once it is detected that the increase in traction is not enough to compensate for the reduction in braking force, that is, the above inequality no longer holds, it is necessary to stop the release of the holding brake.

[0070] S4: Stable traction phase

[0071] S40: After the holding brakes of the two trains are released, the rescue control module determines whether the slope start is successful based on the real-time speeds transmitted by the two trains. If the real-time speeds transmitted by the two trains are negative, stuck, or too different, an emergency braking command is output, and the two trains apply the brakes at the same time; if the speeds of the two trains increase normally, it is determined that the train rescue slope start is successful.

[0072] S5: Coupler gap control during traction phase

[0073] S50: After the two trains have successfully started on the slope, the module tracks the real-time speed, coupler gap, traction force output value, etc. of the two trains in real time and controls the coupler gap.

[0074] S51: Use a control algorithm (such as PID, fuzzy PID, other intelligent control algorithms, etc.), take the coupler gap as the control target, the difference between the actual coupler gap and the expected coupler gap as input, and the reference value of the rescue train traction force as output to control the coupler gap within a reasonable range.

[0075] Specifically, Figure 3 As shown in the figure, the process of coupler gap control using PID algorithm is as follows:

[0076] After the two trains successfully started on the slope, the rescue train monitored the coupler gap in real time and calculated the difference between it and the expected median coupler gap; the expected median coupler gap calculation is:

[0077] Expected median value of coupler gap = (expected upper limit of coupler gap + expected lower limit of coupler gap) / 2;

[0078] Different from the traditional PID algorithm, in order to meet the over-limit safety of the coupler gap, an over-limit detection link is added. The difference should not exceed (the expected upper limit of the coupler gap - the expected lower limit of the coupler gap) / 2. If it exceeds, it needs to be guided to safety. After the over-limit detection is passed, the PID controller adjusts the speed of the rescue train to control the entire rescue slope starting process so that the coupler gap is kept within the allowable safety range.

[0079] S6: Emergency stop control

[0080] During the entire rescue process, the module monitors the real-time speed and coupler gap of the two trains in real time, and ensures guided braking in emergency situations when there are drastic changes or abnormal values ​​in the train speed, drastic changes in the coupler gap or collisions.

[0081] As an embodiment, the specific process of establishing connection communication and integrating traction and braking capabilities between two trains in the subway heavy load rescue process of the present invention is as follows:

[0082] S101: After the two trains are coupled, the rescue control module sends a re-networking instruction to the vehicle control unit;

[0083] S102: The vehicle control unit of the rescue vehicle sends a re-networking instruction to the vehicle control unit of the rescued train. The vehicle control unit of the rescued train exits the master node mode. All nodes of the two trains are connected to the same network and are uniformly managed by the vehicle control unit of the rescue train. The node addresses are reallocated and communication is established.

[0084] Because after the two trains are connected, there is a process of re-establishing network communication.

[0085] Original status: Each network device (network node) of the rescued train uses its own vehicle control unit as the main node and is controlled by the main node.

[0086] Status after coupling: re-networking and initialization, the vehicle control unit of the rescued train exits the master node mode, and each network device of the rescued train takes the vehicle control unit of the rescue train as the master node and is controlled by the new master node.

[0087] S103: The rescue control unit of the train establishes communication through the train bus and sends a traction braking capability test instruction to the vehicle control unit of the rescued vehicle;

[0088] S104: The rescued vehicle starts the traction and braking capacity test, determines the effective traction and braking capacity, and sends the effective traction and braking capacity to the rescue vehicle; the braking capacity is generally determined by the vehicle control unit sending action instructions to each traction control unit and braking control unit in turn, and then monitoring whether the action instructions are executed. If executed, it is considered that the part is normal, and finally the traction capacity percentage and braking capacity percentage are calculated respectively according to the normal number of traction units or braking units, compared with the total number of traction units and the total number of braking units.

[0089] S105: The rescue control unit adds the traction and braking capabilities of the two trains according to the traction and braking capabilities fed back by the rescued vehicle, and calculates the traction and braking capabilities of the two trains;

[0090] S106: The rescue control unit calculates a braking force increase curve and a traction force increase curve according to the integrated traction and braking capabilities and the train traction and braking characteristics.

[0091] Specifically, for the same vehicle model, the traction force increase curve and the braking force increase curve are generally basically consistent, and the existing fitting method is used to describe the curve.

[0092] As an example, Figure 2 As shown, the heavy load rescue automatic hill-start control method process includes:

[0093] First, after the driver determines the rescue conditions, he needs to activate the rescue mode through the HMI and confirm the status of the rescue train so that the system can enter the rescue mode; then, the driver operates the train for coupling. In the rescue mode, the train will be coupled at a lower running speed, generally 4-6 kilometers per hour;

[0094] Then, the train networks of the two trains are re-networked and communication is established, and the rescue train tests the traction and braking capabilities of the rescued train and calculates the maximum traction and maximum braking force that can be output after the two trains are coupled;

[0095] Furthermore, it is determined whether the rescue train is pushing the rescued train or dragging the rescued train during the current rescue slope start, and the initial value of the coupler gap is adjusted according to different situations to ensure safety at the start time;

[0096] Furthermore, the rescue train first outputs traction, and when the traction is greater than the calculated minimum traction for starting on a slope, the braking release action is performed; then, the rescued train outputs traction, and at this time the rescue train controls the total traction exerted by the two trains, and when the traction is greater than the calculated minimum traction for starting on a slope, the rescued train maintains braking release; after both trains are released, the speeds, traction output values, coupler gaps, etc. of the two trains are monitored in real time to determine whether the starting on a slope is successful; if not, emergency braking is performed to ensure safety by stopping the vehicle; if successful, the coupler gap is controlled during the starting on a slope through PID, fuzzy PID, other intelligent control algorithms, etc., to keep it within a safe range;

[0097] As the rescue slope start proceeds, when it is detected that the slope is less than a certain threshold (such as 10‰), the rescue slope start is considered to be completed, and the vehicle control unit takes over the traction braking control.

[0098] Example 2

[0099] In one embodiment of the present invention, a subway heavy load rescue slope start control system is provided, such as Figure 1 As shown, including:

[0100] The rescue control module is used to control the entire heavy-load slope rescue process, receive information and send control instructions, and provide a human-computer interaction interface for the rescue train driver to operate;

[0101] The rescue control module establishes a communication connection with the traction adjustment module, the brake control module and the coupler gap management module.

[0102] Furthermore, the rescue control module obtains the driver's rescue command through the human-machine interaction interface to start the rescue process, determine the state of the rescued train, and judge whether the rescued train has the communication capability and whether it has the controlled capability of traction and braking;

[0103] The rescue control module obtains the speed, load, maximum applicable traction, line information, and coupler gap data of the current rescued vehicle and the rescue vehicle, and interacts with the traction adjustment module, the braking force control module, and the coupler gap management module to determine and output control instructions based on the current state of the train and the rescue stage.

[0104] The traction adjustment module controls the traction to adjust as the rescue load changes during heavy-load ramp starting, ensuring a balance between the traction and the gravity component of the ramp, and between the increase in traction and maintaining brake relief, thereby ensuring the stability of the train start and stop during the rescue process.

[0105] The traction adjustment module interacts with the rescue control module, the brake control module, and the coupler gap management module; through the rescue control module, the rescue process stage information, speed, load, maximum applicable traction, line information and other data of the rescued vehicle and the rescue vehicle are obtained; through the brake control module, the brake release instruction and brake application instruction information are obtained; through the coupler gap management module, the coupler gap change trend information is obtained, and the coupler gap is managed by controlling the traction force; the module controls the reference traction torque and instructions based on the received rescue process stage information, speed, load, line and other information.

[0106] Furthermore, the brake control module is used to manage the release of the brake and the application of emergency brakes. When the traction force reaches a certain percentage, the propulsion force generated can provide support for the gravity component of the two trains brought by the release of the brakes, and when the vehicle starts stably, the two trains are controlled to release the brakes separately; at the same time, when an abnormal situation occurs during the rescue process, it is also necessary to have the ability to apply emergency brakes in any case.

[0107] The braking control module interacts with the rescue control module, the traction adjustment module, and the coupler gap management module; through the rescue control module, it obtains data such as the rescue process stage information, speed, real-time braking force application value, and line information; through the traction adjustment module, it obtains real-time traction torque; through the coupler gap management module, it obtains coupler gap alarm information and outputs emergency braking force application instructions in dangerous situations; this module determines whether the train is in the slope start stage based on the received rescue process stage information, speed, line information, etc., determines the appropriate time based on the size of the real-time traction torque, and outputs instructions to release the holding brake.

[0108] The coupler gap management module analyzes the change status of the coupler gap during the rescue process by acquiring the coupler gap data. When an adverse change trend occurs, it feeds back to the rescue control module to control the traction and braking behavior of the train to avoid a large impact between the two trains due to the coupler gap during the rescue process.

[0109] The coupler gap management module interacts with the rescue control module, traction adjustment module, and brake control module; provides real-time coupler gap data to the rescue control module, traction adjustment module, and brake control module; and provides the rescue control module with information such as whether the coupler gap is tightened into place, whether the coupler gap is stretched into place, and the trend of coupler gap changes.

[0110] In addition, the rescue control module is responsible for interface communication with the human-machine interface, vehicle control unit, traction control unit, brake control unit, etc. outside the system. Traction force adjustment, brake release, coupler gap control and management are completed in each module within the system, and internal interface control is performed through the rescue control module. After the two trains are coupled, the train buses of the two trains are connected, re-networked and communication is established, and the rescue control module communicates with the other train through the vehicle control unit.

[0111] Each system module of Example 2 specifically executes the specific steps of the control method in Example 1.

[0112] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0113] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0114] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A method for controlling the slope start of a heavy-load rescue operation in a subway. It is characterized in that include: Obtain the rescue instruction from the train driver and start the rescue process, determine the status of the rescued train, and judge whether the rescued train has the communication capability and the controllable capability of traction and braking; According to the rescue instructions and the situation of the rescued vehicle, establish communication with the rescued train to obtain the speed, load, maximum traction, line information, and coupler gap data of the rescued vehicle and the rescue vehicle; The acquired data are interactively analyzed, and the output control instructions are determined according to the current train status and rescue stage. The control instructions are then sent to the rescue vehicle and the rescued vehicle. The vehicle controls the corresponding traction and braking according to the control instructions to realize the rescue closed-loop control process. Specifically: During heavy-loaded ramp start, the traction force is controlled to adjust with the change of rescue load, ensuring the balance between traction force and the gravity component of the ramp, and between the increase of traction force and the maintenance of brake relief, so as to ensure the stability of train start and stop during the rescue process; According to the speed, load and route data during the rescue process, the ideal traction force-time rescue curve is calculated, and the reference traction force torque and instructions are given; When the driving force generated by the traction force can provide the weight component of the two trains brought by the brake release to ensure the stable start of the vehicle, the two trains are controlled to release the brakes and maintain them; By acquiring the coupler gap data, the changing state of the coupler gap during the rescue process is analyzed. When an abnormal change trend occurs, the abnormal data is fed back to control the traction and braking behavior of the train and adjust the coupler gap distance between the two trains during the rescue process. After the holding brakes of the two trains are released, the real-time speeds transmitted by the two trains are used to determine whether the ramp start is successful. After the trains are successfully ramped, the real-time speeds, coupler gaps, and traction output values ​​of the two trains are tracked in real time to control the coupler gaps. During the entire rescue process, the real-time speed and coupler gap of the two trains are monitored in real time. When the train speed changes drastically or shows abnormal values, or the coupler gap changes drastically or collides, guide braking is ensured in an emergency.

2. A subway heavy load rescue slope control method as claimed in claim 1, It is characterized in that The control instructions include maintaining the brake release instruction and the brake application instruction; obtaining the coupler gap change trend information, and realizing the coupler gap management by controlling the traction force.

3. A subway heavy load rescue slope control method as claimed in claim 1, It is characterized in that The control process includes the rescue start-up phase, coupler gap control during the start-up phase, traction increase and brake release control, traction stabilization phase, and emergency stop control.

4. A subway heavy load rescue slope start control method as claimed in claim 3, It is characterized in that The coupler gap control process in the startup phase is as follows: The rescue process is determined as towing or pushing based on the coupling position and line ramp information. If the coupling position is at the occupied end, it is a push-start slope; if the coupling position is at the non-occupied end, it is a towing slope. According to the towing or pushing situation, the rescue vehicle fine-tunes the coupler gap by moving forward or backward. If it is towing, the coupler gap is increased; if it is pushing, the coupler gap is tightened.

5. A subway heavy-load rescue slope control system, It is characterized in that include: The rescue control module is used to control the entire heavy-load slope rescue process, receive information and send control instructions, and provide a human-computer interaction interface for the rescue train driver to operate; The rescue control module establishes communication connection with the traction adjustment module, the brake control module and the coupler gap management module; the rescue control module obtains the driver's rescue command through the human-computer interaction interface to start the rescue process, determine the state of the rescued train, and judge whether the rescued train has communication capability and whether it has the controllable capability of traction and braking; The rescue control module obtains the speed, load, maximum applicable traction, line information, and coupler gap data of the current rescued vehicle and the rescue vehicle, and interacts with the traction adjustment module, the braking force control module, and the coupler gap management module, and determines and outputs control instructions according to the current state of the train and the rescue stage, specifically: During heavy-loaded ramp start, the traction force is controlled to adjust with the change of rescue load, ensuring the balance between traction force and the gravity component of the ramp, and between the increase of traction force and the maintenance of brake relief, so as to ensure the stability of train start and stop during the rescue process; According to the speed, load and route data during the rescue process, the ideal traction force-time rescue curve is calculated, and the reference traction force torque and instructions are given; When the driving force generated by the traction force can provide the weight component of the two trains brought by the brake release to ensure the stable start of the vehicle, the two trains are controlled to release the brakes and maintain them; By acquiring the coupler gap data, the changing state of the coupler gap during the rescue process is analyzed. When an abnormal change trend occurs, the abnormal data is fed back to control the traction and braking behavior of the train and adjust the coupler gap distance between the two trains during the rescue process. After the holding brakes of the two trains are released, the rescue control module determines whether the ramp start is successful based on the real-time speeds transmitted by the two trains. After the trains are successfully ramped, the module tracks the real-time speeds, coupler gaps, and traction output values ​​of the two trains in real time to control the coupler gaps. During the entire rescue process, the module monitors the real-time speed and coupler gap of the two trains in real time, and ensures guided braking in emergency situations when there are drastic changes or abnormal values ​​in the train speed, drastic changes in the coupler gap or collisions.

Citation Information

Patent Citations

  • Micro-rail faulted train rescue method and system

    CN109532855A

  • Train brake control method and device

    CN110758360A

  • Traction brake control method, system and equipment for rescue vehicle

    CN111086533A

  • Control method for relief drive of personal rapid transit

    KR101073860B1